DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

Size: px
Start display at page:

Download "DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION"

Transcription

1 OHIO DEPARTMENT OF TRANSPORTATION DISTRICT CONSTRUCTION PROGRAM SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR ALLEN C. BIEHL, DISTRICT DEPUTY DIRECTOR ***Dates in the 2013 Program are subject to change without notice

2 Ashland County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic RIC PM Preventive Maintenance From 0.61 mile south of the Richland County line to north of US 250 7/12/12 7/19/12 8/20/12 6/30/13 $2,160, Strawser Two lanes maintained in each direction, except at night ASD Bridge Rehabilitations Resurface From CR-1575 to TR-653, including three structures near the Interstate 71 interchange 5/24/12 6/1/12 7/9/12 6/15/13 $3,277, Bridge Overlay Systems One lane maintained in each direction at all times ASD Slide Repair Between CR-2404 and TR-585 1/17/13 3/13/13 $1,391, day detour begins April 15 1/28/13 9/18/13 Shelly Sands ASD Culvert 0.17 mile east of TR-593 1/31/13 2/11/13 3/26/13 5/31/13 $89, GE Baker Shoulder restrictions; traffic maintained at all times ASD Resurface From the Richland County line to SR-60 in the City of Ashland 3/14/13 3/25/13 5/1/13 7/31/13 $1,243, Kokosing ASD Resurface From Baney Road to just north of US 250 3/28/13 4/8/13 8/15/13 11/1/13 $2,000,000 temporary signalized lane closures ASD Culvert Just north of TR-975 5/9/13 5/20/13 7/1/13 8/31/13 $230, day detour ASD Culvert 0.12 mile north of TR /23/13 6/3/13 7/1/13 8/31/13 $210, day detour ASD Micro Surface 0.13 mile south of TR-593 to just north of the Medina/Wayne County line 6/27/13 7/8/13 8/1/13 9/30/13 $2,800,000 Intermittent lane restrictions ASD Resurface From SR-39 to the City of Ashland 6/27/13 8/1/13 $2,300,000 7/8/13 10/15/13 ASHLAND COUNTY 1

3 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 ASHLAND COUNTY 2

4 Crawford County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic D03-CHIP FY-2013 Preventive Maintenance On SR-602 from SR-19 to Guiss Road; On SR-96 from SR-98 to SR-602 6/21/12 6/28/12 7/20/12 9/15/13 $996, Specialized Construction CRA CRA Bridge s Between CR-208 SR-39 and 0.4 mile west of the Huron County line 9/20/12 9/27/12 10/29/12 9/29/13 $1,046, R I Construction CRA : 120-day detour CRA : Maintained with temporary signalized lane closures CRA Resurface From Brandt Road to CR /18/12 5/15/13 $739, /25/12 7/14/13 Shelly Sands Deck Overlay FY13 Bridge Repair CRA ; RIC /13/12 12/20/12 5/15/13 8/15/13 $230, BCC Ohio, Inc. Stetzer Rd: Maintained with a temporary signalized lane closure; SR-598: 21-day detour CRA CRA Bridge s Two locations between Swabb Road and High Street in the village of New Washington 5/9/13 5/20/13 6/24/13 8/31/13 $247, day detour and maintained with flaggers MICRO FY 14 Micro Surface On State Route 19 from Denzer Road to Quaintenance Road 6/27/13 7/8/13 9/2/13 10/15/13 $560, CRA Slide Repair 0.17 mile west of the CSX railroad underpass 8/1/13 8/12/13 9/2/13 10/31/13 $585,000 One lane of traffic will be maintained at all times CRA Resurface From the City of Galion to the Morrow County line 9/26/13 10/7/13 5/1/14 7/31/14 $870, CRA Bridge Just north of SR-309 in the City of Galion 12/12/13 12/23/13 6/9/14 7/31/14 $300, day detour CRAWFORD COUNTY 3

