PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 February 12/18)

Size: px
Start display at page:

Download "PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 February 12/18)"

Transcription

1 Petroleum Branch Ellice Ave, Winnipeg, MB R3G 3P2 T F WEEKLY WELL ACTIVITY REPORT PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 February 12/18) DRILLING ACTIVITY To February 12/18 To February 13/ Total Drilling Licences Issued Licences Cancelled Vertical Wells Drilled Horizontal Wells Drilled Stratigraphic Test Holes Drilled Wells Drilled - Total No. of Metres Drilled Wells Re-entered Wells Being Drilled No. of Active Rigs Wells Licenced but Not Spudded Wells Completed as Potential Oil Wells Wells Abandoned Dry Wells Drilled but Not Completed Other Completions New Wells on Production GEOPHYSICAL ACTIVITY Geophysical Programs Licenced Licences Cancelled Kilometers Licenced Kilometers Run OIL PRICES (Average) $/m3 ($/bbl) $/m3 ($/bbl) Month of November (71.15) (55.87) Month of December (69.96) (62.24) OIL PRODUCTION (M3) Month of June

2 2 WEEKLY WELL ACTIVITY REPORT 12 February 2018 Lic. No.: 2594 Lic. No.: 2598 Lic. No.: 2999 Lic. No.: 6168 Lic. No.: 6766 Lic. No.: Corex OGL Kirkella (WPM) UWI: W1.00 Abandoned Producer: 09-Feb-2018 Corex OGL Kirkella (WPM) UWI: W1.00 Abandoned Producer: 09-Feb-2018 Corex OGL Kirkella (WPM) UWI: W1.00 Abandoned Producer: 09-Feb-2018 Tundra Goodlands (WPM) UWI: W1.00 Abandoned Producer: 08-Feb-2018 Tundra Sinclair HZNTL (WPM) UWI: W1.00 Status: Capable of Oil Production - Suspended (SUSP COOP) COOP - Suspended: 09-Feb-2018 Virden Roselea Unit No. 3 HZNTL (WPM) UWI: W Leg #1 UWI: W Leg #2 UWI: W Leg #2 Completing: 07-Feb-2018 Lic. No.: Lic. No.: Corval Daly Sinclair HZNTL E (WPM) UWI: W1.00 Status: Licence Cancelled (CAN) Licence Cancelled: 12-Feb-2018 Corex Daly Sinclair HZNTL B (WPM) UWI: W1.00 Spud Date: 06-Feb-2018 K.B. Elevation: m Surface Casing: m with 10.0 t Finished Drilling: 11-Feb-2018 Total Depth: m Intermediate Casing: m with 39.5 t Rig Released: 12-Feb-2018 Waiting On Service Rig: 12-Feb

3 3 Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Tundra Virden SWD DIR (WPM) UWI: W1.00 Surface Casing: m with 8.0 t Finished Drilling: 07-Feb-2018 Total Depth: m Production Casing: Run Rig Released: 08-Feb-2018 Waiting On Service Rig: 08-Feb-2018 South Pierson Unit No. 1 HZNTL (WPM) UWI: W1.00 Finished Drilling: 07-Feb-2018 Total Depth: m Intermediate Casing: m with 61.3 t Rig Released: 09-Feb-2018 Waiting On Service Rig: 09-Feb-2018 South Pierson Unit No. 1 HZNTL (WPM) UWI: W1.00 Spud Date: 09-Feb-2018 K.B. Elevation: m Surface Casing: m with 13.0 t South Pierson Unit No. 1 HZNTL A (WPM) UWI: W1.00 Completing: 05-Feb-2018 South Pierson Unit No. 1 HZNTL B (WPM) UWI: W1.00 Completing: 05-Feb-2018 Tundra McAuley DIR (WPM) UWI: W1.00 Completing: 08-Feb-2018 Daly Unit No. 4 HZNTL A (WPM) UWI: W1.00 Completing: 07-Feb-2018 Daly Unit No. 4 HZNTL B (WPM) UWI: W1.00 Completing: 06-Feb-2018 Tundra Daly Sinclair Prov. HZNTL A (WPM) UWI: W1.00 Completing: 10-Feb

4 4 Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: Daly Unit No. 3 HZNTL (WPM) UWI: W1.00 Completing: 08-Feb-2018 Daly Unit No. 4 HZNTL (WPM) UWI: W1.00 Completing: 09-Feb-2018 Daly Unit No. 3 Prov. HZNTL (WPM) UWI: W1.00 Completing: 06-Feb-2018 Daly Unit No. 3 Prov. HZNTL A (WPM) UWI: W1.00 Completing: 07-Feb-2018 Waskada Unit No. 8 HZNTL A (WPM) UWI: W1.00 Completing: 10-Feb-2018 CPEC Manson HZNTL A (WPM) UWI: W1.00 Spud Date: 05-Feb-2018 K.B. Elevation: m Surface Casing: m with 13.0 t Intermediate Casing: m with 37.0 t Finished Drilling: 10-Feb-2018 Total Depth: m Rig Released: 12-Feb-2018 Waiting On Service Rig: 12-Feb-2018 Sinclair Unit No. 3 HZNTL (WPM) UWI: W1.00 Completing: 12-Feb-2018 Tundra et al Daly Sinclair HZNTL B (WPM) UWI: W1.00 Spud Date: 09-Feb-2018 K.B. Elevation: m Surface Casing: m with 8.0 t Tundra Daly Sinclair Prov. HZNTL A (WPM) UWI: W1.00 Spud Date: 05-Feb-2018 K.B. Elevation: m Surface Casing: m with 8.0 t Finished Drilling: 08-Feb-2018 Total Depth: m Intermediate Casing: m with 44.0 t Rig Released: 09-Feb

