Bristol. Interstate. (sorted by district, system, route, jurisdiction) Route Jurisdiction UPC Project Description Budget Total Funds

Size: px
Start display at page:

Download "Bristol. Interstate. (sorted by district, system, route, jurisdiction) Route Jurisdiction UPC Project Description Budget Total Funds"

Transcription

1 Bland CORR CONGEST IMPROV BWMT TUNNEL LANE CONTROL IMPROVEMENT Smyth I-81 NBL BRIDGE PROJECT AT ROUTE 11 STR #17478 $13,320 $13, Smyth I-81 STRUCTURES & OVER RTE. 686 $14,900 $14, Washington Washington Bristol Districtwide Bristol Districtwide Bristol Districtwide Latex of I-81 and I-77 $3,392 $3, FY17/CY16 Interstate PM1B I77 Pavement Overlay $4,772 $4, FY17/FY18 SGR Interstate $865 $865 Primary $3,842 $ Wythe T17867 I-77 Wythe Co. Median Barrier $925 $ Wythe #HB2.FY17 Add lane on I-77 (South) at Exit 80 in Wytheville $9,100 $9, Smyth T17900 I-81 Shoulder Improvements - Smyth Co. $1,765 $1,765 T17465 #HB2.FY17 I-81 Exit 19 Ramp Improvements $9,736 $9, INTERSTATE 81 AT EXIT 14 RAMP MODIFICATIONS $43,055 $43, Wythe I-81 Structures & over Reed Creek in Wythe Co $22,500 $23, Wythe Extend accel. lane (exit 72) to decel lane (exit 73) $2,000 $2, Bristol Districtwide Bristol Districtwide 0081 M02 - Multijurisdictional: Bristol MPO Bristol Districtwide Bristol Districtwide Bristol Interstate F15 I-81 Pavement Overlay $3,656 $3, FY16 -CY15 I81 Pavement Overlay $4,865 $4,865 T17456 #HB2.FY17 I-81 at State Route 75 (Exit 17) Interchange Mod. $21,200 $21,200 T13510 Bristol - VDOT SGR Bridge - Balance Entry $0 $28, I-77 Pavement Rehabilitation Using Construction $6,683 $6,683 Interstate Total $192, Smyth Lee Highway over NS Railway Va struct number 1009 $5,626 $5, Washington Washington T18013 Route 11 Structure 1021 over Sinking Creek - Fed ID $1,450 $1,450 T17880 U.S. Route 11 Shoulder Initiative - Washington Co. $2,025 $2, /14/2016

2 Smyth Bridge(Fed ID17390)Rte16 VA#1019 SugarGroveHwyOverSlempCreek Tazewell T18413 US-19 NBL STRUCTURE $2,800 $2, Tazewell T17999 ROUTE 19 STR 1135 OVER NSRR & WRIGHTS VALLEY CREEK Bristol Districtwide Bristol Districtwide Washington Bristol Districtwide Bristol Districtwide Dickenson T17865 US Route 21 Rumble Stripe Initiative $4,565 $4, Lee Bridge Repl - Rte 23 NBL over NSRR (Fed ID 10697) $1,900 $1, Lee Bridge Repl - Rte 23 SBL over NSRR (Fed ID 10696) $1,900 $1, Scott SB&NB 23 over NF Holston R Va struc 1003 & 1108 FED ID $9,532 $9, Bristol Districtwide Bristol Primary Grayson Route 58 Grayson Co Shoulder & Rumble Strips $670 $ Lee T17462 #HB2.FY17 Add climbing lane to Rte. 58 Lee Co. $4,995 $4, Lee over Powell River Va struc 1045 $8,710 $8, Lee Bridge (Fed ID 10710) Rte. 58 over TOWN JONESVILLE RTE 58 - PARALLEL LN-CORRIDOR DEV PE AND R/W ONLY IN SYP $625 $625 $2,805 $2, Roadway Departure Chevron Initiative $1,100 $1, Scott US Route 23 Corridor Improvments in Weber City Area $2,050 $2, Wise Bridge (Fed ID19255) Rte 23 Over Rte610&Powell River VA#1016 $3,697 $3, Wise Bridge (Fed Id 19247) Rte 23 Business Over Indian Creek $3,629 $3, Wise Route 23 Median Shoulders $2,511 $2, US 23 Shoulder Initiative $2,800 $2, Bland Rte 52 Over Wolf Creek (Fed. ID 2962) $2,173 $2, Grayson T17460 #HB2.FY17 - Route 21 and 58 Intersection Radius Improvement $250 $ Grayson Rte. 58 Over Peggy Branch (Fed. ID 8727) $4,732 $4,732 $633 $ Lee US 58 Rumble Strips - Lee $2,235 $2, Scott T17461 #HB2.FY17 - US58/23 Access Management With Park & Ride $7,105 $7,105 $48,807 $48,807 T17882 U.S. 58 Rumble Stripe Initiative $3,110 $3,110 T17881 Alternate Route 58 Shoulder Initiative -Lee Co. $1,635 $1,635 T18417 Route 72 Structure 1017 over Laurel Branch Fed ID 5798 $600 $ Russell T17899 Route 80 Shoulder Initiative $1,665 $1, Buchanan Route 83 Rumble Strip Initiative $4,465 $3,616 06/14/

3 Washington Washington Washington Wise Rte. 158 over Toms Creek VA Struc. No FED ID $2,670 $2, Scott Safety Improvements-Rte. 224 (Phase II-remove curve) $6,644 $6, Buchanan Buchanan Bristol Districtwide Bristol Districtwide T17895 Creeper Trail at US 58 Grade Seperation $350 $ Rte 91 Over N&W Railway & Rte 609 $2,263 $2, Tazewell Bridge (Fed ID 18493) Rte. 102 Over Laurel Creek $1,848 $1, Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Primary Bridge (Fed ID 18969) Rte 91 Over Laurel Creek $1,850 $1, WBL460 over Dismal river & NS RWY Va struc 1074 Fed ID 3819 $5,399 $5, Oversight Corridor Q Conn. 2, Interchange & Hawks Nest $173,629 $173, Buchanan CFX Corridor Q Poplar Creek Phase A Finish $199,289 $199, Buchanan US 460 Shoulder Initiative - Buchanan $2,715 $2, Tazewell US 460 Shoulder Initiative - Tazewell $2,525 $2, District WIde PSI / TSN Intersection Improvements $500 $500 T13918 Bristol - VDOT SGR Paving - Balance Entry $0 $19, Washington-Russell-Buchanan-Tazewell Primary Schedule. $4,717 $4, Bland-Smyth-Wythe-Grayson Primary Schedule. $6,818 $6, FY17/FY18 SGR Primary $4,494 $4, FY17/FY18 SGR Primary $492 $492 Primary Total $576,142 Secondary Bland Ruby's Rd over Little Walker Creek #6 (Fed. ID 3040) $2,331 $2, Bland Bridge Repl. over Little Walker Ck (VA 6001, Fed ID 3037) $1,636 $1, Bland Bridge Repl-Price Ridge Rd over Kimberling Crk (Fed ID 3070) $790 $ Bland Bridge Repl-Skydusky Rd over Big Walker Crk (Fed ID 3071) $1,701 $1, Buchanan STRUCTURAL REHABILITATION OF ASPHALT CONCRETE VAR. RTES. $3,000 $2, /14/2016

4 Dickenson Dickenson Bristol Secondary RTE. 604-PIPE AND PAVEMENT STRUCTURE REPLACEMENT $400 $ STRUCTURAL REHABILITATION OF ASPHALT CONCRETE - VAR. RTES Russell STRUCTURAL REHABILITATION OF ASPHALT CONCRETE - VAR. RTES Tazewell Bridge Replacement Rte 717, Fed ID (VA Str 6113) $1,550 $1, Tazewell Rt 744 superstructure replacement, Fed ID 18665, Va str 6129 $707 $ Tazewell STRUCTURAL REHABILITATION OF ASPHALT CONCRETE - VAR. RTES. $2,601 $2, Lee Rte 661 over Long Hollow Branch Va Str 6053 Fed. ID $1,064 $1, Lee Route 811, Super Str Replacement, Fed ID 10995, Va str 6507 $1,000 $1, Russell Bridge Repl-Roanoke HIll Rd over Rte 63 (Fed ID 16511) $1,300 $1,300 $500 $ Russell RURAL RUSTIC VARIOUS RTES. - PARENT UPC $500 $ Scott 293 RTE RECONSTRUCTION $5,109 $5, Scott Bridge Replacement Rte 627 over Copper Ck (VA Str 6140) $2,057 $2, Scott REPLACE SWINGING FOOT BRIDGE STR. #9009 OVER CLINCH RIVER $125 $ Scott Bridge (Fed Id 16815) Rte. 671 Over Valley Creek $929 $ Scott T18408 DEANS HOLLOW ROAD STRUCTURE $1,256 $1, Smyth Rte 610 Bridge replacement, Fed Id VA Str 6382 $920 $ Smyth Bridge (Fed ID 17613) Rte. 637 Over Carlock Creek $1,480 $1, Smyth T18411 TILLEY'S BRIDGE RD STRUCTURE $1,016 $1, Smyth GREEN VALLEY COURT - RURAL ADDITION $102 $ Tazewell Bridge Replacement Rte 609 over Little River (Fed ID 18548) $2,008 $2,008 $1,200 $1, Tazewell INSTALLATION OF NEW GUARDRAIL-VAR. RTES. $200 $ Washington Washington Washington Washington Washington Washington Washington RTE RECONSTRUCTION WITH BRIDGE REPLACEMENT $3,904 $3, Superstructure Replacement Fed Id $1,024 $1, DEDICATED BRIDGE FUND -REPLACE STRUC #6108 ON RTE 670 $20,287 $20, Bridge Repl-Gen Spr Rd over Wolf Creek (Fed ID 19089) $2,380 $2, Bridge Repl-Watauga Rd over Fifteen Mile Creek(Fed ID 19098) $3,400 $3, Bridge Repl-Tayor Valley Rd over Laurel Creek (Fed ID 19162) $1,551 $1, Bridge Repl-Water St over Beaver Dam Creek (Fed ID 19212) $1,908 $1,908 06/14/