5 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 CRAWFORD COUNTY 4

6 Erie County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic ERI Railroad Grade Separation 0.73 mile west of State Route 101 in the City of Sandusky 7/28/11 8/3/11 9/2/11 7/31/14 $8,154, Mosser Construction Phased construction detours on US 6 SR-101; Superior Street Huron Street closed permanently ERI Culvert Between Joppa Road and Chappel Creek Road 11/29/12 12/6/12 1/17/13 8/19/13 $270, CG Cole Const. 21-day detour ERI-Kelleys Island State Park Resurface Parking lot at campground and the Glacial Grooves parking areas 1/17/13 1/28/13 4/15/13 5/31/13 $460, Henry W. Bergman Inc ERI Culvert Between US Route 250 Old Mudbrook Road 4/11/13 4/22/13 6/1/13 7/31/13 $130,000 SR-13: One lane maintained at all times US 250: One lane maintained westbound ERI Culvert 0.25 mile south of Deehr Road (TR-82) 6/6/13 6/17/13 8/1/13 10/1/13 $175, day detour ERI Bridge Repairs From 0.3 mile north of the Huron County line to TR-97 9/26/13 10/7/13 6/2/14 9/5/14 $500,000 One lane maintained at all times ERI Resurface From US Route 250 to the City of Huron 11/7/13 11/18/13 6/1/14 8/30/14 $728,000 temporary signalized lane closures ERI-2- SYSSIGN Sign On State Route 2 within Erie Lorain Counties 12/12/13 12/23/13 3/3/14 9/3/14 $225,000 Maintained; Shoulder closures as needed ERI Resurface From the Huron County line to SR-99 1/23/14 2/3/14 6/2/14 9/15/14 $960,000 two 28-day detours ERIE COUNTY 5

7 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 ERIE COUNTY 6

8 Huron County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic HUR Bridge Just north of US Route 224 over a branch of the Vermillion River 5/10/12 5/17/12 8/23/12 5/26/13 $1,057, Fechko HUR Culvert 0.14 mile south of US Route 20 11/8/12 11/15/12 4/1/13 10/15/13 $138, Mark Haynes 21-day detour HUR Resurface Within the corporation limits of the village of Monroeville 11/29/12 12/6/12 6/3/13 8/31/13 $1,496, Erie Blacktop One lane maintained in each direction at all times HUR HUR Resurface On State Route 61 from SR-598 to the city of Norwalk; on State Route 598 from SR-61 to State Route /29/12 12/6/12 4/15/13 11/30/13 $3,913, Erie Blacktop or temporary traffic signals; Snyder Rd: 100-day detour S Norwalk Rd.: 90-day detour HUR Slide Repair 0.5 mile north of TR-34 12/13/12 12/20/12 3/1/13 11/24/13 $1,304, Mosser Maintained with a temporary traffic signal HUR Drainage Repair 0.2 mile east of State Route 60 1/17/13 5/1/13 $134, day detour 1/28/13 6/30/13 Mark Haynes HUR Urban Paving On US Route 250 State Route 61 within the corporation limits of the city of Norwalk 4/11/13 4/22/13 7/1/13 8/31/14 $3,000,000 and temporary signalized lane closures HUR-Prospect St Bridge Bridge Between Energy Street Main Street in the village of New London 5/23/13 6/3/13 9/2/13 12/31/13 $500,000 Prospect Street First Street: 90-day detour HUR Bridge 0.3 mile north of Laylin Road over Rattlesnake Creek 6/6/13 6/17/13 7/1/13 10/31/13 $1,700, day detour HUR Bridge Just east of State Route 13 over the Vermilion River 6/6/13 6/17/13 7/15/13 7/15/14 $3,200, day detour HURON COUNTY 7

9 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 HURON COUNTY 8

10 Lorain County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic LOR Bridge Repair Twin structures over the Black River and Ford Road 11/17/11 11/23/11 3/19/12 6/30/14 $10,892, Ruhlin Two lanes maintained in each direction; One lane maintained at night LOR-2 SYSSIGN FY12 Sign Various locations along State Route 2 and Interstate 90 3/22/12 4/3/12 2/18/13 8/9/13 $958, Lake Erie Const LOR Bridge Over Interstate 90 7/26/12 8/2/12 5/1/13 10/31/13 $3,120, Mosser SR-301: 120-day detour I-90: Intermittent single lane closures LOR Bridge 0.13 mile east of Plum Creek Road (TR-1431) 10/4/12 10/11/12 6/1/13 7/31/13 $173, BOG Const. 21-day detour LOR-Boston Road Spot Safety at CSX railroad crossing 12/13/12 12/20/12 6/1/13 11/1/13 $607, Beaver Exc. 75-day detour LOR Railroad Grade Separation 0.14 mile north of State Route 18 in the village of Wellington 1/17/13 1/28/13 4/1/13 9/1/14 $12,324, Beaver Exc. Three separate 14-day detours and one 35-day detour near project completion LOR Resurface From just west of West River Road to the City of Avon 1/17/13 1/28/13 5/1/13 7/31/13 $754, Shelly Co LOR-Oberlin ODOT Garage Salt Storage Building At ODOT maintenance facility in city of Oberlin 3/7/13 3/18/13 4/15/13 8/15/13 $329,777 Kelstin Inc LOR Urban Paving Within the City corporation limits of Lorain 3/28/13 4/8/13 6/1/13 10/31/13 $1,500, LOR Bridge Rehabilitation Resurface From Chester Road to State Route 254 5/9/13 5/20/13 5/1/13 6/30/14 $4,000,000 One lane of traffic in each direction maintained LORAIN COUNTY 9

