Port Everglades Master/Vision Plan Update

Similar documents
Port Everglades 2014 Master/Vision Plan Update

Port Everglades 2014 Master/Vision Plan Update

Port Everglades Master/Vision Plan Update

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015

Port Everglades Master/Vision Plan Update

Port Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006

Port Everglades Overview

Annual Port Review. June 22, 2016

AAPA Smart Ports. Business Intelligence. March 7 th, 2018 Oakland, CA. Nicholas van den Heiligenberg Business Development Manager

Port Everglades. Presented to FMPOAC Freight Committee. July 23, 2015

PORT EVERGLADES 2014 MASTER/VISION PLAN ELEMENT 3 PLAN DEVELOPMENT PRESENTED BY

Panama Canal Stakeholder Working Group Meeting

Master Plan of Costa Rica Atlantic Coast Limon - Moin. November, 2008 Costa Rica

Fort Lauderdale Hollywood International Airport

Shore Power at Port of Seattle. A viable solution to curb emissions at berth

1.5 Facilities Inventory

AIRPORT MASTER PLAN UPDATE

CHAPTER 4: ALTERNATIVES

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

Master Plan Update Community Advisory Committee Kick-off Meeting

Planning, Development and Environment Committee

2006 Port Everglades Master Plan Update Public Participation Program 2 nd Meeting December 6, 2006

Textile and Apparel Importer Trade and Transportation Conference

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

Tampa International Airport Master Plan Update. December 12, 2012

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

Port of Tallinn Estonia s Biggest Maritime Gateway


Efficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016

2014 Port Everglades Master/Vision Plan Table of Contents TABLE OF CONTENTS. Element Title Page

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Lake Tahoe Airport Master Plan

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

Port of Los Angeles CIP Shaun Shahrestani Chief Harbor Engineer Director of Construction September 27, 2018

PREFERRED PLAN Kahului Airport Master Plan and Noise Compatibility Program Update

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Logan International Airport Right Sizing and Good Terminal Planning

Alexandria Port, Egypt

Waterways Council November 10, 2017

Current and Forecast Demand

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

PORT EVERGLADES COMMERCE REPORT FISCAL YEAR 2017

Rail in Mexico: Innovative Solutions for a Vibrant and Growing Mexican Economy

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

Master Plan Update Technical Advisory Committee Meeting

SAN JOSÉ INTERNATIONAL AIRPORT

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

July 21, Mayor & City Council Business Session KCI Development Program Process Update

PORT DEVELOPMENT STRATEGIES & SUCCESS STORIES. PORTMIAMI AN EVOLVING GATEWAY Juan M. Kuryla, PPM PortMiami Director and CEO

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

COCONUT GROVE WATERFRONT MASTER PLAN. ERA / Curtis Rogers / ConsulTech / Paul George Ph.D.

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

UK Port Infrastructure Project Pipeline Analysis Report

FORECASTING FUTURE ACTIVITY

Fort Wayne International Airport Master Plan Study. Executive Summary

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

AAPA CRUISE SEMINAR CRUISE FACILITY DESIGN, PROCESSING, SAFETY & SECURITY Jim Rowe, AIA Bermello Ajamil & Partners APRIL 25, 2013

SERVICE QUALITY IMPROVEMENT AT THE CONTAINER TERMINAL OF THE PORT OF CASABLANCA. 12 th ASEAN PORT & SHIPPING &12 June, Jakarta, Indonesia

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

APPENDIX B SOCIO-ECONOMICS

LNG the future fuel in ferry and cruise ship ports?!

REAL ESTATE TRANSACTION ADVISORY SERVICES

PORT OF TOWNSVILLE NORTHERN AUSTRALIA S TRANSPORT LINK TO THE WORLD TOWNSVILLE PORT EXPANSION PROJECT MAGNETIC ISLAND KNOWLEDGE FORUM 29 APRIL 2017

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Ted Stevens Anchorage International Airport

The Americas. Port of the Americas. Rhonda M. Castillo Gammill, Esq., P.E. Executive Director, Port of the Americas Authority