5 5 Waiting On Service Rig: 09-Feb-2018 Lic. No.: Lic. No.: Lic. No.: Lic. No.: Lic. No.: CPEC Manson HZNTL (WPM) UWI: W1.00 Status: Moving In Rotary Tools (MIRT) Moving In Rotary Tools: 12-Feb-2018 Waskada Unit No. 4 HZNTL A (WPM) UWI: W1.00 Finished Drilling: 06-Feb-2018 Total Depth: m Intermediate Casing: m with 44.5 t Rig Released: 07-Feb-2018 Waiting On Service Rig: 07-Feb-2018 Waskada Unit No. 4 HZNTL (WPM) UWI: W1.00 Spud Date: 07-Feb-2018 K.B. Elevation: m Surface Casing: m with 10.0 t Finished Drilling: 10-Feb-2018 Total Depth: m Intermediate Casing: m with 44.5 t Rig Released: 11-Feb-2018 Waiting On Service Rig: 11-Feb-2018 Waskada Unit No. 16 HZNTL A (WPM) UWI: W1.00 Spud Date: 11-Feb-2018 K.B. Elevation: m Surface Casing: m with 10.0 t Tundra East McAuley HZNTL (WPM) UWI: W STH UWI: W Leg #1 UWI: W1.00 Spud Date: 08-Feb-2018 K.B. Elevation: m Surface Casing: m with 8.0 t Finished Drilling: 10-Feb-2018 Total Depth: m Status: Abandoned Stratigraphic Test Hole (ABD STH) Abandoned Stratigraphic Test Hole: 12-Feb-2018 UWI: W Leg #1 5

6 6 Lic. No.: 9979 From: To: WELL LICENCE TRANSFERS Fort Calgary Miniota HZNTL (WPM) Flow Miniota HZNTL (WPM) Effective February 7, 2018 WELL LICENCE CANCELLATIONS Lic. No.: Corval Daly Sinclair HZNTL E (WPM) Status: Licence Cancelled Date Cancelled: 12-Feb

PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 Jul 2/18)

PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 Jul 2/18) Petroleum Branch 360-1395 Ellice Ave, Winnipeg, MB R3G 3P2 T 204-945-6577 F 204-945-0586 www.manitoba.ca WEEKLY WELL ACTIVITY REPORT PETROLEUM INDUSTRY ACTIVITY REPORT (January 1/18 Jul 2/18) DRILLING

More information

Total Discovery Wells

Total Discovery Wells Drilling Operations Wells Data in-depth (28-21) This section aims at analyzing the count of wells drilled during the fiscal years of and. These in- depth comparisons are divided into four main divisions:

More information

Use steel clip angle as a drill template and drill through mullion. Install bolts with bolt heads on the masonry side of the jamb mullion.

Use steel clip angle as a drill template and drill through mullion. Install bolts with bolt heads on the masonry side of the jamb mullion. Additional 200xpt and 250xpt installation instructions are shown on page 11. STICK METHOD ERECTION (refer to figures 1 and 2) Step 1 Establish all control lines and grades. Step 2 Attach steel intermediate

More information

January Sunday Monday Tuesday Wednesday Thursday Friday Saturday

January Sunday Monday Tuesday Wednesday Thursday Friday Saturday January 2012 1 2 Day Observed New Year s Day 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 7:00 p.m. Water and Sewer Gimli 26 27 28 29 30 31 Unless otherwise noted, hearings will be held

More information

OIL AND GAS EXPLORATION AND DEVELOPMENT ON PROVINCIAL CROWN LANDS

OIL AND GAS EXPLORATION AND DEVELOPMENT ON PROVINCIAL CROWN LANDS NATURAL RESOURCES ENERGY AND MINES July 28, 1997 INFORMATIONAL NOTICE 97-5 Introduction OIL AND GAS EXPLORATION AND DEVELOPMENT ON PROVINCIAL CROWN LANDS This interim informational notice is issued jointly

More information

December 2017 Quarterly Activities Report

December 2017 Quarterly Activities Report 31 January 2018 December 2017 Quarterly Activities Report Mira 6 horizontal well successfully drilled through nearly 1 km of coal Mira field work completed below budget Mira 6 / 2 horizontal-vertical well

