1 Introduction 1. Reference AIP Supplement A9/12, effective from Monday, 11 June UTC to 9 August UTC, runway maintenance work would be carried out on Runway 19L/01R at the Suvarnabhumi Airport as depicted in Figure 1 and Figure 2. Construction work at Area 1 starts on 11 June UTC until a tentative completion date to be notified by NOTAM. Afterwards, construction work at Area 2 continues until 9 August UTC. Moreover, reference NOTAM A2251/12 work at Area 2 will start on 18 July UTC. Figure 1: Portions of Runway 19L and Runway 01R under Maintenance, Entrance and Exit: Area 1 1
2 Figure 2: Portions of Runway 19L and Runway 01R under Maintenance, Entrance and Exit: Area 2 2. Figure 2 summarizes Runway Utilization Plan during the maintenance period: Runway 19 Runway 01 Runway 19R: Normal Operations Runway 01L: Normal Operations Runway 19L: Runway 01R: Area 1: Departures only Area 1: Landing only TORA: 2,000 m LDA: 1,775 m TODA: 2,550 m Operations: Sunrise to sunset ASDA: 2,000 m Operation: H24 Area 2: Departures only Area 2: Landing only TORA: 2,750 m LDA: 2,750 m TODA: 3,250 m Operations: Sunrise to sunset ASDA: 2,750 m PAPI: Activated Length of Thrust: 630 m PAPI: Not activated Entry: Taxiway B3 Not usable for landing Not usable for departures Figure 3: Planned Runway Utilization during Maintenance Period 3. During the maintenance in Area 1, it is expected that (a) Code C aircraft departing from Suvarnabhumi Airport in (b) Northbound, Eastbound or Southbound direction (c) within 700NM from Bangkok should be able to take off on Runway 19L, subject to confirmation from aircraft operators. 4. Based on assumption in para 3, simulation has been carried out on remaining flights departing and landing on the remaining full Runway 19R at VMC capacity of 34 movements/hour. 2
3 5. Results of simulation in para 4 indicates delays in Figure 4. Day of Week Average Delay / Average Delay / Worst-Case Delay Flight Delayed Flight / Flight Mondays ~17 minutes ~18 minutes 41 minutes Tuesdays ~14 minutes ~15 minutes 35 minutes Wednesdays ~28 minutes ~30 minutes 55 minutes Thursdays ~35 minutes ~38 minutes 67 minutes Fridays ~31 minutes ~33 minutes 67 minutes Saturdays ~47 minutes ~50 minutes 95 minutes Sundays ~40 minutes ~41 minutes 82 minutes Figure 4: Delay Statistics from Simulation using Flight Schedule on June 2012 Schedule Management Initiative 6. Based on result in Figure 4, it is expected that if flight schedule remains unchanged, delays on many days of the week could pose safety, efficiency and cost-effectiveness issues to flight operations. 7. As schedule adjustment in the order prescribed in Figure 4 could potentially cause network effect to airline operations, potentially requiring advance coordination, the schedule management initiative would begin at least 7 days before day of operation. Strategic Schedule Adjustment 8. Starting from 7 days prior to operation, latest flight schedule would be obtained from Airport Slot Coordinator. Simulation would be conducted based on the following parameters: 8.1. Segregate departures on Runway 19L based on the following assumptions: Code C Aircraft Departures i.e. Boeing 737, Airbus 320, ATR Departure direction: Northbound, Eastbound and Southbound Distance to destination: Great Circle Distance < 700NM (~ 2 hours of flight time) 8.2. Remaining flights assumed to use Runway 19R ( Managed flights ) applied Demand- Capacity Balancing technique at flow rate of 34 movements/hour Schedule simulation process would result in each aircraft being provided a 30-minute window for departure/arrival at Suvarnabhumi Airport Calculated Landing Time (CLDT) takes into account typical 10-minute taxi-in time Calculated In-Block Time (CIBT) Window at aircraft stand is calculated from CLDT taking into account typical 10-minute taxi-in time Calculated Take-Off Time (CTOT) takes into account typical 20-minute taxi-out time Calculated Off-Block Time (COBT) Window at aircraft stand is calculated from CTOT taking into account typical 20-minute taxi-out time Aircraft may be asked to operate in or out of Suvarnabhumi Airport up to 30 minutes early to reduce overall system delay. 9. Proposed Calculated Departure/Arrival Time Window (COBT/CIBT window) calculated 7 days in advance would be transmitted to airlines through Airport Slot Coordinator for consideration. 3
