Proposed ODOT Construction Projects 1/1/18 thru 6/18/28

Size: px
Start display at page:

Download "Proposed ODOT Construction Projects 1/1/18 thru 6/18/28"

Transcription

1 1/1/18 thru 6/18/28 1/1/ CUY IR NOISE WALL 600 feet west of the Westlake/Rocky River corporation line Construct Type II Noise Barrier at spot locations in the Cities of $1,500,000 to the Rocky River Westlake and Rocky River.Includes sections not built under PID o Moved to SFY 2018 fro 2015PROJECT CANCELLED PER CO REQUEST 1/1/ CUY IR Brecksville; County Line to Oakes PM resurfacing from the county line to Oaks Rd in Brecksville $0 1/1/ CUY Broadview Hts TLCI Broadview Hts: Broadview Rd and Oakes Rd intersection NOACA TLCI Implementation Project: The addition of a leftturn lane to Broadview Road (SR-176) at the Oakes Road intersection in the City of Broadview Heights as part of the City Campus Roadway Pedestrian Access and Safety Improvements. 1/11/ CUY SR Intersection Solon: SR-91 (S.O.M. Center Road) and SR-43 (Aurora Road) 2015 Safety Project: Improve the intersection capacity by widening the intersection of S.O.M. Center Road (SR-91) and Aurora Road (SR-43) in the City of Solon. 1/11/ CUY MLK BLVD 5:055M Cleveland: MLK Blvd over Doan Brook creek Municipal Bridge Project along Martin Luther King Jr Blvd to replace a concrete filled arch structure over Doan Brook creek just south of Jeptha Drive intersection in the City of Cleveland. $182,500 $3,329,562 $1,166,838 1/11/ D12 MNT FY2018 Tree Removal Various General tree and brush clearing along the freeway corridors. $448,385 1/16/ CUY Lee Road Shaker Hts: Various local routes Restripe Lee Road as a 3-lane roadway (one lane each direction with a center turn lane) between North Park and City Hall and between Lomond and Scottsdale. The existing roadway configuration between City Hall and Lomond will remain. The proposed bicycle f 1/25/ GEA US Intersection Troy Township; At SR-700 Safety improvements at intersection of US-422 and SR-700 in Troy Twp. SAFETEA-LU Earmark 1/25/ CUY SR Cleveland; Denison to IR-90 PM resurfacing on SR-176 from Denison Ave to merge with IR- 71 near IR-90 in Cleveland. 1/25/ LAK SR Slope Concord Hambden Road near Big Creek in Concord Township. GSM Project: The proposed repair is to construct a retaining wall or grade the existing slope in order to maintain proper drainage along the ditch line in the road which will minimize any R/W impacts. $120,012 $708,400 $1,239,870 1/25/ CUY IR Cleveland; I-77 to SR-2 Resurfacing I-90 from I-77 to SR-2 in Cleveland. $2,707,279 1/25/ GEA SR Bainbridge Twp; County Line to Washington St Resurfacing for SR-306 from the County Line to Washington St $947,574 in Bainbridge Twp. 1/25/ GEA SR Troy, Burton Twps; US-422 to SR-168 Resurfacing of SR-700 from US-422 to SR-168 in Troy and $561,606 Burton Twps. 1/25/ LAK SR LeRoy Twp; Vrooman Rd to the Cnty Ln Resurfacing from Vrooman Rd to the Lake County Line in LeRoy Township. $496,810 $439,001 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

2 1/25/ CUY Detroit Ave Streetscape II Cleveland: West 78th ST to West 73rd St NOACA TAP Project: Detroit Avenue streetscape improvement $1,348,533 from West 78th Street to West 73rd Street including 480-feet on Lake Ave from West 78th Street to Detroit Avenue and from West 58th Street to West 52nd Street in the City of Cleveland. The improve 1/31/ CUY Wallings Rd Broadview Road to Broadview Heights ECL Resurface Wallings Road from Broadview Road to Broadview $1,673,116 Heights ECL in the City of Broadview Heights. 2/1/ GEA US Intersection Intersection of US-422 and SR-88/SR-528 in Parkman Improve geometrics and capacity at the intersection of US-422 $470,000 Township and SR-88/SR-528 in Parkman Twp. 2/1/ CUY IR 480/Transportation Blvd Garfield Hts; IR-480 interchange to SR-17 Transportation Boulevard Improvements consists of the $5,247,255 following: 1) widen the pavement, 2) widen the Transportation Blvd bridge over IR-480, 3) minor IR-480 WB ramp modification at the intersection, 4) improve the boulevard's traffic signal coordination 2/1/ LAK SR Painesville Twp; Newell St Over SR-2 Replace the deck of the Newell Street bridge over SR-2 in $1,700,000 Painesville Township. 2/1/ CUY IR EB Maple Hts, Cleveland, Warrensville Hts; Cambden Rd to I- Reconfigure the EB I-480 lane assignments through the $6,720, WB bridge Warrensville Center Rd interchange to provide 3 lanes of traffic to IR-480N utilizing the Practical Design criteria established by the Department. Work will be loosely based on the 12/22/08 TransSyste 2/1/ GEA US Chardon Twp; County Line to Chardon WCL Resurface Chardon Rd (US-6) from the Lake County Line to the $770,000 Chardon WCL in Chardon Twp. 2/1/ FACD12 Cleveland FSMF N/A Construct a new maintenance facility located west of IR-77, $16,576,234 just south of Pershing Avenue in the City of Cleveland that will eventually merge Cleveland and Independence yards. Selling as Multi Prime delivery. 2/5/ CUY Euclid Ave/E. 260th St US-20 and SR-175 intersection Improvement to the crosswalk markings and signals, lighting and transit waiting areas at the intersection of Euclid Avenue (US-20) and E. 260th Street (SR-175) in the City of Euclid. Work will include landscaping, new benches and trash receptacles. $136, CUY NORTH COAST HARBOR PED BR N/A Construct a movable pedestrian bridge from east of Dock 32 to Voinovich Park southwest corner in the City Cleveland.SAFETEA-LU Earmark + OH313FFY 05 Appropriation OH140 - Preliminary Development CUY CLEVELAND TOWPATH TRAIL Ph 1Cleveland; Harvard Ave to Steelyard Commons. Construct the Cleveland Towpath Trail in the City of Cleveland from Harvard Avenue to Steelyard Commons.o Related PIDs: 84112, CUY IR Garfield Hts, Maple Hts; Bridge to Lee Road PM resurfacing of IR-480 from the Valleyview Bridge to Lee Road in Garfield Hts and Maple Hts. Includes lighting upgrade. $7,022,122 $3,161,173 $3,785,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

3 92071 GEA US Parkman Twp; Over the Grand River Replace the top of the concrete frame bridge over the Grand $1,490,000 River located west of SR-88 in Parkman Twp. 2/23/ CUY North Park Blvd MLK Blvd to Lee Road NOACA TLCI Implementation Project: Create a buffer between the bike path and the vehicle lanes on North Park Blvd between Martin Luther King Jr. Drive and Lee Road in the City of Cleveland Heights. $32,174 2/28/ CUY INDEPENDENCE ALL-PURPOSE TRLN/A Construct an all-purpose trail from Brecksville Road to Canal Road in the City of Independence.SAFETEA-LU Earmark $2,638,192 2/28/ CUY SR Beachwood; SR-87 to US-422 Repair and resurface northbound Richmond Rd (SR-87/SR-175) from Shaker Blvd (SR-87) to Chagrin Blvd (US-422) in Beachwood. ODOT's participation will be the equivalent of an Urban Paving treatment. 3/1/ CUY SR Parma; SCL to Pleasant Valley Resurface Ridge Road (SR-3) from the south corp. line to Pleasant Valley Rd in Parma. 3/8/ CUY IR L Cleveland; SR-176SB over IR-71SB Replace the deck of the SR-176SB bridge over IR-71SB in Cleveland. Includes painting the structural steel. 3/8/ GEA SR Montville Twp, Thompson Twp; US-6 to County Line Resurface Madison Rd (SR-528) from the GAR Highway (US-6) to the Lake County Line in Montville and Thompson Twps. $1,933,851 $683,279 $3,565,000 $2,500,000 3/8/ GEA SR /VAR Hambden, Montville, Thompson Twps; US-6 to SR- 86/Hambden Twp; Claridon-Troy to US-6 Resurfacing Rock Creek Rd (SR-166) from US-6 to SR-86 in Hambden, Montville, and Thompson Twps; and Old State Rd (SR-608) from Claridon-Troy Rd to US-6 in Hambden Twp. $780,000 3/9/ CUY SR Widening North Royalton; WCL to York Road Reconstruct and widen Royalton Road (SR-82) from the WCL (W.130th) to York Road in the City of North Royalton.o SAFETEA-LU Earmarks OH169 + OH323o ODOT urban paving funds 3/22/ CUY SR Pepper Pike, Hunting Valley; SCL to NCL Resurface SOM Center Rd (SR-91) from the SCL to the NCL in Hunting Valley and Pepper Pike. 3/22/ LAK SR /04.21 Madison, Madison Twp; Cnty Ln to US-20 Resurfacing from the Geauga County Line to North Ridge Rd (US-20) in Madison Twp and Madison. Includes work on 3 culverts: old old old /22/ CUY US Utility Part 2 Cleveland; W.25th over IR-90 Part 2 to complete the relocation of the CPP lines off of the West 25th St bridge over I-90 in Cleveland. Work will include placing duct banks along Wade Avenue and Vega Avenue and running the power cables through the duct banks. This work will be compl $12,873,193 $935,397 $1,040,000 $800,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

