1 July 3, 2014 Re: SWR Bid T , Northwest Trek Asphalt Overlay To Small Works Roster: General, Paving REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Project: Northwest Trek Asphalt Overlay SWR Bid T The Metropolitan Park District of Tacoma will receive bids for SWR Bid T , Northwest Trek Asphalt Overlay project at the office of Northwest Trek Wildlife Park, Metropolitan Park District of Tacoma, Trek Drive East, Eatonville WA until 4:00 PM, Wednesday, July 23, Bids submitted by fax or (must have signature) will be accepted. Bids received after the appointed time set for receipt will be considered non-responsive. All work completed for the Metropolitan Park District will be considered a public works project with prevailing wage documentation required. Contact: Chip Heinz (360) or chip.heinz@nwtrek.org Scope of Work: The project involves an asphalt overlay and an asphalt drainage swale on a portion of the existing roadbed in the Free Roaming Area of Northwest Trek Wildlife Park, Trek Drive East, Eatonville, WA MACC: $100,000 Mandatory Pre-bid Meeting: 10:00AM, Friday, July 11, 2014 Bids Due: 4:00PM, Wednesday, July 23, 2014 Time of Completion: October 1 through October 31, 2014 Liquidated Damages: Please visit our website to view or download specification and/or drawings for SWR Bid T Northwest Trek Asphalt Overlay at Sincerely, Chip Heinz Project Manager

2 INSTRUCTIONS TO BIDDERS Northwest Trek Asphalt Overlay, SWR Bid T SUBMISSION OF BIDS Bids must be delivered no later than Wednesday, July 23, 2014 at 4:00 PM. Informal bids will be received by the Northwest Trek Wildlife Park, Metropolitan Park District of Tacoma, Tacoma, Washington, and to be delivered to Trek Drive East, Eatonville WA or faxed to (360) or ed to (must have signature). Bids submitted by fax or will be accepted if they are received prior to the scheduled bid opening (confirm receipt). Bids received by fax or will be placed in sealed envelopes and opened at the scheduled bid opening with all other bids. There will be a mandatory prebid meeting on site Friday, July 11, 2014 at 10:00 AM. For more information, contact Chip Heinz, Project Manager at (360) or to chip.heinz@nwtrek.org. 2. BIDDING PROCEDURE AND FORMS Bidders shall submit their bids on the bid proposal and signature sheet form included in this invitation to bid. Forms shall be filled in completely in ink or typewritten. The signature sheet must be signed by a responsible company official with their designated title. Bidders may submit additional product information with their bid as desired. 3. BIDDER S REPRESENTATION Each bidder by making his bid represents that he has familiarized himself with the General Conditions for Metropolitan Park District of Tacoma Public Works Projects, Small Works Master Agreement, Metro Parks Tacoma Master Contract for Work Awarded From Small Works Roster and the attached Instructions to Bidders and Specifications. 4. REJECTION OF BIDS & ACCEPTANCE OF BID The MPD shall have the right to reject any or all bids or any items of the bid and to reject a bid, which is in any way incomplete or irregular. Any or all bids may be rejected for good cause. It is the intent of the MPD to award one contract to the lowest responsible bidder, provided the bid does not exceed the funds available. The MPD shall have the right to waive any informality, irregularity, or technical defect in any bids or bids received and to accept the bid or bids which, in its judgment, is in its best interests. 5. AGREEMENT BETWEEN OWNER AND CONTRACTOR A Bidder whose proposal is accepted shall sign the written agreement between MPD and Contractor within ten (10) days from the date of mailing of a Notice from MPD to Bidder of acceptance of his proposal. 6. WARRANTY AND GUARANTEE Bidder warrants and guarantees to MPD that all work will be in accordance with the plans and specifications and will not be defective. If within one year after the date of delivery, any material is found to be defective, the Contractor shall promptly and without cost to MPD, correct such defect. Metro Parks Tacoma Instructions to Bidders Page 1 of 2

3 7. PUBLIC WORK & PREVAILING WAGE RATES Please be aware when submitting a bid that this project is classified as "public work" and is subject to Washington State Prevailing Wage Law. The law requires in part that the following conditions be met: All workers or laborers must be paid the prevailing wage rate for their job classification as determined by the Department of Labor & Industries. A copy of current prevailing wages is attached to this notice. The prime contractor and each subcontractor must file a Statement of Intent to Pay Prevailing Wages with the Department of Labor & Industries, ESAC Division, in Olympia. Statements of intent are to be filed prior to beginning work. The prime contractor and each subcontractor must file a corresponding Affidavit of Prevailing Wages Paid with the Department of Labor & Industries at project completion. Weekly certified payroll forms must be completed by prime contractor and each subcontractor and submitted to the Metropolitan Park District. Industrial Insurance: All Industrial Insurance premium payments must be current for prime contractor and each subcontractor working on the project. The Metropolitan Park District will check with the Department of Labor & Industries to verify current premium status. No progress payments will be made to the prime contractor until approved Statements of Intent to Pay Prevailing Wages have been received by the Metropolitan Park District. Final payment will not be made until approved Affidavits of Prevailing Wages Paid have been received along with determination that the prime contractor and each subcontractor is in a current premium status. Please note that it is the responsibility of the contractor to forward the statements and affidavits. Inquiries regarding prevailing wages or current prevailing wage rates should be directed to the Department of Labor & Industries, Trades & Licensing Division, (360) General questions about the Metropolitan Park District of Tacoma's bidding should be directed to Rhonda Higgins at (253) , and contract compliance requirements should be directed to Elaine Rasmussen at (253) Blank Statements of Intent to Pay Prevailing Wages and Affidavits of Prevailing Wages Paid can be obtained from either the Department of Labor & Industries or the Metropolitan Park District. Metro Parks Tacoma Instructions to Bidders Page 2 of 2

4 1 of 17 7/3/ :47 AM State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone PO Box 44540, Olympia, WA Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 07/23/2014 County Trade Job Classification Wage Holiday Overtime Note Asbestos Abatement Workers Journey Level $ D 1H Boilermakers Journey Level $ N 1C Brick Mason Brick And Block Finisher $ A 1M Brick Mason Journey Level $ A 1M Brick Mason Pointer-Caulker-Cleaner $ A 1M Building Service Employees Janitor $ Building Service Employees Shampooer $ Building Service Employees Waxer $ Building Service Employees Window Cleaner $ Cabinet Makers (In Shop) Journey Level $ Carpenters Acoustical Worker $ D 1M Carpenters Bridge, Dock And Wharf $ D 1M Carpenters Carpenters Carpenter $ D 1M Carpenters Carpenters on Stationary Tools $ D 1M Carpenters Creosoted Material $ D 1M Carpenters Floor Finisher $ D 1M Carpenters Floor Layer $ D 1M Carpenters Scaffold Erector $ D 1M Cement Masons Journey Level $ A 1M Divers & Tenders Diver $ D 1M 8A Divers & Tenders Diver On Standby $ D 1M Divers & Tenders Diver Tender $ D 1M Divers & Tenders Surface Rcv & Rov Operator $ D 1M Divers & Tenders Surface Rcv & Rov Operator $ A 1B Tender Dredge Workers Assistant Engineer $ D 3F Dredge Workers Assistant Mate (Deckhand) $ D 3F

5 2 of 17 7/3/ :47 AM Dredge Workers Boatmen $ D 3F Dredge Workers Engineer Welder $ D 3F Dredge Workers Leverman, Hydraulic $ D 3F Dredge Workers Mates $ D 3F Dredge Workers Oiler $ D 3F Drywall Applicator Journey Level $ D 1H Drywall Tapers Journey Level $ P 1E Electrical Fixture Maintenance Journey Level $ Workers Electricians - Inside Cable Splicer $ C 1G Electricians - Inside Journey Level $ C 1G Electricians - Inside Lead Covered Cable Splicer $ C 1G Electricians - Inside Welder $ C 1G Electricians - Motor Shop Craftsman $ Electricians - Motor Shop Journey Level $ Electricians - Powerline Cable Splicer $ A 4A Construction Electricians - Powerline Certified Line Welder $ A 4A Construction Electricians - Powerline Groundperson $ A 4A Construction Electricians - Powerline Heavy Line Equipment Operator $ A 4A Construction Electricians - Powerline Journey Level Lineperson $ A 4A Construction Electricians - Powerline Line Equipment Operator $ A 4A Construction Electricians - Powerline Pole Sprayer $ A 4A Construction Electricians - Powerline Powderperson $ A 4A Construction Electronic Technicians Journey Level $ Elevator Constructors Mechanic $ D 4A Elevator Constructors Mechanic In Charge $ D 4A Fabricated Precast Concrete Journey Level - In-Factory Work $ Products Only Fence Erectors Fence Erector $ Flaggers Journey Level $ A 3I Glaziers Journey Level $ L 1Y Heat & Frost Insulators And Journeyman $ J 1S Asbestos Workers Heating Equipment Mechanics Journey Level $ F 1E Hod Carriers & Mason Tenders Journey Level $ A 3I Industrial Power Vacuum Cleaner Journey Level $9.32 1