More information

Chocolate Bar GOLD Mining Claim Oro Grande, California 92368

Chocolate Bar GOLD Mining Claim Oro Grande, California 92368 Gold Mining Claim 20 Acres Chocolate Bar GOLD Mining Claim Oro Grande, California 92368 Sale Highlights Formerly: Branch Gold Mine Heavy GOLD & Silver Concentrations: Remaining 300' Horizontal Tunnel with

More information

G azette. Gazette. Manitoba. Manitoba THE. Table of Contents. Vol. 146 No. 9 March 4, 2017 Winnipeg le 4 mars 2017 Vol. 146 n o 9

G azette. Gazette. Manitoba. Manitoba THE. Table of Contents. Vol. 146 No. 9 March 4, 2017 Winnipeg le 4 mars 2017 Vol. 146 n o 9 THE Manitoba Gazette G azette DU Manitoba Vol. 146 No. 9 March 4, 2017 Winnipeg le 4 mars 2017 Vol. 146 n o 9 Table of Contents GOVERNMENT NOTICES Under The Highway Traffic Act: Operating Authority...

More information

O I L S E A R C H L I M I T E D

O I L S E A R C H L I M I T E D 28 December 2006 THE AUSTRALIAN STOCK EXCHANGE (SYDNEY) LIMITED Level 4, Exchange Centre 20 Bridge Street Sydney NSW 2000 Attention: Company Announcements Officer Dear Sir/Madam Re: Oil Search Limited

More information

REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2016

REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2016 27 July 2016 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, REPORT ON ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2016 HIGHLIGHTS Overriding Royalty Interest

More information

Active quarter setting up 2017 growth plans

Active quarter setting up 2017 growth plans Active quarter setting up 2017 growth plans Highlights Gross production from the Seram PSC was 1.39 million barrels (3,805bopd) for the year, up 14% Increased equity in South Block A PSC to 40.7% Amanah

More information

ACCEPTED OFFERS PUBLIC OFFERING

ACCEPTED OFFERS PUBLIC OFFERING ACCEPTED OFFERS PUBLIC OFFERING OF CROWN PETROLEUM AND NATURAL GAS RIGHTS OFFERED September 19, 2018 Page 1 of 4 ** PLAINS REGION ** A0104 (4-22-007) 100% TAMARACK ACQUISITION CORP. 470.66 10.10 A0105

More information

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10. 1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE November 27, 2017 HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND

More information

Media Details 2016/17.

Media Details 2016/17. Media Details 2016/17 Your customers read Airfinance Journal FLEETS Published since 1979, Airfinance Journal is the leading financial news and analysis publication of the aviation finance sector. The journal

More information

ECOPHON Solo Octagon. Installation Manual DESIGN AND SPECIFICATIONS. Use of the Product. Edge Detail. Attachment. Size Availability. Weight.

ECOPHON Solo Octagon. Installation Manual DESIGN AND SPECIFICATIONS. Use of the Product. Edge Detail. Attachment. Size Availability. Weight. ECOPHON Solo Octagon Installation Manual DESIGN AND SPECIFICATIONS Use of the Product Ecophon Solo panels are a high performance sound absorber, capable of being used as the primary acoustic solution when

More information

ECOPHON Solo Circle 1200

ECOPHON Solo Circle 1200 ECOPHON Solo Circle 1200 Installation Manual DESIGN AND SPECIFICATIONS Use of the Product Ecophon Solo panels are a high performance sound absorber, capable of being used as the primary acoustic solution

More information

PT Medco Energi Internasional Tbk.

PT Medco Energi Internasional Tbk. 1 October 2011 PT Medco Energi Internasional Tbk. MedcoEnergi Will Soon Open its Operational Office in Tripoli. PT Medco Energi Internasional Tbk ( MedcoEnergi ) Chief Executive Officer, Mr. Lukman Mahfoedz,

More information

Geothermal cascade use at Geinberg, Austria

Geothermal cascade use at Geinberg, Austria Bulletin d'hydrogt5ologie No 17 (1999) Centre d'hydrogiologie, Universiti de Neuchritel EDITIONS PETER LANG Geothermal cascade use at Geinberg, Austria by *Johann Goldbrunnerl, Robert Bauerl, Andrea Kolb'

More information

Horizontal Gas Well Geometry A Look at Industry Practices/Outcomes

Horizontal Gas Well Geometry A Look at Industry Practices/Outcomes Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 23 26, 24 Horizontal Gas Well Geometry A Look at Industry Practices/Outcomes Rob Sutton Consultant Major Unconventional Gas Plays

More information

Seniors Housing Prairie Mountain Health

Seniors Housing Prairie Mountain Health Seniors Prairie Mountain Health Disclaimer: The Seniors and Healthy Aging Branch created this directory as a public in response to older adults and families requests for information. It is a compilation

More information

ICR-225 WINDOW WALL SYSTEM B - 2-1/4 x 6. Table of Contents (Drawing numbers ie V8761 used as CAD detail reference only )

ICR-225 WINDOW WALL SYSTEM B - 2-1/4 x 6. Table of Contents (Drawing numbers ie V8761 used as CAD detail reference only ) ICR-225 WINDOW WALL SYSTEM B - 2-1/4 x 6 Table of Contents (Drawing numbers ie V8761 used as CAD detail reference only ) Elev-ICR-225-System B-6.00in H8707-Intermediate Horizontal H8751-Head Horizontal

