Dallas Executive Airport

Size: px
Start display at page:

Download "Dallas Executive Airport"

Transcription

1 648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway (3,8 x15 ) 1 2 DATE OF AERIAL: May West Ledbetter Drive Mariner Drive Voyager Drive Red Bird Bird Lane 57 Runway (6,451 x15 ) 64 Westmoreland Road S Hampton Rd. Note: Runway displacement provides RSA prior to landing Runway 31 KEY TODA: Take-Off Distance Available Exhibit 4G: RSA DECLARED DISTANCES - OPTION 1a U.S. Highway 67 (Marvin D. Love Freeway) Challenger Drive Saturn Drive Drive Apollo Dr. Dr. 97 1, 5,958 ASDA/LDA 6,354 LDA 6,451 ASDA 6,451 TORA/TODA

2 Option 1a also proposes changes to Runway 31 declared distances. The RSA required prior to landing is only feet versus the required 1, feet beyond the far end of the runway. Runway 31 currently provides 57 feet of RSA prior to the landing threshold and the full 1, feet of RSA beyond the far end of the runway. Thus, Option 1a only considers reducing the LDA distance via a displaced threshold. As depicted on Exhibit 4G, the landing threshold would be displaced by 97 feet so as to provide feet of RSA prior to landing (57 feet of existing RSA plus 97 feet of displaced threshold). Thus, the declared distances for Runway 31 would remain 6,451 feet for TORA, TODA, and ASDA. The LDA would be reduced by 97 feet for a total of 6,354 feet. It should be noted that displacing the threshold could trigger the need to relocate the ILS glideslope antenna. Costs for relocating the glideslope antenna can vary widely with a low of $5, to more than $1. million as each site can vary widely. Any displacement options to follow will have to include the potential need to relocate the glideslope antenna. As outlined above, this option would not mitigate for the incompatibilities in the RPZs. The Runway 13 RPZ would still extend off airport property and cover four commercial uses. The Runway 31 RPZ would shift 97 feet to the northwest and would still extend beyond airport property to include five commercial and ten residential properties. It should also be noted that any displacement to Runway 31 could prohibit the use of the lead-in light system. The existing lead-in light system is somewhat simplistic and may not be capable of being placed in-pavement. Without the lead-in light system, the visibility minimums for the instrument landing system (ILS) instrument approach procedure to Runway 31 would likely be raised from ¾-mile to not lower than one mile. It is believed that the approach minimums should be maintained at ¾-mile as the airport is commonly frequented by business jet aircraft and is an FAA reliever airport. As such, any displacement scenario presented herein will also consider the installation of a medium intensity approach lighting system (MALS). Depending on the amount of Runway 31 displacement, some of the MALS lights will need to be placed inpavement which increases the cost of the system. An estimate of $1. million has been included to install MALS units with in-pavement lights. RSA Declared Distance Option 1b The second RSA declared distance option utilizes the very same methodology as in Option 1a; however, it considers the potential for the FAA to also require that the full OFA be provided. Due to the angular property line through the OFA and RSA, the southeastern corner of the OFA is impacted at 475 feet from the runway threshold versus 57 feet for the RSA. As a result, instead of the 493- foot limitations placed on the declared distances proposed in Option 1a, this alternative would need to factor a 525- foot limitation. Under Option 1b, the TODA and TORA for both runway ends would remain the current pavement length of 6,451 feet. As depicted on Exhibit 4H, the 525-foot limitation would require a reduction of the Runway 13 ASDA and LDA to 5,926 feet. This option also requires a greater runway displacement on Runway 31 of 125 feet to allow for the full feet of OFA prior to the landing threshold (only 475 feet of OFA is currently available). As a result, the Runway 31 LDA would be reduced to 6,326 feet. All other declared distances on Runway 31 would remain at 6,451 feet. The Runway 13 RPZ would remain in its present condition under this option. The Runway 31 RPZ would be shifted to the northwest by 125 feet and would still extend beyond airport property and cover four commercial and ten residential properties. RSA Declared Distance Option 2a The next RSA declared distance option considers the potential negative impacts of reducing runway distance as put forth in Options 1a and 1b. The reduction in operational length declared available for Runway 13 is critical as the airport experiences winds from the south more than 7 percent of the year. As a result, Runway 13 is utilized far more than Chapter 4 - Development Alternatives / 4-11

