1 European Aviation Safety Agency Strategy & Safety Management Directorate International Cooperation Department Guidance Material Flight Procedure Approval SIASA Grant Contract 2012/ December 2015 Union and implemented by EASA

2 Preamble SIASA project The European Aviation Safety Agency (EASA) was awarded a grant contract by the Secretariat of the African, Caribbean and Pacific Group of States (ACP Group) and the European Aviation Safety Agency (EASA) related to the (SIASA) in November The beneficiaries are aviation authorities of Sub-Saharan Africa and more specifically the Regional Safety Oversight Organisations (RSOO) and Cooperative Development of Operational Safety and Continuing Airworthiness Programmes (COSCAP) of the region and national Civil Aviation Authorities (CAA). The purposes of the SIASA project were as follows: To ensure the development of common regional safety standards and procedures meeting the international requirements in civil aviation (ICAO standards) and eventually the EU aviation safety rules; To contribute to the establishment of effective and sustainable RSOOs via institutional assistance and training of staff. The following five categories of activities were identified during the inception report and was later validated by the project steering committee during its first meeting and constituted the structure of the project s action plan: Assistance to States with SSCs Regulation and guidance material Workshop Training Organisational Within the category Regulation and guidance material, a working group has been set up to develop Guidance Material for flight procedure approval by CAA personnel. Participants in this working group are delegates from Cameroon Civil Aviation Authority (CCAA), Kenya Civil Aviation Authority (KCAA), Mauritania Civil Aviation National Agency (ANAC) and the Nigeria Civil Aviation Authority (NCAA) with the active contribution from ICAO African Flight Procedure Programme (AFPP) and some experts from the French DGCA and EASA. Disclaimer: This document has been produced with the financial assistance of the European Union. The contents of this document is the result of the working group in charge of the development of this guidance material and can under no circumstances be regarded as reflecting the position of the European Union. ISO 9001:2008 Certified Page ii

3 TABLE OF CONTENT SIASA project 1. Introduction Prerequisite Creation of a law (order/circular) Creation of a CAA procedure Compliance with national regulations The ICAO Document The ICAO IFP implementation process (Doc 9906) Step 1: Initiation Step 2: Collect and validate data Step 3 : Create a conceptual design Step 4: Review of the conceptual design by stakeholders Step 5: Apply criteria Step 6: Document and store Step 7: Conduct Safety Activities Step 8: Conduct validation and criteria verification Step 9 : Consultation with stakeholders Step 10 : approval of IFP by the CAA Step 11 : create draft publication Step 12 : Verify draft publication Step 13: Publish IFP Step 14 : Obtain feedback from stakeholders Step 15 : Conduct continuous maintenance Step 16 : Conduct periodic review Additional requirements of the regulatory framework Storage Competency requirements Oversight activities PANS OPS inspectors qualification Audits Review of safety assessment Criteria exemption requests examination Follow up of designers competency by the CAA ISO 9001:2008 Certified Page iii

4 7. Useful Documentation ICAO ICAO IFP Process Flow Diagram Acronyms and abbreviations ISO 9001:2008 Certified Page iv

5 1. Introduction SIASA project EASA has implemented SIASA Project in order to support the improvement of Aviation Safety in Africa. The ICAO references for flight procedure design Doc 8168, has had a change of scope with the advent of PBN introduction (Doc 8168 Part III and Doc 9613). Moreover, due to its extension, its procedures are not always fully understood and transposed to the national AIP as required by Annex 15. The aim of this activity is to setup a group that will develop simplified guidance material for the usage of CAA or regional bodies as required for the development, approval and implementation of instrument flight procedures, conventional and PBN, in accordance with the ICAO Document The composition of the group is based on the economical bodies for Africa, with the expert support of the African Flight Procedure Programme. This programme is a not-for-profit programme of excellence in the field of performance-based navigation implementation developed by ICAO. The programme will utilize best practices in training, automation and quality assurance. The programme will foster all aspects of PBN implementation including training, procedure design, validation and quality assurance, airspace design, and operational approval. Members of the group are experts in the domains concerned for instrument flight procedures regulatory approval. The guidance material will be developed through meetings under EASA support. The guidance material is recommended to African Civil Aviation Authorities in charge of instrument flight procedures regulatory approval. Note: In this document, the term "must" is used in reference to a strong recommendation to implement ICAO requirements. ISO 9001:2008 Certified Page 1 of 15

