Chapter 8. Background Data: Turlock Municipal Airport and Environs. Merced County Airport Land Use Compatibility Plan

Size: px
Start display at page:

Download "Chapter 8. Background Data: Turlock Municipal Airport and Environs. Merced County Airport Land Use Compatibility Plan"

Transcription

1 hapter 8 Background ata: and Environs Merced ounty Airport Land Use ompatibility Plan

2

3 8 Background ata: and Environs OVERVIEW is located in the northeastern part of the county and is owned and operated by the ity of Turlock of Stanislaus ounty. The ity of Turlock; however, is located approximately six miles away from the airport in adjacent Stanislaus ounty. The airport was built in 1948 and has historically been used for general aviation, particularly agriculture-related aviation. AIRFIEL SYSTEM is classified as an Airport Reference ode (AR) 1 B-I (small) which means that it can accommodate light aircraft ( 12,500 lbs) with wingspans of up to 49 feet. The airport encompasses some 320 acres and has a single runway nearly 3,000 feet in length. Runway is a visual runway. The dimensions of the runway protection zone (RPZ) at each runway end are: 250 foot inner width, 450 foot outer width and a length of 1,000 feet. Approximately 75% of the RPZ for Runway 12 (6 acres) lies off airport property. The RPZ for Runway 30 lies entirely on airport. AIRPORT PLANS Airport Master Plan Status The ity of Turlock and the Turlock Regional Aviation Association (TRAA), a nonprofit pilots group responsible for the daily operation of the airport, prepared a Master Plan for the Turlock Municipal Airport in November The purpose of the study was to determine the type and 1 Airport Reference ode (AR) is a coding system defined by the Federal Aviation Administration (FAA) to relate airport design criteria to the operation and physical characteristics of the airplanes intended to operate at an airport. Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012) 8 1

4 HAPTER 8 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS extent of aviation facilities needed at the airport through the year The principal development proposals of the Master Plan include: Relocate the runway to northeast and extend to an ultimate length of 4,400 feet; onvert the existing runway to become a full-length parallel taxiway; Upgrade the runway to Airport Reference ode (AR) from B-I (small) to B-II; Upgrade runway pavement strength and edge lighting; Provide straight-in nonprecision approaches of not lower than 1 mile to both runway ends; Acquire fee title or easements on existing and future RPZ properties; and onstruct new heliport. Basis of Turlock Municipal ALUP The ity and TRAA prepared an Airport Layout Plan which was approved by the Federal Aviation Administration (FAA) in April The ALP drawing depicts the projects detailed in the Master Plan. In accordance with state law, the 2008 ALP was accepted by the alifornia ivision of Aeronautics as the basis of the Land Use ompatibility Plan in April Pertinent data regarding the airport is summarized in Exhibit TUR 1. A copy of the 2008 ALP is provided in Exhibit TUR 2. Airspace Plan As the timing of the future airfield reconfiguration is uncertain, two Airspace Plans have been prepared for. Map TUR 2 in hapter 3 depicts the Federal Aviation Regulations (FAR) Part 77 imaginary surfaces for the airport s existing airfield system and reflects the airport s 3,000-foot long visual runway serving light aircraft ( 12,500 lbs.). The Map TUR 3 in hapter 3 depicts the imaginary surfaces for the airport s future runway system and is consistent with the Airspace Plan provided in the 2008 ALP drawing set. The Future Airspace Plan reflects the relocated 4,400-foot long runway, use by heavy aircraft (> 12,500 lbs), and future nonprecision approaches to both ends of Runway within straight-in minimums of greater than ¾ miles. AIRRAFT ATIVITY ATA Exhibit TUR 3 reflects existing and forecast aircraft activity data. urrent airport operations are based on the FAA s Airport Master Record (2010) and indicate some 10,400 annual operations. The 2004 Master Plan forecast of 51,000 annual operations is carried forward to 2035 for airport land use planning purposes. Exhibit TUR 4 depicts the forecast noise contours and other aeronautical factors upon which the compatibility zones for the airport are based. Airport Environs Exhibit TUR 5 shows a detailed summary of s existing (2010) and planned environs, including airport compatibility policies adopted by the local agencies (Merced and Stanislaus ounty). The existing land use, planned land use, and zoning maps for each agency are 8 2 Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012)

