ballfields 5-8 red hook park

Size: px
Start display at page:

Download "ballfields 5-8 red hook park"

Transcription

1 ballfields 5- red hook park Bordered by Lorraine, Hicks, Henry, and Bay Streets In the Borough of Brooklyn Public Design Commission- Concept Review Submission May, 201 TRC Engineers, Inc. and Parks Capital Design

2 GOALS Meet the requirements of the Consent Order between YC DPR and USEPA Provide sports fields and facilities that meet the community needs Permanent and low maintenance design Use sustainable remedial and stormwater practices and increase resiliency TOTAL BUDGET: PROJECT SIZE: $10.9M (Mayoral Funding) Council District 3, CM Carlos Menchaca 4.7 Acres BALLFIELDS 5- RED HOOK PARK Goals SHEET 2 / 32

3 BROOKLY CREAMER STREET CITY RED HOOK BALLFIELDS 2 MI HICKS STREET BAY STREET LORRAIE STREET 5- RED HOOK BALLFIELDS HERY STREET RED HOOK SWIMMIG POOL EIGHBORHOOD TS SITE TS BALLFIELDS 5- RED HOOK PARK Project Location SHEET 3 / 32

4 LAD USE CATEGORIES 1 AD 2 FAMILY RESIDETIAL MULTI-FAMILY RESIDETIAL MIXED USE OPE SPACE AD OUTDOOR RECREATIO COMMERCIAL ISTITUTIOAL IDUSTRIAL PARKIG TRASPORTATIO / UTILITIES VACAT LOTS SITE BALLFIELDS 5- RED HOOK PARK Surrounding Land Use 1 =400 SHEET 4 /

5 FLOOD HAZARD ZOES ZOE A - 1% annual-chance flood event. o Base Flood Elevation (BFE) exists. ZOE AE - 1% annual-chance flood event. BFE exists. ZOE AO - 1% annual-chance shallow flooding. VE - Areas along coasts subject to inundation by the 1% annual-chance flood event with additional hazards associated with storminduced velocity wave action. BFE exists. SITE FLOODWAY - watercourse reserved to discharge base flood. ZOE X - Moderate risk areas within the 0.2% annual-chance floodplain. LIMIT OF MODERATE WAVE ACTIO Base Flood Elevation (BFE) = BALLFIELDS 5- RED HOOK PARK Flood Risk 1 = SHEET 5 / 32

6 HICKS ST. (7C) (7C) (7C) (7C) (7C) (7C) LEGED(SYMBOLS OT TO SCALE): BAY ST. (7C) (7C) (7C) (7C) (7C) (7C) BAY STREET PLATIG STRIP FIELD # FIELD #5 EXTET OF EXISTIG ATURAL TURF HERY STREET PLATIG STRIP FIELD #7 FIELD # RPZ LORRAIE STREET PLATIG STRIP (7C) (7C) (7C) (7C) (7C) (7C) LORRAIE ST. TREE TO PROTECT EMPTY OR TREE TO BE REMOVED PAVED EXPOSED SOIL TREE CAOPY TREE SURVEY IDETIFIER (7C) (7C) (7C) (7C) (7C) (7C) SCHEMATIC DESIG: EXISTIG CODITIOS WITH PHOTOS SCALE: 1"=20'-0" City of ew York Parks & Recreation Bill de Blasio, Mayor HERY ST. BALLFIELDS 5- RED HOOK PARK Existing Conditions SHEET / 32 TS

7 1 PAORAMIC VIEW, FACIG ORTH atural turf outfields, clay infields, perimeter trees HICKS STREET BAY STREET LORRAIE STREET 1 HERY STREET BALLFIELDS 5- RED HOOK PARK Existing Conditions PHOTO KEY PLA SHEET 7 / 32

8 2 HERY ST. ETRACE 3 LORRAIE ST. ETRACE WITH RPZ HICKS STREET BAY STREET LORRAIE STREET 3 2 HERY STREET BALLFIELDS 5- RED HOOK PARK Entrances PHOTO KEY PLA SHEET / 32

9 4 BLEACHER OUTSIDE PERIMETER FECE, BAY ST. 5 DUGOUT WITH SPORTS BECH AD DRIKIG FOUTAI LORRAIE STREET HICKS STREET 4 BAY STREET HERY STREET BALLFIELDS 5- RED HOOK PARK Site Furnishings SHEET 9 / 32 5 PHOTO KEY PLA

10 PARK SIDEWALK, BAY ST. (left) 7 PARK SIDEWALK, BAY ST. (above) HICKS STREET BAY STREET LORRAIE STREET HERY STREET 7 BALLFIELDS 5- RED HOOK PARK Bay Street Sidewalk PHOTO KEY PLA SHEET 10 / 32

11 PARK SIDEWALK, LORRAIE ST. (left) 9 PARK SIDEWALK, LORRAIE ST. (right) LORRAIE STREET HICKS STREET BAY STREET 9 HERY STREET BALLFIELDS 5- RED HOOK PARK Lorraine Street Sidewalk PHOTO KEY PLA SHEET 11 / 32

12 10 PARK SIDEWALK, HICKS ST. (left) 11 PARK SIDEWALK, HERY ST. (right) HICKS STREET LORRAIE STREET 10 BAY STREET 11 HERY STREET BALLFIELDS 5- RED HOOK PARK Perimeter Sidewalks PHOTO KEY PLA SHEET / 32

13 HICKS STREET + + CREAMER STREET LEGED CAOPY STRUCTURAL ROOT ZOE CRITICAL ROOT ZOE CODITIO-BASED TREE REMOVAL DESIG-BASED TREE REMOVAL BAY STREET LORRAIE STREET HERY STREET BALLFIELDS 5- RED HOOK PARK Tree Inventory SHEET 13 / 32 TS

