CENTRAL LINE VICTORIA LINE
|
|
- Neil Nicholson
- 6 years ago
- Views:
Transcription
1 ENGINEERING NOTICE NO. 35/18 4th FEBRUARY 2018 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE SUNDAY NIGHT/MONDAY, 4th/5th FEBRUARY Track Access Control and Signaller telephone numbers are available from the websites shown below. WEBSITES Our primary website for track safety publications, including rule books is available at You will need to register with us to access this site. Please send your details to The address for our backup website is This site does not require a password PUBLICATION OF ENGINEERS TRAINS IN POSSESSIONS Any Engineers Train, Tamping machine or other on track plant working in a single stage Engineering Hours Possession, where there are no Special Current Arrangements, will be published along with its associated Possession Arrangements in Section E1 of the Engineering Notice, all other possessions will continue to be published in Sections E2 and E3. HAMMERSMITH SERVICE CONTROL CENTRE Hammersmith Service Control Centre is currently being used for Service Control operational training and the testing of the new CBTC signalling system in preparation for Go Live in March It is essential that all maintenance activities and access are closely planned and co-ordinated with the on-site Construction Managers at Hammersmith SCC. Please use the following address when booking maintenance access: SCCSitevisits@tfl.gov.uk METROPOLITAN LINE From start of traffic Monday until start of traffic Wednesday, No. 6 crossover at Swiss Cottage (disused station) Metropolitan line, will be secured normal in connection with the B2F Project. E1 ENGINEER'S TRAINS TONIGHT Train No. 575 RGS Rail Grinder (maximum length 35m) CENTRAL LINE (a) Working at Site: When the Possession Master has taken the Possession, leave Ruislip depot, run to West Ruislip, work to and fro under own power, crossing over as required. On completion, run to White City siding No. 15 road and stable. * This train will not uncouple at any time. Points at West Ruislip, Ruislip Gardens, Northolt, Ealing Broadway, North Acton junction, North Acton and White City must be secured as necessary for movement over them. (b) Possession Granted: West Ruislip buffer stops and Ealing Broadway to Wood Lane substation gaps, all (including White City sidings) Protection:- maintain at Danger signals RUG1253 (route 1), RUG1255 (route 1), WER1055 (route 1) WER1064 (routes 2 and 3) and WER1066 (routes 3 and 4) (Ruislip depot) also in accordance with Section 11 of Rule Book 15. Protecting traction current section:- Notting Hill Gate to Wood Lane, WB (c) Possession Plan No. PPLN-CEN-WER.EBYtoWHC (d) LUL Train Engineering Works Manager SABRE EWSA ID Train No 675 RGU Rail Grinder (maximum length 27m) VICTORIA LINE (a) Working at Site: When the Possession Master has defined the Possession, leave Northumberland Park depot and work to and fro under own power, crossing over as required. On completion, run to Northumberland Park depot and stable. * This train will not uncouple at any time. Points at King's Cross, Highbury & Islington, Finsbury Park, Seven Sisters, Walthamstow Central and Northumberland Park depot must be secured as necessary for movement over them. (b) Possession Granted: Cobourg Street substation gaps to Walthamstow Central, all and stop marker boards on Nos. 48 to 51 roads (Northumberland Park depot) Protection:- secure normal No points (Finsbury Park) also in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Northumberland Park depot). Protecting traction current section:- Dover Street to Cobourg Street, NB (c) in Northumberland Park depot (d) Possession Plan No. PPLN-VIC-WACtoNPD (e) LUL Train Engineering Works Manager SABRE EWSA ID Page 1 of 9
2 E2 (a) ENGINEERING WORKS REQUIRING POSSESSIONS DEPOTS & SIDINGS AT ALL TIMES AND MAINLINE POSSESSIONS DURING ENGINEERING HOURS ONLY AT ALL TIMES CENTRAL LINE White City sidings No. 15 road Stabling rail grinding machine At all times from (Sun night) Protection: maintain at Danger signal WCS9551 (route 15) (White City sidings) This Possession will be superceded by a Possession of all White City sidings and the main line Work carried out in collaboration with the Duty depot/train Operations Standards Manager Possession Plan No. PP-CEN-WHC-15-RD-RG LUL Possession C Chapman (b) SUNDAY NIGHT BAKERLOO LINE Queens Park north sheds, Nos. 22 and 23 roads Replace pigeon netting to Protection: in accordance with Section 11 of Rule Book 15 Protecting traction current sections: Queens Park to Kilburn Park, both Work carried out in collaboration with the Duty depot/train Operations Standards Manager Possession Plan No. PP-QUEENS PARK N-SHED-22 & 23 RDS-EH-01 A1 LUL Possession M Higgins DISTRICT LINE Triangle sidings, all ATC signalling to Protection: in accordance with Section 11 of Rule Book 15 Protecting traction current sections: Earl's Court to High Street Kensington both Possession Plan No. PP-DIS-TRIANGLE SDGS-ALL-RDS-EH LUL Possession SIMC PICCADILLY LINE Cockfosters depot, Nos. 45, 46 to 54 roads west, Oakwood Painting works to PT84, PT84A and steelwork repairs to to reception road and shunt neck blue and brown sections PT84A Protection: in accordance with Section 11 of Rule Book 15 and Rule Book Support Information (Am106) (Cockfosters depot) Protecting traction current sections: Cockfosters to Southgate, both Work carried out in collaboration with Duty depot/duty Train Manager Possession Plan No. PP-PICC-COC-DPT-BLUE-ENTRY.EXIT-SHUNT-RDS-EH LUL Possession B Oriogum (c) MONDAY BAKERLOO LINE London Road depot, all excluding sheds Track maintenance to Protection: maintain at Danger signals BR2 (route 3) and BR4 (route 2) (Lambeth North) also in accordance with Rule Book Support Information (Am106) (London Road depot) Possession Plan No. PP-BK-LRD-ALL-RDS-EXCL-SHED-TH Timetable alterations: details in Section 3 of Traffic Circular No. 3 (2018) LUL Possession M Taylor CIRCLE AND HAMMERSMITH & CITY LINES Hammersmith depot, all excluding Nos. 6 and 8 shed roads ATC installation to Protection: maintain at Danger signals OZ25, OZ26 and OZ27 (Hammersmith), secure normal No. 22A points (Hammersmith) also in accordance with Rule Book Support Information (Am106) (Hammersmith depot) Work carried out in collaboration with Duty depot/train Operations Standard Manager Possession Plan No. PP-HAM-DPT-ALL-(EXC. SHED RDS 6 & 8)-TH Timetable alterations: details in Section 3 of Traffic Circular No. 3 (2018) LUL Possession SIMC Page 2 of 9
3 DISTRICT LINE Lillie Bridge depot, all ATC works to Protection: maintain at Danger signals WB28 (Kensington Olympia) and WB31 (West Kensington) Possession Plan No. PP-DIS-LBD-ALL-RDS-TH LUL Possession SIMC Parsons Green sidings Nos. 21, 22, 25, 27 and 29 roads Track maintenance to Protection: maintain at Danger signal WF4 (routes 1 and 2) and secure normal Nos. 15 and 18 points/crossovers (Parsons Green) Possession Plan No. PP-PARSONS-GRN-SDGS-21, 22, 25, 27 & 29 RDS Parsons Green sidings Nos. 23, 24 and 31 roads Track maintenance to Protection: secure normal Nos. 22 and 24 points/crossovers (Parsons Green) Possession Plan No. PP-PARSONS-GRN-SDGS-23, 24 & 31 RDS-01 A1 3. Parsons Green sidings Nos. 25, 27 and 28 roads Track maintenance to Protection: secure normal Nos. 15 and 58 points/crossovers (Parsons Green) Possession Plan No. PP-PARSONS-GRN-SDGS-25, 27 & 28 RDS-01 Only one of the above Possessions to take place at any time. LUL Possession J Goldrick METROPOLITAN LINE Uxbridge sidings, all Installation of new signal kiosks and cabling to Protection: secure normal Nos. 32, 48B and 49B points (Uxbridge sidings) Possession Plan No. PP-MET-UXBRIDGE-SDGS ALL-RDS-TH Timetable alterations: details in Section 3 of Traffic Circular No. 3 (2018) LUL Possession M Higgins METROPOLITAN & JUBILEE