1 DEMING HEIGHTS PARK LOCATION AND HISTORY Located in the Audubon Park neighborhood, Deming Heights Park is surrounded by a residential area. The first land for the park was acquired in 1913 along with the land for St. Anthony Boulevard. The land was desired because it was the highest point in the Minneapolis park system. At 963 feet above sea level it is ten feet higher in elevation than Sunset Hill on Memorial Parkway north of Wirth Park. Writing in the 1914 annual report, park board president Thomas Voegeli commented on the great natural beauty of the land through which the new St. Anthony Boulevard would pass. Voegeli wrote that the view from the highest point in the city at yetto-be-named Deming Heights Park, could fill the hearts of Minneapolis citizens with patriotic pride. Since its acquisition the park has been treated as a section of St. Anthony Parkway and its acreage included with that of the parkway. With Columbia Park located just two short blocks to the east and Audubon Park two blocks south, the neighborhood already was considered to be well-provided with recreation amenities, so none were ever added to Deming Heights Park which is why it is considered a jewel of ecological importance today. The land was acquired for the view it provided and therefore little has been done in the way of park improvements since its acquisition. EXISTING CONDITIONS AND CHARACTER The site has striking topography a rolling turf hillside with mature tree canopy and areas of meadow. There is a major bicycle presence as the regional trail passes through the park. Deming is one of the most ecologically significant neighborhood parks in the service area, providing an important understory habitat for urban wildlife. Neighbors have spotted a wide variety of birds and even the occasional fox in the park. As it sits on the parkway, which is also an ecological corridor linking to the river, it is an especially critical node of habitat. The view from the park is outstanding. THE PROPOSED DESIGN The design accentuates the natural features and experience of the existing park by maintaining the mature tree canopy, expanding understory planting areas, and placing gathering areas to maximize views. A ropes course was considered for the park, but is instead proposed in nearby Waite Park, as to not impact the habitat that Deming Heights offers to local wildlife. A bicycle maintenance station, plaza, and trail map kiosk are added to entrance of the park to support bicyclists and other users of the regional trail system. A small picnic pavilion formalizes a lookout point in the park and creates a space for groups to enjoy the spectacular views. The observation deck and picnic grove are located on the newly improved ADA pathway, which is currently lacking in the park. CONNECTIONS BETWEEN PARKS Because Deming Heights straddles the parkway, crossing St. Anthony Parkway poses a barrier for park users, and the improved crossing in the park should consider a highly visible option to increase safety for all modes on the Parkway. Wayfinding and trail amenities are important considerations along the entire Grand Rounds. KNOWN LAND USE AND COORDINATION ISSUES As a neighborhood park that flanks a regional parkway, ongoing coordination between regional master planning and funding is required during implementation of the proposed plan. 124

2 INTRODUCTION PLANNING PROCESS SERVICE AREA VISION OPERATIONS AND MAINTENANCE PARK PLANS IMPLEMENTATION 32ND AVE NE REGIONAL BIKE TRAIL AN TH ON AR YP FILLMORE ST NE ST POLK ST NE PICNIC GROVE MATURE TREE CANOPY (MAINTAINED FOREST) REGIONAL TRAIL ROUTE AY KW TRAIL KIOSK DEMING HEIGHTS PARK EXISTING CONDITIONS NORTH EAST OF THE RIVER PARK MASTER PL AN East of the River Park Master Plan 125

3 32ND AVE NE REGIONAL BIKE TRAIL NATURAL AREA : WOODLAND ELEVATION MARKER INTERPRETIVE SIGN POLK ST NE ST ANTHONY PARKWAY FILLMORE ST NE PICNIC GROVE PICNIC SHELTER AND OBSERVATION DECK MATURE TREE CANOPY (MAINTAINED FOREST) REGIONAL TRAIL ROUTE IMPROVED WALKING PATHS ENTRANCE SEATING BIKE MAINTENANCE STATION ENTRY PLAZA TRAIL KIOSK GRAND ROUNDS INTERPRETIVE SIGN IMPROVED CROSSING DEMING HEIGHTS PARK NORTH East of the River Park Master Plan New or significantly changed amenity Existing amenity to remain 126

4 DEMING HEIGHTS DESIGN MATRIX General Input August 2017-May 2018 Design Responses (May 2018) Initial Concepts Input (July-August 2018) Preferred Concept (September 2018) Ecology This park is a ecological resource for the city. Maintained existing tree canopy. Proposed additional prairie and understory plantings to increase habitat. Strong support for ecological restoration and understory plantings. Preferred concept includes expanded understory plantings. Play Wayfinding and Circulation Gathering Aquatic Fields Courts Diamonds Winter Request to explore play opportunities in the park. Park is located along regional trail route. Request to add space to support regional trail users. This park is the highest point in the city, great potential for gathering and observation area. Proposed a ropes course. Proposed an entry plaza Proposes multiple picnic areas, observation deck, fire pit, and entry plaza. Support for ropes course but concern for staffing and ecological impact. Support for improved entrance plaza and walkways. Request to maintain the existing staircase on site. Strong support for observation deck, picnic areas, and entry plaza. Opposition to the fire pit. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Ropes course was not included in the preferred concept. Preferred concept includes plaza space with kiosk and bike repair station. Entry plaza, expanded picnic, observation deck, and picnic shelter included in preferred concept. Other 127

5 PROPOSED AMENITY COST ESTIMATE Asset Type Project 2019 ESTIMATED COST/PROJECT Landscape Naturalized areas $ 379,675 Other Group picnic shelter $ 104,411 Other Observation Plaza $ 94,919 Other Renovate walking paths $ 352,870 Other Bicycle Maintenance Station $ 3,797 Other Kiosk $ 28,922 Other Miscl. signs, trees, furniture $ 18,637 TOTAL $ 983,230 OPERATIONS ESTIMATE Amenity Total Per Unit Operations Cost Qty Cost Group Shelter $ 4, $ 4, Trail Additions $ 5, $ 5, Plaza $ 10, $ 10, Kiosk $ 2, $ 2, Difference $ 21,