3 DATE OF AERIAL: May DECLARED DISTANCE OPTION 1b DISPLACE 31 THRESHOLD BY 125 Consider OFA Limiting Factor No runway extensions TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,926 6,451 LDA 5,926 6,326 Runway (3,8 x15 ) West Ledbetter Drive Mariner Drive Voyager Drive Red Bird Bird Lane 57 Runway (6,451 x15 ) Westmoreland Road S Hampton Rd. Note: Runway displacement provides OFA prior to landing Runway 31 KEY TODA: Take-Off Distance Available Exhibit 4H: RSA DECLARED DISTANCES - OPTION 1b U.S. Highway 67 (Marvin D. Love Freeway) Challenger Drive Apollo Dr. Dr. 1, Saturn Drive Drive 125 5,926 ASDA/LDA 6,326 LDA 6,451 ASDA 6,451 TORA/TODA

4 is Runway 31. Thus, reducing the ASDA for Runway 13 below 6, feet would pose significant operational and economic impacts on airport users and businesses described in RSA Alternative C Decrease Runway Length. Thus, RSA Option 2a proposes similar limitations on the southeast end of the runway but includes pavement extensions at the northwest end of the runway. In RSA Option 2a, the northwest end of the runway is proposed to be extended by 535 feet. This is the maximum extension to the northwest that would allow for the full RSA and OFA north of the extended runway pavement. As depicted on Exhibit 4J, the proposed extension would place the northeastern corner of the OFA at the airport property line. Similar to RSA Declared Distance Option 1a, the landing threshold for Runway 31 would need to be displaced by at least 97 feet to meet the -foot RSA prior to threshold requirements. The associated declared distance calculations for this option are presented on Exhibit 4J. Of note, the 535-foot extension would allow Runway 13 to provide nearly 6,5 feet of ASDA and LDA which is a much better alternative than Options 1a and 1b. Moreover, northerly departures and landings would have increased length available with 6,986 feet of ASDA and 6,889 feet of LDA available. The TORA and TODA would be 6,986 feet for both runways as long as the FAA allows for the RPZs to extend over incompatible uses. As shown on the exhibit, the 535-foot northerly extension would also shift the Runway 13 RPZ 535 feet to the north. The newly shifted RPZ would extend 13 acres beyond current airport property and would encompass 13 commercial units and eight residential units. Obviously, this RPZ shift would significantly increase the incompatible uses in the Runway 13 RPZ. The Runway 31 RPZ would be the same as that proposed in RSA Option 1a. Another important note for this option is the proposed costs associated with a northerly extension. The land northwest of the runway pavement is relatively flat as it has been improved to meet current RSA standards. The area northwest of Taxiway B, however, is not. Approximately 2 feet north of the Taxiway B pavement extended centerline, the topography drops 1 feet. The terrain drops sharply to the east from this point in support of a drainage channel. Costs associated with extending the runway pavement would be relatively typical; however, costs associated with extending parallel Taxiway B would be much greater than typical. The runway pavement extension has been estimated to cost $2.4 million. Extending Taxiway B to the proposed runway end was estimated to cost another $1.5 million. A final factor to consider would be the need to relocate the localizer antenna outside of the RSA which could cost approximately $5,. The installation of a MALS is estimated at $1. million. Thus, the total cost of extending the runway 535 feet to the north, including the extension of Taxiway B, is estimated at $5.4 million. RSA Declared Distance Option 2b Option 2b is the same as Option 2a with the exception of the Runway 31 displaced threshold. As considered in Option 1b, the FAA could require the full OFA to be provided at the south end of the runway. Thus, this option proposes a 125-foot displacement of the Runway 31 threshold instead of 97- foot displacement proposed in Option 2a. The resultant declared distances and a depiction of the improvements are presented on Exhibit 4K. The costs of extending the runway and the RPZ shift for this option are the same as the preceding Option 2a. RSA Declared Distance Option 3 The third declared distance option considers the maximum runway length which can be provided in a conventional manner while using declared distances. This option proposes a 685-foot northwesterly extension which would shift the northern RSA to the current property line. This option would only be feasible if the FAA would agree to allow the OFA to be non-standard. If the northern OFA is allowed to be nonstandard, then it would follow that the southern OFA could be as well. Thus, Option 3 would only propose a 97- foot displacement of Runway 31. The benefits achieved by Option 3 are obvious. The resultant ASDA and LDA on Runway 13 would be 6,643 feet, nearly 1 feet more than currently exists. Moreover, the Runway 31 ASDA and LDA would exceed 7, feet at 7,136 feet and 7,39 feet, respectively. RSA Declared Distance Option 3 is depicted on Exhibit 4L. The negative aspects of this alternative are also obvious. The costs associated with extending the runway 685 feet to the north have been estimated at $2.917 million. The costs to extend Taxiway B to the proposed runway end are estimated at $1.72 million. Installation of a MALS is estimated at $1. million. Finally, the localizer antenna would need to be relocated at an estimated $5,. Thus, the total costs associated with extending the runway and taxiway are estimated 4-12 / Chapter 4 - Development Alternatives

