1 What options were considered As part of the initial planning for the new runway, several options were identified and assessed before determining that the new runway is the most appropriate development to meet the future demand for air services for Perth. Planning Location for the new runway identified in the 1970s by a joint Commonwealth and State Government Committee Support growth Providing essential transport infrastructure capacity and supporting WA s economic development Connecting people and places Furthering Western Australia s social and cultural development and connecting WA to the world

2 The new runway represents the best option to support the international competitiveness of the State s critical export industries, including resources, tourism, international study and agriculture. When do we need a new runway? The need for an additional runway at Perth was first recommended more than 40 years ago by a joint Commonwealth and State Government Committee investigating Perth s planning requirements. Recent modelling shows that an additional runway is needed to meet the demand of intrastate, interstate and international services to and from Perth. The need for the new runway is driven by the demand for arrivals and departures in a given hour. Perth experiences significant peak periods at particular times during the day. During the morning peak period, approximately 80 per cent of aircraft are departing and only 20 per cent are arriving. In the early morning, there is a departure peak that sees up to 40 aircraft departing each hour for a two to three hour period. In the afternoon, there is an arrivals peak which sees up to 26 aircraft arriving each hour for a two to three hour period. Current demand exceeds the capacity in these peak periods. Simulation modelling shows that an additional runway is needed when the number of flights exceeds 145,000 per year. In 2013, flight numbers peaked at 151,000 resulting in significant delays to airlines and passengers. How is the new runway funded? Perth is located on approximately 2,105 hectares of land owned by the Commonwealth of Australia. In 1997, the airport was privatised under a long term lease with oversight remaining with the Commonwealth of Australia. Perth is operated by Perth Pty Ltd, which is a wholly owned subsidiary of Perth Development Group Pty Ltd (PADG). More than 50 per cent of PADG is owned by superannuation funds, including AustralianSuper and Sunsuper. Perth funds infrastructure development through a mix of equity and debt from banks and capital markets. No Commonwealth or State funding is required for the construction of the new runway The number of annual flights is forecast to grow, reaching 172,000 by 2025 and 241,000 by 2045.

3 1985 Location of the new runway released as part of the Perth Master Plan 1985 $1.72b Lost tourism expenditure over 20 years if the new runway is not built 41.8 MILLION Passengers that would not travel to or from Perth over 20 years if the new runway is not built What alternative options were considered? As part of the initial planning for the new runway, several options were identified and assessed before determining that the new runway is the most appropriate development to meet the future demand for air services for Perth. Maximising existing infrastructure by changing operations Perth, in collaboration with Airservices Australia, continually looks at opportunities to improve the efficiency and capacity of the existing runways by improving or changing operational processes and procedures. Any changes must be considered and balanced against any impacts to the environment, surrounding communities and safety. Between 2008 and 2013, Perth undertook significant airfield infrastructure projects. $250 million was invested in new taxiways, taxiway widening, enhanced lighting and approach equipment, as well as runway overlays. In 2012, Airservices and Perth engaged NATS, the UK s largest airnavigation service provider, to study Perth operations. Through implementing recommendations from the study, capacity has improved. However, Perth has largely exhausted efficiencies associated with the existing infrastructure and there is a need for additional runway capacity. A second metropolitan airport A second metropolitan airport has been considered since the late 1970s. In 2015, the State Government released the State Aviation Strategy noting that preliminary work was being undertaken by the relevant government departments to identify a suitable site. However, the State Government has not identified a location or provided any commitment or funding toward the project. When considering a secondary metropolitan airport, the significant cost, impact to newly affected areas and the timeframe to plan, approve and construct a new airport must be examined. In the case of Western Sydney, policy makers first considered the need for a second airport in Sydney in the 1940 s. It wasn t until 1986, some 40 years later, that land began to be purchased at the Bagerys Creek site. An environmental impact statement was released for public comment in October 2015 with the final approval granted in December Construction is scheduled to commence early 2018 with operations starting in It is expected to cost in excess of $2.4 billion. Combined with the cost of building the second airport and given a lead time for approvals and construction, it is unlikely that an airport would be constructed in time to meet the immediate growth needs or forecast demand for air services and therefore is not considered a viable alternative to the new runway. Increase use of other airports Alternative airports were considered, including Jandakot, Cunderdin, Busselton - Margaret River Regional and other regional airfields. These airports were not viable options for various reasons including not having the runway or terminal infrastructure to support the large passenger aircraft types that use Perth and, in some cases, the airports are not conveniently located near large population centres.

