1 10/4/ LAK SR Mentor; Heisley Rd over SR 2 Replace the deck of the Heisley Road bridge over SR 2 in the $4,000 City of Mentor. 10/4/ CUY SR Bridge Repair Cleveland Memorial Shoreway over the Cuyahoga River, Main Avenue Bridge gusset plate retrofit. An expedited sale $650,000 Flats, and GCRTA Railroad will be requested. 10/5/ CUY ROCKSIDE ROAD Turney Road to Broadway Avenue in the cities of Garfield Resurface Rockside Road from Turney Road to Broadway $5,066,919 Hts, Maple Hts, and Bedford Avenue.o NOACA STP Project 11/8/ D12 MOW FY2013 District Wide FY 2013 District Wide Mowing Contract $400,000 11/29/ CUY MADISON AVE/WEST 61ST ST Cleveland: 0.04 mile east of West 65th Street * Remove existing highway superstructure and piers on $2,940,000 Madison Avenue over NS and GCRTA railroad tracks and replace with a pedestrian bridge.* Rehabilitate the West 61st Street pedestrian bridge over NS railroad tracks. Will be sold with PID [NOACA 11/29/ CUY West 74th STREET Cleveland: between Pear Avenue and Wakefield Avenue. o Replace superstructure of the West 74th Street Bridge (160 $2,416,756 ft) over NS/CSX Railroad and GCRTA located between Pear Avenue and Wakefield Avenue in the City of Cleveland.o NOACA STP Project 11/29/ CUY US Cleveland; US 42 over I 71 Replace the deck of the West 25th street bridge over I 71 in the City of Cleveland. Includes widened sidewalks and bike lanes. $3,005,000 11/30/ CUY GENERATOR PURCHASE Various Purchase new generators for the District Office (Facility Project # F12231) and Riveredge Yard (F12232). 12/7/ CUY/SUM/STA/TUS Canalway Signage N/A Phase 2: Installation of informational signs and kiosks along the 110 mile Ohio & Erie Canal Way Scenic Byway in Cuyahoga, Summit, Stark, and Tuscarawas counties.earmark ID: SB0606 (SB 2006 OH 6) 12/13/ CUY IR E Cleveland; West 150th Exit ramp Replace the superstructure of the West 150th St. NB exit ramp over West 154th St. in the City of Cleveland. 1/1/ CUY SNOW ROAD Cities of Parma and Parma Heights from West 130th Street NOACA STP Project: Resurface Snow Road (CR 87) from West to Ridge Road 130th Street to Ridge Road in the cities of Parma and Parma Heights. 1/10/ LAK US Madison Twp: Along US the intersection of Green Road FY2013 Maintenance Project: Replace sections of 24" corrugated plastic pipe on the south side of US 20 at the Green Road intersection. 1/17/ CUY IR /VAR Cleveland; Brooklyn ECL to the Innerbelt Bridge Preventive Maintenance (pavement overlay) of I 71 from just west of Ridge Road (Brooklyn East Corp. Limit) to the Innerbelt Bridge in the City of Cleveland. 1/17/ CUY CLEMENS ROAD Clemens Road and Crocker Rd./Bassett Road intersection in the City of Westlake Construct a Clemens Road by pass and an exclusive southbound right turn lane for the IR 90 westbound ramp at the Crocker Road interchange in the City of Westlake. See also PID for work that is within the limited access. 1/17/ CUY IR Lakewood, Cleveland; Rocky River to W. 44th PM resurfacing from the Rocky River in Lakewood to West 44th St in Cleveland. $327,000 $646,289 $905,000 $6,355,800 $90,000 $3,700,000 $3,734,063 $8,000,000 1 of 22 PIO_10year.xls

2 1/17/ CUY IR City of Westlake: IR 90 and Crocker Rd/Bassett Rd Construct an exclusive right turn lane on Crocker Road $1,315,640 interchange to Clemens Road southbound to the IR 90WB entrance ramp and an additional right turn lane on the I 90WB exit ramp at the IR 90 Crocker Road/Bassett interchange in the City of Westlake. Work within the limited access 1/17/ CUY US 006A Rocky River, Lakewood; Detroit over the Rocky River Install a debris containment system below the Detroit Rd (US 6A) bridge over the Rocky River in Lakewood and Rocky River. $450,000 1/31/ CUY HARVARD AVENUE Cleveland; At East 103rd Street over the W&LE Railroad Rehabilitate the Harvard Avenue Bridge over the W&LE Railroad located at East 103rd Street in the City of Cleveland. CITY'S BR 1/31/ GEA US Claridon & Huntsburg Twps; SR 608 to County Line Resurfacing from SR 608 to the County Line in Claridon and Huntsburg Twps. Includes 3 culverts: GEA , GEA , GEA /31/ CUY SR Westlake; Over Sperry Creek Replace the superstructure of the Detroit Road (SR 254) concrete box beam bridge oversperry Creek located just west of Clague Road in Westlake. 2/14/ LAK SR Paint Eastlake; SR 283 over the Chagrin River Paint the structural steel of the Lakeshore Blvd (SR 283) bridge over the Chagrin River in Eastlake. 3/1/ CUY SOLON SIGNALS Solon: city wide Replace/upgrade traffic signal equipment. Complete rebuild of 16 signals. Upgrade of additional 30 signals including cabinet, controller, interconnect, pre emption, video detection, UPS and pole painting. Improve traffic flow through the city using a cent 3/7/ LAK SR Perry Twp, Madison Twp; Shepard Rd to Madison WCL Resurfacing South Ridge Rd (SR 84) from Shepard Rd to the Madison WCL in Perry and Madison Twps. 3/7/ CUY US Warrensville Hts, Orange, Solon; SR 175 to Solon Rd Resurface US 422 from Richmond Rd (SR 175) to Solon Rd in Warrensville Hts, Orange, and Solon. 3/7/ CUY IR Barrier Rail Westlake: Just east of the county line to west of Cahoon Install continuous median barrier (guardrail type 5 MR) to Road prevent median crossover collisions along IR 90 from just east of the Lorain County Line to west of Cahoon Road in the City of Westlake. 3/12/ CUY RIDGE ROAD Delora Avenue to Memphis Avenue in the City of Brooklyn The reconstruction of Ridge Road from Delora Avenue (just north of I 480) to Memphis Avenue in the City of Brooklyn. $2,875,000 $2,000,000 $951,000 $800,000 $7,200,000 $1,360,000 $5,700,000 $500,000 $13,860,000 3/14/ CUY SR Cleveland; Over GCRTA at Shaker Blvd Replace the Buckeye Road (SR 87) bridge over GCRTA located $9,884,954 at the Woodhill Rd & Shaker Blvd intersection in the City of Cleveland. Combined with PID Work will include building a new structure on a new profile over the existing structure while mai 3/14/ CUY SR Valley View, Garfield Hts; Canal Rd to ECL Resurfacing Granger Road (SR 17) from Canal Road to the ECL $1,520,000 in Valley View and Garfield Hts. 3/14/ D12 LG FY2013 District Wide FY2013 District Lighting Maintenance Contract $1,000,000 2 of 22 PIO_10year.xls