6 2. Prerequisite 2.1. Creation of a law (order/circular) The State must promulgate an order/circular to define the process to implement instrument flight procedures (IFP) in the State (regulatory framework), including development and approval steps. This regulatory framework must reflect the obligations included in Annex 11, appendix 6, Creation of a CAA procedure The CAA must create a procedure describing means to set up the oversight of IFP implementation, including design, approval, review of safety assessment, audits, follow up of designer's competency and criteria exemption Compliance with national regulations For those states that have already incorporated in their national regulations such a process, it is recommended to review them against the process defined in this document. ISO 9001:2008 Certified Page 2 of 15

7 3. The ICAO Document 9906 SIASA project The documents and procedures created by the CAA should make use of the ICAO document 9906 on Quality Assurance for Instrument Flight Procedure Design. Each requirement created by the CAA or adapted from doc 9906 must be explained and should not be less restrictive than ICAO doc ISO 9001:2008 Certified Page 3 of 15

8 4. The ICAO IFP implementation process (Doc 9906) 4.1. Step 1: Initiation The request would be initiated by an initiator stakeholder with clear statement of justification. An initial briefing will be organised to facilitate preliminary discussions between the initiator stakeholder and the CAA regarding the high-level implications of a proposed IFP introduction or change. The initial briefing provides the CAA the opportunity to provide appropriate and tailored advice and guidance on the specific requirements of each IFP proposal. It also provides the initiator stakeholder the opportunity to advise the CAA of outline IFP proposal requirements, any specific issues or concerns associated with these. It is advisable to involve the concerned ANSP/aerodrome operator in the initial briefing. Possible affected stakeholders need to be identified. The following is a list of potential stakeholders to be involved in the Project development: CAA, ANSP, air operators, environmental bodies when relevant, IFP designer, airport management, general aviation, aerial work, military when relevant. The initiation meeting is organized by the initiator stakeholder in coordination with the CAA for all concerned stakeholders. Prior to the initiation meeting, it is recommended that the initiator stakeholder and the CAA have prepared the documentation regarding the Project. It is recommended to choose an IFP design service provider among those designated by the State. The output of the initiation meeting should be a Go/NoGo decision at managerial level to continue with the IFP development. The purpose of the initiation meeting is to identify possible issues with affected stakeholders, which the initiator stakeholder will have to consider in the IFP development. The nominations of the Project Manager (Initiator stakeholder) and the CAA focal point are part of the process. They should be nominated at this point in the process. Note: during this step, runway certification has to be checked against flight procedure project Step 2: Collect and validate data Data collection Data should be collected by the IFP designer. The IFP designer must ensure that specific ATS requirements related to local traffic patterns (altitude, direction and airspeed), feeder/transitions, arrival/departures, preferred routes, ATS routes, communication facilities, time, restrictions and any ATS needs, restrictions or constraints are provided by the ATS provider. The IFP designer must collect the following data from recognized sources: Terrain data: electronic raster and/or vector data or paper cartographic maps; Obstacle data (man-made or natural) with their coordinates and elevation; ISO 9001:2008 Certified Page 4 of 15