6 3 of 17 7/3/ :47 AM Inland Boatmen Boat Operator $ B 1K Inland Boatmen Cook $ B 1K Inland Boatmen Deckhand $ B 1K Inland Boatmen Deckhand Engineer $ B 1K Inland Boatmen Launch Operator $ B 1K Inland Boatmen Mate $ B 1K Inspection/Cleaning/Sealing Of Sewer & Water Systems By Remote Control Cleaner Operator, Foamer Operator $ Inspection/Cleaning/Sealing Of Sewer & Water Systems By Remote Control Inspection/Cleaning/Sealing Of Sewer & Water Systems By Remote Control Inspection/Cleaning/Sealing Of Sewer & Water Systems By Remote Control Inspection/Cleaning/Sealing Of Sewer & Water Systems By Remote Control Grout Truck Operator $ Head Operator $ Technician $ Tv Truck Operator $ Insulation Applicators Journey Level $ D 1M Ironworkers Journeyman $ N 1O Laborers Air, Gas Or Electric Vibrating $ A 3I Screed Laborers Airtrac Drill Operator $ A 3I Laborers Ballast Regular Machine $ A 3I Laborers Batch Weighman $ A 3I Laborers Brick Pavers $ A 3I Laborers Brush Cutter $ A 3I Laborers Brush Hog Feeder $ A 3I Laborers Burner $ A 3I Laborers Caisson Worker $ A 3I Laborers Carpenter Tender $ A 3I Laborers Caulker $ A 3I Laborers Cement Dumper-paving $ A 3I Laborers Cement Finisher Tender $ A 3I Laborers Change House Or Dry Shack $ A 3I Laborers Chipping Gun (under 30 Lbs.) $ A 3I Laborers Chipping Gun(30 Lbs. And Over) $ A 3I Laborers Choker Setter $ A 3I Laborers Chuck Tender $ A 3I Laborers Clary Power Spreader $ A 3I Laborers Clean-up Laborer $ A 3I

7 4 of 17 7/3/ :47 AM Laborers Concrete Dumper/chute $ A 3I Operator Laborers Concrete Form Stripper $ A 3I Laborers Concrete Placement Crew $ A 3I Laborers Concrete Saw Operator/core $ A 3I Driller Laborers Crusher Feeder $ A 3I Laborers Curing Laborer $ A 3I Laborers Demolition: Wrecking & Moving $ A 3I (incl. Charred Material) Laborers Ditch Digger $ A 3I Laborers Diver $ A 3I Laborers Drill Operator $ A 3I (hydraulic,diamond) Laborers Dry Stack Walls $ A 3I Laborers Dump Person $ A 3I Laborers Epoxy Technician $ A 3I Laborers Erosion Control Worker $ A 3I Laborers Faller & Bucker Chain Saw $ A 3I Laborers Fine Graders $ A 3I Laborers Firewatch $ A 3I Laborers Form Setter $ A 3I Laborers Gabian Basket Builders $ A 3I Laborers General Laborer $ A 3I Laborers Grade Checker & Transit Person $ A 3I Laborers Grinders $ A 3I Laborers Grout Machine Tender $ A 3I Laborers Groutmen (pressure)including $ A 3I Post Tension Beams Laborers Guardrail Erector $ A 3I Laborers Hazardous Waste Worker (level $ A 3I A) Laborers Hazardous Waste Worker (level $ A 3I B) Laborers Hazardous Waste Worker (level $ A 3I C) Laborers High Scaler $ A 3I Laborers Jackhammer $ A 3I Laborers Laserbeam Operator $ A 3I Laborers Maintenance Person $ A 3I Laborers Manhole Builder-mudman $ A 3I Laborers Material Yard Person $ A 3I Laborers Motorman-dinky Locomotive $ A 3I

8 5 of 17 7/3/ :47 AM Laborers Nozzleman (concrete Pump, Green Cutter When Using Combination Of High Pressure Air & Water On Concrete & Rock, Sandblast, Gunite, Shotcrete, Water Bla $ A 3I Laborers Pavement Breaker $ A 3I Laborers Pilot Car $ A 3I Laborers Pipe Layer Lead $ A 3I Laborers Pipe Layer/tailor $ A 3I Laborers Pipe Pot Tender $ A 3I Laborers Pipe Reliner $ A 3I Laborers Pipe Wrapper $ A 3I Laborers Pot Tender $ A 3I Laborers Powderman $ A 3I Laborers Powderman's Helper $ A 3I Laborers Power Jacks $ A 3I Laborers Railroad Spike Puller - Power $ A 3I Laborers Raker - Asphalt $ A 3I Laborers Re-timberman $ A 3I Laborers Remote Equipment Operator $ A 3I Laborers Rigger/signal Person $ A 3I Laborers Rip Rap Person $ A 3I Laborers Rivet Buster $ A 3I Laborers Rodder $ A 3I Laborers Scaffold Erector $ A 3I Laborers Scale Person $ A 3I Laborers Sloper (over 20") $ A 3I Laborers Sloper Sprayer $ A 3I Laborers Spreader (concrete) $ A 3I Laborers Stake Hopper $ A 3I Laborers Stock Piler $ A 3I Laborers Tamper & Similar Electric, Air & $ A 3I Gas Operated Tools Laborers Tamper (multiple & $ A 3I Self-propelled) Laborers Timber Person - Sewer (lagger, $ A 3I Shorer & Cribber) Laborers Toolroom Person (at Jobsite) $ A 3I Laborers Topper $ A 3I Laborers Track Laborer $ A 3I Laborers Track Liner (power) $ A 3I Laborers Traffic Control Laborer $ A 3I 8R Laborers Traffic Control Supervisor $ A 3I 8R

9 6 of 17 7/3/ :47 AM Laborers Truck Spotter $ A 3I Laborers Tugger Operator $ A 3I Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker 0-30 psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Compressed Air $ A 3I 8Q Worker psi Laborers Tunnel Work-Guage and Lock $ A 3I 8Q Tender Laborers Tunnel Work-Miner $ A 3I 8Q Laborers Vibrator $ A 3I Laborers Vinyl Seamer $ A 3I Laborers Watchman $ A 3I Laborers Welder $ A 3I Laborers Well Point Laborer $ A 3I Laborers Window Washer/cleaner $ A 3I Laborers - Underground Sewer General Laborer & Topman $ A 3I & Water Laborers - Underground Sewer Pipe Layer $ A 3I & Water Landscape Construction Irrigation Or Lawn Sprinkler $ Installers Landscape Construction Landscape Equipment Operators $ Or Truck Drivers Landscape Construction Landscaping Or Planting $ Laborers Lathers Journey Level $ D 1H Marble Setters Journey Level $ A 1M Metal Fabrication (In Shop) Fitter $ Metal Fabrication (In Shop) Laborer $ Metal Fabrication (In Shop) Machine Operator $ Metal Fabrication (In Shop) Welder $ Millwright Journey Level $ D 1M

10 7 of 17 7/3/ :47 AM Modular Buildings Journey Level $ Painters Journey Level $ Z 2B Pile Driver Journey Level $ D 1M Plasterers Journey Level $ Q 1R Playground & Park Equipment Journey Level $ Installers Plumbers & Pipefitters Journey Level $ A 1G Power Equipment Operators Asphalt Plant Operator $ A 3C 8P Power Equipment Operators Assistant Engineers $ A 3C 8P Power Equipment Operators Barrier Machine (zipper) Power Equipment Operators Batch Plant Operator: Concrete Power Equipment Operators Bobcat $ A 3C 8P Power Equipment Operators Brokk - Remote Demolition $ A 3C 8P Equipment Power Equipment Operators Brooms $ A 3C 8P Power Equipment Operators Bump Cutter Power Equipment Operators Cableways $ A 3C 8P Power Equipment Operators Chipper Power Equipment Operators Compressor $ A 3C 8P Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Over 42m $ A 3C 8P Power Equipment Operators Concrete Finish Machine -laser Screed Power Equipment Operators Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Up To 42m $ A 3C 8P $ A 3C 8P Power Equipment Operators Conveyors $ A 3C 8P Power Equipment Operators Cranes, 100 Tons Tons, Or 150 Ft Of Boom (including Jib With Attachments) $ A 3C 8P Power Equipment Operators Cranes, 200 Tons To 300 Tons, Or 250 Ft Of Boom (including Jib With Attachments) Power Equipment Operators Cranes: 20 Tons Through 44 Tons With Attachments Power Equipment Operators Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) Power Equipment Operators Cranes: A-frame - 10 Tons And Under Power Equipment Operators Cranes: Friction 100 Tons Through 199 Tons $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P

11 8 of 17 7/3/ :47 AM Power Equipment Operators Cranes: Friction Over 200 Tons $ A 3C 8P Power Equipment Operators Cranes: Over 300 Tons, Or 300' Of Boom (Including Jib With Attachments) $ A 3C 8P Power Equipment Operators Cranes: Through 19 Tons With Attachments A-frame Over 10 Tons $ A 3C 8P Power Equipment Operators Crusher Power Equipment Operators Deck Engineer/deck Winches (power) Power Equipment Operators Derricks, On Building Work $ A 3C 8P Power Equipment Operators Dozers D-9 & Under $ A 3C 8P Power Equipment Operators Drill Oilers: Auger Type, Truck $ A 3C 8P Or Crane Mount Power Equipment Operators Drilling Machine Power Equipment Operators Elevator And Man-lift: $ A 3C 8P Permanent And Shaft Type Power Equipment Operators Finishing Machine, Bidwell And Gamaco & Similar Equipment Power Equipment Operators Forklift: 3000 Lbs And Over With $ A 3C 8P Attachments Power Equipment Operators Forklifts: Under 3000 Lbs. With $ A 3C 8P Attachments Power Equipment Operators Grade Engineer: Using Blueprints, Cut Sheets,etc. Power Equipment Operators Gradechecker/stakeman $ A 3C 8P Power Equipment Operators Guardrail Punch Power Equipment Operators Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. & Over $ A 3C 8P Power Equipment Operators Hard Tail End Dump Articulating Off-road Equipment Under 45 Yards Power Equipment Operators Horizontal/directional Drill Locator Power Equipment Operators Horizontal/directional Drill Operator Power Equipment Operators Hydralifts/Boom Trucks Over 10 Tons Power Equipment Operators Hydralifts/boom Trucks, 10 Tons And Under Power Equipment Operators Loader, Overhead 8 Yards. & Over Power Equipment Operators Loader, Overhead, 6 Yards. But Not Including 8 Yards Power Equipment Operators Loaders, Overhead Under 6 Yards $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P

