Network Safeworking Rules and Procedures

Similar documents
Network Safeworking Rules and Procedures

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

CLEARANCE INSTRUCTION READ BACK

GK/GN0692. Guidance on Level Crossing Interface Requirements. Rail Industry Guidance Note for GK/RT0192. Published by

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Module TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

FRAMEWORK TRACK ACCESS AGREEMENT FOR PASSENGER SERVICES. Dated August Between HS1 LIMITED. and EUROSTAR (U.K.) LIMITED

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018

Terms and Conditions of the Carrier

Official Journal of the European Union L 186/27

Level Crossings Configuration Standards

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

British Airways PLC. Agreement to Supply Group Nett Rates. Terms and Conditions

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Level Crossing Interface Requirements

Low Visibility Operations

Information security supplier rules. Information security supplier rules

Appendix A COMMUNICATION BEST PRACTICES

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

General Conditions of Carriage for Passengers and Baggage

Appendix F ICAO MODEL RUNWAY INCURSION INITIAL REPORT FORM

Black Start Ancillary Service Schedule

GUIDANCE RELATING TO THE IMPLEMENTATION OF SOLAS CHAPTER XI-2 AND THE ISPS CODE

INFORMATION REGARDING VISITOR PASSES AT CALGARY INTERNATIONAL AIRPORT

PORTABLE LIGHT SIGNALS

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Short-Haul Operations Route Support Scheme (RSS)

ST. VINCENT AND THE GRENADINES

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

MODEL AERONAUTICAL ASSOCIATION OF AUSTRALIA

REGULATIONS FOR DECLARATION AND DISPOSAL OF UNCLAIMED ITEMS OF THE PIRAEUS CONTAINER TERMINAL S.A. IN THE PIRAEUS FREE ZONE

Training and licensing of flight information service officers

LEVEL CROSSING ATTENDANT (AOD LXA)

San Bernardino International Airport Authority Hangar Policies and Procedures

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

JMA Flying Event Safety Rules

Pembrey Country Park Caravan & Campsite 2018 Booking Conditions

Contents. Subpart A General 91.1 Purpose... 7

1. General Provisions 1. Parties. These Terms & Conditions regulate the legal relationship between us, Skypicker.com s.r.o., ID No.

Civil Aviation Order (Exemption from the provisions of the Civil Aviation Regulations 1988 certain ultralight aeroplanes) Instrument 2015

(Japanese Note) Excellency,

AIRWORTHINESS ADVISORY CIRCULAR

c) Advisory service to IFR flights operating within advisory airspace.

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

REGULATIONS (10) FOREIGN AIR OPERATORS

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX

Government Decree on Inspecting Foreign Ships in Finland (1241/2010)

Official Journal of the European Union L 7/3

AGENCY AGREEMENT. The definitions used in this agreement have the same meaning as those used in the ATOL Regulations 2012.

Cayman Islands Aviation Circular

Motorhome/campervan Permit Terms and Conditions

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

Part 63 CAA Consolidation 22 June 2006 Flight Engineer Licences and Ratings

AMUSEMENT MACHINES CONTRACT. Part 1 which set outs out key details relating to the contract;

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices

Dublin Route Support Scheme ( RSS ) Long-Haul Operations (the Scheme )

PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL. Pres

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI

Technical. Policy Lead. Douglas

GUERNSEY AVIATION REQUIREMENTS. (GARs) CERTIFICATION OF AIRCRAFT PART 21

GAWLER AIRFIELD OPERATIONAL GUIDELINES

SUBPART C Operator certification and supervision

CHAPTER 5 SEPARATION METHODS AND MINIMA

EASA Safety Information Bulletin

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed

Office of Fair Trading. bunk bed safety. A compliance guide to bunk bed safety for short-term rental accommodation

Samsung Electronics Australia Qantas Frequent Flyer Loyalty Program Rewards Scheme. Terms and Conditions. Effective: 22 March 2018

Section M. Airline Transport Pilot s Licence (Aeroplanes)

