Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Size: px
Start display at page:

Download "Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover"

Transcription

1

2

3

4 Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area Area (sm) Imp. % CN Weighted CN ID % % % 98 40% % 96 9 HSG = Hydrologic Soil Group as defined by the Natural Resources Conservation Service. ** Curve numbers for developed areas assume fair condition lawns in combination with fair condition Inter-Mountain Basins Semi-Desert Grassland: CN B = 70, CN C = 80, CN D = 87

5 Lag Time Calculations Village of Milan, New Mexico: Mirabal Park /5/016 OVERLAND FLOW (Kinematic Wave Equation) t t 0.4 P 0.5 nl S 0.8 SHALLOW CONCENTRATED FLOW CHANNEL FLOW Tc Tc Lag BASIN Manning's n -yr, 4-hr Length Max El. Min El. Slope Tt "k" Factor Length Max El. Min El. Slope Vel Tt Manning's n Length Max El. Min El. Slope Vel Tt TOTAL TOTAL (overland) (in) (ft) (ft) (ft) (%) (min) (ft) (ft) (ft) (%) (fps) (min) (channel) (ft) (ft) (ft) (%) (fps) (min) (min) (hrs) (min) % % %

6 MILAN ELEMENTARY SCHOOL SAND ST. UR VE AA LIN A CAT AN MIRABAL PARK IUM INTERSTATE UA LA 40 E. AV M:\MSD\ \_DISCIPLINES\DRAINAGE_OR_SITEWORK\WORKING\BASINS.DWG /18/016 11:53 AM E. AV 1 T. YS CLA DRAINAGE BASIN VILLAGE OF MILAN, NM Mirabal Park /5/ LANG AVE., N.E. SUITE 00 ALBUQUERQUE, NEW MEXICO PH (505) FAX (505)

7 Project: Grants/Cibola County DMP Simulation Run: 10 YR Future Condition Subbasin: B89.1 Start of Run: 01Aug010, 00:00 Basin Model: Grants/Cibola County DMP End of Run: 0Aug010, 00:00 Meteorologic Model: 10 YR Compute Time: 04Feb016, 15:36:01 Control Specifications: Control Volume Units: AC FT Computed Results Peak Discharge : 46.5 (CFS) Date/Time of Peak Discharge : 01Aug010, 06:03 Total Precipitation : (AC FT) Total Direct Runoff :.37 (AC FT) Total Loss : (AC FT) Total Baseflow : (AC FT) Total Excess :.373 (AC FT) Discharge :.37 (AC FT)

8 Project: Grants/Cibola County DMP Simulation Run: 50 YR Future Condition Subbasin: B89.1 Start of Run: 01Aug010, 00:00 Basin Model: Grants/Cibola County DMP End of Run: 0Aug010, 00:00 Meteorologic Model: 50 YR Compute Time: 04Feb016, 16:04:13 Control Specifications: Control Volume Units: AC FT Computed Results Peak Discharge : 70.3 (CFS) Date/Time of Peak Discharge : 01Aug010, 06:18 Total Precipitation : 5.91 (AC FT) Total Direct Runoff : (AC FT) Total Loss : (AC FT) Total Baseflow : (AC FT) Total Excess : (AC FT) Discharge : (AC FT)

9 Project: Grants/Cibola County DMP Simulation Run: 100 YR Future Condition Subbasin: B89.1 Start of Run: 01Aug010, 00:00 Basin Model: Grants/Cibola County DMP End of Run: 0Aug010, 00:00 Meteorologic Model: 100 YR Compute Time: 9Jan016, 10:47:55 Control Specifications: Control Volume Units: AC FT Computed Results Peak Discharge : 81.9 (CFS) Date/Time of Peak Discharge : 01Aug010, 06:03 Total Precipitation : (AC FT) Total Direct Runoff : 4.18 (AC FT) Total Loss : (AC FT) Total Baseflow : (AC FT) Total Excess : 4.19 (AC FT) Discharge : 4.18 (AC FT)