11 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 LORAIN COUNTY 10

12 Lorain County projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic LOR Culvert 0.2 mile north of Webster Road 5/23/13 6/3/13 7/1/13 8/31/13 $100, day detour LOR Culvert 0.12 mile west of State Route 511 6/6/13 6/17/13 8/15/13 10/15/13 $100, day detour SMOOTH FY 14 Smooth Seal On State Route 511 from the Ashland County line to US Route 20 6/27/13 7/8/13 8/1/13 9/15/13 $1,600, LOR Bridge 0.3 mile north of Griggs Road 10/10/13 10/21/13 5/5/14 8/29/14 $660, day detour LOR Bridge 0.28 mile east of Nickel Plate Diagonal Road 11/21/13 12/2/13 4/1/14 7/31/14 $250, day detour LORAIN COUNTY 11

13 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 LORAIN COUNTY 12

14 Medina County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic MED Rehabilitation From State Route 57 to the Summit County line 3/8/12 3/15/12 4/23/12 7/1/14 $17,785, Shelly Sands Two lanes of traffic maintained in each direction with contraflow; Detours on the SR-261, SR-94 SR-57 interchange ramps MED- Brunswick Signal Upgrades City-wide traffic signal replacement 5/24/12 6/1/12 8/3/12 9/30/13 $3,546, Terrace Const MED Intersection Improvement State Route 3 and Reagan Parkway 10/18/12 10/25/12 3/26/13 8/29/13 $565, Fechko SR-3: Two lanes maintained Foote Rd: 3-day detour MED-Noise Walls Two noisewalls around the Interstate 71 State Route 18 interchange and two walls north of the State Route 303 interchange 11/8/12 1/8/13 1/8/13 8/4/13 $1,328, Great Lakes Const Shoulder closures intermittent single lane closures MED Culvert Between State Route 303 and State Route /29/12 12/6/12 3/3013 8/31/13 $104, Page Excavating 10-day detour MED Resurface From US Route 224 to US Route 42 12/13/12 12/20/12 6/1/13 9/30/13 $1,034, Chagrin Valley MED Slide Repair At the State Route 162 underpass 3/14/13 3/25/13 5/1/13 7/31/13 $305, Mark Haynes Shoulder closures intermittent single lane closures MED Culvert 0.5 mile east of Leroy Road 3/28/13 4/8/13 5/27/13 7/29/13 $150,000 One lane of traffic in each direction maintained at all times MED Culvert 0.28 mile east of Brynwood Road 4/25/13 5/6/13 7/1/13 8/31/13 $95,000 7-day detour MED Urban Paving Within the city corporation limits of Medina, including the State Route 57 overlap 5/23/13 6/3/13 7/15/13 10/31/13 $2,000,000 MEDINA COUNTY 13

15 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 MEDINA COUNTY 14

16 Medina County projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic MED Bridge Sleepy Hollow Road over Interstate 71 9/26/13 10/7/13 4/1/14 10/31/14 $950, day detour MED Slide Repair Culvert 0.5 mile north of State Route 606 9/26/13 10/7/13 6/9/14 7/31/14 $700, day detour MED Bridge Remsen Road over Interstate 71 10/10/13 10/21/13 4/1/14 10/31/14 $1,700, day detour MEDINA COUNTY 15

17 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 MEDINA COUNTY 16

18 Richland County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic MRW Reconstruction From just south of the Richland County line to south of State Route 95 9/23/11 9/29/11 11/1/11 10/31/13 $42,036,977 Kokosing Two lanes of traffic maintained in each direction using I-71 SB; State Route 314: 120-day detour RIC PM Preventive Maintenance From 0.61 mile south of the Ashland County line to north of US 250 in Ashland County 7/12/12 7/19/12 8/20/12 6/30/13 $2,160, Strawser Two lanes maintained in each direction, except at night RIC-BP-FY13 Bridge Painting Structures along the US Route 30 corridor, including Fourth Street; Lexington-Springmill Road Trimble Road 9/20/12 9/27/12 5/14/13 8/27/13 $1,385,000 APBN Inc. One lane in each direction maintained on US RIC Signalization US Route 30 Trimble Road interchange area 11/29/12 12/6/12 1/15/13 10/11/13 $848, Perram Electric US 30: Intermittent single lane closures; Trimble Rd: Single lane closures RIC Resurface From 0.25 mile east of Louise Drive to State Route 13 12/13/12 12/20/12 5/1/13 7/31/13 $1,092, Shelly Sands and temporary signalized lane closures RIC Culvert s 0.48 mile north of Snodgrass Road 0.27 mile south of Beam Road 12/13/12 12/20/12 6/1/13 7/31/13 $186, Page Excavating 10-day detour at each culvert BH FY 13 Bridge Repair On State Route 13 over South Main St on US Route 42 just north of State Route 39 in Mansfield 3/14/13 3/21/13 5/15/13 9/30/13 $405, BCC Ohio Inc. SR-13: ; US 42: 60-day detour RIC Resurface From US Route 30 to US Route 250 in Ashland County 4/11/13 4/18/13 5/1/13 10/30/13 $3,200,000 and temporary signalized lane closures RIC-Sewer Storm Sewer Reconstruction At ODOT Maintenance facility in the City of Mansfield 5/23/13 6/3/13 7/23/13 9/23/13 $150,000 Maintained RICHLAND COUNTY 17

