1 IN THE PROVINCIAL COURT OF ALBERTA CRIMINAL DIVISION Between HER MAJESTY THE QUEEN - and - ALL-CAN ENGINEERING AND SURVEYS LTD. CROWN STATEMENT OF FACTS IN SUPPORT OF A GUILTY PLEA SUMMARY OF THE CHARGE ALL-CAN ENGINEERING AND SURVEYS LTD. has entered a guilty plea to count # 4 of the information as amended, alleging that on September 21, 2009, as a party to the offence, did fail to provide information as requested under the Water Act contrary to section 142(1)(b) of the Water Act. The maximum penalty for the offence is $500, but given the extraordinary mitigating factors, the Crown is recommending a penalty of $50,000.00, $40, of which would be directed to a creative sentencing project as authorized under section 148(1) of the Act. BACKGROUND DEVON CANADA CORPORATION planned to construct a pipeline to deliver sweet natural gas from a new well to their existing West Ferrier gas gathering system (and potentially additional wells) in what is described as the Dutch area west of Rocky Mountain House, Alberta. The area where the pipeline was to be constructed is approximately half way between Rocky Mountain House and Nordegg on the south side of Highway 11. In 2008, DEVON CANADA began exploring route options for the pipeline. The project was to be completed in two stages. The western leg, which was through a protected wildlife area for ungulates (mainly elk) and the technically challenging valley of Jackfish Creek, was originally planned to be completed by the fourth quarter of The eastern leg was to be completed in the first quarter of Pursuant to the Code of Practice for Pipelines and Telecommunications Lines Crossing a Water Body, DEVON CANADA was required to submit a Notice to the Director with respect to the pipeline route. The Code of Practice notification is not a mere administrative requirement. The Code requires the person constructing the pipeline to identify all water bodies and plan appropriate measures to protect the aquatic environment.

2 DEVON CANADA planned to use horizontal directional drilling to cross under water bodies and road but this technique can result in a frac-out A frac-out is a release of the bentonite clay used to carry drill cuttings and to lubricate the drill string. Drilling mud, while not toxic per se, has a direct physical effect on the aquatic environment, aquatic organisms may be smothered and suffocate. While most aquatic organisms have adapted to natural fluctuations in suspended sediments loads during spring run-off, they cannot necessarily tolerated large quantities of sediment where drilling mud is released. Frac-outs are a particular risk in connection with horizontal directional drilling under water bodies because, if there is frac-out to surface, the mud has the potential to enter the water body through pre-existing fractures in the bedrock. The high pressure of horizontal directional drilling can force the drilling mud through these fractures to surface. In order to protect water bodies from frac-outs, the design of the directional drill must ensure that the bore is place at a depth within optimal soil/rock conditions under the stream be to adequately reduce the risk of a frac-out. This may affect the length of the drill, since there are technical limits to the arc that the drill can achieved. Additionally, the existence of a water body crossing as regulated under the Code requires a professional engineer to prepare and sign off on a plan that meets the minimum design and construction standards to protect the aquatic environment. CHRONOLOGY September 29, 2008 DEVON CANADA approached Alberta Sustainable Resource Development with a proposed pipeline project within a Class C Critical Wildlife Habitat Zone east of Rocky Mountain House. October 2-22, 2008 DEVON CANADA hired ALL-CAN ENGINEERING to undertake a legal survey of the original proposed route which included walking every foot of the proposed right of way. October 29 The final construction and legal plans of the original proposed route were issued by ALL-CAN. The plan included a table listing the crossings to be encountered during construction including all water body crossings. The table accurately identified all water bodies. November 10 DEVON CANADA submitted their Environmental Field Report (EFR) to the Department identifying wildlife and environmental concerns. Unbeknownst to ALL-CAN, the EFR included a listing of all watercourse crossings based on the original survey prepared by ALL-CAN. 2

3 November 25, 2008 DEVON contacted the Department to request a meeting to discuss another route for the pipeline. DEVON CANADA was concerned that the proposed location for the Jackfish Creek crossing involved a technically difficult directional drill and, if there were a frac-out, DEVON CANADA would not be able to access the valley to contain the drilling fluid. December 5, 2008 ALL-CAN was advised that the project was cancelled until further notice. A final bill for was submitted for the work undertaken to date. January 26, 2009 DEVON CANADA contacted ALL-CAN requesting their assistance in considering alternative routes. Rather than a full legal survey, the request at that point was that contours be added to the photo composite that had already been prepared and to order LIDAR photos for an area roughly 800 meters on either side of Jackfish Creek. LIDAR is a new electronic mapping system. While there are advantages to using LIDAR, there are limitations to the new technology. Although the shadowing on the various images would indicate the presence of a valley, they may not show water flowing. Based on the LIDAR images, DEVON CANADA ultimately determined that the safest route would be to cross Jackfish Creek further to north, approximately 200 meters south of the highway. However, there was no ground truthing of the LIDAR section of the route. March 26, 2009 At a meeting with government officials, DEVON CANADA presented a new route based on a LIDAR developed map. Part of the new route was to run under what was locally known as Baker Road. May 11-12, 2009 As representatives from DEVON CANADA and ALL-CAN were reviewing the LIDAR generated images of the Jackfish Creek directional bore, the DEVON representative, who was familiar with area where the pipeline would cross Baker road, advised the ALL-CAN representative of a wet area on the east side of Baker Road and a channel or valley on the west side of the road. The representative of DEVON CANADA asked the ALL-CAN representative to plot the water body. That was done but inexplicably, reference to the water body was not carried over to subsequent plans, a mistake for which the Supervisor for ALL-CAN took personal responsibility: Q. how come with all of the other maps suddenly it wasn t there? A. I think that was an error on my part. I mean having worked on this drawing, it is a separate drawing due to the file size and data structure It should have probably been moved to the PLA sketches and it wasn t. That s an error of mine. 3