12 9 of 17 7/3/ :47 AM Power Equipment Operators Loaders, Plant Feed Power Equipment Operators Loaders: Elevating Type Belt $ A 3C 8P Power Equipment Operators Locomotives, All Power Equipment Operators Material Transfer Device Power Equipment Operators Mechanics, All (Leadmen - $0.50 $ A 3C 8P Per Hour Over Mechanic) Power Equipment Operators Motor Patrol Grader - $ A 3C 8P Non-finishing Power Equipment Operators Motor Patrol Graders, Finishing $ A 3C 8P Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield $ A 3C 8P Power Equipment Operators Oil Distributors, Blower Distribution & Mulch Seeding Operator $ A 3C 8P Power Equipment Operators Outside Hoists (elevators And $ A 3C 8P Manlifts), Air Tuggers,strato Power Equipment Operators Overhead, Bridge Type Crane: 20 Tons Through 44 Tons Power Equipment Operators Overhead, Bridge Type: 100 Tons $ A 3C 8P And Over Power Equipment Operators Overhead, Bridge Type: 45 Tons $ A 3C 8P Through 99 Tons Power Equipment Operators Pavement Breaker $ A 3C 8P Power Equipment Operators Pile Driver (other Than Crane Mount) Power Equipment Operators Plant Oiler - Asphalt, Crusher $ A 3C 8P Power Equipment Operators Posthole Digger, Mechanical $ A 3C 8P Power Equipment Operators Power Plant $ A 3C 8P Power Equipment Operators Pumps - Water $ A 3C 8P Power Equipment Operators Quad 9, HD 41, D10 And Over $ A 3C 8P Power Equipment Operators Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $ A 3C 8P Power Equipment Operators Remote Control Operator On Rubber Tired Earth Moving Equipment $ A 3C 8P Power Equipment Operators Rigger And Bellman $ A 3C 8P Power Equipment Operators Rollagon $ A 3C 8P Power Equipment Operators Roller, Other Than Plant Mix $ A 3C 8P Power Equipment Operators Roller, Plant Mix Or Multi-lift $ A 3C 8P Materials Power Equipment Operators Roto-mill, Roto-grinder Power Equipment Operators Saws - Concrete $ A 3C 8P Power Equipment Operators Scraper, Self Propelled Under 45 Yards

13 10 of 17 7/3/ :47 AM Power Equipment Operators Scrapers - Concrete & Carry All $ A 3C 8P Power Equipment Operators Scrapers, Self-propelled: 45 $ A 3C 8P Yards And Over Power Equipment Operators Service Engineers - Equipment $ A 3C 8P Power Equipment Operators Shotcrete/gunite Equipment $ A 3C 8P Power Equipment Operators Shovel, Excavator, Backhoe, $ A 3C 8P Tractors Under 15 Metric Tons. Power Equipment Operators Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $ A 3C 8P Power Equipment Operators Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons Power Equipment Operators Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $ A 3C 8P Power Equipment Operators Shovel, Excavator, Backhoes: $ A 3C 8P Over 90 Metric Tons Power Equipment Operators Slipform Pavers $ A 3C 8P Power Equipment Operators Spreader, Topsider & Screedman $ A 3C 8P Power Equipment Operators Subgrader Trimmer Power Equipment Operators Tower Bucket Elevators $ A 3C 8P Power Equipment Operators Tower Crane Over 175'in Height, $ A 3C 8P Base To Boom Power Equipment Operators Tower Crane Up: To 175' In $ A 3C 8P Height, Base To Boom Power Equipment Operators Transporters, All Track Or Truck $ A 3C 8P Type Power Equipment Operators Trenching Machines $ A 3C 8P Power Equipment Operators Truck Crane Oiler/driver Tons And Over Power Equipment Operators Truck Crane Oiler/driver Under $ A 3C 8P 100 Tons Power Equipment Operators Truck Mount Portable Conveyor Power Equipment Operators Welder $ A 3C 8P Power Equipment Operators Wheel Tractors, Farmall Type $ A 3C 8P Power Equipment Operators Yo Yo Pay Dozer Asphalt Plant Operator $ A 3C 8P Assistant Engineers $ A 3C 8P Barrier Machine (zipper) Batch Plant Operator: Concrete Bobcat $ A 3C 8P

14 11 of 17 7/3/ :47 AM Brokk - Remote Demolition Equipment $ A 3C 8P Brooms $ A 3C 8P Bump Cutter Cableways $ A 3C 8P Chipper Compressor $ A 3C 8P Concrete Pump: Truck Mount With Boom Attachment Over 42m Concrete Finish Machine -laser Screed Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure Concrete Pump: Truck Mount With Boom Attachment Up To 42m $ A 3C 8P $ A 3C 8P $ A 3C 8P Conveyors $ A 3C 8P Cranes, 100 Tons Tons, Or 150 Ft Of Boom (including Jib With Attachments) Cranes, 200 Tons To 300 Tons, Or 250 Ft Of Boom (including Jib With Attachments) Cranes: 20 Tons Through 44 Tons With Attachments Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) Cranes: A-frame - 10 Tons And Under Cranes: Friction 100 Tons Through 199 Tons $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P Cranes: Friction Over 200 Tons $ A 3C 8P Cranes: Over 300 Tons, Or 300' Of Boom (Including Jib With Attachments) Cranes: Through 19 Tons With Attachments A-frame Over 10 Tons $ A 3C 8P $ A 3C 8P

15 12 of 17 7/3/ :47 AM Crusher Deck Engineer/deck Winches (power) Derricks, On Building Work $ A 3C 8P Dozers D-9 & Under $ A 3C 8P Drill Oilers: Auger Type, Truck Or Crane Mount $ A 3C 8P Drilling Machine Elevator And Man-lift: Permanent And Shaft Type Finishing Machine, Bidwell And Gamaco & Similar Equipment Forklift: 3000 Lbs And Over With Attachments Forklifts: Under 3000 Lbs. With Attachments Grade Engineer: Using Blueprints, Cut Sheets,etc. $ A 3C 8P $ A 3C 8P $ A 3C 8P Gradechecker/stakeman $ A 3C 8P Guardrail Punch Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. & Over Hard Tail End Dump Articulating Off-road Equipment Under 45 Yards Horizontal/directional Drill Locator Horizontal/directional Drill Operator Hydralifts/Boom Trucks Over 10 Tons Hydralifts/boom Trucks, 10 Tons And Under Loader, Overhead 8 Yards. & Over Loader, Overhead, 6 Yards. But Not Including 8 Yards Loaders, Overhead Under 6 Yards $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P Loaders, Plant Feed

16 13 of 17 7/3/ :47 AM Loaders: Elevating Type Belt $ A 3C 8P Locomotives, All Material Transfer Device Mechanics, All (Leadmen - $0.50 Per Hour Over Mechanic) Motor Patrol Grader - Non-finishing $ A 3C 8P $ A 3C 8P Motor Patrol Graders, Finishing $ A 3C 8P Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield Oil Distributors, Blower Distribution & Mulch Seeding Operator Outside Hoists (elevators And Manlifts), Air Tuggers,strato Overhead, Bridge Type Crane: 20 Tons Through 44 Tons Overhead, Bridge Type: 100 Tons And Over Overhead, Bridge Type: 45 Tons Through 99 Tons $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P Pavement Breaker $ A 3C 8P Pile Driver (other Than Crane Mount) Plant Oiler - Asphalt, Crusher $ A 3C 8P Posthole Digger, Mechanical $ A 3C 8P Power Plant $ A 3C 8P Pumps - Water $ A 3C 8P Quad 9, HD 41, D10 And Over $ A 3C 8P Quick Tower - No Cab, Under 100 Feet In Height Based To Boom Remote Control Operator On Rubber Tired Earth Moving Equipment $ A 3C 8P $ A 3C 8P Rigger And Bellman $ A 3C 8P

17 14 of 17 7/3/ :47 AM Rollagon $ A 3C 8P Roller, Other Than Plant Mix $ A 3C 8P Roller, Plant Mix Or Multi-lift Materials $ A 3C 8P Roto-mill, Roto-grinder Saws - Concrete $ A 3C 8P Scraper, Self Propelled Under 45 Yards Scrapers - Concrete & Carry All $ A 3C 8P Scrapers, Self-propelled: 45 Yards And Over $ A 3C 8P Service Engineers - Equipment $ A 3C 8P Shotcrete/gunite Equipment $ A 3C 8P Shovel, Excavator, Backhoe, Tractors Under 15 Metric Tons. Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons Shovel, Excavator, Backhoes: Over 90 Metric Tons $ A 3C 8P $ A 3C 8P $ A 3C 8P $ A 3C 8P Slipform Pavers $ A 3C 8P Spreader, Topsider & Screedman $ A 3C 8P Subgrader Trimmer Tower Bucket Elevators $ A 3C 8P Tower Crane Over 175'in Height, Base To Boom Tower Crane: Up To 175' In Height, Base To Boom Transporters, All Track Or Truck Type $ A 3C 8P $ A 3C 8P $ A 3C 8P Trenching Machines $ A 3C 8P

18 15 of 17 7/3/ :47 AM Power Line Clearance Tree Trimmers Power Line Clearance Tree Trimmers Power Line Clearance Tree Trimmers Power Line Clearance Tree Trimmers Power Line Clearance Tree Trimmers Truck Crane Oiler/driver Tons And Over Truck Crane Oiler/driver Under 100 Tons $ A 3C 8P Truck Mount Portable Conveyor Welder $ A 3C 8P Wheel Tractors, Farmall Type $ A 3C 8P Yo Yo Pay Dozer Journey Level In Charge $ A 4A Spray Person $ A 4A Tree Equipment Operator $ A 4A Tree Trimmer $ A 4A Tree Trimmer Groundperson $ A 4A Refrigeration & Air Conditioning Mechanic $ A 1G Mechanics Residential Brick Mason Journey Level $ Residential Carpenters Journey Level $ D 1M Residential Cement Masons Journey Level $ A 1M Residential Drywall Applicators Journey Level $ D 1M Residential Drywall Tapers Journey Level $ P 1E Residential Electricians JOURNEY LEVEL $ Residential Glaziers Journey Level $ L 1H Residential Insulation Journey Level $ Applicators Residential Laborers Journey Level $ Residential Marble Setters Journey Level $ Residential Painters Journey Level $ Residential Plumbers & Journey Level $ A 1G Pipefitters Residential Refrigeration & Air Journey Level $ A 1G Conditioning Mechanics Residential Sheet Metal Journey Level (Field or Shop) $ F 1R Workers Residential Soft Floor Layers Journey Level $ E 1B Residential Sprinkler Fitters Journey Level $ C 2R (Fire Protection) Residential Stone Masons Journey Level $