4 3/23/ LAK VROOMAN ROAD LeRoy, Perry Twps; IR-90 to SR-84 Upgrade and relocate Vrooman Rd from IR-90 to SR-84 in $22,199,672 LeRoy and Perry Townships. The work in PIDs 5669 and will be incorporated into this project.o $150,000 for Arch Study set up in 1997 as federal.o Plans by Lake County.o Fund sources: MPO STP, C 3/29/ CUY Wendy Park Bridge N/A Re-Connecting Cleveland: Pathways To Opportunity project to construct a bridge linking the Cleveland Foundation Centennial Trail to Wendy Park on Whiskey Island in the City of Cleveland.o Related projects: , , $6,000,000 4/1/ CUY SRTS FY2015 South Euclid N/A o SRTS Infrastructure Project to improve crosswalks, sidewalk, bike paths, and drop-off areas to service four South Euclid schools in the City of South Euclid.o SRTS Infrastructure Project to improve crosswalks, ADA ramps, school flashers and sidewalks at 4/1/ LAK CR GR VAR FY 2018 N/A CEAO HSIP Project: Lake County will install new and upgrade existing guardrail on various county routes. 4/1/ CUY Olmsted Falls TLCI Columbia Road to Orchard Road NOACA TLCI Implementation Project: Enhance the pedestrian access in downtown Olmsted Falls 4/1/ CUY North Royalton TLCI N Royalton: Memorial Park to Trumpeter Blvd NOACA TLCI Implementation Project: Construct sidewalks on the west side of State Road (SR-94) to connect Memorial Park north towards Royalton Road (SR-82) in the City of North Royalton. 4/5/ CUY US /04.90 Cleveland; Chester Ave from East 93rd to US-20/ Mayfield Rd from US-20 to ECL Resurfacing Chester Avenue from East 93rd Street to Euclid Avenue (US-20) in Cleveland/Mayfield Road from Euclid Avenue (US-20) to the Cleveland Corp. limit in Cleveland 4/5/ GEA AUBURN ROAD (D-E) Auburn Twp: Bainbridge Rd to Franks Rd NOACA STP Project to resurface Auburn Road (CH 4) sections D-E from Bainbridge Road to Franks Road in Auburn Township. 4/5/ GEA CLARIDON TROY ROAD (A-C) Burton Twp: Burton Village North Corp to Taylor Well Rd NOACA STP Project to resurface Claridon Troy Road (CH 3) Sections A-C from the Burton Village north corporation line to Taylor Wells Road. 4/19/ LAK SR 283/ /00.00 Painesville; WCL to US-20/SR-283 to ECL Resurface Richmond St (SR-283) from the WCL to Erie St (US- 20), and Richmond St (SR-535) from SR-283 to the ECL in Painesville and Painesville Twp. Includes work from PID /19/ D12 BH FY2018 Misc Various routes & sections Miscellaneous bridges repairs to Ford Rd and Morley Rd over IR-90, Granger Rd (SR-17) over IR-480, and SR-44 over Kellogg Creek. 4/19/ D12 BH FY2018 Deck Sealing Various Seal the decks of 46 mainline structures along the I-90 corridor from Bradley Rd in Westlake to the NS railroad in Euclid. $357,260 $93,183 $169,000 $150,400 $1,480,000 $735,000 $430,000 $975,000 $2,500,000 $715,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

5 4/19/ D12 CU FY2018 Various Culvert replacement. Right-of-way requiredcuy ; $340,000 replace mishmash culvertgea ; replace 54" CMPLAK ; replace 12" pipe 4/19/ CUY IR Bedford Hts; Over SR-17 Convert the I-480 bridge over Bartlett Road (SR-17) to semiintegral $1,120,000 abutments including replacing the approach slabs and converting to elastomeric bearings. This project is approved for an expedited sale. 4/20/ CUY Pleasant Valley Rd State Road to Broadview Road Resurface Pleasant Valley Road from 0.08 mile east of State $4,795,680 Road to Broadview Road in the City of Parma. 5/1/ LAK SR Kirtland; SCL to south of Kirtland Rd Resurfacing SR 306 from SCL to south of Kirtland Rd. (the $1,700,000 existing concrete section) in the City of Kirtland. 5/1/ CUY US /VAR Rocky River; Center Ridge to Detroit / WCL to US-20 Resurface Wooster Road from Center Ridge to Detroit; and $3,432,000 Detroit Road from the West corp. line to Wooster Rd (US-20) all in Rocky River. 5/1/ LAK CR PM/RPM VAR FY2018 N/A CEAO HSIP Project: Lake County will upgrade existing $148,325 pavement markings and install new raised pavement marker on various county routes. 5/1/ CUY University Hts TLCI Fairmount Blvd to Hillbrook Rd NOACA TLCI Implementation Project: Improve the multimodal $125,000 transportation of Warrensville Center Road in the City of University Heights using complete street concepts that includes mid-block crosswalks between Fairmount Blvd and Meadowbrook Blvd, mid-bloc 5/3/ CUY US Signals Kenilworth to Warrensville Center Rd Cleveland Heights' Mayfield Road Signal project will replace $3,160,686 the existing signals on Mayfield Road with new fiber interconnected signals, pre-empt and ADA ramps.o Federal HSIP and NOACA MPO CMAQ project 5/3/ D12 GR FY2018 Various routes & sections Upgrade the guardrail along IR-90 from SR-2 to East 55th St $785,000 and at US-6 and SR-307. Includes the yearly ding-and-dent repair contract. 5/3/ CUY SR Fence Fairview Park, Cleveland; SR-10 over the Rocky River Add VPF to the Lorain Rd bridge over the Rocky River in $930,000 Fairview Park and Cleveland. 5/3/ CUY Prospect Ave East 22nd St to Carnegie Avenue Resurface Prospect Avenue from East 22nd Street to Carnegie $1,545,000 Avenue in the City of Cleveland. 5/3/ CUY Olmsted Twp TLCI Cook Road/Fitch Road in Olmsted Township NOACA TLCI Implementation Project: Construct new sidewalk $227,273 on the north side of Cook Road between Timber Lane and Fitch Road(approximately 732 linear feet), construct new sidewalk on the south side of Cook Road east of Fitch Road (approximately 429 linear 5/15/ CUY Strongsville TLCI N/A NOACA TLCI Implementation Project: Strongsville Town Center District project to upgrade all pedestrian signals, install pedestrian refuge islands, upgrade all curb ramps to ADA stances, and replace traffic detectors capable of bicycle detection. $324,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