5 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 provided in Exhibits TUR 6 Existing Land Uses, TUR 7 General Plan Land Uses, and TUR 8 Zoning esignations. An aerial photo of the airport is provided in Exhibit TUR 9. As shown in the exhibit, the airport is currently surrounded by agriculture on all sides. The only nearby development is in the unincorporated community of Ballico to the south. There are also a few farm buildings located in the runway protection zone. The adopted airport land use compatibility zones cover land under the jurisdiction of Merced ounty and Stanislaus ounty. The portion of the Influence area situated within Stanislaus ounty is not subject to the authority of the Merced ounty ALU, but is instead under the Stanislaus ounty ALU jurisdiction. The local planning efforts by these agencies are summarized below. Merced ounty Merced ounty is in the process of updating the 1990 General Plan. The updated plan, called the 2030 General Plan, is scheduled for adoption in early The ounty is not anticipating any changes to existing land use designations near the airport as part of this update. The 1990 General Plan includes goals and policies that require projects to be compatible with the ALU Policy Plan. The draft 2030 General Plan, in addition to requiring projects to be compatible with the ALU Policy Plan, also includes goals and policies that will prevent incompatible land uses within airport safety areas, require any development near airports to be consistent with FAA regulations, and prohibit noise-sensitive land uses near public and private airports. Stanislaus ounty Stanislaus ounty last updated its General Plan in The plan includes policies that discourage development in airport hazard areas (unless properly mitigated) and requires regular update, maintenance, and enforcement of the Airport Land Use ommission Plan and ounty Airport Regulations. Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012) 8 3

6 HAPTER 8 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS GENERAL INFORMATION Airport Ownership ity of Turlock Property size Fee title: 320 acres Avigation easements: none Airport lassification General Aviation Airport Elevation 159 feet MSL (estimated) Access Via East Avenue, 8 miles east of central Turlock Building area access from Newport Road to west RUNWAY SYSTEM Runway ritical Aircraft Light twin engine lassification Airport Reference ode B-I (Small) imensions 2,985 feet long; 60 feet wide Pavement Strength 12,500 lbs for aircraft with singlewheel main landing gear Average Gradient 0.03% Runway Edge Lights Low intensity runway lights (LIRL) Primary Taxiways Nearly full length parallel on southwest APPROAH PROTETION Runway Runway Protection Zones Runway 12: 250 foot inner width, 450 foot outer width, 1,000 feet long; about 75% on airport Runway 30: 250 foot inner width, 450 foot outer width, 1,000 feet long; all on airport property Approach Obstacles Runway 14: tree 40 feet high, 800 feet from runway Runway 32: none AIRPORT PLANNING Airport Plan ocuments 2004 Airport Master Plan (adoption pending) Airport Layout Plan approved by Federal Aviation Administration in April 2008 BUILING AREA Location Southwest side of runway Aircraft Parking apacity Hangar spaces for 35 aircraft 55 tiedown spaces on apron Services Fuel: key operated, 24 hours Flight instruction; aircraft maintenance Other Major Facilities None TRAFFI PATTERNS AN APPROAH PROEURES Runway Airplane Traffic Pattern Left traffic to both runway ends Pattern altitude 800 feet above ground level (959 feet MSL) Instrument Approaches None (visual only) Visual Navigational Aids Runway 12: none Runway 30: none Noise Abatement Procedures None Helicopter Traffic Pattern None PROPOSE FAILITY IMPROVEMENTS 2008 ALP Runway/Taxiway System Relocate runway to northeast and extend to 4,400 feet with 75-foot-width Upgrade runway to Airport Reference ode B-II; 30,000 lbs (dual-wheel) pavement strength Existing runway to become parallel taxiway onstruct helipad Upgrade runway edge lighting to medium intensity runway lights (MIRL) Approach Procedures Provide for straight-in nonprecision approaches Building Area onstruct additional hangars and expand apron Approach Protection Acquire fee title or easements on all RPZ property Future RPZs: 500 foot inner width, 700 foot outer width, 1,000 feet long Other Install AWOS, PAPIs and REIL s on both runway ends Source: ata compiled by Mead & Hunt, Inc. (August 2010). Sources include 2004 Master Plan 2008 Airport Layout Plan, Federal Aviation Administration Master Record 5010, and Airnav.com. Exhibit TUR 1 Airport Features Information 8-4 Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012)

7 HAPTER 8 :\Users\870tme\appdata\local\temp\AcPublish_2376\MER ALUP Turlock-ALP and ASP.dwg Aug 19, :46am BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS This is a reduced version of a large size drawing. Exhibit TUR 2 Airport Layout Plan

8 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 This page intentionally blank Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012) 8 5