5 Bristol Secondary Wise Bridge Repl-Bull Bun Rd over Little Toms Crk (Fed ID 19308) $608 $ Wise STRUCTURAL REHABILITATION OF ASPHALT CONCRETE - VAR. RTES. Urban Big Stone Gap SURFACE TREATMENT Bus. 23 $219 $ Big Stone Gap Surface Treatment Route 23 Bus. Gilley Ave. $32 $ Big Stone Gap RECONSTRUCTION RTE. ALT 58 $117 $ Bristol #HB2.FY17 Widen Rte. 11 & I-81 south bound on & off ramps $5,850 $5, Bristol #HB2.FY17 WIDEN RTE. 11 (2 TO 4 LANES) $9,988 $9, Bristol SURFACE TREATMENT-RECONSTRUCTION RTE. 11 $273 $ Bristol MILLING AND PAVING RTE. 381 COMMONWEALTH AVE. $420 $ Bristol MILLING AND PAVING RTE. 421 $121 $ Bristol T17907 Piedmont Avenue Pedestrian Heads $77 $ Bristol T17905 Kings Mill Pike High Friction Surface Treatment $18 $ Bristol T17910 Old Airport Road Sidewalk $50 $ Bristol T17908 Bonham Road/Paulena Drive Sidewalk Initiative $141 $ Marion MILLING AND PAVING ROUTE 16 (COMMERCE STREET) $354 $ Wytheville #HB2.FY17 CONN. ROAD - 2 LANES WITH CURB & GUTTER - PHASE II Abingdon RECONSTRUCT INTERSECTION CUMMINGS ST. & GREEN SPRINGS RD. $500 $ Wythe RTE Reconstruct existing roadway $5,378 $5, Wythe Bridge Repl-Glade Road over Reed Creek (Fed ID 19734) $1,695 $1, BRISTOL SSYP $0 $24,868 Secondary Total $102,226 $6,107 $6,107 $7,970 $7, Bluefield T17458 #HB2.FY17 Leatherwood Lane $1,272 $1, Bluefield SIDEWALK - NEW CONSTRUCTION $80 $ Norton MILLING AND PAVING US23 BUS. PARK AVENUE NW $204 $ Richlands Bridge Repl-Front St over BIg Twn HIll Crk (Fed Id 22465) $3,770 $3, Tazewell MILLING AND PAVING SR16 ALT. FAIRGROUND ROAD $77 $ Tazewell MILLING AND PAVING ROUTE 19 BUS. W. MAIN ST. $168 $ /14/2016

6 Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Districtwide Bristol Urban Tazewell Fed ID Rte 61 E Riverside Drive@Clinch River Va#1805 $1,356 $1, Saltville RTE. 634-ROAD RECONSTRUCTION AND DRAINAGE IMPROVEMENTS Wise FOUR LANE FACILITY WITH CONTINUOUS LEFT TURN LANE- Phase I Enhancement Appalachia Appalachia-Big Stone Gap Trail & Trailhead Project $2,570 $1,797 EN Grayson GRAYSON COUNTY - INSTALLATION OF HISTORIC MARKERS $1,925 $2,263 EN Wytheville Town of Wytheville - Wytheville Heritage Walk $749 $1,201 EN Bland ROCKY GAP GREENWAY - TRANSPORTATION ALTERNATIVES PROGRAM EN Smyth ROUTE 16 (BACK OF THE DRAGON) SCENIC OVERLOOK IMPROVEMENTS Other T17918 PSI/TSN Intersection Initiative $700 $700 T17913 Systemic RD with resurfacing $1,300 $1,300 T17912 Pedestrian Intersection Safety Initiative $305 $305 T17903 Safety Prescoping - Bristol $400 $400 T17888 High Friction Pavement Initiative $512 $512 T15983 #HB2.FY17 HIGHWAY CONST DISTRICT GRANT PRGM - BRISTOL $350 $350 $9,900 $9, Wise GUARDRAIL REPLACEMENT/IMROVEMENT $57 $57 Urban Total $48,974 $312 $1,062 $920 $920 EN Dungannon MAIN STREET STREETSCAPE - DUNGANNON $278 $176 Enhancement Total $7,419 $0 $5,911 T9534 Bristol - Local SGR Bridge - Balance Entry $0 $15,995 T9533 Bristol - Local SGR Paving - Balance Entry $0 $2,461 06/14/

7 Bristol Districtwide PE Bristol Districtwide Bristol Other Committed Safety Projects-Bristol $0 $3, Project Prescoping - Bristol $7,636 $13,697 Other Total $45,099 Bristol Total $972, /14/2016

8 Culpeper RTE 3 - PARALLEL LANE (EAST OF STEVENSBURG TO LIGNUM) Orange INT IMP. / UPGRADE SIGNAL AND INT. RTES.3 AND 20 $1,300 $1, Culpeper Bridge Rehabilitation Rte 15 over Rappahannock River $4,801 $4, Fluvanna Orange T17671 ROUTE 20/231 ROUNDABOUT OLD SOMERSET HSIP $2,640 $2, Louisa T17514 #HB2.FY17 SCHOOL BUS ROAD RELOC. TO CHALKLEVEL ROAD Albemarle Albemarle Albemarle Route 29 Bypass $10,601 $10, Culpeper T17508 #HB2.FY17 BRANDY STATION PARK & RIDE LOT EXPANSION AT 29/663 $900 $ Culpeper RTE 29/718 - Intersection Improvements $2,450 $2, Fauquier T17507 #HB2.FY17 WARRENTON PARK AND RIDE LOT EXPANSION AT 29/605 $7,500 $7, RTE 29 - BYPASS $110,096 $37, RTE 29 - WIDENING & CORRIDOR IMPROVEMENTS $61,321 $61,321 $900 $ Fauquier #HB2.FY17 CONST INTER RTE 15/17/29 AT RTE 15/17/29 BUS $26,931 $26, Madison T17672 ROUTE 29/662 J-TURN SHELBY HSIP $1,770 $1, Culpeper District Culpeper Interstate Culpeper District T13512 Culpeper - VDOT SGR Paving - Balance Entry $0 $12, Culpeper District PM7A-967-F15,P401 PM SOUTH INTERSTATE FED $1,425 $1,149 Interstate Total $13,347 Primary Fauquier T17702 ROUTE 15/17/29 - MEDIAN CLOSURE -OPEN MEDIAN DIRECT. CLOSURE $43,493 $43,493 $3,510 $3, #HB2.FY17 Construct Rural Roundabout at the Int of Rte 15/53 $2,501 $2, Fauquier Bridge Rehabilitation Rt. 17 over S Railway and Rt. 805 $3,848 $3, RTE 29 RUMBLE STRIPS - CULPEPER DISTRICT $960 $ Greene T17518 #HB2.FY17 ROUTE 33/29 RUCKERSVILLE $10,100 $10, Fluvanna Fluvanna #HB2.FY17 Route 53/618 Roundabout $3,674 $3, SHOULDER RUMBLE STRIP ROUTE 53 $1,266 $1,266 06/14/

9 Rappahannock Madison Bridge Rehabilitation Rte 230 Over Conway River $3,223 $3, Albemarle Albemarle Albemarle Culpeper District Culpeper District Culpeper District Culpeper District RTE INSTALL SIGNAL & HFST AT RTE 151 $1,050 $1, Warrenton INT. IMPROVEMENTS AT JAMES MADISON HWY AND FALMOUTH ST Culpeper T17707 ROUTE 522 ROAD DIET AND BIKE PEDESTRIAN IMPROVEMENTS Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper Primary Bridge Repl-Rte 211/522 over N Frk Thrntn Rvr (Fed ID 14633) $2,425 $2,425 T18416 CROZET AVENUE STRUCTURE STRUCTURE 589 $1,900 $1, Bridge Replacement Rte 250 (IVY Road) over Little Ivy Ck $2,918 $2, BIKE AND PED. PROJECTS ALBEMARLE COUNTY (HSIP) $800 $ OPEN CONTAINER - DISTRICTWIDE SAFETY UPGRADES $2,000 $2, OPEN CONTAINER - DISTRICTWIDE PRIMARY SHOULDER RUMBLE STRIPS Secondary $434 $434 $1,095 $1,095 T18352 PM7F-967-F17,P401 $643 $643 T18350 PM7A-967-F17,P401 $758 $758 T18349 PM7G-967-F17,P401 $2,170 $2,170 T13916 Culpeper - VDOT SGR Bridge - Balance Entry $0 $9, Culpeper Districtwide Primary Plant Mix South $2,770 $2, Culpeper Districtwide Primary Plant Mix North $1,297 $1, PM7D-967-F15,P401 PM PRIMARY NORTH FED $2,109 $2, DISTRICT WIDE CENTERLINE RUMBLE STRIPS $550 $ DISTRICTWIDE SIGNAL UPGRADES (HSIP) $500 $500 $3,000 $3, OPEN CONTAINER - ROAD COUNTERMEASURES $304 $304 Primary Total $268, /14/2016