3 3/14/ GEA SR Burton Twp, Middlefield, Middlefield Twp; WCL to County Resurface from approximately the Middlefield WCL to the $1,595,000 Line County Line in Burton Twp, Middlefield and Middlefield Twp. Combined with PID /17/ LAK IR R Slope IR 90 over the Grand River Slope repair follow up work to PID $250,000 3/28/ D12 TSG FY2013 N/A FY2013 District Signal Upgrade ContractSafety Funding Project to upgrade signals a the following locations in the City of Cleveland:1) CUY (Ontario Huron), 2) CUY (West 25th and Clark), and 3) CUY (Miles and Lee) $650,000 4/11/ CUY IR Deck Independence, Cuyahoga Hts; Over the Cuyahoga River, Canal Rd, SR 17, and the Ohio Canal. Replace the deck of the I 77 bridge over the Cuyahoga River in Independence and Cuyahoga Hts. Structural steel painting moved to new project: PID Major Bridge $28,010,000 4/11/ CUY GREENWAY TRAIL Mayfiled Village: 700 ft trail west of SR 91 between Wilson Mills and White Road Mayfield Village Greenway Trail: Construct an all purpose trail that will complete a 2.1 mile trail linking civic functions, employment centers, restaurants, libraries, a series of village parks and Cleveland Metroparks North Chagrin Reservation. o NOACA $1,083,201 4/11/ D12 BH FY2013 Misc Various Bridge maintenance project $2,000,000 4/25/ CUY CB FY2013 Various routes and sections FY2013 Maintenance Project: Drainage and Catch Basin $350,000 Cleanouto IR 77 Fleet Ave median wall, IR 77 Harvard Ave right sideo IR 90 Riverside Rd, IR 90 South Marginal,o IR 480 West 220th right side, IR 480 Lee Rd, IR 480 Wes 5/1/ CUY SR Cleveland; East 55th St to Woodhill Resurface Woodland Avenue from East 55th St to Buckeye Road; and Buckeye Road from Woodland Avenue to Ambler Road all in Cleveland.Combined with PID $1,996,500 5/1/ CUY SR /VAR Cleveland; St. Clair to IR 90 SR 283; Resurface East 72nd St from St. Clair to IR 90 Ramp B2 in Cleveland. SR 283DA; Resurface East 72nd St from IR 90 Ramp B3 to SR 283 in Cleveland. 5/3/ CUY SR Brook Park; SCL to NCL Resurfacing of Engle Rd. (SR 291) from Sheldon Rd. to Brookpark Rd. (SR 17) in the City of Brook Park. 5/3/ CUY US Strongsville: Boston Road to Drake Road Widening and Reconstruction of US 42 (Pearl Road) from Boston Road to the 5 lane pavement section at Drake Road. Upgrading the signal timing, pavement markings, and adding a TWLTL.o ODOT TRAC Project, NOACA STP Project, ODOT City Pavement Project 5/3/ CUY West 6th STREET STREETSCAPE Cleveland: Area bounded by West Third St, Superior Ave, West Tenth St, and the Port Authority Historic Warehouse District Public Realm Implementation: West 6th Streetscape St Clair to Lakeside: Streetscape to widen walks to proivide amenities such as bike racks, wayfinding, public art, historic interpretation, and benches.o NOACA Enhancement P $808,500 $1,970,000 $8,550,000 $760,000 3 of 22 PIO_10year.xls

4 5/3/ CUY PROFESSOR ST INTERSECTIONS Cleveland: Professor Ave from Fairfield Ave/West 10th St to Professor Street Intersection Improvement: Improve pedestrian $725,000 Jefferson Avenue safety at intersections by decreasing the length of the crosswalks through curb bump outs and curb radius reductions and redesigning the angle of intersection to create a simple four way stop i 5/3/ CUY COLUMBIA ROAD North Olmsted: Butternut Ridge Road to Lorain Road NOACA STP Project: Resurface Columbia Road from Butternut Ridge Road to Lorain Road in the City of North Olmsted. $1,806,200 5/9/ GEA SR HSIP Newbury Township: SR 44 and Music Street intersection Remove a portion of the embankment on the east side of SR 44 near the intersection of Music Street to improve sight distance. $165,000 5/9/ CUY IR Safety Cleveland: IR 090 EB from West 25th (US 42) to the IR 490/IR 71/SR 176 interchange 2013 Safety Project: Provide an auxiliary lane in advance of and through the IR 90/IR 490/IR 71 interchange diverge to allow two full lanes to proceed to IR 90 EB, one full lane to IR 71 SB/SR 176 SB, and two full lanes to IR 490 EB. $2,700,000 5/9/ GEA SR Russell Twp: approximately along mile marker FY 2013 Maintenance Project: Slope repair along westbound SR 87 (Kinsman Rd) approximately at mile marker 0.92 in Russell Township. 5/10/ CUY SR Solon, Bedford Hts; SR 43 to 0.43 mi N of RR tracks Resurface Richmond Rd (SR 175) from Aurora Rd (SR 43) to the 4 lane concrete pavement in Solon and Bedford Heights Urban Paving Program. 5/23/ CUY SR 017/ /09.50 Brooklyn Hts, Independence, Valley View, Cuyahoga Hts; WCL to Canal Rd/CSX to I 77 5/23/ CUY LAKEFRONT WEST W.73rd Cleveland: Various locations along the West Shoreway (US 6) 5/23/ CUY SUPERIOR RD/NOBLE RD East Cleveland: Superior Rd & Forrest Hills Ave and Noble Rd & Terrace Rd Resurface Granger Rd from the Brooklyn Hts WCL to Canal Rd in Brooklyn Hts, Independence and Valley View; and Brecksville Rd from the CSX RR bridge to I 77 in Valley View, Independence, and Cuyahoga Hts. o Extend and relocate West 73rd Street and construct new bridge under the NS Railroad to access the West Shoreway (US 6) and Edgewater Park, including relocation of the NEORSD trunk sewer.o Also refer to the Lakefront West Project (PID 77330) Provide dedicated left turn lanes along Superior Road at Forrest Hills Ave. and replace the entire traffic signal installation.upgrade traffic signals, signs and pavement markings at the intersection of Noble Road and Terrace Road, in the City of East Cle 5/23/ CUY IR Slope Bedford Heights; N of NS RR Repair the slope on the east side of I 271 just north of the NS railroad structure in Bedford Hts GSM project 6/1/ D12 GR FY2013(B) Various routes and sections Federal HSIP Project: Upgrade non compliant end terminals on NHS routes 6/6/ CUY SR HSIP Cleveland: Ackley Road/Union Street Intersection Upgrade signals, sign and pavement markings on Broadway Avenue (SR 14) at the Ackley Road/Union Street intersection in the City of Cleveland. $350,000 $501,818 $2,380,000 $34,800,000 $338,400 $350,000 $500,000 $568,743 4 of 22 PIO_10year.xls

5 6/6/ D12 SIGN FY2013 Structure District Wide FY2013 District Sign Structure Repair Contract $250,000 7/1/ CUY IR Cleveland; Bridge to East 55th St PM resurfacing from the bridge over the Cuyahoga River Valley $600,000 to East 55th St in Cleveland. 7/1/ CUY IR Demo Cleveland; Over the Cuyahoga River Standalone project to demo the existing Innerbelt Bridge, SFN $28,100, /1/ CUY WESTLAKE SIGNAL UPGRADE Westlake: various signal location within the city 2014 NOACA CMAQ Project: Upgrade the existing citywide $3,274,656 signal system in the City of Westlake. 7/12/ LAK PAINESVILLE TWP STREETSCAPE N/A Streetscape and related safety improvements to Mentor Ave. (US 20) at various locations between Wellesley Rd. to Fern Dr. in Painesville Township.SAFETEA LU Earmark $248,380 7/12/ CUY CLEVELAND BULKHEAD Cleveland Construct bulkhead and riverwalk connecting Front Street and Main Avenue.Part of a bigger project called the Flats Eastbank ProjectEarmarks: SAFETEA LU OH204 and FY 08 AA TC 0803See also PID 88443; CUY CLEVELAND RIVERWALK; OH317 7/12/ LAK SR Kirtland, Willoughby, Mentor; South of Kirtland Rd to SR 84 Resurface SR 306 (Chillicothe Rd) from south of Kirtland Rd to SR 84 (Johnnycake Ridge Rd) in Kirtland, Willoughby, and Mentor. SR 615 work split to PID /12/ CUY SR Warrensville Hts; SCL to NCL Resurfacing Miles Rd (SR 43) from the SCL to the NCL in Warrensville Hts. Work includes 2 small sections with a split corp with North Randall. 7/12/ CUY SRTS FY2011 Chagrin Falls Chagrin Falls; Various locations 2011 SRTS Project: Safe, off road pedestrian facility, signage, bike racks, pavement markings for 2 schools in the Village of Chagrin Falls.o Village portion see PID for the village school portion. 7/12/ CUY CLEVELAND RIVERWALK N/A Construct a riverwalk connecting Front Street and Maine Avenue in the Flats Eastbank.This project is part of a bigger project called the Flats Eastbank Project.SAFETEA LU Earmark OH317See also PID 80969; CUY CLEVELAND BULKHEAD $5,849,241 $660,000 $1,029,000 $486,050 $1,458,148 7/12/ CUY US From Lake Road to the West Shoreway & Lake Ave in the cities of Lakewood and Cleveland 7/12/ LAK MAIN STREET STREETSCAPE City of Painesville: Main Street from State Street to Park Place/Veteran's Park 7/12/ CUY BELVOIR BLVD Fairmount Blvd to Mayfield Road in the Cities of University Heights and South Euclid Clifton Boulevard Enhancement Projecto landscaping, partial median, parking, bicycle and pedestrian amenitieso resurfacing/pavement repair in Cleveland, project length restripingo new bus stops with bus pads and transit signal prioritizationo Funding: MPO Main Street Transportation and Streetscape Enhancement Project: Provide continuity along Main Street between State Street and Veteran's Park by providing wider pedestrian sidewalks, narrow the lane widths to better balance the space allocated to vehicles NOACA STP Project: Repair and resurface Belvoir Blvd. from Fairmount Blvd. to Mayfield Rd. $8,687,250 $893,445 $3,148,647 5 of 22 PIO_10year.xls