19 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 RICHLAND COUNTY 18

20 Richland County projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic RIC Micro Surface 0.14 mile north of Mansfield-Lucas Road to 0.61 mile south of the Ashland County line 6/27/13 7/8/13 8/15/13 10/15/13 $1,400,000 Two lanes maintained in each direction, except at night RIC Resurface From North McElroy Road to Fleming Falls Road 6/27/13 7/8/13 8/1/13 10/1/13 $700, RIC Resurface On State Route 430 from State Route 39 to its Interstate 71 underpass, including its overlap with SR-39 10/10/13 10/21/13 6/15/14 8/30/14 $890, RIC Bridge Repair 0.6 mile east of State Route 13 11/7/13 11/18/13 7/1/14 8/31/14 $250, day detour RIC Bridge 0.2 mile south of Kings Corners East Road 11/21/13 12/2/13 5/5/14 8/29/14 $720,000 Maintained with a temporary traffic signal RICHLAND COUNTY 19

21 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 RICHLAND COUNTY 20

22 Wayne County Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic WAY Bridge Repair State Route 3 over US Route 30 3/22/12 4/19/12 3/18/13 9/19/13 $2,297, Cosmos SR-3 NB: 60-day detour, SR-3 SB/Columbus Ave: Single lane maintained WAY PM Smooth Seal From 0.5 mile west of South Elyria Road to State Route 3 7/12/12 7/19/12 9/4/12 6/21/13 $2,697, Kokosing One lane maintained in each direction LG FY 13 Highway Lighting US Route 30 State Route 172 interchange in Wayne County 10/4/12 10/11/12 4/1/13 8/15/13 $199, Cornerstone Elec WAY Resurface From Kidron Road to the Stark County line 11/29/12 12/6/12 5/1/13 8/15/13 $1,473, Kokosing WAY Resurface From 0.12 mile south of Sterling Road to just south of Interstate 76 in Medina County 3/14/13 3/21/13 5/1/13 9/30/13 $1,931, Shelly Company 60-day detour maintained with flaggers WAY Urban Paving From its intersection with Madison Avenue to US Route 250 on State Route 302 from State Route 83 to East Liberty Street 3/14/13 3/21/13 6/1/13 10/31/13 $688, Chagrin Valley WAY Concrete Joint Repairs On the Dix Expressway from East Lincoln Way to Friendsville Road 4/11/13 4/22/13 5/15/13 10/15/13 $2,600,000 SR-83/SR-3: One lane maintained in each direction, US 30, SR-585 SR-3 Ramps: Detours WAY Slide Repair 0.5 mile west of Overton Road 6/6/13 8/1/13 $280, day detour 6/17/13 10/31/ WAY Smooth Seal From East Lincoln Way to Dover Road 6/27/13 7/8/13 8/15/13 9/30/13 $660,000 One lane maintained in each direction WAY Resurface From State Route 302 to Interstate 71 12/12/13 12/23/13 6/2/14 9/1/14 $770,000 WAYNE COUNTY 21

23 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 Sale in 2013; Construction in 2014 WAYNE COUNTY 22