STATUTORY INSTRUMENTS. S.I. No. 855 of 2004 IRISH AVIATION AUTHORITY (AIR TRAFFIC SERVICE SYSTEMS) ORDER, 2004

Certificate for international voyage application form

CIVIL AVIATION REQUIREMENT SECTION 3 AIR TRANSPORT SERIES C PART I ISSUE IV, 24 th March 2017 EFFECTIVE: FORTHWITH

EXPOSURE DRAFT. Aviation Transport Security Amendment (Cargo) Regulation 2016

NETWORK MANAGER - SISG SAFETY STUDY

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

HIGHLANDS AND ISLANDS AIRPORTS LIMITED

BGA GMP Sailplane and Self Sustaining Sailplane Maintenance Programme

Maritime Passenger Rights

Hartwig Air Gift Voucher Terms & Conditions

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

TRAFFIC ALERT AND COLLISION AVOIDANCE SYSTEM (TCAS II)

Safety Management System Coordinator. Position Number Community Division/Region Yellowknife Air, Marine and Safety/HQ

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

PART XIII - AIR TRANSPORT SERVICES

Democratic Socialist Republic of Sri Lanka. Implementing Standards (Issued under Sec. 120, Civil Aviation Act No. 14 of 2010)

Guidelines for NOTAM Workflow and Allocation of Responsibilities

kulula.com Ticket Audit and Agent Debit Memo Policy Reference: 5/01/2014

ROTORCROSS AUSTRALIA RACE RULES. Aircraft Rules. Model Specification limits: (maximums unless specified) 330mm (motor to motor diagonal)

Transcription:

Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016

Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version Date 5017 Train Order Working 1.0 31 March 2016 Document History Publication version Effective date Page(s) affected 5017 Train Order Working 4 May 2016 Reasons for and extent of change(s) Authorisation Adam Sidebottom Rail Safety Manager Brookfield Rail 31 March 2016 DISTRIBUTION AND CHANGE: Brookfield Rail maintains the master for this document and publishes the current version of the Brookfield Rail website. Any changes to the content of this publication require the version number to be updated. Changes to this publication must be approved according to the procedure for developing Brookfield Rail products. To view the latest version of this document visit www.brookfieldrail.com 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED

Table of Contents Glossary for this Rule... 5 1. Purpose... 8 2. General... 8 2.1 Network Controller... 8 2.2 Network Control Diagram... 9 3. Authority types... 9 4. Station Limits... 10 4.1 Crossing Stations... 10 4.2 Non-Crossing Stations... 11 5. Designation Limit of Authority... 12 5.1 Limit of Authority Start Point... 12 5.2 Limit of Authority End Point... 12 5.2.1 Station limits sign as the end point... 12 5.2.2 A location within a station as the end point... 13 5.2.3 A Station as the end point... 14 6. Operating with Authorities... 15 6.1 Reporting... 16 6.1.1 Progress... 16 6.1.2 Prior to Crossing... 16 6.2 Rail Traffic Working Advice... 16 6.3 Competent Workers Receiving Authorities... 17 6.4 Identification Numbers... 17 6.5 Track Vehicles in Convoy... 17 6.6 Challenging an Authority... 17 6.7 Proceed Authority... 18 6.8 Conditional Proceed Authority... 18 6.8.1 Failure of the Computer assisted Train Order System... 18 6.8.2 Crossing instructions... 19 6.9 Check of Crossings with the Network Controller... 20 6.10 Shunt Authority... 20 7. Crossings... 21 7.1 Communications Available... 21 7.1.1 Crossing Rail Traffic... 21 7.1.2 Passing Rail Traffic... 22 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 3 of 26

7.2 Communications not Available... 22 7.2.1 Crossing Rail Traffic... 22 7.2.2 Passing Rail Traffic... 23 8. Change of Crossing Station... 23 9. Issuing an Advance Train Order... 23 10. Cancelling an Authority... 24 11. Fulfilling an Authority... 24 12. Keeping records... 24 13. References... 24 14. Effective date... 24 15. Attachments... 25 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 4 of 26