6 5/17/ D12 PPM FY2018 Various routes & sections Pavement PM project on various routes throughout the $1,800,000 district. Includes the Unionville facility. 5/17/ D12 LG FY2018 Various routes & sections Lighting upgrade $1,200,000 5/17/ D12 SIGN FY2018 Various routes & sections Sign structure upgrade contract $440,000 5/17/ GEA SR 528/ /0.00 Safety Middlefield Twp: SR-528/SR-608 intersection Highway Safety Improvement Project: Create SR-528 left-turn lanes from the existing pavement and shoulder, improve the right-turn radius for large vehicles and rebuild the signal installation to improve signal head placement. $833,000 5/30/ GEA Newcomb Rd TLCI Middlefield Twp: Shedd Rd to Georgia Rd NOACA TLCI Implementation Project: Provide additional paved shoulder to Newcomb Road from Shedd Road to Georgia Road in Middlefield Township as outlined in the Amish Safety Strategic Plan (2016). 6/7/ D12 TSG FY2018 Various routes & sections Traffic signal upgrade: install signal at SR-306 and Taylor May, improve signal head configuration at SR-306 and Pettibone, construct 2 pedestrian refuge islands with RRFB's for midblock crossings of SR-283 Lakeshore Blvd near East 242nd Street (Euclid.) 7/16/ CUY Cedar Road Green Road to IR-271 Cuyahoga County project to rehabilitate Cedar Road from Green Road to IR-271 within the Cities of University Heights, South Euclid, Beachwood and Lyndhurst. $1,000,000 $223,000 $4,365,000 7/23/ LAK STANTON PARK SHORE Madison Township: Stanton Park along the Lake Erie shoreline Protect the Lake Erie shoreline from erosion and preserve green space in Stanton Park.OH062 also used on PIDs & /20/ CUY Dock Rehab N/A Repair and replace 1,185 linear feet of sheet pile bulkhead at $7,340,990 the Cleveland Bulk Terminal facility and include the installation of storm water improvements adjacent to the bulkhead.o Earmarks: OH351, OH360 8/23/ CUY IR Newburgh Hts; Harvard over IR-77 Replace the Harvard Avenue bridge over I-77 in the Village of $6,000,000 Newburgh Heights. Work includes removing the center pier, raising the profile for vertical clearance, and upgrading the traffic signals. 9/3/ CUY SR Streetscape Fairview Park: WCL to West 223rd Street Streetscape improvements along Lorain Road (SR-10) from $1,199,860 Fairview Park west corporation line to West 223rd Street in the city of Fairview Park.o extend tree plantings started further east on Lorain Roado include brick panel associated with the tree and tre 9/13/ D12 MNT FY2019 Tree Removal Various General tree and brush clearing along the freeway corridors. $500,000 9/27/ D12 MOW FY2019 Various routes & sections Mowing $800,000 $464,545 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

7 10/25/ LAK SRTS FY2019 Willowick N/A SRTS Infrastructure Project to improve crosswalks at Ronald $71,000 Drive, Pendley Road, and East 305th Street with the installation of curb ramps, signage, warning signs and crosswalk markings for students attending the Willowick Middle School in the City of Wil 10/25/ CUY SRTS FY2019 Cleveland Hts N/A SRTS Infrastructure Project to reconstruct the traffic signal $114,000 with pedestrian crossing facilities at the Noble Road and Quilliams Road to improve the safety of students crossing the intersection that attend Oxford Elementary and Monticello Middle schools 11/1/ CUY Edgehill Rd/Overlook Rd TLCI Cleveland Hts: Edgehill Rd/Overlook Rd NOACA TLCI Implementation Project: Reduce the width of the $125,000 Edgehill Road and Overlook Road intersection to calm traffic and make it friendlier for pedestrians and bicyclist in the City of Cleveland Heights 11/15/ CUY Lakewood Heights Blvd Alger Rd to Chesterland Ave Rehabilitate Lakewood Heights Boulevard (CR-297) from Alger Road to Chesterland Avenue in the City of Lakewood. $1,911,241 12/13/ D12 PM FY2019 Various routes & sections Pavement marking contract for D-12 $2,200,000 1/1/ CUY Riveredge Garage FY2019 Riveredge Garage Construct a cold storage building at Riveredge garage in $30,000 Cuyahoga county. 1/1/ CUY Pearl Road State Rd to Wildlife Way Modify the existing Pearl Road (US-42) roadway between $1,818,750 State Road and Wildlife Way to accomodate a five-lane road section with two five-foot bike lanes and streetscaping which includes new curbing, sidewalks, drive access, landscaping, decorative colored 1/1/ CUY Lakefront/Canal Basin Links N/A Re-Connecting Cleveland: Pathways To Opportunity project:o $700,000 Cleveland Lakefront Bikeway Connector - link the CFCT to the Cleveland Lakefront Bikeway.o Canal Basin Park Connector - links the CFCT to Canal Basin Park, Rivergate Park, GCRTA Waterfront Line Ra 1/1/ CUY Whiskey Island Connector N/A Re-Connecting Cleveland: Pathways To Opportunity project to construct the Whiskey Island Connector linking Wendy Park Bridge to Edgewater Park, three pedestrian tunnels and the Cleveland Lakefront bikeway in the City of Cleveland.o Related projects: $2,900,000 1/1/ CUY Prospect Ave Cleveland: E. 22nd to Carnegie Ave Repair and resurface Prospect Avenue from East 22nd Street to Carnegie Avenue in the City of Cleveland. 1/10/ CUY 17/94/ /10.05/13.96 Cleveland/Parma: SR-17 to IR-480 Highway Safety Improvement Project to improve traffic flow and reduce crashes on State Road (SR 94) by adding a WB right-turn only lane to Brookpark Road (SR 17), lengthening turn-slot storage on the I-480 WB exit to State Road, and reconfiguring travel l $2,446,402 $2,264,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

8 1/10/ CUY Queenswood Drive Bay Village Municipal Bridge Project for SFY 2019 to replace the Queenswood Drive bridge over Sperry Creek in Bay Village. $1,408,262 1/11/ CUY CLEVELAND TOWPATH TRAIL Ph 4N/A o Construct Stage 4 of the Cleveland Towpath Trail from Tremont/Literary Trailhead to Canal Basin Park.o SAFETEA-LU Earmarks: OH-214 and OH-322o FY 2006 Appropriation Earmark: OH-370 in PE Envo Related PIDs: 80997, $12,000,000 1/15/ CUY SR Parma; Ridgewood to SR-17 Resurface Broadview Rd (SR-176) from Ridgewood Drive to $1,550,000 Brookpark Road (SR-17) in Parma. 1/24/ CUY SR Richmond Hts; SCL to NCL Resurface Richmond Rd (SR-175) from the SCL to the NCL in $1,710,000 Richmond Hts. 1/24/ LAK SR Wickliffe, Willowick, Eastlake; County Line to E of SR-91 PM resurfacing of the Lakeland Freeway (SR-2) from the $3,300,000 Cuyahoga County Line to approx. SR-91 in Wickliffe, Willowick, and Eastlake. 1/24/ LAK SR L&R Eastlake; Over a stream west of SR-91 Replace the twin SR-2 bridges over a stream just west of SR-91 $1,070,000 in Eastlake. Work will include installing a 4-sided box structure thru the existing bridges. 1/24/ GEA SR Munson Twp; US-322 to Chardon SCL Resurface Ravenna Rd (SR-44) from Mayfield Rd (US-322) to $640,000 the Chardon SCL in Munson Twp. 1/24/ D12 CU FY2019 Various Culvert rehab/replacement: GEA ; replace 48x36 $400,000 concrete boxgea ; replace 60x30 concrete boxgea ; replace 36x36 concrete boxgea ; replace inlet pipes 1/24/ CUY SR Olmsted Twp; SCL to NCL Resurface Columbia Rd (SR-252) from the Olmsted Falls NCL to $400,000 the North Olmsted SCL in Olmsted Twp 1/31/ CUY US Bay Village; 1.29 mi W of SR-252 Replace the 85' Lake Rd (US-6) bridge over Cahoon Creek $2,900,000 located west of SR-252 in Bay Village. Repairs were done in /31/ CUY SR North Royalton; York Rd to ECL Resurface Royalton Rd (SR-82) from York Road to the ECL in $1,170,000 North Royalton. 1/31/ CUY IR 480N I-480 to US-422 Resurfacing from I-480 to US-422E/I-271N. $2,200,000 1/31/ CUY IR /VAR Paint Various Paint the structural steel of the I-271 mainline bridges over $3,000,000 Marsol and US /31/ CUY East 116th Street Cleveland Municipal Bridge Project for SFY 2019 to rehabilitate East 116th Street bridge over GCRTA in the City of Cleveland. Includes FTA 5337 State of Good Repair funds of $528,000 from PID which was deleted in Ellis. FHWA will be the primary federal age $1,412,640 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