LINES Neasden depot north green, charcoal & charcoal/indigo Signals, points, power, track inspections/maintenance sections, Nos. 58 to 65 roads and vegetation clearance Protection: in accordance with Rule Book Support Information (Am106) (Neasden depot) Possession Plan No. ALO-PP-NED NOR-SOU_A1 LUL Possession D Crowhurst to PICCADILLY LINE Arnos Grove sidings, all Signal maintenance to Protection: maintain at Danger signals PJ27, PJ28 and PJ29 (Arnos Grove) Work carried out in collaboration with Duty depot/duty Train Manager Possession Plan No. PP-PIC-ARNOS GROVE-SIDS-TH-A1 Timetable alterations:- details in Section 3 of Traffic Circular No. 3 (2018) LUL Possession D Trueman Cockfosters depot east end, Nos. 27, 28, 34 to 44 roads, red Rail and topographical surveys to green and brown sections Protection: maintain at Danger signals PM31 (route 1), PM32 (route 1) and PM33 (route 2) (Cockfosters) also in accordance with Rule Book Support Information (Am106) (Cockfosters depot) Work carried out in collaboration with Duty Depot/Duty Train Manager Possession Plan No. PP-PICC-COC-DPT-RED-GREEN-EAST-INCL RDS-TH LUL Possession R Leitch Signal WR24 (South Ealing No. 1 platform) to Acton Town substation, EB local Rolling stock tests to Protection: protection key switch at signal WR3 (Northfields) to be operated maintaining signal WR3 (Northfields) at Danger in accordance with the Appendix to Rule Book 15 Possession Plan No LUL Possession D Brabham Page 3 of 9
4 E3 MAINLINE CLOSURES REQUIRING POSSESSIONS E3.1 CIRCLE & HAMMERSMITH LINE: MOORGATE SUBSTATION GAPS - ROYAL OAK SUBSTATION GAPS (also includes details of trains servicing this possession travelling on the CENTRAL, METROPOLITAN, JUBILEE, CIRCLE & HAMMERSMITH, DISTRICT AND PICCADILLY LINES) (a) Possession and protection: as follows to carry out BTR (Possession stages 4 and 7) Possession stage 4 from when possession Stage 2 is given up Friday night until possession Stage 7 is taken Sunday night Outer rail between Baker Street substation gap and the gap in the current rails associated with section switch D48 (132 metres east of Barbican) Inner rail between the 15m gap in the current rails 45 metres west of Barbican and Baker Street substation gap. Mainline traction current sections included in whole or in part in this stage of the possession:- Baker Street to Chalton Street OR Chalton Street to Baker Street IR Chalton Street to Farringdon OR Farringdon to Chalton Street IR Farringdon to Moorgate OR Moorgate to Farringdon IR Protection: in accordance with the following:- maintain at Danger signals OP29 and OP30 (Edgware Road) maintain at Danger signal OP28 (Edgware Road) maintain at Danger signal MB14 (Baker Street) maintain at Danger signal MB15 (Baker Street) maintain at Danger signal PNX234B (east of Barbican) Concession No. CR08525 v2 Possession stage 7 from when possession Stage 4 is given up Sunday night until Start of Traffic Monday All lines between Moorgate substation gaps, Baker Street substation gaps (south of Nos. 2 and 3 platforms), Bouverie Place substation gaps and Royal Oak substation gaps including Moorgate Nos. 3 and 4 platforms Mainline traction current sections included in whole or in part in this stage of the possession:- Royal Oak to Paddington (Suburban) EB Paddington (Suburban) to Royal Oak WB Bouverie Place and Paddington (Suburban) to Baker St OR Baker St to Bouverie Place and Paddington (Suburban) IR Baker Street to Chalton Street OR Chalton Street to Baker Street IR Chalton Street to Farringdon OR Farringdon to Chalton Street IR Farringdon to Moorgate OR Moorgate to Farringdon IR Protection: in accordance with the following:- Section 13 of Rule Book 15 (b) Current Arrangements: Mainline traction current section Close of traffic switching Start of traffic switching Royal Oak to Paddington (Suburban) EB LC for T202 (00:43 ex 04:35 Edgware Road) Paddington (Suburban) to Royal Oak WB LC for T202 (00:43 ex 04:35 Edgware Road) Bouverie Place and Paddington (Suburban) to Baker Street OR LC for T647 04:35 Baker Street to Bouverie Place and Paddington (Suburban) IR LC for T647 04:35 Baker Street to Chalton Street OR Already off 04:40 Chalton Street to Baker Street IR Already off 04:40 Chalton Street to Farringdon OR Already off 04:45 Farringdon to Chalton Street IR Already off 04:45 Farringdon to Moorgate OR Farringdon Already off 04:45 Moorgate LC for T266 (00:39ex 04:45 Moorgate) Isolations/switching arrangements Section switches D28 and D48 (west and east of Barbican) remain open. Section switches to be closed during EH Sun. Page 4 of 9
5 Moorgate to Farringdon IR Moorgate LC for T266 (00:39ex 04:45 Moorgate) Farringdon Already off 04:45 15m gap in place 45m west of Barbican. Rails to be reconnected during EH Sun. (c) Train numbers and stock: All trains will be composed of locomotive, stock as required and locomotive and must be no greater than 136 metres in length. Trains will use the following numbers: to 647 and tamping machine 771 (d) Working at Site: When the Possession Master has taken the Possession, uncouple as required and work to and fro under own power to the requirements of the Possession Master. On completion, recouple if required. (e) Return paths Tonight (i) When the Possession master and Controller give authority, Train 647 will pass out of the Possession on the inner rail, run to High Street Kensington, run to Earl's Court No. 4 platform, run via the westbound local line to Acton Town No. 1 platform, run via Rayners Lane to Ruislip siding, then run to Ruislip depot and stable. (f) Late Current Off: (i) Late current for Train 647 Earl's Court to Barons Court WB Local Earl's Court to Kensington (Olympia) Both and Single High Street Kensington to Earl's Court WB Cromwell Curve to Earl's Court WB Dist Notting Hill Gate to Cromwell Curve IR Bouverie Place to Notting Hill Gate IR Acton Town to North Ealing and Ealing Broadway WB Ravenscourt Park to Chiswick Park WB Local Bouverie Place and Paddington (Suburban) to Baker Street OR Eastcote to Ickenham WB Sudbury Hill to Rayners Lane WB North Ealing to Alperton WB Barons Court to Ravenscourt Park WB Fast Barons Court to Earl's Court EB Local Earl's Court to High Street Kensington EB Earl's Court to Cromwell Curve EB Dist Cromwell Curve to Notting Hill Gate OR Notting Hill Gate to Bouverie Place OR North Ealing and Ealing Broadway to Acton Town EB Chiswick Park to Acton Town WB Local Barons Court to Ravenscourt Park WB Local Baker Street to Bouverie Place and Paddington (Suburban) IR Rayners Lane to Eastcote WB Alperton to Sudbury Hill WB Acton Town to Northfields WB Local (g) The speed of trains 640 to 647 must not exceed 20 mph (h) Timetable alterations: Details in Timetable Notice No(s). 6/18 (Circle and H&C), 7/18 (District) and 5/18 (Metropolitan) (i) (j) Detailed information and procedures are shown in Possession Plan No. PPLN-HAC-BAStoBAB and Possession Works Guide No. PWG-WK45-HAC-BAStoBAB Possession stages 3, 5 and 6 were cancelled after the Possession plan was published. (k) LUL Possession V Nair E3 ID 2322 E4 SPECIAL CURRENT ARRANGEMENTS CIRCLE & HAMMERSMITH AND METROPOLITAN LINES (a) Late Current Off: (i) Late current off for Train 175 (00:20:30 ex Hammersmith (Met)):- Shepherd's Bush to Royal Oak EB (ii) Late current off for Train 202 (00:43:00 ex Edgware Road):- Royal Oak to Shepherd's Bush WB Royal Oak to Paddington (Suburban) EB Paddington (Suburban) to Royal Oak WB (iii) Late current off for Train 202 (01:04:00 ex Hammersmith (Met)):- Hammersmith to Shepherd's Bush EB Shepherd's Bush to Hammersmith WB Page 5 of 9