Glossary for this Rule Adjacent Near to, close to, parallel to. Advance Train Order AKOL Arrived Complete Authority Blocking Facility Cancel Catch Points Communication Equipment Complete Competent Worker Consist Converging Convoy Cross Crossing Location/Station Fixed Signal Fulfil Issue A Train Order issued before the rail traffic fulfils an existing Train Order that applies from the end of the limits of the existing Train Order (still in effect). Annett s Key on Locomotive. Rail traffic where the last vehicle of a consist has arrived within a location. Formal name for a written Authority (e.g. Local Possession Authority, Alternative Proceed Authority). A facility used by a Network Controller to prevent either the unintended issue of an Occupancy Authority, or the operation of points or signalling equipment. To withdraw permission for or to end previously authorised activities, such as Occupancy Authorities, without completing them. Single or double bladed points used to derail rail traffic that might enter or foul an adjacent running line. A device that supports effective communication between Network Controllers, Rail Traffic crews, Track Workers and other Competent Workers. Rail traffic where the consist has not parted. A worker certified as competent to carry out a relevant task. A listed order of the vehicles arranged to make up a complete train. Lines meeting and joining to become one line. A group of track vehicles not coupled but travelling closely together under a single Occupancy Authority. To cross or pass other rail traffic. May consist of single or double ended portion of track, to hold rail traffic, connected to a main line that is used to permit other rail traffic to cross or pass. A signal that is located permanently near the line. To advise the Network Controller that the instructions on, and associated activities for, an Occupancy Authority have been completed and can be terminated. To provide or send copies of authorities, warnings, notices and Network publications to affected Competent Workers by voice, hand delivery or electronic means. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 5 of 26

Limit of Authority The limit may be defined by a sign, a signal capable of displaying a STOP indication, or a specific kilometrage point on a line. It defines the location to which rail traffic may travel under a Proceed Authority or the limits of a work on track authority. Local Possession Authority (LPA) Location Locomotive Main Line Network Network Controller Network Control Diagram Occupancy Permanent Record Points Proceed Authority Rail Traffic Rail Traffic Crew Route Running Line Section Secure An authority that closes a defined portion of track from non-associated rail traffic for a specified period. A place in the Network with a designated name, identification number, or signalling reference. Self-propelled, non-passenger-carrying railway vehicles used for hauling other (typically freight or passenger) rolling stock. The running line (not including Loops) normally used for running rail traffic through and between locations A combination of track and other associated infrastructure controlled by Brookfield Rail. A Competent Worker who authorises and issues Occupancy Authorities, and works points, signals and other signalling equipment to manage routes for safe and efficient transit of rail traffic in the Network. A diagram used by Network Controllers showing operational information for a Rail Traffic control area, also known as a Network Control graph to create a permanent record. Presence of rail traffic or track workers on track. A record made in writing or in an electronic system, and kept for reference and audit. A track component consisting of paired pieces of tapered rail (blades) that can be moved and set to allow tracks to diverge or converge. An Authority that allows rail traffic to enter and occupy a portion of line and proceed in the forward direction. Trains and track vehicle or vehicles travelling on the Network. Competent Workers responsible for the operation of the Motive Power Unit. The rail traffic path from one limit of authority to the next in the direction of travel. A line (other than a siding) that is used for through movement of rail traffic, not normally used for stabling rail vehicles. The line between the departure end station limits of one location and the arrival end station limits of another location. A section consists of one or more blocks. To safeguard against accidental or unauthorised access or movement. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 6 of 26

Shunt Shunt Authority Siding To move rail traffic, rakes of vehicles, or vehicles on lines for purposes other than through movement. An Authority for rail traffic to move and occupy a block for the purpose of shunting. A portion of track where vehicles can be placed clear of the running lines. Also see intermediate siding. Station Station Limits System of Safeworking Track Track Occupancy Authority (TOA) Track Vehicle Train Order Train Order Territory Travel Work on Track A system of tracks within station limits at the beginning or end of a section at which rail traffic may cross, pass or run around. A defined operational limit of controlled locations or a running line. An integrated system of operating procedures and engineered systems used on the Network, for safe operation of rail traffic, and protection of people and property. The combination of rails, rail connectors, sleepers, ballast, points and crossings. An authority for Competent Workers and their equipment to occupy a defined portion of track for a specified period. A vehicle, usually self-propelled, used for inspecting and/or maintaining infrastructure. An authority issued by the Network Controller for the movement of rail traffic or issue of LPA track work authorities. The portions of line where the Train Order system of Safeworking is used. Planned or purposeful movement from one location to another. The work performed in the Danger Zone. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 7 of 26