19 16 of 17 7/3/ :47 AM Residential Terrazzo Workers Journey Level $ Residential Terrazzo/Tile Journey Level $ Finishers Residential Tile Setters Journey Level $ Roofers Journey Level $ A 2O Roofers Using Irritable Bituminous $ A 2O Materials Sheet Metal Workers Journey Level (Field or Shop) $ F 1E Shipbuilding & Ship Repair Boilermaker $ M 1H Shipbuilding & Ship Repair Carpenter $ E 1B Shipbuilding & Ship Repair Electrician $ E 1B Shipbuilding & Ship Repair Heat & Frost Insulator $ J 1S Shipbuilding & Ship Repair Laborer $ Shipbuilding & Ship Repair Machinist $ E 1B Shipbuilding & Ship Repair Operator $ E 1B Shipbuilding & Ship Repair Painter $ A 1R Shipbuilding & Ship Repair Pipefitter $ E 1B Shipbuilding & Ship Repair Rigger $ Shipbuilding & Ship Repair Sandblaster $ A 1R Shipbuilding & Ship Repair SHEET METAL $ Shipbuilding & Ship Repair Shipfitter $ E 1B Shipbuilding & Ship Repair Trucker $ Shipbuilding & Ship Repair Warehouse $ Shipbuilding & Ship Repair Welder/burner $ E 1B Sign Makers & Installers Sign Installer $ (Electrical) Sign Makers & Installers Sign Maker $ (Electrical) Sign Makers & Installers Sign Installer $ (Non-Electrical) Sign Makers & Installers Sign Maker $ (Non-Electrical) Soft Floor Layers Journey Level $ A 3D Solar Controls For Windows Journey Level $ Sprinkler Fitters (Fire Journey Level $ C 1X Protection) Stage Rigging Mechanics (Non Journey Level $ Structural) Stone Masons Journey Level $ A 1M Street And Parking Lot Sweeper Journey Level $ Workers Surveyors All Classifications $35.68 Null 1 Telecommunication Technicians Journey Level $ Telephone Line Construction - Outside Cable Splicer $ A 2B

20 17 of 17 7/3/ :47 AM Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Telephone Line Construction - Outside Hole Digger/Ground Person $ A 2B Installer (Repairer) $ A 2B Special Aparatus Installer I $ A 2B Special Apparatus Installer II $ A 2B Telephone Equipment Operator (Heavy) Telephone Equipment Operator (Light) $ A 2B $ A 2B Telephone Lineperson $ A 2B Television Groundperson $ A 2B Television Lineperson/Installer $ A 2B Television System Technician $ A 2B Television Technician $ A 2B Tree Trimmer $ A 2B Terrazzo Workers Journey Level $ A 1M Tile Setters Journey Level $ A 1M Tile, Marble & Terrazzo Journey Level $ Finishers Traffic Control Stripers Journey Level $ A 1K Truck Drivers Asphalt Mix $ Truck Drivers Dump Truck $ Truck Drivers Dump Truck And Trailer $ Truck Drivers Other Trucks $ Truck Drivers Transit Mixer $ I 2H Well Drillers & Irrigation Pump Irrigation Pump Installer $ Installers Well Drillers & Irrigation Pump Oiler $ Installers Well Drillers & Irrigation Pump Installers Well Driller $

21 Benefit Code Key Effective thru ************************************************************************************************************ Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two (2) hours before or after a five-eight (8) hour workweek day or a four-ten (10) hour workweek day and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1

22 Benefit Code Key Effective thru N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays, holidays and after twelve (12) hours, Monday through Friday and after ten (10) hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays (except makeup days if circumstances warrant) and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee) and all hours worked in excess of eight (8) hours per day (10 hours per day for a 4 x 10 workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2

23 Benefit Code Key Effective thru ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The first eight (8) hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. B. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 3

24 Benefit Code Key Effective thru C. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. D. All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium rate of 15% over the hourly rate of wage. All other hours worked after 6:00 am on Saturdays, shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week, once 40 hours of straight time work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. F. All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half (1-1/2) times the regular rate of pay. I. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. In the event the job is down due to weather conditions during a five day work week (Monday through Friday,) or a four day-ten hour work week (Tuesday through Friday,) then Saturday may be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, and Christmas Day (7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, the day before Christmas, and Christmas Day (8). C. Holidays: New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). 4

25 Benefit Code Key Effective thru H. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Day after Thanksgiving Day, And Christmas (6). I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day, And Christmas Day (7). K. Holidays: New Year s Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). L. Holidays: New Year s Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, And Christmas Day (8). N. Holidays: New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (9). P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, One-Half Day Before Christmas Day, And Christmas Day. (7 1/2). S. Paid Holidays: New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, And Christmas Day (7). T. Paid Holidays: New Year's Day, Washington s Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Holiday Codes Continued 6. A. Paid Holidays: New Year s Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, Christmas Day, And A Half-Day On Christmas Eve Day. (9 1/2). G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And Christmas Eve Day (11). H. Paid Holidays: New Year's Day, New Year s Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (10). 5

26 Benefit Code Key Effective thru I. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, And Christmas Day (7). T. Paid Holidays: New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran s Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President s Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. 6

27 Benefit Code Key Effective thru I. Holidays: New Year's Day, President s Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year s Day, President s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, And the Day after or before Christmas Day 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. When Christmas falls on a Saturday, the preceding Friday shall be observed as a holiday. O. Paid Holidays: New Year's Day, The Day After Or Before New Year s Day, President s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day After Or Before Christmas Day, And The Employees Birthday. 11). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays: New Year's Day, the day after or before New Year s Day, President s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day after or before Christmas Day (10). If any of the listed holidays fall on Saturday, the preceding Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (9). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. 7

28 Benefit Code Key Effective thru Note Codes 8. A. In addition to the hourly wage and fringe benefits, the following depth premiums apply to depths of fifty feet or more: Over 50 To 100' -$2.00 per Foot for Each Foot Over 50 Feet Over 100' To 150' -$3.00 per Foot for Each Foot Over 100 Feet Over 150' To 220' -$4.00 per Foot for Each Foot Over 150 Feet Over 220' -$5.00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits, the following depth premiums apply to depths of fifty feet or more: Over 50 To 100' -$1.00 per Foot for Each Foot Over 50 Feet Over 100' To 150' -$1.50 per Foot for Each Foot Over 100 Feet Over 150' To 200' -$2.00 per Foot for Each Foot Over 150 Feet Over 200' -Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And Level C: $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level C: $0.50, And Level D: $0.25. P. Workers on hazmat projects receive additional hourly premiums as follows -Class A Suit: $2.00, Class B Suit: $1.50, Class C Suit: $1.00, And Class D Suit $0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. R. Effective August 31, 2012 A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, S. Effective August 31, 2012 A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, T. Effective August 31, 2012 A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31,

29 BID PROPOSAL FOR Northwest Trek Asphalt Overlay, SWR Bid T Bid Due: Wednesday, July 23, 2014 by 4:00 PM. Scope of Work: The project involves an asphalt overlay and an asphalt drainage swale on a portion of the existing roadbed in the Free Roaming Area of Northwest Trek Wildlife Park, Trek Drive East, Eatonville, WA Construction shall be completed within the construction window of October 1 through October 31, If not completed by such date, the contractor shall be liable to the District for damages. The Owner and Contractor agree that in the event this project is not completed on time, the Owner's damages are difficult to calculate. As a result, the Owner and Contractor agree that if the project is not completed by the completion date, Liquidated Damages will be assessed in the amount of $ / day. The undersigned Bidder declares that he has read and fully understands the Notice Inviting Bids, General Conditions for Metropolitan Park District of Tacoma Public Works Projects, Small Works Master Agreement, Metro Parks Tacoma Master Contract for Work Awarded From Small Works Roster, and each and every other Contract Document referred to therein and agrees to all of the terms, conditions and provisions contained therein; that he has examined the site of the work and has made the investigations and formed the estimates as to all conditions and contingencies referred to in and required by the Contract Documents, and he proposes and agrees that if his bid as submitted in the Proposal be accepted, he will contract in the form provided to perform all of the work and in the manner required by the Contract Documents and to complete the same within the time stipulated; that he will accept in full payment therefore the prices named herein. Said prices are to include and cover the furnishing of all materials, the performing of all labor requisite or proper, supervision, overhead, profit, taxes (excluding State sales tax), and the providing of all necessary machinery, tools, appurtenances, equipment and other means required to fully complete this contract, except as otherwise specifically provided in the Specifications. Receipt of addenda numbered is hereby acknowledged and all costs of the work therefore have been included in the Proposal. Base Bid Schedule Written Base Bid Amount (Not including WSST) $ The BASE BID AMOUNT includes the following breakdown: Item Description Estimated Quantities Unit of Measure Unit Price 1 Mobilization N/A Lump Sum >>>>>>>>>>>>>>>>>>> Unit Price Extension 2 Asphalt Overlay 75,000 SF 3 Asphalt Swale 150 LF 4 Swale Drainage N/A Lump Sum >>>>>>>>>>>>>>>>>>> Total Base Bid Amount (Must Equal the Written Base Bid Amount above)