10 Albemarle Albemarle Albemarle Albemarle Albemarle Albemarle Albemarle Fauquier UPGRADE AIKEN DRIVE TO STATE STANDARDS $3,500 $3, Fluvanna RT 629 STRUCTURE OVER MIDDLE FORK KENTS BRANCH $2,457 $2, Greene #HB2.FY17 ROUTE INTERSECTION IMPROVEMENTS $4,260 $4, Louisa ROUTE 601 RECONSTRUCT BRIDGE AT CUB CREEK $1,196 $1, Louisa T18081 RTE. 701 SUPERSTRUCTURE REPLACEMENT STR $2,215 $2, Orange Route 635 Bridge Replacement -Orange $4,251 $4, Rappahannock Culpeper Secondary T18041 RTE BRIDGE REPLACEMENT STR $1,780 $1,780 T18414 FRAY'S MILL RD STRUCTURE 709 $700 $700 T18073 RTE REPLACE BRIDGE STR $1,724 $1,724 T18030 RTE BRIDGE REPLACEMENT STR $1,900 $1,900 T18415 RED HILL ROAD STRUCTURE 792 $5,100 $5, RTE REPLACE SUPERSTRUCTURE $900 $1,000 T18062 RTE REPLACE BRIDGE STR $3,020 $3, Albemarle SUPERSTRUCTURE REPLACEMENT 6244 $900 $1, Culpeper RTE RURAL RUSTIC RD (SURFACE TREAT NON- $468 $468 HARDSURFACE RD) Culpeper RTE RURAL RUSTIC RD (SURFACE TREAT NON- HARDSURFACE RD) $1,231 $1, Culpeper RTE RURAL RUSTIC RD (SURFACE TREAT NON- HARDSURFACE RD) Fauquier ROUTE BRIDGE OVER THUMB RUN - STRUCTURE #6087 $3,511 $3, Fauquier RT 723 BRIDGE REPLACEMENT OVER BRANCH OF GOOSE CREEK Fauquier COMPLETE ROADWAY BETWEEN SALEM AVENUE AND W. MAIN ST ROUTE BRIDGE OVER JORDAN RIVER - STRUCTURE # CULPEPER SSYP $0 $22,579 Urban $300 $300 $2,232 $2,430 $1,400 $1,400 $1,481 $1,481 Secondary Total $67,651 06/14/

11 Albemarle Albemarle Culpeper Urban US-29 RIO ROAD GRADE SEPARATED INTERSECTION $69,762 $69, BERKMAR DRIVE EXTENDED (CONSTRUCTION OF NEW ROADWAY) Charlottesville T17524 #HB2.FY17 EMMET STREET CORRIDOR STREETSCAPE & INTERSECTIONS Charlottesville T17520 #HB2.FY17 FONTAINE AVENUE STREETSCAPE IMPROVEMENTS Charlottesville HILLSDALE EXTENDED SOUTH (CONSTRUCTION OF NEW ROADWAY) Charlottesville US-29 HYDRAULIC ROAD GRADE SEPARATED INTERSECTION (PE ONLY) Orange UR 844 RED HILL ROAD MILLING PAVING AND RECONSTRUCTION Orange RTE 15 JAMES MADSION HWY MILLING PAVING AND RECONSTRUCTION Orange RT 20 BERRY HILL RD/CONSTITUTION HWY MILLING PAVING &RECONST Enhancement $54,490 $54, Charlottesville RTE 20 - BRIDGE REPLACEMENT $14,466 $14, Charlottesville T17527 #HB2.FY17 EAST HIGH STREETSCAPE IMPROVEMENTS $5,638 $5, Charlottesville CHARLOTTESVILLE / NEW ADA IMPROVEMENTS IN VARIOUS LOCATIONS Charlottesville CHARLOTTESVILLE / NEW BICYCLE PROJECTS IN VARIOUS LOCATIONS Charlottesville CHARLOTTESVILLE / CONST. NEW SIDEWALKS IN VARIOUS LOCATIONS $12,115 $12,115 $11,700 $11,700 $10,000 $10,000 $10,000 $10,000 $190 $ Culpeper RTE WIDEN FROM 2 LANES TO 5 LANES $14,110 $14, Orange WARREN ST. MILLING, PAVING, AND RECONSTRUCTION $26 $ Orange GREENFIELDS DRIVE - MILLING, PAVING, AND RECONSTRUCTION $200 $200 $200 $200 U Charlottesville HILLSDALE DRIVE EXTENDED (3 LANES) $29,670 $29, Warrenton RTE. 17 BUS. MILL, OVERLAY, AND ADA COMPLIANCY $388 $388 $15 $15 $155 $155 $525 $525 $600 $600 Urban Total $234,301 EN Fauquier Streetscaping improvements along Main Street $4,512 $5,002 EN Albemarle T th STREET NODE AND BICYCLE CONNECTIONS $613 $ /14/2016

12 Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper District Culpeper Enhancement EN Charlottesville T18065 WATER STREET SHARED USE PATH $354 $319 Enhancement Total $5,821 Other T18126 SAFETY PRESCOPING - CULPEPER $100 $100 T17708 SYSTEMIC ROAD DEPARTURES WITH RESURFACING $1,300 $1,300 T15984 #HB2.FY17 HIGHWAY CONST DISTRICT GRANT PRGM - CULPEPER $0 $5,467 T9558 Culpeper - Local SGR Bridge - Balance Entry $0 $17,030 T9557 Culpeper - Local SGR Paving - Balance Entry $0 $1, Project Prescoping - Culpeper $6,056 $6, Committed Safety Projects-Culpeper $0 $4,792 Other Total $36,748 Culpeper Total $625,878 06/14/

13 Stafford I-95 REL OF RTE 630 W SBGPL OPT BETW EXITS 143 & 140 $149,462 $149, Stafford I-95SB Hard / Dynamic Shoulder Running Project $20,000 $11, Fredericksburg #HB2.FY17 I-95 RAPPAHANNOCK RIVER CROSSING $125,000 $125,000 (SOUTHBOUND) Fredericksburg I-95 SAFETY IMPROVEMENTS AT ROUTE 3 $21,000 $21, Fredericksburg Fredericksburg Fredericksburg Caroline Rte. 1 over South River, Bridge Replacement, Ex Fed ID $3,131 $3, Spotsylvania Spotsylvania T17430 #HB2.FY17 -- NEW COMMUTER PRKG LOT RTE 1 AT COMMONWEALTH DR Stafford T18421 FEFF DAVIS HWY STRUCTURE $5,750 $5, Stafford Rte. 1 over Potomac Creek Bridge Replacement $6,577 $6, Stafford #HB2.FY17 RTE 1/630 AREA CORRIDOR ROAD IMPROVEMENTS $13,280 $13, Stafford RTE 1 RAPP RIVER, BRIDGE REPLACEMENT, EX FED ID $50,000 $4, Stafford INTERSECTION IMPROVEMENTS - RTE 1 JEFF DAVIS HWY & RTE 628 $16,600 $16, Stafford T17433 #HB2.FY17 - SAFETY IMPRV RTE 1 TELEGRAPH/WOODSTOCK $8,800 $7, Stafford #HB2.FY17 ROUTE POTOMAC CREEK DR TURN LANE $1,800 $1,800 $2,992 $ Fredericksburg T18049 ROUTE 1 CORRIDOR STUDY - CITY OF FREDERICKSBURG $250 $ Gloucester Stafford RTE 3 - COMMUTER PARKING LOT STUDY $500 $ Westmoreland King & Queen Fredericksburg Interstate I-95 Corridor Study $280 $630 T13516 Fredericksburg-VDOT SGR Paving-Balance Entry $0 $17, PM-6A-14 ASPHALT RESURFACING, DISTRICT WIDE- INTERSTATE Primary T18075 TURN LANE IMPROVEMENTS - LAFAYETTE HARRISON RD. T17421 #HB2.FY17 - INT. IMPROVEMENTS ROUTES 17B/14/3 $1,500 $1, Stafford RTE 3(BUS.) RAPP RIVER, BRIDGE REPLACEMENT, EX FED ID T17984 #HB2.FY17 RTE 3 PASSING LANES POTOMAC MILLS/FLAT IRON $7,617 $7,617 Interstate Total $333,167 $600 $137 $20,000 $20,000 $12,750 $12,750 T18419 THE TRAIL STRUCTURE $2,250 $2, /14/2016

