Sudan PBN Implementation Plan PBN SG/3

Similar documents
Sudan PBN Implementation Plan PBN SG/2

What is Flexible Use of Airspace (FUA)?

PBN Airspace Concept. ATS requirements

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

DSNA NAVIGATION STRATEGY

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

APAC PBN UPDATE Slide 1 of xx

PBN and Procedure Design training

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Preparation for ASBU B1 (PBN)

Status of PBN implementation in France

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Implementation of PBN in Armenian airspace

(RN R A N V A V & & RN R P N

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Implementation challenges for Flight Procedures

Título ponencia: Introduction to the PBN concept

34 th Airline/ATS Safety Forum

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

Flight Procedure Design and Cartography

Patrizio Vanni (Project Coordinator)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

MEDUSA & NANSC, Egypt

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

PBN Implementation inside Italian Airspace Status update Summer 2013

THIS INFORMATION IS EMBRAER PROPERTY AND CANNOT BE USED OR REPRODUCED WITHOUT WRITTEN AUTORIZATION.

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Presented by: Trinidad and Tobago

TABLE OF CONTENTS 1.0 INTRODUCTION...

French DSNA approach to CNS rationalization & evolution

Learning Objectives. By the end of this presentation you should understand:

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

PBN Implementation Plan Tonga


ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

NEW FPL Transition Phase & Implementation Stages

MIDANPIRG ATM SG/4 Meeting Amman, Jordan, 29 April 3 May 2018

RNP AR APCH Approvals: An Operator s Perspective

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

Final Approach Operations Symposium

MID Region Air Navigation Strategy

Flight Operations Inspector Manual

EASA RNP (AR) Workshop The Landscape Working Together

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION

PLAN. 1. Generalities 2. Current Situation 3. Future Strategy + Actions required 4. Conclusion. Ministry of transport 2013

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

ICAO PBN Symposium Montreal - October Captain Johnny Woods Head of Flight Operations & Chief Pilot

2012 Performance Framework AFI

Bits to Blocks Aviation System Block Upgrades (ASBU)

A Pilot s perspective

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

PBN Operational Approval Overview

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

Honeywell.com PBN Concepts Krakow, Poland

NATA 2018 AGM & CONFERENCE

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

TWELFTH AIR NAVIGATION CONFERENCE

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

European Aviation Safety Agency

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

ICAO framework for LPV

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Towards the Future ATM

Agenda Item 6-ATM Coordination - Airspace restructuring COLLABORATIVE AIRSPACE DESIGN AND MANAGEMENT. (Presented by Airports Authority of India)

Russian Federation ATM modernization program

Approach Specifications

UK Implementation of PBN

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain

Transcription:

Sudan PBN Implementation Plan PBN SG/3 Cairo, Egypt, 11 13 February 2018

Outline Brief of the State of SUDAN s PBN Implementation Plan Status of Implementation Sudan ATS Surveillance System Sudan ATM System. Lessons Learned Challenges Thoughts/Recommendations Conclusion

SUDAN PBN Implementation Plan SCAA established IFPD section in 2011 by a signing contract with ENAC/CGX Aero (French company). Four ATCOs trained in ENAC in: Non precision App. Precision App. RNP APCH. PBN SG/2 Sharm El Sheikh, 22 25 February 2016 3

SUDAN PBN Implementation Plan IFPD section with the help of CGX designed procedures for 11 airports : RNAV SIDs and STARs for 4 airports. RNP APCH for 4 airports. Precision and Non precision procedures for 4 airports. PBN SG/2 Sharm El Sheikh, 22 25 February 2016 4

SUDAN PBN Implementation ti Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports The upper routes network will be RNAV5. SUDAN will apply free routes airspace above flight level 390 in the second step for implementation of the new structure. LOA assigned between SCAA and Military Authority contains the application of FUA. PBN SG/2 Sharm El Sheikh, 22 25 February 2016 5