1. Purpose The purpose of this Rule is to describe the operation of the Train Order Working System of Safeworking used in the Network. 2. General Train Order Working is a System of Safeworking where written Authorities are delivered, or dictated over Communications Equipment, to Rail Traffic Crews and recorded in written form in accordance with Rule 9016 Written Rail Traffic Authorities and Forms. The movement of all Rail Traffic is controlled by Authorities Issued by the Network Controller. The object of the Train Order Working system is to prevent more than one Rail Traffic movement being between any two authorised Train Order Crossing or Non-Crossing Stations at the same time. The Rail Traffic Crew must have a valid Authority before entering a Section. 2.1 Network Controller The Network Controller must: efficiently manage Network activities; formulate, authorise and Issue Authorities; record Occupancies; and to avoid conflicts when formulating new Authorities, refer to the Network Control Diagram, the computerised Train Order system where available, and existing Authorities. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 8 of 26

2.2 Network Control Diagram The primary tool for operational safety is a Network Control Diagram, on which are plotted: planned, authorised and actual Rail Traffic Occupancies; planned, authorised and actual Work on Track Occupancies; and events or conditions that may affect safety. The Network Control Diagram is the primary safeworking tool and should be kept up to date in preference to computerised systems. The Network Controller must refer to the Network Control Diagram in order to: plan Network Rail Traffic requirements; and avoid Occupancy conflicts. 3. Authority types The Network Controller Issues the following Rail Traffic authorities for occupation of Running Lines: Proceed Authority; Conditional Proceed Authority, or Shunt Authority. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 9 of 26

4. Station Limits NOTE: Signs are described in Rule 6007 Signs. The start and end of Train Order Territory is identified by signs: a Commencement of Train Order Territory sign will identify the start of Train Order Territory; and an End of Train Order Territory sign will identify the end of Train Order Territory. 4.1 Crossing Stations Crossing Stations are designated by: Crossing Station indicator signs, located at least 500 metres from the Station Limits sign; and Station Limits signs, located at least 50 metred before the first Points, the Station name is displayed on, and below, the Station Limits sign. Figure 5017-1 Example layout of signs designating a Crossing Station. Only one end is shown. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 10 of 26

4.2 Non-Crossing Stations Non-Crossing Stations are designated by: Non-Crossing Station indicator signs, located at least 500 metres from the Station Limits sign; and the Station name will be displayed on the Station Limits sign. NOTE: The distance between the Station Limits signs at Non-Crossing Stations will be determined by operational requirements, such as the length of Rail Traffic Consists. Figure 5017-2 Example layout of signs designating a Non-Crossing Station. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 11 of 26

5. Designation Limit of Authority The start and end Points of the Limit of Authority must be specified. The Limit of Authority must be designated by specifying the Locations between which the Occupancy is authorised. 5.1 Limit of Authority Start Point The start point of a Train Order will be: the Location where the Train Order is received; or in the case of an Advance Train Order, the Location nominated on the Train Order. NOTE: An Advance Train Order is a Proceed Authority or Conditional Proceed Authority that is Issued before the current Train Order is Fulfilled or Cancelled. 5.2 Limit of Authority End Point A Limit of Authority end point must be designated as follows. 5.2.1 Station limits sign as the end point If a Station Limits sign is designated as the end Location of a Train Order, the Limit of Authority extends to the arrival end Station Limits sign at that Station. Figure 5017-3 Example of where the Limit of Authority end point is a Station Limits sign. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 12 of 26

5.2.2 A location within a station as the end point If a specified Location at a Station, such as Main Line, Loop or CBH Siding, is designated as the end Location of a Train Order, the Limit of Authority extends to the clearance point at the departure end Points. The clearance point is defined by a clearance board or Catch Points. Where there is no clearance board or Catch Points, Rail Traffic Crews must stop their Rail Traffic short of the Converging line so other Rail Traffic has safe passage onto the Adjacent line. Figure 5017-4 Example of where the Limit of Authority end point is a Main line. Figure 5017-5 Example of where the Limit of Authority end point is a Loop or CBH Siding. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 13 of 26

5.2.3 A Station as the end point If a Station is designated as the end Location of a Train Order, the Limit of Authority extends to the departure end Limit of Shunt sign, or where a Limit of Shunt sign is not provided to the departure end Station Limits sign. Figure 5017-6 Example of where the Limit of Authority end point is a station with a Limit of Shunt sign. Figure 5017-7 Example of where the Limit of Authority end point is a station without a Limit of Shunt sign. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 14 of 26