10

11

12 GENERAL SHEET NOTES 1. SEE SHEET 3-1 FOR PHASE 1 GRADING PLAN. SAND ST FOUND: #5 REBAR (NO CAP) 1 13 BEGIN 6 KEYNOTES M.S O PH LE TE NE T EN M SE EA. CONSTRUCT 1" MOW STRIP. SEE DETAIL D/-. 3. CONSTRUCT PAVERS. SEE DETAIL F4/ CONSTRUCT 4" PCC SIDEWALK. SEE DETAIL G8/ CONSTRUCT PLAYGROUND RAMP. SEE DETAIL A1/-1 & C4/ CONSTRUCT BASKETBALL COURT. SEE SHEET -10. SEE DETAIL SHEET CONSTRUCT VOLLEYBALL COURT. SEE SHEET -10. SEE DETAIL A8/-. 8. CONSTRUCT BACKSTOP WALL. SEE DETAIL A7/ CONSTRUCT SOFTBALL FIELD. SEE SHEET INSTALL NATURAL GRASS FIELD. 11. CONSTRUCT 3" ASPHALT. SEE DETAIL D8/ CONSTRUCT 6" x 4" TYPE 'B' CURB AND GUTTER. SEE SHEET CONSTRUCT MOUNTABLE CURB AND GUTTER TYPE 'A'. SEE SHEET CONSTRUCT PARALLEL CURB RAMP. SEE SHEETS 1-8 & LA VA TAL CA E AV INA CONSTRUCT 8" PLAYGROUND WALL. SEE DETAIL F6/-1. SEAL 4 1. CONSULTANTS 3 AVE END PROJECT NAME BY DESCRIPTION LEGEND PAVERS 1 DATE SAND 4" PCC REV. M:\MSD\ \_DISCIPLINES\_SHEETS\_SHEETS - CIVIL\PHII\156097_GD_PHII.DWG 1/5/016 11:03 AM 4 NATURAL GRASS ST Y A CL 5 1 A1 GRADING & DRAINAGE PLAN - PHASE SCALE: 1" = 30' BOP BOTTOM OF POND ELEVATION PROJECT NO: BW BOTTOM OF WALL ELEVATION DESIGNED BY: FG FINISHED GRADE ELEVATION DRAWN BY: FL FLOWLINE ELEVATION ME MATCH EXISTING ELEVATION TA TOP OF ASPHALT ELEVATION TC TOP OF CONCRETE ELEVATION TW TOP OF WALL ELEVATION CHECKED BY: DATE: SHEET TITLE SHEET NO: MJI JEM MJI FEB 015

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E. Prepared for: Prepared by: Marquette County Road Commission Coleman Engineering Company Marquette, Michigan Iron Mountain, MI December 2011 Hydraulic Report Trail 5 Snowmobile Trail Over Mulligan Creek

More information

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON EAST RDICA AVENUE FOR THE LOCATION MAP STANDARD SYMBOLS FEATURE EISTING PROPOSED BENCHMARK BM/TBM SHEET INDE. BM/TBM TITLE SHEET CONCRETE R.O.W. MONUMENT

More information

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422

More information

The Problem.. SuDS: Controlling the Flow. LANDF RM Technical delivery of SuDS 15/10/2013. Bridget Woods Ballard HR Wallingford 1.

The Problem.. SuDS: Controlling the Flow. LANDF RM Technical delivery of SuDS 15/10/2013. Bridget Woods Ballard HR Wallingford 1. SuDS: Controlling the Flow 15th October 2013 Bridget Woods Ballard The Problem.. Page 2 Bridget Woods Ballard HR Wallingford 1 15th October 2013 Landform Event Page 3 HR Wallingford 2013 The Aim of SuDS.