9 HAPTER 8 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS BASE AIRRAFT urrent a Future b Aircraft Type Single Engine Multi Engine 4 12 Turboprop 0 0 Turbojet 0 0 Helicopter 0 3 Total AIRRAFT OPERATIONS Total urrent a, c Future b Annual 10,400 51,000 Average ay istribution by Aircraft Type Single Engine Piston 94% 95% Twin Engine Piston 4% 3% Turboprop 1% 1% Business Jet < 1% < 1% Helicopter < 1% < 1% istribution by Type of Operation Air Taxi 0% 2% Local (incl. touch-and-goes) 33% 39% Itinerant 67% 59% TIME OF AY ISTRIBUTION urrent a Future a All Aircraft ay 94% No Evening 4% hange Night 2% RUNWAY USE ISTRIBUTION urrent a Future a All Aircraft a Takeoffs Runway 12 10% No Runway 30 90% hange Landings Runway 12 10% No Runway 30 90% hange FLIGHT TRAK ISTRIBUTION urrent a Future a Single, Twin Engine Pistons and Helicopters Takeoffs, Runway 12 Straight-out 50% No Right turn 50% hange Takeoffs, Runway 30 Straight-out 50% No Left turn 50% hange Landings, Runway 12 Straight 50% No From downwind pattern 50% hange Landings, Runway 30 Straight-out 50% No From downwind pattern 50% hange Turboprops and Business Jets Takeoffs, Runway 12 Straight-out 100% No Right turn 0% hange Takeoffs, Runway 30 Straight-out 100% No Left turn 0% hange Landings, Runway 12 Straight 100% No From downwind pattern 0% hange Landings, Runway 30 Straight-out 100% No From downwind pattern 0% hange Notes: a Source: Fixed Base Operator (FBO) and Mead & Hunt. FBO indicates that airport is predominantly used by agricultural aircraft and that there is little night activity. b Source: Master Plan (November 2004). Master Plan forecast is carried forward to 2035 for airport land use planning purposes. c Source: Federal Aviation Administration (FAA) Airport Master Record (7/29/2010) for. ata compiled by Mead & Hunt, Inc. (November 2010) Exhibit TUR 3 Airport Activity ata 8-6 Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012)

10 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 ity of Turlock located 6 miles West Stanislaus ounty Merced ounty Stanislaus ounty 12 Merced ounty Legend Boundary Lines ity Limits Airport Property Line Existing Runway (2,985 ft. length) Future Runway (4,400 ft. length) Airport Influence Area Advisory Area for Stanislaus ounty 1 ompatibility Zone Factors 2 Runway Protection Zone (RPZ) Object Free Area (OFA) 2 3 NEL Noise ontours 4 Arrival Accident Risk ontours 4 eparture Accident Risk ontours FAR Part 77, Subpart, Outer Horizontal Surface 5 FAR Part 77, Subpart B, Notification Surface 5 General Aircraft Traffic Pattern Envelope ompatibility Zone elineation ompatibility zones represent a composite of noise, overflight, safety and airspace impacts. See hapter 3, Table 3A, ompatibility Zone Factors, for general concepts used to develop zone boundaries. 6 A db NEL 60 db NEL 55 db NEL Airport-specific considerations include: protection of both existing and future airfield configurations, and proximity of unincorporated Stanislaus ounty to north. Notes 1. Airport Influence Area extends into Stanislaus ounty. This ompatibility Plan is advisory to Stanislaus ounty. :\Users\870tme\appdata\local\temp\AcPublish_8308\MER ALUP Turlock-ompatability.dwg Jul 05, :05pm Merced ounty Prepared By: 3,000' 0 FEET 6,000' 2. Source: Layout Plan (April 2008). 3. Source: Master Plan (November 2004). Noise contours are a composite reflecting a forecast activity level of 51,000 annual operations by 2035 on both existing and future runway systems. 4. Source: alifornia Airport Land Use Planning Handbook published by alifornia epartment of Transportation, ivision of Aeronautics (October 2011). The accident distribution contours depict where an aircraft accident is most likely to happen when one occurs. The contours represent highest concentration of accident points in 20% increments. 5. Source: Federal Aviation Regulation (FAR) Part 77, Safe, Efficient Use, and Preservation of Navigable Airspace (January 2011). See Map TUR 3 in hapter 3 for complete Boundary. 6. Source: Mead & Hunt, Inc. based on input from airport staff. Exhibit TUR 4 ompatibility Factors Map

11 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 This page intentionally blank Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012) 8 7