9 Aerodrome/heliport data, e.g. ARP/HRP and runway(s) with their coordinates and elevation, lighting, magnetic variation and rate of change, weather statistics, altimeter source; Aeronautical data: airspace structure, airspace classifications (A, B, C, D, E, F, G), airways/air routes, altimeter transition altitudes/flight levels, neighbouring instrument procedures, area(s) of magnetic unreliability; NAVAIDS data: coordinates, elevation, service volume, frequency, identifier, magnetic variation; Existing significant points to local navigation Validation of data The IFP designer must use aeronautical data that meet the requirements of accuracy, resolution and integrity as required in Annex 4, Annex 14, and Annex 15. It is recommended that IFP designer visits the airport to see obstacles and terrain and evaluate the validity of the data (accuracy, resolution, integrity, reference geodetic datum and effective dates) then incorporate them into the design documentation. An additional data/survey on site would be requested by the IFP designer, if necessary. Up to date data must be used. If not the case, conservatory margins have to be taken by the IFP designer. The technical study can begin with these margins Step 3 : Create a conceptual design No need to involve the CAA. The IFP designer responsible for the IFP design should develop a conceptual design for review by the stakeholders. Coordination with interested/affected stakeholders should continue throughout the conceptual phase and the subsequent design phase of this process. Complex design environment develop several design options in order to provide sufficient input for the review of the design concept Step 4: Review of the conceptual design by stakeholders Conceptual design is sent to be reviewed by the stakeholders and validated. The conceptual design should include a targeted implementation AIRAC date. Militaries and environmental bodies have (in almost all cases) to be present. The review should preferably be carried out in a face-to-face meeting, and CAA must be part of this meeting. Conclusion of this meeting must be sent to the CAA for information (equivalent of a notification). ISO 9001:2008 Certified Page 5 of 15

10 4.5. Step 5: Apply criteria Actions for IFP designer SIASA project The flight procedure designer must design flight procedures according to criteria defined by the State. These criteria should take the ICAO PANS-OPS as the basis. The design criteria (PANS OPS criteria for instance) to be used in the State has to be written in the national regulation. In the event that the State decides to use the criteria of Doc 8168 PANS-OPS but with certain differences, this should be indicated in the State AIP in accordance with Annex 15. In case of exemptions/deviations from PANS OPS criteria, formal approval by CAA is needed at this stage. To this end, the State must provide in its regulations the possibility to deviate from the current design criteria and the requirements and documentation to be provided for this purpose. The waiver request will be composed of at least: A clear statement of the need to deviate from the existing criteria; A presentation of the various criteria whose use is envisaged; Any aeronautical study to demonstrate that the procedures designed using these criteria would achieve an equivalent level of safety. Expertise of experienced pilot may be required. The IFP design service provider must develop a training program according to the requirements in point 5.2.1, which ensure that designers have the mastery of the criteria used. The design of flight procedures can be done manually or with software. However, to improve the quality of design (reducing errors by automating calculations) and to facilitate the traceability of data, designers must use design software validated by the State Step 6: Document and store The IFP designer must document the IFP design activities (the technical report) in order to facilitate the validation and later maintenance. IFP designer has to document the following: Necessary data used as input in the IFP design; IFP design file that includes design criteria (especially when the design criteria differ from those in PANS OPS), calculations, parameters, publication drafts and the data to be published in AIP; Tools and software used; Stakeholder feedback during the initiation review Step 7: Conduct Safety Activities Determine level of safety impact It is important to assess the level of the safety impact. The goal of the safety assessment is, at least, to study the integration of the flight procedure in the concerned airspace and assess its impact on safety. It should aim at demonstrating that no unacceptable safety risk are introduced in the system. ISO 9001:2008 Certified Page 6 of 15