6 7/12/ LAK SR Mentor; Center St to SR 283 Urban Paving Project along Munson Rd (SR 615) from Center St to Lakeshore Blvd (SR 283) in Mentor. Split from PID 84402The Mentor on the Lake portion is not included. $385,000 7/19/ LAK ST. CLAIR STREET BRIDGE DEMO City of Willoughby: St. Clair Street over the Chagrin River 2013 CEAO LBR Project: Remove the St. Clair Street two span $290,000 steel Warren truss bridge including substructure over the Chagrin River in the City of Willoughby. Work will include embankment work, pavement removal and road termination signage. 9/1/ D12 GR FY2014 N/A District guardrail job order contract for SFY 2014 $150,000 9/1/ D12 PM FY2014 Distrctwide District maintenance contract for pavement markings, striping and raised pavement markers beginning SFY 2014 $1,317,294 10/1/ LAK SR Painesville, Fairport Harbor; Over the Grand River Replace the superstructure of the SR 535 bridge over the Grand River in Fairport Harbor and Painesville. Work will include raising the structure 2 feet and modifying the existing abutments and piers. 10/1/ CUY IR /VAR Cleveland; Eddy Rd interchange IR 90 Replace the Eddy Road bridge over IR 90. Project includes removing the approach ramp bridges and replacing with MSE walls Bridge 10/1/ CUY CANAL ROAD BRIDGE Cleveland: Commercial Road over CSX and under Norfolk and Southern Railroad Municipal Bridge Project: Remove and replace the existing Canal Road (formerly Commercial Road) bridge over CSX railroad and under Norfolk and Southern railroad. The bridge build in 1901 and rehabilititated in 1965 has reached its useful design life.o Pr 10/1/ GEA BELL STREET South Russell Village: WCL to SR 306 NOACA STP Project: GEA Bell Street West Rehabilititation will resurface Bell Street, widen the paved shoulder from 1.5 feet to 4 feet on each side, enclose existing roadside drainage ditches, modify and/or extend existing culverts, add catch basins and re 10/1/ CUY NORTH CHURCH DRIVE Parma Heights: North Church Drive over Big Creek River Municipal Bridge Project: Repair the North Church Drive bridge over Big Creek River in the City of Parma Heights. Extent of repair to be determined. 10/1/ CUY IR 077/SR /11.76 Broadview Hts: SR 82 intersection w/ IR 77 Federal HSIP Project: Improve IR 77 interchange at SR 82 in Broadview Heights by reconfiguring and signalizing IR 77 exit ramps to eliminate unsafe weaves on SR 82. $3,210,000 $9,000,000 $2,812,500 $2,912,425 $843,750 $2,200,000 10/24/ CUY IR Brecksville; Over IR 77 Replace the superstructure of the Valley Parkway bridge over IR $2,600, in Broadview Hts. This project has been split from PID /1/ CUY SR Steel Cleveland; Main Avenue Bridge Structural steel repairs to the truss portion of the Main Avenue $9,340,000 Bridge. Plans to be completed under PID /1/ D12 MOW FY2014 N/A District Mowing Contract for SFY 2014 $460,000 6 of 22 PIO_10year.xls

7 1/1/ GEA US Bainbridge Twp, Auburn Twp; Approx. SR 306 to SR 44 Rehab from E of SR 306 to E of SR 44 in Bainbridge and Auburn $24,500,000 Twps. Treatment will likely be break & seat with asphalt overlay. Includes replacing the EB exit and WB entrance ramps at SR 44. 1/1/ CUY US Cleveland; Over Big Creek & NS RR Spot painting of the Brooklyn Brighton bridge over Big Creek $2,000,000 and NS RR in Cleveland. Beam ends at all expansion joints are to be repainted on this weathering steel structure. Major Bridge Candidate 1/1/ CUY US Cleveland; Detroit Superior Bridge Spot painting areas of the Veterans Memorial (Detroit Superior) bridge in the City of Cleveland. Work includes other miscellaneous repairs. Scope to be determined based on 2010 in depth inspection.2014 MAJOR BRIDGE PROGRAM $3,350,000 1/1/ LAK MAGIC MILE BIKEWAY Willoughby: Johnnycake Ridge Road (SR 84) to Lost Nation Road Bicycle paths for the Magic Mile in the City of Willoughby.SAFETEA LU Earmark OH ; City of Willoughby has requested to cancel this project. 1/1/ CUY SR Moreland Hills, Hunting Valley; WCL to County Line Resurfacing of South Woodland Rd. (SR 87) from approximately SOM Center Rd. (SR 91) to Geauga County in the Villages of Moreland Hills and Hunting Valley. 1/1/ GEA SR Auburn Twp; County Line to US 422 Resurfacing of Ravenna Rd. (SR 44) from the Portage County line to US 422 in Auburn Twp. 1/1/ GEA SR Russell Twp, Newbury Twp; SR 306 to Auburn Rd Resurface Kinsman Rd (SR 87) from Chillicothe Rd (SR 306) to Auburn Rd in Russell and Newbury Twps. 1/1/ LAK SR Painesville Twp, Perry Twp; WCL to Shepard Rd Resurfacing of Walnut Ave/Riverside Dr. (SR 84) from the WCL to Shepard Rd. in Painesville and Perry Twps. Includes culverts. 1/1/ CUY SR Gates Mills; Old Mill Rd to the Cnty Line Resurfacing River Rd (SR 174) from Old Mill Rd to the Lake County Line in Gates Mills. 1/1/ CUY SR Bedford; Over Tinkers Creek Slope and erosion permanent restoration at the south end of the Northfield Road (SR 8) bridge over Tinkers Creek, SR 14, Metroparks, and W&LE RR in Bedford. See PID for shortterm drainage relocation. 1/1/ GEA SR Huntsburg Twp, Montville Twp; Burton Windsor Rd to US 6 Resurface Madison Rd (SR 528) from Burton Windsor Rd to the GAR Highway (US 6) in Huntsburg and Montville Twps. Work will include replacing culvert GEA /1/ LAK SR Concord Twp; Girdled Rd to N of SR 84 Resurface SR 44 from Girdled Rd to north of SR 84 in Concord Twp. 1/1/ CUY ROYALVIEW DRIVE BRIDGE Parma: Royalview Drive over Countryman's Creek Municipal Bridge Project: Replacement of the Royalview Drive bridge over Countryman's Creek located approximately 2200 feet west of Ridge Road in the City of Parma. $1,091,715 $900,000 $1,000,000 $1,600,000 $1,500,000 $1,200,000 $1,090,769 $1,700,000 $4,100,000 $299,970 7 of 22 PIO_10year.xls