4 In a formal admission by ALL-CAN indicated that: At this time was recognized from the LIDAR a potential channel west of Baker Road, and sketched this on the drawing. Unfortunately this channel was overlooked when the phase 3 final survey was completed in the field and not noted on the final plan of survey. May 22, 2009 DEVON CANADA provided Alberta Sustainable Resource Development with the LIDAR plan that had been prepared by ALL-CAN. The legend included the water bodies to be crossed but did not include the crossing at Baker Road. June 10, 2009 ALL-CAN ENGINEERING was awarded a second contract with respect to the new route. The project details and scope of work was to be at the direction of the DEVON representative. Unlike the original contract, the entire route was not surveyed at this point. ALL-CAN Supervisor: According to the A little bit of ground truthing was done at the time. Our crews went out a couple of times. I can t remember if [the DEVON representative] was on site with them or not, but they were picking up specific ground truthing things that they were asked to check out mostly at the east end of the line, a couple of little re-routes around topographical features, that type of thing. Still nothing actual surveyed with variance and distances, just kind of handheld to get around so we could complete the picture. As to why the second route was not completely surveyed at this juncture, the ALL-CAN Supervisor indicated as follows: Q. I mean Devon is the owner of the project A. And it s not ours. They just tell us to survey it where it needs to be surveyed. July 26 30, 2009 Because the new route passed through traditional aboriginal hunting grounds near the Baker Road Crossing, consent was required from two First Nations communities. To facilitate that process, DEVON CANADA arranged for a tour of the site. In preparation for that tour, DEVON CANADA requested that ALL-CAN flag the boundary of the Right of Way so that the site would be visible from the ground. In the course of this work on July 29 th, ALL-CAN crews noted the culvert under Baker Road, but as the crews were flagging for First Nations consultation rather than performing a survey, not formal field notes were prepared. July 30, 2009 The final construction plan for the new pipeline route was issued by ALL-CAN. The plan made no mention of the Baker Road Crossing. 4

5 August 2009 DEVON CANADA hired AECOM, an environmental consulting firm, to assess water body crossings in connection with the pipeline and to prepare the Code of Practice notification. DEVON CANADA s expectation was that AECOM would assess all water body crossings along the route of the pipeline. However AECOM based their work solely on the ALL-CAN construction plan which did not include to the Baker Road crossing. When the DEVON CANADA representative asked AECOM whether additional crossings had been identified, AECOM advised that it had not indentified any additional crossings. Unbeknownst to DEVON CANADA, AECOM did not walk the actual route of the pipeline between Baker Road and Jackfish Creek, but only walked up Jackfish Creek itself. When AECOM did not see any water bodies flowing into Jackfish Creek from the east side where Baker Road is located, they assumed that there were no water bodies that needed to be assessed. It seems that, at least during certain times of the year, the Baker Road Creek does not flow into Jackfish Creek and simply dissipates into the Jackfish Creek flood plain. In the result, the Code of Practice Notification prepared by AECOM was based on the table prepared by ALL-CAN. ALL-CAN was not privy to the dealings between DEVON CANADA and AECOM and Alberta Environment investigators did not learn of the discussions between AECOM and DEVON until after charges had been laid. September 17, 2009 DEVON CANADA submitted a formal application for the new route to SRD which included a new Environmental Field Report (EFR) referencing the water bodies listed by AECOM. While the EFR properly referenced Jackfish Creek and the other water body crossings east of Baker Road, the Baker Road Creek crossing was not included. ALL-CAN was not aware that their work had been relied upon for that purpose. September 21, 2009 AECOM submitted the Code of Practice notification to Alberta Environment with no mention of the Baker Road Crossing. ALL-CAN was not aware that their work had been relied upon for that purpose. 5

6 SUBSEQUENT EVENTS October 9, 2009 DEVON CANADA awarded the contract for the horizontal drill of Jackfish Creek to CANADIAN HORIZONTAL DRILLING LTD. The contract contained a standard clause indicating that changes to the design required prior written authorization by DEVON CANADA. October 15, 2009 In a separate contract with DEVON CANADA, ALL-CAN then undertook a legal survey of the pipeline route to set the boundaries for areas of construction. The survey field crew was aware of the existence of the Baker Road Creek and marked it with survey posts on either side. The lead hand described the creek as 1 to 3 meters wide and documented its existence in the field notes that were then sent back to ALL-CAN s main office. October 20, 2009 DEVON CANADA asked ALL-CAN to make a slight revision to the right of way near Baker Road and to stake out the temporary workspaces from bore entry, exit and access. To facilitate this, another ALL-CAN surveyor cut a small sight-line through the bush and he too discovered the Baker Road Creek. In his statement to the investigator, he described the channel as obvious and flowing. The creek is noted in his field notes and prominent in a hand drawn sketch of the area. That same day, ALL-CAN issued a revised construction plan which included the few areas that had been drawn but did not include the recent field observations and accordingly, the revised construction plan did not identify Baker Road Creek. October 21, 2009 Sustainable Resource Development gave their approval for the new route. October The survey notes from October 20 th were faxed to ALL-CAN S office. According to the formal admission provided by ALL-CAN, this information was not added to the plan as the plan was already basically complete. October 23, 2009 ALL-CAN made some minor changes to the construction plan to reflect the surveys done in connection with the various work sites and access and entry points for the drilling rigs, but the information from the field staff with respect to the Baker Road Crossing was not included. October 28, 2009 The tender for the Dutch Pipeline was awarded to CHALLAND PIPELINE LTD. CHALLAND in turn, hired EVEREAD DIRECTIONAL DRILLING to do the actual work. The contract contained a standard clause indicating that changes to the design required prior written authorization by DEVON CANADA. 6