More information

The dialling plan for the area served by NPA Codes 204 and 431 will be as follows:

The dialling plan for the area served by NPA Codes 204 and 431 will be as follows: Number: PL- 419 Date: May 6, 2011 From: Canadian Numbering Administrator (CNA) Subject: NPA 431 to Overlay NPA 204 (Manitoba, Canada) Related Previous Planning Letters: None In Telecom Decision CRTC 2010-526

More information

ECOPHON Solo Rectangle

ECOPHON Solo Rectangle ECOPHON Solo Rectangle Installation Manual DESIGN AND SPECIFICAT I O N S Use of the Product Ecophon Solo panels are a high performance sound absorber, capable of being used as the primary acoustic solution

More information

DALI Square Track flexibility enabling energy savings

DALI Square Track flexibility enabling energy savings Lighting DALI Square Track flexibility enabling energy savings DALI Square Track Designed for use with DALI projectors with a dedicated adaptor, the DALI Square Track is ideal for users who want lighting

More information

E&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina

E&P in Brief. A Wintershall Fact Sheet. Wintershall in Argentina E&P in Brief A Wintershall Fact Sheet Wintershall in Argentina Annual production in Argentina amounts to approx. 26 million barrels of oil equivalent Participating in 15 fields in Tierra del Fuego, Neuquén

More information

RCS750 3-circuit square track system flexible and multifunctional

RCS750 3-circuit square track system flexible and multifunctional Lighting RCS750 3-circuit square track system flexible and multifunctional 3-circuit Square RCS750 The RCS750 3-circuit square track system is made up of a solid aluminium track available in lengths of

More information

BUS 2 1. Introduction 2. Structural systems

BUS 2 1. Introduction 2. Structural systems BUS 2 1. Introduction 2. Structural systems 3. Staircases terminology, requirements 4. Staircases structures, historic review 5. Staircases 6. Expansion joints 7. Foundations terminology 8. Foundations

More information

Keeping Fun Safe. A public discussion paper on a new Amusement Ride Regulation for Manitoba

Keeping Fun Safe. A public discussion paper on a new Amusement Ride Regulation for Manitoba Keeping Fun Safe A public discussion paper on a new Amusement Ride Regulation for Manitoba October 2016 This information is available in alternate formats upon request. 2 Overview: The Government of Manitoba

More information

ARKANSAS OIL AND GAS COMMISSION

ARKANSAS OIL AND GAS COMMISSION ARKANSAS OIL AND GAS COMMISSION P. O. BOX 11510 EL DORADO, ARKANSAS 71730 3309 PHOENIX AVENUE FORT SMITH, ARKANSAS 72903 s Issued During Week Ending: October 17, 2014 Contractor Start NORTH ARKANSAS DRILLING

More information

Pelican Flyer. Media Pack

Pelican Flyer. Media Pack Pelican Flyer Media Pack OUR BRAND Fly Pelican one of Australia s leading regional airlines based in Newcastle on the east coast of Australia; operating a fleet of 19 seat British Aerospace Jetstream 32

More information

For personal use only

For personal use only QUARTERLY REPORT JUNE 2014 Highlights for the 3 months to 30 JUNE 2014 PRODUCTION AND DEVELOPMENT Full year production 5.6 MMBOE, up 13% on previous financial year Quarterly production of 1.3 MMBOE, in

More information

Realhome LCL Lockers Specification

Realhome LCL Lockers Specification Realhome LCL Lockers Specification Realhome LCL Lockers are an excellent, durable and attractive range of lockers suitable for use in a wide range of industries. Realhome LCL Lockers use 13mm compact laminate

More information

Exploration and Appraisal Drilling Update February 2015 (ASX:OSH ADR: OISHY POMSoX: OSH)

Exploration and Appraisal Drilling Update February 2015 (ASX:OSH ADR: OISHY POMSoX: OSH) Exploration and Appraisal Drilling Update February 2015 (ASX:OSH ADR: OISHY POMSoX: OSH) 5 March 2015 Oil Search operated wells Well Name Objective/ targets Participants Taza 2 Oil appraisal Taza PSC,

More information

Northeast Theis Field Executive Summary

Northeast Theis Field Executive Summary JAY V. MCGOVERN CERTIFIED PETROLEUM GEOLOGIST No. 1170 4226 Petronila Creek, Corpus Christi, TX 78410 Work (361) 883-8606 Mobile (361) 537-2394 Home (361) 767-3206 Northeast Theis Field Executive Summary

More information

Prairie Drought: Precedents and Prospects

Prairie Drought: Precedents and Prospects Prairie Drought: Precedents and Prospects Dave Sauchyn Prairie Adaptation Research Collaborative, University of Regina Managing Climate and Weather Risks for Peace River District Agriculture, Grande Prairie,

More information

Alberta Urban Municipalities Association November 23. Tom Sampson Chief, Calgary Emergency Management Agency Commander, Canada Task Force 2