6 DICKMAN PARK LOCATION AND HISTORY Located in the heart of the St. Anthony West neighborhood, just blocks from the river and the heart of NE Minneapolis, Dickman Park is an important punctuation of greenspace in the urban environment. When acquired, the park was called the Main Street Northeast Playground Site, a very straightforward choice as it was a playground in NE Minneapolis on Main Street. The park was renamed in 1955 for Ralph E. Dickman, a youth worker in northeast Minneapolis turned attorney and Hennepin County Commissioner. The initial 1.23 acres of land for the park were purchased by condemnation in Although the park was smaller than desired, it was located in a neighborhood described as under-served in a 1944 survey of park properties and the needs of the city. The park was expanded in 1954 in an unusual deal. Pioneer Engineering Works acquired ten acres of land from the park board at Northeast Athletic Field in exchange for an acre of land it owned adjacent to Holmes Park and five parcels of land the company bought for the park board to expand Dickman Park. The original deal was for the Holmes land and some cash, but the district court, which had to approve all land dispositions by the park board, ruled that the deal had to be for land only. So Pioneer bought the land at Dickman Park and turned it over to the park board. Before the park was improved in 1955, an additional 0.39 acre was also purchased by condemnation. In 1955, the park was filled and graded after the buildings on the land were moved. Initial plans were for a small athletic field, volleyball and basketball courts, and a picnic area. In 1957 a wading pool was added to complete initial construction. Skaters at Dickman Park were able to put on their skates in a warming house for the first time in the winter of A recreation shelter for the park was completed in Dickman Park facilities were renovated in 2014, including a new playground, two new benches, and a new picnic table. EXISTING CONDITIONS AND CHARACTER This 2-acre park is set in the residential St. Anthony West neighborhood. It is.25 miles from Boom Island park and the Mississippi river front. A large senior care facility is within a block of the park. It is a small park with an open greenspace, picnic pavilion, playground, wading pool, and a small enclosed shelter building. THE PROPOSED DESIGN This design envisions the park as an urban agriculture hub with community garden space, orchard, and community kitchen. The urban agriculture hub would be managed through a partnership with a neighborhood or food access organization. The community garden would provide water and storage space in line with the Urban Agriculture Plan. The community kitchen is inside the existing structure and would be built to commercial kitchen specifications to provide opportunities for safe food processing for public consumption (though per the community garden policy, produce from the community garden itself could not be processed for sale). A single multi sport court is included to foster more multigenerational activities in the park rather than passive 129

7 uses. A central flexible field can be used for community gathering, event space, and play. The design also seeks to improve the neighborhood connections with improved entrances, crossings, and pathways, especially for the high density of senior housing and elder care facilities nearby. CONNECTIONS BETWEEN PARKS Connections through the park along the northern edge in line with 7th Avenue NE are a critical circulation path to maintain, with special consideration for connections to the nearby river parks and NE Farmers Market. KNOWN LAND USE AND COORDINATION ISSUES If a commercial kitchen is built in the park as part of the Urban Agriculture Zone, and with the establishment of a community garden, the Zone would require a community sponsor to steward the effort in collaboration with MPRB. 130

8 NE 2ND ST PERGOLA NATURAL AREA : FLOWER GARDEN 7TH AVE NE PARK BUILDING WADING POOL NE MAIN ST BASKETBALL COURT PLAYGROUND OPEN FIELD DICKMAN PARK EXISTING CONDITIONS NORTH East of the River Park Master Plan 131

9 IMPROVED CROSSING 7TH AVE NE NE MAIN ST NE 2ND ST LOADING ZONE PERGOLA NATURAL AREA : FLOWER GARDEN NATURAL AREA : BEE LAWN URBAN AGRICULTURE ZONE: COMMUNITY GARDEN URBAN AGRICULTURE ZONE: COMMUNITY KITCHEN WADING POOL PLAZA PICNIC AREA ORCHARD PLAYGROUND FLEX FIELD NATURAL AREA : WOODLAND MULTISPORT COURT DICKMAN PARK NORTH East of the River Park Master Plan New or significantly changed amenity Existing amenity to remain 132

10 DICKMAN DESIGN MATRIX General Input August 2017-May 2018 Design Responses (May 2018) Initial Concepts Input (July-August 2018) Preferred Concept (September 2018) Ecology No comments. No comment. No comment. No comment. Play Existing play area is liked. Maintains existing playground. No comment. Includes existing playground. Wayfinding and Circulation Request for improved neighborhood connectivity Improves connections to neighborhood and removes redundant pathways. Request for improved crossings into park. Preferred concept includes realigned walkways and improved crossings. Gathering Request to improve community gathering spaces. Proposed a large plaza, game space, and outdoor work space. Support for plaza and game space. Request to Preferred concept includes expanded plaza space. expand picnic areas. Aquatic No comments. One plan suggested splash pad and the other recommended a wading pool. Strong support for maintaining the wading pool. Low support for splash pad. Preferred design includes existing wading pool. Fields Flex field is used for open play and gatherings Maintains existing flex field. No comments. Preferred concept includes central flexible field. Courts No comments. Maintains existing playground. Request to update the basketball area. Preferred concept includes multisport court Diamonds Not applicable. Not applicable. Not applicable. Not applicable. Winter Not applicable. Not applicable. Not applicable. Not applicable. Other Request for food related amenities. Proposed a community garden, orchard, and community kitchen. Support for the community kitchen, community garden and orchard. Preferred concept includes the community garden, orchard, and kitchen. 133

11 PROPOSED AMENITY COST ESTIMATE Asset Type Project 2019 ESTIMATED COST/PROJECT Aquatics Wading Pool, incl. demolition of existing wading pool $ 854,268 Play Traditional Play Structure in existing container $ Other Pergola $ 17,465 Courts Multisport Court $ 132,886 Landscape Naturalized areas $ 6,644 Landscape Urban Agriculture Area $ 28,911 Other Building renovation $ 840,505 Other Renovate walking paths $ 110,865 Other Miscl. signs, trees, furniture $ 39,831 TOTAL $ 2,031,376 OPERATIONS ESTIMATE Amenity Total Per Unit Operations Cost Qty Cost Volleyball $ 1, $ (1,500.00) Urban Agriculture $ 15, $ 15, Multisport Court $ 1, $ 1, Half Court Basketball $ 1, Difference $ (1,000.00) $ 14,

