Kurobegawa No.4 Power Plant Toyama Prefecture, Japan (Asia)

Similar documents
Guide to the L. F. Manis Photographs

Guide to the L. F. Manis Photographs

(4) Protected Areas in Japan 4-1) Outlines of Protected Area Systems in Japan

The Potentially Dangerous Glacial Lakes

EPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić

WP4.4 Cordevole MCA alternatives description

The Vjosa River in Albania

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

The Nature Conservation Society of Japan

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

UNIT 5 AFRICA PHYSICAL GEOGRAPHY SG 1 - PART II

Guide to the Boulder City 31ers Photograph Collection

Working Across political Boundaries to Realize Quality Infrastructure Investment -Case of Japan-

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

GLOFs from moraine-dammed lakes: their causes and mechanisms V. Vilímek, A. Emmer

Crisis and Strategic Alliance in Aviation Industry. A case study of Singapore Airlines and Air India. Peter Khanh An Le

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION REGION 4 SALT LAKE CITY, UTAH. May 29, 1958

Shrubs and alpine meadows represent the only vegetation cover.

Europe s wild jewel - The Vjosa River in Albania

Concrete Visions for a Multi-Level Governance, 7-8 December Paper for the Workshop Local Governance in a Global Era In Search of

Climate Change Impacts on Glacial Lakes and Glacierized Basins in Nepal and Implications for Water Resources

Cofferdam Performance Hurricanes Harvey & Irma

ECOTOURISM For Nature Conservation and Sustainable Mountain Tourism

Hydro-Electric Schemes Compliance Report June June 2013

Optimizing the Benefits of Regional Tourism Cooperation

China: Natural Environments. Outline. Group Discussion. Territory and Location. Neighbors. Topography Hydrology/river systems. News on China?

Introduction on the Taedong River Basin.

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA

Water quality management in the Lake Baikal region of Russia

Participatory conservation activities involving local stakeholders and international network in Mt. Hakusan Biosphere Reserve, Japan

Adoption and Maintenance of Sustainable Drainage Systems in South Cambridgeshire. Council Policy. Published by South Cambridgeshire District Council

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

Guide to the Virginia "Teddy" Fenton Photograph Collection on the Hoover Dam and Boulder City, Nevada

Water in the Amazon. By Heather and Georgie

The Isonzo/Soca river basin

Greening of the Straits of Malacca

Ex-Ante Evaluation (for Japanese ODA Loan)

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

Hakuba Ski Package - Samurai Tours 1 of 8 8/1/17, 5:12 PM

A Statistical Guide to Gifu Prefecture

Impacts of climate change and water induced disasters in high altitude on hydropower development in Nepal. Rijan Bhakta Kayastha, D. Sc.

Wilderness Areas Designated by the White Pine County bill

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH

Current condition of tourism exchange between Taiwan and Hokuriku district and its promotive measure

Improvements for Business Aviation in Japan

Name: Watarase-gawa N ~ Length of main stream: 108 km

Catchment and Lake Research

2.1 Physical and Biological Description Matabitchuan River Watershed

ALBERTA ADVENTURE SUMMER

ENLOE HYDROELECTRIC PROJECT FERC PROJECT NO PUBLIC SAFETY PLAN. Final

AN OUTLINE OF THE NILE BASIN

Parks & Recreation Areas Program

SNOW WALL TOUR TOKYO TOKYO, KOFU, TATEYAMA, FUJI, HAKONE, JAPAN 5 DAYS 4 NIGHTS PRICE FROM: 76,000~ MUSLIM PACKAGE MID APR MID JUN TOUR CODE: SW-01

浅間温泉. Asama Hot Spring. Next. A Timeless Hot Spring 1,300 Years of Peace and Relaxation, for Samurai, Peasant and Weary Traveler Alike.

The Vjosa River BEAUTIFUL, UNKNOWN AND THREATENED. Vjosa River, Downstream Kalivaçi Construction site. Photo: B.Hoxha

WALKER SWAMP INFORMATION DAY Saturday 23 rd June 2018

TEPCO s Measures to Preserve the Nature of Oze

Lake Chelan Operations

NORTH CASCADE SLACIER CLIMATE PROJECT Director: Dr. Mauri S. Pelto Department of Environmental Science Nichols College, Dudley MA 01571

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

Brown bear (Ursus arctos) fact sheet

Adaptation in the Everest Region

The Lower Prut Floodplain Natural Park (Romania)

Turning crisis into opportunity!