14 Mathews Route 14 - Improve Drainage System at Mathews Courthouse $6,284 $5, Essex T17464 #HB2.FY17 ROUTE 17 CORRIDOR IMPROVEMENTS $1,000 $1, Gloucester Gloucester Gloucester Gloucester Gloucester Middlesex Spotsylvania Spotsylvania Caroline Rte. 207 WBL over Mattaponi River Bridge Rehabilitation $1,093 $10, Spotsylvania Spotsylvania Gloucester T17906 INTERSECTION IMPROVEMENTS AT RT 17/216 $930 $930 T17904 INTERSECTION IMPROVEMENTS - ROUTE 17/17B $880 $880 T17425 #HB2.FY17 -- PEDESTRIAN IMPROVEMENTS ON RTE 17 SB $800 $800 T17423 #HB2.FY17 -- PEDESTRIAN IMPROVEMENTS AT RTE 17/17B INTERSECT $950 $ Signal Coordination along Route 17 $2,801 $2,801 T18420 SBL GEORGE WASH PWY $6,200 $6, INTERSECTION IMPROVEMENTS - RTE 17 MILLS DR & RTE 609 $2,975 $2, Stafford RTE 17 - RECONSTRUCTION $47,268 $47, M05 - Multijurisdictional: Fredericksbug MPO King William Gloucester King & Queen Westmoreland Fredericksburg Primary #HB2.FY17 ROUTE 17 I95 BRIDGE TO HOSPITAL BLVD $20,000 $20,000 T18141 INTERSECTION IMPROVEMENTS - BUS RTE. 17/VA2 (DIXON ST.) T17466 #HB2.FY17 - RAPPAHANNOCK COMM. COLLEGE SITE ACCESS IMPROV T17467 #HB2.FY17 - KING & QUEEN COUNTY BUSINESS/TELEWORK CENTER RTE 205 at MATTOX CREEK BRIDGE REPLACEMENT, Ex Fed ID $300 $100 T17472 #HB2.FY17 - INTERSECTION IMPROVEMENTS ROUTE 30/360 $3,000 $3,000 $625 $625 $752 $ Stafford #HB2.FY17 COMMUTER LOT EXPANSION I-95 E OF EXIT 140 $9,719 $9,719 $9,698 $9,698 T18043 TURN LANE IMPROVEMENTS - RTE 208 (COURTHOUSE RD.) $952 $ RTE. 208 & RTE INTERSECTION IMPROVEMENT $2,350 $ Pedestrian Improvement to Route 216, Guinea Road $1,944 $1, Stafford INTERSECTION IMPROVEMENTS (ROUTES 1, 17 AND 218) $19,035 $19, Stafford RTE BUTLER ROAD WIDENING (2 TO 4 LANES) $29,000 $2, King George King William #HB2.FY17 TURN LANE EXTENSION DAHLGREN NAVAL BASE $730 $730 T18418 RICH/HIGH HWY STRUCTURE10645 $500 $500 06/14/

15 Richmond Richmond Fredericksburg T18031 BIKESHARE AND BICYCLE IFRASTRUCT. IMPROVEMENTS $40 $ Fredericksburg T17463 #HB2.FY17 VIRGINIA CENTRAL RAILWAY TRAIL BRIDGE $160 $ Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg Primary Rte. 360 over Rappahannock River, Fender Rehabilitation $142 $ LM-6A-15 Latex Resurfacing, Northern Neck Res. (Primary) $1,063 $1,063 T18027 REGIONALLY SIGNIFICANT PROJECTS STUDY $500 $1,248 T17892 FRED. DIST. - TRAFFIC SIGNAL MUTCD COMPL. UPGRADES (PE ONLY) INSTALL CENTERLINE RUMBLE STRIPS - PRIMARY - DISTRICTWIDE Secondary Caroline RTE 633 SOUTH RIVER, BRIDGE REPLACEMENT, EX FED ID $2,022 $2, Caroline #HB2.FY17 RTE LADYSMITH ROAD - WIDENING $26,650 $26, Caroline RTE 743 SOUTH RIVER, BRIDGE REPLACEMENT, EX FED ID $750 $750 T13913 Fredericksburg-VDOT SGR Bridge-Balance Entry $0 $35,081 $700 $ PM-6C-17 Asphalt Resurfacing Saluda Res. Primary System(SGR) $5,178 $5,178 Primary Total $290,287 $1,760 $1, Essex 2225 RTE BRIDGE REPLACEMENT $0 $1, Essex Rte. 691 over Piscataway Creek $1,743 $1, Gloucester Gloucester Gloucester King & Queen King & Queen King William King William T18424 TIDEMILL RD STRUCTURE 8548 $500 $ Bridge Replacement Rte. 662 over Fox Creek (Fed ID 8552) $2,470 $2, ROARING SPRINGS ROAD (SR 616) - BIKE/PED IMPROVEMENTS $2,990 $452 T18428 SORGHUM ROAD STRUCTURE10631 $1,950 $1, Newtown Road Over Beverly Creek ( VA Str 6909) $2,787 $2,787 T18426 CUSTIS MILL POND STRUCTURE10668 $1,800 $1,800 T18425 MT OLIVE/COHOKE R $1,950 $1, /14/2016

16 King William Middlesex Spotsylvania Spotsylvania Spotsylvania Spotsylvania Spotsylvania Spotsylvania RTE 1003 BR MATTAPONI R, BRIDGE REPLACEMENT, EX FED ID INTERSECTION IMPROVEMENTS - RTE 620 & RTE 1 $22,730 $22, ROUTE RECONSTRUCTION $4,100 $4, RTE 658 N ANNA RIVER, BRIDGE REPLACEMENT, EX FED ID Urban $1,881 $1,881 T18427 BARRICKS MILL ROAD STRUCTURE $1,700 $1, Bridge Replacement, Rte. 606 over I-95, Ex. Fed ID $10,913 $10, #HB2.FY17 RTE. 606 WEST - RECONSTRUCTION MUDD TAVERN ROAD $21,250 $21,250 $2,549 $2,549 T17889 ROUTE CROSSOVER MOVEMENT CONVERSION $1,433 $1, Stafford T17897 CONSTRUCT SIDEWALK ON COURTHOUSE ROAD $455 $ Stafford Berea Church Road - Reconstruction $4,708 $4, Westmoreland Fredericksburg Secondary Stafford Ferry Road- Widening and Re-striping $3,992 $3, Stafford Lease Commuter Parking Spaces $455 $ Stafford LEFT TURN LANES TO AND FROM ONVILLE ROAD $14,924 $14, Stafford T17901 BIKE AND PEDESTRIAN UPGRADES ON LEELAND ROAD $3,350 $3, PAVE UNPAVED ROAD - MADISON DRIVE $60 $ FREDERICKSBURG SSYP $0 $12,156 Secondary Total $152, Fredericksburg Lafayette Boulevard/Kenmore Avenue Roundabout $4,600 $2, Fredericksburg PRINCESS ANNE STREET IMPROVEMENTS - PHASE 2 $1,471 $1, Fredericksburg Reconstruction of Rte. 1 (Bus.) Lafayette Blvd $175 $ Fredericksburg Reconstruction of Rte. 1 (Stafford Ave. to Idlewild Blvd) $325 $ Fredericksburg Reconstruction of Rte. 1 from Fall Hill Ave. to Stafford Ave $325 $ Fredericksburg Route 3 Signal Optimization $1,047 $1, Fredericksburg RESURFACING - DANDRIDGE STREET $200 $ Fredericksburg RESURFACING - PAYNE STREET $200 $200 06/14/

17 EN King William Fredericksburg Fredericksburg Fredericksburg Urban U Fredericksburg FALL HILL AVE. BRIDGE & APPROACHES RECONSTRUCTION & WIDENING $44,400 $44,400 Urban Total $51,106 Enhancement Stafford MINE ROAD SIDEWALK $819 $1,436 T18072 King William Courthouse Trail System $208 $208 EN Tappahannock T18056 Prince Street - Gateway to the Rappahannock $361 $333 EN Stafford BELMONT/FERRY FARM TRAIL $5,199 $3,941 Enhancement Total $5,918 Other FREDERICKSBURG DISTRICT CMAQ BALANCE ENTRY $0 $ FREDERICKSBURG DISTRICT REGIONAL STP (RSTP) BALANCE ENTRY $0 $ Fredericksburg City Of Fredericksburg Parking Structure $1,255 $ Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg T17964 ROADWAY DEPARTURE - CURVE COUNTERMEASURES - DISTRICTWIDE T17902 FRED. DIST. - TRAFFIC SIGNAL MUTCD UPGRADES (CN ONLY) T17885 DISTRICTWIDE - TRENCH WIDENING (TOP 100 SEGMENTS) $2,100 $2,100 T15985 #HB2.FY17 HWY CONST DISTRICT GRANT PRGM - FREDERICKSBURG $0 $12,396 T9573 Fredericksburg-Local SGR Bridge-Balance Entry $0 $3,811 T9572 Fredericksburg-Local SGR Paving-Balance Entry $0 $2, DISTRICT WIDE - PE ONLY - SIGNAL CLEARANCE INTERVAL STUDY $600 $600 T17956 SAFETY PRESCOPING - FREDERICKSBURG $100 $400 $1,500 $1,500 $1,500 $1, Committed Safety Projects-Fredericksburg $0 $3, /14/2016