30 Unit Price Schedule A. The Contractor agrees that for requested and/or required changes in the scope of the work, the contract sum shall be adjusted in accordance with the following unit prices, where the Metropolitan Park District elects to use this method of determining cost. B. Contractors are advised that the unit prices will enter into the determination of the successful bidder. Unreasonable prices may result in rejection of the entire bid proposal. Unit prices listed below refer to all items installed and completely in place in accordance with an applicable portion of the Construction Documents and include all costs connected with such items, including, but not necessarily limited to, materials, labor, overhead, and profits for general contractor and/or subcontractor. C. No extra will be allowed if an increase becomes necessary due to an error or omission of contractor or any subcontractor. D. Written "Changes in the Work" will be issued formalizing any authorized changes. E. The following unit bid prices do not include State sales tax: No. Item Unit Cost/Unit 1 Asphalt Overlay Square Foot 2 Asphalt Drainage Swale Linear Foot Bid Submitted By: Bidder s Name Title Signature Date Company Name Address City, State & Zip Code Telephone Number Fax Number

31 Northwest Trek Asphalt Overlay BID T SUMMARY OF WORK PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. SCOPE The project involves an asphalt overlay and an asphalt drainage swale on a portion of the existing roadbed in the Free Roaming Area of Northwest Trek Wildlife Park, Trek Drive East, Eatonville, WA The Free Roaming Area contains approximately 94,000 square feet of roadbed requiring upgrades; 75,000 square feet is included in the Base Bid scope. The road currently consists of four inches (4 ) of asphalt over a crushed rock base. The original two inches (2 ) was laid in A two inch (2 ) overlay was applied in Over the years, various asphalt repairs have been made to the approximately twelve feet six inch wide road system. The MACC (Maximum Allowable Construction Cost) for this scope is $100, Asphalt Overlay (Drawing 1) a. Apply tack coat b. Apply and roll 2 of ½ HMA c. Tamp edges d. Taper the asphalt at the start and end of overlay and at any cross roads to create a smooth transition. i. Besides the start and finish, there will be 6 other areas to taper for a total of eight (8) tapered transitions a) For Transitions: Cut out existing asphalt at start and end of overlay to create a smooth transition. b) Seal joints 2. Asphalt Drainage Swale (Drawing 2) e. Excavate a gentle swale on the west side of the tram road i. Approximately 2 3 wide by 150 long ii. Take care not to disturb the 3 wide horizontal chainlink apron attached at the base of the chainlink fence and protruding into the Free Roaming Area f. Excavate for and install a Type 1 Catch Basin (Shope catch basin 75 or equivalent) at the end of the swale i. Catch Basin and grating supplied by contractor g. Excavate through the asphalt roadway (4 of existing asphalt) and install a 12 diameter dual wall drain pipe i. Protrude beyond road by ~3 4 ii. Drain pipe supplied by contractor h. Backfill and properly compact drain pipe trench i. Install crushed rock over swale excavation and over drain pipe j. Install and compact 2 of asphalt over swale establishing gravity drainage into the catch basin grating i. ½ HMA ii. Tamp edges General Requirements

32 Northwest Trek Asphalt Overlay BID T SUMMARY OF WORK k. Install and compact 6 of asphalt over the drain pipe trench i. ½ HMA ii. Tamp edges B. LABOR AND MATERIALS 1. Provide all labor, materials, equipment, tools, construction equipment and machinery, transportation and other facilities and services necessary for the proper execution and completion of the work. 2. Perform the work in conformance with the Contract Documents to the best recognized trade practices and standards, unless more stringent requirements are specified. 3. All workmen must have sufficient knowledge, skill, and experience to perform the work assigned to them. 4. All work shall be accomplished neat, plumb, true to line, and securely installed to produce an acceptable finished assembly. 5. Unless otherwise noted or directed, install all work in accordance with manufacturer's recommendations or requirements for best results. Not one preparatory step or installation procedure may be omitted unless specifically modified or exempted by these documents. 6. Work shall be under direct and full-time supervision of the Contractor. Contractor shall supervise and direct the work using his best skill and attention, and shall be solely responsible for all construction means, methods, techniques, schedules and procedures, and for coordination of all portions of the work. 1.2 WORK BY OWNER A. The Owner will perform the following work related to this contract: 1. Owner will broom edges of and blow debris off the roadway. 1.3 CONTRACTOR S USE OF PREMISES A. Limit use of premises to allow: 1. Owner occupancy. 2. Work by Owner. 3. Work sequence to allow work to be performed when the park is closed Monday through Thursdays in October. 4. Use of premises by public during park operating hours. B. Access to the work site and work times will be coordinated with Owner. 1. Access to the work site in the Free Roaming Area (FRA) animal exhibit will involve entering a secure gated zone. 2. Workers in this area may have to be monitored by Owner staff. 3. Workers shall abide by a strict driving regiment and route. General Requirements

33 Northwest Trek Asphalt Overlay BID T SUMMARY OF WORK 4. Contractor and crew will abide by all directions given by Owner staff regulating entry and exit of the Free Roaming Area (FRA). When entering or exiting the FRA, special care must be given to assure that gates are properly closed after each passage. When work is performed in the FRA, extensive care must be given when operating equipment so no animals sustain injury. 5. Absolutely NO INTERACTION with animals will be allowed o feeding, no touching, no taunting, etc. Failure to abide by this condition may void the contractual arrangements. 6. Contractor may position an asphalt transfer station with approval of Owner. 1.4 SCHEDULE OF VALUES A. Submit schedule on AIA Form G703. Contractor's standard form or electronic media printout will be considered. B. Submit Schedule of Values in within 15 days after date of established in Notice to Proceed. 1.5 APPLICATIONS FOR PAYMENT A. Content and Format: Utilize Schedule of Values for listing items in Application for Payment. B. Payment Period: Monthly. 1.6 CHANGE PROCEDURES A. Stipulated Sum/Price Change Order: Based on Proposal Request and Contractor's fixed price quotation. B. Change Order Forms: As provided under this contract. C. Unit Price Change Order: For pre-determined unit prices and quantities, Change Order will be executed on fixed unit price basis. For unit costs or quantities of units of work which are not pre-determined, execute Work under Construction Change Directive. Changes in Contract Sum/Price or Contract Time will be computed as specified for Time and Material Change Order. D. Field Authorization: Not to exceed, time and material price, based on Engineer s estimate. 1.7 COORDINATION A. Coordinate scheduling, submittals, and Work of various sections of specifications to ensure efficient and orderly sequence of installation of interdependent construction elements. B. Verify utility requirement characteristics of operating equipment are compatible with building utilities. General Requirements

34 Northwest Trek Asphalt Overlay BID T SUMMARY OF WORK 1.8 PRECONSTRUCTION MEETINGS A. Owner will schedule preconstruction meeting after Notice of Award for affected parties. 1.9 CONSTRUCTION PROGRESS SCHEDULES A. Submit initial progress schedule in duplicate within 15 days after date established for Notice to Proceed QUALITY CONTROL A. Codes and Reference Standards: Perform work in accordance with all pertinent codes and regulations, and comply with the referenced portions of "Standard Specifications: of the State of Washington (most current) edition. B. Comply with specified standards as minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. C. Layout: Contractor is to layout and stake the location of all paving and surfacing on the site for approval prior to construction EXAMINATION A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. B. Verify utility services are available, of correct characteristics, and in correct location PARKING A. Arrange for temporary parking areas to accommodate construction personnel SMOKE-FREE FACILITY A. Northwest Trek is a smoke-free facility. Smoking is allowed ONLY in private vehicles. B. The contractor shall be expected to enforce this policy PROGRESS CLEANING AND WASTE REMOVAL A. Collect and maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition. B. Contractor is responsible for proper off-site disposal of any removed asphalt and other construction debris. General Requirements

35 Northwest Trek Asphalt Overlay BID T SUMMARY OF WORK 1.15 POLLUTION AND ENVIRONMENTAL CONTROL A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. B. Provide dust control, erosion and sediment control, noise control, pest control and rodent control to allow for proper execution of the Work PRODUCTS A. Products: Means new material, machinery, components, equipment, fixtures, and systems forming the Work, but does not include machinery and equipment used for preparation, fabrication, conveying and erection of the Work CLOSEOUT PROCEDURES A. Submit written certification Contract Documents have been reviewed, Work has been inspected, and Work is complete in accordance with Contract Documents and ready for Architect/Engineer's inspection. B. Submit final Application for Payment identifying total adjusted Contract Sum/Price, previous payments, and amount remaining due FINAL CLEANING A. Execute final cleaning prior to final inspection. B. Clean debris from site, roofs, gutters, downspouts, and drainage systems. C. Remove waste and surplus materials, rubbish, and construction facilities from site PROTECTING INSTALLED CONSTRUCTION A. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage. B. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials. C. Prohibit traffic or storage upon waterproofed or roofed surfaces. When traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer. D. Prohibit traffic from landscaped areas PROJECT RECORD DOCUMENTS A. Maintain on site one set of Contract Documents to be utilized for record documents. General Requirements

36 Northwest Trek Asphalt Overlay BID T SUMMARY OF WORK B. Record actual revisions to the Work. Record information concurrent with construction progress. C. Specifications: Legibly mark and record at each Product section description of actual Products installed. D. Record Documents and Shop Drawings: Legibly mark each item to record actual construction. E. Submit documents to Owner with claim for final Application for Payment WARRANTIES A. Submit prior to final Application for Payment. PART 2 PRODUCTS Not Used. PART 3 EXECUTION Not Used. END OF SECTION General Requirements

37

38

In TACOMA, WASHINGTON. Owner: The Metropolitan Park District of Tacoma. Planning, Design and Development South 19 th Street.

In TACOMA, WASHINGTON. Owner: The Metropolitan Park District of Tacoma. Planning, Design and Development South 19 th Street. PDZA 2017 KID ZONE IMPROVEMENTS PHASE 1 GOAT FENCE IMPROVEMENTS SWR Bid#J2017-09 In TACOMA, WASHINGTON CONTRACT DOCUMENTS Owner: The Metropolitan Park District of Tacoma Planning, Design and Development

More information

BID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.