4 $2.5b INVESTMENT The new runway forms part of a privately funded investment program over the next decade Use of RAAF Base Pearce RAAF Base Pearce is approximately 30 kilometres north of Perth and has been considered previously as an alternative civilian airport, however it was deemed as unacceptable due to operational constraints imposed by the topography of the nearby Darling Scarp. The Commonwealth Department of Defence has also publicly stated that RAAF Pearce is not a suitable alternative civilian airport because it is one of their busiest and most complex airfields and it operates using very specialised air traffic procedures to allow for the large quantity and type of air traffic. Relocation of Perth Given the billions of dollars in investment of both public and private funds that have gone into the development of Perth, closing Perth would not be a viable solution and an alternative site has not been identified. Any current issues with noise from aircraft would not lessen but simply shift the areas where people are affected. Expand existing runway infrastructure The proposed extension of the cross runway (06/24) from 2,163 metres to 3,000 metres would enable the runway to accommodate all aircraft types, including the Airbus A380. It would allow for an increase in arrivals and departures from the north/ east, however, there would be very little increase in capacity when arriving or departing from the south/west. The overall increase in capacity would only be sufficient to accommodate around 193,000 annual aircraft movements, after which, a new runway would again be needed. Increasing the length of the main runway (03L/21R) from 3,444 metres to 3,800 metres would not provide an increase in arrival and departure capacity but simply caters for larger aircraft. Therefore, extending the existing runway infrastructure would not cater for additional aircraft in peak periods. New runway timeline 1970s planning commenced LOCATE dramatic and unforecast growth 2014 Master Plan approved including how the new runway would likely operate and timing PLAN 1984 location for parallel runway at Perth identified GROWTH INVEST $250m airfield investment program to improve capacity at Perth MASTER PLAN 2014 DESIGN technical studies and design work 2018 public comment APPROVAL 4 years to construct COMMENT Anticipated 2019 approval and decision to build CONSTRUCT OPEN opening subject to actual demand and airline commercial agreement

5 Why do we need a new runway? No new infrastructure Not constructing the new runway will result in flight delays and constrain growth. Simulation modelling has shown that delays would increase from an average of a five minutes in 2016 to 34 minutes by This would be unacceptable to airlines and passengers. To reduce the likelihood of delay, airlines would need to either change the time of flights to or from Perth and move flights into the shoulder or non-peak periods, or change to larger aircraft. As Perth is part of a national and global aviation network, airlines have limited scheduling opportunities or windows within which Perth flights can be scheduled, and, as a result, there is little scope to spread traffic evenly across the operating day. Doing nothing would also significantly constrain growth of flights to and from Perth. This restriction on growth would see unmet domestic and international passenger demand exceed five million passengers per year. Over 20 years this would equal 41.8 million passengers not travelling to or from Perth. This would have a significant economic flow on effect to the State s economy, including $1.72 billion lost tourism expenditure over 20 years if the runway is not built. The new runway will allow more efficient scheduling of regional, domestic and international flights, while improving connectivity between business, tourism and employment, all of which support WA s economic growth. Social and Cultural Benefits Western Australians rely on air transport more than most other Australians for work, education, recreation, health, and to visit friends and family. Perth connects with more than 50 intrastate, interstate, and international destinations. The new runway will enhance and develop new services to new destinations. Employment Perth is a major employment centre. In 2014, the number of people employed (both directly and indirectly) was estimated at 12,570 aviation and 5,230 non-aviation-related full-time employees. During construction, the new runway will create 744 full-time jobs nationally. Tourism Air services are vital to WA s tourism industry and the jobs it supports. More than 90 per cent of visitors to WA come by air, with most arriving at Perth. Spending by international and domestic tourists helps to drive the WA economy. Supporting the resource sector Most fly-in fly-out workers are from the Perth and Peel regions and rely on flights with narrow departure windows, which are generally in the morning. The new runway will help to prevent costly delays to both airlines and resource companies. Productivity improvements Airlines will be able to more efficiently manage departures and arrivals and reduce delays, saving on maintenance, crew and fuel costs. It costs leisure travellers almost $50 for every hour they are delayed and for business travellers it s more than $155. By 2045, the new runway is forecast to deliver a cumulative economic benefit of $2.39 billion. In 2013, the State Government estimated that congestion at Perth was costing the airline industry and its passengers an estimated $72 million a year.