5 RSA with Runway Extension OFA with Runway Extension Ultimate Airfield Pavement DECLARED DISTANCE OPTION 2a DISPLACE 31 THRESHOLD BY 97 Considers Runway 31 RSA Limiting Factor Considers Runway 13 OFA Limiting Factor Extends Runway NW TORA 6,986 6,986 TODA 6,986 6,986 ASDA 6,493 6,986 LDA 6,493 6,889 Runway (3,8 x15 ) 1 2 DATE OF AERIAL: May West Ledbetter Drive Mariner Drive Voyager Drive Red Bird Bird Lane Runway (6,451 x15 ) Westmoreland Road S Hampton Rd. Note: Runway displacement provides RSA prior to landing Runway 31 KEY TODA: Take-Off Distance Available Exhibit 4J: RSA DECLARED DISTANCES - OPTION 2a U.S. Highway 67 (Marvin D. Love Freeway) Challenger Drive Apollo Dr. Dr. 1, Saturn Drive Drive 97 6,493 ASDA/LDA 6,889 LDA 6,986 ASDA 6,986 TORA/TODA 535

6 648 Runway (3,8 x15 ) Mariner Drive Voyager Drive 57 Runway (6,451 x15 ) 6 RSA with Runway Extension OFA with Runway Extension Ultimate Airfield Pavement DECLARED DISTANCE OPTION 2b DISPLACE 31 THRESHOLD BY 125 Considers Runway 31 OFA Limiting Factor Considers Runway 13 OFA Limiting Factor Extends Runway NW by TORA 6,986 6,986 TODA 6,986 6,986 ASDA 6,461 6,986 LDA 6,461 6,861 West Ledbetter Drive Red Bird Bird Lane Westmoreland Road S Hampton Rd. Note: Runway displacement provides OFA prior to landing Runway 31 KEY TODA: Take-Off Distance Available 1 2 DATE OF AERIAL: May Exhibit 4K: RSA DECLARED DISTANCES - OPTION 2b U.S. Highway 67 (Marvin D. Love Freeway) Challenger Drive Apollo Dr. Dr. 1, Saturn Drive Drive 125 6,461 ASDA/LDA 6,861 LDA 6,986 ASDA 6,986 TORA/TODA 535

7 648 Runway (3,8 x15 ) Mariner Drive Voyager Drive 57 Runway (6,451 x15 ) 6 RSA with Runway Extension OFA with Runway Extension Ultimate Airfield Pavement DECLARED DISTANCE OPTION 3 DISPLACE 31 THRESHOLD BY 97 Considers Runway 31 RSA Limiting Factor Considers Runway 13 RSA Limiting Factor Extends Runway NW TORA 7,136 7,136 TODA 7,136 7,136 ASDA 6,643 7,136 LDA 6,643 7,39 West Ledbetter Drive Red Bird Bird Lane Westmoreland Road S Hampton Rd. Note: Runway displacement provides RSA prior to landing Runway 31 KEY TODA: Take-Off Distance Available 1 2 DATE OF AERIAL: May Exhibit 4L: RSA DECLARED DISTANCES - OPTION 3 U.S. Highway 67 (Marvin D. Love Freeway) Challenger Drive Apollo Dr. Dr. 1, Saturn Drive Drive 97 6,643 ASDA/LDA 7,39 LDA 7,136 ASDA 7,136 TORA/TODA 685