12 HAPTER 8 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS AIRPORT LOATION AN NEARBY TOPOGRAPHY Location North-central Merced ounty 1.5 mile south of Stanislaus ounty line 8 miles east of central Turlock 1 mile north of Ballico (unincorporated) Topography Situated on floor of San Joaquin Valley; no major high terrain in vicinity EXISTING AIRPORT AREA LAN USES General haracter Agricultural to north, east, and west Ballico (unincorporated) and agriculture to south Runway Approaches Northwest (Runway 12): field crops except for farm buildings in outer corner of RPZ Southeast (Runway 30): field crops except for farm buildings in outer corner of RPZ Traffic Pattern Field crops and orchards with widely scattered farm buildings and residences STATUS OF LOAL AGENY PLANS Merced ounty General Plan General Plan undergoing update. Adoption anticipated early 2012 Stanislaus ounty General Plan Stanislaus ounty last updated and adopted its General Plan in 1994 AIRPORT ENVIRONS AN LAN USE JURISITIONS ity of Turlock ity limits more than 6 miles from airport boundary Merced ounty Airport property and all adjoining lands within ounty jurisdiction ounty of Stanislaus Northeast runway approach beyond 1.5 mile from runway end lies within Stanislaus ounty PLANNE AIRPORT AREA LAN USES ity of Turlock No planned land uses near airport Merced ounty ontinued agricultural uses adjacent to airport. Some residential development in Ballico ounty of Stanislaus No planned urban uses, continued agricultural uses ESTABLISHE OMPATIBILITY MEASURES 1990 Merced ounty General Plan Policy 10: Requires projects to be compatible with the Airport Land Use ommission Policy Plan or other adopted ALU Plan Merced ounty General Plan (draft) Policies IR-6.1 through 6.9: Prevents incompatible land uses within airport safety areas, and requires new projects to be consistent with the Airport Land Use ompatibility Plan. Policies HS-4.1 and HS-4.2: Requires any development near airports to be consistent with the Airport Land Use ompatibility Plan and FAA regulations. Policy HS-7.10: Prohibits noise-sensitive land uses near public and private airports. Stanislaus ounty General Plan h1, Policy 4: iscourages development in airport hazard areas, unless properly mitigated. h 5, Policy 12: Requires update, maintenance, and enforcement of the Airport Land Use ommission Plan and ounty Airport Regulations. ata compiled by Mead & Hunt and Mintier Harnish (July 2010) Exhibit TUR 5 Airport Environs Table 8-8 Merced ounty Airport Land Use ompatibility Plan (Adopted June 21, 2012)

13 HALL PEPPER ALVES BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 Stanislaus ounty MONTE VISTA Legend Airport Influence Area Airport Land Use ompatibility Zones 1 FAA Height Notification Surface 2 ounty Boundary  ity of Turlock located 6 miles west ity Limits ommunity Boundaries Runway Roads Existing Land Use, 2010 Agriculture Single-Family Residential Multi-Family Residential ommercial Industrial Public/Quasi-Public Merced ounty 12 OAKALE EAST Mining Vacant Miscellaneous NEWPORT 30 LEE SANTA FE LINWOO A TURLOK Notes: 1 See hapter 3, Map TUR 1, ompatibility Policy Map. SUNNY ARES 2 See Map TUR 2, Airspace Protection Map for complete boundary. HARING ata Sources: Existing land use data and basemap details from Merced ounty, Runway alignment from FAA Airport Master Record, Feet 0 1,500 3,000 6,000 ORTEZ LOMBARY PEPPER PARHY GREGG BALLIO LOMBARY GROVE PARK BALLIO BRABURY Land Use ompatibility Plan (Adopted June 21, 2012) Exhibit TUR 6 STOKMAN Existing Land Uses

14 HALL PEPPER ALVES BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 Stanislaus ounty MONTE VISTA Legend Airport Land Use ompatibility Zones 1 Airport Influence Area FAA Height Notification Surface 2 Â ity of Turlock located 6 miles west ounty Boundary ity Limits ommunity Boundaries Runway Roads Urban esignations Rural Residential enters Agricultural Agricultural-Residential Residential Merced ounty 12 OAKALE EAST General ommercial Neighborhood ommercial Industrial Institutional/Public Isolated Urban esignations NEWPORT 30 LEE Residential Industrial SANTA FE LINWOO SUNNY ARES A TURLOK Rural esignations Agricultural Foothill Pasture Stanislaus ounty General Plan Agriculture ORTEZ HARING Notes: 1 See hapter 3, Map TUR 1, ompatibility Policy Map. 2 See Map TUR 2, Airspace Protection Map for complete boundary. ata Sources: General Plan designations from MAG, 2010, and Merced ounty, Basemap details from Merced ounty, Runway alignment from FAA Airport Master Record, ,500 3,000 6,000 LOMBARY PEPPER PARHY GREGG BALLIO LOMBARY GROVE PARK BALLIO BRABURY Feet Land Use ompatibility Plan (Adopted June 21, 2012) Exhibit TUR 7 etailed General Plan Land Uses: Merced ounty

