Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover
|
|
- Brice Morgan Gordon
- 5 years ago
- Views:
Transcription
1
2
3
4 Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area Area (sm) Imp. % CN Weighted CN ID % % % 98 40% % 96 9 HSG = Hydrologic Soil Group as defined by the Natural Resources Conservation Service. ** Curve numbers for developed areas assume fair condition lawns in combination with fair condition Inter-Mountain Basins Semi-Desert Grassland: CN B = 70, CN C = 80, CN D = 87
5 Lag Time Calculations Village of Milan, New Mexico: Mirabal Park /5/016 OVERLAND FLOW (Kinematic Wave Equation) t t 0.4 P 0.5 nl S 0.8 SHALLOW CONCENTRATED FLOW CHANNEL FLOW Tc Tc Lag BASIN Manning's n -yr, 4-hr Length Max El. Min El. Slope Tt "k" Factor Length Max El. Min El. Slope Vel Tt Manning's n Length Max El. Min El. Slope Vel Tt TOTAL TOTAL (overland) (in) (ft) (ft) (ft) (%) (min) (ft) (ft) (ft) (%) (fps) (min) (channel) (ft) (ft) (ft) (%) (fps) (min) (min) (hrs) (min) % % %
6 MILAN ELEMENTARY SCHOOL SAND ST. UR VE AA LIN A CAT AN MIRABAL PARK IUM INTERSTATE UA LA 40 E. AV M:\MSD\ \_DISCIPLINES\DRAINAGE_OR_SITEWORK\WORKING\BASINS.DWG /18/016 11:53 AM E. AV 1 T. YS CLA DRAINAGE BASIN VILLAGE OF MILAN, NM Mirabal Park /5/ LANG AVE., N.E. SUITE 00 ALBUQUERQUE, NEW MEXICO PH (505) FAX (505)
7 Project: Grants/Cibola County DMP Simulation Run: 10 YR Future Condition Subbasin: B89.1 Start of Run: 01Aug010, 00:00 Basin Model: Grants/Cibola County DMP End of Run: 0Aug010, 00:00 Meteorologic Model: 10 YR Compute Time: 04Feb016, 15:36:01 Control Specifications: Control Volume Units: AC FT Computed Results Peak Discharge : 46.5 (CFS) Date/Time of Peak Discharge : 01Aug010, 06:03 Total Precipitation : (AC FT) Total Direct Runoff :.37 (AC FT) Total Loss : (AC FT) Total Baseflow : (AC FT) Total Excess :.373 (AC FT) Discharge :.37 (AC FT)
8 Project: Grants/Cibola County DMP Simulation Run: 50 YR Future Condition Subbasin: B89.1 Start of Run: 01Aug010, 00:00 Basin Model: Grants/Cibola County DMP End of Run: 0Aug010, 00:00 Meteorologic Model: 50 YR Compute Time: 04Feb016, 16:04:13 Control Specifications: Control Volume Units: AC FT Computed Results Peak Discharge : 70.3 (CFS) Date/Time of Peak Discharge : 01Aug010, 06:18 Total Precipitation : 5.91 (AC FT) Total Direct Runoff : (AC FT) Total Loss : (AC FT) Total Baseflow : (AC FT) Total Excess : (AC FT) Discharge : (AC FT)
9 Project: Grants/Cibola County DMP Simulation Run: 100 YR Future Condition Subbasin: B89.1 Start of Run: 01Aug010, 00:00 Basin Model: Grants/Cibola County DMP End of Run: 0Aug010, 00:00 Meteorologic Model: 100 YR Compute Time: 9Jan016, 10:47:55 Control Specifications: Control Volume Units: AC FT Computed Results Peak Discharge : 81.9 (CFS) Date/Time of Peak Discharge : 01Aug010, 06:03 Total Precipitation : (AC FT) Total Direct Runoff : 4.18 (AC FT) Total Loss : (AC FT) Total Baseflow : (AC FT) Total Excess : 4.19 (AC FT) Discharge : 4.18 (AC FT)
10
11