12 ELWELL PARK LOCATION AND HISTORY Located in the Marcy Holmes neighborhood close to 35W, Elwell Park is a true pocket park for the neighborhood. The original Elwell Park was taken by the Minnesota Department of Highways to build the I-35W freeway through east Minneapolis in the early 1960 s. The park was given a major update in The renovation was paid for partly with Neighborhood Revitalization Project (NRP) funds designated by the neighborhood. The park is also known as Turtle Park. Local artists Susan Warner and Marcia MacEathron created the original mosaics. The park plan was laid out to mimic a floor plan of a house. Children from Marcy Open School to designed the original tiles seen throughout the park. EXISTING CONDITIONS AND CHARACTER Elwell Park is a.75-acre children-oriented pocket park in the Marcy Holmes residential neighborhood. The narrow lot has two main play areas and a seating area. The park is highly used by neighborhood families. The park is also lovingly maintained by local residents who donate plants, labor, and time. The neighborhood organization has been fundraising to update the public art elements in the park. The process has been underway for several years, and while there are many hopes for the park, the public art element is a key part of its identity and form. THE PROPOSED DESIGN Design focuses on the renovation of this much loved neighborhood pocket park and proposes plaza spaces and increased seating to support community gathering. The design supports all aspects of the restored artwork including the wall, bench, and turtle along with a new interpretive sign explaining the significance of the site. The gathering space is oriented to the street to provide a welcoming environment for passers by. The play areas include a children s playground as well as an outdoor fitness area. KNOWN LAND USE AND COORDINATION ISSUES Ongoing coordination with the neighborhood on the public art installation and maintenance is required on an ongoing basis or for the life of the art piece. A Park Stewardship Agreement should be finalized to outline the areas stewarded by the neighbors. The park could be expanded in the future to include the area where NW Bell currently has a parking lot if park expansion is of interest or if the parcel becomes available. 135

13 INTRODUCTION PLANNING PROCESS SERVICE AREA VISION OPERATIONS AND MAINTENANCE PARK PLANS 6T HS TS IMPLEMENTATION E PLAYGROUND PUBLIC ART WALL FLOWER GARDEN PLAYGROUND ELWELL PARK EXISTING CONDITIONS NORTH EAST OF THE RIVER PARK MASTER PL AN East of the River Park Master Plan 136

14 INTRODUCTION PLANNING PROCESS SERVICE AREA VISION OPERATIONS AND MAINTENANCE PARK PLANS 6T HS TS IMPLEMENTATION E INTERPRETIVE SIGN ART (Turtle statue) SEAT WALL ART WALL GATHERING AREA PUBLIC ARTPUBLIC RESTORED WALL ART WALL FLOWER GARDEN ADULT FITNESS AREA PLAYGROUND SEAT WALL ART WALL ELWELL PARK NORTH EAST OF THE RIVER PARK MASTER PL AN East of the River Park Master Plan New or significantly changed amenity Existing amenity to remain 137

15 ELWELL DESIGN MATRIX General Input August 2017-May 2018 Design Responses (May 2018) Initial Concepts Input (July-August 2018) Preferred Concept (September 2018) Ecology Play No comment No comment No comment No comment Expand play opportunities and recreation options for all ages. Need to update the equipment and surfacing. Proposed multigenerational play space and fitness area. Support for multigenerational play space. Preferred concept includes play space with adjacent multigenerational play and fitness area. Wayfinding and Circulation Request for improved park signs and ADA compliant pathways. Proposed renovation of Support for new pathways and plazas. Request for interpretative signs. Added interpretive entry sign to preferred concept. Gathering Request for additional group gathering space. Proposed new central plaza space and seating options. Support for plaza spaces Preferred concept includes flexible plaza space. Aquatic Fields Courts Diamonds Winter Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Not applicable. Other Community wants to hide adjacent parking lot. Potential to expand park into the adjacent parcel. Community members want more public art opportunities incorporated into plans. Plan includes public art wall to block view to parking lot. No comment Proposed expanding the park into the adjacent parcel. No interest in park expansion. Preferred concept shows existing park boundaries. 138

16 PROPOSED AMENITY COST ESTIMATE Asset Type Project 2019 ESTIMATED COST/PROJECT Small Scale Traditional Play Structure in existing Play container $ 403,404 Other Renovate walking paths $ 8,672 Other Adult Fitness: multigenerational play equipment $ 14,238 Other Plaza Area $ 31,967 Other Miscl. signs, trees, furniture $ 9,166 TOTAL $ 467,446 OPERATIONS ESTIMATE Amenity Total Per Unit Operations Cost Qty Cost Plaza $ 10, $ 10, Adult Fitness Equipment $ 2, $ 2, Difference $ 12,

17 HIVIEW PARK LOCATION AND HISTORY Located at the top of an incline in the Columbia Park neighborhood, Hiview Park was acquired from the state in The state had acquired the property for non-payment of taxes. The original park was 3.74 acres, but it was expanded in The park board acquired the land at a time when it was looking to fill gaps in playground service identified in a 1944 study of park facilities. While the neighborhood around Hiview was not on the list of neighborhoods needing playgrounds, the Park Board seized the opportunity to obtain free land from the state, when it discovered the land was on the state s list of tax-forfeited properties. The undeveloped land had been used as a playing field by children in the neighborhood for years. The Park Board began developing the land for a park in 1951, partly because it had some money left over from improvements at Bottineau Park. The initial improvements to the park an athletic field, volleyball courts, and children s play area were completed in In 1961, the park was expanded slightly. A small shelter was built and the playground was updated. The next round of improvements to the park occurred in 1977, when a wading pool was added. In 1989, the park was renovated with a new totlot play area and a baseball field and backstop. In 2016, a new wading pool and new playground opened. EXISTING CONDITIONS AND CHARACTER This 4-acre park is set in the Colombia Park Neighborhood. Hiview is situated on the edge of residential and industrial land uses. A large rail yard abuts the western edge of the park. It is.5 miles from the Mississippi Riverfront. Hiview has a tiered arrangement true to its name, with views of the surrounding area from a high vantage point. A sidewalk gap exists along the western edge of the park, which also includes a popular bus stop for the neighborhood. The existing recreational amenities are well used including the wading pool, playground, tennis courts, and horseshoe pit. A neighborhood community garden exists nearby. Because of the site s grade change, the basketball court poses a challenge with ball control, which a fence around the court could help. THE PROPOSED DESIGN The design for Hiview maintains the primary play and open green spaces of the park while expanding recreation and gathering areas. It also improves overall circulation in the park and connection to adjacent transit lines. A new walkway and transit plaza space is added to the western edge of the park. Four combination tennis and pickleball courts are proposed on the southern edge of the park expanding the existing courts. The edges of the park provide opportunity for pollinator habitat with a bee lawn, while the multi-use field remains and is improved. With the basketball and other court sports in close proximity, along with the grade change, the basketball court should be fenced to enhance the safety of all users of the park. 140

18 A new seating area and picnic pavilion are added to accommodate larger groups on the lower tier of the park near the horseshoe pits, which are expanded to accommodate league play. CONNECTIONS BETWEEN PARKS A new sidewalk is proposed along the western edge of the park along with improved crossings at all corners of the park. A small transit plaza and waiting area along Main Street will be included on the street edge to accommodate transit users to and from the park. KNOWN LAND USE AND COORDINATION ISSUES There are no known land use or coordination issues with Hiview. 141