6. Operating with Authorities An Authority may be Issued for Rail Traffic to proceed through more than one single line Section. The Authority to enter and Occupy a Section is: possession of the Train Order, and where provided, clearing of relevant Fixed Signals. The Network Controller must not Issue an Authority for a following Rail Traffic movement until it is confirmed that the previous Rail Traffic movement has reported arrival at the Station in advance. Where a Train Order has been Issued for Travel through a Station and does not specify a Track to be occupied, Rail Traffic may Occupy Tracks in addition to the Main Line at that Station for Shunting purposes. In this situation, the Rail Traffic Crew must advise the Network Controller of any Shunting requirements before Shunting and when Shunting is complete. When required by the Network Controller, Rail Traffic Crews must confirm their understanding of the Limit of Authority. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 15 of 26

6.1 Reporting 6.1.1 Progress In areas where Radio communications are provided, the Rail Traffic Crew must make a general broadcast over the radio of the Rail Traffic progress through Stations as it occurs, the Network Controller will respond to the broadcast wherever possible. Where radio communications are unavailable, Rail Traffic Crews must record and report progress as required by the Network Controller, using on board Communications Equipment or wayside telephones. Rail Traffic Crews must report to the Network Controller when Shunting at a Station is complete, and: the Siding is Secured; and at Annett s locked Sidings, the Annett s key is on the Locomotive (AKOL). Departure must be reported only after the rearmost vehicle has cleared the departure end Station Limits of the specified Station. Arrival at a Station must only be reported after the Rail Traffic has Arrived Complete at the specified Station. Rail Traffic Crews must report to the Network Controller on departure from the Station prior to the Limit of Authority end point. NOTE: Where communications to the Network Controller fail and the Rail Traffic Crew are unable to report departure, the Rail Traffic may continue as directed on the Train Order. 6.1.2 Prior to Crossing When a Crossing is authorised, Rail Traffic Crews must verify with the Network Controller their understanding of the Crossing instructions before departure from the Station prior to the Station where a Crossing is authorised. 6.2 Rail Traffic Working Advice The Network Controller must Issue a Rail Traffic Working Advice which provides relevant information, including: any opposing Rail Traffic; any preceding Rail Traffic which has not terminated; the next following Rail Traffic; LPA s; and TOA s. NOTE: Rail Traffic includes Road Rail Vehicles. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 16 of 26

6.3 Competent Workers Receiving Authorities Competent Workers may receive Authorities and instructions and deliver them to Rail Traffic Crews. Competent Workers at attended Stations must keep copies of Authorities received. If a Rail Traffic Crew does not receive an Authority directly from the Network Controller, the Rail Traffic Crew must verify the Authority, with the Network Controller, before departure. 6.4 Identification Numbers If the leading Locomotive is to be replaced, the Rail Traffic Crew must advise the Network Controller. The Network Controller must Cancel existing Authorities that contain references to the replaced Locomotive and Issue new Authorities showing the new Locomotive. 6.5 Track Vehicles in Convoy When Track Vehicles are to Travel in Convoy, the Competent Worker in charge of the Convoy must: advise the Network Controller of the number of each Track Vehicle (to be included on the Authority); obtain an Authority from the Network Controller; Travel on the leading Track Vehicle; advise the Competent Worker on the rear vehicle of the instruction within the Authority; arrange for the Competent Worker on the rear Track Vehicle to endorse the Authority, and carry the Authority for the duration of the journey. 6.6 Challenging an Authority Competent Workers must challenge an Authority if they believe or become aware that the Authority is incorrect. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 17 of 26

6.7 Proceed Authority A Proceed Authority is a Train Order that authorises Rail Traffic to Occupy, and proceed on, the Main Line or other designated Track, between limits defined on the Authority. Figure 5017-8 Example of a Proceed Authority. 6.8 Conditional Proceed Authority A Conditional Proceed Authority is a Train Order that authorises Rail Traffic: to proceed to a Station in advance in order to Cross another Rail Traffic movement; and after the Crossing movement has been completed, proceed to the end limit of the Authority. All Rail Traffic Crossings must be included in the Authority. Only one intermediate Crossing may be shown on an Authority. NOTE: An Authority may contain more than one Crossing. The Authority s end point must be at the Station of the second Crossing. Rail Traffic Crews approaching a Station where a Crossing is authorised must confirm with the opposing Rail Traffic Crew, the Crossing instructions. 6.8.1 Failure of the Computer assisted Train Order System Where the computer assisted Train Order System is unavailable. Conditional Proceed Authorities are not permitted. Train Orders including crossing may be issued as Proceed and Cross only and must not include instructions to Proceed to another location after the crossing. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 18 of 26