8 at approximately $6.14 million. Maybe more significant would be the increased incompatible uses in the shifted RPZ. An estimated 12 commercial units would be in the shifted RPZ which is higher than any other alternative and eight more than current. An estimated 15 residential units would lie under the shifted RPZ which is also higher than any other option and significant as the current Runway 13 RPZ does not contain any residential units. RSA Declared Distance Option Summary Prior FAA approval for implementation of declared distances is always required. A primary goal of the declared distance options was to provide maximum safety standards and will also provide a runway length capable of serving existing and future business jet operators. Through the existing declared distances, design standards for the RSA and OFA can be met. The analysis, however, did not adjust the declared distances so as to also meet RPZ requirements as was done earlier in the chapter. The current RPZ for both ends of the runway extends beyond airport property and covers incompatible uses. The Runway 13 RPZ covers five commercial properties, while the Runway 31 RPZ also covers five commercial properties but also 12 residences. This determination would consider the declared distance Options 2a, 2b, and 3 to be prudent and/or feasible as long as the FAA allows for OFA and RPZ modification to standards accordingly. As such, these alternatives can be considered further until and/or unless the FAA deems them objectionable. RSA ALTERNATIVE E: ENGINEERED MATERIALS ARRESTING SYSTEM (EMAS) EMAS is an engineered compressible concrete material that is situated beyond the runway end for the purpose of safely stopping an aircraft overrun. EMAS is not considered as a substitute for aircraft undershoots; thus, feet of RSA is still necessary prior to the landing threshold. EMAS has a similar function to the sandy, high-speed exits provided on highways in mountainous terrain in order to safely stop a runaway tractor-trailer. The FAA considers the installation of EMAS as an acceptable substitute to providing the full RSA. EMAS is designed to stop an aircraft overrun by exerting predictable deceleration forces on the landing gear as the EMAS material crushes. It is designed to minimize the potential for structural damage to the aircraft, since such damage could result in injuries to passengers and/or affect the predictability of deceleration forces. Guidance for evaluating an EMAS alternative and for determining the maximum financially feasible cost for RSA improvements is provided in FAA Order 52.9, Financial Feasibility and Equivalency of Runway Safety Area Improvements and Engineered Material Arresting Systems. A standard EMAS installation is capable of safely stopping a design aircraft that leaves the runway end traveling at 7 knots or less. The RSA where the EMAS is located should also provide for potential short landings to runway ends with vertical guidance. Vertical guidance to Runway 31 is available via the ILS glideslope antenna and the visual approach slope indicator (VASI) lights. Therefore, a standard EMAS bed would be a portion of the -foot RSA needed prior to landing. The manufacturer and installer of EMAS has provided an analysis of the system required for given the airport s current critical aircraft. Based on their analysis, the EMAS system which would need to be installed would consist of a 265-foot by 17-foot paved lead-in surface leading into the 235-foot by 17-foot EMAS bed. In order to allow for emergency equipment, an area 5 feet long by 2 feet wide should be prepped and stabilized as depicted on Exhibit 4M. The EMAS bed and installation is estimated to cost $4.4 million (212 cost basis). The lead-in pavement and site preparation is estimated to cost $815,. A MALS is estimated at $1. million. Thus, total EMAS costs are estimated at $6.22 million. The benefits of providing EMAS would be that it would serve as the full 1,- foot RSA for Runway 13 operations. As such, all declared distances for Runway 13 under the EMAS option would be the current runway length of 6,451 feet. For Runway 31, all declared distances Chapter 4 - Development Alternatives / 4-13