6 (iv) Late current off for Train 266 (00:39:00 ex Moorgate):- Farringdon to Moorgate OR (split feeding -- see E3) Moorgate to Farringdon IR (split feeding -- see E3) Moorgate to Aldgate OR Aldgate to Moorgate IR (v) Late current off for Train 403 (00:30:30 ex Baker Street):- Willesden Green to Neasden NB Met Finchley Road to Marlborough Road SB Met Marlborough Road to Baker Street SB Met (vi) Late current off for Train 403 (00:52:00 ex Wembley Park):- Neasden to Preston Road NB Fast Met (vii) Late current off for Train 414 (00:49:00 ex Wembley Park):- Wembley Park to Preston Road NB Local Met (viii) Late current off for Train 414 (23:38:00 ex Uxbridge):- Willesden Green to Finchley Road SB Met (ix) Late current off for Train 417 (00:16:00 ex Amersham):- Croxleyhall to Northwood SB Local Harrow to Preston Road SB Fast Preston Road to Neasden SB Fast Met (x) Late current off for Train 423 (00:19:30 ex Chesham):- Chesham Single Line (xi) Late current off for Train 424 (00:14:30 ex Uxbridge):- Uxbridge substation to Ickenham EB Eastcote to Rayners Lane EB (xii) Late current off for Train 431 (00:38:00 ex Amersham):- Amersham to Chalfont & Latimer SB Chalfont & Latimer to Chorleywood SB (xiii) Late current off for Train 431 (23:44:00 ex Baker Street):- Chorleywood to Chalfont & Latimer NB (xiv) Late current off for Train 432 (00:20:00 ex Baker Street):- Ickenham to Uxbridge substation WB Preston Road to Harrow NB Local (xv) Late current off for Train 432 (01:04:00 ex Uxbridge):- Uxbridge station to Uxbridge substation EB (xvi) Late current off for Train 433 (00:31:00 ex Harrow-on-the-Hill):- Wembley Park sidings roads (xvii) Late current off for Train 435 (00:10:00 ex Baker Street):- Northwood to Croxleyhall NB Local Northwood to Croxleyhall NB Main Harrow to Northwood NB Main (xviii) Late current off for Train 435 (00:53:00 ex Rickmansworth):- Chorleywood to Croxleyhall SB (xix) Late current off for Train 457 (23:52:00 ex Baker Street):- Croxleyhall to Watford NB (a) Late Current Off: Finchley Road to Willesden Green NB Met Marlborough Road to Finchley Road NB Met Baker Street to Marlborough Road NB Met Northwood to Harrow SB Local Harrow to Preston Road SB Local Preston Road to Wembley Park SB Local Met Ickenham to Eastcote EB Rayners Lane to Harrow SB Uxbridge Chalfont & Latimer to Amersham NB Harrow to Rayners Lane NB Uxbridge Uxbridge substation to Uxbridge station WB Croxleyhall to Northwood SB Main Harrow to Northwood NB Local Preston Road to Harrow NB Fast Croxleyhall to Chorleywood NB Watford to Croxleyhall SB DISTRICT AND PICCADILLY LINES (i) Late current off for Train 202 (00:20:00 ex South Kensington):- Cromwell Curve to South Kensington EB Dist South Kensington to Cromwell Curve WB Dist South Kensington to Victoria EB Victoria to South Kensington WB Page 6 of 9
7 (ii) Late current off for Train 266 (00:39:00 ex Moorgate):- Tower Hill to Whitechapel EB Whitechapel to Campbell Road EB Campbell Road to West Ham EB Plaistow to East Ham EB (iii) Late current off for Train 267 (23:43:00 ex Barking Sidings):- West Ham to Campbell Road WB East Ham to Plaistow WB (b) Early Current On: Whitechapel to Tower Hill WB Campbell Road to Whitechapel WB West Ham to Plaistow EB East Ham to Upney EB Plaistow to West Ham WB Upney to East Ham WB Preston Road to Neasden SB Fast Met... 04:45 Preston Road to Wembley Park SB Local Met... 04:45 Neasden to Willesden Green SB Met... 04:55 Willesden Green to Neasden NB Met... 05:20 Willesden Green to Finchley Road SB Met... 04:55 Finchley Road to Willesden Green NB Met... 05:20 Finchley Road to Marlborough Road SB Met... 04:55 Marlborough Road to Finchley Road NB Met... 04:55 Marlborough Road to Baker Street SB Met... 04:55 Baker Street to Marlborough Road NB Met... 04:55 Wembley Park sidings roads... 05:00 E5 ISOLATIONS OF CURRENT Nil. E6 ENGINEERING WORKS ALL LINES Stratford and North Greenwich Following several instances - between Stratford and North Greenwich - where Protection Masters have been found to be on the track prior to the passage of the last timetabled train, all PMs must note the following: The Signal Operator at Neasden Service Control Centre can be contacted on Auto to determine that the last "timetabled" train has passed through the area. RESTRICTIVE ENGINEERING WORKS The Site Person in Charge responsible for work published for Asbestos Exclusion Zones, Keep Clear Areas, Wheels Free or Areas where no other work that affects the integrity of the signalling can take place must ensure that the TAC incident desk receives confirmation, between 21:30 and 23:00, that the published work will be taking place on the shift concerned. If no confirmation is received by 23:00 TAC may disregard the restriction and other staff may be permitted to work within the affected area. Contacting the signaller when passage of last train not witnessed When contacting the signaller, because it has not been possible to witness the passage of the last train, protection staff must state the line, station, platform number and if known, the number of the last train. Do NOT contact the signaller until after the published time for traction current to be switched off. CENTRAL LINE White City platform 3, middle road Protection staff should be aware, that although White City middle road platform 3 is fed from the Park Royal to Wood Lane westbound traction current feed, the last train into the middle road platform approaches in an eastbound direction. Stratford west end TOR to Mile End tailwall, WB Mile End headwall to Bethnal Green tailwall, WB Motorised trolley will be in use. Bethnal Green headwall to Liverpool Street tailwall, WB Barkingside to Gants Hill, all Wheels free. Stratford east end TOR to Leyton, EB Asbestos works Track renewal in tunnel section Asbestos removal and rerailing Ultrasonic testing Fault rectification/repairs CIRCLE & HAMMERSMITH AND METROPOLITAN LINES King's Cross (Disused station) Following the discovery of discarded syringes in the area of Kings Cross disused station, staff are to be extra vigilant whilst passing through or undertaking works in that area. If any such items are identified please ensure these are reported through the EIRF system and immediately advise your manager. Page 7 of 9
8 Liverpool Street - Monitoring equipment At Liverpool Street station, on the Circle & Hammersmith and Metropolitan lines and 200m into tunnels towards Aldgate, automated survey monitoring equipment is installed, fixed to the tunnel and track to monitor movement during construction works above. Please avoid touching this equipment, or obstructing in any way the barrel shaped prisms mounted low down on track and trackside - particularly their line of sight to the instruments hanging from the tunnel crowns. If you think you may have inadvertently touched or damaged this equipment, please contact Jocelyn Donovan at Jocelyn.donovan@ipcmonitoring.com. REVISED TRACK ACCESS ARRANGEMENTS ALDGATE TO MOORGATE AND TOWER HILL TO WHITECHAPEL ALL As a result of a formal incident investigation into a number of recent protection irregularities, it was identified that the following enhancement to track access arrangements will be trialled on these traction current sections: Aldgate to Moorgate Inner Rail Moorgate to Aldgate Outer Rail Tower Hill to Whitechapel Eastbound Whitechapel to Tower Hill Westbound. Staff requiring access to any of these traction current sections in this complex area, must NOT contact the track access control until after the published switching off time for traction current. The track access controller will book you on once they have confirmation that the last train has cleared the area and traction current has been switched off. There is no need to contact the signaller if you do not witness the passage of the last train or trains over these four traction current sections. You must however, continue to test for traction current on all traction current sections that you will be accessing. DISTRICT LINE EMERGENCY CONTACT BETWEEN NOTTING HILL GATE AND BOUVERIE PLACE Protection