14 industrial/ manufactoring HICKS STREET CREAMER STREET vacant land residential multi-family red hook west houses - nycha LEGED PROJECT AREA TW 11.1 BW 11.1 TW 9.0 BW. high volume VEHICULAR traffic corridor bus stop LIGHT VEHICULAR TRAFFIC red hook east houses - nycha surface Drainage flow red hook park FIELD #3 BAY STREET * * STREET LORRAIE * park entry pedestrian circulation bus stop b57, b1 red hook east houses - nycha TW 9.07 BW.74 TW 9.0 BW.75 red hook park FIELD #9 HERY STREET sol goldman recreation center & pool red hook park BALLFIELDS 5- RED HOOK PARK Site Analysis bush clinton playground red hook park SHEET 14 / 32 TS

15 -0 WIDE BIOSWALE VEHICULAR SITE ACCESS HICKS ST. 7-0 wide EW PLATIG STRIP LEGED EXISTIG TREE -0 WIDE BIOSWALE + PROPOSED TREE SITE ACCESS FIELD # FIELD #7 SITE ACCESS +/- 1-0 wide PLATIG STRIP SITE access BAY ST. SYTHETIC TURF FIELD LORRAIE ST. +/ wide PLATIG STRIP SITE access SITE ACCESS FIELD #5 FIELD # SITE ACCESS +/- 7 - wide ex. planting strip site access HERY ST. site access -0 WIDE BIOSWALE BALLFIELDS 5- RED HOOK PARK Schematic Design Plan SHEET 15 / 32 TS

16 EQUIPMET STORAGE BOX AREA LEGED EX. CURB TO REMAI SITE ACCESS PROPOSED TREE, TYP. +/-.0 SECURITY LIGHTIG, TYP. (7C) (7C) (7C) SYTHETIC TURF, TYP. 3 TIER ADA 11.0 BLEACHERS COC. STAIRS, AD field #5 RAMP W/ HADRAIL ADA ACCESSIBLE DUGOUT, TYP. REMOVABLE LITTLE LEAGUE PITCHERS MOUD FOUL LIE 10', TYP. (7C) (7C) (7C) bay st. BASEBALL BACKSTOP COC. RAMP W/ HADRAIL HERY ST. BIOSWALE HICKS ST. KEY PLA BAY ST. LORRAIE ST. HERY ST. 1 = BALLFIELDS 5- RED HOOK PARK Schematic Design - Enlargement at Bay and Henry Street SHEET 1 / 32

17 EQUIPMET STORAGE BOX AREA LEGED BASEBALL BACKSTOP COC. RAMP W/ HADRAIL HICKS ST. VEHICULAR SITE ACCESS PROPOSED TREE, TYP. (7C) (7C) (7C) ADA ACCESSIBLE DUGOUT COC. STAIRS, AD RAMP W/ HADRAIL SITE ACCESS EX. CURB TO REMAI SECURITY LIGHTIG, TYP. +/ bay st. (7C) (7C) (7C) 3 TIER ADA BLEACHERS COC. STAIRS W/ STL. HADRAILS MISTIG STATIO REMOVABLE LITTLE LEAGUE PITCHERS MOUD field # SYTHETIC TURF, TYP. BIOSWALE BAY ST. HICKS ST. KEY PLA LORRAIE ST. 1 = HERY ST. BALLFIELDS 5- RED HOOK PARK Schematic Design - Enlargement at Bay and Hicks Street SHEET 17 / 32

18 EQUIPMET STORAGE BOX AREA LEGED HICKS ST. EX. COC. CURB TO REMAI, TYP. COC. RAMP W/ HADRAIL SECURITY LIGHTIG LORRAIE ST. (7C) (7C) (7C) PROPOSED TREE, TYP. ADA ACCESSIBLE DUGOUT BASEBALL BACKSTOP REMOVABLE LITTLE LEAGUE PITCHERS MOUD field #7 SYTHETIC TURF, TYP. 3 TIER ADA BLEACHERS PORTABLE MOUD STORAGE SHED 11.0 RPZ AD WATER METER (7C) (7C) (7C) +/-.45 COC. STAIRS AD RAMP W/ HADRAIL SITE ACCESS PERMEABLE PAVERS AT 5'x10' TREE PIT W/ BODED AGGREGATE AT TREE TRUK, TYP. BIOSWALE BAY ST. HICKS ST. KEY PLA LORRAIE ST. HERY ST. 1 = BALLFIELDS 5- RED HOOK PARK Schematic Design - Enlargement at Hicks and Lorraine Street SHEET 1 / 32

19 EQUIPMET STORAGE BOX AREA LEGED SYTHETIC TURF, TYP. SECURITY LIGHTIG, TYP. (7C) (7C) (7C) +/ TIER ADA BLEACHERS, TYP. SITE ACCESS field # 11.0 COC. STAIRS W/ HADRAIL REMOVABLE LITTLE LEAGUE PITCHERS MOUD ADA ACCESSIBLE DUGOUT COC. RAMP W/ HADRAIL BASEBALL BACKSTOP (7C) (7C) (7C) HERY ST. LORRAIE ST. PROPOSED TREE, TYP. SITE ACCESS COC. RAMP W/ HADRAIL PERMEABLE PAVERS AT 5'x10' TREE PIT W/ BODED AGGREGATE AT TREE TRUK, TYP. BIOSWALE BAY ST. HICKS ST. KEY PLA LORRAIE ST. HERY ST. 1 = BALLFIELDS 5- RED HOOK PARK Schematic Design - Enlargement at Henry and Lorraine Street SHEET 19 / 32

