Mud Creek and West Mud Creek
|
|
- Sophia Harrington
- 5 years ago
- Views:
Transcription
1 Mud Creek and West Mud Creek Recreational Use Attainability Analysis Summary of Findings Texas Institute for Applied Environmental Research Stephenville, Texas September 15,
2 Project Partners Texas State Soil and Water Conservation Board (TSSWCB) Texas Institute for Applied Environmental Research (TIAER) 2
3 TSSWCB Provide state oversight Management and coordination of project activities Project partners Texas Commission on Environmental Quality (TCEQ) Provide project funding 3
4 TIAER Project administration Develop & maintain stakeholder relations Perform RUAA survey activities GIS inventory Facilitate meetings Develop final technical reports 4
5 RUAA Basics Collect information that will: 1. Confirm or deny primary contact recreation 2. Document any evidence of recreational uses of Mud Creek and West Mud Creek Recreational Use Categories: 1. Primary Contact Recreation 2. Secondary Contact Recreation 1 3. Secondary Contact Recreation 2 4. Noncontact Recreation 5
6 How did we get here? Mud Creek and West Mud Creek are not meeting the water quality standard for primary contact recreation Due to elevated levels of bacteria, E. coli. Requires action to meet the standards that are set by the State of Texas and EPA. 6
7 Texas 303 (d) List Requirement of the Clean Water Act Developed by TCEQ to summarize the condition of the state s surface waters, including concerns for public health, fitness for use by aquatic species and other wildlife, and specific pollutants. 7
8 Why we chose this approach Once on the 303(d) List, action is required by the state Viable candidate Cost Effective Non Regulatory approach State Led, Not Federal 8
9 Impaired Stream Segments Mud Creek (0611C) 2002 Texas Water Quality 303(d) List Bacteria West Mud Creek (0611D) 2010 Texas Water Quality 303(d) List Bacteria 9
10 RUAA Survey Sites Locations Mud Creek 10
11 RUAA Survey Sites Location Mud Creek Site ID Site Description Latitude Longitude Distance from confluence (mi) 1 Distance from previous site (mi) 1 Access MD14 MD13 MD MD15 MD02 MD03 MD04 MD18 MD17 Mud Creek on private property approximately 4.3 km south of Highway NA Mud Creek on private property approximately 3.7 km south of Highway Mud Creek on private property approximately 2.5 km south of Highway Mud Creek crossing SH Mud Creek on private property approximately 2.2 km north of Highway Mud Creek crossing CR Mud Creek crossing FM Mud Creek crossing SH Mud Creek on private property approximately 1.9 km north of Highway Mud Creek on private property approximately 450 meters south of Highway Private Private Private Public Private Public Public Public Private Private 11
12 RUAA Survey Sites Location Mud Creek Site ID Site Description Latitude Longitude Distance from confluence (mi) 1 Distance from previous site (mi) 1 Access Mud Creek crossing SH Public MD16 Mud Creek along the powerline right of way on private property approximately 760 meters North of SH Private MD19 Mud Creek crossing CR Mud Creek crossing FM Mud Creek on private property approximately 1.3 km south of Cherokee County Road Public Public Private MD08 MD MD Mud Creek crossing CR Mud Creek on private property approximately 3.2 km East of SH Mud Creek crossing SH Mud Creek on private property approximately 1.0 km North of SH Mud Creek crossing CR Mud Creek crossing SH Public Private Public Private Public Public 12
13 RUAA Survey Sites Locations - West Mud Creek 13
14 RUAA Survey Sites Locations West Mud Creek Site ID Site Descriptions Latitude Longitude Distance from Confluence (mi) Distance from Previous Site (mi) Access WM12 WM13 West Mud Creek on private property approximately 2.1 km north of SH 135 and 2.1 km east of Cherokee CR3052 West Mud Creek on private property approximately 2.3 km north of SH135 and 1.5 km east of Cherokee CR NA Private Private West Mud Creek crossing at FM Public WM02 WM03 West Mud Creek crossing at County Line Road on Cherokee/Smith County Line West Mud Creek on private property approximately 2.2 km west of Smith CR Public Private West Mud Creek crossing at FM KM northeast of Bullard Public WM06 West Mud Creek crossing at Smith CR Public West Mud Creek crossing FM miles south of Tyler Public West Mud Creek crossing US 69 4 miles south of Tyler Public West Mud Creek crossing at FM 2813 south of Tyler Public WM11 West Mud Creek on private property in Tyler approximately 740 km south of West Grande Blvd Private WM10 West Mud Creek at intersection of SH69 and Grande Blvd in Tyler Private 14