9 6 Exhibit 4M: EMAS OPTION Ru nw ay (6,4 51 x 15 ) EMAS BED D. Lo ve Fr e ew ay ) LEAD-IN PAVEMENT ar vin 61 TORA TODA ASDA LDA 13 6,451 6,451 6,451 6, ,451 6,451 6,451 6,351 U. 3 2 DATE OF AERIAL: May TODA:Re Take-Off Distance Available ane ane Lan Bird La Red R Chapter 4 - Development Alternatives / KEY: 4-14 S. 61 Hi gh wa y 67 (M SITE PREP 62

10 with the exception of the LDA would also be 6,451 feet. The LDA would be reduced by 1 feet; however, as the landing threshold would need to be displaced in order to provide the full feet of RSA prior to landing. Adding EMAS to the south end of Runway is a viable and even prudent option. This option would allow the runway to provide equal length as is provided currently. The negative attribute of this alternative is the cost. Basically, adding EMAS would cost approximately $5.215 million while only preserving existing runway length. Obviously, this option is much better than losing operational runway length as proposed in several previous alternative options. Considering the significant investments, both public and private, already made in the airport, EMAS would support and protect these investments. As such, this alternative is considered viable and prudent and may be explored further in this study. RSA ALTERNATIVE F: COMBINATION METHOD The combination method provides for the flexibility to combine runway relocation, shifting, realignment, EMAS, and/or reduction in order to provide the full RSA. Any combination method will have to include declared distances in order to meet RSA standards. The combination method could also be utilized to shift the RPZs to meet design standards (as was depicted earlier on Exhibit 4C). So far in this RSA determination analysis, the only consideration given in each alternative was for the RSA only without mitigation proposed for the RPZ. This approach was taken so as to independently study the RSA apart from the RPZ issues. It is very possible, however, that the FAA will require any RSA solution to include a solution for meeting the RPZ standard. In fact, the mitigating factor in the FAA decision would be the obligation of federal grant funds necessary to improve the RSA. The FAA many times will not require a change in non-standard conditions until such time as a grant request is made. Thus, it is important that this analysis provide some alternative measures to meet both RSA and RPZ standards that are acceptable to the airport and the FAA if required. Exhibit 4N presents two alternatives which propose combinations of previously outlined alternatives. Both alternatives include a 685-foot northerly extension so as to maximize runway length in both directions. Each alternative also includes a 4-foot displacement of the Runway 13 landing threshold and a 5-foot displacement of the Runway 31 landing threshold. As proposed, the displacements would shift the approach RPZs to both runways and the departure RPZ for Runway 31 away from incompatible land uses. In fact, the approach RPZ for Runway 13 and departure RPZ for Runway 31 would be fully contained on existing airport property as they are essentially the same surface (same size and same location). The approach RPZ for Runway 31 would still extend beyond existing airport property; however, the area outside current property would be over roads and/or areas without any structures. From this point, the alternatives differ in their approach. RSA Combination Method Alternative 1 Alternative 1 would utilize those improvements outlined above but would then apply declared distances to mitigate RSA deficiencies. For Runway 13, the 685-foot extension would allow for the runway to provide a TODA of 7,136 feet which would equate to the entire length of new pavement. The TORA would be slightly shorter at 6,766 feet which would account for a reduction of 37 feet due to the shifted departure RPZ as depicted. The ASDA for Runway 13 would be 6,643 feet which would be computed by adding 685 feet (proposed extension) to the existing 6,451 feet of runway length, and then subtracting 493 feet which is the RSA deficiency beyond the far end of the runway. The LDA for Runway 13 would be the least of all declared distances at 5,558 feet. The LDA would be calculated by reducing the current runway length, 6,451 feet by 4 feet for the displacement, and another 493 feet for RSA deficiency at the far end of the runway. It should be noted that this alternative would not provide for the full OFA beyond the far end of the runway. If the full OFA is required by the FAA, the ASDA and LDA would need to be reduced by another 32 feet. For Runway 31, the TORA would be 6,51 feet to account for the departure RPZ which would require the calculation to end at the proposed location of the Runway 13 displaced threshold (6,451 feet minus 4 feet). The TODA would include the entire length of pavement at 7,136 feet. The ASDA would also include the entire length of pavement, or 7,136 feet as the full 1, feet of RSA could be provided beyond the proposed extension. The LDA for Runway 31 under this alternative would be 6,636 feet to account for the full length of runway pavement minus the proposed 5-foot displaced threshold (7,136 minus 5 feet). Similar to the Runway 13 declared distances, the Runway 31 declared distances for ASDA and LDA Chapter 4 - Development Alternatives / 4-15