6 Great Eastern Hwy Bypass Kalamunda Rd N When was the location of the new runway identified? 1979 Joint Governments Advisory Committee Recommendation Tonkin Hwy Great Eastern Hwy Redcliffe Station Dunreath Dr Leach Hwy West Snook Rd Redcliffe Rd Boud Ave Tonkin Hwy Ross Dr Terminal 1 Terminal 2 Terminal 3 Terminal 4 Bungana Ave Apac Way Fauntleroy Ave Brearley Ave Miller Rd 06 Boundary 03L General Aviation Area Dr South Newton Rd MAIN RUNWAY 03L/21R Reid Rd Kewdale Rd Searle Rd 21R CROSS RUNWAY 06/24 Current Runways Sugarbird Lady Rd Horrie Miller Dr Tarlton Cr Tonkin Hwy Proposed New Runway Air Traffic Control Tower Railway Line & Stations Public Viewing Area ,000 METRES Central Central Station Affleck Rd Paltridge Rd North Abernethy Rd Grogan Rd 03R 24 NEW RUNWAY 03R/21L Abbott Rd Dubs Cl 21L Hudswell Rd Abernethy Rd Roe Hwy Forrestfield Station Dundas Rd In 1972, a joint committee was established to examine the airport requirements for Western Australia. The Commonwealth- State Advisory Committee handed down its final report in The committee evaluated options for aerodromes to be a single primary airport site, capable of development to accommodate two widely spaced parallel runways. Following extensive review of current and proposed airports in the Perth area, the committee found that after weighing economic and environmental considerations, the existing Perth should continue as the sole primary airport for the Perth Region. Following the committee s recommendation, the location of the new runway at Perth was investigated with several options explored. When the preferred location for the new runway was being considered, land use to the north and south of the airport was primarily agricultural farming land or low-density housing. At the time, this area was more sparsely populated and provided the opportunity for more appropriate development with sympathetic planning. The area immediately to the east of the estate was primarily agricultural land and provided the opportunity to be purchased for the long-term use of the airport. The preferred location running north/south was first published in the Perth Master Plan 1985 supported by the development of the first Australian Noise Exposure Forecast (ANEF) for Perth. An ANEF is a planning tool used to guide appropriate development in the vicinity of an airport. WAC FIND OUT MORE For more information about the new runway project and to register to receive updates visit newrunway.com.au facebook.com/perthairport twitter.com/@perth instagram.com/perthairport

New Runway Project. Connecting people and places. Supporting business. Engaging with community

New Runway Project. Connecting people and places. Supporting business. Engaging with community New Runway Project Perth is investing in an important piece of infrastructure for Western Australia. The new runway will see Perth continue to connect lives, businesses and communities to a world full

More information

New Runway Project PRELIMINARY DRAFT MAJOR DEVELOPMENT PLAN VOLUME A: BACKGROUND AND NEED SECTIONS 1-7

New Runway Project PRELIMINARY DRAFT MAJOR DEVELOPMENT PLAN VOLUME A: BACKGROUND AND NEED SECTIONS 1-7 New Runway Project PRELIMINARY DRAFT MAJOR DEVELOPMENT PLAN VOLUME A: BACKGROUND AND NEED SECTIONS 1-7 MAY 2018 70 New Runway Project Preliminary Draft Major Development Plan May 2018 03 Options and Alternatives