Alberta Urban Municipalities Association November 23. Tom Sampson Chief, Calgary Emergency Management Agency Commander, Canada Task Force 2 Alberta Urban Municipalities Association 2017 November 23 Tom Sampson Chief, Calgary Emergency Management Agency Commander, Canada Task Force 2 ISC: Unrestricted 1 Canada Task Force 2 2 3 What is our role

More information

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the

Northern Territory. Ark wishes to extend the strike and further define the size of the Golden Honcho deposit, with the Ark Secures Approval to Commencee Mining Activities at Project, Northern Territory Sydney, 19 August 2014: The Board of Ark Mines Ltd (ASX: AHK) is pleased to announce that it has obtained approval from

More information

Australian Mines increases Marymia ground holding

Australian Mines increases Marymia ground holding 11 June 2015 Australian Mines increases Marymia ground holding Australian Mines Limited ( Australian Mines or the Company ) is pleased to advise shareholders that it has entered into a farm-in and joint

More information

For personal use only

For personal use only NEW HOPE CORPORATION LIMITED ABN: 38 010 653 844 QUARTERLY ACTIVITIES REPORT 31 JANUARY 2015 25 February 2015 Quarter Ended 6 Months Ended Jan 15 ( 000t) Jan 14 ( 000t) Change (%) Jan 15 ( 000t) Jan 14

More information

BARS, FIREPITS, FIREPLACES, PATIOS, PILLARS, SEAT WALLS, TABLES + WATERFALLS. Stone Oasis Landscape Kits

BARS, FIREPITS, FIREPLACES, PATIOS, PILLARS, SEAT WALLS, TABLES + WATERFALLS. Stone Oasis Landscape Kits BARS, FIREPITS, FIREPLACES, PATIOS, PILLARS, SEAT WALLS, TABLES + WATERFALLS Stone Oasis Landscape Kits Your Garage 4 2 Your Home option 1 option 2 You can choose what s best for your outdoor spaces from

More information

Third Parties/Crossing

Third Parties/Crossing Third Parties/Crossing Presentation by Bill Scheers Canadian Association of Petroleum Land Administration Surface Land Administration Advisory Committee November 29, 2011 Agenda EAPUOC Guide for Working

More information

flatbed kit InstalLation Instructions kit contents KIT (tacoma ) kit (hilux )

flatbed kit InstalLation Instructions kit contents KIT (tacoma ) kit (hilux ) InstalLation Instructions flatbed kit 300721-KIT (tacoma 1995-2004) 301047-kit (hilux 1984-1995) kit contents 5356 PINE AVE FRESNO, CA 93727 USA TOLL FREE: 877.4X4.TOYS WORLDWIDE: 559.252.4950 WWW.TRAIL-GEAR.COM

More information

Manitoba DIRECT SERVICE POINTS

Manitoba DIRECT SERVICE POINTS Alexander MB3 $750 Yes Altamont MB3 $4000 Yes Altona MB3 Yes Anola MB3 $750 Yes Arborg MB3 $750 Yes Arden MB3 $4000 Yes Argyle MB3 $750 Yes Arnaud MB3 $2000 Yes Arnes MB3 $2000 Yes Arrow River MB3 $5000

More information

DALI Square Track flexibility enabling energy savings

DALI Square Track flexibility enabling energy savings Lighting DALI Square Track flexibility enabling energy savings DALI Square Track Designed for use with DALI projectors with a dedicated adaptor, the DALI Square Track is ideal for users who want lighting

More information

ATWOOD OCEANICS, INC.

ATWOOD OCEANICS, INC. ATWOOD OCEANICS, INC. Bank of America Securities 2005 Energy Conference November 13 15, 2005 Forward Looking Disclaimer Except for the historical information contained herein, the matters discussed in

More information

2016 Commercial Real Estate. Review and Forecast

2016 Commercial Real Estate. Review and Forecast 2016 Commercial Real Estate Review and Forecast February 4, 2016 Colliers International Saskatchewan Economic Overview Real GDP Growth 6.0% 2014 2015 2016f 5.0% 4.0% 3.0% 2.0% 1.0% 0.0% -1.0% Vancouver

More information

Manitoba DIRECT SERVICE POINTS

Manitoba DIRECT SERVICE POINTS Alexander MB3 $750 Yes Altamont MB3 $6000 Yes Altona MB3 Yes Anola MB3 $750 Yes Arborg MB3 $750 Yes Arden MB3 $6000 Yes Argyle MB3 $750 Yes Arnaud MB3 $750 Yes Arnes MB3 $750 Yes Arrow River MB3 $7000

More information

Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 6

Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 6 Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 6 Table of Contents (Drawing numbers ie H6504 used as CAD detail reference only ) Elev-RcwTC-Type

More information

LGO Energy plc. Trinidad An opportunity for Investors. Neil Ritson, Chief Executive Officer. 21 October 2016,London

LGO Energy plc. Trinidad An opportunity for Investors. Neil Ritson, Chief Executive Officer. 21 October 2016,London LGO Energy plc Trinidad An opportunity for Investors Neil Ritson, Chief Executive Officer 21 October 2016,London London (AIM): LGO www.lgo-energy.com 1 Topics to Cover Today Who are LGO Energy plc? Trinidad

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update February 19, 19 For Grain (18-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var.

