U.S. Army Corps of Engineers Wilmington District

Similar documents
Norfolk District North Atlantic Division

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

MOBILE DISTRICT 2018 DREDGING PROGRAM

Norfolk District North Atlantic Division

USACE GALVESTON DISTRICT PROJECT UPDATE

GALVESTON DISTRICT Dredging Schedules

Water Resources Update after NCGA Long Session

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

MARCH 2014 HYDROGRAPHIC REPORT

January 2018 Air Traffic Activity Summary

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

Coastal Management: Treasure Island - Long Key Nourishment

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

TENTATIVE SCHEDULE

The Corps of Engineers Dredges on the West Coast

Proposed Cherry Grove Canals Dredging Project

The History & Management of the Atlantic Intracoastal Waterway in Florida

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

Port of Kalama, New Approach to Maintenance Dredging

Skull Creek BN "3" to BN "24" May

Skull Creek BN "3" to BN "24" Apr

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

Baltimore Harbor & Channels, Maryland and Virginia

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

Presented to: City of Petaluma City Council

Buffalo District Navigation Program Overview

SAND TIGER SHARK (SoC)

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap)

Research and Statistics Department FOR RELEASE 8:50 A.M. Friday, February 23, 2018

Purpose Goals Sandy Program Overview. Discussions PL84-99

Mini-budget Workshop Coastal Projects

Philadelphia Regional Port Authority. Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy

Great Lakes Navigation System Buffalo District

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

REMARKS: All depths are in reference to Mean Low Water (MLW). Channel Length is in nautical miles.

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

2012 Texas Water Conservation Association Meeting

Cat Island Chain Background & Access Guide

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

Waterway Access and the Atlantic Intracoastal Waterway in Florida

Capital Program Delivery

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

1. Permittee: Department of Public Works and Government Services, Charlottetown, Prince Edward Island.

Carteret County Utilities Coordination Committee. September 9, 2015

Community Work Session #2.1 Ketchikan Upland Planning to Support Expanded Marine Facilities and Larger Cruise Vessels.

FOR SALE Joyner Marina 401 Marina Street Carolina Beach, NC Contact Kelvin Dumas, CCIM OFFER REALTY (919)

SYSTEM BRIEF DAILY SUMMARY

Rocky Mountain Crude Oil Market Dynamics. Tad True, Belle Fourche & Bridger Pipelines Wyoming Pipeline Authority October 26, 2010

Maximising Beneficial Reuse through the use of a Novel Dredging Contract

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

CHAPTER 14. MARINE TRANSPORTATION

Riverine Sand Mining/Scofield Island Restoration (BA-40)

LOVE FIELD ENVIRONMENTAL ADVISORY COMMITTEE QUARTERLY REPORT. October December 2016

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

HARBOR ACADEMY HISTORY AND FINANCE. February 28, 2019

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

Appendix N MAINTENANCE DREDGING STATEMENT OF NEED & PERMIT COMPLIANCE. North Thousand Islands Management Plan Appendices

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

Planned Procurement Opportunities Report. November 2018

PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT

USS SURFBIRD (ADG 383) Summary of Vietnam Deployments

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

New Orleans Municipal Yacht Harbor

Planned Procurement Opportunities Report. January 2019

Cleveland Harbor Dredged Material Management

Supreme Court records, (bulk , )

Planned Procurement Opportunities Report. March 2017

Inner Harbor Navigation Canal Lock. Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

DREDGED MATERIAL DISPOSAL HISTORY AVOCA ISLAND LAKE

1. Enclosure (1) i s forwarded to accordance with referance (a).

Endangered Marine Species

Yukon Bureau of Statistics

Port Everglades Overview

INDUSTRY SNAPSHOT. Aquaculture in Australia

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

Department of Environment and Natural Resources

Planned Procurement Opportunities Report. July 2018

PORT EVERGLADES SAND BYPASS PROJECT

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

2017 and Beyond Forecasted Acquisition Strategy- Jacksonville District Updated 17 Mar 2017

Dredging 101. Why, Who, How and So What! 2015 WAMSI Research Conference. 30 March 2015

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

State of the Waterway 2017

CORPS OF ENGINEERS - MISSISSIPPI VALLEY DIVISION Dennis Norris Steve Jones MISSISSIPPI RIVER MARITIME ASSOCIATION

DELHI TRANSCO LIMITED STATE LOAD DESPATCH CENTER (REGD. OFFICE : SHAKTI SADAN BUILDING, KOTLA ROAD, NEW DELHI

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

Subj: 1976 Command History Ref: (a) OPNAVINST B (1) Command Organization and 1976 Highlights (2) Summary of Operations

STATUS OF THE COALITION. Chuck May, Chair Pro Tem

The Geography of Climate

Transcription:

U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers

Wilmington District Ongoing Contracts Project Quantity Dredge Type Award Date Dredging Start Date Dredging End Date Contractor 1 Wilmington Harbor - Eagle Island Improvements (FY12) N/A N/A 15-Sep-11 30-Oct-11 31-Mar-13 Corey Enterprises, Inc. 2 Masonboro Inlet - Jetty Repairs N/A N/A 31-Jul-12 10-Oct-12 15-Oct-13 Precon Marine Inc. 3 4 5 6 Rollinson Channel & Silver Lake Harbor - Maintenance Dredging 330,000 Pipeline 21-Aug-12 4-Sep-12 31-Mar-13 Cottrell Contracting Corp. Manteo (Shallowbag) Bay - Interior Channels 590,000 Pipeline 24-Aug-12 9-Oct-12 31-Mar-13 Atlantic Intracoastal Waterway - Inlet Crossings 350,000 Pipeline 11-Sep-12 16-Nov-12 31-Mar-13 Southern Dredging Co., Inc. Southwind Construction Corp. Wilmington Harbor - Eagle Island Improvements (FY13) N/A N/A 13-Sep-12 TBD 30-Oct-13 ES&J Enterprises, Inc. 7 Wilmington Harbor - Outer Ocean Bar 850,000 Hopper 17-Sep-12 1-Dec-12 31-Mar-13 8 Morehead City Harbor - Outer Ocean Bar 200,000 Hopper 17-Sep-12 1-Dec-12 31-Mar-13 Great Lakes Dredge & Dock Co., LLC Great Lakes Dredge & Dock Co., LLC 9 Wilmington Harbor - Anchorage Basin 710,000 Pipeline 28-Sep-12 1-Nov-12 31-Jan-13 Southern Dredging Co., Inc. Wilmington Harbor - Anchorage Basin 10 Deepening (CG) 800,000 Pipeline 28-Sep-12 TBD 31-Jan-14 Great Lakes Dredge & Dock Co., LLC

Carolina Beach & Kure Beach Storm Damage Reduction & Wilmington Harbor Inner Ocean Bar Maintenance Dredging

Project: Scope of Work: Material Type: Placement Areas Carolina Beach: Kure Beach: Distance to Place Area: Type of Equipment Carolina Beach: Kure Beach: Env. Windows: (Sea Turtle Nesting) Carolina Beach / Kure Beach, NC Coastal Storm Damage Reduction Sand Est. Placement Quantities 680,000 cubic yards 430,000 cubic yards Varies Completion Date: April 2013 Issue Date: 9/25/12 Sch. Bid Opening Date: 10/24/2012 Sch. Start Date: 11/16/2012 Pipeline Hopper Dredge/Pipeline November 16 April 30

Project: Scope of Work: Depth: Dredging Width: Dredging Length: Material Type: Placement Areas: South Beach: West Beach: Distance to Place Area: Type of Equipment: Env. Windows: (Sea Turtle Nesting) Wilmington Harbor Inner Ocean Bar Maintenance 44 ft (required); + 2 ft 300-700 ft ~ 2.5 miles Sand 1,800,000 cubic yards 50,000 cubic yards Varies Completion Date: April 2013 Issue Date: 9/25/2012 Bid Opening Date: 10/24/2012 Sch. Start Date: 11/16/2012 Ocean-Certified Pipeline November 16 April 30

Project: Dredging Depth: Dredging Width: Dredging Length: Dredging Quantity: Material Type: Placement Area: Distance to Place Area: Type of Equipment: Morehead City Harbor Ocean Bar - Nearshore Disposal 45 ft (required); + 2 ft 400-650 ft ~ 3.5 miles ~ 1,500,000 cubic yards Sand Nearshore 2 5 miles Hopper/Pipeline-Scow Env. Window: January 1 March 31 Reason for Window: Sea Turtles Sch. Issue Date: 10/25/2012 Sch. Bid Opening Date: 11/27/2012 Sch. Start Date: 1/1/2013

Project: Wilmington Harbor, NC Anchorage Basin & vicinity Anchorage Basin Dredging Depth: Dredging Width: Dredging Length: Dredging Quantity: Material Type: Placement Areas: Distance to Place Area: Type of Equipment: Env. Window: Anchorage Basin: Bird Islands: Reason for Window: 42 ft (required); + 2 ft 400-1200 ft Varies ~1,500,000 cubic yards Silt Eagle Island; Bird Islands Varies Pipeline August 1 January 31 September 1 March 31 Fisheries & Bird Nesting Est. Start Date: September 1, 2013 Est. Completion Date: January 31, 2014 Contract Completion: January 31, 2014

Spillway Spillway Spillway Cell 3 Cell 2 Project: Wilmington Harbor, NC Eagle Island Improvements Services: - Cell #1 Raise -Cells #1 & #3 Spillway Replacements Est. Start Date: October 30, 2013 Est. Completion Date: Contract Completion: Unknown Unknown Spillway Spillway Cell 1

Project: Atlantic Intracoastal Waterway Core Creek Dredging Depth: 12 ft (required); + 2 ft Dredging Width: 90 ft Dredging Length: Varies Dredging Quantity: ~ 200,000 cubic yards Material Type: Silt Placement Area: Upland Distance to Place Area: Varies Type of Equipment: Pipeline Env. Window: November 1 April 30 Est. Start Date: November 1, 2013 Est. Completion Date: April 30, 2014 Morehead City

Wilmington District Points of Contact Roger Bullock (910) 251-4822 roger.d.bullock@usace.army.mi Bob Keistler (910) 251-4709 robert.w.keistler@usace.army.mil