11 To assess the impact on safety of the change, a preliminary hazard analysis should be conducted to determine the likely hazards that may arise from the change. Determining this may be accomplished by measuring the impact in various domains, such as: Operational consequences of the change ; Operational consequences for external partners; Level of new functionality introduced in contrast to the existing systems; Number of technical systems affected by the change ; Amount of training or amount of additional staffing needed; and Complexity of the transition from the existing system. Responsibility belongs to the project manager, but the assessment should be performed by those stakeholders that have managerial control over the risks posed by the IFP (e.g. ANSP, aerodrome, airspace users, CAA). The assessment has to be performed by competent and trained staff in safety assessment activities. Coordination between stakeholders and IFP designers during the safety assessment is paramount. Relevant stakeholders (at least ANSP and IFP designer) must participate in the safety assessment Develop safety documentation Safety documentation should be provided for the approval of the IFP. The safety documentation must have a conclusion (saying that the level of safety is acceptable, otherwise the IFP should be modified or abandoned). A good practice is to have this document signed by 3 different people ( written by, verified by, approved1 by ) before submission for the CAA approval. The project manager has to be the person signing in the approved by box. A list of persons who have participated to the realisation of the safety assessment should be included in the documentation Step 8: Conduct validation and criteria verification The purpose of validation is to obtain an assessment of procedure design including obstacle, terrain and navigation data, and provides an assessment of flyability of the procedure. The full validation process includes ground validation and flight validation Ground Validation Ground validation is a mandatory step for each new or modified flight procedure. Ground validation must always be undertaken. It encompasses a systematic review of the steps and calculations (IFP design review) involved in the procedure design as well as the impact on flight operations by the procedure (pre-flight validation). IFP design review must be undertaken by an independent and qualified IFP designer. Once the IFP review is completed with no objections, the pre-flight validation activities must be carried out. The result of this validation must be documented to be submitted as part of the document package for the CAA approval of the IFP. Pre-flight validation (on ground) is aimed 1 This approval is not done by the CAA, but an internal approval. ISO 9001:2008 Certified Page 7 of 15

12 at determining the impact of IFP on flight operations. This validation is conducted by a person(s) with appropriate knowledge of flight validation issues, preferably by an experienced pilot, and the IFP designer. The goal of pre-flight validation is to familiarize and identify potential issues in the procedure design from a flight operational perspective and decide the further steps in the validation process (e.g. to decide if simulator evaluation and/or flight evaluation are needed). The result of this validation must be documented to be submitted as part of the document package for the CAA approval of the IFP Flight validation Flight validation is a mandatory step only if the outcome of the pre-flight validation stipulates it has to be conducted. There are two types of activities in the flight validation: simulator evaluation and flight evaluation. It is recommended practice to undertake simulator evaluation prior to the flight evaluation, if possible Simulator evaluation Recommended step for complex procedures or procedures requiring waiver/mitigation for deviations from design criteria. The aim is at verifying chart depictions, assess flyability and evaluate human factors issues. Flight evaluation The purpose of a Flight evaluation is to check the flyability of a procedure and needs in certain cases to be conducted by an adequate type of aircraft. This information is provided by the validation pilot. Flight evaluation is performed in order to verify data, charts and to assess obstacle infrastructure, flyability and human factors aspects, among others objectives. Note: Periodic flight inspection can be used to perform flight evaluation depending on the aircraft category of the IFR procedure Flight inspection Flight inspection (see ICAO Doc ) may be required for the purpose of calibrating ground-based NAVAIDS or monitoring/evaluating the performance of the GNSS (to make sure that there is no interference or permanent jamming of the GNSS signal). Flight inspection must be performed by a qualified flight inspector using a suitably equipped aircraft. The CAA has to decide if the flight inspection is a mandatory step in the IFP validation of specific procedures (e.g., for new PBN procedures) Produce validation documentation (report) This final step is to assure proper completeness of all forms and reports to validate the entire IFP package. The validation report should consist of individual reports of all steps performed in the validation process Step 9 : Consultation with stakeholders At this stage of the development, all stakeholders should be consulted to get their opinion on the proposed procedure. Gathering their input at this stage allows the creation of a statement ISO 9001:2008 Certified Page 8 of 15