More information

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204) Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY

More information

Core 2 Workshop Locations

Core 2 Workshop Locations Core 2 Workshop Locations WINTER 2018 (MARCH 10 & 11, 2018) This document lists the workshop locations for candidates registered in the Winter 2018 Core 2 module. In each location, the sessions run at

More information

Keencut. Evolution E2

Keencut. Evolution E2 0.2mm Guaranteed Accuracy That s 1:15000 Guaranteed Cutting Straightness! Flip over sub bench parking provides full unobstructed bench surface 5 year guarantee Evolution E2 ACCURACY In 1999 the original

More information

Fat biplane. Project from

Fat biplane. Project from Project: Fat Biplane Page 1 of 23 Fat biplane Playing games is an integral part of every person s life. The game is very important for growing up the child, because children fully concentrate to it, they

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For Grain (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro

More information

ARGENTINA Analyst Review. Abundant Opportunity. Higher Prices. Rob Johnston

ARGENTINA Analyst Review. Abundant Opportunity. Higher Prices. Rob Johnston ARGENTINA 2008 Analyst Review Abundant Opportunity Higher Prices Rob Johnston The following discussions contain certain forward looking statements as defined by the Private Securities Litigation Reform

More information

Supertrack 2. A versatile 3-circuit lighting track system, with a full range of power feeds, connectors, couplers and suspensions.

Supertrack 2. A versatile 3-circuit lighting track system, with a full range of power feeds, connectors, couplers and suspensions. Supertrack 2 A versatile 3-circuit lighting track system, with a full range of power s, s, couplers and suspensions 16A track units in high quality extruded aluminium with three separately switchable circuits.

More information

Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 7-1/4

Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 7-1/4 Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 7-1/4 Table of Contents (Drawing numbers ie H6404 used as CAD detail reference only ) Elev-RcwTC-Type

More information

Alberta Tourism Market Monitor

Alberta Tourism Market Monitor Alberta Tourism Market Monitor Federal Budget 2017 shows commitment to tourism industry The Federal budget announced in March contains encouraging news for the tourism industry. Starting in 2018-19, Parks

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m Last

More information

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July 2002 September 2002

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July 2002 September 2002 NEWS RELEASE Release Time IMMEDIATE Date 24 October 2002 Number 55/02 BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES July 2002 September 2002 This report covers exploration and

More information

Grain Monitoring Program

Grain Monitoring Program Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update.November, 1 For 1 (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m

More information

Campsite Cooking using a Bean Hole

Campsite Cooking using a Bean Hole Campsite Cooking using a Bean Hole What you will need This project will cook bean and bacon stew, with boiled rice Spade Cast iron cooking pot, with a lid and another saucepan Brush Firewood Large log

More information

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July September 2001

BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES. July September 2001 NEWS RELEASE Release Time IMMEDIATE Date 26 October 2001 Number 25/01 BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES July 2001 - September 2001 This report covers exploration and

More information

ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT

ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT Submitted to ConocoPhillips Alaska, Inc. Submitted by Michael Baker, Jr., Inc. 1400 West Benson Blvd., Suite 200 Anchorage, Alaska 99503 TABLE OF

More information

Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007

Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007 Wednesday 12 March 2008 Falkland Oil and Gas Limited ( FOGL or the Company ) Preliminary Results for the year ended 31 December 2007 FOGL, the oil and gas exploration company focused on its extensive licence

More information

PNG. Civil Aviation Rules. Part 47. Aircraft Registration and Marking

PNG. Civil Aviation Rules. Part 47. Aircraft Registration and Marking Part 47 1 PNG Civil Aviation Rules Part 47 Aircraft Registration and Marking Effective 1 January 2004. Part 47 2 Schedule of Rules Subpart A General 3 47.1 Purpose...3 47.3 Definitions...3 Subpart B Aircraft

More information

B is for British Columbia. A is For Alberta

B is for British Columbia. A is For Alberta C is for Canada A is For Alberta Alberta is one of the only provinces in Canada with 2 NHL teams. Edmonton, the capital of Alberta is the home of the West Edmonton Mall, which is the largest shopping mall

More information

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES. $6.60 (incl. GST) 2018 2014 November 28, 2013 November 23, 2017 TO to January 2, 7, 2019 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH

More information

ADAGIO 35 HORIZONTAL ADAGIO 35 HORIZONTAL

ADAGIO 35 HORIZONTAL ADAGIO 35 HORIZONTAL 15 ADAGIO 35 HORIZONTAL ADAGIO 35 HORIZONTAL A stylish horizontal column radiator. The Adagio 35 Horizontal is the perfect example of a radiator designed for its stylish looks as well as its ability to

