Caltrans District 5. District Director s Report A quarterly publication for our transportation partners. Rosales leads Program Project Management
|
|
- Marshall Gray
- 5 years ago
- Views:
Transcription
1 District 5 Highway 1 near Big Sur in Monterey County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system to enhance California s economy and livability. WINTER 2016 District Director s Report A quarterly publication for our transportation partners Preparing for El Niño Monitoring, clearing and repairing all highway culverts and drainage structures. Coordinating with emergency responders to expediently open closed roadways. Working collaboratively with local resource agencies on specific area needs. Providing a uniform approach regarding maintenance forces overseeing a major damage site. Safety Plan addressing reduced fatalities and severe injuries on all public roads. For more information: Rosales leads Program Management Maintaining rapid and appropriate response to storm damages and keeping the traveling public informed are top priorities for the Maintenance Division. This year s efforts are a bit more extensive than during an average rainy season, according to Senior Maintenance Engineer Lance Gorman, P.E. Highway 1 at Big Sur frequently sustains winter storm damage, especially between San Carpoforo Creek, just south of Ragged Point in San Luis Obispo County, and the Carmel River Bridge in Monterey County. This location has a high concentration of endangered and protected resources requiring multi-agency emergency preparation. Every year, Maintenance crews diligently prepare for winter storms by doing the following: Keeping the public informed. Mile Marker Winter Edition Released The Mile Marker: A Performance Report is now available online. This edition features closing the carpool lane gap on Interstate 215 in Southern California, the demolition of the largest pier on the old Bay Bridge and the new 2015 Strategic Highway Deputy District Director Richard Rosales Richard Rosales is the new Deputy District Director of Program Management. He has served for more than 29 years, including 15 years as a project manager in four of the District s five counties. He s experienced in encroachment permits, construction, design and hydraulics, and holds a Bachelor s degree in civil engineering from CSU-Cal Poly, Pomona. He enjoys spending time with his family, basketball, hunting, and golfing. Please Submit Maintenance Service Requests at the Following Link:
2 WINTER 2016 Highway 17 Access Management Plan Addressing mobility, access and safety in coordination and partnership are the main goals for the multi-agency Highway 17 Access Management Plan. The study presents unique challenges as it considers access in a rural area carrying heavy traffic with mountainous terrain. So far, has hosted three workshops in the communities of Happy Valley, Loma Prieta and Scotts Valley, garnering public comment from those traversing the highway daily. The second round of workshops, scheduled in the spring, will present potential concepts for addressing the public s identified needs and issues from the earlier sessions. The plan focuses on preserving both the function and operation of the highway corridor and local road network, reducing conflict points, and coordinating land use and transportation planning. Ultimately, the plan will allow and its partners to proactively manage the highway s existing and future access from the Granite Creek Road interchange to the Santa Cruz-Santa Clara county line. partners on this planning effort include Santa Cruz County Supervisor John Leopold, District 1; Santa Cruz County Supervisor Bruce McPherson, District 5; Santa Cruz County; Santa Cruz County Regional Transportation Commission; California Highway Patrol; and the City of Scotts Valley. invites public input on this plan, which is available online at: Tighter transverse cracks and fewer joints, resulting in smoother pavement and reduced water penetration and potential base damage. Lower life cycle costs despite higher initial costs. Ability to handle heavier truck loading and volumes. Concrete pavement is now being installed across the nation and around the world, according to the Federal Highway Administration. It has the potential to provide a sustainable, long-term, zero maintenance, service life under heavy traffic loadings and challenging environmental conditions. Currently, the $47 million project is being advertised for construction. It is scheduled for completion in summer More information on concrete pavement is available at: F/CRCP-Design_Const-Guide-Jun-5-07.pdf. Concrete pavement for Highway 46 The Highway 46 East (Whitley 2B) project will widen the highway to four lanes for more than four miles near Shandon in San Luis Obispo County. This is District 5 s first project to feature Continuously Reinforced Concrete Pavement, which provides the following major benefits: Sustainable and minimal maintenance. Reduced worker safety risks, future maintenance costs and traffic closures. Public Information Office (805) info-d5@dot.ca.gov Santa Barbara-San Luis Obispo- Monterey-San Benito-Santa Cruz