More information

359 36' 16" 57.592 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD CEDGE Y CONC. SLAB. EL. 1.98M ONC. PAVER STANDARD 2.8Mx5.5M B B B A212"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE EL. FOR CONTINUEATION SEE 3b R

More information

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $ CITY OF IMPERIAL PROPOSAL BID SHEET (02-06-2015) Page 1 of 2 FOR STREET IMPROVEMENT PROJECT PHASE 2 ASPHALT RUBBER COMPOSITE LAYER OVERLAY ON DESIGNATED STREETS BID NO. 2015-01 Item No. Description Units

More information

2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013

2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013 2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013 2014 Colorado River AOP Final Consultation Meeting Welcome and Introductions

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,

More information

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS

APPROVED 10 LOT TENTATIVE TRACT MAP - OCEAN VIEWS Rare Development Opportunity in the Olde Carlsbad Neighborhood Ocean Views from Some Lots Lot Sizes 9,500-15,527 SF Area of New Home Prices From $1,000,000-$1,500,000 SUBMIT BEST OFFER - OFFERS DUE DECEMBER

More information

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo

Introduction. The System. Model Limitations, Assumptions, and Parameters. Optional Services Tech Memo Optional Services Tech Memo Introduction This technical memo evaluates the impact of a tide gate to be installed at the confluence of the Left Bank Tributary of Thalia Creek and Lake Windsor. Specifically,

More information

Waukegan & Calumet Rivers. All Hands Meeting

Waukegan & Calumet Rivers. All Hands Meeting Waukegan & Calumet Rivers 516(e) Update All Hands Meeting David F. Bucaro, P.E. Chief, Economic Formulation & Analysis Section, Planning Branch May 18 th, 2011 Kensington Court Ann Arbor, MI 1 2 Waukegan

More information

City of Rolling Hills INCORPORATED JANUARY 24, 1957

City of Rolling Hills INCORPORATED JANUARY 24, 1957 City of Rolling Hills INCORPORATED JANUARY 24, 1957 NO. 2 PORTUGUESE BEND ROAD ROLLING HILLS, CA 90274 (310) 377-1521 FAX (310) 377-7288 INSTRUCTIONS FOR COMPLETION OF THE LOT COVERAGE FORMS TOTAL STRUCTURES

More information

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

Cau River. Map of River. Table of Basic Data. Vietnam 5

Cau River. Map of River. Table of Basic Data. Vietnam 5 Cau River Map of River Table of Basic Data Name: Cau River Location: Thai Nguyen, Province, Viet Nam Area: 6,030 km 2 Origin: Mt. Phia Deng 1,527 m Outlet: Pha Lai Note: * Indicates missing data in some

More information

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad

More information

PERFORMANCE MEASURE INFORMATION SHEET #16

PERFORMANCE MEASURE INFORMATION SHEET #16 PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days

More information

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP Expansive Views Entitlements for 20 Residential Lots Previously Graded Entitled for 14 Detached Lots, 6 Townhome Units DOWNTOWN SAN DIEGO ASKING PRICE: $1,395,000 - OFFERS DUE JULY 14, 2017 Monterey Heights

More information

City of Palmdale - Westside STUDY AREA PROFILE

City of Palmdale - Westside STUDY AREA PROFILE City of Palmdale - Westside STUDY AREA PROFILE STUDY AREA ID #125 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT

More information

Hydrology Input for West Souris River IWMP

Hydrology Input for West Souris River IWMP Hydrology Input for West Souris River IWMP Prepared by: Mark Lee Manitoba Water Stewardship 1 1 1 Overall view of: drainage area watershed characteristics gauging stations meteorological stations Runoff

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

25 th Avenue Grade Separation. September 13, 2017

25 th Avenue Grade Separation. September 13, 2017 25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND SANDBOX 6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,

More information

The Geography of Climate

The Geography of Climate The Geography of Climate Objective for Today: Today we will examine ways that latitude and landforms influence climate The focus of our study will be the South American Continent in the Formal Region known

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

Snow, Glacier and GLOF

Snow, Glacier and GLOF Snow, Glacier and GLOF & Report on Demonstration River Basin Activities Upper Indus Basin The 5th International Coordination Group (ICG) Meeting GEOSS Asian Water Cycle Initiative (AWCI) Tokyo, Japan,