4 Airline Adjustments 10. The airlines have the option to adjust flight operations in accordance to the proposed windows through communications with Airport Slot Coordinator and Bangkok ATFMU. 11. On day 1 (7 days prior to operation), in the case where it is certain that a specific non-westbound flight can take off using Runway 19L s reduced TORA, the airlines should communicate with Airport Slot Coordinator <coordination@slotthai.com>, AOC and Bangkok ATFMU <atfmu@bobcat.aero> to ensure their preferences are mentioned so that the flight s departures would no longer be qualified as managed flight in the next day s simulation. 12. Likewise, specific Code C flights under conditions specified in para 8.1 unable to accept Runway 19L s reduced TORA should inform Airport Slot Coordinator <coordination@slotthai.com>, AOC and Bangkok ATFMU <atfmu@bobcat.aero> to ensure the next day s updated simulation includes them in managed flights. 13. On the following days (2-6 days prior to operation), schedule simulation is adjusted based on input from the Airlines through Airport Slot Coordinator. Results would be distributed to Airport Slot Coordinator. 14. Preliminary Calculated Departure/Arrival Time Window (COBT/CIBT window at aircraft stand along with CTOT/CLDT) would also be forwarded to key affected ANSPs to facilitate handling and minimize tactical operational impact on operations. Pre-Tactical Schedule Adjustment 15. On the day prior to operation, schedule simulation output in the form of Calculated Departure/Arrival Time Window (COBT/CIBT window at aircraft stand) would be published at < 16. Calculated Departure/Arrival Time Window (COBT/CIBT window at aircraft stand along with CTOT/CLDT) would also be forwarded to key affected ANSPs to facilitate handling and minimize tactical operational impact on operations. Tactical Operations 17. On the day of operations, airlines are expected to declare Runway 19L departure capability on item 18 of their flight plans to expedite handling. Pilot in Command should also state ability to take-off on reduced-length Runway 19L when requesting en route clearance on departure from Clearance Delivery and inform Ground Control on initial contact. 18. Airlines shall plan operations in accordance to published Departure / Arrival Time Window. EOBT in FPL or RPL for departures from Suvarnabhumi Airport shall be adjusted in accordance to published Departure Time Window either by Aircraft Operator or AIS Officer as appropriate. 19. Daily Operational Review and Preparation Teleconference will be conducted among all concerned (DCA Thailand, AEROTHAI, AOT, Airport Slot Coordinator, AOC and IATA) to ensure smooth operations. 20. Tactical ATC operations will facilitate those in compliance with the Calculated Departure/Arrival Time Window (COBT/CIBT window at aircraft stand). Flights complying to Departure/Arrival Time Window would receive priority handling to minimize operational impact of the runway maintenance procedure on the overall system. 21. In the case of unavoidable flight diversion to alternative aerodromes, flights will be tactically managed. 4
5 Contact Information Bangkok Air Traffic Flow Management Unit (Bangkok ATFMU) Tel: / Fax: / Mobile: atfmu@bobcat.aero AFTN: VTBBZDZX Slot Coordinator, Schedule Coordination Department Tel: Fax: coordination@slotthai.com SITA: HDQTTYG / HDQYOTG 5
International Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017
International Civil Aviation Organization SEACG/24 IP/10 06 08/03/2017 Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, 06 08 March 2017 Agenda Item 3: Review of Current
More information1. Air Traffic Statistics Suvarnabhumi Airport: Monday, 11 Sunday, 17 June Actual Daily Traffic & Runway Utilization. (Wed) 13 Jun.