15 Findings for First RUAA Survey Mud Creek (0611C) Conducted July 25 28, 2014 Summary Limited water for recreation No direct recreation observed Limited public access, mostly private property 15
16 Mud Creek Photographs 150m Upstream at MD01 Fish hook and weight at MD04 16
17 Mud Creek Photographs 150m Upstream at MD06 Backpack at MD08 17
18 Mud Creek Photographs Obstruction at MD10 300m Upstream at MD10 18
19 Mud Creek Photographs Steep bank and log jam at MD13 Campfire at MD13 19
20 Mud Creek Photographs Right bank at 150m at MD14 300m Upstream at MD17 20
21 Mud Creek Photographs No Trespassing sign at MD18 Bridge at MD19 21
22 Mud Creek Photographs 0m Upstream at MD21 300m Downstream at MD21 22
23 Findings for First RUAA Survey West Mud Creek (0611D) Conducted June 4-7, 2014 Summary Limited water for recreation No direct recreation observed Limited public access, mostly private property 23
24 West Mud Creek Photographs 150 m Upstream at WM01 Beaver Dam between 150 and 300 m at WM01 24
25 West Mud Creek Photographs 0 m Upstream with Obstruction at WM02 0 m Right Bank at WM02 25
26 West Mud Creek Photographs 0 m Downstream with Obstruction at WM m Upstream with Obstruction at WM03 26
27 West Mud Creek Photographs 0 m Steep Right Bank at WM04 0 m Steep Left Bank at WM04 27
28 West Mud Creek Photographs Single Access Point at WM m Left Bank at WM07 28
29 West Mud Creek Photographs 0 m Downstream at WM09 Obstruction at WM09 29
30 West Mud Creek Photographs 150 m Upstream at WM m Downstream at WM11 30
31 West Mud Creek Photographs 0 m Upstream at WM12 0 m Downstream at WM12 31
32 Next Steps Interviews on-going Collecting feedback on current and past recreational uses of Mud Creek (0611C) and West Mud Creek Interview Forms can be requested from TIAER or found online at 32
33 Contact Information Leah Taylor Office Phone: Jimmy Millican Office Phone:
34 Questions? Project Website: Funding Provided through a State General Revenue Nonpoint Source grant from Texas State Soil and Water Conservation Board. Leah Taylor Texas Institute for Applied Environmental Research ltaylor@tiaer.tarleton.edu (254)
Recreational Use Attainability Analysis Summary of Findings & Public Comment
The Neches River Above Lake Palestine, Prairie Creek, Mud Creek, and West Mud Creek Recreational Use Attainability Analysis Summary of Findings & Public Comment Texas Institute for Applied Environmental
More informationWhite Oak Creek. Recreational Use Attainability Analysis Summary of Findings. Texas Institute for Applied Environmental Research Stephenville, Texas
White Oak Creek Recreational Use Attainability Analysis Summary of Findings Texas Institute for Applied Environmental Research Stephenville, Texas August 8, 2016 Sulphur Springs, Texas August 9, 2016 Mount
More informationMeeting Agenda. Why are we here? Getting Started. Designated Uses. Water Quality Standards
Upper Basin Total Maximum Daily Load Study and Rapidan Technical Advisory Committee Meetings July 27, Meeting Agenda Water Quality Assessments and TMDL Process Bryant Thomas, VA DEQ Overview of 16 TMDL
More informationConservation of Critical Environmental Resources in Chatham Park
Conservation of Critical Environmental Resources in Chatham Park Elaine Chiosso, Haw Riverkeeper Haw River Assembly Haw River As Seen From Chatham Park "Spreading southwestward from the banks of the Haw
More informationDIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015
DIDYMO SURVEY, LOWER FRYINGPAN RIVER, BASALT, COLORADO 2015 Second Annual Report PREPARED FOR: ROARING FORK CONSERVANCY PREPARED BY: COLORADO MOUNTAIN COLLEGE NATURAL RESOURCE MANAGEMENT PROGRAM TIMBERLINE
More informationSusitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report
(FERC No. 14241) Recreation Resources Study Study Plan Section 12.5 2014 Study Implementation Report Prepared for Prepared by AECOM November 2015 TABLE OF CONTENTS 1. Introduction... 4 2. Study Objectives...
More informationSECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN
SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which
More informationCity of Peoria Clean Water Efforts. Governor s s Conference on the Management of the Illinois River October 4, 2007
City of Peoria Clean Water Efforts Governor s s Conference on the Management of the Illinois River October 4, 2007 1 What do you call dinner and a movie with an unemployed guy? An unfunded man-date! 2
More informationPhotographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:
Photograph ID: 1 west View of one of the monitoring well and the large parking lot on the south side of Center Street. Photograph ID: 2 Monitoring well located in the middle of the parking lot located
More informationFinn Creek Park. Management Direction Statement Amendment
Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date
More informationTown of Oakfield Agricultural and Farmland Protection Plan
SECTION III COMMUNITY OVERVIEW A. Regional Setting / Location The Town of Oakfield is located in the northwestern portion of Genesee County. Located west of New York's Finger Lakes, the Town is uniquely
More informationDuncan Hastie, P.E. Dewberry
FEMA s Riverine High Water Marks for Atlanta s September 2009 Flood Event Duncan Hastie, P.E. Dewberry Background High Water Mark Recovery Performed Through FEMA s Hazard Mitigation Technical Assistance
More informationASSESSMENT OF FECAL COLIFORM IN LITTLE RABBIT CREEK AND LITTLE SURVIVAL CREEK
ASSESSMENT OF FECAL COLIFORM IN LITTLE RABBIT CREEK AND LITTLE SURVIVAL CREEK FINAL REPORT Prepared for: Alaska Department of Environmental Conservation 555 Cordova Street Anchorage, Alaska 99501 Prepared
More informationSAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009
SAN ANTONIO RIVER IMPROVEMENTS PROJECT April 27, 2009 1 Project Limits 2 Project Partners City of San Antonio Provides project funding for project amenities (i.e.. Sidewalks, Landscaping, Lighting, etc.)
More informationSF1363 / HF 1061: Legacy Funding; Conference Agreement
- Conference 1 Art 1 - Outdoor Heritage Fund 2 3 Prairies 4 WMA, SNA, & Prairie Bank Easement Acq. Phase III 5 Accelerated Prairie Restoration - Phase III 6 MN Buffers for Wildlife & Water 7 Northern Tallgrass
More informationSIMON CANYON AREA OF CRITICAL ENVIRONMENTAL CONCERN (ACEC)
SIMON CANYON AREA OF CRITICAL ENVIRONMENTAL CONCERN (ACEC) Activities: Facilities: Season / Hours: Description: Hiking, backpacking, fishing, picnicking, watchable wildlife. A graveled parking area, picnic
More informationA GIS Assessment of Erosion Vulnerability for Unofficial Trails in the Columbia River Gorge
A GIS Assessment of Erosion Vulnerability for Unofficial Trails in the Columbia River Gorge Sachi Arakawa Geog 593 Digital Terrain Analysis Fall 2017 Abstract The city of North Bonneville, located along
More informationFECAL COLIFORM MONITORING IN GRAYS HARBOR COUNTY: SUMMARY REPORT OF MONITORING RESULTS FOR
Chehalis Basin Partnership Fecal Coliform Monitoring in Grays Harbor County: Summary Report of Monitoring Results for 2000-2003 Draft June 30, 2003 Prepared by Tetra Tech/KCM, Inc. 1917 First Avenue, Seattle,
More informationWEKIVA WILD AND SCENIC RIVER ACT OF 2000
PUBLIC LAW 106 299 OCT. 13, 2000 WEKIVA WILD AND SCENIC RIVER ACT OF 2000 VerDate 11-MAY-2000 01:59 Oct 20, 2000 Jkt 069139 PO 00000 Frm 00001 Fmt 6579 Sfmt 6579 E:\PUBLAW\PUBL299.106 APPS27 PsN: PUBL299
More informationAppalachian Trail Sustainability Research Study
Appalachian Trail Sustainability Research Study Appalachian National Scenic Trail 2,175 mile footpath from Maine to Georgia Crosses 14 states, 6 NPS units, and 8 National Forests, Managed by the NPS A.T.