8 1/1/ GEA MAPLE HIGHLANDS TRAIL City of Chardon: Fifth Avenue to Water Street (US 6) Maple Highlands Trail Connection: The construction of $466,500 approximately 2,500 linear feet (0.47 miles) of the trail connection and will extend from Fifth Avenue south to Water Street (US 6). This portion of the trail will consist of a 10 ft wide bicycle & ped 1/1/ CUY LARCHMERE BLVD City of Cleveland: East 121st Street to East 130th Street o NOACA STP Project Rehabilitate Larchmere Boulevard from Martin Luther King Jr. Drive to North Moreland Boulevard.o NOACA Enhancement Project Make Larchmere Boulevard more pedestrian and bicycle friendly from East 121st Street to East 130th Street. $2,708,443 1/1/ CUY LYNDHURST AUDIBLE SIGNALS US 322 along City of Lyndhurst at intersections: Brainard Rd, Richmond Rd, Winchester/Irene Rd 1/1/ LAK MORTON HEADLANDS TRAIL II Jordan Drive in the City of Mentor connecting Morton Community Park and Headlands Beach State Park 1/1/ CUY MILL CREEK CONNECTOR TRAIL 2 Garfield Hts: north end of Bacci Park to a trailhead at the Garfield Blvd/Warner Rd intersection 1/1/ CUY TRISKETT RD/WARREN RD Cleveland: Triskett: Lorain Avenue to West 117h Street; Warren: Lorain Avenue to Munn Road City of Lyndhurst Audible Signal Project: Purchase and install signal devices to assist blind or visually impaired as well as pedestrians needing additional time to safely cross three busy intersections in the City of Lyndhurst.o NOACA Enhancement Projec Morton Mentor Headlands Trail Connection Phase II: Widen and resurface 3000 linear feet of Jordan Drive from its current width of 22 ft to a proposed 32 ft. Approximately 1500 linear feet of the route will be a multi purpose pathway. Two asphalt 5 fo Mill Creek Connector Phase II: Continue the trail from the end of Phase I (currently at the north end of Bacci Park in the Village of Cuyahoga Heights) to its intermediate destination at a trailhead to be located at the Garfield Boulevard/Warner Road i NOACA STP Project: Mill and fill Triskett Road from Lorain Avenue to West 117th Street. Warren Road from Lorain Avenue to Munn Road. The proposed work also includes drainage repairs, signal upgrades, ADA curb ramps, pole relocation, curb and driveway repl 1/1/ GEA SR /VAR Various locations in Geauga & Lake Counties Culvert replacement project that may include the following: GEA (south of Wilson Mills in Chester Township)GEA (over tributary of Tare Creek in Middlefield Township)GEA (2.2 miles north of SR 87 in Middlefield Township)LAK 6 2/28/ CUY US Cleveland Hts; Kenilworth to ECL Resurface Mayfield Rd (US 322) from Kenilworth Ave to the ECL in Cleveland Hts. Urban Paving Program 3/1/ D12 GR FY2014(B) Various routes and sections Federal HSIP Project: Upgrade non compliant end terminals on top locations on remaining high volume routes state routes under ODOT jurisdiction. 3/3/ LAK HUBBARD ROAD Madison Twp: US 20 to Lake Road Resurface Hubbard Road (CR 7) from US 20 to Lake Road a distance of 2.38 miles more or less in Madison Township. $72,704 $893,600 $1,649,622 $6,355,800 $950,000 $2,626,500 $250,000 $2,100,000 8 of 22 PIO_10year.xls

9 3/3/ LAK JACKSON STREET Painesville Twp: WCL to ECL Resurface Jackson Street from the Nye Street to the west corporation line w/the City of Painesville a distance of 0.91 mile more or less in Painesville Township. $900,000 3/3/ GEA AUBURN ROAD (Q&R) Chardon Twp: Thwing Road to Mentor Road MPO STP Project: Resurface Auburn Road from Thwing Road (CH 27) to Mentor Road (CH 5n) in Chardon Township. 3/11/ CUY US /VAR Inter Chagrin Boulevard (US 422) and Northfield Road (SR 8) intersection in the City of Shaker Heights Reconfigure the six legged intersection of Chagrin Boulevard (US 422), Warrensville Center Road, Northfield Road (SR 8) and Van Aken Bouelvard in the City of Shaker Heights.o Federal Safety Upgrading Projecto FFY 2010 Appropriation Earmark Project (STP) O 3/21/ CUY BELLAIRE ROAD Cleveland; Over Big Creek Replacement of the Bellaire Road Bridge over Big Creek located between Kensington Avenue and Cress Road in the City of Cleveland. 3/26/ CUY SR Lakewood; SR 237 over IR 90 Replace the deck of the Riverside Dr (SR 237) bridge over IR 90 in the City of Lakewood. Work will include raising the south end of the bridge to gain vertical clearance on the interstate. CUY /31/ LAK SR 306 Multi Purpose Trail City of Kirtland: west of Markell Road to east of Eisenhower Drive SR 306 Multi Purpose Path & Pedestrian Bridge: Construct a 1200 ft multi purpose path with a new 150 ft pedestrian bridge over the South Branch of the Chagrin River, from west of Markell Road to east of Eisenhower Drive in the City of Kirtland.o NOACA Enh 4/1/ CUY LAKEWOOD SIGNALS Ph 4 Lakewood 2013 NOACA CMAQ Project: Lakewood City Wide Signal Project Phase 4* Madison Ave McKinley Ave/Larchmont Ave to Lark St/Ridgewood Ave 4/1/ CUY SR Parma; SCL to US 42 Repair & resurface Ridge Rd (SR 3) from the SCL to Pearl Rd (US 42) in Parma. Work will include resurfacing the asphalt sections and slab & joint repairs to concrete sections. 4/1/ CUY IR NOISE Shaker Boulevard to Mayfield Road Noise Barrier Replacement Project: Replace severely deteriorated concrete panels and reuse the existing steel posts along IR 271 between Shaker Boulevard and Mayfield Road. $350,000 $9,048,248 $4,027,100 $2,100,000 $750,000 $2,747,399 $2,750,000 $3,000,000 4/1/ CUY US Cleveland; Over Flats Industrial RR and Train Avenue Work to include: bearing rehabilitation, bearing seat repair, $305,000 drainage repair. 4/1/ D12 TSG FY2014 N/A District traffic signal repair contract for SFY 2014 $250,000 4/1/ D12 LG FY2014 Various routes & sections Upgrade the lighting on various sections of I 71 and I 480. $1,500,000 4/1/ D12 BH FY2014 Misc Various Bridge repair on various structures $2,000,000 4/15/ CUY BAGLEY/PLEASANT VALLEY Middleburg Hts, Parma; US 42 to York Rd Widen & reconstruct Bagley Rd/Pleasant Valley Rd from Pearl Rd (US 42) to York Road in Middleburg Hts and Parma. TRC ON LBR. CEAO LBR. $20,790,000 9 of 22 PIO_10year.xls

10 5/1/ CUY SR Streetscape Fairview Park: WCL to West 223rd Street Streetscape improvements along Lorain Road (SR 10) from $1,200,000 Fairview Park west corporation line to West 223rd Street in the city of Fairview Park.o extend tree plantings started further east on Lorain Roado include brick panel associated with the tree and tre 5/2/ LAK VROOMAN ROAD LeRoy, Perry Twps; IR 90 to SR 84 Upgrade and relocate Vrooman Rd from IR 90 to SR 84 in LeRoy and Perry Townships. MPO STP. $150,000 for Arch Study set up in 1997 as federal. Plans by Lake County. Also refer to PID for resurfacing portion of project. $24,695,771 5/2/ LAK VROOMAN ROAD Leroy Twp: IR 090 interchange to Vrooman Rd Bridge over the Grand River 5/2/ CUY SNOWVILLE ROAD Culvert Brecksville: Snowville Road over a stream approximately 0.3 mile west of Riverview Road o Rehab Vrooman Road from I 90 to the Vrooman Rd. Bridge over the Grand River in Leroy Townshipo Also refer to PID 5669 for location of the relocated Vrooman Road Bridge over the Grand River.o 2013 CSTP Project Project B: Replace an existing twin 5 foot round corrugated metal pipe culvert which has failed with a 12' x 5' concrete box culvert and connect to the existing 12' x5' concrete box culvert that runs underneath Snowville Road.o Earmark ID: FL1201o FHWA 2 $3,447,675 5/5/ CUY HIGHLAND ROAD Euclid/Richmond Hts: Euclid Avenue to Richmond Road NOACA STP PROJECT: Repair and resurface Highland Road in $5,000,000 the cities of Euclid and Richmond Heights. 6/1/ CUY SR Widening North Royalton; WCL to York Road Reconstruct and widen Royalton Road (SR 82) from the WCL $13,526,000 (W.130th) to YorkRoad in the City of North Royalton.SAFETEA LU Earmarks OH169 + OH323 6/1/ D12 SIGN FY2014 N/A District sign structure repair contract for SFY 2014 $250,000 7/1/ CUY HIGHLAND ROAD BRIDGES Euclid; Over Euclid Creek Rehabilitate 4 bridges along Highland Road in the City of Euclid: $9,785,600 (3) over Euclid Creek and (1) over the East Branch of Euclid Creek. 7/1/ LAK HEISLEY RD PHASE III Mentor: Mentor Avenue to Jackson Street NOACA STP Project: Widen and Reconstruct Heisley Road from $7,051,758 2 to 4 lanes from US 20 (Mentor Ave) to Jackson St. in the City of Mentor.o SAFETEA LU Earmark ID OH251o See also PID /7/ CUY IR Addlane Oakwood, Bedford; County Line to Emery Road Add one (1) lane in each direction along I 271 from IR 480 at $91,700,000 the Summit County Line to IR 480 at Columbus Rd. Work will include replacing the existing pavement from the Summit County Line to approx. Emery Rd under the Pavement Major Rehab program. TR 10/1/ LAK IR LeRoy Twp; Vrooman Rd over IR 90 Replace the superstructure of the Vrooman Road bridge over IR $2,500, in LeRoy Township. Work willinclude minor widening to add 8' shoulders. 11/1/ CUY IR Cleveland; W.140th over I 71 Replace the deck and paint the superstructure of the West 140th Street bridge over IR 71 in the City of Cleveland. Work will include raising the structure to gain vertical clearance on the interstate. $2,310,000 $298, of 22 PIO_10year.xls