24 District Wide Projects PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic PR FY 2013 Tree Stump Removal Various locations within District 3 8/9/12 8/16/12 1/7/13 10/15/13 $533, VanCuren Services GR FY 13 Guardrail Maintenance Various locations within District 3 9/6/12 9/13/12 2/8/13 3/1/14 $556, Lake Erie Const BH FY 13 Bridge Repair ASD ; ASD ; WAY WAY /4/12 10/11/12 5/1/13 8/31/13 $400, Shelly Sands US 250: One lane in each direction; SR-95: 14-day detour; Honeytown Rd: Maintained with temporary signal; Carr Rd: Maintained with temporary signal TSG FY 13 Traffic Signal Repair Various locations within District 3 12/13/12 12/20/12 3/13/13 11/30/13 $156, Linward Electric LOOP FY 13 Loop Detector Repair Various locations within District 3 1/17/13 1/28/13 6/1/13 5/31/15 $99, Perram Electric PM FY 13 Pavement Markings Various locations within District 3 4/25/13 5/6/13 6/3/13 10/31/13 $2,200, RPM FY 13 Raised Pavement Markers Various locations within District 3 4/25/13 5/6/13 6/17/13 5/30/14 $310, I-71 RM FY 13 A Reactive Maintenance On Interstate 71 in Medina County from mile marker 204 to 208 5/23/13 6/3/13 7/15/13 9/30/13 $170,000 Two lanes maintained in each direction I-71 RM FY 13 B Reactive Maintenance On Interstate 71 in southern Richland County from mile marker 160 to 171 5/23/13 6/3/13 7/15/13 9/30/13 $390,000 Two lanes maintained in each direction DISTRICT-WIDE PROJECTS 23

25 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 DISTRICT-WIDE PROJECTS 24

26 District Wide projects (continued) PID Number Route Section Work Type Location Sale Date Award Date Est. Start Est. End Est. Cost Contactor Maintenance of Traffic CRSEAL FY 14 Crack Seal Various locations within District 3 6/27/13 7/8/13 8/1/13 9/30/13 $450, CHIP FY 14 Chip Seal On various sections of SR-181 in Crawford Richland Counties; and SR-162 in Huron, Lorain Medina Counties 7/18/13 7/29/13 8/29/13 11/15/13 $1,200, PR FY 14 Tree Stump Removal Various locations within District 3 8/1/13 8/12/13 10/1/13 9/30/14 $125, LG FY 14 Highway Lighting Various locations within District 3 9/26/13 10/7/13 4/1/14 8/1/14 $75, TSG FY 14 Traffic Signal Installation Various locations within District 3 11/7/13 11/18/13 6/1/14 10/31/14 $150, GR FY 14 Guardrail Maintenance Various locations within District 3 11/21/13 12/2/13 2/1/14 1/31/15 $725,000 DISTRICT-WIDE PROJECTS 25

27 Resurfacing Reactive/Preventive Maintenance Bridge/Culvert Continued Construction from 2012 New Construction in 2013 DISTRICT-WIDE PROJECTS 26

28 O UR M I S S I O N To provide easy conveyance of people and goods from place to place, we will: Take care of what we have; Make our system work better; Improve safety; Enhance capacity O UR V I S I O N A long-term, reliable, professional and highly productive organization For more information, Allen C. Biehl, P.E., District Deputy Director at (419) , Robert L. Weaver, P.E., P.S., District Construction Administrator at (419) , or Christine Myers, Public Information Officer at (419) Like us on Facebook: Follow us on Twitter: Statewide Traffic Information: For general information, call (800) or visit District 3 s Web site at: DISTRICT-WIDE PROJECTS 27

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR HOWARD HUEBNER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 3 2017 CONSTRUCTION PROGRAM Crawford Richland SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES Erie Lorain Huron Medina Ashland Wayne JOHN R. KASICH, OHIO

More information

2 Construction Program

2 Construction Program 2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you

More information

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio

More information

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION ODOT ODOT DISTRICT 7 2018 CONSTRUCTION DISTRICT 7 PROGRAM 2018 CONSTRUCTION PROGRAM SERVING AUGLAIZE, CHAMPAIGN, CLARK, DARKE, LOGAN, MERCER, MIAMI, MONTGOMERY & SHELBY COUNTIES JOHN R. KASICH, OHIO GOVERNOR

More information

Federal State PID Number. Letting Date 8/9/ /19/2019 E170(418) Ashland HUR /HUR CHIP FY2019. CHIP SEAL DBE Goal

Federal State PID Number. Letting Date 8/9/ /19/2019 E170(418) Ashland HUR /HUR CHIP FY2019. CHIP SEAL DBE Goal of Ohio - Department of Transportation Page: 1 : 08/09/18 180447 $703,000.00 98252 7/19/2019 E170(418) Ashland HUR /HUR CHIP FY2019 CHIP SEAL MELWAY PAVING CO INC 7571 ST RT 83, HOLMESVILLE, OH 44633 $582,292.06-17.17

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update

More information

PID Number. Letting Date. Federal State BRIDGE REPAIR DBE Goal 10/20/2016

PID Number. Letting Date. Federal State BRIDGE REPAIR DBE Goal 10/20/2016 Page: 1 160513 Lake SR 91-04.56 $4,220,000.00 85147 7/2/2018 E150(773) RUHLIN COMPANY P O BOX 190, SHARON CENTER, OH 44274 $4,453,869.02 +5.54 DOT CONSTRUCTION CORP 535 NORTH BROAD ST STE 5, CANFIELD,