More informationTufts University Water: Systems, Science, and Society (WSSS) Program
To: From: John Foster, Elbow Cay, the Bahamas; Friends of the Environment, Marsh Harbor, the Bahamas Alex Bedig, Amanda Garfield, Shonda Gaylord, Jack Melcher, Melissa Ng, Nathan Rawding, Kendall Webster,
More informationSAN ANTONIO RIVER IMPROVEMENTS PROJECT. August 6, 2008
SAN ANTONIO RIVER IMPROVEMENTS PROJECT August 6, 2008 1 History of the SA River Improvements 1921 Flood Olmos Dam Complete in 1929 Downtown Flood Relief Projects in 1950 s Dams on the River Channel and
More informationWallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall
Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall Thanks for coming! This document contains State Parks preliminary recommendations
More information\LJc.I1 (Q I] VARIOUS Counties MINUTE ORDER Page 1 of I. VARIOUS Districts
Transportation Code, 545.352 establishes prima facie reasonable and prudent speed limits for various categories of public roads, streets and highways. VARIOUS Districts Directo Traffic Operations Division
More informationThornton Water Project. Larimer County Route Study and Project Update September 12, 2017
Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing
More informationPathogens and Grazing Livestock
Pathogens and Grazing Livestock Steve Ensley DVM, PhD 10/16/09 Water Borne Pathogens This presentation will have a specific emphasis on water borne pathogens. NUMBERS OF IOWA WATER SOURCES WITH Stream/River
More informationTACWA September Meeting CHALLENGES IN MEETING THE TEXAS BACTERIAL LIMITS WITH UV ALONG THE COAST AND BAYS. Gennady Boksiner, P.E. September 30, 2011
TACWA September Meeting CHALLENGES IN MEETING THE TEXAS BACTERIAL LIMITS WITH UV ALONG THE COAST AND BAYS Gennady Boksiner, P.E. September 30, 2011 Bacterial Groups Intestinal bacteria of humans and other
More informationLITTLE LOST MAN CREEK (LLM) (formerly USGS Gaging Station No )
LITTLE LOST MAN CREEK (LLM) (formerly USGS Gaging Station No. 11482468) LOCATION: In Redwood National and State Park approximately 0.8 miles upstream from confluence with Prairie Creek and 3.2 miles northeast
More informationAppendix A Texas Integrated Report - Texas 303(d) List (Category 5)
Appendix A 2012 Texas Integrated Report - Texas 303(d) List ( 5) 2012 Texas Integrated Report - Texas 303(d) List ( 5) As required under Sections 303(d) and 304(a) of the federal Clean Water Act, this
More informationDECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction
Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of
More informationTrail Assessment Report
Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species
More informationYard Creek Provincial Park. Management Plan
Yard Creek Provincial Park Management Plan Draft January 2010 Yard Creek Provincial Park Management Plan Approved by: telàlsemkin/siyam/chief Scott Benton Bill Williams Squamish Executive Director ation
More informationA Brief Overview of the Rio Grande Compact 04/26/06
A Brief Overview of the Rio Grande Compact 04/26/06 The New Mexico Interstate Stream Commission Investigate, Protect, Conserve, and Develop the State s Waters and Stream Systems Negotiate and Administer
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationMUNICIPALITY OF ANCHORAGE
MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial
More informationMP : Blue Hill and the Disney Avalanche Path
MP 252-253: Blue Hill and the Disney Avalanche Path This section of the Auto Tour includes a portion of the wagon road, one of Colorado s most famous avalanches and the remains of an old dam. Route Mile
More informationHIDALGO COUNTY CLOSED LANDFILL INVENTORY
HIDALGO COUNTY CLOSED LANDFILL INVENTORY MSWLF ID FAC ID NAME SITE LOCATION PLACE OP_COMPANY 170 TX00170 CITY OF ALAMO 3 MI SE OF CITY HALL & ADJACENT TO EXISTING LANDFILL SITE ALAMO ALAMO, CITY OF 224
More informationJuneau Creek Alternative
WELCOME Juneau Creek Alternative Introducing the Preferred Alternative for the Sterling Highway MP 45-60 Final EIS Final EIS Released Final Environmental Impact Statement And Final Section 4(f) Evaluation
More informationAppendix A: San Francisco River Photos Gila National Forest
Appendix A: San Francisco River Photos Gila National Forest These photos accompany our request for closure to demonstrate both the the outstanding ecological values associated with this area, as well as
More informationBLANKET CREEK PROVINCIAL PARK
BLANKET CREEK PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN February 2003 BLANKET CREEK PROVINCIAL PARK Purpose Statement and Zoning Plan Primary Role The primary role of Blanket Creek Park is to maintain
More informationAssessment of Pathogen Strategies
Assessment of Pathogen Strategies Bacteria levels in receiving waters are a primary concern for federal, state, and local agencies. The primary sources of bacteria are generally attributed to combined
More informationSegment 2: La Crescent to Miller s Corner
goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,
More informationMINUTES. Additional Stakeholders including CU, CDOT, Town of Erie, and Weld County have been contacted and invited to the recurring progress meetings.