More information

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

REVIEW OF PERTH AIRPORT Noise Abatement Procedures REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise

More information

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM

Badgery s Creek Airport Presention. Revised from NAN 2015 AGM Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline

More information

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway 1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August

More information

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

Sydney Airport Master Plan

Sydney Airport Master Plan Sydney Airport Master Plan This document is printed on ecostar and is manufactured from 100% post consumer recycled paper in a process chlorine free environment under the ISO 14001 environmental management

More information

Memorandum of Understanding with ACT Government

Memorandum of Understanding with ACT Government MEDIA RELEASE 8 April 2015 Memorandum of Understanding with ACT Government The ACT Government and Canberra Airport today entered into a new Memorandum of Understanding (MoU) on key areas of common interest

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

MASTER PLAN PERTH AIRPORT MASTER PLAN 2O14 MINOR VARIATION

MASTER PLAN PERTH AIRPORT MASTER PLAN 2O14 MINOR VARIATION PERTH AIRPORT MASTER PLAN 2O14 MINOR VARIATION MASTER PLAN MASTER PLAN 2014 MINOR VARIATION This Minor Variation is an addendum to, and should be read in conjunction with, the approved Master Plan 2014.

More information

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT

Benefits of NEXTT. Nick Careen SVP, APCS. Will Squires Project Manager, Atkins. Anne Carnall Program Manager, NEXTT Benefits of NEXTT Nick Careen SVP, APCS Anne Carnall Program Manager, NEXTT Will Squires Project Manager, Atkins 12 December 2018 1 Our industry continues to grow Our forecasts predict there will be 8.2

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022 A Co-operative venture of the municipalities of: Cockburn, East Fremantle, Fremantle, Kwinana, Melville & Rockingham Tuesday, 5 December 2017 Enquiries: Mick McCarthy 9364 0631 Our Ref: Federal Budget

More information

Cover photograph This photograph captures a Bell 214B helicopter refilling with water during the response to the Banjup/Forrestdale bushfire in

Cover photograph This photograph captures a Bell 214B helicopter refilling with water during the response to the Banjup/Forrestdale bushfire in JANDAKOT AIRPORT MASTER PLAN 2014 Cover photograph This photograph captures a Bell 214B helicopter refilling with water during the response to the Banjup/Forrestdale bushfire in February 2014. It is one

More information

New Runway Project PRELIMINARY DRAFT MAJOR DEVELOPMENT PLAN VOLUME A: BACKGROUND AND NEED SECTIONS 1-7

New Runway Project PRELIMINARY DRAFT MAJOR DEVELOPMENT PLAN VOLUME A: BACKGROUND AND NEED SECTIONS 1-7 New Runway Project PRELIMINARY DRAFT MAJOR DEVELOPMENT PLAN VOLUME A: BACKGROUND AND NEED SECTIONS 1-7 MAY 2018 110 New Runway Project Preliminary Draft Major Development Plan May 2018 05 Consistency with

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction Introduction and Purpose The Airport Master Planning process evaluates an airport s physical facilities, establishes a forecast for future demand, and identifies a development plan

More information

Aviation Development

Aviation Development Aviation Development Gold Coast Airport has efficient and cost effective passenger processing and aircraft turn-around times that is underpinned by a strong focus on safety. 6.1 INTRODUCTION This focus

More information

AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH

AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH DRIVING ECONOMIC GROWTH In 2016-17 Australian airports added: $34.6 billion in economic

More information

Australian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens

Australian Airport Association Stakeholder Dinner. 31 May 2018 Sydney, Australia. Speech by Angela Gittens Australian Airport Association Stakeholder Dinner 31 May 2018 Sydney, Australia Speech by Angela Gittens Good evening ladies and gentlemen. It is a pleasure to be with you tonight and thank you again Caroline

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

GOLD COAST AIRPORT - Runway 14 southern departures trial

GOLD COAST AIRPORT - Runway 14 southern departures trial Post Implementation Review GOLD COAST AIRPORT - Runway 14 southern departures trial Version 1 Effective January 2016 Airservices Australia 2016 1 of 13 Introduction At the request of the community, Airservices