12 GENERAL SHEET NOTES 1. SEE SHEET 3-1 FOR PHASE 1 GRADING PLAN. SAND ST FOUND: #5 REBAR (NO CAP) 1 13 BEGIN 6 KEYNOTES M.S O PH LE TE NE T EN M SE EA. CONSTRUCT 1" MOW STRIP. SEE DETAIL D/-. 3. CONSTRUCT PAVERS. SEE DETAIL F4/ CONSTRUCT 4" PCC SIDEWALK. SEE DETAIL G8/ CONSTRUCT PLAYGROUND RAMP. SEE DETAIL A1/-1 & C4/ CONSTRUCT BASKETBALL COURT. SEE SHEET -10. SEE DETAIL SHEET CONSTRUCT VOLLEYBALL COURT. SEE SHEET -10. SEE DETAIL A8/-. 8. CONSTRUCT BACKSTOP WALL. SEE DETAIL A7/ CONSTRUCT SOFTBALL FIELD. SEE SHEET INSTALL NATURAL GRASS FIELD. 11. CONSTRUCT 3" ASPHALT. SEE DETAIL D8/ CONSTRUCT 6" x 4" TYPE 'B' CURB AND GUTTER. SEE SHEET CONSTRUCT MOUNTABLE CURB AND GUTTER TYPE 'A'. SEE SHEET CONSTRUCT PARALLEL CURB RAMP. SEE SHEETS 1-8 & LA VA TAL CA E AV INA CONSTRUCT 8" PLAYGROUND WALL. SEE DETAIL F6/-1. SEAL 4 1. CONSULTANTS 3 AVE END PROJECT NAME BY DESCRIPTION LEGEND PAVERS 1 DATE SAND 4" PCC REV. M:\MSD\ \_DISCIPLINES\_SHEETS\_SHEETS - CIVIL\PHII\156097_GD_PHII.DWG 1/5/016 11:03 AM 4 NATURAL GRASS ST Y A CL 5 1 A1 GRADING & DRAINAGE PLAN - PHASE SCALE: 1" = 30' BOP BOTTOM OF POND ELEVATION PROJECT NO: BW BOTTOM OF WALL ELEVATION DESIGNED BY: FG FINISHED GRADE ELEVATION DRAWN BY: FL FLOWLINE ELEVATION ME MATCH EXISTING ELEVATION TA TOP OF ASPHALT ELEVATION TC TOP OF CONCRETE ELEVATION TW TOP OF WALL ELEVATION CHECKED BY: DATE: SHEET TITLE SHEET NO: MJI JEM MJI FEB 015
ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationHydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.
Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek
More informationADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE
ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationThe Problem.. SuDS: Controlling the Flow. LANDF RM Technical delivery of SuDS 15/10/2013. Bridget Woods Ballard HR Wallingford 1.
SuDS: Controlling the Flow 15th October 2013 Bridget Woods Ballard The Problem.. Page 2 Bridget Woods Ballard HR Wallingford 1 15th October 2013 Landform Event Page 3 HR Wallingford 2013 The Aim of SuDS.
More information359 36' 16" 57.592 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD CEDGE Y CONC. SLAB. EL. 1.98M ONC. PAVER STANDARD 2.8Mx5.5M B B B A212"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE EL. FOR CONTINUEATION SEE 3b R
More informationCITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $
CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units
More information2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013
2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013 2014 Colorado River AOP Final Consultation Meeting Welcome and Introductions
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,
More informationAPPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS
Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER
More informationIntroduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo
Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,
More informationWaukegan & Calumet Rivers. All Hands Meeting
Waukegan & Calumet Rivers 516(e) Update All Hands Meeting David F. Bucaro, P.E. Chief, Economic Formulation & Analysis Section, Planning Branch May 18 th, 2011 Kensington Court Ann Arbor, MI 1 2 Waukegan
More informationCity of Rolling Hills INCORPORATED JANUARY 24, 1957
City of Rolling Hills INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 (310) 377-1521 FAX (310) 377-7288 INSTRUCTIONS FOR COMPLETION OF THE LOT COVERAGE FORMS TOTAL STRUCTURES
More informationHYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY
HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.
More informationLUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS
LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118
More informationCau River. Map of River. Table of Basic Data. Vietnam 5
Cau River Map of River Table of Basic Data Name: Cau River Location: Thai Nguyen, Province, Viet Nam Area: 6,030 km 2 Origin: Mt. Phia Deng 1,527 m Outlet: Pha Lai Note: * Indicates missing data in some
More informationImpact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas
Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationVISTA AZUL- APPROVED 20 LOT TENTATIVE MAP
Expansive Views Entitlements for 20 Residential Lots Previously Graded Entitled for 14 Detached Lots, 6 Townhome Units DOWNTOWN SAN DIEGO ASKING PRICE: $1,395,000 - OFFERS DUE JULY 14, 2017 Monterey Heights
More informationCity of Palmdale - Westside STUDY AREA PROFILE
City of Palmdale - Westside STUDY AREA PROFILE STUDY AREA ID #125 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT
More informationHydrology Input for West Souris River IWMP
Hydrology Input for West Souris River IWMP Prepared by: Mark Lee Manitoba Water Stewardship 1 1 1 Overall view of: drainage area watershed characteristics gauging stations meteorological stations Runoff
More informationRIO VISTA MUNICIPAL AIRPORT
DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationSandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationAKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"
6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,
More informationThe Geography of Climate
The Geography of Climate Objective for Today: Today we will examine ways that latitude and landforms influence climate The focus of our study will be the South American Continent in the Formal Region known
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas
More informationSnow, Glacier and GLOF
Snow, Glacier and GLOF & Report on Demonstration River Basin Activities Upper Indus Basin The 5th International Coordination Group (ICG) Meeting GEOSS Asian Water Cycle Initiative (AWCI) Tokyo, Japan,
More informationNEW MEADOWS PARK PROPOSED MASTER PLAN
NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle
More informationAND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).
PROPOSED DEALERSHIP AND FOR: 11 NORTH STATE ROAD, FLORIDA. 3301 INDEX OF DRAWINGS ARCHITECTURAL A-0 COVER SHEET SHEET 1 OF BOUNDARY AND TOPOGRAPHIC SURVEY SHEET OF BOUNDARY AND TOPOGRAPHIC SURVEY A-1.1
More informationAnnual Report to the. International Joint Commission. from the. International Osoyoos Lake Board of Control for
Annual Report to the International Joint Commission from the International Osoyoos Lake Board of Control for Calendar Year 2005 INTERNATIONAL JOINT COMMISSION International Osoyoos Lake Board of Control
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-
More informationWatershed Runoff Analysis
CREATING SOLUTIONS FOR A CHANGING WORLD Watershed Runoff Analysis April 18, 2017 John Melack, UCSB Ed Beighley & Dongmei Feng, Northeastern University Study Workflow Civil and Environmental Engineering
More informationSands Motel 112 McArthur St, Grants, New Mexico 87020
Sands Motel 112 McArthur St, Grants, New Mexico 87020 6565 Americas Pkwy NE Suite 200, Albuquerque, NM 87110 verify the subject offering as suitable for the intended use. Neither exp Realty LLC, it s agents
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2015 Annual Report to the International Joint Commission Cover: Northern extent of Osoyoos Lake, where the Okanagan River enters the lake, 2015. View is to the
More information80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS
11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11
More informationCorktown Parks. Public Meeting. City of Toronto
Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)
More informationHENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report
HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,
More informationShrubs and alpine meadows represent the only vegetation cover.
Saldur river General description The study area is the upper Saldur basin (Eastern Italian Alps), whose elevations range from 2150 m a.s.l. (location of the main monitoring site, LSG) and 3738 m a.s.l.