PROGRESS MEETING BOULDER CREEK MASTER PLAN UDFCD, BOULDER COUNTY, CITIES OF BOULDER & LONGMONT JANUARY 13, 2015 AT 1:00 PM MINUTES 1) ATTENDEES Craig Jacobson, ICON Engineering, Inc. Brian LeDoux, ICON
More informationChuckanut Ridge Fairhaven Highlands EIS Scoping Concerns
Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns Coalition of Southside Neighborhoods CSN Comments for Fairhaven Highlands EIS Scope Hearing, Jan 16, 2008 1 Chuckanut Ridge Hilly Terrain: Potential
More informationDELAWARE S UNIFIED WATERSHED ASSESSMENT AND WATERSHED RESTORATION PRIORITIES. October 1, l998
DELAWARE S UNIFIED ASSESSMENT AND RESTORATION PRIORITIES October 1, l998 Introduction President Clinton s Clean Water Action Plan, released in February l998, presents a broad vision of watershed protection,
More informationGalveston Bay Estuary Program. Carla G. Guthrie, Ph.D. Galveston Bay Council Member Texas Water Development Board
Galveston Bay Estuary Program Carla G. Guthrie, Ph.D. Galveston Bay Council Member Texas Water Development Board The statements contained in this presentation are my current views and opinions and are
More informationHydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.
Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek
More informationApril 10, Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO Dear Mark,
Mark Stiles San Juan Public Lands Center Manager 15 Burnett Court Durango, CO 81301 Dear Mark, We are pleased to offer the following comments on the draft San Juan Public Lands Center management plans
More informationKinder Morgan Canada Trans Mountain Pipeline Expansion Project
Kinder Morgan Canada Trans Mountain Pipeline Expansion Project Lands Taken Up Inventory May 2015 LIMITATION Information collected for this Study is the sole property of the Michel First Nation. The information
More informationIndependent Technical Reference Group Wild Horse Damage around Currango Homestead Made by: Friends of Currango Inc. (FoC) Date: 13 April 2015
Submission to: Dr Mark Lonsdale Independent Chair Independent Technical Reference Group Re: Wild Horse Damage around Currango Homestead Made by: Friends of Currango Inc. (FoC) Date: 13 April 2015 Background
More informationCitrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013
Citrus Heights Creek Corridor Trail Project Trail Advisory Group Meeting #3 July 8, 2013 Agenda Introductions Recap: Community Workshop, Survey Findings, and TAG Field Trip Community Concern Discussion:
More informationExploring the Dumaresq River
Exploring the Dumaresq River The Dumaresq River (dew merrick) lies on the western side of the Great Dividing Range, the continuous line of mountains that flanks the entire east coast of Australia. The
More informationCataloochee. Fishing Species Rainbow Trout and Brook Trout. Recreation
Cataloochee River Information The Cataloochee River is located in the historic Cataloochee Valley--a relatively remote part of Smoky Mountain National Park. The campground is a secluded setting and offers
More informationCommercial, Office, Retail & Medical Site FALCON POINTE - Pflugerville, Texas
Commercial, Office, Retail & Medical Site FALCON POINTE Pflugerville, Texas FALCON POINTE - Pflugerville, Texas Hawaiian Falls Water Park Falcon Pointe Blvd Colorado Sand Dr E Pflugerville Pkwy E Pflugerville
More informationPart Four Greenways and Open Space Vision
Somerset County Project Corridors Somerset County features the following regional project corridors: C. Laurel Hill Greenway; D. Quemahoning Greenway; E. Allegheny Front Wildlife Corridor; K. The Allegheny
More informationPiedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs
Piedra River Protection Workgroup Meeting #5 Feb. 21, 2012 Ross Aragon Community Center, Pagosa Springs What happened at this meeting? - Identified conservation easements - Discussed In-stream Flows -
More information% farmers/private landowners in watershed applying BMPs. Other (Number of participants completed the training)
Easygrants ID: 23803 National Fish and Wildlife Foundation NFWF/Legacy Grant Project ID: 0302.10.023803 U. S. Coral Reef Task Force Partnership Initiative 2010 - Submit Final Programmatic Report (Activities