15 HALL PEPPER ALVES BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 Stanislaus ounty MONTE VISTA Legend Airport Influence Area Airport Land Use ompatibility Zones 1 FAA Height Notification Surface 2 ounty Boundary Runway  ity of Turlock located 6 miles west ity Limits ommunity Boundaries Roads Stanislaus ounty Zoning A-2-40 Exclusive Agriculture Merced ounty Zoning A-1 General Agriculture A-2 Exclusive Agriculture A-R Agricultureal Residential R-1 Single-Family Residential R-1-5K Single-Family Residential (5000') M-H Single-Family Mobile Home R-2 Two-Family Residential Merced ounty 12 OAKALE EAST R-3 Multi-Family Residential R-4 Multi-Family Residential -1 Neighborhood ommercial -2 General ommercial -3 Heavy ommercial -P ommercial Professional Office -T ommercial Transition H-I- Highway Interchange enter M-1 Light Manufacturing NEWPORT 30 LEE M-2 General Manufacturing P Planned evelopment SANTA FE LINWOO A TURLOK SPZ (Aviation/Manufacturing) SPZ (Business Park) SPZ (ommercial) SPZ (Visitor ommercial) SPZ (Institutional) SUNNY ARES SPZ (Open Space) Notes: 1 See hapter 3, Map TUR 1, ompatibility Policy Map. ORTEZ HARING 2 See Map TUR 2, Airspace Protection Map for complete ata Sources: Zoning designations from MAG, 2010, and boundary. Merced ounty, Basemap details from Merced ounty, Runway alignment from FAA Airport Master Record, Feet 0 1,500 3,000 6,000 LOMBARY How to Read the Maps The Zoning maps show zoning designations for both the cities and the unincorporated county. Zoning within the cities extends only to the city limits. The ounty's zoning designations apply to everything outside the city limits. PEPPER PARHY GREGG BALLIO LOMBARY GROVE PARK BALLIO BRABURY Land Use ompatibility Plan (Adopted June 21, 2012) Exhibit TUR 8 Planned Land Uses - Zoning

16 BAKGROUN ATA: TURLOK MUNIIPAL AIRPORT AN ENVIRONS HAPTER 8 Legend Airport Influence Area Airport Land Use ompatibility Zones  FAA Height Notification Surface ity of Turlock located 6 miles west 1 2 ounty Boundary ity Limits ommunity Boundaries Runway Roads Stanislaus ounty OA LE HALL A K EAST PEPPER 12 NEWPORT Merced ounty SA N TA A LINWOO FE NEWPORT Sa nt a 12 SYAMORE 30 HARING Fe r SUNNY ARES 1 Notes: See hapter 3, Map TUR 1, ompatibility Policy Map. 2 See Map TUR 2, Airspace Protection Map for complete boundary. ata Sources: Basemap details from Merced ounty, Runway alignment from FAA Airport Master Record, Aerial image from ESRI, HY LOMBARY PA R 30 GROVE PARK 1,500 3,000 Feet 6,000 BALLIO Land Use ompatibility Plan BRABURY (Adopted June 21, 2012) ALVES BALLIO PEPPER 1,500 Feet 3,000 ORTEZ 750 SYAMORE PALM 0 ELHI GREGG A 0 LOMBARY NORTH Exhibit TUR 9 Aerial View

BACKGROUND DATA: PARADISE SKYPARK AND ENVIRONS

BACKGROUND DATA: PARADISE SKYPARK AND ENVIRONS hapter 7 BAKGROUN ATA: PARAISE SKYPARK AN ENVIRONS Airport Land Use ompatibility Plan 7 Background ata: and Environs INTROUTION is a privately owned and operated general aviation airport. The airport is

More information

BACKGROUND DATA: RANCHAERO AIRPORT AND ENVIRONS

BACKGROUND DATA: RANCHAERO AIRPORT AND ENVIRONS hapter 8 BAKGROUN ATA: RANHAERO AIRPORT AN ENVIRONS Airport Land Use ompatibility Plan 8 Background ata: and Environs INTROUTION is a privately owned and operated 23-acre general aviation facility situated

More information

Background Data: Blue Canyon Airport and Environs

Background Data: Blue Canyon Airport and Environs Chapter 8 Background ata: and Environs Placer County Airport Land Use Compatibility Plan 8 Background ata: and Environs INTROUCTION serves as an important emergency landing field amid mountainous terrain.

