Section I Page 1 Operator/Airframe Details Completion mandatory. Section III Page 2 Signature Block Completion mandatory

Similar documents
APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL

REQUIREMENTS FOR EXTENDED- RANGE OPERATIONS WITH TWO ENGINE AIRCRAFT (ETOPS)

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

APPLICATION FOR LOW. Application received, Date:

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

Surname:... Name of company:... Registration No:... Place of Registration:... Any other SCAA Approval held (quote Approval No.)...

SUBPART C Operator certification and supervision

The name(s) provided will be reflected on the Certificate when issued. The name(s) provided is (are): Surname:... Given Name:... Name of company:...

Flight Safety Division Case Nr. Page 1 of 11

Figure 3.1. Foreign Airport Assessment Aid

EDTO SARPS FROM ANNEX 6 PART 1

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO)

EU-OPS Operations Manual Checklist/Compliance Schedule

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

AOC: MANUAL CONTROL ROSTER

Form SR FCL 1105 (JAR FCL 02) Issue 8 (Jan 2009) Page 1 of 6

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

EXTENDED-RANGE TWIN-ENGINE OPERATIONS

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

Signature: Signature:

Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows:

GUIDANCE MATERIAL FOR Extended Diversion Time Operations (EDTO/ETOPS) Approved by

OPS General Rules for Operations Manuals

Part 125, Amendment 19. Air Operations Medium Aeroplanes. Docket 14/CAR/3

Seychelles Civil Aviation Authority SAFETY DIRECTIVE. This Safety Directive contains information that is intended for mandatory compliance.

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

Operational Procedures

OPERATING PERMIT QUESTIONNAIRE

All-Weather Operations Training Programme

OPERATIONS APPROVAL - EU-OPS OPERATOR NAME... SCHEDULE - THE SPECIFIED REQUIREMENTS Required Yes/No A/C Type Ops Manual Ref. e.g.

CASAS Advisory Pamphlet

Seminar/Workshop on USOAP Continuous Monitoring Approach (CMA) and State Aviation Safety Tools (SAST)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

July 2008 ISSUE, RENEWAL AND RE-ISSUE OF A FLIGHT ENGINEER LICENCE INCLUDING ADDITIONAL CATEGORY AND AIRCRAFT TYPE RATING 1.

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Part 104 CAA Consolidation 1 March 2007 Gliders - Operating Rules

Checklist & Guide for the development of a

Part 121, Amendment 26. Air Operations Large Aeroplanes. Docket 14/CAR/3

Council of the European Union Brussels, 14 October 2016 (OR. en)

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

EVALUATION MANUEL PARTIE D DSA.AOC.CHKL.075

IRELAND SAFETY REGULATION DIVISION

Flight Operations Inspector Manual

Navigation 101 Chapter 3 RNP-10

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS

5/4/2016 ht.ttlms.com

Seychelles Civil Aviation Authority SAFETY NOTICE

HEAD-UP DISPLAY (HUD), EQUIVALENT DISPLAYS AND VISION SYSTEMS

Statement of Compliance Chapter 5: Organisation and Facilities

Regulation (EU) 965/2012 on air operations. and related EASA Decisions (AMC&GM and CS-FTL.1)

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION

CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

OPERATIONS MANUAL. Part D APPENDIX 4

Examiners Record FI/TRI/IRI/SFI/STI (H) Assessment of Competence

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

AC-MMEL/MEL.060 (b) Contents. Subject. CARC Master Minimum Equipment List Preamble

Seychelles Civil Aviation Authority

Application for Low Visibility Operation

Air Operator Certificate Issue / Renewal Application Form (Flight Standards Directorate CAA Pakistan)

REPUBLIC OF SOUTH AFRICA

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

TABLE OF CONTENTS 1.0 INTRODUCTION...

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0

EASA Air Operations Air Operator Certificate

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

Appendix 1(a) to JCAR-FCL 1.055

TEXT OF AMENDMENT 36 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES OPERATION OF AIRCRAFT

Application for Changes requiring prior Approval. FORM

Form SR FCL1175 Issue 1 (Nov 2007) Page 1 of 5

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Safety Criteria for Approval of Extended Range Twin-Engine Operations