More informationWhite Mountain National Forest
White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Boles Brook Snowmobile Bridge Decision Memo Boles Brook Snowmobile Bridge Project Town of Woodstock
More informationAMERICAN S PARTICIPATION IN OUTDOOR RECREATION: Results From NSRE 2000 (With weighted data) (Round 1)
AMERICAN S PARTICIPATION IN OUTDOOR RECREATION: Results From NSRE 2000 (With weighted data) (Round 1) The emphasis of this report is on participation patterns across activities and segments of our society.
More informationFlood History. Floodplain Descriptions
Flood History The worst flooding in the area took place in 1966, 1969, 1971, 1995 and 1998. The storms in 1966 and 1969 caused considerable damage throughout the area due to flooding, erosion and debris
More informationRockin River Ranch State Park. TAC Meeting No. 2
Rockin River Ranch State Park TAC Meeting No. 2 ASPT Welcome Skip Varney Deputy Director of Operations and Development Rockin River Ranch State Park Workshop Outline Planning Process/Schedule Overview
More informationA topographic map shows:,,,,
Name: Period: Mapping the Earth Notes What is a map? Label the compass directions: What does latitude measure? What is the name of the 0 latitude line? Where is 90 north latitude? Where is 90 south latitude?
More informationBacteria Contamination of Surface Waters Due to Livestock Grazing in the Stanislaus National Forest, California (Second Year of Study)
Bacteria Contamination of Surface Waters Due to Livestock Grazing in the Stanislaus National Forest, California (Second Year of Study) Lindsey Myers, staff biologist Central Sierra Environmental Resource
More informationCommercial & Multifamily Sites FALCON POINTE - Pflugerville, Texas
Commercial & Multifamily Sites FALCON POINTE - Pflugerville, Texas Hawaiian Falls Water Park (under construction) Falcon Pointe Blvd Colorado Sand Dr E Pflugerville Pkwy E Pflugerville Pkwy SUBJECT 2 SUBJECT
More informationRE: PATAHA CREEK FECAL COLIFORM COMPLIANCE WITH WATER QUALITY STANDARDS
To: WRIA 35 Planning Committee Memo From: Jory Oppenheimer and Kari Vigerstol Project: WRIA 35 Level II Water Quality CC: Ben Floyd, HDR/EES; John Koreny, HDR/EES Date: March 10, 2005 Job No: 22592 RE:
More informationNorth Carolina Addendum Total Maximum Daily Load (TMDL) for Impaired Segments in the Dan River Watershed to Virginia TMDLs Approved by EPA Region 3
North Carolina Addendum Total Maximum Daily Load (TMDL) for Impaired Segments in the Dan River Watershed to Virginia TMDLs Approved by EPA Region 3 Assessment units (AU) for the Dan River, 22-(39)b and
More informationCommercial, Office, Retail & Medical Sites FALCON POINTE - Pflugerville, Texas
Commercial, Office, Retail & Medical Sites FALCON POINTE Pflugerville, Texas FALCON POINTE - Pflugerville, Texas Hawaiian Falls Water Park Falcon Pointe Blvd Colorado Sand Dr E Pflugerville Pkwy E Pflugerville
More informationThree Sisters Campground Redevelopment
Three Sisters Campground Redevelopment In 2013 heavy rains in southern Alberta caused flooding along the Bow River that resulted in damage to facilities in the Kananaskis Region including the Three Sisters
More informationFECAL COLIFORM BACTERIA SUMMARY SHEET
FECAL COLIFORM BACTERIA SUMMARY SHEET WATERBODY: Greybull River (Tributary to Big Horn River) (WYBH10080009) REACH DESCRIPTION: Confluence wi e Big Horn River upstream to Meeteetse, Wyoming. BACKGROUND:
More informationCity of San Dimas / Unincorporated San Dimas STUDY AREA PROFILE
City of San Dimas / Unincorporated San Dimas STUDY AREA PROFILE STUDY AREA ID #156 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST
More informationLoyalsock Creek Bacterial Coliforms. Presented By: Dr. Mel Zimmerman Clean Water Institute Lycoming College Matthew Bennett Jim Rogers
Loyalsock Creek Bacterial Coliforms Presented By: Dr. Mel Zimmerman Clean Water Institute Lycoming College Matthew Bennett Jim Rogers What is E. coli? Short for Escherichia coli (a bacteria) It is a
More informationChapter 4.0 Alternatives Analysis
Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities
More informationWhy are the underground fuel tanks being removed and replaced with above ground tanks?
AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses
More informationBoardman River Dams Implementation Team. DRAFT Meeting Minutes
Location: Traverse City Governmental Center, Commission Chambers 400 Boardman Avenue Traverse City, MI 49684 Boardman River Dams Implementation Team Grand Traverse County Traverse City Light and Power
More informationNatural Factors Affecting the Level of Osoyoos Lake
Natural Factors Affecting the Level of Osoyoos Lake Background Osoyoos Lake is operated under conditions prescribed by the International Joint Commission (IJC) and Figure 1 shows the ranges within which
More informationStage 2 - November 2017 Survey and Map Comments (verbatim)
Stage 2 - November 2017 Survey and Map Comments (verbatim) Identifying information removed to meet Freedom of Information and Protection of Privacy Act (FOIP Act). Comments are recorded exactly as they
More informationPresentation Overview
DON NARROWS Historical and Existing Conditions March 29, 2008 Presentation Overview 1. Project Location and Background 2. Historical Context How did the Don Narrows Come to Be? 3. The Today 4. Next Steps
More informationA GIS Analysis of Probable High Recreation Use Areas in Three Sisters Wilderness Deschutes and Willamette National Forests
Lindsey Kiesz Geo 565 Term Project 3/15/2010 A GIS Analysis of Probable High Recreation Use Areas in Three Sisters Wilderness Deschutes and Willamette National Forests Introduction The Three Sisters Wilderness
More informationUSDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto
WRI: ENGLISH PEAK SURVEY Theodore Mendoza San Diego State University June 6 th 2016 August 18 th 2016 Advisor: Sam Commarto Klamath National Forest Submitted: March 21, 2017 Table of Contents Acknowledgements
More informationAPPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS
APPENDIX K RURAL ENVIRONMENTAL CLEARANCE PROJECTS Appendix K contains a list of projects that are not planned for construction within the four-year time frame of the Rural TIP, but are referenced in the
More informationw f^(f 3<fSflO >^-.0-o i.
dobs4)n Engineering Ltd. w f^(f 3^-.0-o i. File: 206-001/27022 May 25,2007 Ministry ofenvironment 102 Industrial Place PentictonBC V2A7C8 ^Qoeived MAY 3 1 2007 Attention: Solveij Patschke Dear
More informationPortable Noise Monitor Report
Portable Noise Monitor Report Chicago O Hare International Airport Site 241 61 Grange Road, Elk Grove Village October 3, 215 through October 19, 215 USH8-ILH55-ILS28 Visit the O Hare Noise webpage on the
More informationMickelson Connector Feasibility Study
Friends of the Norbeck PO Box 2003 Rapid City, SD 57709 www.friendsofthenorbeck.org Summary Comments on the Mickelson Connector Feasibility Study Prepared by Brian Brademeyer Submitted to Wyss Associates
More informationEAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009
EAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009 EAST SIDE TRANSPORTATION INITIATIVE AREA First Nations Northern Affairs Communities Metis Peoples PROCESSES EAST SIDE ROAD AUTHORITY (ESRA) CROWN
More informationMills Pecos River Ranch 7800 Acres Val Verde County, Texas Situated along both sides of the Pecos River
Mills Pecos River Ranch 7800 Acres Val Verde County, Texas Situated along both sides of the Pecos River James King, Agent Office 432-426-2024 Cell 432-386-2821 James@KingLandWater.com King Land & Water
More informationPublished Counts TrafficMetrix
Published Counts TrafficMetrix Contents Introduction... 1 TrafficMetrix Features... 1 TrafficMetrix Benefits... 1 TrafficMetrix Data... 1 File Descriptions... 2 State Abbreviations... 3 Count Type Glossary...