7 November 20 December 3, 2009 The horizontal directional drilling of the Jackfish Creek bore proceeded without incident. DEVON CANADA had hired COMPLETE CROSSINGS LTD. to provided environmental oversight and monitoring of the Jackfish Creek crossing. December 3, 2009 At 2230 hours, as drilling was almost complete, the crew performing the horizontal directional drill under Jackfish Creek discovered a frac-out 150 meters upslope from Jackfish Creek. Drilling was suspended. December 4, 2009 The frac-out upslope of Jackfish Creek was reported to Alberta Environment. Later that day, preparation for the Baker Road directional drill by EVEREADY began. EVEREADY s field Supervisor walked the drill path prior to pulling the cable across the drill path and discovered Baker Road creek which he described as a channel that was frozen with ice to the bottom of the channel. As he later told investigators, in his experience the bore would normally have been deeper if it were passing under a water body. Puzzled, he reviewed the construction plan but there was no watercourse marked. He raised the issue with his contact with CHALLAND PIPELINES. While there is disagreement as to the specifics of that conversation, the ultimate result was that because the water body was not on the construction plan, drilling proceeded. There was no attempt to contact DEVON CANADA. December 5, 2009 At approximately 1430 hours, there was a second frac-out at the Baker Road Crossing. COMPLETE CROSSINGS were able to supply the rig with silt fences and instructed the crew as to containment. Temperatures were in the minus 30 to 40 degrees range, which aided the containment and remediation efforts. EVERYREADY and CHALLAND supervisors discussed whether they should adjust the drill depth but as channel containment was in place, they decided to continue drilling at the same depth. December 6, 2009 At 1130 hours, COMPLETE CROSSINGS notified Alberta Environment of the frac-out at the Baker Road Crossing. December 8, 2009 Alberta Sustainable Resource Development requested an explanation as to why the Baker Road crossing had not been identified. 7

8 December 11, 2009 In response to the request for information of December 8 th, COMPLETE CROSSINGS, on behalf of DEVON CANADA provided a formal report admitting that: The HDD crossing of Baker Road was not labelled correctly on the construction drawings, as a small permanent creek was missed. The creek is located in a steep draw on the west side of Baker Road, approximately 20m from the road edge. As discussed before a bore line walk could easily be made to ensure that all natural features are labelled correctly on the construction drawings. Measures taken for better communication between the surveyor and the consultant and a more thorough assessment by foot, not by truck, could also be regarded as mitigation measures. January 5, 2010 In response to an inquiry from Alberta Sustainable Resource Development as to why the Baker Road crossing was not identified in the Environmental Field Report and survey plan, DEVON CANADA admitted that they had failed to identity the water body in part because: The extended timeline and the start/stop nature of the project contributed to key details being overlooked specifically west of Baker Road. It has been determined that at the time of the EFR preparation it was believed that some type of watercourse was present. However, since the plan did not note a crossing and the QAES assessment did not classify a crossing, no crossing was included in the EFR The watercourse did not show up on the ALL-CAN mapping data base used to develop the original survey plan and field survey work also failed to identity then. Office personnel did manually mark something on a LIDAR picture of the Baker Road area on one version, but it did not show up on subsequent versions. That specific LIDAR drawing was being used as part of the Jackfish Creek crossing design and not the road crossing. To prevent future occurrences, DEVON CANADA recommended that: 100% of ROWs are to be walked and investigated by qualified personnel (where safe to do so) regardless if it is part of a larger bore, to ensure all watercourses are indentified. AGGRAVATING FACTORS The Expertise of the Corporate Accused The company is well respected and well known for its considerable expertise. A company of this calibre is held to a very high standard when it comes to protecting the environment. MITIGATING FACTORS Cooperation in the course of the investigation The investigator was impressed with the openness and frankness of ALL-CAN personnel. 8

9 The guilty plea The company has not disputed the facts but raised a legal issue as to the culpability of a contractor for an offence committed by its principal. Upon careful legal assessment, the company then indicated that a plea would be entered. According the company should be given full credit as if this had been an early guilty plea. The extraordinary step of sharing evidence of due diligence with the Crown ALL-CAN was under no obligation to disclose the evidence in support of a claim of due diligence to the Crown in advance but did so in the full knowledge that of what the consequences might be, similar to the situation in Regina v. Geon Canada Ltd. The company also instructed their legal counsel to give the Crown advance notice of the legal challenge that they were contemplating. The contribution to the offence by other parties ALL-CAN was responsible for the original mistake in failing to carry forward the information that it had with respect to the existence of the Baker Road Crossing, but that mistake was compounded by other parties who also were in a position to correct that error. Liability as a party to the offence rests upon ALL-CAN s original mistake but also its failure to have a system in place to check for errors after the fact. As Judge Fradsham remarked in Regina v. Waters & Rogers: As submitted by the Crown, human errors are to be expected in any human Endeavour. When the defense of due diligence is not available, and here Van Waters concedes that it is not available when it tenders its guilty plea, the error constitutes a culpable violation of the legislation. The accused must answer for that error, and one of the circumstances to be considered by the sentencing Court is what the accused did to prevent the occurrence (even though those acts are insufficient to provide a viable defense). Since human errors are inevitable, it is insufficient for the accused to say that it gave proper instruction to its employees and expected them to perform in accordance with them. The point is that the best of instructions cannot prevent violations borne of human error. It falls to the accused to put in place systems which are designed to counteract the inevitable human error. The need for such systems increases proportionately with the risks associated with an error occurring in the accused's operations. 9