More information

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Air Transport Connectivity Enhancement Project (RRP BHU 44239-013) SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1 Sector Road Map 1. Sector Performance,

More information

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport In its draft 2014 determination of the maximum level of charges at Dublin

More information

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CANBERRA AIRPORT IS THE ONLY 24 HOUR BOEING 747, B777-300 AND A340 CAPABLE AIRPORT...BETWEEN BRISBANE AND MELBOURNE. 9 Runway and airfield developments Airports

More information

sdrftsdfsdfsdfsdw Comment on the draft WA State Aviation Strategy

sdrftsdfsdfsdfsdw Comment on the draft WA State Aviation Strategy sdrftsdfsdfsdfsdw Comment on the draft WA State Aviation Strategy 1 P a g e 2 P a g e Tourism Council WA Comment on the Draft WA State Aviation Strategy Introduction Tourism Council WA supports the overall

More information

Asian Breeze (62) ( 亜細亜の風 )

Asian Breeze (62) ( 亜細亜の風 ) Asian Breeze (62) ( 亜細亜の風 ) A Happy New Year to you all 19 February 2019 Dear Coordinators and Facilitators in Asia/Pacific region. A Happy New Year of 2019. It may sound too late to say it but considering

More information

Plugging the greater Midlands region into global wealth

Plugging the greater Midlands region into global wealth Plugging the greater Midlands region into global wealth A great airport for a great city Birmingham Airport will be at the centre of a network of great airports delivering aviation capacity and connectivity

More information

The private financing of airport infrastructure expansions

The private financing of airport infrastructure expansions The private financing of airport infrastructure expansions Economic and financial challenges Aviation Insight Series, Singapore Aviation Academy 15 July 2015 Greg Houston Partner, HoustonKemp Australia

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Airservices Australia Long Term Pricing Agreement. Discussion Paper April Submission by Australia Pacific Airport Corporation (APAC)

Airservices Australia Long Term Pricing Agreement. Discussion Paper April Submission by Australia Pacific Airport Corporation (APAC) Airservices Australia Long Term Pricing Agreement Discussion Paper April 2015 Submission by Australia Pacific Airport Corporation (APAC) Airservices Australia Long Term Pricing Agreement Discussion Paper

More information

ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions

ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions ECONOMIC MASTER PLAN Florida s airport industry indicates the following programs are needed to maximize its impact on the State s economy: AIRPORT SECURITY Develop Model Security Plan for General Aviation

More information

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. NATIONAL AIRPORTS SAFEGUARDING FRAMEWORK GUIDELINE D MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. REVISION DATE VERSION NUMBER CHANGES MADE APPROVED

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

Terms of Reference. Canberra Airport Community Aviation Consultation Group

Terms of Reference. Canberra Airport Community Aviation Consultation Group Canberra Airport Community Aviation Consultation Group February 2014 1. Name The name of the Group is Canberra Airport Community Aviation Consultation Group. 2. Background Canberra Airport was established

More information

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN MASTER PLAN 2014 PROPOSED AIRPORT DEVELOPMENT STRATEGY 2034 Important Notice This Master Plan has been prepared by Brisbane Airport

More information

3 The growth of Western Sydney

3 The growth of Western Sydney 3 The growth of Western Sydney About this chapter This chapter provides an overview of Western Sydney s growing population and economy, and the benefit of the proposed Western Sydney Airport. Population

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

August The Coalition s Policy for Aviation

August The Coalition s Policy for Aviation The Coalition s Policy for Aviation August 2013 Key Points The Coalition will strengthen our aviation industry and allow it to be more competitive. We will ensure our aviation sector is safe, reliable,

More information

MASTER PLAN 2010 ADDENDUM REPORT

MASTER PLAN 2010 ADDENDUM REPORT December 2013 ACKNOWLEDGEMENT This Master Plan Addendum Report has been prepared with the assistance of technical input and planning advice provided by Airport Master Planning Consultants Pty Ltd. COPYRIGHT