19 INTRODUCTION PLANNING PROCESS SERVICE AREA VISION PARK PLANS OPERATIONS AND MAINTENANCE IMPLEMENTATION NE MAIN ST ED G 35TH AVE NE BASKETBALL WADING POOL PICNIC SHELTER E PL HORSESHOE PICNIC AREA PLAYGROUND NE 2ND ST HIVIEW PARK EXISTING CONDITIONS NORTH EAST OF THE RIVER PARK MASTER PL AN East of the River Park Master Plan 142

20 EDGE PL NE MAIN ST NE 2ND ST 35TH AVE NE IMPROVED CROSSINGS TRANSIT PLAZA EXTENDED SIDEWALK TENNIS/PICKLE BALL FLEX FIELD FENCED BASKETBALL WADING POOL IMPROVED PICNIC SHELTER HORSESHOE PICNIC AREA PICNIC PAVILION PLAYGROUND IMPROVED WALKING PATHS NATURAL AREA: BEE LAWN HIVIEW PARK NORTH East of the River Park Master Plan New or significantly changed amenity Existing amenity to remain 143

21 HIVIEW DESIGN MATRIX General Input August 2017-May 2018 Design Responses (May 2018) Initial Concepts Input (July-August 2018) Preferred Concept (September 2018) Ecology Request to expand the natural areas and support the existing mature canopy. Added natural areas around the park edge and under the mature tree canopy. No comment. Natural areas including bee lawn added around park edges. Play Playground was recently renovated and in great condition. Playground is maintained. No comment. Playground is maintained. Wayfinding and Circulation Missing pedestrian pathways on the park edge and near the transit stop. Pathways added surrounding the park. Request to improve connection to public transit routes. Preferred concept includes walking trail loops, sidewalks along the park edge and improved transit plaza. Gathering Picnic pavilion needs renovation. Improved Proposes renovation to existing pavilion gathering spaces needed throughout the park. and new picnic pavilion be added. Support for increased gathering spaces. Preferred concept includes renovated picnic shelter and new picnic pavilion adjacent to the horseshoe. Aquatic Wading pool is recently renovated. Pool is maintained. No comment. Pool is maintained. Fields Currently 2 larger flexible lawns. Request to use on area for tennis courts. One field is maintained the other transitioned to court space. Support for multiuse fields One multiuse flexible field is maintained. Courts Basketball court is highly used. Request for tennis be added. Basketball maintained and a bank of four tennis added. Support for maintaining basketball and including tennis courts. Preferred concept maintains the existing basketball court and newly proposed four tennis and pickleball courts. Diamonds Not applicable. Not applicable. No comment. Not applicable. Winter Not applicable. Not applicable. No comment. Not applicable. Other Not applicable. Not applicable. No comment. Not applicable. 144

22 PROPOSED AMENITY COST ESTIMATE Asset Type Project 2019 ESTIMATED COST/PROJECT Aquatics Wading Pool, incl. demolition of existing wading pool $ 854,268 Play East: Traditional Play Structure in existing container $ 806,809 Courts Tennis Court (4) $ 493,577 Courts Basketball Court (1) $ 123,394 Landscape Naturalized areas $ 54,483 Other Building expansion $ 261,026 Other Group picnic shelter $ 104,411 Other Renovate walking paths $ 1,214,959 Other Miscl. signs, trees, furniture $ 78,259 TOTAL $ 3,991,187 OPERATIONS ESTIMATE Amenity Total Per Unit Operations Cost Qty Cost Group Shelter $ 4, $ 4, Tennis Court $ 1, $ 6, Difference $ 10,

23 HOLMES PARK LOCATION AND HISTORY This 4.3-acre park in the Marcy Holmes Neighborhood is directly adjacent to Marcy Open School and bordered by 4th Street on the west. Holmes Park s history is an incremental journey with the first land for the park acquired in Homes were removed from the land and the block was graded for playing fields and a blacktop, as well as a small shelter to serve primarily as a warming house for skating. In 1959 the Holmes School PTA requested that the blacktop be replaced with grass and a softball field, a project completed that same year. In 1983 the Park Board acquired an additional two acres of land for the park, bringing the total to about 4½ acres. The land was purchased from the school board. The final boundaries of the park were established in 1991 when the school board and park board rearranged their ownership of the two blocks to accommodate the construction of Marcy Open School. At that time the last privately owned lot on the parcel of land was purchased by the school board and turned over to the park board as part of the deal. EXISTING CONDITIONS AND CHARACTER Holmes Park sees heavy use from school activities, especially on the playground. The park is highly used and shows significant signs of wear. The park has a large central turf field that appears to be graded for water infiltration. The park playground was situated around the school in a fan shape to mirror the form of the building. During school hours the playground is at capacity, and while it is open to the public during park hours, it is important for the playground and park to remain welcoming to the general public throughout the day and year. A stormwater garden was installed by community members in collaboration with MWMO at the edge of the school, and while it is not on park property, it has played an important role in knitting the school grounds and parkland together from a circulation perspective. The wading pool is well loved, and the wall of the nearby restroom/pumphouse is a potential site for public art, as identified by the community. However, the wading pool is situated along the edge of 4th Street which is a busy one-way arterial corridor, and adjacent to the school on another side, both competing land uses with a small children s gathering space. The tennis and basketball courts at the north edge of the park are popular neighborhood spots. In terms of circulation, the park is heavily trafficked by pedestrians passing through the bustling Marcy Holmes neighborhood, and clear circulation is an important feature of the park.park currently. THE PROPOSED DESIGN Because of the adjacent Marcy Open School, this park is one that plays dual function much of the year as a school outdoor space and a neighborhood park. The proposed design facilitates a clear designation of the park as a public space that is open to all users, young and old. Circulation is improved to accommodate the desire lines of passage through the park from corner to corner and across from 5th to 4th without compromising the larger flexible greenspace in the middle of the park. That green space is intended to accommodate drop-in soccer and other field sports, as well as other unprogrammed recreational and leisure activities. The popular tennis courts are expanded 146