More informationTable 1: Margarita (SDSU) Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle
County of Riverside Public Safety Enterprise Communication Project Appendix A: Candidate Site Descriptions Margarita (SDSU) Communication Site Margarita (SDSU) Communication Site Overview The site is located
More informationCHAPTER: Engineers Without Borders-CMU COUNTRY: El Salvador COMMUNITY: Gualindo Arriba PROJECT: La Quebrada River Bridge
Document 521 PRE-ASSESSMENT REPORT CHAPTER: Engineers Without Borders-CMU COUNTRY: El Salvador COMMUNITY: Gualindo Arriba PROJECT: La Quebrada River Bridge PREPARED BY Engineers Without Borders-CMU, 06-14-09
More informationRECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area.
RECREATION Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area. OPPORTUNITIES FOR SOLITUDE / QUIET TRAILS. One attraction
More informationLAKE HURON BEACH STUDY
LAKE HURON BEACH STUDY A microbiological water quality evaluation of Grand Bend Beach and related pollution sources in 1985 Ministry of the Environment D.A. McTavish Director Southwestern Region Copyright
More informationAPPENDIX D MSP Airfield Simulation Analysis
APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/
More informationAlternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas
Roadless Area Conservation FEIS Summary Table S-1. Comparison of Key Characteristics and Effects by Prohibition Alternative. The effects summarized in this table A would occur in inventoried roadless areas
More informationWrinkly Face Provincial Park Purpose Statement and Zoning Plan
Wrinkly Face Provincial Park Purpose Statement and Zoning Plan Wrinkly Face Provincial Park is located about 16 km northeast of Winfield. The park is accessed via a logging road off the Beaver Main Forest
More informationJanuary 14,2010. Ms. Linda Bassi Colorado Water Conservation Board 1313 Sherman Street, Room 723 Denver, CO Dear Linda,
STATE OF COLORADO Bill Ritter, Jr., Governor DEPARTMENT OF NATURAL RESOURCES DIVISION OF WILDLIFE AN EQUAL OPPORTUNITY EMPLOYER Thomas E. Remington, Director 6060 Broadway Denver, Colorado 80216 Telephone:
More informationCity of Walnut STUDY AREA PROFILE
City of Walnut STUDY AREA PROFILE STUDY AREA ID #133 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT REPORTING FORM
More informationFigure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including:
Barr Engineering Company 4700 West 77th Street Minneapolis, MN 55435-4803 Phone: 952-832-2600 Fax: 952-832-2601 www.barr.com An EEO Employer Minneapolis, MN Hibbing, MN Duluth, MN Ann Arbor, MI Jefferson
More informationStatistical Evaluation of BMP Effectiveness in Reducing Fecal Coliform Impairment in Mermentau River Basin
Statistical Evaluation of BMP Effectiveness in Reducing Fecal Coliform Impairment in Mermentau River Basin Z.-Q. Deng 1 and H. Chowdhary 2 1 Assistant Professor, Department of Civil and Environmental Engineering,
More information2.0 Resource Management Goals of Agencies with Jurisdiction Over the Resource to be Studied
Study 9.1 PRIMARY PROJECT ROADS AND TRAILS August 2011 1.0 Project Nexus Yuba County Water Agency s (YCWA or Licensee) continued use, operation and maintenance (O&M) of s (Project) Primary Project Roads
More informationBlue Trails: Protecting Rivers, Fostering Stewardship
Blue Trails: Protecting Rivers, Fostering Stewardship What Are Blue Trails? Blue Trails are the water equivalent of hiking trails. They are created to facilitate recreation in and along rivers and water
More informationClassifications, Inventory and Level of Service
Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon
More information