11 1/1/ CUY/GEA US /0.00 Solon; Solon Rd to the County Line / Bainbridge Twp; Resurface US 422 from Solon Rd to east of SR 306 in Solon and $5,800,000 County Line to east of SR 306 Bainbridge Twp. 1/1/ LAK METROPARK BIKE TRAIL City of Mentor between SR 84/Garfield Rd to Norton o Construct a two way multi use asphalt path from the $4,218,621 Parkway southeast corner of SR 84 (Johnnycake Ridge Rd) and Garfield Rd to Norton Parkway in the Newell Creek Development in the City of Mentor.o Plan and construct extension of bicycle trails adjacent to the 1/1/ CUY NORTH COAST HARBOR PED BR N/A Construct a movable pedestrian bridge from east of Dock 32 to $4,941,900 Voinovich Park southwest corner in the City Cleveland.SAFETEA LU Earmark + OH313FFY 05 Appropriation OH140 Preliminary Development 1/1/ CUY SR Woodmere; IR 271 to Pepper Pike Corp Widen Chagrin Boulevard in the Village of Woodmere. $16,500,000 1/1/ CUY SR Cleveland; W. 150th to W. 117th Urban Paving of Lorain Road in the City of Cleveland from West $1,980, th St to W. 117th St 1/1/ GEA SR Parkman, Troy, Burton Twps; Nash Rd to Burton SCL Resurface SR 168 from Nash Rd to the Burton SCL in Parkman, $2,200,000 Troy, and Burton Twps. 1/1/ GEA SR Auburn Twp; Over LaDue Reservoir Replace the existing slab superstructure on the SR 44 bridge $955,000 over LaDue Reservoir in Auburn Township. 1/1/ LAK SR Eastlake; SR 91 over SR 2 Replace the deck of the S.O.M. Center Road bridge (SR 91) over $3,606,000 the Lakeland Freeway (SR 2) in the City of Eastlake. LAK /1/ CUY IR Cleveland; I 77 over the industrial access drive Replace the superstructure of the I 77 bridge over the industrial access drive, just south of Pershing, in the City of Cleveland. $3,500,000 1/1/ CUY SR Shaker Hts; WCL to ECL Resurface Shaker Blvd from the WCL to the ECL in Shaker Hts. Urban Paving Program 1/1/ CUY SR Brook Park; Eastland Rd to SR 17 Concrete pavement repair along the Berea Freeway (SR 237) from Eastland Rd to Brookpark Rd (SR 17) in Brook Park. 1/1/ CUY IR L&R Euclid; IR 90 over Lakeland Blvd connector Remove the superstructure of the twin mainline slab bridges over the Lakeland Boulevard Connector in Euclid. Structures will be replaced by fill. 1/1/ CUY CHAGRIN FALLS SIDEWALKS Village of Chagrin Falls: North Street, Mill Street and Cleveland Street o North Street between Chagrin Falls NCL and Mill Street: 1) repair and resurface the existing asphalt pavement, 2) repair and/or replace the existing brick roadway pavers, which is an extension of an existing rehabilitated brick road, 3) provide an appro 1/1/ LAK SR Painesville Twp; Newell St Over SR 2 Replace the deck of the Newell Street bridge over SR 2 in Painesville Township. 1/1/ CUY WATERLOO ROAD Cleveland: East 152nd Street to East 162nd Street 2013 NOACA STP Project: Waterloo Road reconstruction2013 NOACA Enhancement Project: Waterloo Road streetscape $2,942,500 $1,800,000 $4,800,000 $2,575,000 $2,000,000 $4,195, of 22 PIO_10year.xls

12 1/1/ CUY LAKE LINK TRAIL N/A Construct the Greenway Corridor Trail (a.k.a Cleveland $8,338,098 Mahoning Trail) along the abandoned railroad right of way in the Flats from the Towpath Trail along Irishtown Bend underneath the Main Avenue bridge crossing the Willow Street bridge to a proposed ped 1/1/ CUY SOUTH GREEN RD SIGNALS South Euclid: Cedar Rd to Monticello Blvd 2013 NOACA CMAQ Project: Upgrade and replace obsolete traffic signal equipement at tne existing signalized intersections along South Green Road between Cedar Road and Moniticello Boulevard in the City of South Euclid. $2,015,475 1/1/ LAK AUBURN CRILE CONNECTOR RD Concord Twp: Auburn Rd to Crile Rd 2015 NOACA STP Project: Construct a connector road from Auburn Road to Crile Road, including modifications to Auburn Road, Crile Road and the intersection of Auburn Road and SR 44. 1/1/ GEA SR 088/ /10.53 Parkman Township; 1.60 miles E of SR 528 / Hambden Twp; Over Sisson Creek S of Sisson Rd Replace the twin CMP bridge over a stream located 1.60 miles east of SR 528 (just east of Owen Road) on SR 88 (Nash Road) in Parkman Township. AND replace the bridge over Sisson Creek located 0.15 miles south of Sisson Rd on SR 608 (Old State Road) in Ha $3,699,000 1/1/ LAK CASHEN ROAD Madison Twp: Cashen Road over Arcola Creek CEAO Bridge Replacement Project $1,206,000 1/1/ CUY SR Hunting Valley, Pepper Pike; 0.76 mi N of SR 87 Replace the prestressed concrete beam bridge over a stream $1,204,000 located north of SR 87 in Pepper Pike and Hunting Valley. $500,000 1/1/ GEA SR Middlefield Twp; SR 528 to SCL Resurface Old State Road (SR 608) from SR 528 to the Middlefield SCL in Middlefield Twp and Middlefield. 1/1/ CUY IR Emery to Fairmount PM resurfacing of mainline IR 271 from Emery Rd to Fairmount Rd in Warrensville Hts, Orange, Beachwood, and Pepper Pike. 3/1/ CUY CLVRT FY2015 Various locations in Cuyahoga County Culvert reconstruction contract. Many locations repaired under DSR contracts. 3/2/ CUY LAKESHORE BLVD BRIDGE Bratenahl: Lakeshore Boulevard over Nine Mile Creek CEAO LBR Project: Replace the existing 40 foot span, earth filled concrete arch with a new single span structure. 3/2/ CUY OLD ROCKSIDE ROAD BRIDGE Independence: Old Rockside Road over the Cuyahoga River Municpal Bridge Project: Replace the Old Rockside Road bridge over the Cuyahoga River in the City of Indpendence. The new structure will provide a 10 feet of width for pedestrian and bicycle traffic. 3/2/ LAK STANTON PARK SHORE Madison Township: Stanton Park along the Lake Erie Protect the Lake Erie shoreline from erosion in Stanton shoreline Park.OH062 also used on PIDs & /2/ LAK McMACKIN ROAD Madison Twp: US 20 (North Ridge Rd) to Chapel Rd Resurface McMackin Road (CR 117) from US 20 to Chapel Road (CR 26) for a distance of 1.74 miles more or less in Madison Township. $450,000 $4,000,000 $400,000 $1,500,000 $4,368,100 $291,000 $1,600, of 22 PIO_10year.xls