20 EQUIPMET STORAGE BOX AREA EQUIPMET STORAGE BOX AREA EQUIPMET STORAGE BOX EQUIPMET STORAGE BOX AREA AREA HICKS ST. LEGED 2 - HT. STEEL FECE 4-0 HT. STEEL FECE BAY ST. LORRAIE ST. -0 HT. CLF -0 HT. CLF -0 HT. CLF HERY ST. BALLFIELDS 5- RED HOOK PARK Fencing Diagram SHEET 20 / 32 TS

21 HICKS ST. LEGED COTRACT BOUDARY LARGE DECIDUOUS SHADE Tree MEDIUM DECIDUOUS SHADE Tree Flowering Tree BAY ST. LORRAIE ST. EXISTIG Tree BIOSWALE GROUDCOVER WITHI Planting Area HERY ST. BALLFIELDS 5- RED HOOK PARK Planting Diagram SHEET 21 / 32 TS

22 KEY PLA A A LORRAIE ST. HERY ST. 3/1 = BALLFIELDS 5- RED HOOK PARK Site Section A-A Lorraine Street SHEET 22 / 32

23 KEY PLA LORRAIE ST. B B HERY ST. 3/1 = BALLFIELDS 5- RED HOOK PARK Site Section B-B Lorraine Street SHEET 23 / 32

24 BAY ST. LORRAIE ST. HICKS ST. SCHEMATIC DESIG: PROPOSED REMEDIAL PLA HERY ST. SCALE: 1"=20'-0" City of ew York Parks & Recreation Abel Bainnson Butz,Bill LLP de Blasio, Mayor TS BALLFIELDS 5- RED HOOK PARK Proposed Remedial Design Plan SHEET 24 / 32 Mitchell J. Silver, Commissioner Sheet 2 of 5

25 1. REMOVE SOIL BY HAD AD VACUUM I PLATIG STRIPS (0-"). 2. PLACE DEMARCATIO LAYER AD PLACE CLEA TOPSOIL. 3. PLACE MULCH AD VEGETATED GROUD COVER. 4. ISTALL 4' FECE WITH PICKETS. BALLFIELDS 5- RED HOOK PARK Proposed Remedial Design Photos - Planting Strip SHEET 25 / 32

26 VARIES" BIOSWALE CLEA TOPSOIL STEEL FECE WITH PICKETS DOT SIDEWALK EXISTIG TREE MULCH GROUD COVER CURB WALL ELEV. VARIES 9'± (TYP.) MULCH ROOTS DEMARCATIO LAYER UDISTURBED SOIL TS BALLFIELDS 5- RED HOOK PARK Proposed Remedial Design Details - Planting Strips Existing Trees SHEET 2 / 32 SCHEMATIC DESIG: REMEDIAL DETAILS - PLATIG STRIP SCALE: 1" = 10'

27 VARIES BIOSWALE BALLFIELD SPORTS FECE SYTHETIC TURF STEEL FECE CLEA TOPSOIL EXISTIG CURB GROUD COVER ELEV EXISTIG/EW SIDEWALK PAVEMET 3.5" - 4"Ø EW TREE ELEV. VARIES 9'± (TYP.) MULCH DEMARCATIO LAYER EW TREE UDISTURBED SOIL DEMARCATIO LAYER COC. FTG. AT 10' O.C. OPE-GRADED STOE BASE AD POSSIBLE STORMWATER CHAMBER TS BALLFIELDS 5- RED HOOK PARK Proposed Remedial Design Details - Planting Strips Proposed Trees SHEET 27 / 32

28 1. REMOVE A MAXIMUM OF -ICHES OF SOIL BY HAD / VACUUM I 5' X 10' TREE PITS. 2. REMOVE, REGRADE AD REPLACE EXISTIG SIDEWALK TO MEET -ICH HIGH EW CURB. ISTALL DEMARCATIO LAYER. 3. ISTALL PERMEABLE PAVERS. 4. TROWEL 2-ICH OF RESI BODED AGGREGATE. SCHEMATIC DESIG: REMEDIAL DETAILS AT LORRAIE STREET - TREE PIT PHOTOS SCALE: 1" = 10' BALLFIELDS 5- RED HOOK PARK Proposed Remedial Design Photos - Tree Pits Schematic Design: Remedial Details - Tree Pits and Planting SHEET 2 / 32

29 EXISTIG STREET TREE BODED AGGREGATE EW PERIMETER FECE CURB AROUD PLATIG STRIP RECOSTRUCTED SIDEWALK PERMEABLE PAVERS DRAIAGE AGGREGATE EXISTIG ROAD BED EW STEEL FACED CURB DEMARCATIO LAYER EXISTIG TREE PIT UDISTURBED SUBGRADE EXISTIG STEEL FACED CURB TS RAISE STREET CURB TO FULL HEIGHT AD REGRADE SIDEWALK SO THAT PERMEABLE PAVERS MAY BE ISTALLED ABOVE EXISTIG TREE ROOTS AD MEET FLUSH WITH THE EW COCRETE PAVEMET. BALLFIELDS 5- RED HOOK PARK Proposed Remedial Action for Lorraine St. Tree Pits SHEET 29 / 32

30 synthetic turf color: green W/ PAITED white lines little league pitchers mound color: orage CHAI LIK FECE, -0, -0, -0 ht. COLOR: BLACK dpr standard backless bench type c- black frame, rpl color: weathered wood STORAGE BOX MAGLI TRASH RECEPTACLE MODEL: MLWR00-32, COLOR: GUMETAL, LID COLORS: BLACK (TRASH), BLUE & GREE (RECYCLIG) Accessible STEEL Bleachers- 3 tiers, SEATS powdercoated, white BALLFIELDS 5- RED HOOK PARK Site Furnishings Ribbon Bike Rack, galvanized steel SHEET 30 / 32