More information

NEW MEADOWS PARK PROPOSED MASTER PLAN

NEW MEADOWS PARK PROPOSED MASTER PLAN NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle

More information

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES). PROPOSED DEALERSHIP AND FOR: 11 NORTH STATE ROAD, FLORIDA. 3301 INDEX OF DRAWINGS ARCHITECTURAL A-0 COVER SHEET SHEET 1 OF BOUNDARY AND TOPOGRAPHIC SURVEY SHEET OF BOUNDARY AND TOPOGRAPHIC SURVEY A-1.1

More information

Annual Report to the. International Joint Commission. from the. International Osoyoos Lake Board of Control for

Annual Report to the. International Joint Commission. from the. International Osoyoos Lake Board of Control for Annual Report to the International Joint Commission from the International Osoyoos Lake Board of Control for Calendar Year 2005 INTERNATIONAL JOINT COMMISSION International Osoyoos Lake Board of Control

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

Watershed Runoff Analysis

Watershed Runoff Analysis CREATING SOLUTIONS FOR A CHANGING WORLD Watershed Runoff Analysis April 18, 2017 John Melack, UCSB Ed Beighley & Dongmei Feng, Northeastern University Study Workflow Civil and Environmental Engineering

More information

Sands Motel 112 McArthur St, Grants, New Mexico 87020

Sands Motel 112 McArthur St, Grants, New Mexico 87020 Sands Motel 112 McArthur St, Grants, New Mexico 87020 6565 Americas Pkwy NE Suite 200, Albuquerque, NM 87110 verify the subject offering as suitable for the intended use. Neither exp Realty LLC, it s agents

More information

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission International Osoyoos Lake Board of Control 2015 Annual Report to the International Joint Commission Cover: Northern extent of Osoyoos Lake, where the Okanagan River enters the lake, 2015. View is to the

More information

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

80' MIN 100'-0 15'-0 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS 11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11

More information

Corktown Parks. Public Meeting. City of Toronto

Corktown Parks. Public Meeting. City of Toronto Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)

More information

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September 2015 Title: Officer: Chock Lane Traffic Calming scheme Monitoring Report Rob Grieve, Principal Officer, Highways and Traffic,

More information

Shrubs and alpine meadows represent the only vegetation cover.

Shrubs and alpine meadows represent the only vegetation cover. Saldur river General description The study area is the upper Saldur basin (Eastern Italian Alps), whose elevations range from 2150 m a.s.l. (location of the main monitoring site, LSG) and 3738 m a.s.l.

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR 7. WINDSOCK 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7...... CNT BOX NOEL. CNT BOX. CNT BOX NOEL. CNT BOX NOEL..7... 7. 7.......7. 7. 7..7. TOP. TOP. TOP TOP.7 7.. TOP TOP.7. TOP TOP..7 TOP. TOP.7. PVC

More information

FOR LEASE 5431 H Street Sacramento, CA

FOR LEASE 5431 H Street Sacramento, CA PROPERTY PROFILE Lot Size Building Size 0.128 acres ±1,089 SF AP 004-0341-009 Land Use C-2 General Commercial Zone MARKET HIGHLIGHTS Great access to both Highway 50 & Interstate 80 Within close proximity

More information

MEASUREMENT OF ACCELERATION Pre-Lab. Name: Roster#

MEASUREMENT OF ACCELERATION Pre-Lab. Name: Roster# MEASUREMENT OF ACCELERATION Pre-Lab Name: Roster# Date: 1. A tree is 15.0 m high and cast a shadow along the ground that is 30.0 m long. Draw a triangle that represents this situation. What angle does

More information

S-4893 June 12, Amendments to NYMEX Chapter 9A, Appendix A to Eliminate Secondary Aggregation for Certain Contracts