13 3/2/ CUY SRTS FY2015 East Cleveland N/A 2015 SRTS Infrastructure Project: Improve lighting, signage, $384,000 crosswalks, ped signals, and sidewalks to service the East Cleveland City Schools 3/2/ CUY SRTS FY2015 Brooklyn N/A 2015 SRTS Infrastructure Project: Improve crosswalks, $154,000 sidewalk, bike paths, and drop off areas to service the Brooklyn City Schools. 3/2/ LAK SRTS FY2015 Painesville Twp N/A 2015 SRTS Infrastructure Project: Install sidewalks, signage, $432,000 school flashers, pavement markings and bike racks to service Hadden & Buckeye Schools. 3/2/ GEA PETTIBONE ROAD Bainbridge Twp: Cuy Co/Gea Co line to Chillicothe Rd (SR MPO STP Project: Resurface Pettibone Road $480, ) 3/2/ GEA RAVENNA ROAD (A D) Chardon Twp: Chardon Village Corp to Colburn Road MPO STP Project: Resurface Ravenna Road (CR 601) from the $520,000 Chardon Village/Township Corporation line to Colburn Road (Geauga/Lake county line). 3/2/ GEA CHAGRIN ROAD (C E) Bainbridge Twp: Catsden Road to SR 306 (Chillicothe Road) MPO STP Project: Resurface Chagrin Road from Catsden Road (TR189) to Chillicothe Road (SR 306) in Bainbridge Township. $350,000 3/2/ GEA BAINBRIDGE ROAD Bainbridge Twp: Cuy/Gea Co line to SR 306 and SR 306 to Washington Street MPO STP Project: Resurface Bainbridge Road from the Cuyahoga County line to Chillicothe Road (SR 306) and from Chillicothe Road (SR 306) to Washington Street in Bainbridge Township. (Sections A G) 3/6/ CUY LAKEFRONT WEST Ramps Cleveland: Various locations along West Shoreway (US 6) o Closure of the Main Avenue Bridge EB entrance ramp from $6,629,693 West 28th Street and the realignment of the Main Avenue Bridge WB exit ramp to the south.o Reconstruction of the West Shoreway West 45th Street ramps to accomodate the West 28th Street traffic.o Re 3/31/ LAK CB FY2015 Along US 20 in Lake County Catch basin upgrade contract $250,000 3/31/ CUY SR Slide Gates Mills; SR 174 south of Rodgers Rd GSM Project: Slope stabilization with sheet pile or segmental retaining wall (based on geotechnical investigation and recommendation). Removal of current roadway surface and unsuitable subgrade. Rebuilding of 2 lane asphalt roadway at desired plan grades $432,813 4/1/ GEA SR Safety Middlefield Twp; Hayes Rd to County Line Reconstruct the hill along SR 87 to improve vertical sight $2,500,000 distance from Hayes Rd to the east as necessary. Work will include shoulder widening for Amish buggy use along a portion of the project. Resurfacing completed under PID Work should incl 4/1/ LAK SR Eastlake; WCL to ECL Resurfacing from east of SR 91 to the ECL in Eastlake $1,166,000 4/1/ LAK SR Painesville; WCL to US 20 Resurface Richmond St (SR 283) from the WCL to Erie St (US $737,000 20) in Painesville and Painesville Twp. 4/1/ CUY US Cleveland; I 480 to I 71 Resurface Pearl Rd (US 42) from IR 480 to IR 71 in Cleveland. $2,695,000 $800, of 22 PIO_10year.xls

14 4/1/ LAK US Painesville; Watson to the ECL Resurface Mentor Ave (US 20) from Watson to the ECL in $528,000 Painesville. Urban Paving Program 4/1/ CUY IR Various locations in the IR 77 and IR 480 interchange in the City of Independence GSM Project: Slope and erosion repairs at several locationso backslope failure on the south side of IR 77 SB ramp from IR 480 EBo erosion along the west slope of the IR 77 mainline overpass bridgeo slope failure on the north slope of the IR 480 WB near S $1,068,819 4/1/ CUY East 79th STREET BRIDGE Cleveland: East 79th Street over Norfolk Southern Railroad and GCRTA tracks. Remove and replace the East 79th Street bridge over Norfolk Southern Railroad and GCRTA Rapids tracks along with approach pavements ending at the limits of the wingwall ends.o Local Bridge Projecto MPO STP Project $7,100,000 4/1/ D12 LG FY2015 Various routes & sections Lighting upgrade throught the district $1,500,000 5/15/ CUY STEARNS ROAD Olmsted Twp; At NS RR Construct a grade separation at Stearns Road and Norfolk $11,000,000 Southern Railroad in Olmsted Township.SAFETEA LU Earmark 6/1/ CUY SR Maple Hts; Lee Rd to ECL Resurface from Lee Road to the ECL in Maple Hts. Urban Paving Program 6/1/ LAK METROPARKS PEDESTRIAN BRIDGE Lake Metroparks bike/hike trail over NS RR just west of o Construct an overhead crossing (bridge and approaches) over Liberty St in Painesville the Norfolk & Southern Railroad tracks that would connect two sections of Lake Metroparks 4.5 mile Greenway Corridor.o 2009 Appropriation Act Earmark OH392 7/1/ CUY INNERBELT CCG2 EB Bridge Cleveland; New EB Innerbelt structure over the Cuyahoga River Valley 7/1/ CUY TRANSPORTATION BLVD Garfield Heights: Granger Road (SR 17), Transportation Blvd and Antenucci Blvd Design Build Finance ContractNew structure to replace existng Innerbelt Bridge ( ). CCG2. Work includes demo of the existing structure,but that work be done under PID if necessary. Should be sold at the same time as PID CUY o Extension of Transportation Blvd. to Rockside Road allowing direct access from I 480 to the Cuyahoga Valley National Park.o Work included in this project is the installation of multipurpose paths connecting Turney Road to Transportation Boulevard along 7/1/ CUY IR Cleveland; IR 71 over IR 490 Replace the deck of the IR 71 bridge over IR 490/IR 90. NEW DECK TO MAINTAIN EXISTING WIDTH. Should be sold with PID /1/ CUY IR L&R Highland Hts, Mayfield; Over Wilson Mills Rd Replace the mainline IR 271 slab bridges over Wilson Mills Rd in the Cities of Highland Hts and Mayfield. 10/1/ CUY IR Cleveland; Pershing Ave over IR 77 Replace the Pershing Ave bridge over IR 77 in Cleveland. New structure will have no median pier. INNERBELT ENVIRO DOCUMENT APPROVED WITH 4 LANES ON PERSHING $1,017,500 $1,087,500 $288,000,000 $11,500,000 $5,000,000 $4,100,000 $5,600,000 1/1/ LAK SR Willowick; WCL to SR 640 Urban paving $1,078, of 22 PIO_10year.xls

15 1/1/ CUY LAKEWOOD SIGNALS Ph 5 Lakewood 2015 NOACA CMAQ Project: Lakewood City Wide Signal Project $2,649,686 Phase 5* Hilliard Rd/Franklin Blvd SR 237 (Riverside Dr) to Ridgewood Ave 1/1/ CUY CLEVELAND TOWPATH TRAIL Ph 3 N/A Construct Stage 3 of the Cleveland Towpath Trail construction from Steelyard Commons to Tremont/Literary Trailhead.SAFETEA LU Earmarks OH214+ OH322 $10,000,000 1/1/ CUY SR Moreland Hills; SCL to NCL Resurface SOM Center Rd from the SCL to the NCL in the Village of Moreland Hills. 1/1/ GEA SR Chardon Twp; Chardon NCL to Lake Cnty Ln Resurface Ravenna Road (SR 44) from the Chardon NCL to the Lake County Line in Chardon Twp. 1/1/ GEA US Chester Twp; Cnty Line to Heath Rd Resurface Mayfield Rd (US 322) from the Cuyahoga County Line to Heath Rd in Chester Twp. 1/1/ CUY IR Garfield Hts, Maple Hts; Bridge to IR 480N PM resurfacing of IR 480 from the Valleyview Bridge to IR 480N in Garfield Hts and Maple Hts. 1/1/ GEA US Munson Twp; Heath Rd to SR 44 Resurface Mayfield Rd (US 322) from Heath Rd to Ravenna Rd (SR 44) in Munson Twp. 1/1/ CUY IR /VAR Paint Cleveland; IR 90 bridge painting Paint the structural steel of 5 mainline bridges on I 90 in Cleveland 1/1/ CUY SR Cleveland; Denison to IR 90 PM resurfacing on SR 176 from Denison Ave to merge with IR 71 near IR 90 in Cleveland 1/1/ CUY IR /VAR Paint Rocky River, Lakewood; Wooster, Hilliard, Woodward over I Paint the structural steel of 3 bridges over IR 90 in Rocky River 90 and Lakewood: Wooster Rd, Hilliard Rd, and Woodward Ave. $900,000 $1,100,000 $1,800,000 $8,000,000 $2,000,000 $4,000,000 $675,000 $3,100,000 1/1/ CUY IR Noise Panel Bratenahl; East 86th to SR 283 Noise wall panel replacement along IR 90 from East 86th St to $2,530,000 SR 283 in Bratenahl. Split from PID /1/ GEA SR Hambden Twp; US 6 to County Line Resurface Old State Rd (SR 608) from the GAR Highway (US 6) $1,100,000 to the Lake County Line in Hambden Twp. 1/1/ GEA SR Newbury, Munson Twps; SR 87 to US 322 Resurfacing from Kinsman Rd (SR 87) to Mayfield Rd (US 322) $1,500,000 in Newbury and Munson Twps. 1/1/ GEA SR Burton, Middlefield Twps; ECL to WCL Resurfacing from the Burton ECL to the Middlefield WCL in $900,000 Burton and Middlefield Townships. 1/1/ LAK SR L Eastlake; Over a stream west of SR 91 Replace the superstructure of the SR 2 bridge $450,000 3/1/ CUY INDEPENDENCE ALL PURPOSE TRL N/A Construct an all purpose trail from Brecksville Road to Canal Road in the City of Independence.SAFETEA LU Earmark $1,522,684 3/1/ LAK SR Shared Use Path Willoughby Hills SCL (White Rd) to US 20 (Euclid Ave) in the Cities of Willoughby Hills and Willoughby 2013 NOACA CMAQ Project: Construct a shared use path along the east side of SOM Center Road (SR 91) in the Cities of Willoughby Hills and Willoughby. $1,100,000 3/1/ CUY CEDAR AVE BRIDGE Cleveland: Cedar Avenue over Doan Brook CEAO LBR Project: Bridge replacement project. $2,898, of 22 PIO_10year.xls

