Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Size: px
Start display at page:

Download "Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013"

Transcription

1 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY This Paper summarises the work completed to implement RNP 4 in the Brisbane and Melbourne FIRs and considers the possibility of leveraging this work to implement RNP 4 in Mauritius and Malé FIRs. 1 INTRODUCTION 1.1 Background At ASIAOCG/7 DCA Mauritius informally approached Airservices Australia regarding the possibility of leveraging the work done to implement RNP 4 in Brisbane and Melbourne FIRs to implement RNP4 in the Mauritius FIR Airservices took an action to investigate the opportunities to extend work already completed by Airservices to implement RNP4 for the benefit of other ASIOACG members. 1.2 RNP4 Context On 20 Jun 2004 the President of ICAO on behalf of the ICAO Air Navigation Commission authorised the use of 30 NM lateral and longitudinal separation standards between aircraft meeting the RNP 4 criteria; RNP 4 was subsequently implemented in Oceanic Airspace in the Brisbane and Melbourne FIRs ICAO Doc 7030 was amended for the MID/ASIA region to state that 30 NM separation standards may be applied in the Brisbane, Melbourne and other FIRs in the Pacific Ocean region between RNP 4 approved aircraft Note: ICAO Doc 4444 chapter 5 now contains instructions for longitudinal and lateral spacing using RNP 4 navigation tolerances ISPACG determined that a working group be established to implement RNP 4 in accordance with the provisions of ICAO Doc 7030 and 4444; the 30/30 Implementation Project was established and it achieved the implementation of RNP 4 in Auckland Oceanic, Brisbane, Honiara, Nauru and Nadi FIRs on 20 Jan 2005.

2 1.2.5 Following on from the successful implementation of RNP 4 by the 30/30 Implementation Project, RNP 4 separation standards were introduced in the Melbourne FIR on 11 Mar The implementation of RNP 4 in the Melbourne FIR was accelerated by leveraging the work completed by the 30/30 Implementation Project The sum of this work in both the Brisbane and Melbourne FIRs may provide a basis for a similar regional implementation of RNP 4 in the Indian Ocean area, including Mauritius and Malé FIRs. 1.3 Scope This Information Paper details the work that was completed to implement RNP 4 in the Pacific Ocean area (including the Brisbane FIR) and subsequently the Melbourne FIR. It aims to summarise ANSP considerations related to a future regional implementation of RNP 4 similar to that which was completed in the Pacific Ocean area Both aircraft and aircrew must be certified to the RNP 4 approval in order to be eligible for application of the standard to that aircraft. ICAO Doc 9613 details the requirements that must be satisfied by both an aircraft and its crew in order to meet the RNP 4 approval Reference and related documents: a) ICAO Doc 4444 Procedures for Air Navigation Services Air Traffic Management b) ICAO Doc 7030 Regional Supplementary Procedures c) ICAO Doc 9426 Air Traffic Services Planning Manual d) ICAO Doc 9613 Performance Based Navigation Manual e) ICAO Doc 9689 Manual on Airspace Planning Methodology for the Determination of Separation Minima f) ICAO Doc 9869 Manual on Required Communication Performance g) ICAO Annex 11 to the Convention on Civil Aviation - Air Traffic Services h) Australian Manual of Air Traffic Services (MATS) i) Australian Aeronautical Information Publication (AIP) j) En Route Monitoring Agency (EMA) Handbook k) Global Operational Data Link Handbook (GOLD) 2 DISCUSSION 2.1 Characteristics of RNP RNP 4 is a navigation approval based on a total system error (TSE) of ±4 NM along track and ±4 NM cross track for 95% of flight time 1 ; RNP 4 allows the use of 30 NM lateral and longitudinal separation standards between RNP 4 approved aircraft subject to a number of requirements The requirements for the use of the 30 NM standards may be summarised as 2 3 : 1 ICAO Doc 9613 p. II-C ICAO Doc 9613 p. II-C-1-2 Page 2 of 7