More information

Background Data: Blue Canyon Airport and Environs

Background Data: Blue Canyon Airport and Environs 5 Background Data: and Environs INTRODUCTION serves as an important emergency landing field amid mountainous terrain. The airport has existed on the site since the 1930s or 40s. The facility was operated

More information

Background Data: Lincoln Regional Airport and Environs

Background Data: Lincoln Regional Airport and Environs Chapter 9 Background ata: and Environs Placer County Airport Land Use Compatibility Plan 9 Background ata: and Environs INTROUCTION /Karl Harder Field is a former military training airfield built during

More information

Background Data: Lincoln Regional Airport and Environs

Background Data: Lincoln Regional Airport and Environs 6 Background Data: and Environs INTRODUCTION /Karl Harder Field is a former military training airfield built during World War II on a mile-square section of open rangeland some three miles west of central

More information

Chapter 5. Background Data: Gustine Municipal Airport and Environs. Merced County Airport Land Use Compatibility Plan

Chapter 5. Background Data: Gustine Municipal Airport and Environs. Merced County Airport Land Use Compatibility Plan hapter 5 Background ata: Gustine Municipal irport and Environs Merced ounty irport Land Use ompatibility Plan 5 Background ata: Gustine Municipal irport and Environs OVERVIEW Gustine Municipal irport

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Airport Background Data and Assumptions Report New Cuyama Airport. Santa Barbara County Airport Land Use Compatibility Plan Update

Airport Background Data and Assumptions Report New Cuyama Airport. Santa Barbara County Airport Land Use Compatibility Plan Update Airport Background Data and Assumptions Report Santa Barbara County Airport Land Use Compatibility Plan Update June 25, 212 Updated August 17, 217 Airport Background Data and Assumptions Report 1. Introduction

More information

at: Accessed May 4, 2011.

at:   Accessed May 4, 2011. 3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

Comparison Between Old and New ALUC Plans

Comparison Between Old and New ALUC Plans A P P E N I X H Comparison Between Old and New ALUC Plans OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) sets forth land use compatibility criteria for the environs of Auburn Municipal,

More information

Chapter 4 Airport Facility Requirements

Chapter 4 Airport Facility Requirements Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

CHAPTER 1 BACKGROUND AND PROPOSED ACTION CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

OVERVIEW BASIC DESIGN FACTORS. Demand Determinants

OVERVIEW BASIC DESIGN FACTORS. Demand Determinants 3 Airfield Airfield Design Design OVERVIEW The basic configuration of the runway and taxiway system at Hanford Municipal Airport has changed moderately since the airport was constructed in 1950. These

More information

CHAPTER 1 INTRODUCTION AND BACKGROUND

CHAPTER 1 INTRODUCTION AND BACKGROUND CHAPTER 1 INTRODUCTION AND BACKGROUND An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance with the National

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT chapter 5 Recommended Master Plan Concept airport master plan The planning process for Coolidge Municipal Airport has included several analytical efforts in the previous chapters intended to project potential

More information

BACKGROUND DATA: CHICO MUNICIPAL AIRPORT AND ENVIRONS

BACKGROUND DATA: CHICO MUNICIPAL AIRPORT AND ENVIRONS hapter 5 BKGROUN T: HIO MUNIIPL IRPORT N ENVIRONS irport Land Use ompatibility Plan 5 Background ata: hico Municipal irport and Environs INTROUTION hico Municipal irport is the largest and busiest airport

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 APPENDIX K LAND USE Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 Appendix K Land Use THIS PAGE INTENTIONALLY LEFT BLANK Charles M. Schulz - Sonoma County Airport

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

Notice of Extended Comment Period for an Intent to Adopt a Negative Declaration

Notice of Extended Comment Period for an Intent to Adopt a Negative Declaration County of Santa Clara Department of Planning and Development Planning Office County Government Center, East Wing, 7 th Floor 70 West Hedding Street San Jose, California 95110-1705 (408) 299-5770 FAX (408)

More information

Grants Pass Airport Master Plan & Airport Layout Plan Update

Grants Pass Airport Master Plan & Airport Layout Plan Update Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:

More information

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and

More information

Airfield Design. Public Review Draft OVERVIEW BASIC DESIGN FACTORS. Airport Role

Airfield Design. Public Review Draft OVERVIEW BASIC DESIGN FACTORS. Airport Role Public Review Draft 3 Airfield Design OVERVIEW The Facilities Plan, Figure 3D, presents the recommended airfield improvements. The principal airfield design issues examined in this chapter are the optimal

More information

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

PLAN Anoka County - Blaine Airport

PLAN Anoka County - Blaine Airport Reliever Airports: NOISE ABATEMENT PLAN Anoka County - Blaine Airport INTRODUCTION The noise abatement plan for the Anoka County-Blaine Airport was prepared in recognition of the need to make the airport

More information

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM)

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) INTRODUCTION The Noise Abatement Plan (FCM Plan) for the Flying Cloud Airport has been prepared in recognition of the need to make the

More information

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan 1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY CHAPTER 7 AIRPORT LAND USE COMPATILIBILTY CHAPTER 7 AIRPORT LAND USE COMPATIBILIITY 7.0 INTRODUCTION On airport aviation related development is typically compatible with aircraft operations. On airport

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

FINAL SUMMARY REPORT

FINAL SUMMARY REPORT FINAL SUMMARY REPORT RUNWAY 1-19 EXTENSION ANALYSIS at MIDDLEBURY STATE AIRPORT PREPARED BY ROXBURY, VERMONT APRIL 2008 FINAL SUMMARY REPORT TABLE OF CONTENTS SECTION PAGE 1.1 INTRODUCTION...1 2.1 OBSTRUCTION

More information

Chapter One INVENTORY

Chapter One INVENTORY Chapter One INVENTORY Airport Layout Plan Report The initial step in the preparation of the Airport Layout Plan Report for is the collection of information pertaining to the Airport and the area it serves.

More information

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005

Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh James T. Beall, Jr. Liz

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related to encroachment of incompatible

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

Chapter 5 Airport Development Alternatives

Chapter 5 Airport Development Alternatives Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA AB 4564 September 7, 2010 Regular Business RENTON AIRPORT STATUS UPDATE Proposed Council Action: Receive update. No action required. DEPARTMENT OF

More information

FACILITY REQUIREMENTS 5.1 Introduction

FACILITY REQUIREMENTS 5.1 Introduction Chapter 5 FACILITY REQUIREMENTS 5.1 Introduction The facility requirements section of this study defines the physical facilities needed to safely and efficiently accommodate the current and future aviation

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

St. Paul Downtown Airport (STP)

St. Paul Downtown Airport (STP) Reliever Airports: NOISE ABATEMENT PLAN St. Paul Downtown Airport (STP) 1 INTRODUCTION The noise abatement plan for the St. Paul Downtown Airport (STP) was prepared in recognition of the need to make the

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Basic Design Factors. Airfield Design. Airport Role

Basic Design Factors. Airfield Design. Airport Role Chapter 3 Airfield Design Basic Design Factors The Federal Aviation Administration (FAA) provides guidance and standards for airport design through a series of Advisory Circulars (ACs). These guidelines

More information

Background and Inventory

Background and Inventory 1 Background and Inventory HANFORD MUNICIPAL AIRPORT Hanford Municipal Airport is a general aviation facility serving Kings County and the surrounding communities of Hanford, Armona and Lemoore in south-central

More information

Acronyms. Airport Layout Plan Report Appendix A A-1

Acronyms. Airport Layout Plan Report Appendix A A-1 Appendix A Acronyms AC... Advisory Circular ADG... Airplane Design Group ADO... Airport District Office AGL... Above Ground Level AIM... Aeronautical Information Manual AIP... Airport Improvement Program

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

RECOMMENDED MASTER PLAN CONCEPT

RECOMMENDED MASTER PLAN CONCEPT RECOMMENDED MASTER PLAN CONCEPT Chapter Five The airport master planning process for Salina Regional Airport (SLN) has progressed through a systematic and logical process with a goal of formulating a recommended

More information

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward : Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

COMPREHENSIVE LAND USE PLAN SANTA CLARA COUNTY PALO ALTO AIRPORT

COMPREHENSIVE LAND USE PLAN SANTA CLARA COUNTY PALO ALTO AIRPORT COMPREHENSIVE LAND USE PLAN SANTA CLARA COUNTY PALO ALTO AIRPORT ADOPTED By the SANTA CLARA COUNTY AIRPORT LAND USE COMMISSION San Jose, California November 19, 2008 Prepared by Walter B. Windus, PE Aviation

More information

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016 Airport Land Use Compatibility Plan (ALUCP) Update Public Information Meeting #4 June 8 & 9, 2016 Agenda 1. Study Process 2. Noise Complaint Patterns 3. Proposed Overflight Areas (AOA) 4. Proposed Land