More informationCAUTION - NOTICE TO CONTRACTOR
7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC
More informationFOR LEASE 5431 H Street Sacramento, CA
PROPERTY PROFILE Lot Size Building Size 0.128 acres ±1,089 SF AP 004-0341-009 Land Use C-2 General Commercial Zone MARKET HIGHLIGHTS Great access to both Highway 50 & Interstate 80 Within close proximity
More informationMEASUREMENT OF ACCELERATION Pre-Lab. Name: Roster#
MEASUREMENT OF ACCELERATION Pre-Lab Name: Roster# Date: 1. A tree is 15.0 m high and cast a shadow along the ground that is 30.0 m long. Draw a triangle that represents this situation. What angle does
More informationS-4893 June 12, Amendments to NYMEX Chapter 9A, Appendix A to Eliminate Secondary Aggregation for Certain Contracts
S-4893 June 12, 2009 Amendments to Chapter 9A, Appendix A to Eliminate Secondary Aggregation for Certain Contracts Effective for trade date June 15, 2009, the New York Mercantile Exchange, Inc. ( or Exchange
More informationSpecification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE
Specification Details: DLA Land and Maritime - VQ Date: 2/4/2015 Specification: MIL-DTL-28803 Title: Display, Optoelectronic, Readouts, Backlighted Segmented Federal Supply Class (FSC): 5980 Conventional:
More informationDD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X
ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES
More informationHydrological Analysis for Simanggo-2 HEPP
Part 15 Hydrological Analysis for Simanggo-2 HEPP PART 15 HYDROLOGICAL ANALYSIS FOR SIMANGGO-2 HEPP 15.1 METEOROLOGY AND HYDROLOGY Meteorological Records and Hydrological Records are collected from Meteorological
More informationParks & Recreation Areas Program
PARKS & RECREATION Parks & Recreation Areas Program As part of its mission to conserve and protect natural resources, the Upper Big Blue Natural Resources District (NRD) has been involved in several large-scale
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2010 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2010... 2 Drought Criteria...
More information25 th Avenue Grade Separation. December 13, 2017
25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationInternational Osoyoos Lake Board of Control Annual Report to the International Joint Commission
International Osoyoos Lake Board of Control 2013 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2013... 2 Drought Criteria...
More informationImpacts of climate change on the hydrological processes in the Mekong River. Hui Lu & Wei Wang Tsinghua University
1 Impacts of climate change on the hydrological processes in the Mekong River Hui Lu & Wei Wang Tsinghua University Outline Backgrounds Method and data Model calibration Temperature and rainfall trends
More informationFun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21
It Starts in Parks Fun Facts How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 Fun Facts How many people visit Central Winds Park Annually? a. Over 100,000 b. 20,000 c. 10,000 d. 1,000 It Starts
More informationHYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA
PROC. S.D. ACAD. SCI., VOL. 77 (1998) 59 HYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA Perry H. Rahn Department of Geology & Geological Engineering South Dakota School of Mines and Technology Rapid City,
More informationColombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.
Colombia (South America) Water use and drainage in Colombia Location: Case Study: The Stormwater Challenge in Barranquilla Source: Wikipedia The University of Alabama February 25, 2008 Population: 45 million
More informationLake Chelan Operations
Lake Chelan Operations IPMA Executive Seminar September 17, 2013 Presented by: Janet Jaspers Chelan County PUD Lake Chelan Hydroelectric Project Today s Discussion Chelan PUD Overview Interesting Facts
More informationTown Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.
Town Hall Meeting July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave. Stay connected! 5046 S. State St. Chicago, IL. (773) 373-9273 ward03@cityofchicago.org www.dowellforthirdward.com Facebook.com/aldermanpat.dowell
More informationFORUM PARTNERSHIP 5611 E MORGAN AVE 429, Other Retail Structures MIXED USE FAIR 027 1/10
8-6--7-7.-7 FORM TNERSHIP 56 E MORGAN AVE 49, Retail Structures MIXED SE FAIR 7 / Parcel Number 8-6--7-7.-7 Local Parcel Number 9-7-7-7- Tax ID: Routing Number KO- Property Class 49 Retail Structures :
More informationLake Wissota Access Locations within the LaFayette Township. By Chad Martin
Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road
More informationUNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR
UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR AIC 127/2006 (Pink 110) 7 December NATS Limited Aeronautical Information Service Control Tower Building, London Heathrow Airport Hounslow, Middlesex TW6
More informationPRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP
PREPARED FOR: NW 16TH AVE. PRELIMINARY PLANS INDEX OF DRAWINGS COVER SHEET CITY OF GAINESVILLE PUBLIC WORKS DEPARTMENT END PROJECT NW 16TH AVE NW 8TH AVE. UNIVERSITY OF FLORIDA 0 2000' 4000' NW 13TH ST.