31 ACCESSIBLE DRIKIG FOUTAI WITH BOTTLE FILLER, COLOR: BLACK MISTIG STATIO color: BLACK 2 - Ht. Steel Picket Fence B POLE w/ riverside fixture BODED AGGREGATE PERMEABLE PAVERS 4 ht. steel picket fence ground hydrant BALLFIELDS 5- RED HOOK PARK Site Furnishings SHEET 31 / 32

32 HERY ST. LORRAIE ST. BALLFIELDS 5- RED HOOK PARK Perspective View - Facing Field # SHEET 32 / 32

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan.

Bellevue South Park. Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Bellevue South Park Located between E 26th and E 28th at Mt. Carmel Place, in the Borough of Manhattan. Community Board 6 Review January 2, 2018 Christopher M. Crowley, RLA NYC Parks Total Budget: Project

More information

Community Board 12 Parks & Cultural Affairs Commitee Presentation March 7, 2017 MKW + Associates, Parks Capital Design

Community Board 12 Parks & Cultural Affairs Commitee Presentation March 7, 2017 MKW + Associates, Parks Capital Design HIGHBRIDGE PARK ACHOR PARKS PROGRAM: COCEPTUAL MASTER PLA Located along Amsterdam Avenue / Fort George Avenue from 155th Street to Dyckman Street, in the Borough of Manhattan Community Board 12 Parks &

More information

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with

More information

PROJECT: Gold House 819 Cerrito Street

PROJECT: Gold House 819 Cerrito Street PROJECT: Gold House 819 Cerrito Street PROJECT DESCRIPTIO THIS PROJECT PROPOSES THE COVERSIO OF A EXISTIG 2-CAR ITO A SIGLE CAR AD ADJACET ETRY TO THE HOME APPLICAT/ARCHITECT DEVI DUTTA-CHOUDHURY, AIA

More information

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features: Property Features: Free - Standing; Entitled 53,8 SF;,311 SF Office (3) Dock High Loading Rare, New Planned Wholesale Warehouse Corner Location (Live Oak Ave. & Washington Dr.) 1 Block South Of Valley

More information

Prairie Village Parks and Recreation Master Plan Individual Park Plans and Details

Prairie Village Parks and Recreation Master Plan Individual Park Plans and Details Prairie Village Parks and Recreation Master Plan Individual Park Plans and Details This master plan report section provides additional insight into the improvement recommendations that have been created

More information

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018 AGENDA MEMORANDUM Community Services Department CSAB Meeting Date: April 10, 2018 To: Community Services Advisory Board From: Dana A. Souza, Director Date: April 4, 2018 Legislative Quasi-Judicial SUBJECT:

More information

Corktown Parks. Public Meeting. City of Toronto

Corktown Parks. Public Meeting. City of Toronto Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)

More information

NEW MEADOWS PARK PROPOSED MASTER PLAN

NEW MEADOWS PARK PROPOSED MASTER PLAN NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle

More information

PICNIC AREA PLAY AREA. Wirth/ Victory Memorial Parkway Regional Trail. Zenith Ave N

PICNIC AREA PLAY AREA. Wirth/ Victory Memorial Parkway Regional Trail. Zenith Ave N Victory Memorial Park PICIC PLAY LRT STATIO TRAIL COECTIOS RECOIFUGRED ITERSETIO AT GOLDE VALLEY RD & THEODORE WIRTH PKWY 0 1,000 Broadway Theodore Wirth Parkway 29th Ave PICIC PLAY Wirth/ Victory Memorial

More information

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority. TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE

More information

Community Development Department Council Chambers, 7:30 PM, December 20, 2012

Community Development Department Council Chambers, 7:30 PM, December 20, 2012 STAFF REPORT 2012-56P: Alley Vacation Community Development Department Council Chambers, 7:30 PM, December 20, 2012 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician

More information

French Regional Park Creative Play Area

French Regional Park Creative Play Area French Regional Park Creative Play Area A TURF MAINTENANCE STRIP EXISTING BASSWOOD TREE PLAY AREA SIGN EXISTING MAPLE TREES B BIKE PARKING C SLIDE TREE TOWER SHADE UMBRELLA PICNIC TABLE SEATING K-5 NET

More information

M E S T I Z O C U R T I S P A R K

M E S T I Z O C U R T I S P A R K ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC

More information

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover, THE HUDSON 1'-8" 1'-8" 4'-0"4'-3 4'-0"4'-3 1/2" 1/2" Street Street trees trees in in tree tree grates grates along along Kingsbury Kingsbury Street Street - - 3" 3" caliper caliper shade shade trees trees

More information

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover Village of Milan, Mirabal Park /5/016 DEVELOPED LAND AREAS** Basin Basin HSG "B" HSG "C" HSG "D" Basin Basin Area Area

More information

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R)

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Action Park/projects Total 2,014 2,015 2,016 2,017 2,018 2,019 2020+ Athletic fields ac stop ep ace e t, o e u

More information

SOUTH PARK AT FRESHKILLS PARK ANCHOR PARKS PROGRAM COMMUNITY VISIONING. JCC of Staten Island February 1, 2017