BID FORM. Bid by: Name of Bidder. Address:  Address: To the Texas Department of Transportation hereinafter called the Agent. BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI

INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA. CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI INVITATION FOR TENDERS BOSNIA AND HERZEGOVINA CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POČITELJ - BIJAČA, SUBSECTION POČITELJ - ZVIROVIĆI No: JPAC 841-B80-17 This Invitation for Tenders is published

More information

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree

More information

BUILDING AND CONSTRUCTION GENERAL ON-SITE AWARD 2010 (MA000020) National Building and Construction Industry Award 2000 (AP825520).

BUILDING AND CONSTRUCTION GENERAL ON-SITE AWARD 2010 (MA000020) National Building and Construction Industry Award 2000 (AP825520). WAGE BULLETIN JULY 2012 Wages & Allowances BUILDING AND CONSTRUCTION GENERAL ON-SITE AWARD 2010 (MA000020) Transitioning from National Building and Construction Industry Award 2000 (AP825520). Fair Work

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 21, 2018 To whom it may concern: The Colfax County

More information

OCCUPATIONAL TOOL AND EQUIPMENT LIST

OCCUPATIONAL TOOL AND EQUIPMENT LIST OCCUPATIONAL TOOL AND EQUIPMENT LIST Ironworker (Generalist) Government of Newfoundland Labrador Department of Advanced Education and Skills March 2012 Preface This document is intended as a companion

More information

2018 SEASONAL WORKAMPER PROGRAM POLICY Hart Ranch Camping Resort Club

2018 SEASONAL WORKAMPER PROGRAM POLICY Hart Ranch Camping Resort Club 2018 SEASONAL WORKAMPER PROGRAM POLICY Hart Ranch Camping Resort Club The following policy was implemented to enhance the understanding of the existing Workamper Programs at Hart Ranch Camping Resort Club

More information

National DIY.com Retail Shelf Pull Auction - DAYTIME (August 5)

National DIY.com Retail Shelf Pull Auction - DAYTIME (August 5) National DIY.com Retail Shelf Pull Auction - DAYTIME (August 5) Auction Opens: Thu, Jul 28 2:49pm PT Auction Closes: Fri, Aug 5 10:00am PT K1910 Ridgid Portable Vac K1942 ryobi gas Straight Shaft String

More information

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 September 14, 2018 The Colfax County Board of Commissioners

More information

The Holes Creek Bridge Replacement By Bradley McClelland

The Holes Creek Bridge Replacement By Bradley McClelland The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes

More information

COUNTY BOARDS OF EDUCATION SERVICE PERSONNEL BY POSITION FULL-TIME EQUIVALENCY (FTE) - EXCLUDING RESA PERSONNEL FOR THE YEAR

COUNTY BOARDS OF EDUCATION SERVICE PERSONNEL BY POSITION FULL-TIME EQUIVALENCY (FTE) - EXCLUDING RESA PERSONNEL FOR THE YEAR Director/ Para- Autism Coordinator County Aide LPN professional Mentor of Services Accountant Auditor 17.02 4.50 2.00-1.40 0.20 1.23 228.00 2.00 31.00 56.00 7.00 - - 46.50-2.00 4.00 1.00 14.70-12.00 4.50

More information

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County

More information

Sample Estimate Reports Estimate Reports were created in XL-Pro Software

Sample Estimate Reports Estimate Reports were created in XL-Pro Software Sample Estimate Reports Estimating Pro Software Estimate Reports were created in XL-Pro Software / TIME EQUIP.. COST* AMOUNT - 1 GENERAL REQUIREMENTS 1.00 LSUM - INSURANCE - general liability 1.00 lsum

More information

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION

TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION TOWN OF OSOYOOS DIVIDEND RIDGE AND SPARTAN DRIVE/FUJI COURT STREET LIGHT INSTALLATION CONTRACT DOCUMENTS AND SPECIFICATIONS TRUE Consulting September 2012 Job No. 302-1322 PLANHOLDER REGISTRATION FORM

More information

FY16 18 CONSTRUCTION ESCORT SUPPORT

FY16 18 CONSTRUCTION ESCORT SUPPORT MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS AND ENVIRONMENTAL AFFAIRS DEPARTMENT SUITE 209S LOGAN OFFICE CENTER SUITE 209S ONE HARBORSIDE DRIVE EAST BOSTON MA 02128-2909 REQUEST FOR QUALIFICATIONS MPA

More information

PRODUCT CATALOGUE. for. smartphone / website / digital edition / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. smartphone / website / digital edition / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

SECTION 32. Airfield and Aircraft Operations

SECTION 32. Airfield and Aircraft Operations SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements

More information

HOME OWNER PRE- DELIVERY INSTRUCTIONS

HOME OWNER PRE- DELIVERY INSTRUCTIONS Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions

More information

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM endry Marine HENDRYMARINE.COM Our Busines.s Hendry Marine Industries, Inc. (HMI) consists of a diverse range of maritime businesses, including commercial and government ship repair, marine environmental

More information

Texada Wireless Internet Tower Final Report

Texada Wireless Internet Tower Final Report Texada Wireless Internet Tower Final Report Texada Wireless Internet Tower, Completion Report, March, 2012 PRIMARY OBJECTIVE The primary objective was to establish an inexpensive, reliable, wireless network

More information

the foss seattle shipyard helping you succeed in a competitive market

the foss seattle shipyard helping you succeed in a competitive market the foss seattle shipyard helping you succeed in a competitive market the foss shipyard advantage When you decide to invest in your fleet, you can count on Foss s proven track record to get the job done

More information

ADDENDUM NO. TWO AB

ADDENDUM NO. TWO AB ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County

More information

6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS. P/N November 2014 Revision 1

6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS. P/N November 2014 Revision 1 6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS P/N 80749 November 2014 Revision 1 2014 Climax Portable Machining and Welding Systems or its subsidiaries. All rights reserved. Except as

More information

BID SCHEDULE LOT 1 Two Four-place Piston Helicopter (3 Passengers & Pilot) Bidder (Company ) Company Address Bidder Contact Name Contact E-Mail Contact Phone # Web site Bidder s Authorized Signature Name

More information

Installation Instructions

Installation Instructions Installation Instructions Hex Sierra TopTec Products, LLC 7061 Highway 221 Moore, SC 29369 Phone: (800) 845-2830 Fax: (800) 921-7750 e-mail: sales@toptecproducts.com www.toptecproducts.com 2004 TopTec

More information

Building Permit Application

Building Permit Application Building Permit Application Co-Owner Name Lot # Address City State Zip Phone (home) (cell) Contractor (if applicable) The above named co-owner hereby makes application to Cedar Shores Campground Condominium

More information

INSTALLATION INSTRUCTIONS FOR BALCO, INC. FLOOR MATS FM2R-(A, C, D) W/O FRAME 4V

INSTALLATION INSTRUCTIONS FOR BALCO, INC. FLOOR MATS FM2R-(A, C, D) W/O FRAME 4V 2626 South Sheridan PO Box 17249 Wichita, Kansas 67217 Phone: (316) 945-9328 Fax: (316) 945-0789 INSTALLATION INSTRUCTIONS FOR BALCO, INC. FLOOR MATS FM2R-(A, C, D) W/O FRAME 4V 2012, Balco, Inc. INSTALLATION

More information

Affiliate: Houston Tool Inventory As Of: 12/25/2017

Affiliate: Houston Tool Inventory As Of: 12/25/2017 Affiliate: Houston Tool Inventory As Of: 12/25/2017 NOTE: The Total Inventory quantity does not reflect current tool type availability; please call the Houston ToolBank at 713-674-0262 for more information.

More information

SALE LISTING of BUILDERS PLANT & EQUIPMENT

SALE LISTING of BUILDERS PLANT & EQUIPMENT Aberdeen & Northern Marts Thainstone Centre, Inverurie. AB51 5XZ Saturday 10 th March 2018 Sale of Commercial Vehicles, 4 x 4s, Excavators, Digger Loaders, Trailers, Tractors, Agricultural Machinery and

More information

EXTERNAL COMMUNICATIONS - CIVIL AVIATION SERVICES

EXTERNAL COMMUNICATIONS - CIVIL AVIATION SERVICES EXTERNAL COMMUNICATIONS - CIVIL AVIATION SERVICES 15.100 The Department of Civil Aviation (DCA) operates under the aegis of the External Communications Division of the Prime Minister s Office. It is the

More information

McDonald Manufacturing, Inc.

McDonald Manufacturing, Inc. McDonald Manufacturing, Inc. Home About Us Contact Us Downloads McDonald Manufacturing offers a wide line of lightweight all steel welded construction masonary tools. HINGES AND STRAPS MIXER BLADE 38A

More information

Welcome to the Pacific Spas family!

Welcome to the Pacific Spas family! Welcome to the Pacific Spas family! Your Pacific Spa has been engineered and built to the highest standards. Enjoy it regularly and experience the serenity and satisfaction that you ve wanted. The information

More information

City of Redding Airports

City of Redding Airports City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated

More information

Tri-Glide Instruction Manual

Tri-Glide Instruction Manual Tri-Glide Instruction Manual 12 Timber Lane Marlboro NJ 07746 09/09/2011 tel: 732.462.6277 fax:732.462.6355 email: sales@hilmanrollers.com CONTENTS Contents Page Warnings 3 Operating Instructions 4 General

More information

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6 15 th Revised Page 25 ISSUED: NOVEMBER 27, 2017 EFFECTIVE: JANUARY 1, 2018 DOCKAGE (I) (C)(GS) 410 Except as otherwise provided herein, or as otherwise specified in Leases, Operating and Berthing Agreements

More information

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION

More information

are greasable that the units *Positive indexing for raising roll down the track on and

are greasable that the units *Positive indexing for raising roll down the track on and We at the Thomas family have deep roots in the Maine tradition of craftsmanship and innovation. Dale Thomas began working with steel in 1959 and for almost five decades gained extensive experience in steel

More information

BILL SCHOLTES KLAMATH SPORTSMANS PARK

BILL SCHOLTES KLAMATH SPORTSMANS PARK BILL SCHOLTES KLAMATH SPORTSMANS PARK RULES OF THE PARK PURPOSE The purpose and intent of these rules is to inform all park users and Member Organizations of the obligations of all to be aware of how the

More information

Personal 898 $951, $0.00 $98, $472, $478, Real 5 $6,812, $0.00 $56, $4,486, $2,326,517.