Flight Movement Weekly Air Traffic Management Situation Report Due to maintenance of the eastern runway at the Suvarnabhumi Airport from 11 e 212, Aeronautical Radio of Thailand Ltd (AEROTHAI) compiled
More informationSuvarnabhumi Airport Runway Maintenance. Air Traffic Management Situation Review Week 4: 2 8 July 2012
Suvarnabhumi Airport Runway Maintenance Air Traffic Management Situation Review Week 4: 2 8 July 2012 9 Jul 2012 1 Flight Movements Daily Traffic & Runway Utilization 900 800 700 Daily Traffic & Runway
More informationSuvarnabhumi Airport (VTBS/BKK) Runway Maintenance 3 Mar 2 May ICAO SAIOACG/7 & SEACG/24 March 2017 Bangkok, Thailand
Suvarnabhumi Airport (VTBS/BKK) Runway 3 Mar 2 May 2017 ICAO SAIOACG/7 & SEACG/24 March 2017 Bangkok, Thailand Area (1) 2 Area (2) 3 Area (3) 4 Runway Utilization Scheme (19) 5 Runway Utilization Scheme
More informationICAO Bay of Bengal ATS Coordination Group ATFM Task Force
For effective date July 2007 AIRAC 5 July 2007(0707051200UTC) ICAO Bay of Bengal ATS Coordination Group ATFM Task Force MODEL AIP SUPPLEMENT BAY OF BENGAL ATFM PROCEDURES Note: Text identified as (ANSPs)
More informationTHE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT
THE CIVIL AVIATION AUTHORITY OF THAILAND AIRAC Phone: 66 02 568 8831 Fax: 66 02 568 8830 Aeronautical Information Service Department AIP SUPPLEMENT AFTN: VTBAYOYX E-mail: aisthai@caat.or.th 333/105 Lak
More informationBAY OF BENGAL AND SOUTH ASIA AIR TRAFFIC FLOW MANAGEMENT HANDBOOK
BAY OF BENGAL AND SOUTH ASIA AIR TRAFFIC FLOW MANAGEMENT HANDBOOK VERSION 2.9 2 February 2017 Table of Contents Table of Contents... i Glossary of Terms... iii 1. Introduction... 1 Purpose and Scope...
More informationENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)
TEL: +91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: +91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW
More informationTHE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT
THE CIVIL AVIATION AUTHORITY OF THAILAND AIRAC Phone: 66 02 568 8831 Fax: 66 02 576 1903 Aeronautical Information Service Department AIP SUPPLEMENT AFTN: VTBAYOYX E-mail: aisthai@caat.or.th 333/105 Lak
More informationIRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax
IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel +353 61 703750 Fax +353 61 366245 DUBLIN AIRPORT (EIDW) RUNWAY 10/28 UPGRADE PHASE 1 AND PHASE 2
More informationADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES
Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical
More informationAIRAC AIP SUPPLEMENT A 16/17 08 June 2017
Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,
More informationMulti Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014
Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014 CANSO Asia Pacific Collaborative ATM Operations Workshop, Colombo 7 May 201 Evolution of the Regional ATFM Concept Research
More informationGOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION
GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case
More informationCATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA. ATFM TF 1 Meeting September 2018
CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA ATFM TF 1 Meeting September 2018 Topics Topics. The Need C-ATFM Network C-ATFM Operations Current Status and Activities Challenges in Implementation
More informationFUEL MANAGEMENT FOR COMMERCIAL TRANSPORT
FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT 1. Introduction An aeroplane shall carry a sufficient amount of usable fuel to complete the planned flight safely and to allow for deviation from the planned operation.
More informationMULTI-NODAL ATFM COMMON OPERATING PROCEDURES (COP)
MULTI-NODAL This document provides an essential framework, details of procedures, rules and requirements applicable for Air Traffic Flow Management for Operational Trial. ATFM COMMON OPERATING PROCEDURES
More informationLisboa RFE. Respect the ATC and the other pilots at all times and be understanding.