SOUTH PARK AT FRESHKILLS PARK ANCHOR PARKS PROGRAM COMMUNITY VISIONING. JCC of Staten Island February 1, 2017 SOUTH PARK AT FRESHKILLS PARK ANCHOR PARKS PROGRAM COMMUNITY VISIONING JCC of Staten Island February 1, 2017 TONIGHT S AGENDA 1/ PRESENTATION: ANCHOR PARKS OVERVIEW WHAT WE HEARD IN NOVEMBER CONCEPTUAL

More information

7. Plan Implementation

7. Plan Implementation 7. Plan Implementation 7.1 Implementation Timeline This section includes a list of achievable park and recreation actions. In the Implementation Action Matrix that follows, the implementation actions have

More information

PARKS & BEACHES PROJECTS

PARKS & BEACHES PROJECTS #18 72ND STREET PARK, LIBRARY, #19 BLUEWAYS & AQUATIC CENTER $1.1 MILLION $60 MILLION New facility to include: Create Kayak Launches with All Wheels Skate Park Floating Docks and Seating at: Library/Media

More information

No 30 x 48 space is provided for a wheelchair under the picnic table.

No 30 x 48 space is provided for a wheelchair under the picnic table. ITEM: LLOYD PARK PICNIC TABLE ADA GUIDELINE: 305, 902.2 No 30 x 48 space is provided for a wheelchair under the picnic table. Remove one of the picnic table arms. Photo of Picnic Table on the bluff PARK:

More information

01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING

01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING Skateboard Park Picnic Area Reading Nest Story Tree and Fire Pit 5 River Access 6 Wetlands 7 Picnic Area YOU ARE HERE This park is open sunrise to sunset. 6 5 7 PARK ICON GREY CONCRETE SKATEABLE CAP WITH

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

River Parks Trail: Tulsa, Oklahoma

River Parks Trail: Tulsa, Oklahoma River Parks Trail: Tulsa, Oklahoma Purpose: The purpose of the River Parks Trail is to maintain, preserve, develop, and promote the Arkansas River for the economic and cultural benefit of the community.

More information

Initial Development Analysis, Maxinjauri Mziuri,Batumi Contextual Analysis & Feasibility Study January 2018

Initial Development Analysis, Maxinjauri Mziuri,Batumi Contextual Analysis & Feasibility Study January 2018 Maxinjauri Mziuri I Initial Development Analysis Architecture Masterplanning Design Initial Development Analysis, Maxinjauri Mziuri,Batumi Contextual Analysis & Feasibility Study January 2018 January 2018

More information

Permeable RECREATIONAL TRAILS

Permeable RECREATIONAL TRAILS SMART EARTH SOLUTIONS Permeable RECREATIONAL TRAILS GEOWEB GEOPAVE GEOTERRA Innovative Solutions for Designing & Building Trails. Trail Surface Stabilization The key to planning and building trails into

More information

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm Dover Park Master Plan Community Design Event Tuesday, May 22, 5 7 pm Agenda I. Introduction / Overview 20 minutes II. Small Group Design Activity 60 minutes III. Small Group Report Out IV. Conclusion

More information

4. Improvement Plan Elements

4. Improvement Plan Elements 4. Improvement Plan Elements Detailed description of all elements Leigh Creekside Park Improvement Plan Preliminary Conceptual Time Zone Layout Caveat: in the following plans and descriptions, specific

More information

Let'sPlaySF! SERGEANT JOHN MACAULAY PARK. Recreation and Park Commission Approval of Concept Design November 1, 2017

Let'sPlaySF! SERGEANT JOHN MACAULAY PARK. Recreation and Park Commission Approval of Concept Design November 1, 2017 Let'sPlaySF! SERGEANT JOHN MACAULAY PARK Recreation and Park Commission Approval of Concept Design November 1, 20 PROJECT LOCATION AND NEIGHBORHOOD CONTEXT CORNER OF LARKIN & MYRTLE O FARRELL STREET MYRTLE

More information

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 It Starts in Parks Fun Facts How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 Fun Facts How many people visit Central Winds Park Annually? a. Over 100,000 b. 20,000 c. 10,000 d. 1,000 It Starts

More information

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan.

WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan. WELCOME WELCOME TO THE SECOD CETRE I THE PARK PUBLIC OPE HOUSE WHY ARE YOU HERE? To provide feedback on the Area Redevelopment Plan. WHAT IS THE PROJECT? The Centre in the Park Area Redevelopment Plan

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Overview Map OVRP Concept Plan Update Project

Overview Map OVRP Concept Plan Update Project Leged Cocept Pla Boudary Park Study rea lterative Boudary Muicipal Boudary Wildlife Refuge TIOL CIT Multi-use Trail Hike/Bike Trail Hike Oly Trail ccessible Path KE L OT Other Trails Coceptual Trail Corridor

More information

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

ELLICOTT STATION- BATAVIA, NY

ELLICOTT STATION- BATAVIA, NY Property Overview: ew Development Project in the Heart of Downtown Batavia Part of a Live - Work - Play Mixed Use Campus Class A Office Space Ground Floor Space with 18 Ceilings Close to I-90, Major Arteries

More information

URBAN AND LANDSCAPE DESIGN - PRELIMINARY CONCEPT COBHAM DRIVE CYCLEWAY - MARCH 2017

URBAN AND LANDSCAPE DESIGN - PRELIMINARY CONCEPT COBHAM DRIVE CYCLEWAY - MARCH 2017 URBA AD LADSCAPE DESIG - PRELIMIARY COCEPT COBHAM DRIVE CYCLEWAY - MARCH 2017 LADSCAPE COTEXT WELLIGTO PRE 1855 AKAU TAGI - EVAS BAY GS Science Reference: C15244/24 Photograph by Lloyd Homer URBA & LADSCAPE

More information

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND SANDBOX 6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,