3 a) both aircraft are RNP 4 approved; b) both aircraft are reporting by ADS-C at least every 14 minutes when applying longitudinal separation; c) a data link event contract is set for lateral deviations greater than 5 NM; d) direct controller pilot communications exist with both aircraft (VHF or CPDLC); and e) when an expected ADS-C report is not received, an alternative separation standard must be implemented within 14 minutes from the time the report was expected ICAO Doc 9869 specifies communication specifications in the Required Communication Performance framework. The RCP 240 specification is currently envisaged as a specification for communications supporting the application of lateral and longitudinal separation of 30 NM Implementation of RNP 4 in the Brisbane and Melbourne FIRs ICAO Doc 9613 sets out a process for developing an airspace concept based on PBN and provides guidance for implementation of each recognised PBN specification An airspace concept describes the intended operations within an airspace volume; this airspace concept is driven by strategic objectives which are identified by airspace stakeholders the ANSP, airspace users, environmental and government policy. The most common strategic objectives driving airspace concepts are safety, capacity, efficiency, environment and access RNP 4 was implemented in the Brisbane and Melbourne FIRs to address capacity, efficiency and environment strategic objectives. The resulting airspace concept was Oceanic Airspace with a sparse route structure, user preferred routes and a mixed navigation environment including RNP 4 and RNAV 10. This airspace concept aligns with the ICAO Doc 9613 Oceanic/Remote Continental airspace concept ICAO Doc 9613 identifies the enablers to the airspace concept and the role that each enabler plays in facilitating the airspace concept; enablers include navigation and communication. 7 ICAO Doc 9613 also details how PBN, exposure to risk and intervention capability must be taken into account by airspace planners when determining separation minima and route spacing. 3 ICAO Doc 4444 p ICAO Doc and ICAO Doc 9613 p. I-A ICAO Doc 9613 p. I-A ICAO Doc 9613 p. I-A-2-3 fig. I-A-2-2 Page 3 of 7

4 2.3 Safety assessment A collaborative safety assessment was carried out by Airservices Australia and Airways New Zealand prior to the implementation of RNP 4 in the Pacific Ocean area including the Brisbane FIR. RNP 4 was found to meet the target level of safety (TLS) requirement 9 of no more than 5 10 fatal accidents per flight hour for application in the Pacific Ocean area (separate calculations were performed by Airservices Australia and Airways New Zealand and both resulted in figures lower than that required). 8 The method of safety assessment prior to implementation was the evaluation method as described in ICAO Doc A safety assessment was carried out prior to the implementation of RNP 4 in the Melbourne FIR and was similar to the ICAO Doc 9689 comparison with a reference system method 9 because the system being introduced in the Melbourne FIR was similar to that introduced in the Brisbane FIR ICAO Doc 9689 specifies the requirements for a proposed system to be considered sufficiently similar to a reference system in the proposed system, when compared to the reference system: a) the separation minima must not be less; b) communications and surveillance must not be of worse accuracy, reliability, integrity or availability; c) frequency and duration of application of the minimum separation between aircraft must not be greater; and d) navigation performance of the population aircraft must not be worse Doc 9613 Attachment B contains sample safety assessments for the implementation of 30 NM separation in oceanic and remote airspace. 2.4 Method of implementation The method of implementation chosen for the Melbourne and Brisbane FIRs was the no mandate mixed navigation capability method as described in ICAO Doc 9613 ie aircraft without RNP 4 approval may continue to operate in the Melbourne and Brisbane FIRs without RNP 4 approval although such aircraft are not eligible for application of RNP 4 separation standards. A mixed navigation capability environment dictates that there must be procedures to notify controllers of navigation capability 10 because the separation minima that may be applied between each aircraft pair will vary depending on the navigation capability of both aircraft Doc 9613 suggests other methods of implementation including mandate and mixed mandate. While the mandate method is simpler to administer from the perspective of the ANSP, it may be impractical for operators to upgrade all aircraft to RNP 4 standards. 2.5 Performance monitoring 8 9 The RGCSP recommends that 5 10 fatal accidents per flight hour is used as the assessment TLS for systems introduced after 2000 (see ICAO Doc 9689 p. 25) 9 ICAO Doc 9689 p ICAO Doc 9613 p. I-B-3-5 Page 4 of 7