18 Fredericksburg Fredericksburg Fredericksburg Fredericksburg Fredericksburg 9999 M05 - Multijurisdictional: Fredericksbug MPO 9999 M05 - Multijurisdictional: Fredericksbug MPO CMPD PE12 PIAO M05 - Multijurisdictional: Fredericksbug MPO Fredericksburg M05 - Multijurisdictional: Fredericksbug MPO Fredericksburg Other INSTALL FLASHING YELLOW ARROWS - DISTRICTWIDE $1,500 $2, ROADWAY DEPARTURE COUNTERMEASURES- DISTRICTWIDE ROADWAY DEPARTURE - CURVE COUNTERMEASURES - DISTRICTWIDE ITS DEPLOYMENT - DISTRICT WIDE - FREDERICKSBURG DISTRICT FREDERICKSBURG DISTRICT-WIDE PIPE REHABILITATION ON-CALL $1,000 $1,000 $1,500 $1,500 $3,510 $3,800 $7,565 $6, FAMPO CLRP Planning Assistance $1,115 $ GW Ride Connect / TDM Assistance $1,296 $2, Congestion Management System & Project Definitions $483 $ Project Prescoping - Fredericksburg $2,852 $6, Public Involvement Activities $458 $358 Other Total $54,680 Fredericksburg Total $887,588 06/14/

19 Hampton Interstate Resurfacing Schedule with T&S Upgrades $2,679 $2, Newport News Replace Denbigh Blvd Bridge over I-64 and CSX Railroad $32,500 $32, Norfolk I-64 & I-264 Pavement Rehabilitation - D/B Project # 1 $37,968 $37, Norfolk #HB2.FY17 I-64 WB Off-Ramp Exit 282A Terminal Improvement $9,300 $9, Norfolk HRBT Over Height Detection $900 $ Norfolk I-64 Hampton Rd ATM - Phase I WB $14,500 $14, Chesapeake I-64 Southside Widening and High-Rise Bridge, Phase 1 $20,000 $20, Chesapeake I-64 WB Exit 296A Ramp Terminal Realignment $1,180 $1, Hampton Roads Hampton Roads Hampton Roads #HB2.FY17 I-64 CAPACITY IMPROVEMENTS - SEGMENT III $311,304 $154, Hampton Roads Hampton Roads Crossing Study Supplemental EIS $6,500 $11, Sussex I-95 Resurfacing Schedule with T&S Upgrades $3,312 $3, Emporia I-95 Meherrin River Bridge replacement Fed ID 20236/23237 $30,158 $30, Norfolk RTE INTERCHANGE IMPROVEMENTS - 64 WB RAMP TO 264 EB $158,002 $158, Norfolk Southside Interstate Resurfacing Schedule with T&S Upgrades $7,282 $7, Virginia Beach I-264/WITCHDUCK ROAD INTERCHANGE & RAMP EXTENSION (C-D ROAD) Virginia Beach I-264 Concrete Pavement Repair $12,710 $12, Hampton Roads Hampton Roads 0264 M06 - Multijurisdictional: Hampton Roads MPO 0664 M06 - Multijurisdictional: Hampton Roads MPO $191,362 $67,525 T11488 DT/MT/MLK - Interstate Construction $62,429 $62, DT/MT/MLK Interstate Debt Service $15,284 $7, MMMBT Traffic & Safety Improvements $7,000 $7, Norfolk R000 - I-564 INTERMODAL CONNECTOR $175,638 $197, Hampton Roads Hampton Roads Interstate I-64 CAPACITY IMPROVEMENTS - SEGMENT I $122,552 $144, I-64 CAPACITY IMPROVEMENTS - SEGMENT II $189,708 $213, I-64 & I-264 Pavement rehabilitation - D/B Project # 3 $68,180 $68, Norfolk AIR TERMINAL INTERCHANGE - INTERMODAL CONNECTOR $125,500 $10, Newport News I664 Peninsula CPR/Resurfacing $3,559 $3,559 T13509 Hampton Roads-VDOT SGR Paving-Balance Entry $0 $8,419 Interstate Total $1,286, /14/2016

20 York T18369 Williamsburg Residency Plant Mix, State of Good Repair $199 $ James City T18405 James City 2017 Plant Mix, State of Good Repair $234 $ Surry Jamestown Ferry Boat $27,587 $27, Southampton Southampton Route 35 over Tarrara Creek (VA Str 1017) $3,292 $3, Sussex T18370 Sussex 2017 Plant Mix, State of Good Repair $562 $ Isle of Wight Southampton Southampton Southampton Hampton Roads Hampton Roads James City James City James City York Bridge Repl-Rte 134 over Brick Kiln Ck (Fed ID 19855/19856) $7,448 $7, City of Suffolk T18368 Concrete Pavement Repair and Asphalt Overlay, SGR Project $979 $ Accomack 0189 M06 - Multijurisdictional: Hampton Roads MPO Hampton Roads Primary RTE 35 - BRIDGE REPLACEMENT $13,082 $13, RTE 58 BUSINESS BRIDGE (Carrsville) over Rte. 632 and CSX $11,046 $11,046 T18371 Southampton 2017 Plant Mix, State of Good Repair $607 $ RTE 58 - CONSTRUCT INTERCHANGE $26,402 $26, Route 58 SuperElevation Correction $2,361 $2,361 T11487 MLK/DT/MLK - Primary Construction $2,018,737 $2,018, DT/MT/MLK Primary Debt Service $579,256 $250, Skiffes Creek Connector $72,986 $35, Richmond Road Intersection Rte 199 West Ramp $749 $1, Pocahontas Trail Reconstruction $18,000 $2, RTE REPLACE 1 BRIDGE ON NEW LOCATION $101,645 $101, Bridge Rte. 189 (Southquay Road) over BlackWater River $25,077 $25, James City Route 199 Intersection Improvements at Brookwood Drive $400 $ Isle of Wight Main Street Pedestrian Improvements $165 $ Sussex Bridge Replacement Rte 301 over Nottoway River (VA Str 1014) $5,069 $5, Isle of Wight Southampton Hampton Roads Isle Of Wight 2016 Plant Mix Schedule, Primary Part $355 $ Southampton Plant Mix Schedule, Primary Part $1,352 $1,352 T13919 Hampton Roads-VDOT SGR Bridge-Balance Entry $0 $19,149 06/14/

21 Hampton Roads Hampton Roads Hampton Roads Hampton Roads Accomack Accomack Accomack Greensville Isle of Wight Isle of Wight Isle of Wight Isle of Wight Isle of Wight Isle of Wight James City James City James City James City James City Northampton Hampton Roads Primary Roadway Safety Improvements, Districtwide $2,828 $3, Curve Advisory Speed Review $1,538 $2, Southside Centerline Rumble Strips $1,550 $1, ITTF Arterial Oper. Imprv: US 60, Rt 143 & Rt 199 $1,560 $1,560 Primary Total $2,564,455 Secondary 8300 RTE RECONSTRUCTION $8,194 $8, Rte 1304 (Wallace Rd) Bridge Replacement over West Ridge Ck $2,165 $2, Rte 1306 (School Ln) Bridge Replacement over West Ridge Ck $2,281 $2, Otterdam Road Improvements $8,348 $8,348 T17498 #HB2.FY17 RTE 17 AT US RTE 258 INT CAPACITY IMPROVEMENTS Rte 620 Reconstruction - Broadwater Road $4,687 $3, Rte 621 Over Passenger Swamp Va Str $2,052 $2, Turner Drive Intersection Improvements at Benns Church Blvd $350 $ #HB2.FY17 NIKE PARK RD EXTENSION FROM REYNOLDS DR TO RTE 17 $6,770 $4,270 $11,658 $11, Rte 680 Over Stallings Creek VA str $1,731 $1, Bridge Replacement Rte 601 over Diascund Creek, Fed ID $2,390 $2, FOUR LANE WIDENING FRM LIBRARY TO RT 60 $14,262 $4, #HB2.FY17 Longhill Rd Widening $19,800 $19, Centerville Road Intersection Improvements at News Road $2,377 $2, OLDE TOWNE RD/LONGHILL RD TURN LANE IMPROVEMENTS $2,060 $2, Rte 642- Reconstruction $11,475 $11, /14/2016