3D SURVEYING AND VISUALIZATION OF THE BIGGEST ICE CAVE ON EARTH

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

INTERPRETING TOPOGRAPHIC MAPS (MODIFIED FOR ADEED)

LITTLE LOST MAN CREEK (LLM) (formerly USGS Gaging Station No )

Regional impacts and vulnerability mountain areas

AIRCRAFT ACCIDENT INVESTIGATION REPORT

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST

Flood Control for Typhoon 18 at Yodo River System in Avoidance of Catastrophe through Coordinated Operation of 7 Dams -

Parque Bicentenario Av. Amazonas & Av. de la Prensa, Quito, Ecuador

Deir al Qilt Locality Profile

Overview of Japan s Sustainable Tourism Development

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT

Opportunity and Function of Airport in Lowcost Aviation Development

The Himalayan Future Transition, Equity and Ecological Stability. Jayanta Bandyopadhyay

FOOTPATH MANAGEMENT IN ICELAND A VISUAL REFLECTION ON QUALITY CONCERNS AND FOOTPATH POLICY CONSIDERATIONS

TRANSPORTATION PLANNING AND LOCAL RESIDENTS' EXPECTATIONS IN LESS DEVELOPED AREAS IN JAPAN

State of Conservation Report Sagarmatha National Park (Nepal) (N 120)

Snow/Ice melt and Glacial Lake Outburst Flood in Himalayan region

Extraordinary summer flood in a karst area: case study in Croatia

ZAGORI IN SITU (3-day trip)

Environmentally Sustainable Airport

GEOGRAPHY AND HISTORY

Managing Disasters, Sustaining Development in the Hindu Kush Himalayas

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

Kagoshima Prefecture consists of about 600

Region 1 Piney Woods

THE WARMTH OF WOOD, THE ECONOMY OF PELLETS INNOVATION, TECHNOLOGY, SAVINGS FAIR SRL ITALIAN MADE PELLET STOVES BIO STOVE ADVANTAGES THE PELLET

Intuition! Common Standards for Statistics on Inbound Domestic and Foreign Tourists by Prefecture

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

2008 OCEA Award (Outstanding Civil Engineering Achievement Award)

Estimation of Glacier Lake Outburst Flood and its Impact on a Hydro Project in Nepal

Chile Earthquake 2010

Transcription:

IEA Hydropower Implementing Agreement Annex VIII - Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 14-02: Development of Regional Industries Kurobegawa No.4 Power Plant, Japan Key Issue: 14- Development of Regional Industries Climatic Zone: Cf : Temperate Humid Climate Subjects: - Tourism development centering Kurobe Dam Effects: - Preservation of natural environment - Development of popular tourist spot - Provision of access to remote area for general public use Project Name: Country: Kurobegawa No.4 Power Plant Toyama Prefecture, Japan (Asia) Implementing Party and Period - Project: The KANSAI Electric Power Co., Inc. 1961 (Completion of construction) - - Good Practice: The KANSAI Electric Power Co., Inc. 1964 (Commencement of operation) - Key Words: Environmental protection, Tourism, Discharge for sight seeing Abstract: The project was the first large-scale construction project in Japan that addressed the task of environmental protection. The Alpine Route developed in relation with the project has now become one of the major sightseeing spots in Japan, attracting more than 1,000,000 tourists annually. 1. Outline of the Project The construction of the Kurobe Dam (Kurobegawa No.4 Power Plant) was planned by Kansai Electric Power Co., Inc. to cope with the increase in power demand due to the rapid economic recovery after the Second World War. The dam development plan was developed as the core of the consistently planned development of the Kurobe River System. The scheme was planned to allow future construction of new power plants and expansion of the existing power plant downstream, and involved the development of a large reservoir at the most upstream end of the Kurobe River to enable the existing downstream power plant to be operated during the winter season when there is less rainfall to ensure a stable supply of electricity. Power plant Dam Reservoir Table-1 Kurobegawa No.4 power plant and Kurobe dam specifications Item Specification River system Kurobe Catchment area 202.85 km 2 Start of operation January, 1961 Max. Output 335,000kW Max. Power discharge 72.0m 3 /s Max. Effective head 545.5m Name Kurobe Type Arch Crest length 492 m Max. Height 186 m Volume 1,583,000 m 3 Design Flood Discharge 1,260 m 3 /s Catchment area 184.5 km 2 Impounding area 3.450 km 2 Max. Reservoir capacity 199,285,000 m 3 Effective depth 60 m Normal water level EL. 1,448.0 m