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

CHAPTER 2.0 ALTERNATIVES

CHAPTER 2.0 ALTERNATIVES CHAPTER 2.0 ALTERNATIVES 2.1 INTRODUCTION 2.1.1 SCOPE OF THE ALTERNATIVES ANALYSIS This chapter summarizes the screening analysis conducted to identify the range of reasonable and practicable alternatives

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Winona Runway Shift Project

Winona Runway Shift Project Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport

More information

Appendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION RUNWAY 17-35

Appendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION RUNWAY 17-35 Appendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION Master Plan Update RUNWAY 17-35 Hector International Airport SUFFICIENCY ANALYSIS Near the completion of the Master Plan Update

More information

Session. Arrester Systems, Declared Distances and Runway Excursion Prevention

Session. Arrester Systems, Declared Distances and Runway Excursion Prevention Session Arrester Systems, Declared Distances and Runway Excursion Prevention 1 Runway Excursion Toronto, Canada August 2, 2005 200 meters from end of runway 2 American Airlines Flight 331, Norman Manley

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th

More information

SAN FRANCISCO INTERNATIONAL AIRPORT

SAN FRANCISCO INTERNATIONAL AIRPORT 1 SAN FRANCISCO INTERNATIONAL AIRPORT Runway Safety Area Program ACI-NA Operations and Technical Affairs Conference April 7, 2011 RSA Status Completed RSA Studies Environmental Assessment ongoing and on

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

5.0 ALTERNATIVES ANALYSIS

5.0 ALTERNATIVES ANALYSIS 5.0 ALTERNATIVES ANALYSIS The Alternative Analysis chapter describes and evaluates the various development alternatives considered for. In addition, it presents a preferred development plan that accommodates

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES

ADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 1.0 INTRODCTION Morristown Municipal Airport (hereinafter referred to as MM or Airport ) is a busy general aviation reliever airport owned by the Town of Morristown and operated by DM AIRPORTS, LTD. (hereinafter

More information

Facility Requirements

Facility Requirements C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over

More information

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS 6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

AIRPORT DEVELOPMENT ALTERNATIVES

AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four AIRPORT DEVELOPMENT ALTERNATIVES Prior to defining the development program for Telluride Regional Airport, it is important to consider development potential and constraints at the airport.

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities

1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities To properly plan for improvements at Dallas Executive Airport, it is necessary to translate forecast aviation demand into the specific types and quantities of facilities that can adequately serve the demand.

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

INTERIM RUNWAY SAFETY AREA STUDY

INTERIM RUNWAY SAFETY AREA STUDY Interim Runway Safety Area Study September 2017 INTERIM RUNWAY SAFETY AREA STUDY YEAGER AIRPORT PREPARED FOR: THE CENTRAL WEST VIRGINIA REGIONAL AIRPORT AUTHORITY PREPARED BY: LANDRUM & BROWN TEAM SEPTEMBER

More information

D.1 Introduction. Ronald Reagan Washington National Airport

D.1 Introduction. Ronald Reagan Washington National Airport Appendix D. Alternatives D.1 Introduction Federal Aviation Administration (FAA) Orders 1050.1E, Environmental Impacts: Policies and Procedures, and 5050.4B, National Environmental Policy Act (NEPA) Implementing

More information

APPENDIX E AIRFIELD PLANNING, DESIGN, & CONSTRUCTABILITY REVIEW

APPENDIX E AIRFIELD PLANNING, DESIGN, & CONSTRUCTABILITY REVIEW APPENDIX E AIRFIELD PLANNING, DESIGN, & CONSTRUCTABILITY REVIEW The identification, evaluation, and refinement of the airfield development alternatives were subject to a variety of planning, engineering,