24 to from 2 courts to 3 courts A second play area and relocated wading pool articulate that the park play areas are intended for the general public as well as the school. The wading pool and pump house are relocated away from 4th to situate the amenity in a quieter area of the park, farther away from the busy traffic of 4th Street. The edge of the park along 4th will integrate with proposed bike facilities and improved transit connections, including a potential E Line bus rapid transit station. The design includes two play areas. A new multi-generational nature play located near the tennis courts keeps in mind the original design of the park by the community in the 1980s. The existing playground near the school is redesigned and upgraded in conjunction with planned school updates in A walking loop and seating areas throughout the park, including a small woodland gathering area, are included as multigenerational amenities in the park to ensure Holmes continues to be a welcoming space for all. The natural areas added along the edges are proposed as bee lawn which have same look as the current park, but to attract pollinators and enhance the ecological function of the park. KNOWN LAND USE AND COORDINATION ISSUES Additional coordination with Minneapolis Public Schools about parcel ownership is required. As the new playground is installed, MPS will work in collaboration with MPRB during demo and construction of the new playground. The Community Advisory Committee for the East of the River Park Master Plan has made it clear that the master plan is recommended contingent on ongoing coordination with MPS, especially around circulation in the park. MPRB requests that circulation patterns are improved across the park as part of the school expansion. CONNECTIONS BETWEEN PARKS Holmes Park is along the potential future route of the E Line Bus Rapid Transit System. As route and station planning continue, MPRB will coordinate with Metro Transit on this important regional transit connection opportunity, as long as there is no negative impact to park land or park users. Safe connections across 4th Street and the new County bicycle facilities along that street are important for park users access to the nearby Mississippi River, Chute Square, and Elwell Park. 147

25 INTRODUCTION PLANNING PROCESS SERVICE AREA VISION HS TS OPERATIONS AND MAINTENANCE IMPLEMENTATION PERGOLA E DA VE SE 5T PARK PLANS 2N TENNIS BASKETBALL PLAYGROUND MULTIUSE FIELD 4TH ST SE WADING POOL MARCY OPEN SCHOOL* MPRB PROPERTY LINE HOLMES PARK EXISTING CONDITIONS NORTH EAST OF THE RIVER PARK MASTER PL AN East of the River Park Master Plan 148

26 5TH ST SE 2ND AVE SE NATURAL AREA: BEE LAWN EXPANDED TENNIS & PICKLEBALL WADING POOL FLOWER GARDEN NATURE PLAY 4TH ST SE MARCY OPEN SCHOOL* IMPROVED WALKING PATHS IMPROVED BASKETBALL PLAYGROUND SHADE ARBOR MULTIUSE FIELD ADA ACCESSIBLE WALKING LOOP SOCIAL SWINGS MULTI-SPORT HALF COURT *MARCY OPEN SCHOOL PLAN IS REPRESENTATIVE OF PROPOSED EXPANSION HOLMES PARK MPRB PROPERTY LINE NORTH East of the River Park Master Plan New or significantly changed amenity Existing amenity to remain 149

27 HOLMES DESIGN MATRIX General Input August 2017-May 2018 Design Responses (May 2018) Initial Concepts Input (July-August 2018) Preferred Concept (September 2018) Ecology No Comments To meet broader service area requests, added natural areas throughout the park. Support for natural areas. Natural area bee lawn and flower gardens placed throughout the park. Play The playground is currently being renovated. Any plans should incorporate developing plans. Request to expand if possible. Added natural play. Request to improve playgrounds. Request to include play area away from the school. Support for nature play. Nature play was added to the western edge of the park. New playground containers are represented. Wayfinding and Circulation Current pathways are in poor condition. Improved pathways and defined walking loop. Support for improved walking paths and ADA accessibility. A fully accessible 1000' walking loop was added. Pathways improved throughout. Gathering Gathering space is adjacent to the school, not friendly to larger community. Proposed seating areas in western side of the park. No comments. Plaza space with picnic and restrooms added to the western side of the park. Aquatic Wading pool in poor condition. Proposed a wading pool and splash pad be relocated to the western side of the park. Support for the addition of the splash pad Splash pad was added to the western side of the and request for wading pool to be renovated. park. Fields Multiuse field is used but large. Slightly reduced the size of the multiuse Support for multiuse fields. field to accommodate additional amenities. Multiuse field is maintained but slightly smaller. Courts Tennis and basketball courts are highly used. Maintained basketball courts and expanded tennis courts. Support for basketball and tennis courts. Maintained basketball courts and expanded tennis courts. Diamonds Not applicable. Not applicable. Not applicable. Not applicable. Winter Not applicable. Not applicable. Not applicable. Not applicable. Other Limited amenities for the larger community. Concern that the school needs dominate the park. Proposed nature play and gardens on the western side of the park. Support for development of amenities throughout the park. Amenities spread throughout the park with special focus on areas away from the school. 150

28 PROPOSED AMENITY COST ESTIMATE Asset Type Project 2019 ESTIMATED COST/PROJECT Aquatics Wading Pool, incl. demolition of existing wading pool $ 854,268 Other New Pump House and changing room $ 533,443 Play Traditional Play Structure in existing container $ 806,809 Play Nature Play $ 806,809 Athletics Athletic Field renovation $ 504,968 Courts Tennis Court $ 370,183 Courts Basketball Court $ 185,091 Landscape Naturalized areas $ 22,780 Other Social Swings $ 37,967 Other Renovate walking paths $ 485,984 Other Miscl. signs, trees, furniture $ 92,166 TOTAL $ 4,700,469 OPERATIONS ESTIMATE Amenity Total Per Unit Operations Cost Qty Cost Nature Play $ 7, $ 7, Tennis Court $ 1, $ 3, Half Court Basketball $ 1, $ (1,000.00) New pumphouse and bathroom $ 20, $ 20, Difference $ 29,

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION CLEVELAND PARK LOCATION LOCATION AND HISTORY Attempts to create a neighborhood park and playground in the Cleveland neighborhood began in 1926, when the park board designated for acquisition the block

More information

and plant some trees, but that was only accomplished through state and federal work-relief programs.

and plant some trees, but that was only accomplished through state and federal work-relief programs. PEAVEY LOCATION AND HISTORY Peavey Park sits in the Phillips Community on a large block bounded by major streets: Franklin Avenue, Chicago Avenue, and Park Avenue. The southern continue through to Chicago

More information

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with

More information

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK N ILIO NA VE N JAM ES AV E PLAYGROUND PAR K PRO PER TY B OUN DAR Y

More information

HALL PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION

HALL PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION HALL PARK LOCATION LOCATION AND HISTORY Hall park straddles Lyndale Avenue on the city s near north side. This neighborhood was identified in a 1938 study of the city s playground needs as one of five

More information

FOLWELL PARK LOCATION AND HISTORY LOCATION

FOLWELL PARK LOCATION AND HISTORY LOCATION FOLWELL PARK LOCATION LOCATION AND HISTORY Folwell Park is a large (by neighborhood park standards) tract of land located south of Dowling Avenue between Humboldt and Knox Avenues. The land for the park