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

PID Number. Letting Date. Federal State BRIDGE REPAIR 7/9/2008. Federal State Letting Date. PID Number

PID Number. Letting Date. Federal State BRIDGE REPAIR 7/9/2008. Federal State Letting Date. PID Number 080435 NO BIDS Montgomery IR-75-18.32 83187 BRIDGE REPAIR 9/30/2008 No Bids for this 080436 DELAYED Franklin LR-INT'L GATEWAY (SECOND PROJECT) 75293 INTERCHANGE 9/30/2009 E041(201) has been Delayed 080437

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal

PID Number. Letting Date. Federal State /26/2018 FOUR LANE RESURFACING DBE Goal of Ohio - Department of Transportation Page: 1 : 08/02/18 180411 Warren /CLI-IR 71-07.05/00.00 $17,632,000.00 106242 FOUR LANE RESURFACING 8/30/2019 E180(162) BARRETT PAVING MATERIALS 3751 COMMERCE DR,

More information

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road. Ohio Department of Transportation Traffic Advisory District 4 Allen C. Biehl, P.E., Deputy Director 2088 S. Arlington Road. Akron, Ohio 44306 www.transportation.ohio.gov/dist4 Friday, September 18, 2015

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 4 2017 CONSTRUCTION PROGRAM SERVING ASHTABULA, MAHONING, PORTAGE, STARK, SUMMIT AND TRUMBULL COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR JOHN PICURI, P.E., DISTRICT

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Federal State PID Number. Letting Date BRIDGE REPAIR DBE Goal 9/16/2010

Federal State PID Number. Letting Date BRIDGE REPAIR DBE Goal 9/16/2010 of Ohio - Department of Transportation Page: 1 : 09/22/10 100475 Henry Lucas Ottawa Wood VA-BH-FY2011 $820,000.00 87968 7/15/2011 E100(315) VELOTTA COMPANY 6740 RIDGE RD, SHARON CENTER, OH 44274 $742,851.82-9.41

More information

PID Number Letting Date 8/26/2009 GUARDRAIL REBUILDING LAKE ERIE CONSTRUCTION COMPANY P O BOX 777, NORWALK, OH $633,

PID Number Letting Date 8/26/2009 GUARDRAIL REBUILDING LAKE ERIE CONSTRUCTION COMPANY P O BOX 777, NORWALK, OH $633, of Ohio - Department of Transportation Page: 1 : 09/03/09 090408 Highland CR-C.R.16/VARIOUS-VARIOUS $290,000.00 82904 5/31/2010 E070(917) LAKE ERIE CONSTRUCTION COMPANY P O BOX 777, NORWALK, OH 44857 $238,270.00-17.84

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE October 12, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 167 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

Letting Date. Federal State PID Number. 4/9/2015 TWO LANE RESURFACING DBE Goal

Letting Date. Federal State PID Number. 4/9/2015 TWO LANE RESURFACING DBE Goal of Ohio - Department of Transportation Page: 1 Bid Results : 04/17/15 Time: 1:04 PM 150152 Wayne SR 57-10.82 $1,158,000.00 86840 TWO LANE RESURFACING 8/1/2015 E110(312) KOKOSING CONSTRUCTION COMPANY 886

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM TO: FROM: NOACA Board of Directors Grace Gallucci, Executive Director DATE: October 3, 2014 RE: Resolution No. 2014-044 Project Planning Reviews 1

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Delaware County Engineer

Delaware County Engineer 2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,

More information

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 7, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 187 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Jobs and Progress. Central Ohio Region ODOT Districts 3, 5 and 6. Ohio's Transportation Improvement Strategy

Jobs and Progress. Central Ohio Region ODOT Districts 3, 5 and 6. Ohio's Transportation Improvement Strategy Jobs and Progress August Plan Ohio's Transportation Improvement Strategy ERIE Central Ohio Region ODOT Districts, 5 and 6 MARYSVILLE HEATH ZANESVILLE CAMBRIDGE Bob Taft, Ohio Governor Gordon Proctor, ODOT

More information

PID Number Letting Date 4/4/2019 FOUR LANE RESURFACING DBE Goal

PID Number Letting Date 4/4/2019 FOUR LANE RESURFACING DBE Goal Page: 1 190169 $8,215,000.00 Sandusky US 6/US 20-14.61/14.59 Resurf/Brdg 77825 11/1/2019 E150(041) KOKOSING CONSTRUCTION COMPANY 6235 WESTERVILLE RD, WESTERVILLE, OH 43081 $8,180,408.68-0.42 INC GERKEN

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities **11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place. EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