10 The courage of the accused in sharing lessons learned These proceedings are an embarrassment to a company with such a high reputation for excellence but the company is willing to subject itself to further inquiry and review in a formal root cause analysis exercise to be conducted by the University of Calgary. As in the Suncor case, the company has agreed to share that information with other companies so as to prevent future offences. This openness and a willing to learn from a bad experience are consistent with the company s approach throughout these proceedings. All of which is respectfully submitted. Susan McRory Environmental Coordinator Specialized Prosecutions Alberta Justice. 10

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529

Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529 February 14, 2012 Office of Public Engagement United States Citizenship and Immigration Services 20 Massachusetts Ave. NW Washington, DC 20529 Via e-mail: public.engagement@dhs.gov RE: Comments on USCIS

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

Abandoned Mine Sites Policy

Abandoned Mine Sites Policy SUBJECT: Abandoned Mine Sites Policy Policy Number: MRE 006 2004 C. R. File Number: 565 00 0002 Effective Date: September 1, 2004 To Be Reviewed: September 1, 2008 Approval: Original signed by W. David

More information

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person

Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person Consumer Protection Group Air Travel Organisers Licensing Criteria for an application for and grant of, or a variation to, an ATOL: fitness, competence and Accountable Person ATOL Policy and Regulations

More information

The Collection and Use of Safety Information

The Collection and Use of Safety Information Page 1 of 1 1. Purpose and Scope... 2 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.1 Context... 2 5.2 Issues Relevant to this Policy... 3 5.3 Civil Aviation Rules and Advisory

More information

o Violence Against Women and Department of Justice Reauthorization Act of 2005 (VAWA 2005), Public Law No , 119 Stat.

o Violence Against Women and Department of Justice Reauthorization Act of 2005 (VAWA 2005), Public Law No , 119 Stat. INTERIM MEMO FOR COMMENT Posted: 03-08-2011 Comment period ends: 03-22-2011 This memo is in effect until further notice. U.S. Citizenship and Immigration Services Office of the Director (MS 2000) Washington,

More information

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Order 2012-9-1 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the Department of Transportation On the Fourth day of September, 2012. JSC Aeroflot

More information

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601.

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601. U. S. Citizenship and Immigration Services Office of the Director (MS 2000) Washington, DC 20529-2000 May 9, 2011 PM-602-0038 Policy Memorandum SUBJECT: Requests to Expedite Adjudication of Form I-601,

More information

THE LAW AND REGULATION IN THE UK OVERSEAS TERRITORIES. Published by Air Safety Support International Ltd

THE LAW AND REGULATION IN THE UK OVERSEAS TERRITORIES. Published by Air Safety Support International Ltd THE LAW AND REGULATION IN THE UK OVERSEAS TERRITORIES Published by Air Safety Support International Ltd Air Safety Support International Limited 2007 First published May 2007 Second issue September 2008

More information

Anti-Bribery and Corruption

Anti-Bribery and Corruption Newcrest strictly prohibits bribery and other unlawful or improper payments made to any individual or entity, as outlined in this Anti-Bribery & Corruption. Newcrest's Anti- Bribery & Corruption applies

More information

STTM EVENT DELAYED CAPACITY AND ALLOCATION SUBMISSIONS SYDNEY 13 & 14 JULY 2013

STTM EVENT DELAYED CAPACITY AND ALLOCATION SUBMISSIONS SYDNEY 13 & 14 JULY 2013 STTM EVENT DELAYED CAPACITY AND ALLOCATION SUBMISSIONS SYDNEY 13 & 14 JULY 2013 PREPARED BY: Market Performance DOCUMENT REF: STTM ER 13/002 DATE: 22 August 2013 Am,ttolion l:nergy 1\_.n,ketOperctor Ltd

More information

UAB Avion Express FAMILY ASSISTANCE PLAN

UAB Avion Express FAMILY ASSISTANCE PLAN UAB Avion Express FAMILY ASSISTANCE PLAN 1. Overview 1.1. The purpose of the UAB Avion Express Family Assistance Plan is to provide company personnel with the guidelines, procedures and training that will

More information

SUBJECT: Extension of Status for T and U Nonimmigrants (Corrected and Reissued)

SUBJECT: Extension of Status for T and U Nonimmigrants (Corrected and Reissued) U.S. Citizenship and Immigration Services Office of the Director (MS 2000) Washington, DC 20529-2000 October 4, 2016 PM-602-0032.2 Policy Memorandum SUBJECT: Extension of Status for T and U Nonimmigrants

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Datum Issues in the Red River of the North Basin ----

Datum Issues in the Red River of the North Basin ---- Datum Issues in the Red River of the North Basin ---- Scoping Document May 1999 Russell E. Harkness, Hydrologist United States Geological Survey Water Resources Division 2 EXECUTIVE SUMMARY Two datum issues

More information

Chapter 9: National Parks and Protected Areas

Chapter 9: National Parks and Protected Areas Part 9.1 Torngat Mountains National Park Reserve 9.1.1 The area set out in the Map Atlas (shown for illustrative purposes only in schedule 9-A) and described in appendix D-2 shall become a National Park

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

The Amusement Ride Safety Act

The Amusement Ride Safety Act 1 AMUSEMENT RIDE SAFETY c. A-18.2 The Amusement Ride Safety Act being Chapter A-18.2 of the Statutes of Saskatchewan, 1986 (consult the Table of Saskatchewan Statutes for effective dates) as amended by

More information

Marine Stewardship Council. Privacy Notice for Job Applicants

Marine Stewardship Council. Privacy Notice for Job Applicants Marine Stewardship Council Privacy Notice for Job Applicants The MSC is committed to protecting the privacy and security of a job applicant s personal information. This Privacy Notice describes how the

More information

IN THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH CIRCUIT. No Non-Argument Calendar. D. C. Docket No CV-CMA.