22 Southampton Southampton Southampton Hampton Roads Secondary Bridge (Fed ID 17757) Rte 308 Over Three Creek $4,224 $4, Rte 635 Over N&W Railroad VA Str $3,315 $3, Rte 659 Over Flat Swamp VA str $2,192 $2, Southampton Route 671 over Nottoway River and Nottoway River ( Two Struc $20,222 $10, Southampton #HB2.FY17 General Thomas Highway Signalization Project $650 $ Sussex Bridges ( FED ID , 18306) Over Blackwater River $4,773 $4, Sussex Stokes Rd over Magus Mill Pond Va struc 6054 $1,212 $1, Chesapeake T17386 #HB2.FY17 Deep Creek Bridge Replacement $48,468 $20, Chesapeake nd Street Bridge Replacement $18,349 $7, Onley 8301 RTE RECONSTRUCTION $2,468 $2, HAMPTON ROADS SSYP $0 $8,232 Secondary Total $153,429 Urban Emporia Improvement of the Halifax Street Bridge $1,271 $1, Hampton Cunningham Drive Sidewalk Project $920 $ Hampton Wythe Creek Road - Widen to 3 Lanes $31,779 $29, Hampton Pembroke - Reconstruct C&G, sidewalks, crosswalks $2,500 $2, Hampton T17959 Traffic Signal System Retimings $1,055 $1, Hampton Citywide Traffic Signal Upgrades Phase IV $553 $ Hampton Traffic Signal System Retiming $698 $698 U Hampton #HB2.FY17 Coliseum Drive Extension - New 4 Lane Extension $4,573 $4,573 U Hampton #HB2.FY17 Little Back River Road Reconstruction $9,270 $9, Newport News CITYWIDE ITS UPGRADES - MULTI LOCATIONS $300 $ Newport News #HB2.FY17 Replacement of bridge over Lake Maury $8,200 $8, Newport News Intersection improvements - to minimize flooding $3,900 $3, Newport News Primary Extension Paving - Warwick Boulevard $80 $ Newport News Primary Extension Paving $222 $ Newport News Primary Extension Paving - Warwick Blvd $87 $143 06/14/

23 Hampton Roads Urban Newport News Warwick Blvd/Harpersville Road Intersection Improvements $605 $ Newport News Streetscaping, storm, sanitary, underground utilites $12,172 $12, Newport News Newport News Signal Timing Improvements $900 $ Newport News Newport News Pedestrian Improvements $1,000 $1, Newport News Newport News Citywide Signal System Retiming $500 $ Newport News Briarfield Sidewalk $600 $ Newport News Warwick Boulevard Sidewalk Widening $500 $500 U Newport News 4483 #HB2.FY17 ATKINSON BLVD - 4 LANES $68,383 $68,383 U Newport News Hogan Drive Ph 2 $10,000 $2,000 U Newport News Habersham Drive Extension/Realignment $6,000 $4,122 U Newport News Independence Boulevard - New Roadway $15,250 $ Norfolk #HB2.FY17 U.S. 58 Corridor Intersection Capacity & Safety $2,337 $2, Norfolk West Oceanview Avenue $2,540 $2, Norfolk 1765 RTE & 8 LANES $60,476 $60, Norfolk Robin Hood Rd & Military Hwy Phase 1, link w/ UPC 1765 &9783 $26,865 $26, Norfolk Campostella Bridge Rehabilitation $6,000 $6, Norfolk Cheseapeake Blvd/ Cromwell Drive Int. Improvements $287 $ Norfolk RTE RECONSTRUCTION $104,319 $104, Norfolk Remove existing concrete and replace with asphalt. $6,537 $4, Norfolk Remove existing concrete and replace with asphalt. $2,767 $2, Norfolk Intersection Improvements at Granby St. and Bayview Blvd $500 $ Norfolk Norfolk Signal Timing Improvements - Phase III $600 $ Norfolk Norfolk ATMS Phase 4C $1,440 $1, Norfolk New ADA Ramps throught out City $500 $ Norfolk Norfolk Pedestrian Signal Upgrade - Citywide $1,870 $1, Norfolk #HB2.FY17 Norfollk Traffic Control System Platform Upgrade $3,000 $3, Portsmouth Bridge Replacement - Churchland Bridge $35,500 $35, Portsmouth George Washington Highway Corridor Improvements $4,600 $ Portsmouth RTE LANE $28,203 $28, Portsmouth Int. Geometeric - Portsmouth Blvd. Rte 337 & Elmhurst Lane $500 $ Portsmouth Primary Extension Paving - Turnpike Road $47 $ Portsmouth Citywide Signal Timing - Phase 4 $132 $ /14/2016

24 Hampton Roads Urban Portsmouth Westhaven Bicycle Improvements $500 $ Portsmouth Portsmouth Traffic Signal Upgrades $3,000 $4, Portsmouth Instersection Improvements - Court/ Bart/ Pavillion $1,222 $1, Chesapeake Primary Extension Paving - Airline Boulevard $201 $ Chesapeake Primary Extension Paving - Atlantic Avenue $799 $ Chesapeake Chesapeake Expressway Guardrail Improvements $768 $ Chesapeake Chesapeake Battlefield B/vd FYA $453 $453 U Chesapeake T17966 Chesapeake Signal Timing & Incident Management Plans $150 $150 U Chesapeake Chesapeake Signal Timing - Phase 1 $150 $150 U Chesapeake Chesapeake Signal Timing - Phase 2 $150 $150 U Chesapeake Chesapeake Signal Timing - Phase 3 $150 $ Suffolk Primary Extension Paving - Godwin Boulevard $265 $ Suffolk Bridge Road Traffic Signal upgrades $1,257 $1, Suffolk #HB2.FY17 Route 58/ Holland Road Corridor Improvements $77,183 $77, Suffolk Suffolk Bypass ITS Improvements $1,650 $1, Suffolk Suffolk Bypass Intersection Improvements at Godwin Boulevard $1,080 $1, Suffolk RTE WIDEN TO 4 LANES $11,060 $11, Suffolk Nansemond Pkwy Intersection Improvements at Wilroy Road $2,400 $2, Suffolk #HB2.FY17 Intersection Imp At Shoulders Hill Rd & Rte 17 $17,079 $17, Suffolk Nasemond Parkway Traffic Signal Upgrades $2,748 $2, Suffolk Shoulders Hill Road Multi-Use Path $272 $ Suffolk West End Suffolk Bypass Interchange IMR Study $200 $ Suffolk Realignment of Colonial Avenue $650 $ Suffolk Nansemond Pkwy/Bennetts Pasture Rd Intersection Improvements $4,100 $ Suffolk Pughsville Area Drainage Improvements $1,000 $1, Suffolk Suffolk Transportation Operation Center $2,050 $ Suffolk Suffolk Citywide Signal Timings $370 $ Suffolk Speights Spillway Bridge Replacement $1,350 $1, Virginia Beach Northampton Blvd Mill & Overlay $726 $ Virginia Beach #HB2.FY17 RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY $57,566 $45, Virginia Beach Lesner Bridge Replacement Project, VA Beach $98,400 $98, Virginia Beach Independence Blvd/Edwin Drive Intersection Improvements $647 $647 06/14/

25 Hampton Roads Urban Virginia Beach Traffic Adaptive Corridor Implementation $390 $ Virginia Beach Rosemont Rd/South Plaza Trail Intersection Improvements $363 $ Virginia Beach First Colonial Road Intersection Improvements at Laskin Road $1,000 $1, Virginia Beach LYNNHAVEN PARKWAY - WIDENING TO 4 LANES $42,890 $42, Virginia Beach ELBOW RD - UPGRADE TO 4 LANES & EXTENSION (PE ONLY IN SYIP) Virginia Beach #HB2.FY17 INDIAN RIVER ROAD - UPGRADE TO 4 LANES $43,567 $27, Virginia Beach Centerville Turnpike Widening $36,675 $36, Virginia Beach Rosemont Road $15,769 $15,711 U Virginia Beach T17383 #HB2.FY17 Centerville Turnpike - Phase III $30,096 $6, Poquoson Wythe Creek Road Traffic Signal Upgrade $260 $260 Enhancement $69,903 $41,583 U Virginia Beach Bus Stop Infrastructure and Accessibility Improvements $399 $399 U Virginia Beach Corridor Retiming - Kempsville Rd & Newtown Area $521 $ Williamsburg Richmond Rd. Resurfacing $544 $ Franklin Primary Extension Paving - Clay Street $215 $ Franklin Primary Extension Paving - South Street $276 $276 U Franklin Bank St & Oak St Drainage Improvements $100 $ Poquoson RTE CITY OF POQUOSON - PHASE I $19,823 $19, Poquoson South Lawson Park Multi-Use Path $195 $195 Urban Total $905, Williamsburg Monticello Avenue Multi-Use Trail $1,250 $ Hampton Pine Chapel Road Pedestrian/Bicycle Trail $2,254 $2,254 EN Cape Charles TOWN OF CAPE CHARLES - MULTI-USE TRAILS $3,388 $4,261 EN Greensville Highway 301 North Sidewalk $409 $574 EN Chesapeake Chesapeake Bike Trail $723 $1,223 EN Newport News Washington Ave Streetscape and Pedestrian Improvements $500 $500 EN Virginia Beach Independence Boulevard and Baxter Road Sidewalk $1,151 $993 EN Virginia Beach Providence Road Sidewalk $925 $ /14/2016