More information

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT chapter 5 Recommended Master Plan Concept airport master plan The planning process for Coolidge Municipal Airport has included several analytical efforts in the previous chapters intended to project potential

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

GCAA ADVISORY CIRCULAR

GCAA ADVISORY CIRCULAR GUYANA CIVIL AVIATION AUTHORITY 73 High Street Kingston Georgetown GUYANA TEL. NOs: (592) 225 6822, 225 0778, 227 8111 FAX: (592) 225 6800 E-mail: director-general@gcaa-gy.org GCAA ADVISORY CIRCULAR AERODROME

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

CHAPTER 4 DEMAND/CAPACITY ANALYSIS CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan 1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability

More information

Appendix A - Glossary

Appendix A - Glossary Appendix A - Glossary The terms and definitions here are relevant to airport design standards and retrieved from AC 150/5300-13A, Airport Design. A Accelerate-Stop Distance Available (ASDA). See Declared

More information

AERODROME LIGHTING SYSTEM

AERODROME LIGHTING SYSTEM AERODROME LIGHTING SYSTEM 1. Introduction This chapter will show the wide variety of approach lighting systems before the runway threshold and systems present on runways. 2. Runway approach ramps 2.1.

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

Use of technology to mitigate overrun aftermath

Use of technology to mitigate overrun aftermath Use of technology to mitigate overrun aftermath 1 Overview The Overrun Problem Runway End Safety Area Requirements What is Runway Safety Arrestor Bed: Known as Engineered Material Arrestor System (EMAS)

More information

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions. ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

Grants Pass Airport Master Plan & Airport Layout Plan Update

Grants Pass Airport Master Plan & Airport Layout Plan Update Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

Chapter 4.0 Facility Requirements

Chapter 4.0 Facility Requirements Chapter 4.0 Facility Requirements Having inventoried the existing infrastructure and forecasted demand, determining airport facility requirements is the next essential step in the airport master planning

More information

DRAFT Chapter Six - 1

DRAFT Chapter Six - 1 The planning process for the Albuquerque International Sunport (ABQ) Sustainable Master Plan has in cluded several analytical efforts in the previous chapters intended to provide forecasts of potential

More information

BRL LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Runway Pavement OFA RPZ Building Restriction Line Holding Position Object Free Area Runway Protection Zone Buildings Etended Clear

More information

3.1 Facility Requirements Overview Airfield Facility Requirements... 1

3.1 Facility Requirements Overview Airfield Facility Requirements... 1 Table of Contents 3.1 Overview... 1 3.2 Airfield... 1 Airspace Capacity...1 Airside Capacity... 2 Aircraft Mix Index... 3 Arrivals Percentage... 4 Touch-and-Go Percentage... 4 Taxiway Access Factors...

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Las Vegas McCarran International Airport. Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan September 1994 Prepared jointly by the U.S. Department of Transportation,

More information

JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris

JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris Friedman Memorial Airport / T-O Engineers Airport Alternatives Technical Analysis Table of Contents 1.0 Background and Purpose of Analysis... 1 1.1

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

C > Capacity Analysis and Facility Requirements

C > Capacity Analysis and Facility Requirements Buchanan Field Buchanan Field Airport Master Planning Program C. CAPACITY ANALYSIS & FACILITY REQUIREMENTS C > Capacity Analysis and Facility Requirements INTRODUCTION. The capacity of an airfield is primarily

More information

Appendix F Cultural Resource Consultation

Appendix F Cultural Resource Consultation Appendix F Cultural Resource Consultation FAA Consultation Letter to the California State Historic Preservation Officer Response Letter from the California State Historic Preservation Officer STATE

More information

Chapter One PROJECT DESCRIPTION

Chapter One PROJECT DESCRIPTION Chapter One PROJECT DESCRIPTION Environmental Impact Report Monterey Peninsula Airport 1.1 INTRODUCTION This Environmental Impact Report (EIR) analyzes and documents the potential environmental impacts

