Island Eastern Corridor Boardwalk-Cycleway Feasibility Study

Similar documents
IEC BOARDWALK CYCLEWAY FEASIBILITY STUDY

Harbourfront Commission

A. CONCLUSIONS OF THE FGEIS

FEASIBILITY CRITERIA

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

Open Space Projects at Kai Tak Harbourfront Area. Harbour Unit 24 February 2017

HONG KONG OBSERVATION WHEEL AT CENTRAL WATERFRONT. Presented by THE HALL ORGANISATION LTD

Stainforth & Keadby Canal Installation of Multiuser Path

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Construction Staging Adelaide Street West

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

F6. Coastal Ferry Terminal Zone

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

Temporary Uses at the New Central Harbourfront

2.2 For these reasons the provision of tourist signing will only be considered:

Task Force on Harbourfront Developments on Hong Kong Island

places Mooloolaba s heart five

Draft City Centre Transport Proposals

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

5 Rail demand in Western Sydney

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

London Borough of Barnet Traffic & Development Design Team

Uniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.

San Pedro Waterfront Development Efforts Presentation for Trade, Commerce & Technology Committee

A31 Ringwood improvement scheme

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

TERMINAL DEVELOPMENT PLAN

: Activity Room No. 1, G/F, Hong Kong Central Library 66 Causeway Road, Causeway Bay, Hong Kong

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Major Scheme Business Case Summary Report for Programme Entry

TORONTO TRANSIT COMMISSION REPORT NO.

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Pattullo Bridge Replacement Project

RE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.

John Betts School Crossing Review

Board meeting

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

Concord Road Interchange. Standard hours of work

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT

Land Management Summary

Northern Beaches Transport Action Plan

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

EXECUTIVE SUMMARY FALL Introduction. Findings

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

CAIRNS A STRATEGIC PORT

Cammachmore. Community Action Plan Prepared by Newtonhill, Muchalls & Cammachmore Community Council

Trigger Point Justification Note 30 th August 2013

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

Presentation Overview

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Union Station Queens Quay Transit Link Study

Millport Charrette. Moving forward What do you think? Where are the opportunities? What are the priorities?

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

Living & Working Access and Recreation

Capital & Counties. October 2007

A summary of Draft Makara Peak Mountain Bike Park Master Plan

Flow Stand Up Paddle Board Parkway Plan Analysis

Abstract. 1 Introduction

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Chapter 2 Route window W25 Maidenhead station. Transport for London

CITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter

Airways New Zealand Queenstown lights proposal Public submissions document

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

WESTERN RECLAMATION & VIADUCT HARBOUR WATERFRONT VISION 2040

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Thames Estuary Path Hoo Peninsula and Medway Estuary Overview

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

Mt. Hood National Forest

Thames Estuary Path Basildon, Castle Point and Eastern Thurrock Overview

WPI Research Project - February Designing a Living Victoria Harbour: A Marine User s Perspective

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Queen s Circus Roundabout

Floating Docks. Our unique capability is your solution

Sharing the Way with Sustainable Transport Options

POLICY DCS-04: Tourism Directional Sign Policy. Development and Cultural Services

St. Patrick s Street Development Brief

The cultural heart of York Central

Outdoor Developed Areas

What s covered. What s not covered. Options for those not covered. ABA Coverage

26 th Meeting of Harbour-front Enhancement Committee held at 2:30 pm on 13 May 2009 at 15/F, North Point Government Offices, 333 Java Road, Hong Kong

EASA Safety Information Bulletin

SR 934 Project Development And Environment (PD&E) Study

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013)

Pedestrian Safety Review Spadina Avenue

Signature Project Scheme in Central & Western District: Harbourfront Enhancement and Revitalisation ( HEAR ) at the Western Wholesale Food Market

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

Building Connections to SUPPORT LIFE S JOURNEYS

Transcription:

For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront Cycleway into the Island Eastern Corridor Boardwalk proposed in the Hong Kong Island East Harbour-front Study. BACKGROUND 2. The Hong Kong Island East Harbour-front Study (HKIEHS) placed especial emphasis on the need for connectivity and accessibility to the harbourfront. 3. A key proposal of the HKIEHS was that the creation of a continuous accessible harbourfront area around North Point is best served by the erection of a 2-kilometre public boardwalk under the existing Island Eastern Corridor. The proposal offers movement only on foot, not by bicycle. 4. Reference is made to the presentation made by Hong Kong Cycling Alliance to the Harbourfront Commission, on 7 September 2011, proposing a Harbourfront Cycleway from Kennedy Town to Heng Fa Chuen. This paper addresses only the Island Eastern Corridor section of that cycleway. Locality 5. It is further noted that, at present, the Fortress Hill-North Point area has extremely poor connectivity to the harbour because of the blocking effect of the IEC. The layout of the area also constrains the surface movement of people along essentially two roads, whether on foot, in a public or private motor vehicle or by bicycle. This exposes all cyclists to busy and fast traffic conditions that may deter some from passing through this area at all.