16 3/1/ CUY AVERY ROAD BRIDGE Broadview Heights: Avery Road over Chippewa Creek CEAO LBR Project: Rehabilitate a continuous three span 152 $2,000,000 foot long steel beam bridge along Avery Road in the City of Broadview Heights. The proposed work will include the replacing and widening the superstructure, repairs to the substructure, approach 3/1/ CUY WEST CENTER STREET BRIDGE Berea: West Center Street over east branch of the Rocky Municipal Bridge Project: Replace the West Center Street $3,125,000 River Bridge (SFN ) over the east branch of the Rocky River in the City of Berea. 3/3/ GEA OLD STATE RD (B H) Parkman Twp/Middlefield Twp: SR 088 to SR 528 CEAO CSTP Project: Resurface Old State Road from SR 088 to $811,000 SR 528 in Parkman and Middlefield townships. 3/3/ GEA GR FY2016 LOCAL N/A CEAO HSIP Project: Install new guardrail and updgrade existing guardail and guardail end treatments on various county roads. $350,000 3/3/ LAK VROOMAN ROAD Leroy Twp: SR 86 (Painesville Warren Rd) to IR 90 Resurface Vrooman Road from SR 86 (Painesville Warren Road) to IR 90 a distance of 1.2 miles more or less in Leroy Township. 3/3/ GEA KIRTLAND ROAD Chardon Twp: Lake County/Geauga County Line to US 6 (Chardon Road) MPO STP Project: Resurface Kirtland Road (CR 17) from the county line (Wisner Road) to US 6 (Chardon Road) in Chardon Township. 3/31/ CUY MEMPHIS AVENUE Brooklyn: WCL to Ridge Road Repair, reconstruct and intersection improvements on Memphis Avenue. 3/31/ CUY SR Slope Granger Road east of Canal Road in Garfield Hts. GSM Project: The design approach will be focused on 3 major areas: 1) To improve the collection and transport of groundwater and surface water before it has an opportunity to reach the pavement area. 2) To construct a catchment wall behind the curb line 4/1/ CUY SR Pepper Pike, Hunting Valley; SCL to NCL Resurface SOM Center Rd (SR 91) from the SCL to the NCL in Hunting Valley and Pepper Pike. 4/1/ LAK SR Mentor; West of SR 306 to Garfield Rd Resurfacing of Johnnycake Ridge Road (SR 84) from west of SR 306 to Garfield Road in the City of Mentor 4/1/ CUY US /04.90 Cleveland; East 93rd to US 20/Cleveland, Cleveland Hts; US Resurfacing Chester Ave from E. 93rd St to Euclid Ave (US 20) in 20 to Kenilworth Cleveland/Mayfield Rd from Euclid Ave (US 20) to Kenilworth Ave in Cleveland and Cleveland Hts 4/1/ CUY US Cleveland; US 6 to East 93rd St Resurface Chester Ave (US 322) from Superior Ave (US 6) East 93rd St in Cleveland. Urban Paving Program 4/1/ LAK SR Mentor ECL to Painesville WCL Resurface Lakeshore Blvd (SR 283)/Singer Ave/River St/Richmond St from the Mentor ECL to the Painesville WCL in Painesville Twp and Grand River Village. 4/1/ CUY SR Independence; Rockside Rd to NCL Resurface from Rockside Rd to the Cuyahoga Valley railroad in Independence. 4/1/ CUY SR 043DA Bedford Hts; SR 8 to SR 17 Resurfacing from Northfield Rd (SR 8) to Libby Rd (SR 17) in Bedford Hts 4/1/ CUY SR Westlake; SCL to US 20 Resurfacing from the North Olmsted corp line to Center Ridge Road (US 20) in Westlake. $1,390,500 $300,000 $2,936,900 $1,000,000 $1,089,000 $616,000 $1,485,000 $5,087,500 $775,000 $1,045,000 $385,000 $605, of 22 PIO_10year.xls

Proposed ODOT Construction Projects 2/1/11 thru 6/18/20

Proposed ODOT Construction Projects 2/1/11 thru 6/18/20 87466 D12 LG FY2011 Various routes & sections Annual contract to upgrade the lighting at various locations throughout District 12 based on systematic inspections. $290,000 2/24/2011 12075 CUY SR 176 12.67

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM TO: FROM: NOACA Board of Directors Grace Gallucci, Executive Director DATE: October 3, 2014 RE: Resolution No. 2014-044 Project Planning Reviews 1

More information

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

CUY LAKE TO LAKES TRAIL (PHASE 2): PID 1299 Superior Avenue Cleveland, Ohio 44114 216-241-2414 (extension 287) 216-621-3024 (fax) emay@mpo.noaca.org NOACA MEMORANDUM To: Melinda Bartizal (216) 584-2087 From: Ed May (216) 241-2414 ext. 287 Date:

More information

Proposed ODOT Construction Projects 1/1/18 thru 6/18/28

Proposed ODOT Construction Projects 1/1/18 thru 6/18/28 1/1/18 thru 6/18/28 1/1/2018 83147 CUY IR 09004.90 NOISE WALL 600 feet west of the Westlake/Rocky River corporation line Construct Type II Noise Barrier at spot locations in the Cities of $1,500,000 to

More information

Federal Aid # Termini

Federal Aid # Termini ROAD FEDERAL AID 2/26/2013 902 Ridge Road I 480 to Memphis 82566 County Brooklyn 8,309,354 10/16/2013 1027 Belvoir Blvd Fairmount Blvd. to Mayfield Rd 92121 County University Heights; South Euclid 3,614,497

More information

Buckeye Health Plan Community Solutions Allwell Medicare 2018 Preferred Pharmacy Listing

Buckeye Health Plan Community Solutions Allwell Medicare 2018 Preferred Pharmacy Listing Buckeye Health Plan Community Solutions Allwell Medicare 2018 Preferred Listing This Preferred Listing was updated on 09/27/2017. For more recent information or other questions, please contact Allwell

More information

01 Central Akron: State Route 8 on the east. I-76 on the south, west on I-76 to East Blvd,

01 Central Akron: State Route 8 on the east. I-76 on the south, west on I-76 to East Blvd, SP A linguistic (floating) district of Spanish speaking groups in Area 54. 01 Central Akron: State Route 8 on the east. I-76 on the south, west on I-76 to East Blvd, north to Diagonal Rd. and Portage Path,

More information

OGS FINDING AIDS. Title: Cuyahoga County, Ohio Plat Maps OHIO GENEALOGICAL SOCIETY

OGS FINDING AIDS. Title: Cuyahoga County, Ohio Plat Maps OHIO GENEALOGICAL SOCIETY OHIO GENEALOGICAL SOCIETY 611 State Route 97 W Bellville OH 44813-8813 419-886-1903 www.ogs.org OGS FINDING AIDS Users of this collection should credit the Ohio Genealogical Society in any reference citing.

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Bike_NoHelm_AVG_2011 Bike_Sdwlk_AVG_2011 Ped_Tot_AVG_2011. Bike_Male_AVG_2011. Bike_Fem_AVG_2011. Bike_Tot_AVG_2011.