More information

Appendix D Airfield Ongoing Projects Alternatives

Appendix D Airfield Ongoing Projects Alternatives Appendix D Appendix D D.1 Introduction The set of alternatives for each of the airfield facilities was compared with respect to each other and the existing condition. 1 The screening and evaluation process

More information

Chapter III - Demand/Capacity and Facility Requirements

Chapter III - Demand/Capacity and Facility Requirements Chapter III - Demand/Capacity and Facility Requirements The facility requirements identified in this chapter are summarized on Exhibit III.1. The future requirements serve to determine which airport facilities

More information

Facility Requirements

Facility Requirements 4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal

More information

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Airport Layout Plan Report In this chapter, existing components of the Airport are evaluated so that the capacities of the overall system are identified.

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

AIRFIELD SAFETY IN THE UNITED STATES

AIRFIELD SAFETY IN THE UNITED STATES International Civil Aviation Organization 24/11/09 North American, Central American and Caribbean Office (NACC) Twenty Second Meeting of Directors of Civil Aviation of the Eastern Caribbean (E/CAR/DCA/22)

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

TABLE OF CONTENTS. 1.0 PROJECT SUMMARY INTRODUCTION Scope Summary/Methodology RSA-Runway Environment Relationship...

TABLE OF CONTENTS. 1.0 PROJECT SUMMARY INTRODUCTION Scope Summary/Methodology RSA-Runway Environment Relationship... TABLE OF CONTENTS 1.0 PROJECT SUMMARY...1 1.1 INTRODUCTION...1 1.1.1 Scope Summary/Methodology...1 1.1.2 RSA-Runway Environment Relationship...2 1.2 EXISTING CONDITIONS...4 1.2.1 Airfield Overview...4

More information

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY RSAT RUNUP ANALYSIS 1. INTRODUCTION The FAA Runway Safety Action Team (RSAT) is a team of FAA staff that works with airports to address existing and potential runway safety problems and issues. The RSAT

More information

at: Accessed May 4, 2011.

at:   Accessed May 4, 2011. 3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.

More information

CHAPTER 6 ALTERNATIVES ANALYSIS

CHAPTER 6 ALTERNATIVES ANALYSIS CHAPTER 6 ALTERNATIVES ANALYSIS 6 6 ALTERNATIVES ANALYSIS INTRODUCTION The purpose of this chapter is to identify and evaluate alternative development strategies for long-range development planning at

More information

INDEPENDENCE STATE AIRPORT (7S5)

INDEPENDENCE STATE AIRPORT (7S5) INDEPENDENCE STATE AIRPORT (7S5) Airport Master Plan Update 2018 Planning Advisory Committee PAC Meeting #3 April 11, 2018 1994-2016 AGENDA The second PAC workshop will cover the following topics: Recap

More information

Porter Airlines Runway Extension Study. Billy Bishop Toronto City Centre Airport

Porter Airlines Runway Extension Study. Billy Bishop Toronto City Centre Airport Porter Airlines Runway 08-26 Extension Study Billy Bishop Toronto City Centre Airport Porter Airlines Runway 08-26 Extension Study Billy Bishop Toronto City Centre Airport (BBTCA) Prepared for: Mr Andrew

More information

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

CHAPTER 6 IDENTIFICATION AND EVALUATION OF ALTERNATIVES

CHAPTER 6 IDENTIFICATION AND EVALUATION OF ALTERNATIVES CHAPTER 6 IDENTIFICATION AND EVALUATION OF ALTERNATIVES This chapter identifies and evaluates development alternatives for the Duluth International Airport to satisfy the Airport Facility Requirements

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

Basic Design Factors. Airfield Design. Airport Role

Basic Design Factors. Airfield Design. Airport Role Chapter 3 Airfield Design Basic Design Factors The Federal Aviation Administration (FAA) provides guidance and standards for airport design through a series of Advisory Circulars (ACs). These guidelines

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010

FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT. August 31, 2010 FUTENMA REPLACEMENT FACILITY BILATERAL EXPERTS STUDY GROUP REPORT August 31, 2010 MANDATE AND SCOPE OF WORK: In order to achieve the earliest possible relocation of Marine Corps Air Station Futenma, the

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information