Flight Operations Inspector Manual

Airmen s Academic Examination

Web conference: CRD Part-NCC Overview

AERODROME LICENCE APPLICATION PROCESS

Procedures for Approval of Master Minimum Equipment List

Explanatory Note to Decision 2013/022/R

AIR NAVIGATION ORDER

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

OPERATIONAL BULLETIN

Notification of the Department of Civil Aviation

Flight Dispatcher Training and Checking Program

Part 139 Aerodromes. Part 139 Compliance Matrix

Checklist & Guide for the development of a

Declaration and List of Approvals for EASA Part- NCC and Part-SPO Operators

Air Operations - Medium Aeroplanes

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

HONDURAS AGENCY of CIVIL AERONAUTICS (AHAC) RAC-OPS-1 SUBPART Q FLIGHT / DUTY TIME LIMITATIONS AND REST REQUIREMENTS. 01-Jun-2012

CAAV VAR 15 DFR Jan-2011 Version 1.0

Sao Tome and Principe Civil Aviation Regulations

GUERNSEY ADVISORY CIRCULARS. (GACs) TRAINING PROGRAMMES GAC 121/135-1

Annex II to Decision 2018/012/R AMC and GM to Part-ARO Issue 3, Amendment 8

Transcription:

SEYCHELLES CIVIL AVIATION AUTHORITY APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL Applicants are strongly advised to read the 'ETOPS Notes for Completion' before completing the form. Please complete the form in BLOCK CAPITALS using black or dark blue ink. This form is designed to elicit all the required information from those operators requiring ETOPS operations approvals. The completed form and supporting documentation should be submitted to the Flight Operations Inspecttorate of the Safety Regulation at the address listed in the 'Notes for Completion'. Section I Page 1 Operator/Airframe Details Completion mandatory Section II Page 2 ETOPS Notes For Completion Section III Page 2 Signature Block Completion mandatory Section IV Pages 3 to 7 Operator's ETOPS Operations Manual Matrix Completion mandatory SECTION I OPERATOR/AIRFRAME DETAILS 1 Applicant Details - required for all Approval requests Please give the official name and business or trading name(s), address, mailing address, e-mail address and contact telephone/fax numbers of the applicant. Note: For AOC holders - company name, AOC number and e-mail address will suffice. 2 Aircraft Details - required for all Approval requests Aeroplane type(s), series and registration mark(s). Aeroplane Type Aeroplane Series Registration Form SR OPS 1814 Issue 2 (Mar 2010) Page 1 of 7

SECTION II RNP APPROACH NOTES FOR COMPLETION 1 Applicability Extended Operations (ETOPS) applies to operators wishing to use twin-engined aircraft more than 60 minutes' flying time from a suitable diversion aerodrome. Such routes could be long ocean crossings, polar routes or routes where there are limited diversions available, e.g. trans-siberia. The requirements for Operator Approval to carry out ETOPS are laid out in EU-OPS and EASA AMC 20-6. Additional guidance can be found in CAP 789. ETOPS is a major process, which will involve all aspects of a company's operation. It is therefore strongly recommended that your Flight Operations Inspector be contacted before submitting an application. It is likely that MNPS, RVSM and RNP-10 approval will also be required. 2 Operator's ETOPS Operations Manual Matrix Section IV of this application form is the Operator's ETOPS Operations Manual Matrix. All applicants should complete Column 4 of this matrix in full. If more than one type of aircraft/fleet is included in a single application a completed matrix should be included for each aircraft/fleet. Failure to complete the ETOPS Operations Manual Matrix may result in a delay in processing your application. 3 Documents to be included with the application Copies of all documents referred to in Column 4 of the Operator's ETOPS Operations Manual Matrix should be included when returning the completed application form to the Seychelles Civil Aviation Authority. Original documents should not be sent, photocopies are sufficient. Do not send complete manuals, only the relevant sections/pages will be required. Failure to include all relevant documentation may result in a delay in processing your application. 4 Submissions and Enquiries Address for submissions: Contact details for enquiries: Seychelles Civil Aviation Authority Tel : +248 438 4271 Safety Regulation Fax: +248 438 4269 Flight Operations and Flight Crew Licensing Inspectorate E-mail: ops@scaa.sc Seychelles International Airport P.O Box 181 Victoria Seychelles SECTION III SIGNATURE BLOCK Signature:... Name (BLOCK LETTERS):... Appointment:... Date:... Please note that a minimum of 120 working days will normally be required to process and issue an ETOPS approval - if data is missing or omitted the process may take considerably longer. Form SR OPS 1814 Issue 2 (Mar 2010) Page 2 of 7