9 2/21/ CUY US Cleveland; West 25th over IR-90 Replace the superstructure of the West 25th St (US-42) bridge over IR-90 in the City of Cleveland. Work will include installing shallower beams to gain vertical clearance on IR-90. See PID and PID for utility relocation. CUY $4,300,000 2/21/ LAK IR Rockefeller to W of SR-306 Resurface IR-90 from approximately Rockefeller Rd to the $6,720,000 concrete section west of SR-306 in Willoughby Hills, Waite Hill, and Willoughby. 2/21/ CUY IR L&R Cleveland; I-90 over GCRTA Painting structural steel. $3,700,000 2/21/ CUY SR Steel Cleveland; Over the Cuyahoga River Structural steel repair/retrofit on the Hope Memorial Bridge over the Cuyahoga River in the City of Cleveland. $11,500,000 2/21/ CUY East 49th Street/Harvard Ave Harvard Ave to Fleet Ave/ E. 55th to Washington/E. 49th Rehabilitate East 49th Street from Harvard Avenue to Fleet Avenue and Harvard Avenue from East 55th Street to Washington/East 49th Street in the Village of Newburgh Heights. $1,689,013 2/26/ CUY SR Widening SR-82 (East Royalton Rd) from east of SR-176 to Treeworth Blvd in Broadview Hts. Widen a section SR-82 from three-lane to a five-lane from east of Broadview Road (SR-176) to Treeworth Boulevard. The work include the construction of urban shoulder, curb and gutter, resurfacing, bike path, traffic signals, signs, and pavement markings. 3/1/ CUY SR Lakewood; N of IR-90 to West Clifton Resurface Riverside Drive (SR-237) from north of I-90 to West Clifton Blvd in Lakewood. 3/7/ GEA SR Munson Twp; S of US-322 over Butternut Creek Replace and widen the slab bridge on Ravenna Road (SR44) over Butternut Creek located 0.10 miles south of Mayfield Rd (US-322) in Munson Twp. 3/7/ GEA US Hambden Twp; Chardon ECL to SR-166 Resurface the GAR Highway (US-6) from the Chardon ECL to SR- 166 in Hambden Twp. 3/7/ CUY US East Cleveland; East of Superior Rehabilitate, replace, or otherwise upgrade the 15' stone arch drainage structure carrying Dugaway Brook under Euclid Avenue (US-6) located just east of Superior Avenue in East Cleveland. 3/7/ CUY EAST CLEVELAND SIGNALS East Cleveland - city wide MPO CMAQ Project: Upgrade and coordinate the traffic signals along Euclid Avenue in the City of East Cleveland. $5,952,519 $260,000 $865,000 $930,000 $350,000 $2,302,293 3/7/ CUY IR Middleburg Hts, Brook Park; US-42 to I-480 Resurfacing from Pearl Rd (US-42) to I-480. $4,500,000 3/7/ CUY IR Auxiliary Lane Middleburg Hts, Strongsville; I-71 SB from I-80 to SR-82 Add an auxiliary lane along southbound I-71 from the Ohio $1,475,000 Turnpike (I-80) entrance ramp to the SR-82WB exit, a distance of approximately 6200 between ramp terminals. Work will include converting the I-71 southbound exit to SR-82 westbound to a two-lane 3/15/ CUY NORTH MAIN STREET BRIDGE Chagrin Falls: North Main Street over Chagrin River CEAO LBR Project: Rehabilitate the North Main Street bridge (C.R. 264) over the Chagrin River in the Village of Chagrin Falls. Note that county is pursuing CBP credit. $3,691,600 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

10 3/21/ FACD12 Vrooman Outpost Vrooman Outpost Replace the existing salt storage shed and construct a cold storage building at the Vrooman Outpost in Lake county. $1,500,000 3/21/ GEA US Claridon Twp; SR-44 to SR-608 PM treatment of Mayfield Rd (US-322) from Ravenna Rd (SR- 44) to SR-608 in Munson and Claridon Twps. 3/21/ CUY IR Cleveland: IR-90/MLK Blvd Interchange o Safety Project: Improve traffic flow and reduce crashes at the IR-90 interchange at Martin Luther King Drive by extending two southbound lanes on MLK to East Blvd, signalizing the EB and WB ramp terminal intersections, modifying the EB exit to allow do 3/21/ CUY IR Barrier North Olmsted, Fairview Park; SR-252 to the Rocky River Replace the median barrier along I-480 from SR-252 to the Rocky River bridge in North Olmsted and Fairview Park. Work will include upgrading the median lighting. 3/21/ CUY Clark Ave Streetscape Cleveland: West 41st S and Quigley Ave Resurface Clark Avenue pavement between West 41st Street and Quigley Avenue and include streetscape improvements in the City of Cleveland. 4/4/ D12 BH FY2019 Misc Various routes and sections District-wide bridge repair project on multiple structures. Plans prepared under PID /4/ CUY US Cleveland; Over the Cuyahoga River Place a new wearing surface on the Detroit-Superior bridge in Cleveland. Other work includes substructure patching, fiber wrapping, railing repair, and other concrete repairs. 4/18/ CUY SR /05.51 North Olmsted; SR-17 to SR-10/SR-10 to NCL Resurfacing from SR-17 to Lorain Rd (SR-10) and from Lorain Rd to the North corp. limit in North Olmsted 4/18/ CUY IR Noise Barrier Miller Road to Highland Drive Construct sections noise barrier along IR-77 approximately between Miller Road and Oakes Road in the City of Brecksville. 5/1/ CUY Warrensville Ctr Rd Enhncmnt Norwood Rd to Thornton Park Warrensville Center Road Enhancement Project to streetscape and construct a multipurpose path from Norwood Road to Thornton Park in the City of Shaker Heights $950,000 $2,371,676 $3,000,000 $6,870,233 $3,500,000 $10,000,000 $700,000 $2,800,000 $3,000,000 5/2/ D12 TSG FY2019 Various routes & sections Various routes & sections $250,000 5/2/ LAK West Jackson St WCL to Richmond St Resurface West Jackson Street from Painesville WCL to $1,291,070 Richmond Street in the City of Painesville. Work will include signage and pavement markings to incorporate a share bicycle lane in both directions. 5/16/ D12 GR FY2019 Various routes & sections Guardrail upgrade contract $1,400,000 5/16/ D12 SIGN FY2019 Various routes & sections Sign structure repair $250,000 5/23/ CUY SR Cleveland; W.117th to West 65th St Resurface from West 117th St. to West 65th St. in Cleveland. $1,820,001 6/6/ D12 PPM FY2019 Various routes & sections Pavement PM project throughout the district $2,000,000 6/6/ D12 LG FY2019 Various routes & sections Lighting upgrade. $1,500,000 6/6/ D12 BH FY2019 Deck Sealing Various Deck sealing $1,585,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