5 2.5.1 A multi ANSP navigation error and communication difficulty reporting programme was established to compile data relating to gross errors in navigation and loss or difficulty of direct controller pilot communication (via CPDLC) prior to the initial implementation of RNP 4 in the Brisbane FIR; ICAO Doc 9613 dictates that monitoring be completed before implementation of RNP Collection of this data relies on radar, ADS-C and CPDLC data as well as crew reports (RNP 4 requires performance monitoring by aircrew) Monitoring of navigation performance in the Brisbane and Melbourne FIRs is now carried out by the Australian Airspace Monitoring Agency (AAMA), a division of Airservices Australia. AAMA is progressing towards a monitoring programme in accordance with the En Route Monitoring Agency (EMA) Handbook - a document published by the ICAO Bangkok Regional Office. Work on global guidance material for conducting monitoring programmes is ongoing and is currently in draft form AAMA collects traffic samples and assesses collision risk in the Brisbane, Honiara, Jakarta, Melbourne, Nauru, Port Moresby and Ujung Pandang FIRs and reports results to State authorities and ICAO. 2.6 Information to operators The Australian AIP was updated by Supplementary Publication (AIP SUP) before the implementation date of RNP 4; the AIP SUP notified operators that RNP 4 separation was available, directed them to avenues of obtaining approval from aviation regulators and provided information on specific flight planning and reporting requirements As implementation was through a no mandate mixed navigation capability method, the Australian AIP now lists RNP 4 as a PBN approval recognised (rather than required) in the Brisbane and Melbourne FIRs. 2.7 Training, internal operational documents and regional agreements Guidelines relating to the minimum topics of training for controllers are specified in ICAO Doc In Australia, controllers were provided with an RNP 4 specific training programme prior to the implementation of RNP 4. The programme ensured that controllers were proficient with the following: a) CPDLC knowledge; b) ADS-C knowledge; c) the effect of periodic reporting delays and failures on longitudinal separation; d) other ATM automation system and location specific procedures and knowledge eg changes to coordination requirements to surrounding units; and e) requirements for the application of RNP 4 separation standards as included in the Australian Manual of Air Traffic Services (MATS). 2.8 Regulatory authorities Airservices Australia aligned the implementation of RNP 4 with the introduction of procedures by the Civil Aviation Safety Authority Australia (CASA) for Australian operators to obtain RNP 4 approval; the work of the 30/30 Implementation Group for the initial implementation of RNP 4 was also forwarded to CASA. 11 ICAO Doc 9613 p. II-C-1-3 Page 5 of 7

6 2.9 Potential for leveraging The implementation of RNP 4 in the Melbourne FIR was able to rely extensively on the work completed by the ISPACG 30/30 Implementation Project for the Pacific Ocean area including the Brisbane FIR The development of strategic objectives and the resulting airspace concept applied equally to the Melbourne and Brisbane FIRs due to their similar operations. The monitoring programme conducted by the 30/30 Implementation Project was directly applicable to the Melbourne FIR due to the similar aircraft population and airspace characteristics and the resulting safety assessment completed prior to implementation in the Melbourne FIR was able to be based on the comparison with a reference system method which is less complex and less time consuming to complete than the evaluation method Some of the work completed for the implementation of RNP 4 in the Brisbane and Melbourne FIRs may now provide a basis for a similar regional implementation of RNP 4 in the Indian Ocean area including in the Mauritius and Malé FIRs Potential for leveraging exists in the following areas: The development of strategic objectives, airspace concepts, and identification and specification of the enablers to the airspace concept The regional implementation of RNP 4 in the Pacific Ocean area may be similar in its strategic objectives and resulting airspace concept to a regional implementation of RNP 4 in the Indian Ocean area i.e. Oceanic Airspace with sparse route structures and satellitebased navigation Safety assessments Where the airspace meets the requirements to be considered as a suitable pair with an existing reference system, savings may be made by utilising the comparison with a reference system safety assessment method prior to implementation Performance monitoring Significant work was completed prior to implementation regarding monitoring of navigation and communication performance of the population aircraft and ANSP equipment. However, the commonality of the population aircraft with the Brisbane and Melbourne FIRs should be determined Training, internal documents and regional agreements Training of controllers may be similar to that conducted prior to the implementation of RNP 4 in the Melbourne FIR especially where common equipment and procedures exist Letters of Agreement, local instructions and changes to AIP that were completed prior to implementation of RNP 4 in the Pacific Ocean area may provide a model on which to base changes for a regional implementation of RNP 4 in the Indian Ocean area Conclusion 12 ICAO Doc 9689 p. 19 Page 6 of 7