IN THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH CIRCUIT. No Non-Argument Calendar. D. C. Docket No CV-CMA. [DO NOT PUBLISH] WANDA KRUPSKI, a single person, IN THE UNITED STATES COURT OF APPEALS FOR THE ELEVENTH CIRCUIT No. 08-16569 Non-Argument Calendar D. C. Docket No. 08-60152-CV-CMA versus COSTA CRUISE LINES,

More information

Chapter 326. Unclaimed Moneys Act Certified on: / /20.

Chapter 326. Unclaimed Moneys Act Certified on: / /20. Chapter 326. Unclaimed Moneys Act 1963. Certified on: / /20. INDEPENDENT STATE OF PAPUA NEW GUINEA. Chapter 326. Unclaimed Moneys Act 1963. ARRANGEMENT OF SECTIONS. PART I PRELIMINARY. 1. Interpretation.

More information

Anti-Bribery and Corruption Policy

Anti-Bribery and Corruption Policy Anti-Bribery and Corruption Policy Newcrest strictly prohibits giving, offering or receiving bribes or other unlawful or improper payments as outlined in this Anti-Bribery and Corruption Policy. Newcrest's

More information

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601.

Policy Memorandum. Authority 8 CFR governs USCIS adjudication of Form I-601. U. S. Citizenship and Immigration Services Office of the Director (MS 2000) Washington, DC 20529-2000 June 6, 2012 PM-602-0038.1 Policy Memorandum SUBJECT: Requests to Expedite Adjudication of Form I-601,

More information

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31 THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation

More information

1. Why do some I-601 waivers of inadmissibility take so long to adjudicate?

1. Why do some I-601 waivers of inadmissibility take so long to adjudicate? 1 of 7 6/21/2010 10:51 AM 1. Why do some I-601 waivers of inadmissibility take so long to adjudicate? USCIS Response: Several factors affect the processing time of a Form I-601, Application for Waiver

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 AUGUST 13 TH - AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

As Introduced. 132nd General Assembly Regular Session H. B. No

As Introduced. 132nd General Assembly Regular Session H. B. No 132nd General Assembly Regular Session H. B. No. 631 2017-2018 Representatives Hughes, Patterson A B I L L To amend sections 1711.53, 1711.55, and 1711.99 and to enact section 1711.552 of the Revised Code

More information

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Order 2017-7-10 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the Department of Transportation On the 21 st day of July, 2017 Delta Air Lines,

More information

CBP/AILA Liaison Meeting Questions and Answers* Meeting February 18, 2010

CBP/AILA Liaison Meeting Questions and Answers* Meeting February 18, 2010 CBP/AILA Liaison Meeting Questions and Answers* Meeting February 18, 2010 *The following answers are the AILA liaison committee notes from the liaison meeting. 1. What is the Houston CBP policy and criteria

More information

SERVICE AGREEMENT. The Parties agree as follows: 1. SERVICE AGREEMENT:

SERVICE AGREEMENT. The Parties agree as follows: 1. SERVICE AGREEMENT: SERVICE AGREEMENT This Service Agreement (the Service Agreement ) is effective as of the date of purchase of the baggage tracking service product offered by Blue Ribbon Bags, LLC ( Provider ) by, or on

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 13 OCCURRENCE REPORTING Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First Issue published for

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

AGENDA ITEM D4. T:\Board Folders\Board Agenda\Science and Technology\D4 Big Fish Lake Augmentation Agreement

AGENDA ITEM D4. T:\Board Folders\Board Agenda\Science and Technology\D4 Big Fish Lake Augmentation Agreement AGENDA ITEM D4 DATE: December 1, 2015 TO: Matt Jordan, General Manager FROM: Alison Adams, Chief Technical Officer SUBJECT: Lake Augmentation Agreement with the Barthle Brothers Ranch, LLC Approve SUMMARY:

More information

HIGHWAY TRAFFIC BOARD DECISION. File Number: Alsask Bus Services Ltd. of Alsask, Saskatchewan

HIGHWAY TRAFFIC BOARD DECISION. File Number: Alsask Bus Services Ltd. of Alsask, Saskatchewan HIGHWAY TRAFFIC BOARD DECISION File Number: 11-14 Alsask Bus Services Ltd. of Alsask, Saskatchewan IN THE MATTER of an application for an amendment to Operating Authority Certificate #7874 filed by Alsask

More information

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. 2012-4-15 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the Department of Transportation On the Thirteenth day of April, 2012 Frontier Airlines,

More information

Issued by the Department of Transportation on the 28 th day of January, 2016 FINAL ORDER

Issued by the Department of Transportation on the 28 th day of January, 2016 FINAL ORDER Order 2016-1-13 Served: January 28, 2016 DEPARTMENT UNITED OF STATES TRANSPORTATION OF AMERICA UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the

More information

Revalidation: Recommendations from the Task and Finish Group

Revalidation: Recommendations from the Task and Finish Group Council meeting 12 January 2012 01.12/C/03 Public business Revalidation: Recommendations from the Task and Finish Group Purpose This paper provides a report on the work of the Revalidation Task and Finish

More information

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT:

FILE: /PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT: APPROVED AMENDMENTS: Effective Date Briefing Note /Approval Summary of Changes: FILE: 11000-00/PERM EFFECTIVE DATE: May 16, 2014 AMENDMENT: Table of Contents 1. POLICY APPLICATION... 1 2. PRINCIPLES AND

More information

China - Family Assistance Legislation. Family Assistance Type Legislation and its Impact on Airlines

China - Family Assistance Legislation. Family Assistance Type Legislation and its Impact on Airlines Information Article China - Family Assistance Legislation Relevance Family Assistance Type Legislation and its Impact on Airlines The information contained in this document (information article) is provided

More information

Amerisearch Background Alliance Privacy Policy

Amerisearch Background Alliance Privacy Policy Amerisearch Background Alliance Privacy Policy Amerisearch Background Alliance hereafter known as Amerisearch respects individual privacy and values the confidence of its customers, employees, consumers,

More information

City of Redding. Redding Police Facility. Enough study! Just do it!