11 7/1/ CUY Warrensville Ctr Rd Chagrin Blvd to Fairmount Blvd Resurface Warrensville Center Road from Chagrin Boulevard to Fairmount Boulevard in the City of Shaker Heights. $1,998,200 7/1/ CUY IR Drainage Cleveland; Ramp W-N to CSX RR Replace the barrier wall between the Ramp W-N bridge and the CSX bridge along EB IR-480 with a taller wall. Work will include adding catch basins behind the wall and installing a new 72" pipe from the catch basins to the 72" conduit beneath IR-480 east o 8/19/ CUY PORT AUTHORITY ACCESS RD N/A Design and construct road enhancements of the Cleveland Port Authority in the City of Cleveland.SAFETEA-LU Earmark 9/1/ GEA SR Culvert Troy Twp; between Patch and Mumford Replace culvert GEA on Tavern Rd (SR-168) Between Patch Rd and Mumford Rd. Work will include widening the shoulders for pedestrian traffic by enclosing the ditch line. 10/1/ GEA SR Safety Middlefield Twp; Hayes Rd to County Line Reconstruct the hill along SR-87 to improve vertical sight distance from Hayes Rd to the east as necessary. Work will include shoulder widening for Amish buggy use along a portion of the project. Resurfacing completed under PID Work should incl 10/1/ GEA SR Claridon Twp; S of US-322 Replace the concrete box beam superstructure of the SR-608 bridge over a creek located just south of US-322 in Claridon Twp. Work will include repairing or replacing the wing walls and other miscellaneous repairs. 10/1/ CUY IR CCG7A Cleveland: West 14th St to Jenning Fwy Construct a deceleration lane on IR-71 SB to the SR-176 exit ramp. Split off from PID 82378, CUY Innerbelt CCG7 Jennings. 10/1/ LAK IR /01.45 Willoughby Hills; Over Eddy Rd/Over I-271 Replace the ramp bridges from I-271 NB to I-90 WB over Eddy Rd and mainline I-271 in Willoughby Hills. Work will include new structures on a new alignment. 10/1/ CUY East 116th/Harvard Signal CUY E. 116th St/Harvard intersection, City of Cleveland, at the CCRL grade crossing DOT # C. Upgrade the traffic signal at the south leg of the East 116th/Harvard Rd intersection to be interconnected with the preemption at Cleveland Commercial Railroad grade crossing DOT # C. See PID Paint the structural steel of 11 bridges in the IR-71/IR-480/SR- 237 interchange in Cleveland and Brook Park. 1/1/ CUY IR /VAR Paint Cleveland, Brook Park; Various structures in the IR- 480/71/237 interchange 1/1/ CUY IR Lakewood, Cleveland; Rocky River to IR-71 Resurfacing from the Rocky River to West 44th St in Lakewood and Cleveland. 1/1/ CUY IR /VAR Cleveland, Euclid; SR-283 to SR-2/IR-90 to the Cnty Line Resurfacing from Lakeshore Blvd to SR-2 in Cleveland and Euclid. Includes SR-2 from IR-90 to the County Line. $500,000 $2,047,500 $400,000 $2,040,000 $545,000 $6,000,000 $9,500,000 $150,000 $7,700,000 $10,000,000 $9,800,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

12 1/1/ CUY IR North Olmsted, Fairview Park; County Line to the Rocky PM resurfacing from the Lorain County Line to the Rocky River $7,650,000 River bridge in North Olmsted and Fairview Park. Includes lighting upgrade. 1/1/ CUY IR Maple Hts, Bedford Hts; Lee Rd to IR-271 Resurfacing IR-480 from Lee Road to IR-271 in Maple Hts and $4,000,000 Bedford Hts. 1/1/ CUY CARTER ROAD Cleveland: Carter Road over Cuyahoga River Rehabilitation of the Carter Road lift bridge over the Cuyahoga $2,007,000 River in the City of Cleveland. 1/1/ CUY IR /24.63 Cleveland; Over E.140th and E.152nd Replace the decks of the mainline IR-90 bridges over East $9,100, th St and East 152nd St in Cleveland. Work will include painting the structural steel. 1/1/ CUY IR /VAR Paint Cleveland; IR-90 bridge painting Paint the structural steel of 9 mainline bridges on I-90 in $4,600,000 Cleveland 1/1/ CUY LAKE LINK TRAIL N/A Construct the Greenway Corridor Trail (a.k.a Cleveland $7,962,883 Mahoning Trail) along the abandoned railroad right-of-way in the Flats from the Towpath Trail along Irishtown Bend underneath the Main Avenue bridge crossing the Willow Street bridge to a proposed ped 1/1/ CUY US 042 Signals Middleburg Hts: N/A Coordinated Signal System Upgradeo NOACA Project Name: CUY US 42 (Pearl Rd) Tri-City Traffic Signal Coordination $1,843,000 1/1/ LAK IR 090/SR 528 Enhancement Village of Madison: IR-90 and SR-528 (River Street) Madison Gateway Enhancement: Landscaping and signage that will expose the area's viniculture and landscaping nursery industries.o NOACA Enhancement Project 1/1/ GEA BUNDYSBURG ROAD BRIDGE Bundysburg Road over Swine Creek in Parkman Township CEAO LBR Project: Replace the Bundysburg Road bridge over Swine Creek in Parkman Townshipo 2018 County LBR Project using Credit Bridge Program credit. 1/1/ CUY Strongsville Signals Strongsville; Various routes & sections City-wide signal upgrade project along SR-82 and US-42 in the City of Strongsville. 1/1/ GEA Mentor Rd G-K Chardon Twp: SR-44 to Lake County NOACA STP Project to resurface Mentor Road (CH 5N) Section G-K from the Chardon Village north corporation line to the Lake County Line. 1/1/ GEA MUNN ROAD Auburn Twp: Washington St to Stafford Rd NOACA STP Project to resurface Munn Road (CH 32) Section D from Washington Street to Stafford Road in Auburn Township. 1/1/ GEA WASHINGTON STREET (G-J) Auburn Twp: Munn Rd to Ravenna Rd NOACA STP Project to resurface Washington Street (CH 606, Section G-J) from Munn Road to Ravenna Road in Auburn Township. 1/1/ LAK SR Madison Twp; SR-528 to the Cnty Ln Chip seal from SR-528 to the Ashtabula County Line in Madison Twp. 1/1/ GEA SR Middlefield, Claridon, Huntsburg Twps; NCL to Cuyahoga River PM treatment to SR-608 from the Middlefield NCL to the Cuyahoga River in Middlefield, Huntsburg, and Claridon Twps $143,448 $463,600 $1,688,188 $970,000 $408,000 $3,880,000 $650,000 $700,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

13 1/1/ LAK SR Fairport Harbor, Painesville Twp; Corp line to US-20 Resurfacing from the Painesville Corp Line to US-20 in Fairport $1,100,000 Harbor and Painesville Twp. 1/1/ GEA SR Chester Twp; US-322 to Cnty Ln Resurface Chillicothe Rd (SR-306) from Mayfield Rd (US-322) $1,200,000 to the Lake County Line in Chester Twp. 1/1/ LAK Waite Hill Bridge Waite Hill Road over the Chagrin River Replace the existing Waite Hill Road bridge over the Chagrin $1,896,300 River in the Village of Waite Hill.o CEAO LBR Project for 2020o Federal/State exchange project 1/1/ FACD12 Geauga FSMF N/A of a new Geauga County FSMF on Tare Creek Parkway in Middlefield to replace the existing Burton facility. $9,000,000 1/1/ CUY IR /VAR Paint Various Paint the structural steel on multiple bridges along I-271: Harvard, Chagrin, Fairmount, Cedar, Brainard, and Lander. 1/1/ CUY SR Slide Repair Fairview Park; east of W. 192nd Street Slope repair and roadway stabilization by installing a drilled shaft retaining wall on the south side of Lorain Road just east of W. 192nd Street. 1/1/ LAK IR Slide Repair Willougby Hills: east of Maplegrove Road Slope repair on the north side of IR-90 just east of Maplegrove Road 1/1/ GEA Maple Highlands Trail II SR-44 to Water Street Maple Highlands Trail Phase II - Construct a multi-purpose trail from SR-44 to Water Street (0.86 mile) which will complete the missing section of the Geauga County Maple Highlands Trail network through the City of Chardon. $8,000,000 $550,000 $500,000 $1,547,811 1/1/ D12 MOW FY2020 Various routes & sections Mowing $800,000 1/1/ CUY SRTS FY2016 Cleveland N/A SRTS Infrastructure Project to construct sidewalk and path ranging from 5 to 8 feet in width and improve signals and crosswalks in priority corridors near Cleveland City Schools $363,640 1/1/ CUY SRTS FY2020 Cleveland Hts N/A SRTS Infrastructure Project to improve sidewalks, signals and crossings at five (5) locations in the Cleveland Heights/University Heights schools. 1/1/ CUY SRTS FY2020 Euclid N/A SRTS Infrastructure Project to install sidewalks, improve crosswalk markings for visibility and accessibility in the Euclid city shcools. 1/1/ CUY SRTS FY2020 Rocky River N/A SRTS Infrastructure Project to improve crossings by adding pedestrian countdown signals and sidewalks around intersections on priority corridors in the Rocky River School District. 1/1/ CUY Memphis Avenue Memphis Avenue over CSXT RR CEAO LBR Project: Replace the Memphis Avenue Bridge over the CSXT Railroad in the City of Brooklyn. $223,000 $107,500 $153,000 $2,979,400 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