Bike_NoHelm_AVG_2011 Bike_Sdwlk_AVG_2011 Ped_Tot_AVG_2011. Bike_Male_AVG_2011. Bike_Fem_AVG_2011. Bike_Tot_AVG_2011. Bike_Tot_AVG_2011 Location_ID Location Muni Muni_Type County 10101 Fairmount_W_Richmond Beachwood City CUY 4 5 2016 12 10 2 1 2 13 0 24 25 24 1 2 4 12 3 37 10102 SWoodland_W_Richmond Beachwood City CUY

More information

GEAUGA COUNTY POLLING LOCATIONS TOWNSHIP/VILLAGE PRECINCTS POLLING LOCATION ADDRESS CITY ZIP PHONE

GEAUGA COUNTY POLLING LOCATIONS TOWNSHIP/VILLAGE PRECINCTS POLLING LOCATION ADDRESS CITY ZIP PHONE GEAUGA COUNTY POLLING LOCATIONS -- 2015 TOWNSHIP/VILLAGE PRECINCTS POLLING LOCATION ADDRESS CITY ZIP PHONE 2015 AUBURN TWP A, B, C, D, E Adam Hall 11455 Washington St. (east of Auburn Rd.) Chagrin Falls

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

Aetna "Select Provider" Listing - Ambulatory Surgery Cleveland - January, CSA St. Vincent Charity Hospital

Aetna Select Provider Listing - Ambulatory Surgery Cleveland - January, CSA St. Vincent Charity Hospital OHIO ASHTABULA COUNTY Ashtabula Ashtabula County Medical 6460140, 34194 2420 Lake Avenue Ashtabula, OH 44004 Phone: 440-997-2262 CUYAHOGA COUNTY Beachwood Cleveland for Digestive Health & Endoscopy, LLC.

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

142 Collaborative Actions by County June 28, 2011

142 Collaborative Actions by County June 28, 2011 New Release! History of the Project... 142 s by County June 28, 2011 The KSU Center expresses its appreciation to the Fund for our Economic Future, The Knight Foundation, and the Civic Commons for their

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations Rapid Transit Facilities 1 1.T.2 Brookpark Road Station Reconstruct and reconfigure the Brookpark Road station. 1 1.T.5 Puritas Avenue Station Reconstruct and reconfigure the Puritas Avenue (West 150th

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

STORES ADDRESS TUES WED THURS FRI SAT ACME #15 AKRON 3979 MEDINA RD, AKRON, OH X X #20 PARMA 1225 PLEASANT VALLEY RD.

STORES ADDRESS TUES WED THURS FRI SAT ACME #15 AKRON 3979 MEDINA RD, AKRON, OH X X #20 PARMA 1225 PLEASANT VALLEY RD. STORES ADDRESS TUES WED THURS FRI SAT ACME #15 AKRON 3979 MEDINA RD, AKRON, OH X X #20 PARMA 1225 PLEASANT VALLEY RD., PARMA, OH X X BUEHLER'S FOREST MEADOW 275 FOREST MEADOW RD., MEDINA, OH 44256 X RIVERSTICKS

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Aetna "Select Provider" Listing - Ambulatory Surgery Cleveland - January, 2013

Aetna Select Provider Listing - Ambulatory Surgery Cleveland - January, 2013 OHIO ASHTABULA COUNTY Ashtabula Ashtabula County Medical 6460140, 34194 2420 Lake Avenue Ashtabula, OH 44004 Phone: 440-997-2262 CUYAHOGA COUNTY Beachwood Cleveland for Digestive Health & Endoscopy, LLC.

More information

District One Contacts

District One Contacts District 1 District One Contacts Kirk Slusher District Deputy Director 419-999-6804 kirk.slusher@dot.state.oh.us Dan Kaseman District Planning & Engineering Administrator 419-999-6861 dan.kaseman@dot.state.oh.us

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34 Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

East Cleveland/ Bratenahl

East Cleveland/ Bratenahl E 106TH ST East / Bratenahl EAST 105TH ST.! Station Type: Urban, bus transfer station! Site: E. 105th St. & Dupont Ave.,! Serves: east side, East, Bratenahl! urrent Land Use: Parking lot (private) & RTA

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 3 2017 CONSTRUCTION PROGRAM Crawford Richland SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES Erie Lorain Huron Medina Ashland Wayne JOHN R. KASICH, OHIO

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal of Ohio - Department of Transportation Page: 1 : 08/02/18 180411 Warren /CLI-IR 71-07.05/00.00 $17,632,000.00 106242 FOUR LANE RESURFACING 8/30/2019 E180(162) BARRETT PAVING MATERIALS 3751 COMMERCE DR,

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road. Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

Culpeper District. Albemarle County Monthly Report December 2011

Culpeper District. Albemarle County Monthly Report December 2011 Culpeper District Albemarle County Monthly Report Special Issues Construction Significant Accomplishments (as of 11/15/11) Georgetown Road completed on November 8. I-64 Eastbound Shadwell Exit completed

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

Case: 2:06-cv ALM-TPK Doc #: Filed: 05/30/12 Page: 1 of 41 PAGEID #: 6729

Case: 2:06-cv ALM-TPK Doc #: Filed: 05/30/12 Page: 1 of 41 PAGEID #: 6729 Case: 2:06-cv-00896-ALM-TPK Doc #: 277-12 Filed: 05/30/12 Page: 1 of 41 PAGEID #: 6729 Page 1 of 41 A.J.RICKOFF SCHOOL 3500 E. 147TH STREET CLEVELAND, OH 44120 CLEVELAND -01-A CLEVELAND -01-K CLEVELAND

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $0.856 09/04/2013 County Route 528 Roundabout

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

Whittier Bridge Project

Whittier Bridge Project Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013 Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013 Cleveland Innerbelt Construction Schedule former schedule 2011 Winter Begin Construction Innerbelt CCG1 (WB Bridge)

More information

Delaware County Engineer

Delaware County Engineer 2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location Number Individual STIP ID Improvement Type Source of Funds Type/ Program TOTAL HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance

More information

Program Project Name Project Description

Program Project Name Project Description Program Project Name Project Description PAVING BERLIN-BARRE CITY ***List Provided by Vermont's Agency of Transportation*** RESURFACE VT62 IN BERLIN AND BARRE CITY, BEGINNING APPROX. 0.2 MILE EAST OF THE

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION OHIO DEPARTMENT OF TRANSPORTATION DISTRICT 3 2013 CONSTRUCTION PROGRAM SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place. EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION

NEW JERSEY DEPARTMENT OF TRANSPORTATION Burlington Bispham Street Bridge over Rancocas Creek (DB # D0806) OTHER CON $1.000 $1.000 $0.000 N/A $1.000 Hanover Street Bridge over Rancocas Creek, CR 616 (DB # D9902) STP-STU CON $3.240 $0.000 $0.000

More information

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

I-94 East Corridor Performance

I-94 East Corridor Performance Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities

More information

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015) Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal

More information

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1 Funding Prior Years Expenditures to 6-30-10 Total Project Cost Estimated Expenditures for FY 2006 Non- Taxable Non- Housing RDA Bonds Bond Proceeds 2005 Prop. 1B USDA Loans/ Grants Dev Impact Fees TUMF

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

Capital Improvement Program Fiscal Year

Capital Improvement Program Fiscal Year Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications. FY TIP Project Title/Location STIP ID HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway Fund

More information

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION ODOT ODOT DISTRICT 7 2018 CONSTRUCTION DISTRICT 7 PROGRAM 2018 CONSTRUCTION PROGRAM SERVING AUGLAIZE, CHAMPAIGN, CLARK, DARKE, LOGAN, MERCER, MIAMI, MONTGOMERY & SHELBY COUNTIES JOHN R. KASICH, OHIO GOVERNOR

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

Gulf Coast MPO Obligated Projects

Gulf Coast MPO Obligated Projects Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road

More information

THE CANAL BASIN DISTRICT PLAN

THE CANAL BASIN DISTRICT PLAN T h e C a n a l B a s i n D i s t r i c t P l a n, C l e v e l a n d, O h i o - 2 0 0 9 F i n a l R e p o r t The Canal Basin District Plan creates a new green infrastructure for the city of Cleveland,

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv) Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,

More information

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016

PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 PROJECTS OBLIGATED FOR FEDERAL HIGHWAY ADMINISTRATION FUNDING IN THE SOUTHEASTERN WISCONSIN REGION: 2016 Project Description Phase Milwaukee Milwaukee 24 2016307 2200-13-70 WEST HIGHLAND AVENUE, CITY OF

More information