More information

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE GLENWOOD AVE MULTI-USE DIAMONDS VINCENT AVE N MORGAN AVE N PENN AVE N DOG PARK MULTI-USE FIELDS PLAYGROUND AK E RD S CHESTNUT AVE DA

More information

WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK

WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK WEST CENTRAL SECTION CONTENTS: FARWELL PARK NORTH COMMONS PARK OLIVER TRIANGLE RUSSELL PARK THEODORE WIRTH REGIONAL PARK VALLEY VIEW PARK WILLARD PARK FARWELL PLACE THOMAS AVE N SWING BENCH PICNIC AREA

More information

SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK

SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK SPLASH PAD Good condition. PARK BUILDING BRYANT AVE N Good condition and unique to

More information

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK LUCY LANEY COMMUNITY SCHOOL N 33RD AVE N 33RD AVE SINGLE-FAMILY RESIDENTIAL MULTI-USE DIAMOND

More information

Community Advisory Committee Meeting #3 April 21, 2015

Community Advisory Committee Meeting #3 April 21, 2015 Community Advisory Committee Meeting #3 April 21, 2015 Purpose (charge) of the CAC: Be Knowledgeable, Be an Engaged Representative, Develop Master Plan, & Prioritize Plan 1 Welcome/ Introductions Review

More information

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010 This is a compilation of issues and outcomes identified by the CAC. It is a work in progress,

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

M E S T I Z O C U R T I S P A R K

M E S T I Z O C U R T I S P A R K ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC

More information

NEW MEADOWS PARK PROPOSED MASTER PLAN

NEW MEADOWS PARK PROPOSED MASTER PLAN NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle

More information

Webber Park Master Plan Charrette Summary

Webber Park Master Plan Charrette Summary SMALL GROUP #1 - September 29, 2011 Webber Park Master Plan Charrette Summary More trash cans, especially near picnic grounds A year round pool is very needed-physical & mental health are significantly

More information

Southwest Quadrant Distinctive Features

Southwest Quadrant Distinctive Features SOUTHWEST QUADRANT Southwest Quadrant Distinctive Features LAND USE The 31.17 square mile Southwest Quadrant includes all the area within the planning area west of I-5 and south of the Sacramento River.

More information

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm Dover Park Master Plan Community Design Event Tuesday, May 22, 5 7 pm Agenda I. Introduction / Overview 20 minutes II. Small Group Design Activity 60 minutes III. Small Group Report Out IV. Conclusion

More information

Business Item No

Business Item No Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018

More information

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District Chapter eight Parks and Recreation Introduction One of the indicators of quality of life in a city is the parks and recreation system. The City of Crystal Lake is fortunate to have an excellent parks and

More information

City of Haslett. City of East Lansing. City of East Lansing

City of Haslett. City of East Lansing. City of East Lansing Central Park North (Nancy L. Moore Park) Lake Park North Expansion White Park Expansion #2 White Park Expansion #1 County East East Haslett East East TF87-212 Acquisition $90,000.00 Park. TF08-138 Acquisition

More information

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks. September 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Brewers Park and Clinton Park Renewal Concept Plans RECOMMENDATION THAT the

More information

Park Design and Location Criteria

Park Design and Location Criteria Park Design and Location Criteria This section is presented in the interest of assisting park and recreation agencies in the development of a system of parks and recreation areas. A recreation system is

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

City of Keller Parks and Facilities Inventory

City of Keller Parks and Facilities Inventory City of Keller Parks and Facilities Inventory April 2013 1. BEAR CREEK PARK 44 ACRES 1 Basketball Court with 2 goals 4 Drinking Fountains 1 Large Pavilion with 4 picnic tables, electricity and fireplace

More information

7. Plan Implementation

7. Plan Implementation 7. Plan Implementation 7.1 Implementation Timeline This section includes a list of achievable park and recreation actions. In the Implementation Action Matrix that follows, the implementation actions have

More information

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan Heart of the Lakes Area Recreation Plan 1. Design and construct the following trails (please see the following map): a. the Speedway Trail 1) primary pathway the main trail 2) secondary pathway the proposed

More information

Trail Etiquette. Hours of Operation. Trail Accessibility

Trail Etiquette. Hours of Operation. Trail Accessibility Trail Guide The Elmhurst Park District, with 28 parks and over 460 acres of land, offers nearly six miles of paved or asphalt park trails and maintains an additional 3.6 miles of trails within Elmhurst.

More information

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e The Town of Hebron Section 2 2014 Plan of Conservation and Development Preservation of Unique Assets J. Recreation Open spaces, parks, sports fields, and recreational programs are considered essential

More information

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017 Frederickson LUAC Community Plan Update Parks & Recreation September 25, 2017 Kimberly Freeman Resource Stewardship Superintendent kimberly.freeman@co.pierce.wa.us 253-798-4261 Joseph Coppo Senior Parks

More information

PARKS & BEACHES PROJECTS

PARKS & BEACHES PROJECTS #18 72ND STREET PARK, LIBRARY, #19 BLUEWAYS & AQUATIC CENTER $1.1 MILLION $60 MILLION New facility to include: Create Kayak Launches with All Wheels Skate Park Floating Docks and Seating at: Library/Media

More information

4MRV Parks Master Plan: Site Analysis

4MRV Parks Master Plan: Site Analysis 4MRV Parks Master Plan: Site Analysis Lardner/Klein Landscape Architects in association with: RK&K Grimm + Parker Kittelson & Associates Partners for Economic Solutions RIB U.S.Cost Civil Engineering Architecture

More information

The Narrows Waterfront Park A Crown Jewel for Southern Brooklyn

The Narrows Waterfront Park A Crown Jewel for Southern Brooklyn The Narrows Waterfront Park A Crown Jewel for Southern Brooklyn In New York, the unquestioned popularity of urban spaces such as Riverside Park, the High Line, Brooklyn Bridge Park and others has demonstrated

More information

The Vision for the San Juan Islands Scenic Byway

The Vision for the San Juan Islands Scenic Byway The Vision for the San Juan Islands Scenic Byway 2 Judd Cove, Orcas Island, Courtesy of Kurt Thorson (kurtthorson.com) and San Juan County Land Bank Vision for the San Juan Islands Scenic Byway The San

More information

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018 BRYAN REGIONAL PARK Presented by: Burditt Consultants November 13, 2018 AGENDA 1. Project Purpose & Mission 2. Project Vision & Goals 3. Stakeholder Feedback 4. Program Overview 5. Phase A Plan Overview

More information

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 It Starts in Parks Fun Facts How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 Fun Facts How many people visit Central Winds Park Annually? a. Over 100,000 b. 20,000 c. 10,000 d. 1,000 It Starts

More information

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

NORTH HEMPSTEAD BEACH PARK MASTER PLAN NORTH HEMPSTEAD BEACH PARK MASTER PLAN COMMUNITY DESIGN CHARRETTE Supervisor Judi Bosworth Viviana L. Russell Peter J. Zuckerman Angelo P. Ferrara Anna M. Kaplan Lee R. Seeman Dina M. De Giorgio VISIONING

More information

River First Initiative and Waterworks Park

River First Initiative and Waterworks Park River First Initiative and Waterworks Park The RiverFIRST proposal is critical to the creation of a larger regional parks and trails network, as well as ecological and infrastructure system. When realized,

More information

TEMPE BEACH PARK - RECOMMENDATIONS

TEMPE BEACH PARK - RECOMMENDATIONS TEMPE BEACH PARK - RECOMMENDATIONS Tempe Beach Park has the potential to become a regional destination park, but it suffers from a host of physical and operational problems, as well as structural flaws.