Personal 898 $951, $0.00 $98, $472, $478, Real 5 $6,812, $0.00 $56, $4,486, $2,326,517. For selection details, see the final page of the report. For Fiscal Year Ending September/2016 Grouped by Resource Type Resource Type Depreciation Quantity Purchase Price Salvage Value Fiscal Year Accumulated

More information

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1

TENDER NO. T WESTDALE ROAD SANITARY SEWER UPGRADE ADDENDUM NO. 1 TENDER NO. T-2170-2018 ADDENDUM NO. 1 SCHEDULE OF QUANTITIES AND PRICES REPLACE A revised copy of the Schedule of Quantities and Prices with changes bolded in red has been posted online (pdf attached).

More information

BUILDING GUIDELINES FOR RIVER RIDGE ASSOCIATION EFFECTIVE NOVEMBER 16, 2009

BUILDING GUIDELINES FOR RIVER RIDGE ASSOCIATION EFFECTIVE NOVEMBER 16, 2009 BUILDING GUIDELINES FOR RIVER RIDGE ASSOCIATION EFFECTIVE NOVEMBER 16, 2009 DO NOT BEGIN ANY CONSTRUCTION WITHOUT FIRST OBTAINING BOTH RIVER RIDGE AND MECKLENBURG COUNTY PERMITS. DOING SO SHALL RESULT

More information

Kissimmee DAYS February 6th- 9am 80% ABSOULTE

Kissimmee DAYS February 6th- 9am 80% ABSOULTE 80% ABSOULTE Sale Site: 651 West Southport Road Kissimmee, Florida, USA, 34746 T: +1 407.396.6060 F: +1 407.396.8181 6 DAYS February 6th- 11th @ 9am Kissimmee 2017 Unused Caterpillar 320FL - choice of

More information

WELCOME TO DAMEN SONG CAM

WELCOME TO DAMEN SONG CAM WELCOME TO DAMEN SONG CAM HISTORY 2002 - Damen starts building ships with Song Cam Shipyard March 20, 2014 - Damen Song Cam grand opening ceremony As from 2015 - Damen Song Cam starts building series of

More information

Training Centers. Boilermaker

Training Centers. Boilermaker Training Centers Boilermaker International Brotherhood of Boilermakers, Iron Ship Builders, Blacksmiths, Forgers and Helpers Local 374 6333 Kennedy Ave. Hammond, IN 46323 (219) 844-17 sburke374@local374.org

More information

MAINTENANCE TOOLS? LANDSCAPE & MAINTENANCE TOOLS BROCHURE Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE &

MAINTENANCE TOOLS? LANDSCAPE & MAINTENANCE TOOLS BROCHURE Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE & MAINTENANCE? Q: LOOKING FOR A LARGE SELECTION OF LANDSCAPE & A: LOOK NO FURTHER THAN MESA EQUIPMENT & SUPPLY. www.mesaequipment.com LANDSCAPE & MAINTENANCE BROCHURE PEOPLE PRODUCT PERFORMANCE AIR COMPRESSORS

More information

Detail Occupation Level Summary

Detail Occupation Level Summary Detail Occupation Level Summary Earnings are stated in 2014 dollars for full-time, year-round workers, extracted from the ACS from 2010 to 2012. All values are unadjusted for disability status. Both Genders

More information

SAFETY IS A SKILL. OSHA, Scaffold, Fire Safety, Rigging, Flagger, Concrete courses, and more!

SAFETY IS A SKILL. OSHA, Scaffold, Fire Safety, Rigging, Flagger, Concrete courses, and more! SAFETY IS A SKILL. FALL 2017 SAFETY TRAINING SCHEDULE We are dedicated to advocacy, training and providing support by achieving quality, developing leadership and establishing a relationship which enhances

More information

General Metal Shop Safety

General Metal Shop Safety Youth Explore Trades Skills General Metal Shop Safety Description The purpose of this activity is to introduce students to the metal shop environment while giving a brief description of tools, equipment,

More information

Tents & Membrane Structures Information Packet

Tents & Membrane Structures Information Packet Tents & Membrane Structures Information Packet South Metro Fire Rescue Authority Community Safety Services Division Life Safety Bureau 9195 E. Mineral Ave. Centennial, Colorado 80112 Tel: (720) 989-2230

More information

Mixer Blade Sets of Parts and Installation Procedure Using Epoxy

Mixer Blade Sets of Parts and Installation Procedure Using Epoxy Mixer Blade Installation Procedure Important Safety Notice STAY CLEAR OF MIXER UNTIL MIXER IS OFF, MAIN PANEL IS LOCKED OUT, AND ALL MIXER COMPONENTS' MOTIONS ARE STOPPED. FOLLOW STANDARD SAFETY PROCEDURES

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

Step by Step Set Up Guide

Step by Step Set Up Guide lite Step by Step Set Up Guide 1 lifting lug Secure lifting lugs to a certified lifting sling. Stand and stabilize escape system under work platform. Position module with round lunette ring facing work

More information

RamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED

RamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED ClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED Side height Length: Ridge height Width: Measurement in meters: Width: All widths between 10 and 24 m Side height: As desired, in 5 m sections Ridge

More information

BOWMAN EAGLES BOWMAN FIELD LOUISVILLE, KENTUCKY /12/19 RULES AND REGULATIONS

BOWMAN EAGLES BOWMAN FIELD LOUISVILLE, KENTUCKY /12/19 RULES AND REGULATIONS BOWMAN EAGLES BOWMAN FIELD LOUISVILLE, KENTUCKY 40205 1/12/19 RULES AND REGULATIONS MEMBERSHIP NEW MEMBER INITIATION: To become a member of BOWMAN EAGLES a person must fill out an Application, pay in advance

More information

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204) Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY

More information

NEW YOUTH CAMP APPLICATION FOR A YOUTH CAMP THAT WAS NOT ISSUED A CERTIFCATE OR A LETTER OF COMPLIANCE IN THE PREVIOUS YEAR

NEW YOUTH CAMP APPLICATION FOR A YOUTH CAMP THAT WAS NOT ISSUED A CERTIFCATE OR A LETTER OF COMPLIANCE IN THE PREVIOUS YEAR NEW YOUTH CAMP APPLICATION FOR A YOUTH CAMP THAT WAS NOT ISSUED A CERTIFCATE OR A LETTER OF COMPLIANCE IN THE PREVIOUS YEAR http://phpa.dhmh.maryland.gov/ OEHFP/CHS/SitePages/youth-camp-certifications.aspx

More information

Lincoln, NE November 9, 2018 (Friday)

Lincoln, NE November 9, 2018 (Friday) Lincoln, NE November 9, 2018 (Friday) Unreserved public auction Caterpillar D6N XL 1 of 2 John Deere 770D Caterpillar 627F 2011 Case 550 QuadTrac Caterpillar 963D 2016 Smithco SX3-46-36 46 Ft ACCEPTING

More information

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 55 45 99 45 2/7/7 Tuesday Daily Precipitation. Weather Conditions: Clear Progress Report

More information

The Labour Relations Act, Before the Ontario Labour Relations Board. The Utility Contractors' Association of Ontario Incorporated, - and -

The Labour Relations Act, Before the Ontario Labour Relations Board. The Utility Contractors' Association of Ontario Incorporated, - and - File No.: 2317-12-R The Labour Relations Act, 1995 Between: Before the Ontario Labour Relations Board The Utility Contractors' Association of Ontario Incorporated, - and - Labourers International Union

More information

WELCOME TO DAMEN SONG CAM

WELCOME TO DAMEN SONG CAM WELCOME TO DAMEN SONG CAM HISTORY 2002 Damen starts building ships with Song Cam Shipyard March 20, 2014 Damen Song Cam grand opening ceremony As from 2015 Damen Song Cam starts building series of tugs

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

RFP 1-12-C069 ELECTONIC SECURITY SYSTEM (ESS) MAINTENANCE & REPAIR SERVICES AT WASHINGTON DULLES INTERNATIONAL & RONALD REAGAN WASHINGTON

RFP 1-12-C069 ELECTONIC SECURITY SYSTEM (ESS) MAINTENANCE & REPAIR SERVICES AT WASHINGTON DULLES INTERNATIONAL & RONALD REAGAN WASHINGTON RFP 1-12-C069 ELECTONIC SECURITY SYSTEM (ESS) MAINTENANCE & REPAIR SERVICES AT WASHINGTON DULLES INTERNATIONAL & RONALD REAGAN WASHINGTON NATIONAL AIRPORTS PRE-PROPOSAL CONFERENCE March 21, 2012 (Please

More information

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox During the early morning hours of Wednesday, October 10, 2001, twelve hopper rail cars traveling on the Wheeling

More information

ANNEX C List of eligible investments

ANNEX C List of eligible investments ANNEX C List of eligible investments Structure Substructure Planning Relevan Permitted Animal Housing Roofed Area N/A Unroofed Area N/A Loose house Yes Yes FYP Yes Yes No Slatted Area Yes Yes FYP Yes Yes

More information

2014 Community Profile

2014 Community Profile Wise County City of Decatur, County of Wise, State of Texas, located 38 miles rthwest of Fort Worth POPULATION Year 2014 (est.) 2010 Census 2000 City 6,208 6,042 5,201 County 61,089 59,127 48,793 Type

More information

Kontrol Kube Advanced Owners Manual

Kontrol Kube Advanced Owners Manual Mobile Containment. Simplified. TM Kontrol Kube Advanced Owners Manual KONTROL KUBE www.kontrolkube.com 800.343755 1 IMPORTANT SAFETY INFORMATION SAVE THESE INSTRUCTIONS. CAREFULLY READ AND FOLLOW THESE