Masters working on the Traction Current Sections "Notting Hill Gate to Bouverie Place, both" should note the tunnel telephone lines (for emergency discharge of traction current) are controlled by the Metropolitan Service Controller at Baker Street. Staff working in this location should telephone 910 in the event of an emergency; this information should be entered in their log books. VICTORIA STATION At Victoria station, on the Victoria Line and District and Circle Line, through the platform limits and 200m into tunnels and sidings, London Underground have installed automated survey monitoring equipment fixed to the tunnel rings and track to monitor tunnel movement during the Victoria station Upgrade. In addition there are 3 instruments, mounted on podia in the Victoria line crossovers. Please avoid touching this equipment, or obstructing in any way the barrel shaped prisms mounted low down in passenger circulation areas and trackside - particularly their line of sight to the instruments hanging from the tunnel crowns. If you think you may have inadvertently touched or damaged this equipment, please contact David Smith on REVISED TRACK ACCESS ARRANGEMENTS ALDGATE TO MOORGATE AND TOWER HILL TO WHITECHAPEL ALL As a result of a formal incident investigation into a number of recent protection irregularities, it was identified that the following enhancement to track access arrangements will be trialled on these traction current sections: Aldgate to Moorgate Inner Rail Moorgate to Aldgate Outer Rail Tower Hill to Whitechapel Eastbound Whitechapel to Tower Hill Westbound. Staff requiring access to any of these traction current sections in this complex area, must NOT contact the track access control until after the published switching off time for traction current. The track access controller will book you on once they have confirmation that the last train has cleared the area and traction current has been switched off. There is no need to contact the signaller if you do not witness the passage of the last train or trains over these four traction current sections. You must however, continue to test for traction current on all traction current sections that you will be accessing. Signal A755 (west of South Kensington) to signal EF268 (east of South Kensington), EB Keep clear. Excavation work for BTR DISTRICT AND PICCADILLY LINES Earls Court and Ealing Common There have been several instances between Earls Court and Ealing Common on the West bound District Line where Protection Masters have been found to be on the track prior to the passage of the last timetabled train. PMs who are unable to determine that the last "timetabled" train has passed through the area should contact the appropriate Signal Operator. Chiswick Park west end TOR to Acton Town east end TOR, all APD signal & points maintenance No other work that affects the integrity of the signalling can take place. Acton Town to South Ealing and Ealing Common east end TOR, APD signal & points maintenance all No other work that affects the integrity of the signalling can take place. JUBILEE LINE Westminster to Kilburn, all Jub Wheels free. VCC Maintenance METROPOLITAN LINE HARROW ON THE HILL TO WATFORD SOUTH JUNCTION, NB MAIN Protection Masters working on the northbound main line between Harrow-on-the-Hill No. 1 platform and Watford South Junction must be aware of Chiltern Trains train movements when testing traction current. Page 8 of 9
9 NORTHERN LINE OLD STREET TO EUSTON (CITY) Testing of tunnel lighting circuits. All staff accessing the track should be aware that the tunnel lighting will be switched on & off during engineering hours from both Northern Lines between Old Street and Euston (City). Staff needing to access the track in this area (including platforms grounds) should ensure that they have made sufficient provision for lighting, torches, etc. to enable their works to proceed safely. Kennington Loop - raised TBTC loop cable In the Kennington Loop there are installed two areas of raised TBTC loop cable. The loop is raised on brackets for approximately 50m through both the southbound and northbound step-plate junctions. Please be mindful when crossing or accessing the track in these areas to avoid tripping. Please make every effort not to stand on the loop cable or brackets. Please make every effort not to drop items on, lean or store items next to the loop or brackets. Please report any damage to the Fault Report Centre on (auto 51986) for internal staff or (auto 51985) for external staff. Angel to High Barnet via Camden Town Nos. 3 and 4 platforms, Ultrasonic testing all Keep clear. Motorised trolley will be in use. Hampstead headwall to Golders Green tunnel mouth, NB Asbestos works Golders Green to Hampstead, SB Water Corrosion Fault Camden Town Nos. 1 and 2 platforms to Chalk Farm, both Asbestos works Morden depot boundary limits to Morden, all APD signal & points maintenance No other work that affects the integrity of the signalling can take place. PICCADILLY LINE Track Access Arrangements on the Aldwych Branch During Engineering Hours (normally 23:00 to 06:00) requests for access to the track must be made to the Piccadilly Line East Track Access Controller. During Traffic Hours (normally 06:00 to 23:00) requests for access to the track, and for current to be switched on and off, should be made to the Piccadilly Line Service Controller. Full details of these arrangements are included in the Rule Book team Local/Network Operating Procedure publication "Aldwych Branch/Station Access Procedures" Hounslow West to Hatton Cross, both Wheels free. Hatton Cross, both Wheels free. Signal maintenance Maintenance VICTORIA LINE VICTORIA STATION At Victoria station, on the Victoria Line and District and Circle Line, through the platform limits and 200m into tunnels and sidings, London Underground have installed automated survey monitoring equipment fixed to the tunnel rings and track to monitor tunnel movement during the Victoria station Upgrade. In addition there are 3 instruments, mounted on podia in the Victoria line crossovers. Please avoid touching this equipment, or obstructing in any way the barrel shaped prisms mounted low down in passenger circulation areas and trackside - particularly their line of sight to the instruments hanging from the tunnel crowns. If you think you may have inadvertently touched or damaged this equipment, please contact David Smith on DELAYED ACCESS AT BRIXTON AND WALTHAMSTOW CENTRAL Access to the Brixton and Walthamstow areas is deferred until all train movements have ceased in the area. This request is a result of a Service Control General Manager instruction regarding Access / Egress to Tunnel sidings as published in the Service Control Bulletin dated 23rd December Staff who wish to book out in the area should do so after the published switch off time. Pimlico to Green Park, NB Keep clear. Motorised trolley will be in use. Movement of rails WATERLOO & CITY LINE Track Access Arrangements on Sundays and Bank Holidays Staff must book on with the Track Access Controller before accessing the track during Engineering Hours and book off after completion of work. As shown in the Guide to Switching, Engineering Hours normally extends from COT Saturday until SOT Monday (unless amended by publications, which will show arrangements for Bank Holidays). The Track Access Control Centre is staffed by prior arrangement only between 07:00 and 23:00 on Sundays and Bank Holidays. For more information - +TACManagers@tube.tfl.gov.uk THE ABOVE INSTRUCTIONS MUST BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANT PROCEDURES IN THE RULE BOOK AND ITS ASSOCIATED DOCUMENTS. Ayten Selçuk for ACCESS PUBLICATIONS MANAGER Page 9 of 9
Track Access Control and Signaller telephone numbers are available from the websites shown below.