City of Redding. Redding Police Facility. Enough study! Just do it! City of Redding Redding Police Facility City of Redding, 777 Cypress Ave. Redding, CA. 96001 (530) 339-7220 Enough study! Just do it! Background Since 1978 Redding Police Department (RPD) has occupied

More information

Audit. 6 Most Important Ways to Avoid an Unclaimed Property Audit

Audit. 6 Most Important Ways to Avoid an Unclaimed Property Audit 6 Most Important Ways to Avoid an Unclaimed Property Audit The processing of unclaimed property seems like a behind-the-scenes function that should be managed quietly by finance directors and accounting

More information

SUPPLEMENTAL NOTE ON HOUSE SUBSTITUTE FOR SENATE BILL NO. 70

SUPPLEMENTAL NOTE ON HOUSE SUBSTITUTE FOR SENATE BILL NO. 70 SESSION OF 2017 SUPPLEMENTAL NOTE ON HOUSE SUBSTITUTE FOR SENATE BILL NO. 70 As Recommended by House Committee on Federal and State Affairs Brief* House Sub. for SB 70 would enact law and amend the Kansas

More information

INTERNATIONAL CONFERENCE ON AIR LAW. (Beijing, 30 August 10 September 2010) ICAO LEGAL COMMITTEE 1

INTERNATIONAL CONFERENCE ON AIR LAW. (Beijing, 30 August 10 September 2010) ICAO LEGAL COMMITTEE 1 DCAS Doc No. 5 15/7/10 INTERNATIONAL CONFERENCE ON AIR LAW (Beijing, 30 August 10 September 2010) ICAO LEGAL COMMITTEE 1 OPTIONS PAPER FOR AMENDMENT OF ARTICLE 4 OF THE MONTREAL CONVENTION (Presented by

More information

AUDIT COMMITTEE CHARTER

AUDIT COMMITTEE CHARTER Qantas Airways Limited Adopted ABN 16 009 661 901 AUDIT COMMITTEE CHARTER Objectives 1. The objectives of the Qantas Audit Committee are to assist the Board in fulfilling its corporate governance responsibilities

More information

Managing Unclaimed Property Risks in the Music Industry

Managing Unclaimed Property Risks in the Music Industry Managing Unclaimed Property Risks in the Music Industry Crowe TM Unclaimed Property Solution Audit Tax Advisory Risk Performance The complex economics of the music industry are undergoing considerable

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 66 AIRCRAFT MAINTENANCE PERSONNEL LICENSING AND AUTHORISATION Published by Air Safety Support International Ltd Air Safety Support International

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

AVIATION INVESTIGATION REPORT A04Q0041 CONTROL DIFFICULTY

AVIATION INVESTIGATION REPORT A04Q0041 CONTROL DIFFICULTY Transportation Safety Board of Canada Bureau de la sécurité des transports du Canada AVIATION INVESTIGATION REPORT A04Q0041 CONTROL DIFFICULTY AIR CANADA JAZZ DHC-8-300 C-GABP QUÉBEC/JEAN LESAGE INTERNATIONAL

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding In Accordance with Section V of the U.S./Canada Bilateral Aviation Safety Agreement Implementation Procedures for Design Approval, Production Activities, Export Airworthiness

More information

AIR MADAGASCAR ADM POLICY

AIR MADAGASCAR ADM POLICY Page 1 sur 5 AIR MADAGASCAR ADM POLICY Agency Debit Memos ADM Air Madagascar Policy Update : 18 June 2014 Effective date: 01st July 2014 Background AIR MADAGASCAR publishes this document in order to provide

More information

Code of Conduct Annual Report 2016/2017

Code of Conduct Annual Report 2016/2017 Issued: September 2017 Code of Conduct Annual Report 2016/2017 The Code of Conduct applies to all ABTA Members and is central to achieving ABTA s aims, in particular delivering higher standards for customers

More information

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Order 2013-8-27 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the Department of Transportation On the Thirtieth day of August, 2013 United Airlines,

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Investigation Report Worker Fatality March 31, 2014

Investigation Report Worker Fatality March 31, 2014 Investigation Report Worker Fatality March 31, 2014 Report No- F-OHS-062228-389D3 March 2015 Page 1 of 6 The contents of this report This document reports s (OHS ) investigation of a worker fatality in

More information

AERONAUTICAL INFORMATION CIRCULAR Belgium and Luxembourg

AERONAUTICAL INFORMATION CIRCULAR Belgium and Luxembourg AERONAUTICAL INFORMATION CIRCULAR AIM Belgium Control Tower Tervuursesteenweg 303 1830 Steenokkerzeel BELGIUM FAX: +32 (0) 2 206 24 19 AFS: EBVAYOYX Email: aip.production@belgocontrol.be URL: www.belgocontrol.be