6.8.2 Crossing instructions A Crossing occurs when: opposing Rail Traffic movements meet at an authorised Crossing Station; or a following Rail Traffic movement passes a preceding Rail Traffic movement at an authorised Crossing Station. Rail Traffic must not depart a Station at which a Crossing has been arranged until: the opposing Rail Traffic movement has Arrived Complete; or an Authority has been Issued for Rail Traffic to depart. The Authority containing the instructions for the Crossing movement must include the Rail Traffic identification and: the leading Locomotive identification; or all Track Vehicles identification. Figure 5017-9 Train No 1234 has an Authority to Proceed to Bravo, take Loop, cross train No 2345 then Proceed to Charlie. The condition to depart Bravo is that train No 2345 has arrived complete at Bravo. Figure 5017-10 Train No 1234 has an Authority to Proceed to Bravo, take Loop, cross train No 2345 (this is the one permitted Intermediate crossing), then Proceed to Charlie and take Loop, cross train No 3456. The end point of this Authority must be Charlie as this is the station of the second crossing. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 19 of 26

6.9 Check of Crossings with the Network Controller After the reading back of a Train Order including a Crossing has been confirmed as correct, the Rail Traffic Crew, must- ascertain whether the opposing Rail Traffic has been Issued with a Train Order for the intended Crossings; and request the Network Controller to confirm the Stations where Crossings are to be effected by repeating the particulars of the Train Order Issued to the opposing Rail Traffic. The Network Controller and the recipient must endorse details of information given on the bottom portion of their Train Order. NOTE: It is not necessary for the R ail Traffic Crew to prepare a copy of the Train Order that has been Issued to the opposing Rail Traffic. 6.10 Shunt Authority Rail Traffic may be authorised to Travel on the Network by Issue of a Shunt Authority. A Shunt Authority is a Train Order that authorises the Occupation of the block Section in advance for Shunting requirements at a Station. WARNING: Rail Traffic must not Occupy the Section beyond the Limit of Shunt sign, unless the Rail Traffic Crew are in possession of an Authority for the Section, even where the Rail Traffic movement will not go beyond the Station Limits sign. If there is no Authority Issued for Rail Traffic to Occupy the Section in advance, a Shunt Authority must be Issued. This authorises Rail Traffic to Shunt beyond the Limit of Shunt sign where provided or beyond the Station Limits sign where a Limit of Shunt sign is not provided. A Shunt Authority permits Rail Traffic to move in either direction. Shunt movements within Station Limits or, where provided, Limit of Shunt signs, must be approved by the Network Controller. In this circumstance a Train Order is not required. Before approving Shunting movements within Station Limits the Network Controller must ensure that: no Authority has been Issued for other Rail Traffic into or through that Station; where a Train Order System is available, Station Blocking Facilities are applied; and after giving approval for a Shunt movement, not Issue other Rail Traffic an Authority into or through that Station. The approval to Shunt must be recorded on the Network Control Diagram. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 20 of 26

Figure 5017-11 Example of a Shunt Authority for a rail traffic movement beyond the Limit of Shunt sign or Station Limits sign. This Authority is for the section but must be fulfilled at Omega. 7. Crossings The Network Controller Issues written instructions about Crossing movements, and the line to be occupied, within the Proceed Authority. Rail Traffic Crews set Points as required. 7.1 Communications Available 7.1.1 Crossing Rail Traffic Rail Traffic Crews must: comply with instructions provided within the Authority; and communicate with the Rail Traffic to be Crossed and reach agreement on which Rail Traffic is to enter the Station first. The crew of the Rail Traffic that is to enter first; must: set the Route, if required, and enter the Station on the specified Track; report arrival to the Network Controller when the Rail Traffic has Arrived Complete; set the Route for and admit the opposing Rail Traffic; obtain an Authority to Proceed if not in possession of an Authority; and after the Crossing movement has been completed, set the Route for departure. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 21 of 26