More informationOrigin and Extraction of Andean Salars
Think Simulation! Adventures in Electrolytes Origin and Extraction of Andean Salars Lithium and Boron Recovery from Salt brines and Salt flats in Chile and Bolivia http://tunari.tripod.com/landscapes.html
More informationCAUTION - NOTICE TO CONTRACTOR
WINDSOCK 7. 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7....... CNT BOX NOEL CNT BOX.. CNT BOX NOEL CNT BOX NOEL.7 7........ 7...7.. 7..7. 7..7 TOP. TOP TOP TOP. TOP. 7.7.. TOP. TOP.7 TOP. TOP.7 TOP. PVC
More informationCITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016
CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment
More informationFACTUAL REPORT AVIATION
Aircraft Registration Number: N38DM Occurrence Date: Occurrence Type: 4/6/ Accident Most Critical Injury: Serious Investigated By: NTSB Location/Time Nearest /Place IMMOKALEE Zip Code Local Time Time Zone
More informationNote that the steepest 8 direction pour point model slope in direction 64 is: 10.0
GIS in Water Resources Exercise #3 Solution Part 1. 1.1 Hand Calculations (i) The standard ESRI surface slope function Grid size 10 m Diagonal distance= 14.142 m 47.5 48 47.7 50.6 48.3 dz/dx= -0.125 45.1
More informationKNIGHTS LANDING RIVER RANCH WOODLAND, CA - YOLO COUNTY
PROPERTY HIGHLIGHTS ±77.2 Gross Acres Contains Excellent Sandy and Silty Clay Loam Soils Established Surface Water Rights in Sacramento River Developed River Diversion and Distribution System Three Phase
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)
More informationNo 30 x 48 space is provided for a wheelchair under the picnic table.
ITEM: LLOYD PARK PICNIC TABLE ADA GUIDELINE: 305, 902.2 No 30 x 48 space is provided for a wheelchair under the picnic table. Remove one of the picnic table arms. Photo of Picnic Table on the bluff PARK:
More informationBRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE
BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE The Orlando North Airpark Enterprise Zone is a rare opportunity for any company desiring to relocate or open a new operation in the State of Florida.
More informationFIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR
ANR 31 REFERS FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR Civil Aviation Authority of Fiji Private Bag (NAP0354), Nadi Airport Fiji Tel: (679) 6721 555; Fax (679) 6721 500 Website: www.caafi.org.fj
More informationCambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,
THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationTYPICAL SECTION OF IMPROVEMENT
TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE 8 8 OR END TREATMENT IS REQUIRED FOR BRIDGE APOACH, ADD.5 TO
More informationFACTUAL REPORT AVIATION
Aircraft Registration Number: NJA Occurrence Date: Occurrence Type: //2 Accident Most Critical Injury: Serious Investigated By: NTSB Location/Time Nearest /Place LINDRITH Zip Code Local Time Time Zone
More informationCity of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting
City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,
More informationTO LET offices. 20,735 to 64,639 sq ft. available now WATERFRONT HOUSE, TECHNOLOGY DRIVE, BEESTON BUSINESS PARK, NG9 1LA.
TO LET offices WATERFNT HOUSE, TECHNOLOGY RIVE, BEESTON BUSINESS PARK, NG9 1LA available now 20,735 to 64,639 sq ft High Quality Refurbished Grade A offices Secure site with manned gatehouse Up to 323
More informationValley Fliers 1402 Auburn Way North, #223 Auburn WA 98002
Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002 Instructor: Check Out Date: Phase 1: Pre-Flight Name: Certificate Number: Certificate Type: Ratings: Total Flight Time: Last 90 Days: Club check
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationTaste and Odor Relationships in North Texas Reservoirs. Jennifer Owens Tarrant Regional Water District
Taste and Odor Relationships in North Texas Reservoirs Jennifer Owens Tarrant Regional Water District Tarrant Regional Water District Reservoir System Reservoir Facts Lake Arlington Benbrook Lake Cedar
More informationYEARS IP hrs. Outdoor Converter. The perfect partner to team up with any 12V LED solution. Full power range from 15W to 200W
OCV5 Slim 12V Outdoor Converter 5 YEARS IP67 50.000 hrs The perfect partner to team up with any 12V LED solution Full power range from 15W to 200W SLIM profile (40x23mm) to fit in very thin applications
More informationGlaciology. Water. Glacier. Moraine. Types of glacier-dammed lakes. Mechanics of jökulhlaup
A Jökulhlaup Jökulhlaup. Catastrophic events where large amounts of water are suddenly discharged. Jökulhlaup s are a sudden and rapid draining of a glacier dammed lake or of water impounded within a glacier.