INTRODUCTION On this briefing for the 2018 you will find the information you need to have the better experience possible during our event. We count with everyone s full cooperation, both Pilots and ATC
More informationSECTION 6 - SEPARATION STANDARDS
SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights
More informationIntentionally left blank
Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time (TOBT)... 3 Who is responsible
More informationThe Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.
BOBASIO 3-WP/10 22-24/10/2013 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. Agenda 7: Green Initiatives
More informationMajor Runway/Taxiway Maintenance Work Bangalore International Airport (Devanahalli) (08 MAR 2012 TO 04 MAY 2012)
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN
More information[EFFECTIVE DATE: 23 AUG 2012]
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN
More informationChangi Airport A-CDM Handbook
Changi Airport A-CDM Handbook Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time
More informationDELHI AIRPORT COLLABORATIVE DECISION MAKING (DA-CDM) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS : VIDDYXAX FAX : 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN
More informationREPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE
Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE
More informationATM Collaboration & Data Sharing
ATM Collaboration & Data Sharing ATFM Steering Group 1 Tokyo, Japan 8-10 December 2010 Piyawut Tantimekabut (Toon) Executive Officer, Systems Engineering Airspace Management Centre AEROTHAI 1 Pre-2005
More informationNATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION
NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION LAS VEGAS, October 10 12, 2017 In anticipation of a large number of aircraft operating to and from the Las Vegas area in conjunction with the 2017
More informationRECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES
RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX
More informationSTANDARD AIRPORT TAXI ROUTES (SATR) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP)
AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG
More informationEffective: MILITARY EXERCISE WALLABY 2018 SHOALWATER BAY TRAINING AREA (SWBTA) 19 SEPTEMBER 17 NOVEMBER 2018
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 53/18
More informationAIR TRAFFIC FLOW MANAGEMENT
AIP New Zealand ENR 1.9-1 ENR 1.9 AIR TRAFFIC FLOW MANAGEMENT 1 FLOW MANAGEMENT AND CONTROL 1.1 Flow Control 1.1.1 In order to assist traffic management, ATS sectors may introduce flow control procedures.
More informationATM Network Performance Report
ATM Network Performance Report 2019 Page 1 of 20 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 7 Airborne delay... 7 Notable events... 7 CTOT (Calculated take
More informationINTRODUCTION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SINGAPORE CHANGI AIRPORT
Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE
More informationLFPG / Paris-Charles de Gaulle / CDG
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationAIRPORTS AUTHORITY OF INDIA S AIRPORT COLLABORATIVE DECISION MAKING SYSTEM. (Presented by Airports Authority of India) SUMMARY
12 th Meeting of Arabian Sea-Indian Ocean ATS Coordination Group ASIOACG/12) & 8 th Meeting of Indian Ocean Strategic Partnership to Reduce Emissions (INSPIRE/8) New Delhi, India, 20-21 September 2017
More informationAirspace Organization and Management
Airspace Organization and Management Asia and Pacific Regional Sub Office 2014 17 November 2014 Page 1 CONTENTS Concept of Flexible Use of Airspace (FUA) Flexible and adaptable airspace structure Conditional
More informationIFR SEPARATION USING RADAR
IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,
More informationLELYSTAD AIRPORT PILOT S INFORMATION
LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest
More informationCENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA CATFM. ATFM Global Symposium /22/2017 ATFM Global Symposium 2017
CATFM CENTRAL AIR TRAFFIC FLOW MANAGEMENT ( C-ATFM ) INDIA 1 ATFM Global Symposium-2017 Topics Topics. The Need C-ATFM Network C-ATFM Operations Current Status and Activities Challenges in Implementation
More informationAERODROME OPERATIONS 1 INTRODUCTION
AIP New Zealand AD 1.5-1 AD 1.5 AERODROME OPERATIONS 1 INTRODUCTION 1.1 General 1.1.1 This section details procedures for operations on and in the vicinity of aerodromes. 1.1.2 The layout of the circuit
More informationSession. Arrester Systems, Declared Distances and Runway Excursion Prevention
Session Arrester Systems, Declared Distances and Runway Excursion Prevention 1 Runway Excursion Toronto, Canada August 2, 2005 200 meters from end of runway 2 American Airlines Flight 331, Norman Manley
More informationLELYSTAD AIRPORT PILOT S INFORMATION
LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest
More informationSPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR
Phone: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT
More informationEffective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 02/19
More informationNATS LTD. - IN CONFIDENCE
ACS Report 0908 TERMS AND DEFINITIONS USED IN AIRPORT CAPACITY STUDIES Edited version of document for ACL reference 21-09-2010 Airport Capacity Studies Operational Analysis NATS Ltd. ACS REPORT 0908 TERMS
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures
VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating
More informationATM Network Performance Report
ATM Network Performance Report 2018. Page 1 of 16 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 6 Airborne delay... 6 Notable events... 6 Melbourne... 9 Airborne
More informationEffective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, AVALON EAST (YAVE) OPERATIONS
AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 01/19
More informationInauguration 2017 Dulles Tower
Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The
More informationCHAPTER 4 AIR TRAFFIC SERVICES
CHAPTER 4 AIR TRAFFIC SERVICES 4.1 Objectives of the air traffic services 4.1.1 The objectives of the air traffic services shall be to: a) prevent collisions between aircraft; b) prevent collisions between
More informationCLEARANCE INSTRUCTION READ BACK
CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely
More informationAir Traffic Management (GTA) First semester, 2017/2018
Instituto Superior Técnico Air Traffic Management (GTA) First semester, 2017/2018 First test Solution proposal Name: Number: Read carefully each question before answering The answers should be given exclusively
More informationA-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA)
A-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA) This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior written consent.
More informationNCAA COLLEGE FOOTBALL NATIONAL CHAMPIONSHIP
Notices to Airmen NCAA College Football National Championship NCAA COLLEGE FOOTBALL NATIONAL CHAMPIONSHIP ATLANTA, January 5 9, 2018 SPECIAL AIR TRAFFIC PROCEDURES The following procedures will be implemented
More informationInternational Civil Aviation Organization
International Civil Aviation Organization ATFM/SG/4 WP/06 01-05/12/2014 The Fourth Meeting of ICAO Asia/Pacific Air Traffic Flow Management Steering Group (ATFM/SG/4) Bangkok, Thailand, 1 5 December 2014
More informationLELYSTAD AIRPORT PILOT S INFORMATION
LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest
More informationHEATHROW NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES Version 3
LOCAL RULE 1 HEATHROW NIGHT MOVEMENT AND QUOTA ALLOCATION PROCEDURES Version 3 1. POLICY All Night Flights require the prior allocation of a slot and corresponding Night Quota (movement and noise quota).