ENGINEERING NOTICE NO. 15/18 15th JANUARY 2018 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE MONDAY NIGHT/TUESDAY, 15th/16th JANUARY Track Access Control and Signaller telephone numbers are available
More informationTrack Access Control and Signaller telephone numbers are available from the websites shown below.
ENGINEERING NOTICE NO. 340/17 6th DECEMBER 2017 LONDON UNDERGROUND LIMITED ALL LINES OPERATIVE WEDNESDAY NIGHT/THURSDAY, 6th/7th DECEMBER Track Access Control and Signaller telephone numbers are available
More informationAvoiding stairs Tube guide
London Underground Avoiding stairs Tube guide Showing all Tube and DLR stations where you can use lifts, escalators or ramps between the street and the platform January 2016 MAYOR OF LONDON A B C D Heathrow
More informationNotting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013
Notting Hill Carnival Road Closures & Travel Information Sunday 25 th /Monday 26th August 2013 Compiled by Paul Murphy August 2013 Correct as of Friday 23 rd August 2013 CONTENTS Road Closures & Map Changes
More informationNotting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014
Notting Hill Carnival Road Closures & Travel Information Sunday 24 th /Monday 25th August 2014 Compiled by Paul Murphy-Kasp August 2014 CONTENTS Road Closures & Map Changes to Bus routes & Map Transport
More informationDAILY PERFORMANCE REVIEW Thursday, 20 th September 2012
DAILY PERFORMANCE REVIEW Thursday, 20 th September 2012 SENIOR OPERATING OFFICER S SUMMARY A good day for our customers, with just a few minor incidents during the day. Before SOT a cracked rail was found
More informationSpot the Difference: How to tell when two things are the same (and when they re not!)
Spot the Difference: How to tell when two things are the same (and when they re not!) Raymond Vozzo School of Mathematical Sciences Undergraduate Seminar May 2010 Outline Introduction Topology Category
More informationNEWS AND NOTES 40 YEARS TO THE AIRPORT
NEWS AND NOTES 40 YEARS TO THE AIRPORT Left: On 16 December 2017, it will be 40 years since the Piccadilly Line was extended to Heathrow Airport, having previously opened to Hatton Cross on 19 July 1975.
More informationProfile west. Impressive modern office environment. Excellent national and international access.
Profile west Impressive modern office environment. Excellent national and international access. At 52,990 sq ft (4,923 sq m ) Profile West is a landmark building which provides an impressive modern office
More informationUNDERGROUND NEWS INDEX 2017
UNDERGROUND NEWS ISSN 0306-8617 INDEX 2017 Issues 661 672 PUBLISHED MONTHLY BY THE LONDON UNDERGROUND RAILWAY SOCIETY 834 INDEX TO 2017 ISSUES OF UNDERGROUND NEWS Page entries marked * are, or include,
More informationJubilee and Metropolitan Lines. Jubilee: Waterloo to Stanmore. Metropolitan: Aldgate to Harrow-on-the-Hill
Jubilee and Metropolitan Lines Jubilee: Waterloo to Stanmore Metropolitan: Aldgate to Harrow-on-the-Hill Saturday 16 th to Sunday 17 th January 2016 Headlines Jubilee: West Hampstead to Stanmore Metropolitan:
More information98 Manor Way, Beckenham, Kent BR3 3LR
98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM
More informationLondon Underground. Performance report. Period /12 (16 October 12 November 2011) MAYOR OF LONDON. Transport for London
London Underground Performance report 8 11/1 (16 October 1 November 11) MAYOR OF LONDON Transport for London Contents Page 1. Introduction, context and overview of period 3. Network performance summary
More informationTHE GENERAL STRIKE OF 1926
THE GENERAL STRIKE OF 1926 By Antony Badsey-Ellis In the 1920s labour disputes were common in Britain. The most significant of these was the General Strike, which lasted for nine days from midnight on
More informationCASE STUDY. Transport For London
CASE STUDY Transport For London It s good to work with people who care as much as I do. The level of professionalism was immense. It was an intense, exciting time that produced an exceptional result. Roberto
More informationTransport for London. Visitor Oyster card. The smart way to travel around London
Transport for London Visitor Oyster card The smart way to travel around London What is a Visitor Oyster card? How do I use a Visitor Oyster card? A Visitor Oyster card is a smartcard pre-loaded with pay
More informationTransport for London. Visitor Oyster card. The smart way to travel around London
Transport for London Visitor Oyster card The smart way to travel around London What is a Visitor Oyster card? How do I use a Visitor Oyster card? A Visitor Oyster card is a smartcard pre-loaded with pay
More informationDear Parent(s) TRANSPORT TO THE SCHOOL SITE
July 2017 TO PARENTS OF YEAR 7 AND NEW SIXTH FORM STUDENTS ATTENDING JFS FROM SEPTEMBER 2017 Dear Parent(s) TRANSPORT TO THE SCHOOL SITE I write with details of transport arrangements to the School, effective
More informationHave a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft
Have a look and explore something new 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft London Arches Wood Lane Discover new character retail, restaurant and bar space in West London The White City Area
More informationLondon Underground. The early tube lines, originally owned by several private companies, were brought together under the
2F%2Fen.wikipedia.org%2Fw%2Findex.php%3Ftitle%3DTemplate%253AAttached_KML%252FLondon_Underground%26action%3Draw&output=classic) From Wikipedia, the free encyclopedia The London Underground (also known
More informationYour guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon
Visitor information Welcome to London Your guide to getting around central London on public transport and making the most of your visit. tfl.gov.uk/visitinglondon Tube and central London bus maps inside
More informationOut of Station Interchanges (October 2010)
Station NLC Exit station Operator Station NLC Entry station Operator Maximum Permitted Interchange Time 502 Aldgate LU 7490 Fenchurch Street NR 40 508 Archway LU 1524 Upper Holloway NR 20 511 Baker Street
More informationprime residential investment
prime residential investment EXECUTIVE SUMMARY EXECUTIVE SUMMARY Rare opportunity to acquire a self-contained freehold block of 14 high quality flats in the heart of Kensington The block comprises 5 x
More informationConsidering Access to Healthcare Services Bus Planning
Appendix 1 Considering Access to Healthcare Services Bus Planning Transport for London Buses Directorate Network Development February 2014 The Role of Buses Buses often provide the main public transport
More informationDAILY PERFORMANCE REVIEW Friday, 19 th October 2012
DAILY PERFORMANCE REVIEW Friday, 19 th October 2012 SENIOR OPERATING OFFICER S SUMMARY Overall a good day for our customers with only a few minor incidents to spoil their travelling experience. The Jubilee
More informationHave a look and explore something new. 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft
Have a look and explore something new 13 A1-A4 Units To Let From 765 sq ft to 1,800 sq ft London Arches Wood Lane Discover new character retail, restaurant and bar space in London The White City Area is
More informationNetworks. CS4423. Prof. Götz Pfeiffer Semester 2 (2018/2019)
.. Prof. Götz Pfeiffer http://schmidt.nuigalway.ie/cs4423 School of Mathematics, Statistics and Applied Mathematics NUI Galway Semester 2 (2018/2019) .. Prof. Götz Pfeiffer http://schmidt.nuigalway.ie/cs4423
More informationLONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication
LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)
More informationMEETING REPORTS THE ALDWYCH BRANCH
MEETING REPORTS THE ALDWYCH BRANCH by Antony Badsey-Ellis, joint author with Mike Horne of the forthcoming book of this name. A report of the LURS meeting at All Souls Club House on 9 December 2008 The
More informationThis is the start of an amazing journey. London is a world-class city and deserves a Tube it can be proud of. Our vision is to make that happen.