More information

35 Bee Tree Park Planning Zone 3

35 Bee Tree Park Planning Zone 3 35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone

More information

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014 Existing Conditions Site Plan CONGRESSIONAL CEMETERY SOUTHEAST BOULEVARD Planning Study Concept A (formerly A-1) Site Plan Concept A (formerly A-1) Concept A proposes an expansion of the Capitol Hill neighborhood

More information

ADA Compliance Projects Summary Sheet

ADA Compliance Projects Summary Sheet District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including:

More information

D R A F T. December 6, 2016

D R A F T. December 6, 2016 D R A F T December 6, 2016 Mr. Gregory C. Johnson, P.E. Office of the Administrator Mail Stop C-400 State Highway Administration P.O. Box 717 Baltimore MD 21203-0717 RE: MD 978 (Hall Road) Sidewalk Funding

More information

Capital Prioritization

Capital Prioritization 14 Capital Prioritization 279 279 280 Park & Recreation CAPITAL PRIORITIZATION As described in Chapter 8, the recommendations presented in Chapter 9 are prioritized to provide a guide for future capital

More information

10.3 TRAIL DESIGN STANDARDS

10.3 TRAIL DESIGN STANDARDS 10.3 TRAIL DESIGN STANDARDS BICYCLE AND PEDESTRIAN MASTER PLAN Introduction This chapter provides guidelines to both public and private entities for the future development of various types of trails. The

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

Bath Township Parks 2017 Year in Review

Bath Township Parks 2017 Year in Review Bath Township Parks 2017 Year in Review Photo by John Landis BATH TOWNSHIP PARKS Since 1968 2 CONTENTS Bath Township s Mission Statement..3 Park Director s Annual Report...3 Human Resources. 4 Community

More information

IBO. Fiscal Brief January Costs Climb for Replacing Parks Displaced by New Yankee Stadium. Now Also Available. IBO s Weblog

IBO. Fiscal Brief January Costs Climb for Replacing Parks Displaced by New Yankee Stadium. Now Also Available. IBO s Weblog IBO New York City Independent Budget Office Fiscal Brief January 2009 Costs Climb for Replacing Parks Displaced by New Yankee Stadium Now Also Available IBO s Weblog... at www.ibo.nyc.ny.us SUMMARY In

More information

FOR SALE Rare Mid-Town Location

FOR SALE Rare Mid-Town Location FOR SALE Rare Mid-Town Location 1590 Willamette Street, Eugene Oregon 1590 WILLAMETTE STREET 2 Rare Mid-Town Location Address 1590 Willamette Street Eugene, Oregon 97402 This Building is located on a high

More information

HEARST GARDENS BERKELEY, CA 94702

HEARST GARDENS BERKELEY, CA 94702 APPLICANT: RHOADES PLANNING GROUP 1611 TELEGRAPH AVE. SUITE 200 OAKLAND, CA 94612 [510] 545-4341 PROJECT: BERKELEY, CA 94702 ARCHITECT: DEVI DUTTA-CHOUDHURY, AIA DEVI DUTTA ARCHITECTURE INC. 1958A UNIVERSITY

More information

Assessing Your Trails, Keeping Them Safe and Enjoyable

Assessing Your Trails, Keeping Them Safe and Enjoyable Jon Wood, PLA, ASLA Associate Vice President Stewart Bert Lynn, PLA, ASLA, LEED AP Project Manager Mecklenburg County Asset and Facility Management Assessing Your Trails, Keeping Them Safe and Enjoyable

More information

Creative Recreational Systems, Inc Vol. 3 ESSENTIALS. Value Play Solutions

Creative Recreational Systems, Inc Vol. 3 ESSENTIALS. Value Play Solutions Vol. 3 TM ESSENTIALS Value Play Solutions Welcome to ESSENTIALS CONTENTS BUILT TO LAST! Best Value DURABLE & ROBUST LOW MAINTENANCE EASY & QUICK TO INSTALL LOW SURFACING COSTS LOW PURCHASE PRICE LOW PRICE

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. Date: 6/23/2016 Lucy V. Barnsley Elementary School Addition, Mandatory Referral MR2016027

More information

Application for Permit to Develop in a Floodplain Area

Application for Permit to Develop in a Floodplain Area Application for Permit to Develop in a Floodplain Area The undersigned hereby makes application for a permit to develop in a designated floodplain area. The work to be performed is described below and

More information

DECEMBER 19, 2017 HIGHWAY 158 CORRIDOR PARKS MASTER PLANS CITY OF ROANOKE RAPIDS PARKS AND RECREATION

DECEMBER 19, 2017 HIGHWAY 158 CORRIDOR PARKS MASTER PLANS CITY OF ROANOKE RAPIDS PARKS AND RECREATION DECEMBER 19, 2017 HIGHWAY 158 CORRIDOR PARKS MASTER PLANS CITY OF ROANOKE RAPIDS PARKS AND RECREATION MAYOR AND CITY COUNCIL Emery Doughtie, Mayor Suetta Scarbrough, District 1 Ernest Bobbit, District

More information

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016

MBTA WOLLASTON. Station Improvements Public Meeting. January 14, 2016 MBTA WOLLASTON Station Improvements Public Meeting January 14, 2016 Kleinfelder, Inc. Architectural Engineers, Inc. Code Red Consultants, LLC Keville Enterprises, Inc. Vertical Transportation Excellence

More information

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018 BRYAN REGIONAL PARK Presented by: Burditt Consultants November 13, 2018 AGENDA 1. Project Purpose & Mission 2. Project Vision & Goals 3. Stakeholder Feedback 4. Program Overview 5. Phase A Plan Overview