Plan view of Kurobe dam Intake The Kurobe Dam construction site was located in the Chubu Sangaku National Park, which lies among high mountains of about 3,000m Left wing dam high. The plan was a giant project, dam partly funded by the World Bank, involving the construction of the Kurobe largest arch-type dam in Japan (and River the largest in the world at the time) with a height of 186m in a highland Section of Kurobe dam from downstream of about 1,300m above sea level lying between very steep cliffs. Right wing Left wing The dam provided a total reservoir capacity of approximately 200 million m 3, and a maximum power generation capacity of 258,000 kw dam dam (presently 335,000 kw). The Fig.-1 Plan and section view from downstream project attracted a great deal of attention at the time since civil engineers in Japan at the time had no experience with such a grand project, which posed a variety of difficulties, including construction in steep mountain range areas and restrictions imposed by the National Park Law. Table-1 gives power plant and dam specifications. Fig.-1 shows a plan of the dam and a dam section from downstream. Right wing dam 2. Features of the Project Area Approximately 86 km long Kurobe River with its average inclination as steep as 1/40 China originates in the Northern Japan Japan Alps comprised of mountains with their altitudes around 3,000m and flows north into the Sea of Japan. The site is located in one of Japan s most rainy and snowy regions with an average annual precipitation of about 4,000mm. Abundant rain in the summer months and snow in the winter months provide the Kurobe River Kurobe Dam with a constant, abundant supply of water throughout the year. Because of its ideal climate, the Kurobe River basin has been developed for hydropower Fig.-2 Site location generation for many years. The Kurobe River was originally formed by uplifts due to orogenic movements and thousands of years of erosion by ice, snow, and flowing water from the Ice Age. The banks of the main stream have been sharpened off by its steep flow where a number of tributaries merge along the way leaving gorges and cliffs in places. The canyon, the Kurobe River Canyon, had 2

been regarded as one of the untouched natural beauties in Japan where most of the Canyon is designated as Chubu Sangaku National Park for its beautiful landscape. However, because of the steep topography and harsh climate, the beauty of the Canyon had been hidden from the general public except for some mountaineers. Majority of the area surrounding the Kurobe Dam site is designated as National Forests, with especially important parts of the area designated as special zones or special conservation zones. The hunting of wildlife such as Japanese serow, a specially protected species, ermine, and ptarmigan, the alpine plants, and construction of structures are strictly restricted. 3. Benefits 3.1 Characteristics of the Dam Construction 1) Protection of the Natural Environment The construction of the Kurobe Dam was the first large-scale dam construction project in Japan that addressed the task of preserving natural environment. The dam construction site was located in the Chubu Sangaku National Park and under strict regulation under the National Parks Law (enacted in 1931 and changed into the Natural Parks Law in 1957). In order to achieve economical efficiency and a satisfied level of safety under the unique topographical and climatic conditions as well as the need to preserve the natural environment of the precious area, Kansai Electric Power Co., Inc. constructed a fully underground power plant with all power generation and transformation facilities (including water channels, surge tanks, penstocks, plant buildings, transformer station, and switching station) buried underground and only a few facilities such as the dam body and water intake appearing above ground. 2) Discharge for Sightseeing One of the conditions, imposed by the Ministry of Health and Welfare (now the Ministry of Health, Labour, and Welfare) that had to be met to commence the project was to discharge dam water to the downstream corridor around Juji-gorge, sightseeing spot. The dam currently discharges up to 15m 3 /s of water depending on the season and the time of the day in a form of mist via howell-bunger valves installed in the dam body. This way of discharging is primarily to protect the bedrock immediately downstream of the dam. However it has now become a sightseeing attraction creating a rainbow over the downstream face of the dam (See Fig.-3). Fig.-3 Discharge from Kurobe Dam 3) Material Hauling Road As the site was located in a remote area, efficient hauling of considerable amount of construction materials and large equipment into the Canyon was the key to successful construction within given short period of time. The only roads in the mountain range that led to the dam site were trekking path for mountaineers at the time, and there was a necessity to construct an appropriate material hauling road. As a result of careful route mapping taking into consideration various factors such as the route length, site conditions, and harsh winter climate, it was decided to adopt a 25.2km route connecting to Ohmachi City in Nagano prefecture. This long route was comprised of a 5.4km tunnel section (Kanden Tunnel) that was to run through Mt. Akazawa (E.L. 2,678m) and Mt. Narusawa (E.L. 2,641m) from the right bank of the dam, a road that was to be newly constructed, and existing road section that was to be upgraded. The excavation of the tunnel became troublesome when a serious fracture zone was hit. The struggle to penetrate became widely known throughout Japan that a movie on the struggle was created starring a famous actor. The permission to construct the hauling road was given by the government on a condition that the road is to be available for public use after completion of the project. The road is now being used as a touring route. 3