This is the start of an amazing journey London is a world-class city and deserves a Tube it can be proud of. Our vision is to make that happen. INDEX Destinations Leisure and entertainment Public buildings
More informationSHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason
SHOREDITCH STATION TO CLOSE THIS JUNE by John Thomason The first indication seen was the Quad-Royal (poster size) tube map displayed at stations with text adjacent to Shoreditch stating that the station
More informationEditorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014:
Editorial text from Grand Union Alliance Report of First Old Oak Common & Park Royal Charette, held in Brent on 15 November 2014: Morning session Theresa Magee, Wesley Estate Residents Associaton (Ealing)
More informationNEWS AND NOTES NEW SIGNALLING
NEW SIGNALLING NEWS AND NOTES Above: L18 transferring to Hammersmith for CBTC testing on 2 June 2018, passing through Wood Lane on the westbound. It, and L17 on the east end, are the first (1969 Metro-Cammell-built)
More informationPARKVIEW BRENTFORD PARKVIEW BRENTFORD
OPPORTUNITY TO OCCUPY A HIGHLY VISIBLE LANDMARK OFFICE BUILDING OVERLOOKING THE M4 MOTORWAY IN WEST LONDON GREAT WEST ROAD TW8 9AZ 02 HIGH PROFILE One of the most prominent buildings in West London comprising
More informationNorth West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan
North West London CCG Phamacy Name Address Postcode Tel. No. Christmas Day 28th Dec 1st Jan Honeypot Pharmacy 189 Streatfield Road, Kenton,, HA3 9DA 020 8204 4542 10:00-13.00 Closed Closed Tanna Chemist
More informationSTATION REFURBISHMENT SUMMARY
STATION REFURBISHMENT SUMMARY Since the previous report was published in Underground News No.556 in April 2008, some of the station refurbishment work being undertaken by Metronet has resumed and at some
More informationONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH
ONE BURLINGTON LANE HOGARTH ROUNDABOUT CHISWICK, LONDON W4 2TH The building offers an occupier the chance to relocate their headquarters to one of the most prominent sites in London and benefit from unrivalled
More informationTRS018 Annex A. Development of Train Services for Chiltern Routes
TRS018 Annex A Development of Train Services for Chiltern Routes October 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role is
More informationLONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018
LONDON DO NOT ALIGHT HERE WALK SUNDAY 25 FEBRUARY 2018 Parkland Walk Site of Former Crouch End Station Travel Arrangements We will be catching the 9.20 am train from Biggleswade. A one-day travel card
More informationHeathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018
1 Heathrow Airport Ltd Rail Engineering Access Statement Sunday 10 th December 2017 to Saturday 8 th December 2018 2 of 26 ISSUE RECORD Issue Date Comments Draft V0 16/09/2016 Draft Rules Draft V1 21/10/2016
More informationROYAL ARSENAL, LONDON SE18
ROYAL ARSENAL, LONDON SE18 - 8,000-30,000 SQ FT OF STUNNING OFFICE SPACE - EXCEPTIONAL CONVERTED WAREHOUSE - EXPOSED BRICK WALLS, PAINTED STEEL COLUMNS AND 4-6M CEILING HEIGHTS - 1 MINUTES WALK FROM CROSSRAIL
More informationLTW 372 Annex B. Development of Train Services for Chiltern Routes. Draft for consultation
LTW 372 Annex B Development of Train Services for Chiltern Routes Draft for consultation February 2011 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling
More informationCROSSRAIL INFORMATION PAPER A1 DEVELOPMENT OF THE CROSSRAIL ROUTE
CROSSRAIL INFORMATION PAPER DEVELOPMENT OF THE CROSSRAIL ROUTE This paper explains how the Crossrail route set out in the Crossrail Bill was developed. It will be of particular relevance to those interested
More informationWORK WATERFRONT SUITES AVAILABLE FROM 9,100 TO 25,542 SQ FT
WORK WATERFRONT SUITES AVAILABLE FROM 9,00 TO 25,542 SQ FT WATERFRONT WATERFRONT IS ONE OF TWO GRADE A HEADQUARTERS BUILDINGS WHICH FORM HAMMERSMITH EMBANKMENT. THROUGH ITS FULL HEIGHT GLAZING & IMPRESSIVE
More informationBY THE MET. TO WATFORD
BY THE MET. TO WATFORD by Eric Stuart BACKGROUND The Metropolitan Railway is well-known for its main line to the north first to Chesham, then Aylesbury and beyond. But there are also the branches to Brill,
More informationravengreen THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential
64 66 THE MALL EALING BROADWAY LONDON W5 Well Let Town Centre Retail and Office Investment with Residential Development Potential ravengreen CHARTERED SURVEYORS Gunnersbury Park Ealing Green College Walpole
More informationFOREWORD. A 1billion investment in the Lo
HACKNEY SHOREDITCH The area is home to London s largest number of start-ups, and Europe s highest concentration of tech and creative businesses. Hackney Council has also signed a partnership agreement
More informationEDITED PRESS RELEASES
EDITED PRESS RELEASES TRANSPORT FOR LONDON TRANSPORT FOR LONDON INVITES ARCHITECTS TO SUBMIT PLANS ON 55 BROADWAY 5 August 2013 Transport for London has begun the process of tendering architects to assess
More informationWorkplace Population: Key Facts
: Key Facts May 2014 Introduction Friday 23 rd May saw release 5.2 of 2011 Census data. Included in this release were the first statistics on the workplace population and the first data provided at the
More informationHOW TO CELEBRATE A CENTENARY
HOW TO CELEBRATE A CENTENARY It was originally planned to republish this article in either the January or May 2008 issue of Underground News, marking 145 years of the Underground but lack of space precluded
More informationEFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017
EFL CUP FINAL SUNDAY 26 TH FEBRUARY 2017 Travel Plan Wembley Stadium will be hosting the English Football League (EFL) Final between Manchester United F.C. and Southampton F.C. on Sunday 26 th February
More informationBelow: NF 119/15 NF 120/15 NF 121/15
NEWSFLASHES Items for the Newsflashes (and Tailpieces) section of Underground News may be sent to the Editor by post and also by E-Mail, to the following address: editorun@lurs.org.uk NF 111/15 Further
More informationFinchley and Golders Green Area Committee 27 April 2017
Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning
More informationWELCOME TO CONNAUGHT HALL
WELCOME TO CONNAUGHT HALL ABOUT US 18 UNIQUE COLLEGES - ONE OUTSTANDING UNIVERSITY The University of London is a federal University. It consists of 18 self-governing Colleges of outstanding reputation,