7 The implementation of RNP 4 in the Melbourne FIR was able to rely extensively on the work completed by the ISPACG 30/30 Implementation Project for the Pacific Ocean area including the Brisbane FIR The successful leveraging of earlier work completed by ISPACG for the implementation of RNP 4 in the Melbourne FIR may be replicated in the Indian Ocean area including Mauritius and Malé FIRs Components of implementation as described in ICAO documents including safety assessment, performance monitoring, training, internal documents and regional agreements may all benefit from comparison with, or reliance on the work completed for the Brisbane and Melbourne FIRs. Therefore, the opportunity exists for the regional implementation of RNP 4 in the Indian Ocean area in order to achieve improvements in capacity, efficiency and environmental benefits similar to those achieved in the Pacific Ocean area as well as the Brisbane and Melbourne FIRs. 3 ACTION BY THE MEETING The meeting is invited to consider the information presented in this paper as a means of accelerating RNP4 implementation in the ASIOACG region Page 7 of 7

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima

Manual on Monitoring the Application of Performance-based Horizontal Separation Minima Manual on Monitoring the Application of Performance-based Horizontal Separation Minima (PBHSM Manual) Presented to: 2 nd NAT PBCS Workshop By: Christine Falk Date: 17-19 June 2015 Overview Why a PBHSM

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Overview of Worldwide Data Link Equipage Mandates

Overview of Worldwide Data Link Equipage Mandates Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording

More information

ICAO provisions on data link implementation

ICAO provisions on data link implementation ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

Excerpts from ICAO PBCS Manual

Excerpts from ICAO PBCS Manual IBAC Bulletin - 8 Dec. 2017 Attachment A Excerpts from ICAO PBCS Manual Chapter 4. Complying with and RCP/RSP specification 4-8 4.3.1.7 The ANSP should establish the following, subject to a bilateral,

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_001 Subject: Implementation of Performance Based Separation Minima Originator: NAT SPG Issued: 06 February 2018 Effective: 29 March 2018 The purpose of this North Atlantic Operations

More information

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) AMOFSG/8-IP/6 23/12/09 AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG) EIGHTH MEETING Melbourne, Australia, 15 to 18 February 2010 Agenda Item 5: Observing and forecasting at the

More information

Global Operational Data Link Doc 10037

Global Operational Data Link Doc 10037 Global Operational Data Link Doc 10037 Global Operational Data Link (GOLD) Familiarization with Performance Based Communications and Surveillance (PBCS) Workshop Dakar, Senegal 11-15 September 2017 Prepared

More information

Consider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES

Consider problems and make specific recommendations concerning the provision of ATS/AIS/SAR in the Asia Pacific Region LOST COMMUNICATION PROCEDURES International Civil Aviation Organization Thirteenth Meeting of the APANPIRG ATS/AIS/SAR Sub-Group (ATS/AIS/SAR/SG/13) Bangkok, Thailand, 23-27 June 2003 ATS/AIS/SAR/SG/13 WP/30 23/6/03 Agenda Item 4:

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

The NAT OPS Bulletin Checklist is available at  & NAT Documents, NAT Documents, then NAT Ops Bulletins. Serial Number: 2017_003 Subject: RLatSM Phase 2 AIC Originator: NAT SPG Issued: 15 December 2017 Effective: 15 December 2017 The purpose of North Atlantic Operations Bulletin 2017-003 is to provide guidance

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

ICAO Annex 14 Standards and Aerodrome Certification

ICAO Annex 14 Standards and Aerodrome Certification ICAO Annex 14 Standards and Aerodrome Certification Punya Raj Shakya Regional Officer Aerodromes and Ground Aids, ICAO Asia/Pacific Regional Office (Bangkok) ICAO Workshop for Pacific Island States, 12-15