More informationAnn Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB
MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:
More informationTRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)
BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 From: Barney
More informationballfields 5-8 red hook park
ballfields 5- red hook park Bordered by Lorraine, Hicks, Henry, and Bay Streets In the Borough of Brooklyn Public Design Commission- Concept Review Submission May, 201 TRC Engineers, Inc. and Parks Capital
More informationCommunity Advisory Panel Meeting #
Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian
More informationCOATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT
R "W" PAY LIMITS OF ITEM 601 PAY LIMITS OF ITEM 601 STRUCTURAL CONCRETE STRUCTURAL CONCRETE 1'3" PCBC END SEGMENT B C 1'3" COATING AND STRUCTURAL CONCRETE COATING (ANTIGRAFFITI) 1'3" CURB FINISHED GRADE
More informationBellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan.
Bellevue South Park Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Community Board 6 Review January 2, 2018 Christopher M. Crowley, RLA NYC Parks Total Budget: Project
More informationTerms, conditions and prices
Terms, conditions and prices 2017 PORT OF ALTA valid from January 1th - Expires Des 31th 2017 page 1 CRUISE QUAYS IN ALTA QUAY LENGTH DRAFT BEAM HEIGHT Terminalquay 169 m 8,4 m Unlimited Marinequay 63
More informationROYAL VIEW DEVELOPMENT
GRETNA BUILDING FOR LEASE ROYAL VIEW DEVELOPMENT PROPOSED RENDERINGS AVAILABLE FOR PRE-LEASE + + LEASE RATE AND AVAILABILITY MINIMUM SPACE: MAXIMUM SPACE: LEASE RATE: 1,278 SF 16,500 SF $16.50 - $22.00
More informationCapital Prioritization
14 Capital Prioritization 279 279 280 Park & Recreation CAPITAL PRIORITIZATION As described in Chapter 8, the recommendations presented in Chapter 9 are prioritized to provide a guide for future capital
More information09a Indexes Page 187 Tuesday, August 22, :44 PM Plates
Plates Plate 1 1a. View of the Western Cemetery with the tombs of the Senedjemib Complex in the present volume highlighted, looking northwest from the top of the pyramid of Khufu. 16 November 1993. Peter
More informationHeathrow Airport Property Rents 2016/17 Consultation Document
Heathrow Airport Property Rents 2016/17 Consultation Document Date: 17 th June 2016 Prepared by: Heathrow Airport Limited Status: Final Page 1 of 13 Contents 1.0 Introduction 2.0 Heathrow Property Rents
More informationFIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C
FIGURES Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City CSI Job No. 9680.33 C INFERRED EXTENT OF ARSENIC IMPACTED SOIL C.A. No. 262 Additional Soil Assessment Activities 607, 609,
More information566± acres total - WILL DIVIDE Volusia County, FL
L IC E N S E D HUNTING P RESERVE ts Q u a i l ahi ul anb l e are av r info! fo CALL TODAY LAKEFRONT PROPERTY PERFECTION This ranch lies on a natural sand ridge in North Volusia County, Florida and has
More informationMardi Gras 2011 King & Queen. Eusebio Arballo Sylvia Preciado
Mardi Gras 2011 King & Queen Eusebio Arballo Sylvia Preciado Sylvia manages the Imperial Valley Red Cross, which is located on Broadway Avenue in El Centro. She is well known in the community for her tireless
More informationUnincorporated East Los Angeles - Southeast STUDY AREA PROFILE
Unincorporated East Los Angeles - Southeast STUDY AREA PROFILE STUDY AREA ID #30 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES
More information2014 Parks and Trails General Obligation Bond: $42 million. $3 million County Trails $1 million City Playgrounds $38 million FMRP
2014 Parks and Trails General Obligation Bond: $42 million $3 million County Trails $1 million City Playgrounds $38 million FMRP FMRP Location and Connections Major Timelines Completion of phase I the
More information