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP) 2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport

More information

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master

More information

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Public Consultation Paper September 2017 Summary Purpose The purpose of this paper is to seek comments through public consultation

More information

PUBLIC SCOPING MEETING APRIL 2018

PUBLIC SCOPING MEETING APRIL 2018 Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

Applewood Heights Community Open House

Applewood Heights Community Open House Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected

More information

INQUIRY INTO THE OPERATION, REGULATION AND FUNDING OF AIR ROUTE SERVICE DELIVERY TO RURAL, REGIONAL AND REMOTE COMMUNITIES

INQUIRY INTO THE OPERATION, REGULATION AND FUNDING OF AIR ROUTE SERVICE DELIVERY TO RURAL, REGIONAL AND REMOTE COMMUNITIES INQUIRY INTO THE OPERATION, REGULATION AND FUNDING OF AIR ROUTE SERVICE DELIVERY TO RURAL, REGIONAL AND REMOTE COMMUNITIES SENATE STANDING COMMITTEES ON RURAL AND REGIONAL AFFAIRS AND TRANSPORT OVERVIEW

More information

Airport forecasting is used in master planning to guide future development of the Airport.

Airport forecasting is used in master planning to guide future development of the Airport. Airport Forecasts Airport forecasting is used in master planning to guide future development of the Airport. 4.1 INTRODUCTION Airport forecasting ensures development is appropriate for passengers, ground

More information

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th The Calgary Airport Authority Parallel Runway Project Public Consultation Meetings April 30 th, May 2 nd & May 4 th 1 Welcome AGENDA The Airport Authority The Project The Environmental Assessment Process

More information

15-17 November 2018 Bankstown Airport

15-17 November 2018 Bankstown Airport 15-17 November 2018 Bankstown Airport Australian Aviation Showcase and Careers Exposition Event Overview Aviatex 2018 - Event Overview 1 Contents Executive Summary...3 What is Aviatex?...4 1. Aviation

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

PERTH-ADELAIDE CORRIDOR STRATEGY

PERTH-ADELAIDE CORRIDOR STRATEGY INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

6.0 AIRFIELD DEVELOPMENT PLAN

6.0 AIRFIELD DEVELOPMENT PLAN 6.0 AIRFIELD DEVELOPMENT PLAN 6.0 AIRFIELD DEVELOPMENT PLAN Key points The airfield development plan in this Master Plan is capable of meeting forecast demand to 2033 and beyond. The development plan:

More information

A THIRD RUNWAY AT HONG KONG INTERNATIONAL AIRPORT IS CRUCIAL TO HONG KONG S ECONOMIC FUTURE

A THIRD RUNWAY AT HONG KONG INTERNATIONAL AIRPORT IS CRUCIAL TO HONG KONG S ECONOMIC FUTURE A THIRD RUNWAY AT HONG KONG INTERNATIONAL AIRPORT IS CRUCIAL TO HONG KONG S ECONOMIC FUTURE Cathay Pacific firmly believes that a third runway at Hong Kong International Airport (HKIA) is a vital component

More information

AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011

AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011 AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011 1. Introduction This submission is provided to the ACCC by Regional Express Holdings Ltd in response to

More information

9 November, Defence White Paper 2015 R1-3-A135 Russell Offices Department of Defence PO Box 7901 CANBERRA BC ACT 2610.

9 November, Defence White Paper 2015 R1-3-A135 Russell Offices Department of Defence PO Box 7901 CANBERRA BC ACT 2610. 9 November, 2014 Defence White Paper 2015 R1-3-A135 Russell Offices Department of Defence PO Box 7901 CANBERRA BC ACT 2610 Dear Sir/ Madam Re: 2015 Defence White Paper On behalf of the Regional Development

More information

South East Traffic Solution

South East Traffic Solution South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

2004/05 Full Year Results Presentation to Investors

2004/05 Full Year Results Presentation to Investors Geoff Dixon Chief Executive Officer 2004/05 Full Year Results Presentation to Investors 18 August 2005 Group Highlights 12 months to June 2005 12 months to June 2004 Increase/ (decrease) % Sales and operating