More information

Physical Activity Resource Assessment (PARA) Form Protocol and Operational Definitions

Physical Activity Resource Assessment (PARA) Form Protocol and Operational Definitions Physical Activity Resource Assessment (PARA) Form Protocol and Operational Definitions Protocol General Directions At an indoor facility, stop at the reception area and introduce yourself to desk staff

More information

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK LUCY LANEY COMMUNITY SCHOOL N 33RD AVE N 33RD AVE SINGLE-FAMILY RESIDENTIAL MULTI-USE DIAMOND

More information

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018 Former Middle School Site Green Space & Brecksville Road Streetscape March 27, 2018 Brecksville Streetscape & Downtown Greenspace Project Schedule City of Indepenence 2017 2018 Meeting Schedule Tasks/Deliverables

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

0.86 AC of Freeway Visible Retail Land Available For Ground Lease or BTS

0.86 AC of Freeway Visible Retail Land Available For Ground Lease or BTS .86 AC of Freeway Visible Retail Land Available For round Lease or BTS Elk Park Village Pad Information Drive-Thru Pad SIZE ZOI.86 AC (±37,462 SF) C - eneral Commercial AP 125-3-33 ADDRESS 9679 E. Stockton

More information

Area Surrounding Maplewood Manor

Area Surrounding Maplewood Manor BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,

More information

A UNIQUE PRE-LETTING OPPORTUNITY

A UNIQUE PRE-LETTING OPPORTUNITY THE GENERATOR BUILDING BRISTOL A UNIQUE PRE-LETTING OPPORTUNITY TO BE COMPREHENSIVELY RE-MODELLED TO PROVIDE 30,611 SQ FT OF OUTSTANDING, CONTEMPORARY OFFICE SPACE A uique opportuity Uique pre-lettig

More information

esigning Camp and Picnic Units

esigning Camp and Picnic Units Chapter D esigning Camp and Picnic Units Camp units are designed for overnight use and may include a parking pad. Picnic units generally are for day use only. Equestrian camp and picnic units do not have

More information

BUILDING / RESTROOMS WALKING LOOP SIGNALIZED AT- GRADE CROSSING

BUILDING / RESTROOMS WALKING LOOP SIGNALIZED AT- GRADE CROSSING A WADIG POOL SPLASH PAD BUILDIG / RESTROOMS ADULT FITESS MULTI-USE FIELD MULTI-USE DIAMOD WALKIG LOOP SIGALIZED AT- GRADE CROSSIG AMPHITHEATER/ SEATIG FLATTEED SITE - AT GRADE CROSSIG (REMOVAL OF EXISTIG

More information

SAN FRANCISCO PARK EVALUATION PROGRAM EVALUATION FORM

SAN FRANCISCO PARK EVALUATION PROGRAM EVALUATION FORM SAN FRANCISCO PARK EVALUATION PROGRAM EVALUATION FORM Generic evaluation form August 3, 2016 List of Features Athletic Fields Buildings & General Amenities Children s Play Areas Dog Play Areas Greenspace

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

WEST SIDE RENDERING WEST SIDE RENDERING

WEST SIDE RENDERING WEST SIDE RENDERING WEST SIDE REDERIG WEST SIDE REDERIG.67 /8/206 :22:27 PM TM FORM LIER CIP COCRETE - WOOD PLAK TEXTURE 2 CIP COCRETE - SMOOTH TEXTURE EXPOSED COE TIES 3 GLASS FIBER REIFORCED COCRETE PAEL - TYPE 4 GLASS

More information

2014 SPLOST Final Draft County-wide Parks System Rehabilitation

2014 SPLOST Final Draft County-wide Parks System Rehabilitation Page 1 of 5 ADA Improvements (County Wide) Accessibility projects related to trails/walkways, door entrances, pool access, curb cuts, ramps, etc. Additionally, ADA Audit of facilities to identify and prioritize

More information

3. Existing Parks and Open Space

3. Existing Parks and Open Space 3. 3.1 Introduction To assist communities in parks planning, the National Recreation and Parks Association (NRPA) has developed a Parks, Open Space, and Pathways Classification Table. Originally developed

More information

T WIN CREEK & G ERMANT O WN METROPARKS

T WIN CREEK & G ERMANT O WN METROPARKS T WI CREEK & G ERMAT O W METROARKS RI MA RY & SECO DA RY H UB S R E L IM I ARY S IT E L A A. Outdoor Education & Recreation Center ark Gateway (secondar y) arking Multi-urpose Trails Creek Access / Fossils

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

General Fund. Parks, Recreation, and Community Services. Fiscal Year 2017

General Fund. Parks, Recreation, and Community Services. Fiscal Year 2017 Parks, Recreation, and Community Services Mission: The mission of the City of Rio Rancho s Department of Parks, Recreation, & Community Services is to create and maintain spaces and activities that grow

More information

SRF Project No

SRF Project No August 2007 Prepared for: The City of Moorhead, Minnesota Submitted by SRF Project No. 5766 2 Table of Contents Chapter 1 Background Information... 4 Chapter 2 Inventory of Conditions at Existing Parks...