District One Contacts

District One Contacts District 1 District One Contacts Kirk Slusher District Deputy Director 419-999-6804 kirk.slusher@dot.state.oh.us Dan Kaseman District Planning & Engineering Administrator 419-999-6861 dan.kaseman@dot.state.oh.us

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

PID Number Letting Date 3/7/2019 MAJOR RECONSTRUCTION DBE Goal

PID Number Letting Date 3/7/2019 MAJOR RECONSTRUCTION DBE Goal Page: 1 190037 Franklin IR 70-14.54 (Proj 2E) *** PROJECT HAS ALTERNATES $78,420,000.00 105322 MAJOR RECONSTRUCTION 7/31/2021 E180(134) KOKOSING CONSTRUCTION COMPANY 6235 WESTERVILLE RD, WESTERVILLE, OH

More information

Letting Date 11/2/2017 BRIDGE REPLACEMENT (3 BRIDGES) DBE Goal. PID Number Federal State Letting Date. PID Number

Letting Date 11/2/2017 BRIDGE REPLACEMENT (3 BRIDGES) DBE Goal. PID Number Federal State Letting Date. PID Number of Ohio - Department of Transportation Page: 1 : 11/15/17 170530 DELAYED Cuyahoga IR 90-26.16/VAR 87628 BRIDGE REPLACEMENT (3 BRIDGES) 7/1/2020 E100(135) has been Delayed 170559 Scioto US 52-19.01 $1,371,000.00

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR KIRK SLUSHER, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 1 2018 CONSTRUCTION PROGRAM Defiance Paulding Putnam Hancock 1 VanWert Wyandot Allen Lima Hardin SERVING ALLEN, DEFIANCE, HANCOCK, HARDIN, PAULDING, PUTNAM, VAN WERT AND WYANDOT COUNTIES

More information

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Weekly East Tennessee Construction Report for May 31-June 6, 2018 Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane

More information

Road Construction Ahead January-April 2015 NORTHWEST REGION

Road Construction Ahead January-April 2015 NORTHWEST REGION NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,

More information

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties) District 1 (Cook, DuPage, Will, McHenry, Kane and Lake Counties) District 2 -Jane Byrne Interchange reconstruction in Chicago o $76.6 million; $31.8 million spent o Spread over four separate contracts

More information

City of Grand Island Tuesday, December 12, 2017 Council Session

City of Grand Island Tuesday, December 12, 2017 Council Session City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

Letting Date. Federal State PID Number 10/25/ BRIDGE REPAIR DBE Goal. PID Number. Letting Date. Federal State

Letting Date. Federal State PID Number 10/25/ BRIDGE REPAIR DBE Goal. PID Number. Letting Date. Federal State of Ohio - Department of Transportation Page: 1 : 11/02/18 180524 DELAYED Marion US 23-07.66 91519 BRIDGE REPAIR 9/2/2019 E130(922) has been Delayed 180533 Adams Brown SR 136-00.00 & BRO-US 52-21.05 $971,000.00

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

Project ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19

Project ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19 N Middlesex 608420 LOWELL- RECONSTRUCTION AND REHABILITATION OF SIX BRIDGES (ENEL BRIDGES) TIGER 07/29/2016 $100,000.00 GRANT 601426 BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK

More information

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS Date: September 29, 2017 #17-292 District: District 3 - Marysville, www.dot.ca.gov/dist3 Amarjeet S. Benipal, District Director Contact: Liza Whitmore, liza.whitmore@dot.ca.gov Phone: Office: (530) 634-7640

More information

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE June 1, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 090 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

PID Number. Letting Date. Federal State /5/2018 FOUR LANE RESURFACING DBE Goal

PID Number. Letting Date. Federal State /5/2018 FOUR LANE RESURFACING DBE Goal of Ohio - Department of Transportation Page: 1 : 04/17/18 180192 Ashtabula SR 11/SR 45-13.94/24.07 $4,160,000.00 88933 FOUR LANE RESURFACING 9/28/2018 E161(314) KOSKI CONSTRUCTION CO P O BOX 1038, ASHTABULA,

More information

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE September 14, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 149 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Fall 2015 Tender Release

Fall 2015 Tender Release Tender Close 001-05-00 Hwy. 1, Thin Overlay, 4km past the sintaluta access to 4km short of the JCT. Hwy 1, km 43.25 to 53.40 Thin Overlay Southern December 2015 January 2016 Length = 10.15 km Asphalt Concrete

More information

I-94 East Corridor Performance

I-94 East Corridor Performance Corridor Context The corridor runs 16 miles between downtown St. Paul and the Wisconsin state border. The corridor serves as an important East-West connection for the Metro area, serving the communities