S-4893 June 12, Amendments to NYMEX Chapter 9A, Appendix A to Eliminate Secondary Aggregation for Certain Contracts S-4893 June 12, 2009 Amendments to Chapter 9A, Appendix A to Eliminate Secondary Aggregation for Certain Contracts Effective for trade date June 15, 2009, the New York Mercantile Exchange, Inc. ( or Exchange

More information

Specification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE

Specification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE Specification Details: DLA Land and Maritime - VQ Date: 2/4/2015 Specification: MIL-DTL-28803 Title: Display, Optoelectronic, Readouts, Backlighted Segmented Federal Supply Class (FSC): 5980 Conventional:

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

Hydrological Analysis for Simanggo-2 HEPP

Hydrological Analysis for Simanggo-2 HEPP Part 15 Hydrological Analysis for Simanggo-2 HEPP PART 15 HYDROLOGICAL ANALYSIS FOR SIMANGGO-2 HEPP 15.1 METEOROLOGY AND HYDROLOGY Meteorological Records and Hydrological Records are collected from Meteorological

More information

Parks & Recreation Areas Program

Parks & Recreation Areas Program PARKS & RECREATION Parks & Recreation Areas Program As part of its mission to conserve and protect natural resources, the Upper Big Blue Natural Resources District (NRD) has been involved in several large-scale

More information

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission International Osoyoos Lake Board of Control 2010 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2010... 2 Drought Criteria...

More information

25 th Avenue Grade Separation. December 13, 2017

25 th Avenue Grade Separation. December 13, 2017 25 th Avenue Grade Separation December 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25

More information

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission International Osoyoos Lake Board of Control 2013 Annual Report to the International Joint Commission TABLE OF CONTENTS ACTIVITIES OF THE BOARD... 1 HYDROLOGIC CONDITIONS IN 2013... 2 Drought Criteria...

More information

Impacts of climate change on the hydrological processes in the Mekong River. Hui Lu & Wei Wang Tsinghua University

Impacts of climate change on the hydrological processes in the Mekong River. Hui Lu & Wei Wang Tsinghua University 1 Impacts of climate change on the hydrological processes in the Mekong River Hui Lu & Wei Wang Tsinghua University Outline Backgrounds Method and data Model calibration Temperature and rainfall trends

More information

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 It Starts in Parks Fun Facts How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 Fun Facts How many people visit Central Winds Park Annually? a. Over 100,000 b. 20,000 c. 10,000 d. 1,000 It Starts

More information

HYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA

HYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA PROC. S.D. ACAD. SCI., VOL. 77 (1998) 59 HYDROLOGY OF GLACIAL LAKES, FORT SISSETON AREA Perry H. Rahn Department of Geology & Geological Engineering South Dakota School of Mines and Technology Rapid City,

More information

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila. Colombia (South America) Water use and drainage in Colombia Location: Case Study: The Stormwater Challenge in Barranquilla Source: Wikipedia The University of Alabama February 25, 2008 Population: 45 million

More information

Lake Chelan Operations

Lake Chelan Operations Lake Chelan Operations IPMA Executive Seminar September 17, 2013 Presented by: Janet Jaspers Chelan County PUD Lake Chelan Hydroelectric Project Today s Discussion Chelan PUD Overview Interesting Facts

More information

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave. Town Hall Meeting July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave. Stay connected! 5046 S. State St. Chicago, IL. (773) 373-9273 ward03@cityofchicago.org www.dowellforthirdward.com Facebook.com/aldermanpat.dowell

More information

FORUM PARTNERSHIP 5611 E MORGAN AVE 429, Other Retail Structures MIXED USE FAIR 027 1/10

FORUM PARTNERSHIP 5611 E MORGAN AVE 429, Other Retail Structures MIXED USE FAIR 027 1/10 8-6--7-7.-7 FORM TNERSHIP 56 E MORGAN AVE 49, Retail Structures MIXED SE FAIR 7 / Parcel Number 8-6--7-7.-7 Local Parcel Number 9-7-7-7- Tax ID: Routing Number KO- Property Class 49 Retail Structures :