7.1.2 Passing Rail Traffic Rail Traffic Crews must comply with instructions provided within the Authority. The crew of the Rail Traffic that is to arrive first must: set the Route, if required, and enter the Station on the specified Track ; report arrival to the Network Controller when the Rail Traffic has Arrived Complete; and set the Route for and admit the passing Rail Traffic as required. The passing Rail Traffic Crew must: confirm with the Rail Traffic Crew to be passed that: the instructions within the Authorities are not in conflict; and the Route is set or needs to be set. If the Route is not set, set the Route; arrive on the specified Track; and obtain an Authority to proceed if not in possession of an Authority. 7.2 Communications not Available 7.2.1 Crossing Rail Traffic If communications is not available between Rail Traffic Crews, the Rail Traffic to Occupy the Main Line must: stop at the arrival end Station Limits sign; and wait to be admitted by the opposing Rail Traffic Crew. The crew of the Rail Traffic to Occupy the Crossing Loop must: set the Route and enter the Station on the specified Track; set the Route for and admit the opposing Rail Traffic to the Main Line; obtain an Authority to proceed if not in possession of an Authority; and after the Crossing movement has been completed, set the Route for departure. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 22 of 26

7.2.2 Passing Rail Traffic If communication is not available between Rail Traffic Crews, the Rail Traffic to arrive first must: set the Route, if required, and enter the Station on the specified Track; report arrival to the Network Controller when the Rail Traffic has Arrived Complete; and set the Route for and admit the passing Rail Traffic as required. The passing Rail Traffic must: wait to be admitted by the preceding Rail Traffic Crew; and obtain an Authority to proceed if not in possession of an Authority. 8. Change of Crossing Station If it is necessary to change a Crossing Station specified on existing Authorities, the Network Controller must: first, Cancel the Authority held by the Rail Traffic whose journey is being shortened, then Issue a new Authority with altered Crossing instructions; and then, Cancel the Authority held by the Rail Traffic whose journey is being extended and Issue a new Authority with altered Crossing instructions. 9. Issuing an Advance Train Order An Advance Train Order is a Proceed Authority or Conditional Proceed Authority Issued while Rail Traffic is en-route and may be Issued while the Rail Traffic is in motion. An Advance Train Order must only be issued when the Rail Traffic is in the section prior to the end limit of the current Train Order. Where the Advance Train Order is to be Issued while Rail Traffic is in motion, the Rail Traffic must be under the control of more than one crew member. If there is only one Rail Traffic Crew member then the Rail Traffic must be stationary to receive an Advance Train Order. An Advance Train Order will not come into effect until the Rail Traffic arrives at the Limit of Authority end point for the current Train Order. Where the current Train Order has a Crossing at the Limit of Authority end point, that Crossing must also be recorded on the Advance Train Order. 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 23 of 26

10. Cancelling an Authority An Authority that cannot be Fulfilled must be Cancelled. An Authority may be Cancelled and a new Authority Issued whilst Rail Traffic is in motion, provided that the Rail Traffic: has not passed the proposed Limit of Authority; will not pass the limit of the new Authority; and is under the control of more than one crew member. If there is only one Rail Traffic Crew member then the Rail Traffic must be stationary before the Authority is Cancelled. If there is any doubt as to whether the Rail Traffic cannot be prevented from exceeding the proposed Limit of the Authority, the Rail Traffic must be stopped and its Location determined before an Authority is Cancelled. 11. Fulfilling an Authority An Authority is Fulfilled after all instructions contained within it have been carried out. Train Orders Issued to Station Limits signs must not be Fulfilled until the Rail Traffic has been authorised to enter the Station and has Arrived Complete within the Station Limits. 12. Keeping records Network Controllers must keep a Permanent Record of relevant details and movements in the Network. 13. References 6007 Signs 9016 Written Rail Traffic Authorities and Forms 14. Effective date 4 May 2016 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 24 of 26

15. Attachments Train Order Issue form 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 25 of 26

Train Order Receipt form 5017 Train Order Working, Version 1.0, 31 March 2016 UNCONTROLLED WHEN PRINTED 26 of 26