Boardwalk proposal 6. The boardwalk, as proposed in the HKIEHS, provides a public space for leisure through pedestrian access to the harbourfront. It thus meets the basic need to provide harbour access, but is less effective in satisfying Harbour Planning Guidelines objectives such as connectivity, as it is mainly attractive for leisure strolling. To someone who wants to get to a prized fishing spot, or to photograph a particular view, or meet a friend halfway, the 'walking' aspect may be considered an impediment. As such, the diversity and vibrancy of the boardwalk, in the currently proposed format, are likely to be diminished: if people who want come together to sing, chat, play mahjong etc are put off by the long walk, and choose to meet elsewhere, the two-kilometre stretch of walkway will be occupied mainly by strollers, giving it a one-dimensional feel. The Harbourfront Cycleway from Kennedy Town to Heng Fa Chuen 7. The Harbourfront Cycleway is proposed to run from Kennedy Town to Heng Fa Chuen, and will benefit Hong Kong in several ways: primarily, it will provide connectivity and accessibility between harbourfront locations, enabling full and productive use of the waterfront and making possible the emergence of a distinct identity for the harbourfront; it will serve as a leisure facility for Hong Kong people to enjoy and which offers health, social, environmental and economic benefits; it will be a practical transport route on Hong Kong island, enabling safe, pollution-free individual movement between district centres, reducing demand on roads and public transport; and as a tourism draw it will enable overseas visitors to appreciate Hong Kong s most highly regarded asset, but which they can currently barely access Victoria Harbour. 8. The HKIEHS Stage 2 Proposals recognise the general public request for a continuous cycle track along the waterfront promenade. The Harbourfront Cycleway on the IEC Boardwalk 9. The Harbour Planning Guidelines (HPGs), under Physical Linkage, state that: Sustainable transport modes should also be considered, where appropriate, to facilitate access of pedestrians to the harbourfront. Page 2

Cycling is probably the most sustainable transport of all, in its multiple benefits and minimal impacts, and likely the only practicable transport mode that could be applied along the boardwalk. 10. We consider the proposal for a boardwalk under the IEC to be an outstanding opportunity to more fully meet the requirements of the HPGs by incorporating a cycleway along its two-kilometre length, on the landward side. Explicit support for the inclusion of the cycleway as part of the boardwalk has come not only from thousands of members of the public but also from representatives across the political spectrum. 11. HPG Land Use Planning objectives encourage Vibrancy and diversity and prioritise Recreation and leisure. This section of the cycleway would meet those criteria and address all of the concerns with the existing pedestrian-only proposal outlined above: It will allow convenient movement along the length of the boardwalk, smoothing the loading to lessen clustering of people near inland access points. It will attract people wishing to undertake an activity at a particular point along its length, or just away from the crowds. It will be a worthwhile short cycle ride by itself. It provides a vital link in the Cycleway as a whole, bypassing the congested and unpleasant ride along King's Road / Java Road, as well as neatly bypassing the only substantial waterfront private property along the northern shore of the island. 12. The full 2-kilometre length of the boardwalk would be travelled in approximately seven minutes by bike, non-stop at a leisurely pace, or 30 minutes continuous walking. Engineering and implementation A nine-metre wide IEC boardwalk 13. In the HKIEHS Stage 2 report, it is proposed that the boardwalk should run under the IEC and be 5 metres wide typically, mostly between the main pairs of support columns. After surveying at several locations, we find that the clear space between columns under the IEC is typically 9.7 metres. Page 3