26 Newport News Amtrak Station Relocation - Amtrak Multimodal Station Reloc $43,223 $37, Suffolk #HB2.FY17 Godwin Blvd/Route 58 Park & Ride Lot $1,130 $1, Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads Hampton Roads 9999 M06 - Multijurisdictional: Hampton Roads MPO Hampton Roads Enhancement EN Virginia Beach West Great Neck Sidewalk $860 $742 Enhancement Total $12,157 Transit T18096 #HB2.FY17 Peninsula Regional Park and Ride Enhancement $3,500 $3,500 T18095 #HB2.FY17 Regional Commuter Express Bus $2,859 $2,859 Transit Total $45,389 Other HAMPTON ROADS MPO CMAQ BALANCE ENTRY $0 $3, HAMPTON ROADS DISTRICT REGIONAL STP (RSTP) BALANCE ENTRY T18136 SAFETY PRESCOPING - HAMPTON ROADS $100 $100 T17863 Port of Virginia - ITS Masterplan for Hampton Roads $150 $150 T15986 #HB2.FY17 HIGHWAY CONST DISTRICT GRANT PRGM - HAMPTON $0 $33,197 $0 $38,805 T9588 Hampton Roads-Local SGR Bridge-Balance Entry $0 $46,641 T9587 Hampton Roads-Local SGR Paving-Balance Entry $0 $38, Green Operator Ocean-Going Vessel Hybrid $5,000 $5, Green Operator Truck Replacement $3,000 $3, Committed Safety Projects-Hampton Roads $0 $3, Hampton Rds Regional Opticom Preemption Strategic Plan & Dev $1,650 $1,650 06/14/

24 MONTH PRELIMINARY ADVERTISEMENT FOR PROJECTS UNDER $250,000

24 MONTH PRELIMINARY ADVERTISEMENT FOR PROJECTS UNDER $250,000 24 MONTH PRELIMINARY ADVERTISEMENT FOR PROJECTS UNDER $250,000 Tier I out 9/10/2018 11/9/2018 12/23/2018 1/22/2019 1/8/2019 113335 0664-114-428,N501 Williamsburg HAMPTON Interstate Crack Sealing $11,500

More information

Projected Fiscal Year 2015 and Fiscal Year 2016 Virginia Preschool Initiative Funded Slots

Projected Fiscal Year 2015 and Fiscal Year 2016 Virginia Preschool Initiative Funded Slots June 24, 2014 FY15 VPI slots by locality Source: VDOE Fiscal Year 2015 and Fiscal Year 2016 Virginia Preschool Initiative Funded of VPI Local 001 ACCOMACK 0.3555 215 - $831,405 $458,595 218 - $843,006

More information

Draft 2040 LRTP Candidates

Draft 2040 LRTP Candidates Ballahack Defense Access s Route 17 Old Battlefield s Centerville Turnpike Mount Pleasant VA Beach City Line Widening and Airport Access West Route 17 alignment Light Rail Existing LRT LRT Extension Survey

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

Managed Long-Term Services and Supports Provider Area Service Form

Managed Long-Term Services and Supports Provider Area Service Form Managed Long-Term Services and Supports Provider Area Service Form This form is for Anthem HealthKeepers Plus members on behalf of HealthKeepers, Inc. Provider name and doing business as per W-9: TIN:

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Presented By: Deputy Executive Director February 17, 2011

Presented By: Deputy Executive Director February 17, 2011 TRANSPORTATION PROJECT PRIORITIZATION Presented By: Camelia Ravanbakht, Ph.D. Ca e a aaba t,.. Deputy Executive Director February 17, 2011 OVERVIEW 2034 Long-Range g Transportation Plan (LRTP) Process

More information

Road Construction Ahead January-April 2015 NORTHWEST REGION

Road Construction Ahead January-April 2015 NORTHWEST REGION NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

SMART SCALE 2016 Project Scores

SMART SCALE 2016 Project Scores 2016 s Name Title 1731 D Bristol Marion Town 1620 D Bristol Bristol City 1645 D Bristol Smyth County 1646 D Bristol Smyth County 1644 D Bristol Smyth County 1647 D Bristol Smyth County 1689 D Bristol Big

More information

AWARD INTERSTATE. Bid Amount: Less Than 5 Million. Report created on : 4/20/18. Letting Date: 3/28/2018. Estimated Construction Cost.

AWARD INTERSTATE. Bid Amount: Less Than 5 Million. Report created on : 4/20/18. Letting Date: 3/28/2018. Estimated Construction Cost. : Less Than 5 Million INTERSTATE 202 112417 LOCATION: VARIOUS (NFO)PM2N-060-F18, P401 ADAMS CONSTRUCTION COMPANY 1 $1,418,249.41 $1,440,244.38 ROANOKE PM02458 MONTGOMERY VA SALEM DISTRICT SGR - 2018 PLANT

More information

DLAS Document Summary

DLAS Document Summary DLAS Document Summary DLAS Document Summary Teacher Survey Results Author Department of Education Enabling Authority Item 136, paragraph B.12., Chapter 3, 2014 Special Session I Acts of Assembly Executive

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

Project Delays in the FY09-14 Six-Year Improvement Program

Project Delays in the FY09-14 Six-Year Improvement Program Project Delays in the FY09-14 Six-Year Improvement Program ROUTE 58 58 Abingdon Big Stone Gap Bluefield Bristol Lebanon Marion Norton Saltville Tazewell Wise Wytheville Widening from two to four lanes

More information

VIRGINIA CIRCUIT COURT LIST 2

VIRGINIA CIRCUIT COURT LIST 2 VIRGINIA CIRCUIT COURT LIST 2 COUNTY/CITY PHONE Accomack P.O. Box 126 Road Accomack, VA 23301-0126 Albemarle Albemarle County 501 East Jefferson Street Charlottesville, VA 22902 Alexandria 520 King Street

More information

Consensus Scenario (Approved May 17, 2017)

Consensus Scenario (Approved May 17, 2017) Percentage DGP DGP+Earmark HPP Step 1 Step 2 Step 3 Total Remaining # Projects Amount DGP # Projects Amount HPP # Projects Amount HPP # Projects* Funding DGP** HPP Bristol 6.8% $20,740,248 $21,210,894

More information

HB2 Submitted Applications (project data has not been validated) Principal Improvement ID ID District Organization Name

HB2 Submitted Applications (project data has not been validated) Principal Improvement ID ID District Organization Name 460-Leatherwood Commercial 468 67 Bristol Town of Bluefield Development $ 1,433,000 $ 1,633,000 X X X 474 78 Bristol County of Wythe Construct Auxiliary Lane I77 North Exit 32 onto I81 South $ 9,000,000

More information

FY2017 HB2 Scored Projects - Statewide (Sorted By App ID)

FY2017 HB2 Scored Projects - Statewide (Sorted By App ID) 474 Bristol County of Wythe Construct Auxiliary Lane I77 North Exit 32 onto I81 South X X 1.415 $ 9,100,000 $ 9,000,000 1.573 X X 476 Bristol County of Wythe Construct Climbing Lane I77 North to Exit 32

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

30, 2017 LESS: FY 2017 PLUS: FY 2017 LESS: FY 2017 LESS: FY

30, 2017 LESS: FY 2017 PLUS: FY 2017 LESS: FY 2017 LESS: FY 55100 Accomack County 4,427,575 1,518,904 2,969,007 2,903,892 287,693 908,788 65,851-2,077,166 16,145 896,974 139,287 139,287-55101 Albemarle County 36,811,809 4,205,186 7,403,914 7,497,090 644,135 1,554,090

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place. EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in

More information

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018 FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

SUMMARY OF PROPOSED CHANGES TO THE 2017 LOW INCOME HOUSING TAX CREDIT QUALIFIED ALLOCATION PLAN

SUMMARY OF PROPOSED CHANGES TO THE 2017 LOW INCOME HOUSING TAX CREDIT QUALIFIED ALLOCATION PLAN Topics: SUMMARY OF PROPOSED CHANGES TO THE 2017 LOW INCOME HOUSING TAX CREDIT QUALIFIED ALLOCATION PLAN 1. At-Large Pool Eliminate the At-Large Pool o Fund each deal that is next in line in pools 1, 2

More information

SMART SCALE Round 2 Update. Nick Donohue

SMART SCALE Round 2 Update. Nick Donohue SMART SCALE Round 2 Update Nick Donohue Deputy Secretary of Transportation January 2017 Round 2 Summary 436 applications submitted 33 applications screened out $1.393 billion SMART SCALE request $1.864

More information

FY , /30/2014 PLUS: FY 2014 LESS: FY

FY , /30/2014 PLUS: FY 2014 LESS: FY 55100 Accomack County (275,883) 3,037,806-2,278,355-41,204 942,874 79,602 918,486 628,762 628,762-55101 Albemarle County 28,184,164 7,590,704-5,693,028-73,801 2,422,775 3,201,583 5,007,572 30,772,427 30,772,427-55102

More information

COMMISSIONER'S REPORT

COMMISSIONER'S REPORT INTERSTATE 255 109855 LOCATION: VARIOUS COMPANY 1 $2,785,604.37 $2,997,976.18 (NFO)PM2S-962-F17,P401 ROANOKE NHPP-962-2(104) MONTGOMERY VA 523 107360 LOCATION: VARIOUS ALLAN MYERS VA, INC. 3 $1,844,444.00

More information

Awarded Projects - 2/16/11 Route Project Jurisdiction. Pavement Restoration. Pavement Restoration. Pavement Restoration. Pavement Restoration