More informationSECTION 4 - APPROACH CONTROL PROCEDURES
SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES
More informationAERODROME MARKINGS AND SIGNALIZATION
1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway
More informationFLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT
Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,
More informationCIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS
CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control
More informationREGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES
REGIONAL CARIBBEAN CONTINGENCY PROCEDURES FOR HURRICANES TABLE OF CONTENTS 1. STRATEGIC PHASE 2. PRETACTICAL PHASE 3. TACTICAL PHASE 4. AIR TRAFFIC FLOW MANAGEMENT PROCEDURES 5. AIR TRAFFIC CONTROL PROCEDURES
More informationConsider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES
International Civil Aviation Organization Thirteenth Meeting of the APANPIRG ATS/AIS/SAR Sub-Group (ATS/AIS/SAR/SG/13) Bangkok, Thailand, 23-27 June 2003 ATS/AIS/SAR/SG/13 WP/30 23/6/03 Agenda Item 4:
More informationAIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT
AIP GEN.2- SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 7 GEN.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT. GENERAL. All flights into / from or over the territory of Sri Lanka and landing in such territory
More informationRUNWAY SAFETY ISSUES and MITIGATION OPTIONS
RUNWAY SAFETY ISSUES and MITIGATION OPTIONS By Wing Commander Nutt Homasavin Airports of Thailand Plc. 1 CONTENT AOT s Airports Safety Policy, Structure and Committee Runway Safety Program Background of
More information2nd forum. Airport FRA. procedure
2nd Airport-CDM@FRA forum Airport CDM @ FRA procedure procedure schema Take Off Outstation TFO F U M Estimated Landing time (CFMU/DFS) Approach to FRA TMI TSAT Issue (-40min) Final SEQ approach TMO Landing
More informationPreliminary Findings of Proposed Alternative
Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be
More informationThe text of the amendment is arranged to show deleted, new or amended text, as shown below:
Annex to Decision 2016/009/R Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Authority, Organisation and Operations Requirements for Aerodromes Amendment 1 The Annex to Decision 2014/012/R
More informationAir Traffic Flow & Capacity Management Frederic Cuq
Air Traffic Flow & Capacity Management Frederic Cuq www.thalesgroup.com Why Do We Need ATFM/CDM? www.thalesgroup.com OPEN Why do we need flow management? ATM Large investments in IT infrastructure by all
More informationFLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA
FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA EFFECTIVE October 11, 201609 0400 This Notice does not supersede restrictions pertaining to the use of airspace contained
More informationSeen through an IATA lens A-CDM Globally
Seen through an IATA lens A-CDM Globally A-CDM Basics ATM Perspective Airport CDM is a part of the broader Collaborative Decision Making Focus: managing the turnaround of the aircraft fully transparent
More informationATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR
ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR OBJECTIVE: This ATS Contingency plan s objective is to ensure the continued safety and supplies of air navigation services in the event of partially or total
More informationFRA CDM. Airport Collaborative Decision Making (A-CDM) Flight Crew Briefing FRANKFURT AIRPORT. German Harmonisation
Airport Collaborative Decision Making (A-CDM) CDM Airport @ FRA Flight Crew FRANKFURT AIRPORT Table of contents: 1. General... 3 2. Target Off Block Time (TOBT)... 4 2.1 Automatically generated TOBT...
More informationREPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES
Phone: 248-384000 AFS: FSIAYNYX FAX: 248-384030 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT S02/09
More informationCOMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management
L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN
More informationAIP GEN SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 17 GEN 1.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT
AIP GEN.2- SRI LANKA REGULATIONS AND REQUIREMENTS 25 MAY 7 GEN.2 ENTRY, TRANSIT AND DEPARTURE OF AIRCRAFT. GENERAL. All flights into / from or over the territory of Sri Lanka and landing in such territory
More informationCollaborative Decision Making at JCAB ATMC
CIVIL AVIATION BUREAU of JAPAN Collaborative Decision Making at JCAB ATMC First Meeting of Asia/Pacific ATFM Steering Group Tokyo, Japan, December 8-1, 21 Kimihiko Ito ATC Division, ATS Department, JCAB
More informationThe pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1
The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1 Operational Hazards Workload issues during taxiing that can result in a loss of
More informationTransitional Considerations
Flight Plan 2012 ICAO Workshop for the AFI Region 13-14 Feb 2011 Transitional Considerations Kim Breivik EUR Task Force Chairman EUROCONTROL 2012 Project Manager The European Organisation for the Safety
More informationAir Traffic Management Emissions Reduction. Project Report. APEC Transportation Working Group
Air Traffic Management Emissions Reduction Project Report APEC Transportation Working Group December 2013 APEC Project TPT 09/2012A Produced by For Asia Pacific Economic Cooperation Secretariat 35 Heng
More information1 LOCAL TRAFFIC REGULATIONS AND RESTRICTIONS
27 APR 17 (1) OSTRAVA/Mošnov VFR-AD-LKMT-TEXT-1 1 LOCAL TRAFFIC REGULATIONS AND RESTRICTIONS 1.1 Control of aircraft on movement area 1.1.1 Area NORTH 3 is a manipulating area for service centre and coating.