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR

UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR UNITED KINGDOM AERONAUTICAL INFORMATION CIRCULAR AIC 127/2006 (Pink 110) 7 December NATS Limited Aeronautical Information Service Control Tower Building, London Heathrow Airport Hounslow, Middlesex TW6

More information

PRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP

PRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP PREPARED FOR: NW 16TH AVE. PRELIMINARY PLANS INDEX OF DRAWINGS COVER SHEET CITY OF GAINESVILLE PUBLIC WORKS DEPARTMENT END PROJECT NW 16TH AVE NW 8TH AVE. UNIVERSITY OF FLORIDA 0 2000' 4000' NW 13TH ST.

More information

Origin and Extraction of Andean Salars

Origin and Extraction of Andean Salars Think Simulation! Adventures in Electrolytes Origin and Extraction of Andean Salars Lithium and Boron Recovery from Salt brines and Salt flats in Chile and Bolivia http://tunari.tripod.com/landscapes.html

More information

CAUTION - NOTICE TO CONTRACTOR

CAUTION - NOTICE TO CONTRACTOR WINDSOCK 7. 7.7 CPP TOP.. 7.7 INV CPP EL..7...7.7.... 7....... CNT BOX NOEL CNT BOX.. CNT BOX NOEL CNT BOX NOEL.7 7........ 7...7.. 7..7. 7..7 TOP. TOP TOP TOP. TOP. 7.7.. TOP. TOP.7 TOP. TOP.7 TOP. PVC

More information

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016 CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment

More information

FACTUAL REPORT AVIATION

FACTUAL REPORT AVIATION Aircraft Registration Number: N38DM Occurrence Date: Occurrence Type: 4/6/ Accident Most Critical Injury: Serious Investigated By: NTSB Location/Time Nearest /Place IMMOKALEE Zip Code Local Time Time Zone

More information

Note that the steepest 8 direction pour point model slope in direction 64 is: 10.0

Note that the steepest 8 direction pour point model slope in direction 64 is: 10.0 GIS in Water Resources Exercise #3 Solution Part 1. 1.1 Hand Calculations (i) The standard ESRI surface slope function Grid size 10 m Diagonal distance= 14.142 m 47.5 48 47.7 50.6 48.3 dz/dx= -0.125 45.1

More information

KNIGHTS LANDING RIVER RANCH WOODLAND, CA - YOLO COUNTY

KNIGHTS LANDING RIVER RANCH WOODLAND, CA - YOLO COUNTY PROPERTY HIGHLIGHTS ±77.2 Gross Acres Contains Excellent Sandy and Silty Clay Loam Soils Established Surface Water Rights in Sacramento River Developed River Diversion and Distribution System Three Phase

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)

More information

No 30 x 48 space is provided for a wheelchair under the picnic table.

No 30 x 48 space is provided for a wheelchair under the picnic table. ITEM: LLOYD PARK PICNIC TABLE ADA GUIDELINE: 305, 902.2 No 30 x 48 space is provided for a wheelchair under the picnic table. Remove one of the picnic table arms. Photo of Picnic Table on the bluff PARK:

More information

BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE

BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE The Orlando North Airpark Enterprise Zone is a rare opportunity for any company desiring to relocate or open a new operation in the State of Florida.

More information

FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR

FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR ANR 31 REFERS FIJI ISLANDS AERONAUTICAL INFORMATION CIRCULAR Civil Aviation Authority of Fiji Private Bag (NAP0354), Nadi Airport Fiji Tel: (679) 6721 555; Fax (679) 6721 500 Website: www.caafi.org.fj

More information

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover, THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

TYPICAL SECTION OF IMPROVEMENT

TYPICAL SECTION OF IMPROVEMENT TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE 8 8 OR END TREATMENT IS REQUIRED FOR BRIDGE APOACH, ADD.5 TO

More information

FACTUAL REPORT AVIATION

FACTUAL REPORT AVIATION Aircraft Registration Number: NJA Occurrence Date: Occurrence Type: //2 Accident Most Critical Injury: Serious Investigated By: NTSB Location/Time Nearest /Place LINDRITH Zip Code Local Time Time Zone

More information

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting Wednesday, May 31, 2017 6:30 to 8 P.M. Frank Allis Elementary School 4201 Buckeye Road Madison,

More information

TO LET offices. 20,735 to 64,639 sq ft. available now WATERFRONT HOUSE, TECHNOLOGY DRIVE, BEESTON BUSINESS PARK, NG9 1LA.