Awarded Projects - 2/16/11 Route Project Jurisdiction. Pavement Restoration. Pavement Restoration. Pavement Restoration. Pavement Restoration Route 360 Route 460 Route 360 Route 460 I-81 I-77 I-66 I-81 I-64 I-464 I-460 I-295 Route 29 Route 55 Route 234 Route 15 Route 1 Route 28 Route 287 Route 9 Route 7 Page 1 Amelia Amelia Dinwiddie Dinwiddie

More information

CONSUMER FINANCE LICENSEES

CONSUMER FINANCE LICENSEES OPERATING IN VIRGINIA AT THE CLOSE OF BUSINESS APRIL 17, 2017 BUREAU OF FINANCIAL INSTITUTIONS STATE CORPORATION COMMISSION COMMONWEALTH OF VIRGINIA 7 Corners Financial, Inc. CF-2868 AIV CL LLC CF-2943

More information

SMART SCALE Round 3. Nick Donohue

SMART SCALE Round 3. Nick Donohue SMART SCALE Round 3 Nick Donohue Deputy Secretary of Transportation January 2019 SMART SCALE Round 1 Round 2 % Change Total # Submitted 321 436 36% Requested Funding 7.2B 9.7B 38% Available Funding 1.4B

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

District UPC State Project Jurisdiction Rec Cn Estimate Target Adv Date Project Coordinator

District UPC State Project Jurisdiction Rec Cn Estimate Target Adv Date Project Coordinator District UPC State Project Jurisdiction Rec Cn Estimate Target Adv Date Project Coordinator Bristol 97553 EN04084102 Scott County $ 5,000 4/3/2018 Chase.Buchanan Bristol 103604 EN12140261 Abingdon $ 520,950

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

VDOT / VTCA Hampton Roads District Dialogue. December 13, 2017

VDOT / VTCA Hampton Roads District Dialogue. December 13, 2017 VDOT / VTCA Hampton Roads District Dialogue December 13, 2017 AGENDA Opening Remarks and Overview James S. Utterback, PMP Program Overviews Preliminary Engineering Chris Eggleston, PE Construction John

More information

Marti Donley; Daniel Reese; Rodney White UPC FFY14 TIP AMD pdf

Marti Donley; Daniel Reese; Rodney White UPC FFY14 TIP AMD pdf Marti Donley From: Sent: To: Cc: Subject: Attachments: Lloyd Robinson Thursday, October 10, 2013 8:14 AM Andy Waple jason.robinson@vdot.virginia.gov; Marti Donley; Daniel Reese; Rodney White FW: TIP Amendment

More information

Hampton Roads. Transportation Project Priorities

Hampton Roads. Transportation Project Priorities Hampton Roads Transportation Project Priorities Prepared by HRTPO Staff Revised March 21, 2013 2034 LRTP Regionally Funded Construction Priori za on Category Roadway Systems include Interstate, Primary,

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

Attachment A - FY 2018 Revenue Sharing Program Allocations - Approved

Attachment A - FY 2018 Revenue Sharing Program Allocations - Approved Attachment A - - Approved Name Bristol District Wytheville Town East Main Street 107236 $315,000 Lithia Road Withers Road/Cassell Road Wytheville Town (summary) $315,000 Culpeper District Charlottesville

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015

DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015 DRAFT FY16 to FY21 RSTP Allocation Recommendations, Recommended by TAC on 3/17/2015 Existing/ RSTP Allocation Recommended Ashland 103393 Trolley line trail:ii Existing 1,100,000-500,000 600,000 - - - 1,100,000

More information

Route 58 Corridor Development Fund

Route 58 Corridor Development Fund Route 58 Corridor Development Fund Appropriation Act Item 447 B.3 (Special Session I, 2006) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation

More information

STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS Recommended May 9, 2012

STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS Recommended May 9, 2012 Strategic Priorities (Projects 1-20) STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS VDOT's Secondary Program County's Proposed Ranking Route Number and Name Location

More information

Culpeper District. Albemarle County Monthly Report. September 2012

Culpeper District. Albemarle County Monthly Report. September 2012 Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT CONTACT: VDOT Customer Service 1-800-367-7623 November 18, Richmondinfo@VDOT.virginia.gov WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Below is a forecast of road construction that is expected

More information

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total Cash - General Fund Transfer Cash - General Fund Transfer Total - - - - - - Cash - Greenbrier TIF Intersection Improvements: Battlefield Blvd. at Volvo Pkwy. 40-230 125,000 550,000 - - - 675,000 Right

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

Moving the Economy. To HRTPO Board November 16, 2017 By Robert B. Case, PE, PhD

Moving the Economy. To HRTPO Board November 16, 2017 By Robert B. Case, PE, PhD Moving the Economy To HRTPO Board November 16, 2017 By Robert B. Case, PE, PhD Moving the Economy How Well the Hampton Roads Transportation System Serves Three Key Economic Sectors: Port Military Hospitality

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

VDOT Culpeper District John Lynch, P.E. District Administrator December 12, 2013

VDOT Culpeper District John Lynch, P.E. District Administrator December 12, 2013 VDOT Culpeper District John Lynch, P.E. District Administrator John.Lynch@VDOT.Virginia.gov December 12, 2013 CULPEPER DISTRICT Culpeper District Geography: Albemarle Louisa Fluvanna Greene Madison Orange

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

Virginia Department of Fire Programs

Virginia Department of Fire Programs Virginia Department of Fire Programs FUNDED TRAINING PROGRAMS FOR CALENDAR YEAR 2018 This document has been developed from the Training Survey that the localities participated in requesting funding for

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

THE RICHMOND REGION Transportation Priority Projects

THE RICHMOND REGION Transportation Priority Projects Priority Order Project Description Estimated Need (in millions) 1* Main Street Station Phase III - Station facility improvements Route 360 East of I-295 Widen to 6 & 8 lanes (I-295 to Walnut Grove Rd)

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $0.856 09/04/2013 County Route 528 Roundabout

More information

American Job Center Finder

American Job Center Finder American Job Finder Job Finder Name Address Phone Roanoke Wytheville One-Stop Campus Employment Commission- Richmond Office - Charlottesville - VEC Region 2000 Fairfax Alexandria Winchester VEC Office

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

TRANSPORTATION INITIATIVE. Review of Road Funding and Revenue Alternatives February 8, 2017

TRANSPORTATION INITIATIVE. Review of Road Funding and Revenue Alternatives February 8, 2017 TRANSPORTATION INITIATIVE Review of Road Funding and Revenue Alternatives February 8, 2017 Overview Historical and Current Funding New Construction Road Project Needs Allocation of State Road Funds Metropolitan

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

***** 2 JANAF Shopping Center E Virginia Beach Blvd, Norfolk, VA ******

***** 2 JANAF Shopping Center E Virginia Beach Blvd, Norfolk, VA ****** Shopping center addresses NORFOLK 1 - Center Shops - 738 W 22nd St, Norfolk, VA 23517 Incidents = 3 (all larceny) ***** 2 JANAF Shopping Center - 5900 E Virginia Beach Blvd, Norfolk, VA 23502 ****** incidents

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69 FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, 540-387-5238 SALEM 69 Jen.Ward@vdot.virginia.gov - The following is a list of forecasted highway projects that may impact traffic traveling

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness, From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Roads to Prosperity Program. Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018

Roads to Prosperity Program. Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018 Roads to Prosperity Program Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018 Part A Surge Part B GARVEE 1 Turnpike 1 GO Bond 1 PART B GARVEE 2 3.3 B +/- Roads to Prosperity

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Weekly East Tennessee Construction Report for May 31-June 6, 2018 Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane

More information

A New Era of Transportation Solutions

A New Era of Transportation Solutions A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION FY 20162025 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM DVRPC FY 2017 Authorized and Unauthorized Projects (All funds $ millions) Burlington Arney's Mount Trail, Phase 1 (DB #D1713) TAP CON $3.000 $3.000

More information

Virginia NTBI III Total Weight Collected - October 29, 2011

Virginia NTBI III Total Weight Collected - October 29, 2011 Virginia NTBI III Total Weight Collected - October 29, 2011 TOTAL COLLECTED WEIGHT: 9,450.4 pounds 22.2 20.0 0.6 8.0 365.0 127.8 18.8 59.6 150.6 39.8 6.4 9.0 5.6 148.8 Ashland PD Ashland PD 601 England

More information

VIRGINIA LICENSED BARBER SCHOOLS Sorted by Zip Code

VIRGINIA LICENSED BARBER SCHOOLS Sorted by Zip Code MANASSAS, VA 20109 1303080123 DAYDREAMERS ACADEMY 10432 BALLS FORD RD STE 300 MANASSAS, VA 20109 919-219-1032 shearandcomb@gmail.com GAINESVILLE, VA 20155 1303080212 FRANKLINS' FAMILY BARBER SHOP LLC 7608

More information

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 May 16, 2014 Chuck McGinness, (954) 777-4090 chuck.mcginness@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 FORT LAUDERDALE -- Construction and maintenance-related lane

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance

More information

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds

FY Transportation Improvement Program Funding Summary: Local Match for Federal Funds CMAQ-Flex AMPA Wide Bicycle Facil. Prog. & Activities 100.5 A300705 City of $25,562 $25,562 AMPA Wide Bicycle Facil. Prog. & Activities 100.6 A300706 City of $25,562 $25,562 AMPA Wide Joint TDM-Travel

More information