More information

ICAO UPDATE. (Presented by the Secretariat)

ICAO UPDATE. (Presented by the Secretariat) International Civil Aviation Organization 29/05/15 CAR/SAM Planning and Implementation Regional Group (GREPECAS) Third Meeting of the Programmes and Projects Review Committee (PPRC/3) (Mexico City, Mexico,

More information

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. BOBASIO 3-WP/09 22-24/10/2013 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. Agenda Item 7: Green Initiatives

More information

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING

MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING International Civil Aviation Organization Global Tracking 2014-WP/1 5/5/14 WORKING PAPER MULTIDISCIPLINARYMEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda item 1: Explore the need

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

EUR/SAM corridor airspace concept

EUR/SAM corridor airspace concept TWENTYENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT21) (Lisbon, Portugal, 8 to 10 June, 2016) Agenda Item 2: Air traffic management (ATM) RNP 4 IN THE EUR/SAM CORRIDOR

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

AERONAUTICAL INFORMATION CIRCULAR 33/17

AERONAUTICAL INFORMATION CIRCULAR 33/17 NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

Entry of Flight Identity

Entry of Flight Identity ADS-B TF/3-IP/13 International Civil Aviation Organization The Third Meeting of Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force (ADS-B TF/3) Bangkok, 23-25 March

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) Durban, South Africa, 4-5 June 2018 Agenda Item 4: System

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No. Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework

More information

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators

More information

AIR NAVIGATION COMMISSION

AIR NAVIGATION COMMISSION 13/2/04 AIR NAVIGATION COMMISSION ANC Task No. CNS-7901: Conflict resolution and collision avoidance systems PRELIMINARY REVIEW OF PROPOSED AMENDMENTS TO ANNEX 6, PART II TO INCLUDE PROVISIONS CONCERNING

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

(Presented by the Secretariat)

(Presented by the Secretariat) CNS/SG/4-WP29A INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE Fourth Meeting of the APIRG Communications, Navigation and Surveillance Sub-group (Dakar, Senegal, 25-29 July

More information

North Atlantic Initiatives

North Atlantic Initiatives North Atlantic Initiatives Monday, 17 March 2014; Session 4 (3:30 5:00) PRESENTED BY: Terry Cecil FAA International Operators Conference Tampa, FL March 17 20, 2014 Briefing Objective North Atlantic Initiatives

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3 IBAC TECHNICAL REPORT SUMMARY Subject: NAT Operations and Air Traffic Management Meeting: North Atlantic (NAT) Procedures and Operations Group Meeting 2 Reported by Tom Young POG2 took place at the ICAO

More information

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016

LARGE HEIGHT DEVIATION ANALYSIS FOR THE WESTERN ATLANTIC ROUTE SYSTEM (WATRS) AIRSPACE CALENDAR YEAR 2016 International Civil Aviation Organization Seventeenth meeting of the GREPECAS Scrutiny Working Group (GTE/17) Lima, Peru, 30 October to 03 November 2017 GTE/17-WP/07 23/10/17 Agenda Item 4: Large Height

More information

The list of action items. UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November 2014

The list of action items. UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November 2014 The list of action items UPDATED in ASIOACG/9 INSPIRE/5, Dubai UAE 11 th to 14 th November Number Action Item Action Officer(s) Current Status Action Pending Target Date 1. Phased approach A04-02 Introduction

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Services Charter. 2014/15 to 2015/16

Services Charter. 2014/15 to 2015/16 Services Charter 2014/15 to 2015/16 Services Charter Overview Objective Airservices Australia is a governmentowned organisation providing safe and environmentally sound air traffic management, aviation

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

Proposal for the updating of the FASID ATM Evolution Tables

Proposal for the updating of the FASID ATM Evolution Tables WP/24 22/09/03 International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions Sixth Meeting/workshop of Air Traffic Management

More information

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator: Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM.965.037 Operator: Adress: E-mail: AOC No: Phone no: The relevant elements defined in the mandatory part of the Operational

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017 Part 171 CAA Consolidation 10 March 2017 Aeronautical Telecommunication Services - Operation and Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 171 provides the

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2.