More informationThe Evergreen 3 Project
The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West
More informationInitial proposals for new Parliamentary constituency boundaries in London
Initial proposals for new Parliamentary constituency boundaries in London Contents Summary 3 1 What is the Boundary Commission for England? 5 2 Background to the 2018 Review 7 3 Initial proposals for London
More informationWest London Economic Prosperity Board. 21 March Summary. Title Orbital Rail in West London
West London Economic Prosperity Board 21 March 2017 Title Orbital Rail in West London Report of Status Urgent Enclosures Officer Contact Details Amar Dave (LB Brent) Public No Appendix 1: Specification
More informationBoard meeting
Board meeting 28.11.17 Secretariat memorandum Author: Vincent Stops Agenda item: 8 Ref: LTW568 Drafted: 13.11.17 Oxford Street bus changes associated with pedestrianisation 1 Purpose of report 1.1. To
More information1 Tottenham Court Road 1 Holborn 1 Aldwych 1 Waterloo 1 Elephant & Castle 1 Bricklayer's Arms 1 Surrey Quays 1 Canada Water 2 Marylebone 2 Marble
Route Blind 1 Tottenham Court Road 1 Holborn 1 Aldwych 1 Waterloo 1 Elephant & Castle 1 Bricklayer's Arms 1 Surrey Quays 1 Canada Water 2 Marylebone 2 Marble Arch 2 Hyde Park Corner 2 Vauxhall 2 Stockwell
More informationUNIQUE CENTRAL LONDON FREEHOLD INTEREST
INVESTMENT SUMMARY UNIQUE CENTRAL LONDON FREEHOLD INTEREST 128 King Henry s Road London NW3 3ST 1.76 ACRES IN PRIME CENTRAL LONDON INVESTMENT SUMMARY 128 KING HENRY S ROAD Prime location in one of London
More informationA PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT
A PROMINENT GRADE A HEADQUARTERS BUILDING TOTALLING 117,263 SQ FT VANTAGE LONDON A 12-STOREY OFFICE BUILDING CONVENIENTLY LOCATED OFF JUNCTION 1 OF THE M4 WHICH BENEFITS FROM DIRECT ACCESS INTO CENTRAL
More informationModule TS9. Level crossings - signallers regulations. GE/RT8000/TS9 Rule Book. Issue 3. March 2014
GE/RT8000/TS9 Rule Book Level crossings - signallers regulations Module TS9 Issue 3 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents
More informationLondon Transport Railways
London Transport Railways The following selection of images is of the stock displayed in the Underground Centenary exhibition held at Neasden Depot, which we visited on Saturday 25 th May 1963... Sadly
More informationBEAUTIFULLY CONSIDERED ICONIC LIVING
BEAUTIFULLY CONSIDERED ICONIC LIVING 2 A landmark development of 115 apartments centered in the heart of Wembley. Brent Cross Shopping Centre 4 Elizabeth House is a striking residential development of
More information100 YEARS OF THE HAMPSTEAD TUBE
100 YEARS OF THE HAMPSTEAD TUBE by Antony Badsey-Ellis, author of The Hampstead Tube A report of the LURS meeting at All Souls Clubhouse on 11 September 2007 Rather than making a selection from his recent
More informationHOUSE WATERSIDE RIVERSIDE UXBRIDGE 20,996 SQ FT (1,948 SQ M) TO LET A NEWLY REFURBISHED HIGH QUALITY OFFICE BUILDING
RIVERSIDE UXBRIDGE TO LET A NEWLY REFURBISHED HIGH QUALITY OFFICE BUILDING 20,996 SQ FT (,948 SQ M) This two storey building with striking curved frontage, is set in a pleasant waterside location overlooking
More informationHIGH SPEED UK. ..connecting in London. Colin Elliff BSc CEng MICE. Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, HSUK
HIGH SPEED UK..connecting in London Colin Elliff BSc CEng MICE Civil Engineering Principal, Quentin Macdonald BSc(Eng) CEng FIRSE MIET Systems Engineering Principal, www.highspeeduk.co.uk HS2+3 GL EH GL
More information2 longwalk Stockley Park, Heathrow UB11 1BA
www.2longwalk.com 2 longwalk Stockley Park, Heathrow UB11 1BA Newly refurbished 48,552 sq ft headquarter office building 2 longwalk Stockley Park, Heathrow UB11 1BA 2 Longwalk offers businesses bright,
More informationXlirSX TO UNDERGROUND NEWS ISSUES l68
XlirSX TO UNDERGROUND NEWS - 1975 ISSUES 157 - l68 ACCIDENTS COLLISIONS Ealing Common depot, multiple 93 Edgware, 19^6 kl High Barnet, sidings overrun 28.2«75 Klondyke sidings, A & 1938 stocks 27.8.75
More informationProvincial Railway Technical Standards
GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements
More informationStories and Rhyme Times By Day of the Week
Venue Day & Time Address Contact Details Watford Borders Daily at 11am and 2 pm Waterfields Retail Park, New Road, Watford, WD17 2EU 01923 256902 Brent Cross Borders Daily at 2pm Unit A Brent South Shopping
More informationCITY OF WESTMINSTER. 2. The general effects of the Orders, in relation to the implementation of Phase 2 of the Piccadilly 2 Way Scheme, would be in:
CITY OF WESTMINSTER CARLTON HOUSE TERRACE, CARLTON STREET, CHARLES II STREET, HAYMARKET, JERMYN STREET, NORRIS STREET, ORANGE STREET, PANTON STREET, REGENT STREET, ST. JAMES S MARKET, SUFFOLK PLACE, SUFFOLK
More informationThe best office building in Harrow. 3,304 sq ft 15,163 sq ft
The best office building in Harrow 3,304 sq ft 5,63 sq ft 2 minutes from london marylebone by train and just 9 mins from Baker street by tube HARROW: grade a location, grade a offices Metropolitan Line
More informationCAA NZ CAR 121 Subpart K 30-Oct-2017 CAR 125 Subpart K 30-Oct-2017 CAR 135 Subpart K 30-Oct-2017 AC Oct-2006 AC Aug-2011 Fatigue of
CAA NZ CAR 121 Subpart K 30-Oct-2017 CAR 125 Subpart K 30-Oct-2017 CAR 135 Subpart K 30-Oct-2017 AC 119-2 27-Oct-2006 AC 119-3 12-Aug-2011 Fatigue of Flight Crew Table of Contents DESCRIPTION...5 A Part
More informationMODERN OFFICES TO LET. 26/28 GROVE W6 HAMMERSMITH
MODERN OFFICES TO LET. 26/28 26/28 MODERN OFFICE ACCOMMODATION IN THE HEART OF. AVAILABLE FROM 3,145 SQ FT TO 34,456 SQ FT. AN INSPIRING PLACE TO WORK. The accommodation is approached via a dramatic and
More informationCrossrail / Elizabeth Line An Update
Crossrail / Elizabeth Line An Update Howard Smith Operations Director, Crossrail Railfuture Autumn 2018 Conference 10 th November 2018 Novotel Reading (uploaded to the www.railfuture.org.uk website with
More informationUNDERGROUND NEWS ISSN CONTENTS ISSUE NUMBERS, PAGES, DATES & NEWSFLASHES 7 LIST OF SOCIETY MEETINGS 8
UNDERGROUND NEWS ISSN 0306-8617 CONTENTS MAIN INDEX 2-7 ISSUE NUMBERS, PAGES, DATES & NEWSFLASHES 7 LIBRARY EVENINGS 7 LIST OF SOCIETY MEETINGS 8 LIST OF SOCIETY VISITS & TOURS 8 CREDITED ARTICLES 8 UNDERGROUND
More informationPotential future transport projects for London October 2016