Ship Owner Expectations

BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT

AIRPORT DEVELOPMENT PLAN. Design-Build Institute of America September 8, 2015

Ted Stevens Anchorage International Airport

Shanghai Green Port Construction. Shanghai Municipal Transportation Commission

Norfolk International Airport

PortMiami Director and CEO Juan M. Kuryla PUBLIC-PRIVATE PARTNERSHIPS (P3)

BNA Master Plan Update Community Advisory Committee Meeting No. 5

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Public Information Meeting. September 2015

Westover Metropolitan Airport Master Plan Update

Alternatives Analysis EXECUTIVE SUMMARY

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

Technical Advisory Committee Briefing #3

Chapter 1: Introduction Draft

PORT OF GALVESTON PORT DIRECTOR S REPORT. May 22, 2018

California Los Angeles County Chapter PORT OF LOS ANGELES. January 16, 2018

BNA Master Plan Update Public Meeting No. 2

Sean Treacy. Commercial Director Asia Pacific Royal Caribbean Cruises Ltd. September 2014

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Shipbuilding Mega Yards Largesse

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Transcription:

1 Port Everglades Master/Vision Plan Update 3 rd Tenant & Stakeholder Meeting November 21, 2013

2 Agenda Project Process Overview Summary of the Market Assessments October 30 th Charrette Summary Industry Trends Assessment of Projects

3 Master/Vision Plan Update Process Phase I End of September 2013 COMPLETED Existing Conditions Assessment Market Assessment Business Line Forecasts (with and without 50ft of water) Community and Stakeholder Meetings Phase II March/April 2014 Plan Development (Terminal Design Trends, Cargo Operational Enhancement Opportunities, Fa cility Needs Assessment, Conceptual Planning Studies, 20-Year Vision Plan, Parking, and Rail and Truck Traffic) Strategy Development (Master Plan Development & Financial S trategy) Final Plan Plan Implementation Executive Summary Community and Stakeholder Meetings Phase III March/April 2014 3-D Computer Animated Video

Master/Vision Plan SUMMARY OF THE MARKET ASSESSMENTS 4

5 Containers 2,500,000 2,000,000 1,987,953 1,710,612 1,500,000 1,631,967 Total TEUs 1,000,000 949,262 500,000 Actual Baseline @ 2.7% Baseline Plus @ 3.0% High @ 3.7%

6 Dry Bulk, Break Bulk, Yachts and Vehicles 6,000,000 5,388,036 5,000,000 4,000,000 Short Tons 3,000,000 3,288,036 2,000,000 2,388,036 1,000,000 1,368,342 Actual Baseline Baseline Plus High

7 Multi-day Cruise Passengers 7,000,000 6,321,066 6,000,000 5,697,066 5,000,000 5,385,066 4,813,066 Revenue Passengers 4,000,000 3,000,000 3,478,321 2,000,000 1,000,000 Actual Low Medium High High Unconstrained

8 Single-Day Cruise Passengers 1,600,000 1,400,000 1,200,000 1,000,000 Passengers 800,000 600,000 400,000 316,888 200,000 0 81,360 251,125 0 Actual Low Medium High

9 Petroleum 400 350 Historic Forecasted 300 Thousands of Barrels Per Day 250 200 150 100 50 0 Gasoline Jet & Kerosene Diesel Fuel Oil Other Source: Port Everglades (2000 2012), USACE, DOE, IHS Estimates Note 2013 utilizes fiscal year 2013 data to April provided by Port Everglades

Plan Development CHARRETTE SUMMARY 10

Cargo Cruise Petroleum Aggregate Storage and access West of ICTF Molasses Parcel for Neo Bulk Storage or Other Ro Ro Operations at Notch and Berth 5 Tracor Basin Partial or Total Fill (~6ac) Cargo Operations McIntosh Road Capacity and Access Gate Efficiency North Spangler Parcel for Taxi staging Molasses Parcel for staging (Northport will not be staging) Midport Garage for bus staging Tracor Basin Partial or Total Fill (~6ac) Cruise Operations Cruise Terminals 21, 22/24, 25 consolidation North Spangler Parcel for Truck Staging or Other Distribution Molasses Parcel for Potential New Use Modernized Manifold System Achieve 15,000 20,000 barrels/hr Above Ground Pipelines 11