3 Goleta Drainage Upgrades (05-0G070) Union Valley Parkway Interchange Planting (463814) Castillo Street Concrete Pavers (1F610) U.S 101 Pavement Preservation (1A7204) In Goleta from 0.2 mile east to 0.7west of Fairview Ave. Overcrossing (PM 22.3 to 23.0) In Santa Maria at Union Valley Parkway (PM ) In the City of Santa Barbara at Castillo Street (PM R14.2) County in and Near Goleta From Maria Ygnacio creek bridge to North of Cathedral Oaks Overcrossing (PM ) Upgrade Drainage Culverts Irrigation, Planting, Erosion Control Install concrete pavers on Castillo Street to address ponding water and rough pavement CONSTRUCTION PROJECTS $16.6 Million SHOPP 2013-Summer 2017 $600,000 STIP Summer 2015 $873,000 SHOPP Pavement Preservation Summer 2015 $1.3 Million SHOPP (Resident Engineer) Steve DiGrazia David Beard David Beard (CJ) Steve DiGrazia (JK) Contractor Flat Iron West of San Marcos, CA Empire Landscaping Inc. of Davis, CA Peterson Chase of Irvine, CA. Granite of Santa Barbara, CA. Northbound Fairview on-ramp and Southbound Fairview off-ramp eight month continues until early Plant Establishment began in January completed in early October began in September 2015 but is now under winter suspension until spring Page 1 of 4
4 CONSTRUCTION PROJECTS (CONTINUED) (Resident Engineer) Contractor Hwy. 101/154 (05-0G280) County at the Rancho Cielo Vista and Arroyo Hondo Vista Points Vista Rehabilitation and Install Interpretive Displays Late Summer 2015/ Late Winter 2016 $699,000 Federal Transportation Enhancement Corby Kilmer (AN) RSB Group, Inc. began in September Work to be performed in other counties in District 5. Hwy. 246 Route 246 Passing Lanes (0C640) County near Lompoc, from Cebada Canyon Road to Hapgood Road (PM R16.7) Passing Lanes and Operational Improvements $21 Million STIP and Measure A (KM) Papich of Pismo Beach, CA. will be suspended for the winter. Hapggod Road (West) at SR 246 will re-open when the suspension begins. Phase South Coast 101 HOV Lanes (0N700) Between Bailard Avenue in Carpinteria and Sycamore Creek in the city of Santa Barbara (PM ) Construct one High occupancy Vehicle (HOV) lane in each direction. length is 10.9 miles Begin 2018 (first phase) funding dependent $350 Million STIP and Measure A Scott Eades PA&ED Portion of EIR to be recirculated as a result of recent court hearing. Page 2 of 4
5 Linden and Casitas Pass Interchanges (4482U1) Gaviota Curve Realignment (0T6301) Hwy. 154 Cachuma Pass (1C830) In Carpinteria from south of Carpinteria Creek Bridge to north of Linden Avenue Overcrossing (PM ) In Gaviota from north of the Beckstead Overcrossing to south of the Gaviota Tunnel (PM ) Near Santa Barbara from 0.4 mi west of Edison Street to Cold Springs Canyon (PM R ) Reconstruct Linden Avenue and Casitas Pass Road Interchanges as well as extend Via Real to Linden Avenue. Realign curve on Northbound Hwy. 101 Pavement Preservation $61 Million STIP $6.9 Million SHOPP $9.9 Million SHOPP David Beard Rochelle Vierra PS&E/ R/W PAED Ready to List December Anticipated CTC funding vote January Advertising for construction, bids open 2/3/2016. Anticipate start of construction Spring Work continuing on PS&E. Anticipate ready to list in spring 2016 Former Hwy. 225 Las Positas Retaining Wall (1C190) In the City of Santa Barbara 1.5 miles south of US 101 along Arroyo Burro Creek (PM 1.5) Repair Retaining Wall $1 Million SHOPP PAED Environmental document and preliminary design being prepared. Anticipate ready to list in Fall 2017 Page 3 of 4
6 (CONTINUED) Phase Hwy. 154/246 Roundabout Planting (0T001) County near Santa Ynez at and near Route 246 intersection (PM 8.1) Landscaping $140,000 SHOPP PS&E Current advertisement date is March could be delayed further by drought. Hwy. 246 Route 246 Drainage Repair (1A170) In Santa Ynez at Cuesta Street (PM ) Drainage and slope repair $1 Million SHOPP PS&E is in PS&E phase. Anticipate ready to list in winter Page 4 of 4
Latest Mile Marker Released
District 5 Looking north at US/101 Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system
More informationLatest Mile Marker Released
District 5 Looking north at US 101/Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation system
More informationLatest Mile Marker Released
Caltrans District 5 Looking north at US 101/Los Osos Valley Road interchange in San Luis Obispo County District Director Timothy Gubbins Provide a safe, sustainable, integrated and efficient transportation