Appendix A Potential future transport projects for London October 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public, including the users
More informationNetwork Safeworking Rules and Procedures
Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version
More informationBRAND NEW FULLY-FITTED OFFICES OPPOSITE STRATFORD STATION AVAILABLE TO RENT 2,800 SQ FT
BRAND NEW FULLY-FITTED OFFICES OPPOSITE STATION AVAILABLE TO RENT 2,800 SQ FT Stratosphere Tower is a spectacular 36 storey tower located in the heart of Stratford, providing a luxurious collection of
More informationSignage Re-branding Display Roll-out Programmes Commercial Fit Out. Signage & Fit-Out Specialists
Signage Re-branding Display Roll-out Programmes Commercial Fit Out Signage & Fit-Out Specialists design inspire deliver The Cennox Group specialise in the delivery of signage and fit-out services for many
More informationM&EE Stabling Point Safety Survey
M&EE Stabling Point Safety Survey Location Southall West Siding Stannox number Date of assessment 27/06/2016 Compiled by Name Company Daniel Crisp Colas Rail Telephone 07753 798016 email address daniel.crisp@colasrail.co.uk
More informationKick off will be at 17:00, with this event not being subject to extra time and penalties. Event timings are as follows:
2018 FIFA World Cup Russia Qualifier England vs Lithuania, Sunday 26 th March 2017 Travel Plan Wembley Stadium will be hosting 2018 FIFA World Cup Russia Qualifier between England and Lithuania on Sunday
More informationGovia Thameslink Railway consultation on December 2015 timetable - APTU response
Thameslink: Bedford to Gatwick Airport and Brighton Q1 What do you think about these proposals noting that it is not possible to serve both London Bridge and London Blackfriars stations from Preston Park,
More informationChapter 7 Route Window C6 Farringdon station. Transport for London
Chapter 7 Route Window C6 Farringdon station FARRINGDON STATION 7 Route Window C6 Farringdon station Fox and Knot Street Worksite Farringdon Crossover Worksite This worksite will be situated on the triangular
More informationAppendix J - Q133/ 2011 Oyster Overcharging (1) Table 1: Incomplete pay as you go journeys in 2010
Appendix J - Q133/ 2011 Oyster Overcharging (1) Table 1: Incomplete pay as you go journeys in 2010 Month No. of Cards No. of Total incurring max journeys charged fare charges (000) ( 000) (000) January
More informationEALING CROSS 85 UXBRIDGE ROAD LONDON
EALING CROSS 85 UXBRIDGE ROAD LONDON IT S ALL IN A FEALING 0 EALING CROSS EIGHT FLOORS OF NATURAL LIGHT AND LOTS OF LOVELY SPACE. THIS IS EALING S MOST MODERN BUILDING. 0 FEALING DYNAMIC Less than seven
More informationALBION COURT LON DONW6
ALBION COURT LON DONW6 WELCOME TO ALBION COURT Albion Court, Albion Place, Hammersmith, London W6 0QT Albion Court is situated in a quiet and secure private gated courtyard. Just 65 metres from the bustling
More informationVisitor information. Explore more and pay less with a. Discover your special offers and discounts. Visitor Oyster card
Visitor information Explore more and pay less with a Visitor Oyster card Discover your special offers and discounts Categories Simply turn up and show your Visitor Oyster card in order to enjoy the range
More informationVisitor information. Explore more and pay less with a. Discover your special offers and discounts. Visitor Oyster card
Visitor information Explore more and pay less with a Visitor Oyster card Discover your special offers and discounts Categories Simply turn up and show your Visitor Oyster card in order to enjoy the range
More informationStylish Offices Available To let
Stylish Offices Available To let 100, ROAD, W6 7JP OFFICE SUITES TO LET WITH CAR PARKING SPACES 1,385 TO 18,563 SQ FT. (128.7 TO 1,724.4 SQ.M) New Build Office Accommodation Tenant in Period Office Space
More informationUNDERGROUND NEWS ISSN INDEX CONTENTS LIST OF SOCIETY MEETINGS 10
UNDERGROUND NEWS ISSN 0306-8617 1987 INDEX CONTENTS MAIN INDEX 2-10 LIBRARY EVENINGS 10 ISSUE NUMBERS, PAGES, DATES & NEWSFLASHES 10 LIST OF SOCIETY MEETINGS 10 LIST OF SOCIETY VISITS & TOURS 10 CREDITED
More informationPopulation analysis of North West London for John Lyon s Charity
Population analysis of North West London for John Lyon s Charity This note summarises the findings of our population analysis for the eight north west London boroughs in which John Lyon s Charity is active.
More informationFACT SHEET. For everything London
Computer generated image is indicative only For everything London New high specification 1, 2 and 3 bedroom apartments in a classic London location: Argo House, Kilburn Park Road is a fantastic choice
More informationHAMMERSMITH GROVE W6
HAMMERSMITH GROVE W6 HAMMERSMITH GROVE W6 A landmark building in an unrivalled location 26-28 Hammersmith Grove has been comprehensively refurbished to provide urbane and stylish office accommodation,
More informationAir Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES
Air Law and ATC Procedures Subject: Classroom Instruction: YES (Workshop) Appr. # of Instruction Hrs: 3 Internal Examination: YES ITSS (online) / Offline International Law: Conventions, Agreements and
More information4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.
145 11. TRAM EXTENSION PROJECT PROPOSED PARKING CHANGES AND STREET MODIFICATIONS IN LICHFIELD STREET, MANCHESTER STREET, HIGH STREET, TUAM STREET, ASH STREET, BEDFORD ROW AND OXFORD TERRACE General Manager
More informationREPUBLIC OF INDONESIA MINISTRY OF TRANSPORATIONS DIRECTORATE GENERAL OF CIVIL AVIATION JAKARTA INDONESIA
LAMPIRAN KEPUTUSAN DIREKTUR JENDERAL PERHUBUNGAN UDARA NOMOR : KP 060 Tahun 2018 TANGGAL : 6 Maret 2018 STAFF INSTRUCTION SI 8900 3.329 Maintenance Records System Evaluations Amendment : 0 Date : 6 REPUBLIC
More information3 Lunch - Non-Participating Store List. Participation and product range may vary. Shop Number Address City Zip
3 Lunch - Non-Participating Store List. Participation and product range may vary. Shop Number Address City Zip 33020 180 High St Acton, London W3 9NN 22014 Vicarage Fields Shpg Ctr Barking, Greater London
More informationTRANSPORT : PROCESS Topic Discussion. 20th July 2016
TRANSPORT : PROCESS Topic Discussion 20th July 2016 1 TODAY S SESSION Process not solutions - masterplan currently evolving Existing & future networks Checking feedback - understanding the issues How a
More information