More information

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role

Airfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role 3 Airfield Design OVERVIEW Due to the presence of significant physical constraints, little change to the existing airfield is anticipated. The emphasis in this plan is on identifying airfield improvements

More information

CHAPTER 3 FACILITY REQUIREMENTS

CHAPTER 3 FACILITY REQUIREMENTS CHAPTER 3 FACILITY REQUIREMENTS 3.1 INTRODUCTION To properly plan for the future requirements of Newport News/Williamsburg International Airport, it is necessary to translate the forecasts of aviation

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS 6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities

More information

During all other times operators are required to use the designated run-up locations for run-ups above idle power.

During all other times operators are required to use the designated run-up locations for run-ups above idle power. OVERVIEW Thank you for your interest in the Portland International Airport Management Program. We appreciate your commitment to noise abatement and helping us remain good neighbors. The Port of Portland

More information

KSBP HIGH. San Luis County Rgnl Airport San Luis Obispo, California, United States

KSBP HIGH. San Luis County Rgnl Airport San Luis Obispo, California, United States Diagram #1: Runway 29 Departure Guide All Aircraft Categories / Runway 29 p. 1 of 8 Diagram #2: Runway 11 Departure Guide All Aircraft Categories / Runway 11 p. 2 of 8 NOISE ABATEMENT PROCEDURES by Whispertrack

More information

Attachment B Ordinance Campus Master Plan Marshfield Municipal Airport

Attachment B Ordinance Campus Master Plan Marshfield Municipal Airport Attachment B Ordinance 1256 2013-2018 Campus Master Plan Marshfield Municipal Airport Adopted: August 13, 2013 TABLE OF CONTENTS Section 1: Introduction... 2 1-1 What is a Campus Master Plan?... 2 1-2

More information

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to

More information

Airport Master Plan 1

Airport Master Plan 1 1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 Meeting Agenda 1. Master Plan Status [5 Minutes] 2. Preferred Forecasts [15 Minutes] 3. Runway Length Options [45

More information

AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE

AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE GOODING MUNICIPAL SOURCE: JeppView 3.6.3.1 (Printed May 19, 2010) MAGIC VALLEY REGIONAL BURLEY MUNICIPAL LOCATION MAP NTS - SITE 12 AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE

More information

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised)

Technical Memorandum. Synopsis. Steve Carrillo, PE. Bryan Oscarson/Carmen Au Lindgren, PE. April 3, 2018 (Revised) Appendix D Orange County/John Wayne Airport (JWA) General Aviation Improvement Program (GAIP) Based Aircraft Parking Capacity Analysis and General Aviation Constrained Forecasts Technical Memorandum To:

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 2035 Transportation Plan 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

5.0 ALTERNATIVES ANALYSIS

5.0 ALTERNATIVES ANALYSIS 5.0 ALTERNATIVES ANALYSIS The Alternative Analysis chapter describes and evaluates the various development alternatives considered for. In addition, it presents a preferred development plan that accommodates

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California

Public Review Draft South County Airport Master Plan Report. County of Santa Clara San Martin, California Public Review Draft South County Airport Master Plan Report County of Santa Clara San Martin, California July 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

KSMO HIGH. Santa Monica Muni Airport Santa Monica, California, United States

KSMO HIGH. Santa Monica Muni Airport Santa Monica, California, United States Diagram #1: Airport Diagram with Monitors and Turbine Aircraft Hold Areas Aircraft Categories: A, B, C, D & E / Runways: 03 & 21 p. 1 of 7 NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #2: Monitors

More information

Dallas Executive Airport

Dallas Executive Airport 648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions 13 31 TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway 17-35 (3,8

More information

Chapter 4 Development Alternatives

Chapter 4 Development Alternatives LAKE COUNTY AIRPORT MASTER PLAN UPDATE The preceding chapter identified deficiencies of the Lake County Airport (Airport) with respect to existing and anticipated aeronautical demand, which are consistent

More information

Effective Altitude. R-3103 To 30,000 (To 9,144 meters) Source: NACO 2002 Notes: 1 By NOTAM issued 12 hours in advance

Effective Altitude. R-3103 To 30,000 (To 9,144 meters) Source: NACO 2002 Notes: 1 By NOTAM issued 12 hours in advance 8.4 AIRSPACE USE 8.4.1 Affected Environment The affected airspace environment is described below in terms of its principal attributes, namely controlled and uncontrolled airspace, special use airspace,

More information