12 Cargo Cruise Petroleum Container Yard Improvements Densification Dynergy Property Utilization Berth 33 Length and Aggregate Berth FPL Return Maximization of Berth 14/15 Analysis Needed Southport Footprint Future Allocation of Available Parcels Berth 19 & 20 Opportunity, Upland & Basin Midport Optimization Analysis of Multi Level Cruise Operations Scheduling Diversification Sufficient Growth Potential for Full Range of Cruise Ships Standardized/ Interchangeable Berths Depth, Width, Loading Arms, Concurrent Operations FPL Return Dynergy Property Utilization Maximization of Berth 14/15 Analysis Needed

13 Port Wide Internal Port Traffic Circulation Overall Analysis Based on Current and Future Volumes Security Gates Capacity Adequate for the Future? E.g., Lanes, Flows, Operations, etc. Future Allocation of Available Parcels for Port Growth Resolution of Proprietary Berth Use by Port Tenants and Identification for Shared Use LNG/CNG Bunkering Acceptable Relocation of Tugs Operations During Construction Airport Operational Impacts Air Draft

Plan Development INDUSTRY TRENDS 14

Industry Trends to Consider in Phase II Cruise terminals Larger footprint to accommodate newest ships Multi level operations Multiple boarding bridges Simultaneous embarkation and debarkation Use of lower level for staging/parking Consolidated terminals and CBP operations Container terminals Densification through use of RTGs/RMGs Consolidated facilities for more efficient access/security Off site empty storage Fewer ships using ships gear LNG bunkering Shore power Renewable Energy Development ( Green Technology) 15

Plan Development PROJECT ASSESSMENT 16

17 Sector Project Northport 1. 2. 3. 4. PETROLEUM NEOBULK NEOBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Midport 5. 6. 7. 8. 9. 10. Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity Southport 11. 12. 13. 14. CARGO DRYBULK McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration

18 Cruise Densification Singapore New York Nassau

NOT BEING CONSIDERED FOR FURTHER STUDY Northport Cruise Complex Expansion 19

NOT BEING CONSIDERED FOR FURTHER STUDY 20 Berth 18 Extension Cost Berth 18 Extension (New Berth 19) $101.2 Rebuild Berth 19 Terminal 18 Expansion ($5.3M) $95.8M TBD Revenue Considerations Cruise (Berth 18 Extension) Oasis Class: one year round sailing Vista Class: one year round sailing Seasonal Sailings Cruise (New Berth 19 Midweek Sailing) Container (New Berth 19 13.3ac) Neobulk (New Berth 19 13.3ac)

ADVANCING IN THE PLAN FOR FURTHER STUDY 21 Midport Cruise Pier 19/20 Replacement of Berth 19/20 with two pier berths capable of berthing Dream- and Vista-Class vessels Requires expansion to Terminal 19 and elevated passenger concourse

ADVANCING IN THE PLAN FOR FURTHER STUDY 22 Midport Cruise Pier 19/20 Cost Pier 19/20 Rebuild Berth 19 Terminal 19/20 Expansion (with Concourse) $118.5M ($4.7M) $113.9M TBD Revenue Considerations Cruise (Pier 19/20) Dream-Class: one year-round sailing Vista-Class: one year-round sailing Seasonal Sailings Container (New Berth 19 16ac)

ADVANCING IN THE PLAN FOR FURTHER STUDY Tracor Partial and Total Fill 23 Cost Partial New Rebuild $51.2M ($19.8M) Total Revenue Considerations Berth 29 Lengthening Cruise Larger Vessel at CT 29 More efficient ops at Berth 29 Connectivity to Midport Cruise East Container Container Yard (+/ 6ac) Connectivity to Southport Increased berth length New Rebuild $62.4M ($19.8M) $31.5M $42.7M

24 Sector Project Northport 1. 2. 3. 4. PETROLEUM NEOBULK NEOBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Midport 5. 6. 7. 8. 9. 10. Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity Southport 11. 12. 13. 14. CARGO DRYBULK McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration

25 Petroleum Berths 7-13 3 redundant berths with an optional 4 th berth Depth Width Loading arms Concurrent operations

Current 20-Year Master Plan Northport Berths 26

ADVANCING IN THE PLAN FOR FURTHER STUDY Petroleum Manifold (Berths 7-13) 27 Partial Preliminary Cost Piping/Manifolds Pumps (6) Switchseat/Pumps Control Pump Controls Unloading Arms (12) $15 20M $2.3M $1.0M $0.5M $1.5M $20.3 25.3M Revenue Considerations 2012 Operating Revenues: $25.7M 15,000 20,000 barrels/hr Two Pipelines Distillate Fuels Residual Fuels

Berth Reconfiguration for Petroleum Berths will Advance for Further Study 28 Northport Berths 5-14 Cost Berths 5 14 Rebuild Berths 5 14 $376.8M ($112.3M) $264.5M Revenue Considerations Cruise Berth 5 Petroleum Berths 7 13 Cement Berth 14/15 Neo Bulk Berths 5, 14/15

29 Sector Project Northport 1. 2. 3. 4. PETROLEUM NEOBULK NEOBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Midport 5. 6. 7. 8. 9. 10. Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity Southport 11. 12. 13. 14. CARGO DRYBULK McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration

ADVANCING IN THE PLAN FOR FURTHER STUDY 30 Neobulk Opportunities Berth 5 Storage yard at PEV PM parcel Berth 14/15 Storage yard at FPL parcel

31 Sector Project Northport 1. 2. 3. 4. PETROLEUM NEOBULK NEOBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Midport 5. 6. 7. 8. 9. 10. Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity Southport 11. 12. 13. 14. CARGO DRYBULK McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration

ADVANCING IN THE PLAN FOR FURTHER STUDY Midport Container Yard 32

33 Sector Project Northport 1. 2. 3. 4. PETROLEUM NEOBULK NEOBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Midport 5. 6. 7. 8. 9. 10. Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity Southport 11. 12. 13. 14. CARGO DRYBULK McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration

Southport Security Checkpoint Relocation 34

35 Sector Project Northport 1. 2. 3. 4. PETROLEUM NEOBULK NEOBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Midport 5. 6. 7. 8. 9. 10. Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity Southport 11. 12. 13. 14. CARGO DRYBULK McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration

36

37 Sector Project Northport 1. 2. 3. 4. PETROLEUM NEOBULK NEOBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Midport 5. 6. 7. 8. 9. 10. Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity Southport 11. 12. 13. 14. CARGO DRYBULK McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration

ADVANCING IN THE PLAN FOR FURTHER STUDY Berth 33 Reconfiguration 38 Greater operating flexibility Cost savings on crane articulation Contiguous berth length 31-33 2,850ft (Berth 33 850ft) Cost New Berth 33 Rebuild Berth 33 $53.8M ($22M) $31.8M

39 Projects Advancing for Further Study Northport Midport Southport 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Sector Project Status PETROLEUM NEOBULK NEOBULK CARGO DRYBULK Northport Cruise Complex Expansion (Slip 2, Berth 5, CT 4, Parking) Slip 1 and Slip 3 (Berths 7/8, 9/10, 12/13, 14/15) Berth 5/ Ro Ro Ramp/ Cargo Yard PEV Parcel Berth 14/15 / Cargo Yard FPL Parcel Pier 19/20 Construction Midport Cruise West Berth 18 Extension Tracor Basin (Partial or Total Fill) Berth lengthening and Cruise Terminal 29 expansion Midport Cruise East Consolidation New Berth 19 (Contingent on 18 Extension) Tracor Basin (Partial or Total Fill) Berth lengthening and container yard expansion Southport Container Yard Connectivity McIntosh Gate 19.9 Acre Parcel Aggregate Berth & Storage Berth 33 Reconfiguration Not Advancing Advancing Advancing Advancing Advancing Not Advancing Advancing Advancing Not Advancing Advancing Advancing Advancing Advancing Advancing

Project Development NEXT STEPS 40

41 Port Everglades Master/Vision Plan Update Contact Person and Email Natacha J. Yacinthe, Ph.D. Project Manager (954) 468-0213 To Submit Comments by E-mail: portmasterplan@broward.org www.portevergladesmasterplan.com