14 1/1/ CUY Johnston Mill Run Trail I Miles Ave to Lee Rd/Krruish Park Johnston Mill Run Trail Phase 1 is the construction of off-road, $1,298,700 paved, multi-purpose bike and pedestrian shared-use path from Miles Avenue to Lee Road and Kerruish Park in the Cities of Cleveland and Garfield Heights. 1/1/ CUY Warrensville Ctr Rd Broadway Avenue to IR-480 Resurface Warrensville Center Road from Broadway Avenue to IR-480 in the Cities of Bedford and Maple Heights. $2,697,570 1/1/ CUY US Valley Parkway to West 130th Street Resurface Pearl Road (US-42) from Valley Parkway to West 130th Street in the Cities of Strongsville and Middleburg Heights. 1/1/ CUY US West 130th Street to Snow Road Resurface Pearl Road (US-42) from West 130th Street to Snow Road in the Cities of Parma and Parma Heights. 1/1/ CUY Lorain Ave Complete Streets W 20th St to W 65th St Lorain Avenue (SR-10) Complete Streets project to enable safe access for all users, including pedestrians, bicyclists, motorists and transit riders of all ages and abilities from W. 20th Street to W. 65th Street in the City of Cleveland. 1/1/ CUY Scranton Rd Sackett Avenue to Fairfield Avenue Repair and resurface Scranton Road from Sackett Avenue to Fairfield Avenue in the City of Cleveland. 1/1/ CUY Scranton Rd Cleveland: Sackett Rd to Fairfield Ave Repair and resurface Scranton Road from Sackett Road to Fairfield Avenue in the City of Cleveland. 1/1/ CUY Coit Rd Cleveland: Kirby Ave to St. Clair Ave Repair and resurface Coit Road from Kirby Street to St. Clair Avenue in the City of Cleveland. 1/16/ CUY SR /06.70 Garfield Hts; Over Mill Creek Rehabilitate two (2) Broadway Ave (SR-14) bridges over Mill Creek in Garfield Hts. Combined with PID /1/ CUY NORTH OLMSTED SIGNALS PH 2 North Olmsted: Various route within the city MPO CMAQ Project: Upgrade the traffic signals and signal system along Brookpark Road (SR-17), Columbia Road (SR- 252), and Butternut Ridge Road in the City of North Olmsted. This is phase 2 of the city's city wide signal upgrade plan. Also see PID fo 3/1/ CUY Multi-Purpose Trail Phase 3 Cuyahoga Hts Village of Cuyahoga Heights Multi-Purpose Trail - Phase 3 is a project to construct a multi-purpose trail (1300 L.F.) starting at the end of Phase 2 of the Village's Multi-Purpose Trail (approximately half-mile north of Canal Road) to just east of East 71 3/2/ LAK VROOMAN ROAD Leroy Twp: SR-86 (Painesville-Warren Rd) to IR-90 Resurface Vrooman Road from SR-86 (Painesville Warren Road) to IR-90 a distance of 1.2 miles more or less in Leroy Township. 3/3/ LAK MADISON AVE Painesville Twp: Painesville City corp line to SR-84 MPO STP Project: Resurface Madison Avenue (CR-306) from the Painesville City corporation line to SR-84 a distance of 2.21 miles more or less in Painesville Township. $5,963,263 $4,497,128 $5,500,000 $2,587,936 $2,587,937 $919,645 $2,400,000 $3,885,820 $801,000 $1,455,000 $1,557,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

15 3/15/ CUY SR Lyndhurst; SCL to US-322 Concrete pavement repairs to Richmond Road (SR-175) from $520,000 Cedar Road to Mayfield Road (US-322) in the City of Lyndhurst. 4/1/ CUY IR Cleveland; Over NS RR and Train Avenue Paint the IR-90 mainline bridge over the NS RR and Train $11,000,000 Avenue in Cleveland. Work will include structural steel repairs. 4/1/ CUY SR Cleveland; SCL to Broadway Resurfacing Miles Road from the Warrensville Hts corp line to Broadway Avenue in Cleveland. $2,730,000 4/1/ LAK METROPARKS PEDESTRIAN BRIDGLake Metroparks bike/hike trail over NS RR just west of Liberty St in Painesville o Construct an overhead crossing (bridge and approaches) over the Norfolk & Southern Railroad tracks that would connect two sections of Lake Metroparks 4.5 mile Greenway Corridor.o 2009 Appropriation Act Earmark OH392o SAFETEA- LU Earmark OH175 $2,593,350 4/1/ CUY IR Barrier Various section along IR-71 in Cuyahoga County Replacement of the concrete median barrier on IR-71 from $4,000,000 SLM 6.10 to /1/ CUY IR /23.71 Barrier Cleveland; Various sections on IR-90 Median barrier: Repair/replace concrete median barrier on I- $7,000, from SLM to 14.40, and from SLM to Split from PID /1/ CUY SR Garfield Hts; WCL to ECL Resurface from the WCL to the ECL in Garfield Hts $1,770,000 4/1/ CUY SR Cleveland, Parma, Brooklyn; West 130th to ECL Resurface Brookpark Rd (SR-17) from West 130th St to the Brooklyn Hts West corp limit in Cleveland, Parma, Brooklyn and a small section of Brooklyn Hts. $4,240,000 4/1/ CUY INTERMODAL TRANSIT CENTER Shaker Heights; ITC at Warrensville/Northfield/Van Aken/Chagrin intersection Construct an Intermodal Transit Center at the end of the extended Blue Line in Shaker Heights. Split from PID $40,000,000 4/1/ CUY SR Slide Gates Mills; SR-174 south of Rodgers Rd GSM Project: Stabilization of the slope on Chagrin River Road $432,813 (SR174), just south of Rodgers Road, in the Village of Gates Mills. Work includes installation of sheet pile or segmental retaining wall (based on geotechnical investigation and recommendation 4/1/ D12 BH FY2020 Deck Sealing Various Deck sealing $2,150,000 4/1/ CUY York Rd/Bennett Road North Royalton: York Road to Bennett Road Ohio Turnpike Mitigation Project in the City of North Royalton $117,000 to 1) re-establish ditch lines to intercept the drainage from the turnpike in the area of York Road to Bennett Road, 2) clean a storm culvert and rebuild/replace a manhole west of York Road an 4/1/ CUY JOHN NAGY BOULEVARD Cleveland Slope restoration along John Nagy Boulevard adjacent to Big $2,000,000 Creek in Cleveland. 4/1/ CUY IR Superstructure Westlake; I-90 over Tuttle Creek Replace the superstructure (slab) of the IR-90 bridge over $1,900,000 Tuttle Creek in Westlake. 4/1/ D12 BH FY2020 Misc Various routes and sections District-wide bridge repair project on multiple structures $2,500,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

16 4/1/ D12 GR FY2020 Various routes & sections Guardrail upgrade contract $1,400,000 4/1/ D12 LG FY2020 Various routes & sections Lighting upgrade. $1,500,000 4/1/ D12 PM FY2020 Various routes & sections Pavement marking contract for D-12 $2,200,000 4/1/ D12 SIGN FY2020 Various routes & sections Sign structure repair $250,000 4/1/ D12 PPM FY2020 Various routes & sections Pavement PM project throughout the district $2,000,000 4/1/ CUY US Pipe Cleveland; Over the Cuyahoga River Repair the drain pipe located in the southwest slope of the $400,000 Veterans Memorial Bridge. Plan preparation will be done under PID /1/ CUY EAST 9TH STREET Removal Cleveland; Over RTA Remove the bridge structure over the GCRTA tracks located $400,000 just west of "new" East 9th Street in Cleveland. 4/1/ CUY IR Deck Clevel; W. 44th over I-90 Replace the deck of the West 44th St bridge over I-90 in $3,500,000 Cleveland. 4/1/ D12 CU FY2020 Various Culvert rehab/replacement: GEA ; replace 96X 24 concrete boxlak ; replace 53X102 sandstone box $610,630 4/1/ GEA US Slope East of Chagrin River Road Slope repair along WB US-422 just east of Chagrin River Rd. $500,000 4/1/ CUY SR Brecksville; Creek to ECL Resurfacing from Chippewa Creek to the County Line in $850,000 Brecksville 4/1/ CUY IR 480N Barrier Multiple LPA; I-480 to Green Road Replace the median barrier along I-480N from IR-480 to Green Road in Warrensville Hts, Maple Hts, Bedford Hts, and North Randall. $400,000 5/1/ CUY OLD ROCKSIDE ROAD BRIDGE Independence: Old Rockside Road over the Cuyahoga River Municpal Bridge Project: Replace the Old Rockside Road bridge over the Cuyahoga River in the City of Indpendence. The new structure will provide a 10-feet of width for pedestrian and bicycle traffic. $3,906,000 6/1/ CUY/SUM/STA/TUS Canalway SignageN/A Phase 2: Installation of informational signs and kiosks along the 110-mile Ohio & Erie Canal Way Scenic Byway in Cuyahoga, Summit, Stark, and Tuscarawas counties.earmark ID: SB0606 (SB-2006-OH-6) $646,289 6/1/ D12 TSG FY2020 Various routes & sections Various routes & sections $250,000 9/1/ CUY SOUTH GREEN RD SIGNALS South Euclid: Cedar Rd to Monticello Blvd 2013 NOACA CMAQ Project: Upgrade and replace obsolete traffic signal equipement at the existing signalized intersections along South Green Road between Cedar Road and Moniticello Boulevard in the City of South Euclid. $1,883,622 10/1/ GEA US US-322 and Auburn Road Highway Safety Project to improve the US-322 (Mayfield Road) and Auburn intersection by constructing exclusive left-turn lanes on all approaches and improving the signal head visibility within Munson Township. 11/1/ LAK SR Deck Willoughby; Over I-90 Replace the deck of the SR-306 bridge over IR-90 in Willoughby. Includes painting the structural steel $1,627,000 $8,000,000 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