SECTION IV APPLICANT'S ETOPS SUBMISSIONS MATRIX Please complete your review of your Operations Manual. The ETOPS flight operations minimum requirements are given in the table below. Enter the Operations Manual references in the last column and return the matrix, together with photocopies of the relevant pages of the Operations Manual, to the address given in paragraph 4 of Section II. Operations Manual Subjects Requirements Operator's Operations Manual Part A General Documents/regulations used in compiling ETOPS Manual/Procedures. Brief description of ETOPS. Definitions. Criteria. Approval Qualifications. Training (Initial and Recurrent) and Checking. ETOPS Authorisation. ETOPS Flight Preparation and Planning. EU-OPS EASA AMC 20-6 FAA AC 120-42B Extended Operations. Adequate aerodrome. Approved one-engine inoperative cruise speed. Threshold distance/time. Adequate ETOPS en-route alternate. Equal time points. Rule distance/time. ETOPS segment. ETOPS significant system. Maximum approved diversion time. Dispatch. Company AOC defined operating area. List of certified aircraft types/engine combinations. Approved diversion time. Crew qualifications. ETOPS qualified dispatcher personnel. ETOPS qualified operations staff. ETOPS qualified maintenance personnel. Flight crew training and Operations Manuals. Flight crew currency requirements. Commander's responsibilities. Statement to show when ETOPS are allowed. Aircraft serviceability and MEL. Communication and navigation facilities. Critical fuel scenario. Critical fuel reserve. ETOPS alternate aerodrome selection. ETOPS alternate planning minima. Pre-dispatch and post-dispatch weather minima. Computerised flight plan. Delayed dispatch. Maintenance check (pre-departure service check). Verification flights. Form SR OPS 1814 Issue 2 (Mar 2010) Page 3 of 7

Part A General (continued) Part B Type Specific Flight Crew Procedures. Type-related ETOPS Operations. Crew responsibilities. Flight documentation/chart handling. Fuel management. Weather monitoring. Change of routing. Diversion decision-making. Icing. Crew workload management. Identification of ETOPS aeroplanes. Types of ETOPS operations that are approved. Placards and limitations. One-engine inoperative speed. Type-specific Planning Requirements. ETOPS Fuel Planning. MEL/CDL. Aeroplane Systems. Including critical fuel scenario. ETOPS-specific MEL/CDL items. Performance data. Aerodrome technical differences, navigation fit, communications fit. Part C Route and Aerodrome Instructions Non-normal Procedures. ETOPS Areas and Routes. Navigation failures. Action to be taken on ETOPS-significant system failure. Low fuel scenario. Crew incapacitation. Approved area of operation. ETOPS en-route alternates. Performance restrictions and weather minima for en-route alternates. Meteorological facilities/information. Low altitude cruise information. Route minimum diversion altitudes. MSA restrictions. Route-specific oxygen requirements. Form SR OPS 1814 Issue 2 (Mar 2010) Page 4 of 7

Part D Training Ground, Simulator and Line Training. General: ETOPS overview. ETOPS regulations. ETOPS type design approval. Definitions. Approved one-engine inoperative speed. Maximum approved diversion time. Operator's approved diversion time. ETOPS area of operation. ETOPS routes. ETOPS alternate aerodromes and weather minima. Navigation systems accuracy, limitations and operating procedures. Meteorological facilities and information. In-flight monitoring and procedures. Computerised flight plan. Charts and position plotting. Equal time Normal procedures: Flight planning and dispatch. ETOPS fuel requirements. Route alternate selection - weather minima. MEL - equipment-specific. ETOPS service check and technical log. Pre-flight FMS set-up. Form SR OPS 1814 Issue 2 (Mar 2010) Page 5 of 7

Part D Training (continued) Flight performance progress monitoring. Flight management, navigation and communication systems. Aeroplane system monitoring. Weather monitoring. In-flight fuel management (to include independent cross-checking of fuel quantity). Non-normal procedures: Diversion procedures and diversion 'decisionmaking'. Navigation and communication systems, including appropriate flight management devices in degraded modes. Fuel management with degraded systems. Procedures for single and multiple failures in flight affecting ETOPS sector entry and diversion decisions. Operating on standby power. Operational restrictions associated with system failures including any applicable MEL considerations. ETOPS Simulator Training and Line Flying Under Supervision. Pilots conversion course. Annual refresher course. Form SR OPS 1814 Issue 2 (Mar 2010) Page 6 of 7

Flight Operations Staff and Dispatchers. Outline of training syllabus to include: ETOPS regulations. Operational approval. Aeroplane performance. Diversion procedures. Area of operation. Fuel requirements. Dispatch considerations: MEL, CDL, weather minima and alternate airports. Delayed dispatch. Documentation. Any Further Comments to Support Your Application: Form SR OPS 1814 Issue 2 (Mar 2010) Page 7 of 7