(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2. 15/ 2/13 INTERNATIONAL AIRWAYS VOLCANO WATCH OPERATIONS GROUP (IAVWOPSG)) SEVENTH MEETING Bangkok, Thailand, 18 to 22 March 2013 Agenda Item 3: Follow-up of IAVWOPSG/6 conclusions STATUS OF FOLLOW-UP OF

More information

Implementation of the new CNS/ATM systems in the region

Implementation of the new CNS/ATM systems in the region SEACG/12 WP/9 03/05/05 International Civil Aviation Organization The Twelfth Meeting of the South East Asia ATS Coordination Group (SEACG/12) Bangkok, Thailand, 3 6 May 2005 Agenda Item 5: Implementation

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT/20 WP/10 Attachement A PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT Region PROJECT DESCRIPTION (PD) Title of the Project Starting date Ending date Meetings on The Improvement of Air Traffic Services

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item

More information

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018

OPERATIONS CIRCULAR. Subject: Performance Based Communication and Surveillance (PBCS) OC NO 01 of 2018 Date: 23 rd March 2018 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 01 of 2018 Date: 23 rd March 2018 OPERATIONS CIRCULAR File No AV 22024/02/2018-FS Subject: Performance Based Communication

More information

Terms of Reference for a rulemaking task

Terms of Reference for a rulemaking task Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1

More information

Bits to Blocks Aviation System Block Upgrades (ASBU)

Bits to Blocks Aviation System Block Upgrades (ASBU) Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make

More information

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20 NPF/SIP/2011-WP/20 Aerodrome Safety Saulo Da Silva International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nadi, Fiji, 28 March-1

More information

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE Terms of Reference for a rulemaking task Implementation of Evidence-Based Training within the European regulatory framework ISSUE 1 3.9.2015 Applicability Process map Affected regulations and decisions:

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System

Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System Inmarsat GADSS Solutions Global Aeronautical Distress and Safety System 30 November 2016 While the information in this document has been prepared in good faith, no representation, warranty, assurance or

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

NATA 2018 AGM & CONFERENCE

NATA 2018 AGM & CONFERENCE NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING. Montreal, 31 January to 11 February 2005 AGENDA ITEM 5

FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING. Montreal, 31 January to 11 February 2005 AGENDA ITEM 5 10/2/05 FLIGHT CREW LICENSING AND TRAINING PANEL (FCLTP) SECOND MEETING Montreal, 31 January to 11 February 2005 AGENDA ITEM 5 The attached constitutes the report on Agenda Item 5 and should be inserted

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE. Lisbon, Portugal, 19 to 20 May 2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICAN OFFICE FOURTEENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT/15) Lisbon, Portugal, 19 to 20 May

More information

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)

More information

ICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ

ICAO Changes to the Present Flight Plan Form. Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ Introduction to FPL 2012 Background ICAO 2012 Timeline ICAO 2012 Impacts

More information

ASSEMBLY 37TH SESSION

ASSEMBLY 37TH SESSION International Civil Aviation Organization WORKING PAPER A37-WP/73 11/8/10 ASSEMBLY 37TH SESSION TECHNICAL COMMISSION Agenda Item 25: Follow-up of the High-level Safety Conference (2010) REPORT ON THE IMPLEMENTATION

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

SRC POSITION PAPER. Edition March 2011 Released Issue

SRC POSITION PAPER. Edition March 2011 Released Issue E U R O C O N T R O L SRC POSITION PAPER Safety Assessment of Optimised Operations in Low Visibility Conditions Utilising Landing Clearance Delivery Position and/or Landing Clearance Line Concept, Edition1.5,

More information

ICAO Initiatives on Global Tracking

ICAO Initiatives on Global Tracking ICAO Initiatives on Global Tracking Nancy Graham Director, Air Navigation Bureau, ICAO Expert Dialogue on Real-time Monitoring of Flight Data, including the Black Box the Need for International Standards

More information