More information

Carrizo Oil & Gas Inc

Carrizo Oil & Gas Inc RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By

More information

SEASONAL ANCHOR SYSTEM FOR PAIR OF PORTABLE SOCCER GOALS

SEASONAL ANCHOR SYSTEM FOR PAIR OF PORTABLE SOCCER GOALS INSTALLATION & USAGE MANUAL SEASONAL ANCHOR SYSTEM FOR PAIR OF PORTABLE SOCCER GOALS No. 00417-040 Set of Four No. 00417-080 Set of Eight ALL PORTABLE SOCCER GOALS MUST BE ANCHORED, TO COMPLY WITH THE

More information

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES. $6.60 (incl. GST) 2019 2014 November 28, 2013 November 22, 2018 TO to January 1, 7, 2020 2015 Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES NEW SOUTH

More information

Wv410 window. Installation Instructions

Wv410 window. Installation Instructions Wv410 window Installation Instructions Part NO. Y007 February 2014 TABLE OF CONTENTS SECTION PAGE I. Product Description and Limitations..........3 II. General Statements and Definitions........3 III.

More information

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways

Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways Railway-Highway Crossing at Grade Regulations: Guidelines for British Columbia s Provincial Heritage Railways SHORT TITLE 1. These Guidelines may be cited as the Railway-Highway Crossing at Grade Guidelines.

More information

The S.S. City of Medicine Hat in the spring of (Alberta Provincial Archives)

The S.S. City of Medicine Hat in the spring of (Alberta Provincial Archives) The S.S. City of Medicine Hat in the spring of 1907. (Alberta Provincial Archives) S. S. CITY OF MEDICI NE HAT INFORMATION S HEET AND CHRONOLOGY 1 The S.S. City of Medicine Hat, a steam-powered sternwheeler,

More information

Alberta Tourism Market Monitor

Alberta Tourism Market Monitor Alberta Tourism Market Monitor Record-breaking 2016 for national parks visitation Alberta s national parks experienced new highs in 2016 as the provincial economy entered into recovery. Among the highs

More information

Suspended Signage Solutions

Suspended Signage Solutions Suspended Signage Solutions For all types of signage and displays - Aesthetically pleasing - Easy and efficient installation - Complete off-site solutions Angel Foot Options Express Page 6 Page 5 Standard

More information

Past practice - Fernie Derrick restoration

Past practice - Fernie Derrick restoration Published August 26, 2011 INDUSTRY NEWS Past practice - Fernie Derrick restoration James Waterman Staff Writer About one hundred years ago, aspiring oilmen tried their luck in the environs of Akamina Creek

More information

TO EXPLORE / EXPLOIT FOR GAS AND CRUDE OIL EGAS

TO EXPLORE / EXPLOIT FOR GAS AND CRUDE OIL EGAS TO EXPLORE / EXPLOIT FOR GAS AND CRUDE OIL EGAS EGAS Ministry of Petroleum N. Idku. (A) RWE N. El Amriya RWE Rosetta North BG W. Delta Deep Marine Area-5 BG N. Damietta BALTIM E. IEOC N. Gamasa BG W. ABU

More information

ARKANSAS OIL AND GAS COMMISSION HEARING AGENDA October 25, 2011, 9:00 am Fort Smith, Arkansas

ARKANSAS OIL AND GAS COMMISSION HEARING AGENDA October 25, 2011, 9:00 am Fort Smith, Arkansas ARKANSAS OIL AND GAS COMMISSION HEARING AGENDA October 25, 2011, 9:00 am Fort Smith, Arkansas Note: Due to a large number of docket items, the hearing may run multiple days 1. REGULAR DOCKET DOCKET # 286

More information

Part 175.E Request for data. concerning objects and structures. that affect aviation safety

Part 175.E Request for data. concerning objects and structures. that affect aviation safety Part 175.E Request for data concerning objects and structures that affect aviation safety Airservices Australia 2015 Page 1 of 7 Table of contents 1 Background...3 2 Purpose...3 3 Part 175.E Data Suppliers...3

More information

December 2014 Quarterly Report

December 2014 Quarterly Report Corporate Structure Shares 35,970,000 Options 7,250,000 Perf. Rights 5,000,000 Cash $4.2m ASX Code - BBR Directors Patrick Ford Non-Executive Chairman Chris Cowan Executive Director Nelson Reynolds Non-Executive

More information

Evander Gold Mining (Pty) Ltd

Evander Gold Mining (Pty) Ltd Evander Gold Mining (Pty) Ltd Prospecting Right: MP 30/5/1/1/2/14910 PR Prospecting Right and Environmental Authorisation for the Evander East 2 Project Dunrose Trading 186 (PTY) Ltd T/A Shango Solutions

More information

WOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004

WOOLGAR PROJECT DRILL PROGRAM RESULTS NOVEMBER 2004 2nd December 2004 Announcements Officer Australian Stock Exchange Limited Level 10 20 Bond Street Sydney NSW 2000 ACN 008 901 380 ABN 35 008 901 380 Level 1 173 Mounts Bay Road Perth, Western Australia

More information

Cascade Flue System Guide

Cascade Flue System Guide Cascade Flue System Guide For use with the following appliances: CPM 58 CPM 77 CPM 96 CPM 116 EF80 EF100 EF120 CPM_ANCIL/CASCADE FLUE GUIDE_V1_JANUARY 2016 1 P a g e Introduction This guide has been produced