TO LET offices. 20,735 to 64,639 sq ft. available now WATERFRONT HOUSE, TECHNOLOGY DRIVE, BEESTON BUSINESS PARK, NG9 1LA. TO LET offices WATERFNT HOUSE, TECHNOLOGY RIVE, BEESTON BUSINESS PARK, NG9 1LA available now 20,735 to 64,639 sq ft High Quality Refurbished Grade A offices Secure site with manned gatehouse Up to 323

More information

Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002

Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002 Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002 Instructor: Check Out Date: Phase 1: Pre-Flight Name: Certificate Number: Certificate Type: Ratings: Total Flight Time: Last 90 Days: Club check

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

Taste and Odor Relationships in North Texas Reservoirs. Jennifer Owens Tarrant Regional Water District

Taste and Odor Relationships in North Texas Reservoirs. Jennifer Owens Tarrant Regional Water District Taste and Odor Relationships in North Texas Reservoirs Jennifer Owens Tarrant Regional Water District Tarrant Regional Water District Reservoir System Reservoir Facts Lake Arlington Benbrook Lake Cedar

More information

YEARS IP hrs. Outdoor Converter. The perfect partner to team up with any 12V LED solution. Full power range from 15W to 200W

YEARS IP hrs. Outdoor Converter. The perfect partner to team up with any 12V LED solution. Full power range from 15W to 200W OCV5 Slim 12V Outdoor Converter 5 YEARS IP67 50.000 hrs The perfect partner to team up with any 12V LED solution Full power range from 15W to 200W SLIM profile (40x23mm) to fit in very thin applications

More information

Glaciology. Water. Glacier. Moraine. Types of glacier-dammed lakes. Mechanics of jökulhlaup

Glaciology. Water. Glacier. Moraine. Types of glacier-dammed lakes. Mechanics of jökulhlaup A Jökulhlaup Jökulhlaup. Catastrophic events where large amounts of water are suddenly discharged. Jökulhlaup s are a sudden and rapid draining of a glacier dammed lake or of water impounded within a glacier.

More information

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB

Ann Arbor Municipal Airport Ann Arbor, MI Date of Latest ALP ACIP Airport Code - A Airport Identifier - ARB MICHIGAN AIRPORT DEVELOPMENT PROGRAM AIP CAPITAL IMPROVEMENT PLAN 20102019 FEDERAL/STATE/LOCAL Ann Arbor, MI Date of Latest ALP 2008 ACIP Airport Code A Airport Identifier ARB Prepared by: MDOTAERO Sponsor:

More information

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207) BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 From: Barney

More information

ballfields 5-8 red hook park

ballfields 5-8 red hook park ballfields 5- red hook park Bordered by Lorraine, Hicks, Henry, and Bay Streets In the Borough of Brooklyn Public Design Commission- Concept Review Submission May, 201 TRC Engineers, Inc. and Parks Capital

More information

Community Advisory Panel Meeting #

Community Advisory Panel Meeting # Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian

More information

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3" FINISHED GRADE 1'-3" 3" VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT

COATING AND STRUCTURAL CONCRETE COATING (ANTI-GRAFFITI) 1'-3 FINISHED GRADE 1'-3 3 VENEER ALLOWANCE LEDGER W/ MECHANICAL ANCHOR BOLT R "W" PAY LIMITS OF ITEM 601 PAY LIMITS OF ITEM 601 STRUCTURAL CONCRETE STRUCTURAL CONCRETE 1'3" PCBC END SEGMENT B C 1'3" COATING AND STRUCTURAL CONCRETE COATING (ANTIGRAFFITI) 1'3" CURB FINISHED GRADE

More information

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan.