More information

STATE OF NEW JERSEY. ASSEMBLY, No th LEGISLATURE

STATE OF NEW JERSEY. ASSEMBLY, No th LEGISLATURE ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED SEPTEMBER, 0 Sponsored by: Assemblyman JOHN ARMATO District (Atlantic) Assemblyman VINCENT MAZZEO District (Atlantic) SYNOPSIS Requires hotels

More information

RE: Draft AC , titled Determining the Classification of a Change to Type Design

RE: Draft AC , titled Determining the Classification of a Change to Type Design Aeronautical Repair Station Association 121 North Henry Street Alexandria, VA 22314-2903 T: 703 739 9543 F: 703 739 9488 arsa@arsa.org www.arsa.org Sent Via: E-mail: 9AWAAVSDraftAC2193@faa.gov Sarbhpreet

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

MIFACE INVESTIGATION: #02MI106

MIFACE INVESTIGATION: #02MI106 MIFACE INVESTIGATION: #02MI106 SUBJECT: Highway Worker Killed by Passenger Vehicle While Setting Up Highway Work Zone Warning Signal Summary On Friday, August 9, 2002, a 26-year-old technical sales representative

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

To Be Or Not To Be Junior Manned/Extended

To Be Or Not To Be Junior Manned/Extended To Be Or Not To Be Junior Manned/Extended It is important to remember that there are no contractual provisions that control staffing levels. Management has free reign to determine the head count numbers

More information

Finn Creek Park. Management Direction Statement Amendment

Finn Creek Park. Management Direction Statement Amendment Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date

More information

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Order 2016-1-3 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the Department of Transportation on the 7 th day of January, 2016 United Airlines,

More information

FILED: NEW YORK COUNTY CLERK 10/12/ :31 PM INDEX NO /2016 NYSCEF DOC. NO. 1 RECEIVED NYSCEF: 10/12/2016

FILED: NEW YORK COUNTY CLERK 10/12/ :31 PM INDEX NO /2016 NYSCEF DOC. NO. 1 RECEIVED NYSCEF: 10/12/2016 FILED: NEW YORK COUNTY CLERK 10/12/2016 01:31 PM INDEX NO. 655422/2016 NYSCEF DOC. NO. 1 RECEIVED NYSCEF: 10/12/2016 SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK Project Orbis International,

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE

BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE BRIEF TO THE ROYAL COMMISSION ON ABORIGINAL PEOPLES THE NUNAVIK CONSTITUTIONAL COMMITTEE MAY, 1993 EXECUTIVE SUMMARY - This brief is submitted by the Nunavik Constitutional Committee. The Committee was

More information

L-3 Unit Suspended, Loses $5 Billion Contract to Lockheed Martin. Written by Administrator

L-3 Unit Suspended, Loses $5 Billion Contract to Lockheed Martin. Written by Administrator On June 21, 2010, the Department of Defense announced that Lockheed Martin had been awarded an ID/IQ contract potentially worth as much as $5 billion. Here is the official DOD announcement Lockheed Martin

More information

Third Parties/Crossing

Third Parties/Crossing Third Parties/Crossing Presentation by Bill Scheers Canadian Association of Petroleum Land Administration Surface Land Administration Advisory Committee November 29, 2011 Agenda EAPUOC Guide for Working

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

Appendix 8.D Water Vole and Otter Survey Report

Appendix 8.D Water Vole and Otter Survey Report Appendix 8.D Water Vole and Otter Survey Report Entec UK Limited Entec UK Limited Water Vole and Otter Survey Report June 2009 Final Client Job Name Report title File reference E.ON Renewables Ltd Water

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

Planners slam pipeline permit applications

Planners slam pipeline permit applications Planners slam pipeline permit applications January 31, 2018 BY JOHN BRUCE STAFF WRITER Dominion employees were present to answer planning commission questions and comment about the construction storage

More information

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES

PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES PUBLIC ACCOUNTABILITY PRINCIPLES FOR CANADIAN AIRPORT AUTHORITIES The Canadian Airport Authority ( CAA ) shall be incorporated in a manner consistent with the following principles: 1. Not-for-profit Corporation

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Brief in Support. ( Airport ) where Air Traffic Control ( ATC ) advised United Airlines flight 1112 to divert to

Brief in Support. ( Airport ) where Air Traffic Control ( ATC ) advised United Airlines flight 1112 to divert to Brief in Support I. Case No. 2014GL800041 This case revolves around an incident at the Cleveland Hopkins International Airport ( Airport ) where Air Traffic Control ( ATC ) advised United Airlines flight

More information

kulula.com Ticket Audit and Agent Debit Memo Policy Reference: 5/01/2014

kulula.com Ticket Audit and Agent Debit Memo Policy Reference: 5/01/2014 kulula.com Ticket Audit and Agent Debit Memo Policy Reference: 5/01/2014 Policy Title kulula.com Ticket Audit and Agent Debit Memo Policy Policy Reference Number 5/01/2014 Version 1 Author Deborah Verberne-Smith

More information

DRONE SIGHTINGS ANALYSIS AND RECOMMENDATIONS

DRONE SIGHTINGS ANALYSIS AND RECOMMENDATIONS DRONE SIGHTINGS ANALYSIS AND RECOMMENDATIONS UNMANNED AIRCRAFT SAFETY TEAM DRONE SIGHTINGS WORKING GROUP DECEMBER 12, 2017 1 UNMANNED AIRCRAFT SAFETY TEAM DRONE SIGHTINGS WORKING GROUP EXECUTIVE SUMMARY