3.2 Development of tourism spot centering Kurobe Dam The Kurobe Dam standing in harmony with nature has been a tourism spot since the completion of the project. The former material hauling road connecting the dam from its right bank and Nagano allows tourists from Nagano prefecture to visit the site. In addition, Tateyama-Kurobe Tourism Co developed a route connecting the dam from its left bank and Toyama prefecture. Hence by 1971, the route connecting Nagano and Toyama prefecture via the Kurobe Dam, the Tateyama-Kurobe Alpine Route, was completed. See Fig.-4 below. Shinano-Ohmachi Nagano Toyama Kurobe dam Fig.-4 The Tateyama-Kurobe Alpine Route The 90km long Alpine Route allows tourists to visit the 3,000m high Northern Japan Alps and enjoy beautiful panoramic views from 8 different means of transportation including trolley bus, cable car, and ropeway (See Fig.-5). In particular, the Kurobe Dam having the largest dam height in Japan and the dam reservoir with emerald water are regarded as the highlight of this route. Various facilities, including boats, lakeside walks, and resting places and lookouts on the dam, have been developed in and around the area. Fig.-5 The Rope way with Kurobe dam behind 4. Effects of the Benefits The Tateyama-Kurobe Alpine Route that was developed in relation with the Kurobe Dam construction project has now become one of the major tourists spots in Japan, attracting more than 1,000,000 tourists every year. It also ranks top for the most popular tourism spot to visit in Toyama prefecture and the spin-off it provides to the local economy can be considered significant. 5. Reasons for Success The reasons that enabled the Kurobe Dam construction project to spin-off a number of socioeconomic benefits in addition to its fundamental function to provide hydroelectric power can be thought as follows: 1) Location The Kurobe Dam is located in the Chubu Sangaku National Park that lies in an area abundant of untouched nature and considered as one of the few untouched beauties in Japan. 2) Protection of the natural environment and preservation of natural landscape The project has given a great deal of consideration to the fact that the site was located in a national park and strived to protect and preserve natural environment and landscape by constructing fully 4

underground facilities or by carrying out re-vegetation of damaged areas due to construction work. The 186m-high Kurobe arch dam is also designed in perfect harmony with the surrounding natural environment of the Canyon. 3) Cooperation with the Local Community The project assisted the local government and local tourism developers in their development of a magnificent sightseeing route including a route through the Kurobe Dam as one of the major sightseeing spots, by providing the hauling road for public use or assisting the construction of tourism facilities in and around the Kurobe Dam site. 4) The popularity of the project The Kurobe Dam project is known as a project of the century throughout Japan. The great success of the movie depicting the long and hard struggle to excavate Kanden Tunnel is thought to have a significant effect in publicizing the project and its spin-offs. 6. Outside Comments 1) Kitanihon Shimbun (Feb. 24, 2001) Kazuo Kido, a trustee for World Heritage of the National Federation of UNESCO Associations in Japan (Tokyo), said, Tateyama-Kurobe has values as both a Natural Heritage and a Cultural Heritage, indicating a possibility that Tateyama-Kurobe may be registered as a Combined Heritage, in which case it would become the first Combined Heritage in Japan. Kido said, Tateyama is an internationally famous mountain range tourism spot that has a long history of mountain worship religions which dates back to 1,300 years ago and beautiful, magnificent natural landscapes. On the other hand, the Kurobe River Canyon has untouched nature and a history of environmentally-friendly power development with related facilities such as the Kurobe Dam and Kurobegawa No.4 Power Plant. 7. Further Information 7.1 References 1) An Overview of Toyama Prefecture, Toyama Prefectural Government 7.2 Inquiries The Kansai Electric Power Co., Inc. URL: http://www.kepco.co.jp/english/index.htmll This case history of hydropower good practice is published for educational and informational purposes only and may not be used for any other purpose. Duplication for commercial purposes is prohibited. The author(s) of this publication make no express or implied warranties concerning this case history, including no warranty of accuracy or fitness for a particular purpose. 5 C New Energy Foundation, Japan, 2006

6