17 1/1/ LAK SR L&R Wickliffe; Over Worden Rd Replace the mainline SR-2 slab bridges over Worden Rd in the $3,000,000 City of Wickliffe. 1/1/ CUY IR Paint Rocky River, Lakewood; Over the Rocky River Paint the structural steel of the mianline IR-90 bridge over the $30,000,000 Rocky River in Rocky River and Lakewood. Major Bridge Program 1/1/ CUY IR Cleveland; SR-2 to East 55th Street Resurface the East Shoreway (IR-90) from the Innerbelt Curve $1,800,000 to East 55th Street in Cleveland. 1/1/ CUY IR Cleveland; Bridge to W. 139th PM resurfacing from the Rocky River Bridge to West 139th St $4,200,000 in Cleveland. Includes lighting upgrade. 1/1/ CUY IR Cleveland; I-480 to the Brooklyn Corp Line PM resurfacing from IR-480 to the Brooklyn Corp Line. $5,200,000 Inlcudes lighting upgrade. 1/1/ GEA SR Troy Twp; County Line to US-422 Resurface Claridon-Troy Rd (SR-700) from the Portage County $870,000 Line to US-422 in Troy Twp. 1/1/ LAK SR Concord Twp; County Line to Painesville-Ravenna Rd Resurface Concord-Hambden Rd (SR-608) from the Geauga County Line to Painesville-Ravenna Rd in Concord Twp. $830,000 1/1/ CUY SR Cleveland; Bridge to IR-90 Resurface the Shoreway from the Main Avenue Bridge to IR- $3,100, in Cleveland. 1/1/ CUY/LAK IR /00.00 Highland Hts, Mayfield, Willoughby Hils; S of Wilson Mills PM resurfacing of mainline IR-271 from south of Wilson Mills $3,800,000 to IR-90 Rd. to IR-90 in the Cities of Highland Hts. and Willoughby Hills and the Village of Mayfield. 1/1/ CUY IR Deck Cleveland; Scranton Ave over IR-90 Replace the deck of the Scranton Avenue bridge over IR-90 in $4,650,000 Cleveland. Includes painting the structural steel. 1/1/ GEA SR Thompson Twp; SR-528 to Cnty Ln Resurfacing from SR-528 to the Lake County Line in Thompson $780,000 Twp. 1/1/ GEA US Hambden, Montville Twps; SR-166 to the Cnty Ln Resurfacing of the GAR Highway from SR-166 to the County $1,200,000 Line in Hambden and Montville Twp. 1/1/ LAK US Madison Twp; Townline Rd to the County Line Resurface North Ridge Rd (US-20) from Townline Rd to the $5,100,000 Ashtabula County Line in Madison Twp. 1/1/ GEA SR Bainbridge, Russell Twps; Washington St to SR-87 Resurfacing from Washington St in Bainbridge Twp to Kinsman $850,000 Rd (SR-87) in Russell Twp. 1/1/ D12 BH FY2021 Deck Sealing Various routes and sections Bridge deck sealing $1,000,000 1/1/ CUY SR Cleveland, Brooklyn Hts; SR-17 to N of Schaaf Replace the concrete pavement in the I-480/SR-176 $12,000,000 interchange in Cleveland and Brooklyn Heights; create new access points for SR 176 SB to enter I-480 EB quicker; modify legs entering SR 176 NB such that one full lane enters from Brookpark Road, I-480 EB, 1/1/ LAK Markell Road Bridge Waite Hill: Markell Rd over E. Branch Chagrin River Replace the Markell Road bridge over the East Branch of the Chagrin River approximately 0.5 mile west of SR-306 in the Village of Waite Hill.o This project has been approved for the Federal/State Exchange Program. $1,454,200 10year_Jan2018thruJan of 27 MJH_All Projects for PIO_excel.qry

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM TO: FROM: NOACA Board of Directors Grace Gallucci, Executive Director DATE: October 3, 2014 RE: Resolution No. 2014-044 Project Planning Reviews 1

More information

Proposed ODOT Construction Projects 2/1/11 thru 6/18/20

Proposed ODOT Construction Projects 2/1/11 thru 6/18/20 87466 D12 LG FY2011 Various routes & sections Annual contract to upgrade the lighting at various locations throughout District 12 based on systematic inspections. $290,000 2/24/2011 12075 CUY SR 176 12.67

More information

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

CUY LAKE TO LAKES TRAIL (PHASE 2): PID 1299 Superior Avenue Cleveland, Ohio 44114 216-241-2414 (extension 287) 216-621-3024 (fax) emay@mpo.noaca.org NOACA MEMORANDUM To: Melinda Bartizal (216) 584-2087 From: Ed May (216) 241-2414 ext. 287 Date:

More information

Proposed ODOT Construction Projects 10/1/12 thru 6/18/22

Proposed ODOT Construction Projects 10/1/12 thru 6/18/22 10/4/2012 82759 LAK SR 002 12.62 Mentor; Heisley Rd over SR 2 Replace the deck of the Heisley Road bridge over SR 2 in the $4,000 City of Mentor. 10/4/2012 93980 CUY SR 002 14.41 Bridge Repair Cleveland

More information

Buckeye Health Plan Community Solutions Allwell Medicare 2018 Preferred Pharmacy Listing

Buckeye Health Plan Community Solutions Allwell Medicare 2018 Preferred Pharmacy Listing Buckeye Health Plan Community Solutions Allwell Medicare 2018 Preferred Listing This Preferred Listing was updated on 09/27/2017. For more recent information or other questions, please contact Allwell

More information

Federal Aid # Termini

Federal Aid # Termini ROAD FEDERAL AID 2/26/2013 902 Ridge Road I 480 to Memphis 82566 County Brooklyn 8,309,354 10/16/2013 1027 Belvoir Blvd Fairmount Blvd. to Mayfield Rd 92121 County University Heights; South Euclid 3,614,497

More information

01 Central Akron: State Route 8 on the east. I-76 on the south, west on I-76 to East Blvd,

01 Central Akron: State Route 8 on the east. I-76 on the south, west on I-76 to East Blvd, SP A linguistic (floating) district of Spanish speaking groups in Area 54. 01 Central Akron: State Route 8 on the east. I-76 on the south, west on I-76 to East Blvd, north to Diagonal Rd. and Portage Path,

More information

Bike_NoHelm_AVG_2011 Bike_Sdwlk_AVG_2011 Ped_Tot_AVG_2011. Bike_Male_AVG_2011. Bike_Fem_AVG_2011. Bike_Tot_AVG_2011.