More information

USCIS Update Dec. 18, 2008

USCIS Update Dec. 18, 2008 Office of Communications USCIS Update Dec. 18, 2008 USCIS FINALIZES STREAMLINING PROCEDURES FOR H-2B TEMPORARY NON-AGRICULTURAL WORKER PROGRAM WASHINGTON U.S. Citizenship and Immigration Services (USCIS)

More information

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0 Advisory Circular AC19-1 Revision 0 Test Pilot Approvals 03 July 2009 General Civil Aviation Authority Advisory Circulars contain information about standards, practices, and procedures that the Director

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

GENERAL INFORMATION Aircraft #1 Aircraft #2

GENERAL INFORMATION Aircraft #1 Aircraft #2 GENERAL INFORMATION Identification number: 2007075 Classification: Serious incident Date and time 1 of the 2 August 2007, 10.12 hours occurrence: Location of occurrence: Maastricht control zone Aircraft

More information

GUERNSEY AVIATION REQUIREMENTS. (GARs) CERTIFICATION OF AIRCRAFT PART 21

GUERNSEY AVIATION REQUIREMENTS. (GARs) CERTIFICATION OF AIRCRAFT PART 21 GUERNSEY AVIATION REQUIREMENTS (GARs) PART 21 CERTIFICATION OF AIRCRAFT Published by the Director of Civil Aviation, Guernsey First Issue Second issue Third issue Fourth issue Fifth issue December 2013

More information

14150 SW 129 th Street Miami, Florida Phone: (305) Fax: (305)

14150 SW 129 th Street Miami, Florida Phone: (305) Fax: (305) 14150 SW 129 th Street Miami, Florida 33186 Phone: (305) 259-5611 Fax: (305) 259-9535 Personal Information Employer Information Last Name Employer First Name Address Middle Name City / State Address ZIP

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

Families & Immigration: A Practical Guide 4 th Edition Table of Contents. Qualifying Family Relationships and Eligibility for Visas

Families & Immigration: A Practical Guide 4 th Edition Table of Contents. Qualifying Family Relationships and Eligibility for Visas Families & Immigration Families & Immigration: A Practical Guide 4 th Edition Table of Contents Chapter 1 Qualifying Family Relationships and Eligibility for Visas 1.1 Overview of the Family Immigration

More information

kulula.com Ticket Audit and Agent Debit Memo Policy

kulula.com Ticket Audit and Agent Debit Memo Policy kulula.com Ticket Audit and Agent Debit Memo Policy Policy Title Policy Reference Number 5/01/2014 Version 8 kulula.com Ticket Audit and Agent Debit Memo Policy Author Sunel Oelofse Original Create Date

More information

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2 Advisory Circular Subject: Part Design Approvals Issuing Office: Standards Document No.: AC 521-007 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 5612108-V33 Effective Date: 2012-03-16 1.1

More information

Public Bill Committee Considerations for the Financial Claims and Guidance Bill Thomas Cook Group Response February 2018

Public Bill Committee Considerations for the Financial Claims and Guidance Bill Thomas Cook Group Response February 2018 Public Bill Committee Considerations for the Financial Claims and Guidance Bill Thomas Cook Group Response February 2018 Thomas Cook Group would like to take this opportunity to thank the Public Bill Committee

More information

Human Factors in ATS. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 2 November Effective on issue

Human Factors in ATS. United Kingdom Overseas Territories Aviation Circular OTAC Issue 1 2 November Effective on issue United Kingdom Overseas Territories Aviation Circular OTAC 172-7 Human Factors in ATS Issue 1 2 November 2011 Effective on issue GENERAL Overseas Territories Aviation Circulars are issued to provide advice,

More information

Below is an example of a well laid-out template of a route card used by the Sionnach Team which is a good format to begin with.

Below is an example of a well laid-out template of a route card used by the Sionnach Team which is a good format to begin with. Route Card A route card is used as a navigational aid to hill walkers by setting out a step by step plan for an intended hike. It is good practice to make out a route card before every hike you or your

More information

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport - 1 - NATS Swanwick Interface Agreement between TERMINAL CONTROL (LTC), SWANWICK And NATS xxxxxx AIRPORT Owners: General Manager LTC Swanwick General Manager xxxxx Airport APPROVED BY Title Name Signature

More information

DATE: Wednesday, July 31, ACTION: Interim rule with request for comments.

DATE: Wednesday, July 31, ACTION: Interim rule with request for comments. FEDERAL REGISTER Vol. 67, No. 147 Rules and Regulations DEPARTMENT OF JUSTICE (DOJ) Immigration and Naturalization Service (INS) 8 CFR Parts 204, 245 and 299 [INS No. 2104-00] RIN 1115-AGOO Allowing in

More information

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates

Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates 25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross acquires mining rights to land adjacent Fort Knox mine, adds more than 2 million ounces to mineral resource estimates Toronto,

More information

ACCIDENT INVESTIGATION AND PREVENTION (AIG) DIVISIONAL MEETING (2008)

ACCIDENT INVESTIGATION AND PREVENTION (AIG) DIVISIONAL MEETING (2008) International Civil Aviation Organization 25/6/08 WORKING PAPER ACCIDENT INVESTIGATION AND PREVENTION (AIG) DIVISIONAL MEETING (2008) Agenda Item 1: Annex 13 1.1: Chapter 1 of Annex 13 Montréal, 13 to

More information

Take Comfort in Compliance. Crowe Unclaimed Property Services

Take Comfort in Compliance. Crowe Unclaimed Property Services Take Comfort in Compliance Crowe Unclaimed Property Services Audit / Tax / Advisory / Risk / Performance Smart decisions. Lasting value. States are increasingly assertive about their rights to unclaimed

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 2 DECEMBER 11 TH TO DECEMBER 16 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information