More information

PID Number. Letting Date. Federal State BRIDGE REPAIR DBE Goal 2/1/2018

PID Number. Letting Date. Federal State BRIDGE REPAIR DBE Goal 2/1/2018 of Ohio - Department of Transportation Page: 1 : 02/22/18 180002 Lorain US 6-09.67 $25,245,000.00 92013 BRIDGE REPAIR 9/30/2019 E131(476) The Ruhlin Company - Perram Electric, Inc - PO BOX 190, SHARON

More information

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Constructor: Joseph B. Fay

Constructor: Joseph B. Fay 1 1 2 OWNER: PENNDOT Engineering District 11-0 City of Pittsburgh Design Consultant: SAI Consulting Engineers KTA-Tator Constructor: Joseph B. Fay Construction Manager: Michael Baker Construction Inspection:

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE February 1, 2019 CONTACT: Sandy Myers 540-332-9201 (office) STA19 020 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

PID Number. Letting Date. Federal State /17/2018 FOUR LANE RESURFACING DBE Goal

PID Number. Letting Date. Federal State /17/2018 FOUR LANE RESURFACING DBE Goal Page: 1 180246 Madison Pickaway /PIC-IR 71-04.56/00.00 $15,284,000.00 25596 FOUR LANE RESURFACING 6/30/2019 E130(475) SHELLY & SANDS 1515 HARMON AVE, COLUMBUS, OH 43223 $14,694,990.32-3.85 SHELLY COMPANY

More information

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69 FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, 540-387-5238 SALEM 69 Jen.Ward@vdot.virginia.gov - The following is a list of forecasted highway projects that may impact traffic traveling

More information

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE February 8, 2019 CONTACT: Sandy Myers 540-332-9201 (office) STA19 027 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness, From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects

Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects Evansville Metropolitan Planning Organization Program Year 2015 Annual Listing of Obligated Projects December 22, 2015 Indiana, Kentucky, Transit and Planning Obligations The Evansville Metropolitan Planning

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

Weekly construction update

Weekly construction update November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41

More information

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

PID Number. Letting Date. Federal State SIGNALIZATION 5/21/2015

PID Number. Letting Date. Federal State SIGNALIZATION 5/21/2015 of Ohio - Department of Transportation Page: 1 Bid Results : 06/10/15 Time: 2:19 PM 150178 Hamilton SR 264-0.08 Cleves SRTS $54,000.00 96341 SIGNALIZATION 9/15/2015 E131(447) BANSAL CONSTRUCTION INC 3263

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

El Dorado County / Tahoe Roadwork Schedule

El Dorado County / Tahoe Roadwork Schedule Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

PID Number. Letting Date. Federal State BIKEWAYS DBE Goal 5/11/2017

PID Number. Letting Date. Federal State BIKEWAYS DBE Goal 5/11/2017 Page: 1 170232 Athens Belpre Trail CR 24A Ext $976,000.00 101710 BIKEWAYS 9/30/2018 E170(074) FREEDOM CONSTRUCTION 60500 PATCH ROAD, NEW CONCORD, OH 43762 $1,015,000.00 +4.00 ENTERPRISES, AXIS CIVIL CONSTRUCTION

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

MoDOT Southwest District

MoDOT Southwest District Barry County Route 37: Add right-turn lane at Route 60 in Monett Route 60: Rehabilitate westbound bridge over railroad in Monett Route D: Resurface pavement between Route 248 and Route 265/413 in Crane

More information

Apparent Bids for Letting of April 10, 2018

Apparent Bids for Letting of April 10, 2018 Apparent Bids for Letting of April 10, 2018 Letting ID: 04102018 Cut-Off Time: 02:00:59 PM 020-1147480 Cherokee 2018 Cherokee CTC Resurfacing 1FR001 F & R ASPHALT, INC. 128 REEVES LANE EASLEY, SC 29641

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

CUY LAKE TO LAKES TRAIL (PHASE 2): PID 1299 Superior Avenue Cleveland, Ohio 44114 216-241-2414 (extension 287) 216-621-3024 (fax) emay@mpo.noaca.org NOACA MEMORANDUM To: Melinda Bartizal (216) 584-2087 From: Ed May (216) 241-2414 ext. 287 Date:

More information

TRAFFIC ALERT FOR JUNE 25-29, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR JUNE 25-29, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE June 22, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 100 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

Townships Eligible to Apply for Township Sign Grant 2018

Townships Eligible to Apply for Township Sign Grant 2018 Townships Eligible to Apply for Township Sign Grant 2018 For more information on the Ohio Dept. of Transportation s Township Sign Grant Program, please visit the program s website at: http://www.dot.state.oh.us/divisions/planning/localprograms/pages/township_safety_s

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All

More information