Bike_NoHelm_AVG_2011 Bike_Sdwlk_AVG_2011 Ped_Tot_AVG_2011. Bike_Male_AVG_2011. Bike_Fem_AVG_2011. Bike_Tot_AVG_2011. Bike_Tot_AVG_2011 Location_ID Location Muni Muni_Type County 10101 Fairmount_W_Richmond Beachwood City CUY 4 5 2016 12 10 2 1 2 13 0 24 25 24 1 2 4 12 3 37 10102 SWoodland_W_Richmond Beachwood City CUY

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

OGS FINDING AIDS. Title: Cuyahoga County, Ohio Plat Maps OHIO GENEALOGICAL SOCIETY

OGS FINDING AIDS. Title: Cuyahoga County, Ohio Plat Maps OHIO GENEALOGICAL SOCIETY OHIO GENEALOGICAL SOCIETY 611 State Route 97 W Bellville OH 44813-8813 419-886-1903 www.ogs.org OGS FINDING AIDS Users of this collection should credit the Ohio Genealogical Society in any reference citing.

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

GEAUGA COUNTY POLLING LOCATIONS TOWNSHIP/VILLAGE PRECINCTS POLLING LOCATION ADDRESS CITY ZIP PHONE

GEAUGA COUNTY POLLING LOCATIONS TOWNSHIP/VILLAGE PRECINCTS POLLING LOCATION ADDRESS CITY ZIP PHONE GEAUGA COUNTY POLLING LOCATIONS -- 2015 TOWNSHIP/VILLAGE PRECINCTS POLLING LOCATION ADDRESS CITY ZIP PHONE 2015 AUBURN TWP A, B, C, D, E Adam Hall 11455 Washington St. (east of Auburn Rd.) Chagrin Falls

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Aetna "Select Provider" Listing - Ambulatory Surgery Cleveland - January, CSA St. Vincent Charity Hospital

Aetna Select Provider Listing - Ambulatory Surgery Cleveland - January, CSA St. Vincent Charity Hospital OHIO ASHTABULA COUNTY Ashtabula Ashtabula County Medical 6460140, 34194 2420 Lake Avenue Ashtabula, OH 44004 Phone: 440-997-2262 CUYAHOGA COUNTY Beachwood Cleveland for Digestive Health & Endoscopy, LLC.

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34 Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

More information

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations Rapid Transit Facilities 1 1.T.2 Brookpark Road Station Reconstruct and reconfigure the Brookpark Road station. 1 1.T.5 Puritas Avenue Station Reconstruct and reconfigure the Puritas Avenue (West 150th

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road. Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

East Cleveland/ Bratenahl

East Cleveland/ Bratenahl E 106TH ST East / Bratenahl EAST 105TH ST.! Station Type: Urban, bus transfer station! Site: E. 105th St. & Dupont Ave.,! Serves: east side, East, Bratenahl! urrent Land Use: Parking lot (private) & RTA

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 3 2017 CONSTRUCTION PROGRAM Crawford Richland SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES Erie Lorain Huron Medina Ashland Wayne JOHN R. KASICH, OHIO

More information

Aetna "Select Provider" Listing - Ambulatory Surgery Cleveland - January, 2013

Aetna Select Provider Listing - Ambulatory Surgery Cleveland - January, 2013 OHIO ASHTABULA COUNTY Ashtabula Ashtabula County Medical 6460140, 34194 2420 Lake Avenue Ashtabula, OH 44004 Phone: 440-997-2262 CUYAHOGA COUNTY Beachwood Cleveland for Digestive Health & Endoscopy, LLC.

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

STORES ADDRESS TUES WED THURS FRI SAT ACME #15 AKRON 3979 MEDINA RD, AKRON, OH X X #20 PARMA 1225 PLEASANT VALLEY RD.

STORES ADDRESS TUES WED THURS FRI SAT ACME #15 AKRON 3979 MEDINA RD, AKRON, OH X X #20 PARMA 1225 PLEASANT VALLEY RD. STORES ADDRESS TUES WED THURS FRI SAT ACME #15 AKRON 3979 MEDINA RD, AKRON, OH X X #20 PARMA 1225 PLEASANT VALLEY RD., PARMA, OH X X BUEHLER'S FOREST MEADOW 275 FOREST MEADOW RD., MEDINA, OH 44256 X RIVERSTICKS

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

District One Contacts

District One Contacts District 1 District One Contacts Kirk Slusher District Deputy Director 419-999-6804 kirk.slusher@dot.state.oh.us Dan Kaseman District Planning & Engineering Administrator 419-999-6861 dan.kaseman@dot.state.oh.us

More information

142 Collaborative Actions by County June 28, 2011

142 Collaborative Actions by County June 28, 2011 New Release! History of the Project... 142 s by County June 28, 2011 The KSU Center expresses its appreciation to the Fund for our Economic Future, The Knight Foundation, and the Civic Commons for their

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area KALAMAZOO AREA TRANSPORTATION STUDY FY 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM MARCH 2019 AMENDMENTS The program is developed using the continuing, What is the TIP? cooperative, and comprehensive

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

Whittier Bridge Project

Whittier Bridge Project Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits

More information

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal of Ohio - Department of Transportation Page: 1 : 08/02/18 180411 Warren /CLI-IR 71-07.05/00.00 $17,632,000.00 106242 FOUR LANE RESURFACING 8/30/2019 E180(162) BARRETT PAVING MATERIALS 3751 COMMERCE DR,

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E. P3 & Design-Build 101 st Annual THE Conference February 25 th, 2015 Speaker: Andrew Gensch, P.E. Presentation Outline Ohio River Bridges Project Overall Discussion Downtown Crossing and East End Locations

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019 City of Madera Engineering Division Citizen s Oversight Committee February 13, 2019 INTRODUCTION The City of Madera uses Measure T funds to support various programs as outlined in the Annual Expenditure

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

THE CANAL BASIN DISTRICT PLAN

THE CANAL BASIN DISTRICT PLAN T h e C a n a l B a s i n D i s t r i c t P l a n, C l e v e l a n d, O h i o - 2 0 0 9 F i n a l R e p o r t The Canal Basin District Plan creates a new green infrastructure for the city of Cleveland,

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness, From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION ODOT ODOT DISTRICT 7 2018 CONSTRUCTION DISTRICT 7 PROGRAM 2018 CONSTRUCTION PROGRAM SERVING AUGLAIZE, CHAMPAIGN, CLARK, DARKE, LOGAN, MERCER, MIAMI, MONTGOMERY & SHELBY COUNTIES JOHN R. KASICH, OHIO GOVERNOR

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

Case: 2:06-cv ALM-TPK Doc #: Filed: 05/30/12 Page: 1 of 41 PAGEID #: 6729

Case: 2:06-cv ALM-TPK Doc #: Filed: 05/30/12 Page: 1 of 41 PAGEID #: 6729 Case: 2:06-cv-00896-ALM-TPK Doc #: 277-12 Filed: 05/30/12 Page: 1 of 41 PAGEID #: 6729 Page 1 of 41 A.J.RICKOFF SCHOOL 3500 E. 147TH STREET CLEVELAND, OH 44120 CLEVELAND -01-A CLEVELAND -01-K CLEVELAND

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All

More information

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 Project Description Phase Milwaukee Milwaukee 24 2016307 2200-13-70 WEST HIGHLAND AVENUE, CITY OF

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013 Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013 Cleveland Innerbelt Construction Schedule former schedule 2011 Winter Begin Construction Innerbelt CCG1 (WB Bridge)

More information

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Bispham Street Bridge over Rancocas Creek (DB # D0806) OTHER CON $1.000 $1.000 $0.000 N/A $1.000 Hanover Street Bridge over Rancocas Creek, CR 616 (DB # D9902) STP-STU CON $3.240 $0.000 $0.000

More information

I-70/I-71 Project Public Meeting Presented By

I-70/I-71 Project Public Meeting Presented By I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010 W e l c o m e Thom Slack Planning Administrator,

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

Federal State PID Number. Letting Date 8/9/ /19/2019 E170(418) Ashland HUR /HUR CHIP FY2019. CHIP SEAL DBE Goal

Federal State PID Number. Letting Date 8/9/ /19/2019 E170(418) Ashland HUR /HUR CHIP FY2019. CHIP SEAL DBE Goal of Ohio - Department of Transportation Page: 1 : 08/09/18 180447 $703,000.00 98252 7/19/2019 E170(418) Ashland HUR /HUR CHIP FY2019 CHIP SEAL MELWAY PAVING CO INC 7571 ST RT 83, HOLMESVILLE, OH 44633 $582,292.06-17.17

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $0.856 09/04/2013 County Route 528 Roundabout

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information