SUDAN PBN Implementation Plan Khartoum (HSSS) airport ILS approach R/W 36 CAT 1 ILS approach R/W 18 Cat 1 RNAV approach (LNAV only) for R/W36 &18 SIDs & STARs RNAV 1

Status of Implementation RWY Ends 18/36 HSSS 17/35 HSPN 19/01 HSOB 04/22 HSNN ILS / CAT LNAV LNAV/ VNAV LPV RNP AR RNAV SID RNAV STAR 1 YES NO NO NO YES YES 1 YES NO NO NO YES YES YES NO NO NO YES YES YES NO NO NO YES YES PBN SG/3 Cairo, Egypt, 11 13 February 2018 8

Tools & Facilities To reduce errors in the procedure design process, as well as to standardize the application of the PANS OPS criteria SCAA supply the IFPD section with very efficient software s Geotitan D4F C4F OLS PBN SG/2 Sharm El Sheikh, 22 25 February 2016 9

Sudan ATS Surveillance System The Surveillance System in Sudan include the following: 6 MSSR antennas PORT SUDAN DONGOLA KHARTOUM EL OBEID AL FASHER AD DAMAZIN

Sudan ATS Surveillance System SCAA has 16 ADS B stations: 4 integrated with the system. 4 waiting for integration. 8 stations under installation.

Sites

ATM System Sudan signed new contract with Thales company for 10 years to upgrade the hardware and Software of the ATM system (TOPSKY)

ATM System SCAA ATM system is supported by : ADS C CPDLC AIDC OLDI Safety net and monitoring function Recording system

Sudan Current Situation RNAV Current status in Sudan (routes) The following RNV routes are established within Khartoum Airspace: Route UM863 as RNAV route linking the Gulf states with West Africa Route UT124 as RNAV route linking East Africa with Europe

Sudan Current Situation RNAV Current status in Sudan (routes) Routes UQ584 as RNAV route linking the Gulf with West Africa down South America Route UT535 linking Juba with East Africa. Route UT139 as RNAV 10 linking east Africa with West Africa. Route UT142 linking East Africa with the North West Africa.

Sudan current ATS routes This current situation encourage SCAA to restructure the Sudan airspace to satisfy the National, Regional and Global objectives.

Sudan current ATS route

New RNAV routes network Main goals for the airlines: Save flight time and fuel consumption by reducing distance. Have several options for flight planning. Improve flight plan adherence by formalizing direct routes usually cleared by the controllers. Satisfy most of the requests of the airlines. PBN SG/2 Sharm El Sheikh, 22 25 February 2016 19

New RNAV routes network Main goals for sudanese ATCOs: Decongest hotspots as much as possible. Split bidirectional routes by creating unidirectional routes as much as possible. Formalize direct routes usually cleared by the controllers. Have a network that can answer almost all requests. PBN SG/2 Sharm El Sheikh, 22 25 February 2016 20

First step of Implementation 42 new RNAV routes added to the existing conventional network. 12 are unidirectional routes. RNAV routes above FL285. PBN SG/2 Sharm El Sheikh, 22 25 February 2016 21

PBN SG/2 Sharm El Sheikh, 22 25 February 2016 22

Challenges Lake of Training in approval process. National Aircraft modification for the PBN application. Sudanese pilot training in order to safely conduct an operation. Regulations governing the application of PBN. PBN SG/2 Sharm El Sheikh, 22 25 February 2016 23

Conclusion The new RNAV Routes network, RNAV SIDs and STARs would have an impact for the national airlines, but it has positive effect for all airlines flying over Khartoum FIR or landing Sudan international airports, so that SCAA request from the national airlines to upgrade their fleets to meet the development in the PBN environment.

Conclusion The restructure of SUDAN airspace would have a cross border impact, but it has positive effect for all airlines flying over Khartoum FIR, so that we appreciate any support from neighboring countries, ICAO MID/AFI offices and ITATA.

Thanks for your attention