14. The nine-metre width is sufficient to accommodate the entire boardwalk the original pedestrian-only form, 5 metres wide, and the cycleway, at 4 metres wide. 15. Increasing the width of the boardwalk to 9.7 metres at a small comparative cost will ensure future design flexibility such that a cycleway could be implemented either at its inception or at a later stage. 16. Whilst it is possible for the boardwalk to occupy the clear physical width of 9.7 metres along most of its length, further investigation and clarification is required regarding the additional loading placed onto the existing IEC pile caps by the boardwalk together with its pedestrian and cycle users. 17. The Harbour Planning Guidelines require that: Public space for recreation and leisure uses should be created wherever possible. and also that: A continuous promenade of adequate width should be provided along the entire harbour-front areas, as far as is practicable, to accommodate such leisure activities as strolling and jogging, pedestrian circulation,... Cycle tracks should be encouraged where there is sufficient width. 18. The creation of a 5-metre boardwalk under the IEC, between support pillars that are generally almost twice that width apart, would seem to contradict this HPG by not utilising potential space that, by virtue of its location under the shadow of the roadway, landward of the pedestrian boardwalk, bounded by the support pillars and utilising the concrete pile caps, would be unlikely to provide significant other benefit or opportunity, and just as completely complies with the important constraints under the Protection of the Harbour Ordinance. 19. A cost analysis has not yet been carried out for the increased width boardwalk, however it is reasonable to assume that it would be much less than the proportionate increase in width (5 metres to 9.7 metres). Page 4

20. Certainly it would be advantageous to build in the cycleway, or capacity for it, from the outset, rather than retrofitting it. Design variations 21. Several road junctions and other locations will require some variation to the standard width boardwalk-cycleway. Most such instances can be satisfactorily addressed with reference to the HKIEHC proposals. Tong Shui Road exit 22. The HKIEHS proposal envisages the boardwalk narrowing to a 3-metrewidth swing-out section around the slip road of the Tong Shui Road exit of the IEC. From our survey, the available fully supported width around this slip road could be approximately 6.5 metres, routing over pile caps outside of the IEC support columns. Using cantilever beams, it would be possible to increase to continue the full width boardwalk. 23. The widened boardwalk around the Tong Shui slip road will need to be addressed with regards to the Protection of the Harbour Ordnance in the same way that the pedestrian-only boardwalk proposal would have been. Man Hong Street exit 24. At the Man Hong Street exit, the slip roads are higher than at Tong Shui Road, and the entire boardwalk can pass right underneath them. Ferry Pier Intersections at North Point 25. At North Point Ferry Piers, the arrangement proposed in the HKIEHS could be followed, namely at-grade intersections, offering all boardwalk users access inland and to the ferry services. Cyclists would be required to dismount when crossing the major pedestrian thoroughfares to the ferries. A similar arrangement would be applicable at North Point DG Vehicular Ferry Pier. Western end of boardwalk 26. The proposed western start of the boardwalk is at Oil Street, on the reclamation adjacent to the rising Central Wanchai Bypass. We suggest that, to provide connectivity for all boardwalk users with the new public areas of the Wanchai Development Phase II, consideration be given to beginning the Page 5

cycleway/boardwalk under the IES near its start at Causeway Bay Typhoon Shelter, adjacent to Victoria Park Road. It would then skirt around the rising Central Wanchai Bypass, on the reclaimed land. 27. This arrangement would avoid the difficulties associated with the cycleway and pedestrian connective routes continuing north-eastward on land and turning under the IEC at Hing Fat Street, Watson Road or Oil Street. Routing through this densely occupied area of Causeway Bay / Tin Hau would be undesirable for both the cycleway, due to possible limited street capacity, and pedestrians, who would lose contact with the waterfront while they followed inland streets. 28. It might be necessary to enable access by small marine vessels to the small section of Causeway Bay Typhoon Shelter east of this section of the IEC, adjacent to Tung Lo Wan Fire Station. HKIEHS suggests the use of bascule bridges for such access, and this may be appropriate here. Other links inland 29. The HKIEHS proposes connectivity with the hinterland at Tong Shui Road and North Point Ferry Piers, as well as the start of Hoi Yu Street, all of which are intersections with existing piers, or on land. It might be beneficial to include linkages at City Garden and/or Provident Centre, for cycle and pedestrian access by residents of those developments. FURTHER ACTION 30. We request that this Taskforce support the undertaking of detailed loading calculations and a cost comparison for the boardwalk, then to be made publicly available, if possible. 31. We request that this Taskforce support the inclusion in the next stage of design the widening of the boardwalk to approximately 9.7 metres with a view to including the cycleway on the landward side. 32. We request the advice of the Taskforce on how to integrate planning of the western start of the boardwalk proposed herein and the boardwalk as whole, which are in separate planning zones. Page 6

33. Members are invited to express any further views on the above proposals. Hong Kong Cycling Alliance January 2012 Page 7