More information

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions

More information

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB LOCATION PLAN RENDERING NTS 00 Atlantic Avenue Atlantic City, NJ 0840 07/4/07 CAFRA SUBMISSION COVER SHEET - RENDERING, LOCATION PLANS DRAWING INDEX & PROJECT TEAM 45 West 57th Street New York, NY 009

More information

Prepared for: Town of Plattsburgh 151 Banker Road Plattsburgh, NY

Prepared for: Town of Plattsburgh 151 Banker Road Plattsburgh, NY TOWN OF PLATTSBURGH RECREATION MASTER PLAN Prepared by: Chazen Engineering, Land Surveying & Landscape Architects Co., P.C. Prepared for: Town of Plattsburgh 151 Banker Road Plattsburgh, NY 12901 7307

More information

SAN FRANCISCO PARK EVALUATION PROGRAM PES15 EVALUATION FORM

SAN FRANCISCO PARK EVALUATION PROGRAM PES15 EVALUATION FORM SAN FRANCISCO PARK EVALUATION PROGRAM PES15 EVALUATION FORM FY2015 Generic Park Evaluation Form ----- June 26, 2014 List of Features Athletic Fields Buildings & General Amenities Children s Play Areas

More information

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm Community Input Meeting Fairgrounds Master Planning Update January 7, 2016, 7 pm Fiesta Hall Santa Clara County Fairgrounds 355 Tully Road, San Jose, CA Tonight s Agenda 1) Board of Supervisors Direction

More information

Mayor s State of the Town Message Presented 01/17/2013

Mayor s State of the Town Message Presented 01/17/2013 Mayor s State of the Town Message Presented 01/17/2013 Plans for the Next Four Years Governance Issues Create a "Vision Plan" for the town to guide the Municipal Government for the next four years Create

More information

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520

More information

The Master Plan, Walkability, and Trails in the City of Solon. April 23, 2018

The Master Plan, Walkability, and Trails in the City of Solon. April 23, 2018 The Master Plan, Walkability, and Trails in the City of Solon April 23, 2018 Tonight s topics 1. Existing trail options in the City of Solon 2. Potential trail options 3. How trails and walkability converge

More information

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK N ILIO NA VE N JAM ES AV E PLAYGROUND PAR K PRO PER TY B OUN DAR Y

More information

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL EXHIBIT C 7 6 4 2 7 5 8 1 5 7 6 4 2 8 9 1 1 CULTURED STONE COLUMN BASE 4 NEW PORCELAIN TILE FINISH 7 NEW METAL SIDING 2 EXISTING PAINTED METAL STANDING SEAM ROOF 5 NEW LIGHT FIXTURES 8 NEW TRELLIS WITH

More information

Park & Recreation Commission. Chanhassen. Parks & Recreation System Plan. March 28, 2017

Park & Recreation Commission. Chanhassen. Parks & Recreation System Plan. March 28, 2017 Park & Recreation Commission Chanhassen Parks & Recreation System Plan March 28, 2017 Topics 1. Recap of Guiding Principles 2. System Plan Recommendations - Goals, Policies, & Initiatives 3. Community

More information

Karen Ginsberg, Director of Community & Cultural Services

Karen Ginsberg, Director of Community & Cultural Services Information Item Date: April 22, 2013 To: From: Subject: Mayor and City Council Karen Ginsberg, Director of Community & Cultural Services Update on Give Santa Monica Program Introduction This report provides

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Community Park Capital Project. February 6, 2017

Community Park Capital Project. February 6, 2017 Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016

More information

Outdoor Developed Areas

Outdoor Developed Areas The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

What s covered. What s not covered. Options for those not covered. ABA Coverage

What s covered. What s not covered. Options for those not covered. ABA Coverage The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

New Orleans Recreation Development Commission (NORDC)

New Orleans Recreation Development Commission (NORDC) New Orleans Recreation Development Commission (NORDC) Monthly Commission Report - 12/05/2017 Prepared by the City of New Orleans, Capital Projects/ Project Delivery Unit NORD Capital Program Phase Number

More information

Carson City Open Space APNs and , west of Deer Run Road bridge

Carson City Open Space APNs and , west of Deer Run Road bridge 32 acres (See separate packet for information on this open space property) OPEN SPACE PROPERTY APNs 008-541-73 and 008-541-92 (north and south sides of the river) Morgan Mill Road River Access Area (parking

More information

ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY

ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY AN ORDINANCE OF THE TOWNSHIP OF JACKSON AMENDING SECTIONS OF THE JACKSON TOWNSHIP ZONING ORDINANCE AS FOLLOWS: PROVIDING NEW DEFINITIONS OF CAMPGROUNDS, CAMPSITE,

More information

Ongoing Projects 3/16/2017 2

Ongoing Projects 3/16/2017 2 Ongoing Projects 26 th to 34 th Street, West Avenue to Bay Avenue ($6.5 million contract awarded) 46 th Street (complete) 29 th Street Firehouse South Jersey Gas improvements 34 th Street playground repairs

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group CAPITAL PROJECT LIST Based on extensive public outreach in 2008 and 2013-2014, the 2014 Parks, Recreation, and Open Space (PROS) Plan

More information

UP TO 13,854 SQ FT (1,287 SQ M) OF GRADE A OFFICE SPACE AVAILABLE

UP TO 13,854 SQ FT (1,287 SQ M) OF GRADE A OFFICE SPACE AVAILABLE UP TO 13,854 SQ FT (1,287 SQ M) OF GRADE A OFFICE SPACE AVAILABLE Mell Square 0.2 miles / 4 mi walk* Over 90 shops ad restaurats, plus parkig for 950 cars Touchwood 0.1 miles / 3 mi walk* Over 80 shops,

More information

Attachment 1: Revitalizing Yonge Downtown Yonge Street

Attachment 1: Revitalizing Yonge Downtown Yonge Street Attachment 1: Revitalizing Yonge Downtown Yonge Street Photo credit: Downtown Yonge BIA Attachment - Revitalizing Yonge Downtown Yonge Street 1 Photo credit: Downtown Yonge BIA Photo credit: Downtown Yonge

More information

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior. COMMUNITY DESCRIPTION Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior. The township is largely rural but has one main population

More information