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017)

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017) Queensland - 11 Queensland OVERVIEW Queensland is nearly five times the size of Japan, seven times the size of Great Britain, and two and a half times the size of Texas. Queensland is Australia s second

More information

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE www.channelcapacityupgrade.com.au 2 $10 BILLION in trade value Introduction The Port of Townsville is the largest container and automotive port in Northern Australia and last financial year handled around

More information

Press Release March 1, Refer to: Anna Salgado

Press Release March 1, Refer to: Anna Salgado Press Release March 1, 2018 Refer to: Anna Salgado 63 917 5637629 asalgado@megawide.com.ph MEGAWIDE GMR offers an alternative solution to NAIA congestion Aligned with the government strategy to develop

More information

DEVELOPING AIR LINKAGES TO SUSTAIN TOURISM AMONG THE OIC MEMBER STATES

DEVELOPING AIR LINKAGES TO SUSTAIN TOURISM AMONG THE OIC MEMBER STATES Standing Committee for Economic and Commercial Cooperation of the Organization of Islamic Cooperation (COMCEC) DEVELOPING AIR LINKAGES TO SUSTAIN TOURISM AMONG THE OIC MEMBER STATES COMCEC COORDINATION

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Queensland Tourism Aviation Blueprint to 2016

Queensland Tourism Aviation Blueprint to 2016 Queensland Tourism Aviation Blueprint to 2016 tq.com.au Blueprint outline The purpose of the Queensland Tourism Aviation Blueprint to 2016 is to develop the strategic framework that will guide aviation

More information

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will

More information

Public Transport for Perth in 2031

Public Transport for Perth in 2031 South West Group Submission Public Transport for Perth in 2031 October 2011 South West Group Vision and Mission Local Governments in South Metropolitan Perth, through cooperation with industry, community

More information

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal 30 th January 2016 Local Government s critical role in driving the tourism economy January 2016 de Waal Contents Local Government can make or break tourism in their jurisdiction... 3 TNQ Tourism Vision...

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

Submission to the Joint Standing Committee on Northern Australia

Submission to the Joint Standing Committee on Northern Australia Submission to the Joint Standing Committee on Northern Australia Inquiry into Opportunities and Methods for Stimulating the Tourism Industry in Northern Australia February 2017 About the RAC RAC represents

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf GSC Sydney East Rev Draft -references Port Botany - 30 https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf Pages 6. The District s freight routes, particularly

More information

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County

More information

CAREERS SNAPSHOT AVIATION AND MARITIME TAFE NSW STRATEGY TAFENSW.EDU.AU

CAREERS SNAPSHOT AVIATION AND MARITIME TAFE NSW STRATEGY TAFENSW.EDU.AU CAREERS SNAPSHOT TAFE NSW STRATEGY TAFENSW.EDU.AU OCCUPATIONS IN GROWTH FLIGHT ATTENDANTS This occupation is forecast to employ over 260 additional workers in the next three years in NSW (an increase of

More information

SYDNEY S AVIATION FUTURE

SYDNEY S AVIATION FUTURE SYDNEY S AVIATION FUTURE MEETING THE CHALLENGE OF GROWING DEMAND www.ttf.org.au TOURISM & TRANSPORT FORUM The Tourism & Transport (TTF) is the peak industry group for the Australia tourism, transport,

More information

Guidance material for land use at or near aerodromes

Guidance material for land use at or near aerodromes Guidance material for land use at or near aerodromes Table of Contents Overview... 1 Glossary... 1 Types of Aerodromes... 1 Obstacle Limitation Surfaces... 2 Wildlife Hazard Management... 2 Notice of Intention

More information

REVIEW OF THE CRUISE INDUSTRY ACTION PLAN

REVIEW OF THE CRUISE INDUSTRY ACTION PLAN REVIEW OF THE CRUISE INDUSTRY ACTION PLAN Review of cruise industry As part of the Tourism White Paper initiative, the Government announced that it would review the 1997 Action Plan for the Development