More informationIVAO Switzerland Division
IVAO ATC Operations Zurich Delivery Information Contact: ch-aoc@ivao.aero Revision list Date Updated by Update description 22.05.2015 CH-ADIR Document Creation 30.10.2017 CH-AOC Changing Phraseology Examples
More informationAirport Collaborative Decision Making (A-CDM) Operations Guidelines Version Date: 2017/07/21
Airport Collaborative Decision Making (A-CDM) Operations Guidelines Version 01.10 Date: 2017/07/21 Airport Authority Hong Kong owns the copyright subsisting in this material. Except as permitted under
More informationEXTENDED-RANGE TWIN-ENGINE OPERATIONS
EXTENDED-RANGE TWIN-ENGINE OPERATIONS 1. Introduction Extended range operations by aircraft with two turbine power units (ETOPS or EROPS) are sometimes necessary to permit twin engine aircraft to operate
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationTVSU UNION ISLAND/Union Is. (ST. VINCENT AND THE GRENADINES)
AIP AD 2.951 AD 2. AERODROMES TVSU AD 2.1 AERODROME LOCATION INDICATOR AND NAME TVSU UNION ISLAND/Union Is. (ST. VINCENT AND THE GRENADINES) TVSU AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1
More informationEfficiency and Automation
Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad
More informationAnalysis of Air Transportation Systems. Airport Capacity
Analysis of Air Transportation Systems Airport Capacity Dr. Antonio A. Trani Associate Professor of Civil and Environmental Engineering Virginia Polytechnic Institute and State University Fall 2002 Virginia
More informationAIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI
AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE Vineet Gulati GM(ATM-IPG), AAI AIR TRAFFIC FLOW MANAGEMENT ATFM is a service provided with the objective to enhance the efficiency of the ATM system by,
More informationHIGHLANDS AND ISLANDS AIRPORTS LIMITED
HIGHLANDS AND ISLANDS AIRPORTS LIMITED ARRANGEMENTS FOR FLIGHTS OUTSIDE OFFICIAL OPENING HOURS The term Company or HIAL Group applies to Highlands and Islands Airport Limited (HIAL) and any subsidiary
More informationIFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude
More informationCurriculum for AIM Training Module 2: ARO Officer
Curriculum for AIM Training Module 2: ARO Officer 1. THE AERONAUTICAL INFORMATION SERVICES The general objectives are to enable students to: Appreciate how the aeronautical information services function;
More informationAIP SUPPLEMENT 01/18 23 MAR18
PHONE : +94-11- 2264203 FAX : +94-11- 2259916 AFS E-mail : VCBIYHYX VCCCYAYX : aishq@airport.lk ddgasr@caa.lk DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA AERONAUTICAL INFORMATION SERVICES (AIS/HQ) AIRPORT
More informationAir Traffic Flow Management User Manual
C-MAN0125 Version 10 Effective 2 March 2017 Prepared: Authorised: Karina Law ATM Information Specialist Paddy Goodall ATM Network Services Manager Ensure document is current before use Airservices Australia
More informationEVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA
18 NOV 2010 AIP LATVIA EVTA AD 2-1 18 NOV 2010 Note: The following sections in this chapter are intentionally left blank: AD-2.11, AD-2.14, AD-2.15, AD-2.16, AD- 2.19, AD-2.20, AD-2.21, AD-2.23 EVTA AD
More informationSERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE. Correct to 1 May This document is for guidance only and is subject to change.
SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE Correct to 1 May 2015. This document is for guidance only and is subject to change. Implementing Regulation (EU) 923/2012, supporting Acceptable
More informationSafety and Airspace Regulation Group
Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation
More informationRunway Analysis User Guide
Runway Analysis User Guide The Runway Analysis & Weight and Balance functions are accessed by selecting Runway Analysis & Weight and Balance from the Flight Plan drop down menu. Select the tail to be used
More informationChapter 6. Airports Authority of India Manual of Air Traffic Services Part 1
Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential
More information