More information

Crystal Compact Housing and Winter Kit

Crystal Compact Housing and Winter Kit Crystal Compact Housing and Winter Kit Operating instructions Page 3 Installation instructions Page 6 To be kept in the vehicle! Sales and Service in UK and Eire: Truma (UK) Ltd. Truma House, Eastern Avenue,

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52 Many, many years ago when we put the first tanks on the back of the garage, the council inspector had said that I needed to put in a rubble drain to take the stormwater from the roof of the garage. This

More information

Media Log Report Rev.01/26/12 From: 07/02/2018 0:58

Media Log Report Rev.01/26/12 From: 07/02/2018 0:58 7/9/18 22:11 18WS004307 Lafountain St / Roger St 7/9/18 20:14 18WS004306 Motor Vehicle Complaint / 7/9/18 19:48 18WS004305 TRO/FRO Violation / Bus Stop 7/9/18 18:19 18WS004304 Hood St / Bellevue St 7/9/18

More information

Strut Clamp Pipe & Conduit

Strut Clamp Pipe & Conduit PRODUCT SPECIFICATIONS 0F Strut Clamp Pipe & Conduit Size: Steel pipe sizes 2" through 0" Finish: Electro-Galvanized Pipe clamps are designed to fit into the opening of 5 /8" wide channel profiles Pre-Assembled

More information

Brine Lithium Properties Chile For Sale/Option

Brine Lithium Properties Chile For Sale/Option Brine Lithium Properties Chile For Sale/Option 3 Brine Lithium Properties 10,800 Ha (25,686 acres) on 3 Salars 2 Salar de Atacama The highest grade lithium salar in the world Salar de Atacama is the world's

More information

Alaskan landscape evolution and glacier change in response to changing climate

Alaskan landscape evolution and glacier change in response to changing climate Alaskan landscape evolution and glacier change in response to changing climate Following the publication of two pictures comparing the length of the Muir Glacier in Alaska, USA in the June 2005 issue of

More information

3-circuit square RCS750

3-circuit square RCS750 Lighting 3-circuit square RCS750 3-circuit Square RCS750 The Philips 3-circuit square track system consists of an anodised aluminium profile in natural anodised or painted white in lengths of 1, 2, 3 and

More information

Crown Point Ventures Ltd. November 2010 Marketing

Crown Point Ventures Ltd. November 2010 Marketing Crown Point Ventures Ltd. November 2010 Marketing Forward Looking Statements 2 The information in this presentation contains certain forward-looking statements. These statements relate to future events

More information

GoodLife Personal Trainer Institute Course Schedule

GoodLife Personal Trainer Institute Course Schedule GoodLife Personal Trainer Institute Course Schedule October 2017 Pickering, ON October 20, 2017 FROM 9 am TO 6 pm October 21, 2017 FROM 9 am TO 6 pm October 22, 2017 FROM 9 am TO 6 pm November 2017 1755

More information

EKKN FIELD. Potential for continued and enhanced oil recovery at EKKN (Elang-Kakatua-Kakatua North) JPDA - Timor Sea

EKKN FIELD. Potential for continued and enhanced oil recovery at EKKN (Elang-Kakatua-Kakatua North) JPDA - Timor Sea EKKN FIELD Potential for continued and enhanced oil recovery at EKKN (Elang-Kakatua-Kakatua North) Background: JPDA - Timor Sea Oil was discovered in Elang-1 in February 1994 and the size of the oilfield

More information

DAILY & WOODS A PROFESSIONAL LIMITED LIABILITY COMPANY ATTORNEYS AT LAW

DAILY & WOODS A PROFESSIONAL LIMITED LIABILITY COMPANY ATTORNEYS AT LAW JERRY L. CANFIELD, P.A. THOMAS A. DAILY, P.A. WYMAN R. WADE, JR., P.A. DOUGLAS M. CARSON, P.A. ROBERT R. BRIGGS, P.A. C. MICHAEL DAILY, P.A.! L. MATTHEW DAVIS, P.A. COLBY T. ROE Also Licensed in Oklahoma!

More information

For personal use only

For personal use only 29 July 2014 QUARTERLY ACTIVITIES REPORT To 30 th June 2014 Blue Energy Limited (ASX: BUL ) is pleased to report increased activity during the 30 June 2014 quarter across proven and emerging basins in

More information

US 8,197,000 B1. Jun. 12, (45) Date of Patent: (10) Patent No.: Cohen. (12) United States Patent (54) Warren Cohen, Philadelphia, PA (US)

US 8,197,000 B1. Jun. 12, (45) Date of Patent: (10) Patent No.: Cohen. (12) United States Patent (54) Warren Cohen, Philadelphia, PA (US) US008197000B1 (12) United States Patent Cohen (10) Patent No.: (45) Date of Patent: US 8,197,000 B1 Jun. 12, 2012 (54) (76) (*) (21) (22) (63) (51) (52) (58) (56) CHAIR STRUCTURE HAVING AUXLARY BACKREST

More information