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Perth Noise Abatement Procedures - Change to Preferred Runways

Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary Preferred Runways Perth Perth Airport Perth Noise Abatement Procedures - Change to Preferred Runways Environmental Analysis Summary April 2016 1 of 10 Environment Analysis

More information

ASX Announcement. Appointment of Preferred Contractor for CHPP Construction at Colton Mine

ASX Announcement. Appointment of Preferred Contractor for CHPP Construction at Colton Mine ASX Announcement December 13, 2010 Appointment of Preferred Contractor for CHPP Construction at Colton Coal Mine and further Progress on Surat Basin Rail support NEC s Timetable for Coal Production Northern

More information

NICKI KENYON GENERAL MANAGER CONSUMER MARKETS VISIT VICTORIA. VICTORIAN TOURISM CONFERENCE 25 July 2017

NICKI KENYON GENERAL MANAGER CONSUMER MARKETS VISIT VICTORIA. VICTORIAN TOURISM CONFERENCE 25 July 2017 NICKI KENYON GENERAL MANAGER CONSUMER MARKETS VISIT VICTORIA VICTORIAN TOURISM CONFERENCE 25 July 2017 OVERVIEW Victoria s Visitor Economy Strategy & Targets Victoria s tourism performance Priorities for

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Airport Master Plan Update June 15, 2017

Airport Master Plan Update June 15, 2017 Airport Master Plan Update June 15, 2017 www.harveyfield.com The Master Plan is a 20-year plan to understand the needs of current and future users of the Airport. This is important to ensure that safe

More information

Fort Wayne International Airport Master Plan Study. Executive Summary

Fort Wayne International Airport Master Plan Study. Executive Summary Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development

More information

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE

AIRCRAFT NOISE INFORMATION PACK: CANNING VALE AIRCRAFT NOISE INFORMATION PACK: Table of Contents CANNING VALE 1. Aircraft movements affecting Canning Vale... 2 2. Effects of wind on runway selection... 2 3. Seasonal winds... 2 4. Flight path illustrations...

More information

Department of Transport. Western Australian State Aviation Strategy Draft for Public Comment - August 2013

Department of Transport. Western Australian State Aviation Strategy Draft for Public Comment - August 2013 Department of Transport Western Australian State Aviation Strategy Draft for Public Comment - August 2013 CONTENTS 1. Minister s foreword 4 2. Executive summary and key actions 7 3. Introduction 22 3.1.

More information

2003/04 Full Year Results Presentation to Investors

2003/04 Full Year Results Presentation to Investors 2003/04 Full Year Results Presentation to Investors 19 August 2004 Geoff Dixon Chief Executive Officer Highlights 12 months to June 2004 12 months to June 2003 Increase/ (decrease) % Sales and operating

More information

Runway Scheduling Limits Summer 2015

Runway Scheduling Limits Summer 2015 Appendix 1 Runway Scheduling Limits Summer 2015 Arrivals Hour (UTC) 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Average Total Summer 2014 38 39 37 40 40 41 40 43 43 41 41 44 44 43 38 44 20 39.8

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

SUSTAINABLE DEVELOPMENT PLAN 2015

SUSTAINABLE DEVELOPMENT PLAN 2015 LAND USE SUSTAINABLE DEVELOPMENT PLAN 2015 EAST MINILANDS EAST MINILANDS SUSTAINABLE DEVELOPMENT SUSTAINABLE DEVELOPMENT DHL eastmidlandsairport.com OUR AIRPORT FOREWORD by Andy Cliffe Managing Director

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Will it Fit? Preliminary Findings

Will it Fit? Preliminary Findings Will it Fit? Preliminary Findings Presented by John Dickson Airport System Development Committee, Chair Transportation Committee October 24, 2018 Agenda Introduction & overview Airport site planning considerations

More information

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT Report To: EXECUTIVE CABINET Date: 7 February 2018 Cabinet Deputy/Reporting Officer: Subject: Report Summary: Cllr Bill Fairfoull Executive Member (Finance & Performance) Tom Wilkinson, Assistant Director