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Bellevue South Park Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Community Board 6 Review January 2, 2018 Christopher M. Crowley, RLA NYC Parks Total Budget: Project

More information

Terms, conditions and prices

Terms, conditions and prices Terms, conditions and prices 2017 PORT OF ALTA valid from January 1th - Expires Des 31th 2017 page 1 CRUISE QUAYS IN ALTA QUAY LENGTH DRAFT BEAM HEIGHT Terminalquay 169 m 8,4 m Unlimited Marinequay 63

More information

ROYAL VIEW DEVELOPMENT

ROYAL VIEW DEVELOPMENT GRETNA BUILDING FOR LEASE ROYAL VIEW DEVELOPMENT PROPOSED RENDERINGS AVAILABLE FOR PRE-LEASE + + LEASE RATE AND AVAILABILITY MINIMUM SPACE: MAXIMUM SPACE: LEASE RATE: 1,278 SF 16,500 SF $16.50 - $22.00

More information

Capital Prioritization

Capital Prioritization 14 Capital Prioritization 279 279 280 Park & Recreation CAPITAL PRIORITIZATION As described in Chapter 8, the recommendations presented in Chapter 9 are prioritized to provide a guide for future capital

More information

09a Indexes Page 187 Tuesday, August 22, :44 PM Plates

09a Indexes Page 187 Tuesday, August 22, :44 PM Plates Plates Plate 1 1a. View of the Western Cemetery with the tombs of the Senedjemib Complex in the present volume highlighted, looking northwest from the top of the pyramid of Khufu. 16 November 1993. Peter

More information

Heathrow Airport Property Rents 2016/17 Consultation Document

Heathrow Airport Property Rents 2016/17 Consultation Document Heathrow Airport Property Rents 2016/17 Consultation Document Date: 17 th June 2016 Prepared by: Heathrow Airport Limited Status: Final Page 1 of 13 Contents 1.0 Introduction 2.0 Heathrow Property Rents

More information

FIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C

FIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C FIGURES Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City CSI Job No. 9680.33 C INFERRED EXTENT OF ARSENIC IMPACTED SOIL C.A. No. 262 Additional Soil Assessment Activities 607, 609,

More information

566± acres total - WILL DIVIDE Volusia County, FL

566± acres total - WILL DIVIDE Volusia County, FL L IC E N S E D HUNTING P RESERVE ts Q u a i l ahi ul anb l e are av r info! fo CALL TODAY LAKEFRONT PROPERTY PERFECTION This ranch lies on a natural sand ridge in North Volusia County, Florida and has

More information

Mardi Gras 2011 King & Queen. Eusebio Arballo Sylvia Preciado

Mardi Gras 2011 King & Queen. Eusebio Arballo Sylvia Preciado Mardi Gras 2011 King & Queen Eusebio Arballo Sylvia Preciado Sylvia manages the Imperial Valley Red Cross, which is located on Broadway Avenue in El Centro. She is well known in the community for her tireless

More information

Unincorporated East Los Angeles - Southeast STUDY AREA PROFILE

Unincorporated East Los Angeles - Southeast STUDY AREA PROFILE Unincorporated East Los Angeles - Southeast STUDY AREA PROFILE STUDY AREA ID #30 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES

More information

2014 Parks and Trails General Obligation Bond: $42 million. $3 million County Trails $1 million City Playgrounds $38 million FMRP

2014 Parks and Trails General Obligation Bond: $42 million. $3 million County Trails $1 million City Playgrounds $38 million FMRP 2014 Parks and Trails General Obligation Bond: $42 million $3 million County Trails $1 million City Playgrounds $38 million FMRP FMRP Location and Connections Major Timelines Completion of phase I the

More information