More information

WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS

WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS This signed document, along with a plan and detail of any proposed works, must be submitted for approval to the board via management

More information

INVITATION FOR BID VENDOR: BID OPENING:

INVITATION FOR BID VENDOR: BID OPENING: Wicomico County Purchasing Department 125 N. Division Street, Room B3 Salisbury, Maryland 21801 INVITATION FOR BID PROJECT: Aircraft Rescue and Firefighting Live-Fire Training DEPARTMENT: Salisbury-Ocean

More information

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8 Contents Introduction 1 Duct & Fitting Range 2 Duct Sizes 3 Fittings 5 Round Duct Connector 7 Installation 8 Celmec International Pty Ltd ACN 005 850 546 Melbourne Tel: +61 3 8552 8200 Fax: +61 3 9555

More information

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from:

Reuse of RAP in asphalt pavements. RAP = Recycled Asphalt Pavement also called millings or grindings from: PASS Recycle/RAP Applications Definition RAP = Recycled Asphalt Pavement also called millings or grindings from: bump grinding of hot mix pavements millings from mill and fill operations large chunks of

More information

Wicomico County Purchasing Rick D. Konrad Purchasing Agent 125 N. Division St. Room B-3 Salisbury, MD Ph Fax

Wicomico County Purchasing Rick D. Konrad Purchasing Agent 125 N. Division St. Room B-3 Salisbury, MD Ph Fax Wicomico County Purchasing Rick D. Konrad Purchasing Agent 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Addendum # 1 Date: 8/11/2014 BID: Airport Cleaning Services

More information

FATALITY INVESTIGATION ACTIVITY #2

FATALITY INVESTIGATION ACTIVITY #2 FATALITY INVESTIGATION ACTIVITY #2 UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION Surface Nonmetal Mine (Limestone)

More information

Town of Carbonear. Regular Council Meeting, August 7, 2012

Town of Carbonear. Regular Council Meeting, August 7, 2012 Town of Carbonear Minutes of a regular meeting of the Council of the Town of Carbonear held in Council Chambers, August 7, 2012 at 3:00pm Members Present: Mayor Sam Slade Deputy Mayor Ches Ash Councillors

More information

BOARD MEMBERS - CONSTRUCTION SECTOR TRADE BOARDS

BOARD MEMBERS - CONSTRUCTION SECTOR TRADE BOARDS BOARD MEMBERS - CONSTRUCTION SECTOR TRADE BOARDS No. BOARD NAME INCLUDED TRADES MEMBER NAME POSITION TENURE 1. Architectural Glass and Metal Technician Architectural Glass and Metal Technician Laird, Steve

More information

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 4 33 83 45 /7/7 Tuesday Daily Precipitation.25" Weather Conditions: Rain Progress Report

More information

FONTANA UNIFIED SCHOOL DISTRICT Classified Salary Schedule

FONTANA UNIFIED SCHOOL DISTRICT Classified Salary Schedule CLERICAL AND SECRETARIAL Buyer 18 20.82 21.75 22.73 23.76 24.82 25.94 27.11 High School Secretary II 18 20.82 21.75 22.73 23.76 24.82 25.94 27.11 High School Secretary I 17 19.92 20.82 21.75 22.73 23.76

More information

Counter Display Items

Counter Display Items 1/4" Dr. x 3/8" Dr. Dual Drive Stubby Ratchet Part No. 640923 Dual drive 2 in 1 design Compact size is great for fasteners in tight areas Black composite coating with TPR injection handle for comfort 272504

More information

Clovis Fire Department

Clovis Fire Department Clovis Fire Department Standard # 4.1 TENTS & CANOPIES Purpose The intent of this standard is to provide the minimum requirements needed to obtain a permit to erect tents or canopies. Scope This standard

More information

MIDAMERICA ST. LOUIS AIRPORT Invitation for Bid: HVAC Service & Maintenance Solicitation No

MIDAMERICA ST. LOUIS AIRPORT Invitation for Bid: HVAC Service & Maintenance Solicitation No MIDAMERICA ST. LOUIS AIRPORT Solicitation No. 2016-05 TO: ISSUED BY: All Plan Holders and Meeting Attendees (Meeting Roster Attached) MidAmerica St. Louis Airport Dept. of Engineering & Planning DATE:

More information

TOOLING COMPONENTS. tel fax Clamping Kits Step Blocks...7. Driver Studs...

TOOLING COMPONENTS.  tel fax Clamping Kits Step Blocks...7. Driver Studs... Clamping Kits... 2-8 Step Blocks...7 Driver Studs... 9-13 Bolts, Screws... 14-20 Nuts, Washers... 21-29 Sex Bolts... 30-31 Clamps... 32-44 Screws... 45-49 Knobs & Levers... 49-53 Rest Pads...54 Index Plungers...

More information

VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT

VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT REQUEST FOR BIDS AND PROPOSALS BID REQUEST NO. 4375-02 VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT ISSUE DATE: December 23, 2011 BID OPENING DATE: JANUARY 11, 2012 3:00 PM LOCAL TIME

More information

ADDENDUM 1 FOR REQUEST FOR BID For REPLACEMENT OF PASSENGER BOARDING BRIDGES 7 AND 4 At ORLANDO MELBOURNE AIRPORT AUTHORITY RFB

ADDENDUM 1 FOR REQUEST FOR BID For REPLACEMENT OF PASSENGER BOARDING BRIDGES 7 AND 4 At ORLANDO MELBOURNE AIRPORT AUTHORITY RFB ADDENDUM 1 FOR REQUEST FOR BID For REPLACEMENT OF PASSENGER BOARDING BRIDGES 7 AND 4 At ORLANDO MELBOURNE AIRPORT AUTHORITY RFB20190324-01 April 3, 2019 This addendum is issued as part of the Proposing

More information

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6 16th Revised Page 25 ISSUED: MAY 22, 2018 EFFECTIVE: JULY 1, 2018 DOCKAGE (I)(GS) 410 Except as otherwise provided herein, or as otherwise specified in Leases, Operating and Berthing Agreements or Terminal

More information

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163 INTRODUCTION The City of Hutchinson is issuing a Request For Proposal (RFP) for the private or commercial use of the Hangar

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

DUST BARRIER SYSTEM. zipwall.com

DUST BARRIER SYSTEM. zipwall.com Why? is the only comprehensive dust barrier system. In addition to the versatile 10', 12', and 20' spring-loaded poles, the complete system includes accessories to easily create entryways and form tight

More information

For Immediate Release: May 30, Complaint & Violation Summary for 335 East 91 st Street:

For Immediate Release: May 30, Complaint & Violation Summary for 335 East 91 st Street: For Immediate Release: May 30, 2008 www.nyc.gov/buildings Complaint & Violation Summary for 335 East 91 st Street: Since construction began in July 2007, there have been a total of 22 complaints (not including

More information

Selected Commercial Wage Rates in the North East, 1940

Selected Commercial Wage Rates in the North East, 1940 Selected Commercial Wage Rates in the North East, 1940 Note: Annual BLS bulletins show us that many of those working in the New York City building trades made approximately $1.50 an hour in the late 1920s.

More information

BOILERMAKERS' NATIONAL BENEFIT FUNDS (CANADA) RECIPROCAL AGREEMENTS MASTER LIST AS AT APRIL 20, 2018

BOILERMAKERS' NATIONAL BENEFIT FUNDS (CANADA) RECIPROCAL AGREEMENTS MASTER LIST AS AT APRIL 20, 2018 BOILERMAKERS' NATIONAL BENEFIT FUNDS (CANADA) RECIPROCAL AGREEMENTS MASTER LIST AS AT APRIL 20, 2018 RECIPROCAL FUND/LOCAL UNION BOILERMAKERS 1. Boilermakers Lodge 191 (Victoria B.C.) January 1 2010 January

More information

Tenders. Manitoba Infrastructure

Tenders. Manitoba Infrastructure Tenders Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Manitoba Infrastructure Reference

More information

DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, Accession 548

DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, Accession 548 Finding Aid for DETROIT, TOLEDO, AND IRONTON RAILROAD PHOTOGRAPHS SUBSERIES, 1922-1923 Finding Aid Published: June 2011 20900 Oakwood Boulevard Dearborn, MI 48124-5029 USA research.center@thehenryford.org

More information

FULL DEPTH RECLAMATION (FDR)

FULL DEPTH RECLAMATION (FDR) FULL DEPTH RECLAMATION (FDR) Virginia Experience Past and Present Michael Wells, P.E. March 2, 2018 Outline What is Full Depth Reclamation (FDR) VDOT Experience Full Depth Reclamation (FDR) Bound layers

More information

WHEREAS, the City operates and manages Rapid City Regional Airport (RAP); and

WHEREAS, the City operates and manages Rapid City Regional Airport (RAP); and MEMORANDUM OF UNDERSTANDING BETWEEN THE RAPID CITY DEPARTMENT OF FIRE & EMERGENCY SERVICES AND RAPID CITY REGIONAL AIRPORT BOARD RELATING TO THE PROVISION OF AIRPORT RESCUE AND FIREFIGHTING SERVICES This

More information

NORTH BERWICK, MAINE, MINUTES OF PLANNING BOARD NOVEMBER 17, 2011

NORTH BERWICK, MAINE, MINUTES OF PLANNING BOARD NOVEMBER 17, 2011 1 NORTH BERWICK, MAINE, 03906 MINUTES OF PLANNING BOARD NOVEMBER 17, 2011 Present: Chairman R. Todd Hoffman, Barry Chase, Shaun DeWolf, Rick Reynolds and Lawrence Huntley, CEO. Absent: Mark Cahoon and

More information

Piranha Ironworkers All Share These Standard Features

Piranha Ironworkers All Share These Standard Features Piranha Single Operator Ironworkers provide: Industry leading cycle times punch holes in less time than other ironworkers Urethane Strippers Results in less part distortion, faster cycle times, no need

More information