More informationAnnual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)
Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal
More informationFlood History. Floodplain Descriptions
Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris
More informationSTAFF REPORT. MEETING DATE: February 7, 2008 AGENDA ITEM: 6
STAFF REPORT SUBJECT: RSTP& LSTP Fund Balances MEETING DATE: February 7, 2008 AGENDA ITEM: 6 RECOMMENDATION: STAFF CONTACT: Receive an update on programmed funds from the Regional Surface Transportation
More informationAPPENDIX A DATA COLLECTION BIBLIOGRAPHY SANTA CLARA COUNTY I-680 CORRIDOR STUDY
APPENDIX A DATA COLLECTION BIBLIOGRAPHY APPENDIX A DATA COLLECTION BIBLIOGRAPHY This section of the I-680 Corridor Study presents a summary (or bibliography) of the data that was collected and reviewed
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationProgress Report for Projects of Regional Significance
Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More information90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits
90 I-90 Snoqualmie Pass East September 2015 Annual Mega-Project Report Purpose of this Report The financial and schedule information in this document will assist the Office of Financial Management in meeting
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationProgress Report for Projects of Regional Significance
SR 58 BELTWAY IMPROVEMENTS MARCH 2018 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance OCTOBER 2018 EDITION This report is updated quarterly and posted on
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationSelection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.
ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationCapital Improvement Program Fiscal Year
Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationN Prime Retail Pads w/ Direct CA-99 & Betty Dr Access. Direct Access to Upgraded HWY 99 Off/On Ramps
Prime Retail Pads w/ Direct CA-99 & Betty Dr Access Direct Access to Upgraded HWY 99 Off/On Ramps Optimal Visibility w/ Easy to - Over 70,000 Cars Per Day Unmatched Level of Consumer Traffic & High Volume
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationAmerican Society of Civil Engineers Newsletter November 2008
American Society of Civil Engineers Newsletter November 2008 NOVEMBER REGULAR MEETING Santa Barbara Airport Airline Terminal Improvement Project Taxiway M, Northwest Service Road, and Goleta Slough Overlook
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationDIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018
DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES
More informationUpdate on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan
Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra
More informationWeekly East Tennessee Construction Report for May 31-June 6, 2018
Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane
More informationCanada and Alberta announce 33 new infrastructure projects
January 28, 2010 Canada and Alberta announce 33 new infrastructure projects Stimulus funding will create jobs, stimulate regional economy Calgary... Rob Merrifield, Minister of State (Transport), and Luke
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationI-405 Express Toll Lanes Coming in 2015
I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016
RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationCALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN
CALIFORNIA DEPARTMENT OF TRANSPORTATION CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN Prepared by Division of Traffic Operations Office of Traffic Management Submitted to Federal Highway
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More information2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016
2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The
More informationOverview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016
Overview of Highway 37 Project Napa County Board of Supervisors December 20, 2016 1 Project Location-Caltrans District 4 2 SR 37 Corridor Features 2 to 4 lane 21 mile corridor traversing Solano, Sonoma,
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationDelaware County Engineer
2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More informationDick Trammel. Senior Democrats of Northwest Arkansas. Chad Adams. Chairman, Arkansas Highway Commission. District 4 Engineer
Dick Trammel Chairman, Arkansas Highway Commission Chad Adams District 4 Engineer Senior Democrats of Northwest Arkansas Tuesday, June 21, 2016 Legislation Governor s Working Group on Highway Funding January
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017
Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada
More informationBuchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan
Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationStrategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer
Strategic Signal Timing Changes = BIG Results Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer Pre Signal Timing Updates Signal Timing Updates Average Retiming Interval Percent
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update
More informationOFFICE OF THE CITY MANAGER
OFFICE OF THE CITY MANAGER December 6, 2013 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items: On Wednesday, the ribbon was cut to signal
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationSanta Barbara And Surrounding Area READ ONLINE
Santa Barbara And Surrounding Area READ ONLINE If searching for the book Santa Barbara and Surrounding Area in pdf form, then you have come on to faithful site. We furnish the utter variation of this book
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationFHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need
Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More informationG Street Undercrossing. City Council Meeting Date: November 3, 2008
G Street Undercrossing City Council Meeting Date: November 3, 2008 Introduction G Street undercrossing Long-term goal of the City In General Plan since 1997 In City s Public Facilities Financing Plan
More informationMost people notice when ODOT builds something
ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what
More informationATTACHMENT B. Reference No.
ATTACHMENT B Projects in the Five-Year Capital Improvement Program for Fiscal Years Ending 2014-2018 GOVERNMENT CODE SECTION 65402 GENERAL PLAN CONFORMITY ANALYSIS 1 4 Orcutt GS Station 21 (Orcutt) Rebuild
More informationPRIORITIES COMMITTEE MEETING
PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony
More informationEXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND
EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County
More informationNDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT
NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationFNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY
FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)
More informationSierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS
Date: September 29, 2017 #17-292 District: District 3 - Marysville, www.dot.ca.gov/dist3 Amarjeet S. Benipal, District Director Contact: Liza Whitmore, liza.whitmore@dot.ca.gov Phone: Office: (530) 634-7640
More informationWEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.
NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway
More informationCLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet
CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway
More informationSan Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1
San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 OVERVIEW Brief recap from October Traffic Analysis Findings Draft Environmental Document Summarized Outcomes Questions
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationHIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS
HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS Agenda and Meeting Format 7:00-7:15 Welcome 7:15-8:00 Presentation 8:00-8:30 Open House 8:30 Recap 9:00 Conclusion 2 Meeting Goals: Introduce the project
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationRoad Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities
**11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More informationCOASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL
COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to
More informationDepartment of Public Works P.O Box 4186, San Rafael, CA / Fax: 415/
Department of Public Works P.O Box 4186, San Rafael, CA 94913-4186 415/499-7877 Fax: 415/499-3724 Raul M. Rojas DIRECTOR San Antonio Road Bridge Replacement September 9, 2015 Community Meeting Summary
More informationViaduct Demolition at Girard Interchange
i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95
More informationState Project Reconstruction I-84
State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant
More informationTTAC MINUTES. Thursday, May 1, 2014 Solvang City Hall Solvang CA 9:00 a.m. Santa Barbara Metropolitan Transit District
TTAC MINUTES Thursday, May 1, 2014 Solvang City Hall Solvang CA 9:00 a.m. TTAC Voting Members Present Rose Hess James Winslow Mike Luther Dennis Delzeit Browning Allen (Chair) Shad Springer Chris Sneddon
More informationThe Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).
The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationSR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5
SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.
More information- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and
More information