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Hemisfair Civic Park. Vision and Program Plan

Hemisfair Civic Park. Vision and Program Plan Hemisfair Civic Park Vision and Program Plan OCTOBER 2013 Hemisfair Civic Park Vision and Program Plan Prepared under the direction of the Hemisfair Park Area Redevelopment Corporation. Planning assistance

More information

35 Bee Tree Park Planning Zone 3

35 Bee Tree Park Planning Zone 3 35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone

More information

REVISED AGENDA. Special Council Meeting. Monday, September 11, 2017 (REVISED TO INCLUDE ON-TABLE ITEMS)

REVISED AGENDA. Special Council Meeting. Monday, September 11, 2017 (REVISED TO INCLUDE ON-TABLE ITEMS) Mission Statement In carrying out its mandate, Bowen Island Municipality will work towards conducting operations in a way that: Improves the economic, environmental and social well-being for present and

More information

Criteria Based System for MPRB Regional Park and Trail Capital Project Scheduling

Criteria Based System for MPRB Regional Park and Trail Capital Project Scheduling Criteria Based System for MPRB Regional Park and Trail Capital Project Scheduling July 19, 2017 Background Beginning with the 2017-2022 Capital Improvement Program (CIP), MPRB used equity-driven metrics

More information

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table of Contents Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table

More information

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County Silver Lake Park An Environmental Jewel for the Citizens of Prince William County The Prince William Park Authority Mission Statement states: The Prince William County Park Authority will create quality

More information

PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES

PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES This page was intentionally left blank PROCESSES INTRODUCTION The South Service Area Master Plan creates unique new designs

More information

CHAPTER 5. Chapter 5 Recreation Element

CHAPTER 5. Chapter 5 Recreation Element CHAPTER 5 Recreation Element Chapter 5 Recreation Element The Recreation Element of the Meyers Area Plan is a supplement to the Recreation Element of the TRPA Regional Plan and the El Dorado County General

More information

Classifications, Inventory and Level of Service

Classifications, Inventory and Level of Service Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What has been decided? What are the details of the plan? What

More information

4.0 FACILITIES INVENTORY

4.0 FACILITIES INVENTORY 4.0 FACILITIES INVENTORY 4.1 PARK LEVEL OF SERVICE STANDARDS (LOS) Based on current City of Longview Parks and Recreation Level of Service (LOS) Standards (Figure G), the City currently has a deficiency

More information

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018 AGENDA MEMORANDUM Community Services Department CSAB Meeting Date: April 10, 2018 To: Community Services Advisory Board From: Dana A. Souza, Director Date: April 4, 2018 Legislative Quasi-Judicial SUBJECT:

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

6.5 DURANGO EXCELS AT PARK CONNECTIVITY

6.5 DURANGO EXCELS AT PARK CONNECTIVITY City of Durango 6.5 DURANGO EXCELS AT PARK CONNECTIVITY The City of Durango excels at park connectivity as evidenced by the success of the Animas River Trail (ART) project. While it is clear there are

More information

Contra Costa County Parks and Recreation Facilities

Contra Costa County Parks and Recreation Facilities Contra Costa County Parks and Recreation Facilities CONTRA COSTA COUNTY PUBLIC WORKS DEPARTMENT 255 GLACIER DRIVE MARTINEZ, CALIFORNIA 94553 Parks and Recreation Facilities 1 West County Lefty Gomez Community

More information

Information Requests. Street Car Wildlife Golden Valley Leash Ordinance/Dog Park

Information Requests. Street Car Wildlife Golden Valley Leash Ordinance/Dog Park Information Requests Street Car Wildlife Golden Valley Leash Ordinance/Dog Park (How we got here!) 1980 Plan for Wirth Park (Designated Master Plan) Wirth Lake/Picnic Area designated as a general recreation

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES

PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES This page was intentionally left blank PROCESSES INTRODUCTION The South Service Area Master Plan creates unique new designs

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

Public Park System. Township of Derry. Providing natural open space for the recreational use of our residents and guests.

Public Park System. Township of Derry. Providing natural open space for the recreational use of our residents and guests. Township of Derry Public Park System Providing natural open space for the recreational use of our residents and guests. Directory of Recreational Amenities Hershey s Commitment to Recreation Famous candy

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2

WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2 WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2 MONDAY, NOVEMBER 5, 2018, 6:00 P.M.; PARKS DEPT. CONFERENCE ROOM ATTENDEES: Lisa Dean Larry Gardner Duane Harding David

More information

SOUTH INTERCHANGE AREA

SOUTH INTERCHANGE AREA Santaquin City General Plan 1 Location and Characteristics The South Interchange Area of Santaquin is located west of Interstate 15 and south of 500 South (Figure 1). It includes properties already annexed

More information

Villages at Buffalo Run East

Villages at Buffalo Run East Villages at Buffalo Run East Neighborhood Park Subhead to title page goes here. Public Design Meeting April 9, 2015 Capital Improvement Program Commerce City s $137 million CIP is the result of a 2013

More information

Corktown Parks. Public Meeting. City of Toronto

Corktown Parks. Public Meeting. City of Toronto Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)

More information

A VISION FOR EL MIRAGE

A VISION FOR EL MIRAGE el mirage A VISION FOR EL MIRAGE OASIS, ARIZONA A thriving desert jewel destination with a strong arts district, high-wage employment parks system joined together by cohesive, multi-use accessible trails

More information

A Vision for South Skunk River and Chichaqua Bottoms Greenbelt

A Vision for South Skunk River and Chichaqua Bottoms Greenbelt A Vision for South Skunk River and Chichaqua Bottoms Greenbelt Photo: Jim Pease Chichaqua Bottoms Booklet 7 of 8 Greater Des Moines Water Trails and Greenways 1 2016 Table of Contents Booklet 1: Water

More information

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS Appendices Gwinnett County 2004 Comprehensive Parks and Recreation Master Plan APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS March 2004 Monteith Brown Planning Consultants & The Jaeger Company

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager Date: May 29, 2013 To: Recreation and Park Commission, Capital Committee Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager From: Subject: Mary Hobson, Project

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

City of Oak Harbor Parks & Descriptions

City of Oak Harbor Parks & Descriptions City of Oak Harbor Parks & Descriptions North West Section Koetje Park - NE 7 th Avenue (3.5 acres) Neighborhood and Community Park with playgrounds on one tot lot, one soccer/practice field, picnic tables,

More information

AGENDA REGULAR PARKS COMMISSION MEETING May 26, :15 A.M Monticello Public Works Office

AGENDA REGULAR PARKS COMMISSION MEETING May 26, :15 A.M Monticello Public Works Office Park Commission Agenda: 05/26/2016 AGENDA REGULAR PARKS COMMISSION MEETING May 26, 2016 9:15 A.M Monticello Public Works Office To enhance community pride through developing and maintaining city parks

More information

Waukee Trailhead Public Art and Amenities Project

Waukee Trailhead Public Art and Amenities Project Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection

More information

Parks, Recreation, Trails and Open Space Master Plan Survey Results. October 2018

Parks, Recreation, Trails and Open Space Master Plan Survey Results. October 2018 Parks, Recreation, Trails and Open Space Master Plan Survey Results October 2018 Conducted by Qualtrics subconsultant 300 completed responses Random attempt to get a balanced response from all four Council

More information

Corabelle Park. Inventory. Future Development

Corabelle Park. Inventory. Future Development Corabelle Park Size: Approximately 4 acres Site Description: Corabelle Park is a relatively new park within the Murray County Park System. It is located on the south side of Corabelle Lake just off gravel

More information

Welcome! INTRODUCTION. Tell us what you think! Comment forms are provided for your feedback

Welcome! INTRODUCTION. Tell us what you think! Comment forms are provided for your feedback Welcome! Comment forms are provided for your feedback Tell us what you think! INTRODUCTION The City of Salmon Arm s O cial Community Plan (OCP) and its Parks and Recrea on Master Plan (2012) both iden

More information

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park. Lakeside Beach TF00-136 $122,550.00 in fee simple of approximately one-half acre of property on the shore of Spring Lake to exp the Lakeside Beach. 2000 River Ravines TF00-150 $910,000.00 in fee simple

More information

City of Sierra Madre STUDY AREA PROFILE

City of Sierra Madre STUDY AREA PROFILE City of Madre STUDY AREA PROFILE STUDY AREA ID #112 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT REPORTING FORM

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

places Mooloolaba s heart five

places Mooloolaba s heart five five places the mooloolaba heart 1 Flexible community event use of school oval 2 Enhanced streetscape District cycle route Future cross-block pedestrian link 5 Existing school buildings New signalised

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

17 Mathilda Welmering Park Planning Zone 3

17 Mathilda Welmering Park Planning Zone 3 17 Mathilda Welmering Park Planning Zone 3 8301 Mathilda Visit Date: September 2016 St. Louis County Parks Master Plan Page 1 Description: The six acre Mathilda Welmering Park is named for two streets

More information

Schachtner Street. Village Park Somerset, Wisconsin

Schachtner Street. Village Park Somerset, Wisconsin Schachtner Street Village Park Village Park Schachtner Street Softball Field Lower Terrace Parking Area Baseball Field Upper Terrace Parking Lot Mid Terrace Parking Area Restroom Building Path to Bridge

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES

PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES PARK PLANS SECTION CONTENTS: INTRODUCTION KEY/LEGEND PARK PLANS & COST ESTIMATES This page was intentionally left blank PROCESSES INTRODUCTION The South Service Area Master Plan creates unique new designs

More information

Design Charrette Public Meeting

Design Charrette Public Meeting Design Charrette Public Meeting Citizen Advisory Committee Members of the Public November 2, 2011 - Theodore Wirth Chalet - 6:30-8:30 p.m. Park Background: Visitation Estimation 2010 Regional Visitation

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17 WHAT? Great Wolf Resorts has identified Gilroy, California as a potential location for a new Great Wolf Lodge family resort and has entered into a 60-day period of exclusivity with the City and community

More information

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction As an open meadow park positioned along the Mahoning River,

More information

Dogpatch Project Descriptions Summary DRAFT UNDER REVIEW January 11, 2017

Dogpatch Project Descriptions Summary DRAFT UNDER REVIEW January 11, 2017 1. OPEN SPACE A. Esprit Park Why : Esprit Park, Dogpatch s only City Park, is already struggling under current use. It was not designed for intensive use and is not sustainable in its current state. What

More information

Parks and Recreation Master Plan

Parks and Recreation Master Plan Emerging Themes Parks and Recreation Master Plan City of Mount Dora, Florida September 17, 2018- Revised October 1, 2018 Agenda Welcome & duction Master Plan The Inventory & Existing Community Overview

More information

MASTER PLAN EXECUTIVE SUMMARY

MASTER PLAN EXECUTIVE SUMMARY Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands 1.0 Introduction 1.1 Purpose of Report This Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

More information

Appendix C - Existing Developed Parks

Appendix C - Existing Developed Parks Appendix C - Existing Developed Parks Table of Contents Appendix C Existing Developed Parks Table of Contents... Pg. i Introduction... Pg. ii Amos P. Catlin Park... Pg. 1 Beacon Hill Park... Pg. 1 Cambridge

More information

Wilds. Headwaters. Lakes. Oxbows. Falls

Wilds. Headwaters. Lakes. Oxbows. Falls 56 5 4 3 Wilds Headwaters Lakes Oxbows Falls 57 Zones It could be said the on-the-ground essence of this master plan appears within the next 6 pages of this report. As we learned in the preceding Cultural

More information

LUDLAM TRAIL CORRIDOR DISTRICT

LUDLAM TRAIL CORRIDOR DISTRICT 1 APPLICATION NO. 9 MAY 2015 CDMP CYCLE LUDLAM TRAIL CORRIDOR DISTRICT PLANNING ADVISORY BOARD November 2, 2015 BACKGROUND 2 Staff Application Former Florida East Coast railroad corridor (privately owned)

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Capital Prioritization

Capital Prioritization 14 Capital Prioritization 279 279 280 Park & Recreation CAPITAL PRIORITIZATION As described in Chapter 8, the recommendations presented in Chapter 9 are prioritized to provide a guide for future capital

More information