13 on the fulfilment of the initially agreed requirements (the initiation meeting and the review of the conceptual design). Depending on environmental protection laws in each State, a consultation of environmental bodies has to be conducted. The stakeholders competent in that domain should validate those areas of specific competency that the design office does not possess. A written statement from those entities will serve for the approval process of the IFP. The stakeholders have to be the same as the ones present at the step 4 (review of the conceptual design), which include militaries and environmental bodies. It is unlikely that any issue will be raised at this point of the process, but in the event of a significant safety issue being identified, the IFP may need to be reconsidered. The project manager has the possibility to allow a new modified design (back to step 1), in case of an objection from a stakeholder. Stakeholders endorsement The Stakeholders and users views and comments shall be documented and stored. Before stakeholders endorsement different opinions and feedback should be analysed and collated. This should form part of the documentation for the approval process of the IFP. This consultation can takes place as a public meeting or with video conference, expert workshop or even just by Step 10 : approval of IFP by the CAA Each new or modified flight procedure must be approved by the CAA before being published in the AIP 2. The documentation needed to get the approval is provided by the Project Manager and it includes: Report of the Managerial decision (step 1) Technical report of the instrument flight procedure design, including the instrument flight procedure description and the draft publication Report of the data validation (step 2); this report could be inserted in the technical report Report of the Safety assessment (step 7) Report of the validation process (step 8) including ground validation report (IFP reviewed by an independent designer and pre-flight review) and flight validation report (as relevant step: simulator evaluation, flight evaluation and flight inspection) Stakeholders endorsement from the consultation (step 9) The designer s competency documentation (including initial and recurrent training) could be requested but it is recommended in Doc 9906 The software validation would be provided. The framework of the document would be shared with the provider 2 This has been proposed as amendment to Annex 11, Chapter 2, point 2.32 in the ICAO SL15.22 dated on the 13 th May 2015 ISO 9001:2008 Certified Page 9 of 15

14 A conformity certificate which indicates that the procedure has been designed in conformity with criteria accepted by the CAA (refer to national regulation) would be provided. Note: CAA has to check if the runway certification is compliant with the flight procedure intended to be published Upon completion of its evaluation of the IFP, the CAA must inform the Project manager of its decision to accept or reject the IFP without undue delay, including the rationale supporting its decision to approve or reject the IFP proposal. The CAA must publish its approval of the proposed IFP Step 11 : create draft publication The AIS must develop the chart taking into account all relevant requirements of Annex 4 and Annex 15. Additional requirements valid for the State in which the procedure is to be implemented should also be considered. IFP designer must provide all relevant information required for the AIP publication, including a coding table. Rules and standard for the coding table should be based on ARINC 424 requirements. It is important that the AIS receives the entire IFP, supported by a graphical depiction, for regulatory approval and for the initiation of the AIRAC publication process Step 12 : Verify draft publication Actions for IFP designers (and possibly others stakeholders such as pilot, users of the procedure, etc. ). The final draft charts must be verified to check completeness and correctness. Other stakeholders should also receive a copy of the draft State publication at this stage to check completeness Step 13: Publish IFP Action for AIS: Publish IFP as per Annex 4, Annex 15 and State requirements Step 14 : Obtain feedback from stakeholders Action for ANSP/Aerodrome operator. ANSP/Aerodrome operator should develop some mechanisms in order to get feedback from users of the new procedures published. This feedback should be forwarded to the IFP designers for information or necessary action Step 15 : Conduct continuous maintenance It is a good practice to designate the ANSP and/or aerodrome operator as responsible for step 15 and 16, in collaboration with the CAA, when appropriate. When ATS is available on the ISO 9001:2008 Certified Page 10 of 15

15 airport, the ANSP should be responsible for the maintenance and the periodic review. Otherwise, airport operator should be responsible. The goal is to ensure that every change identified to obstacles, aerodrome, aeronautical data and criteria are assessed. If required, a modification of the flight procedure has to be initiated as soon as possible. The designer must have access to these information, through the responsible nominated organisation. The IFP designer will have to determine whether or not the change is significant or not. This should be reported to the ATS/Aerodrome operator for the decision of further steps, including the need of re-design part or all of the flight procedure following the complete process Step 16 : Conduct periodic review The goal is to update the flight procedure on a periodic basis, determined by the CAA. All changes that occurred since the publication or the last review of the procedure have to be reviewed. If as a result of the review, the need of a redesign of part or all of the flight procedure is identified, the complete process should be followed. This periodicity must not be greater than 5 years. This periodicity shall be written in the national regulations. ISO 9001:2008 Certified Page 11 of 15

16 5. Additional requirements of the regulatory framework 5.1. Storage The IFP designer and the project manager must store the IFP documentation (technical report, safety assessment, software version ) as long as the flight procedure is in service. A paper version and an electronic version (.pdf preferred) should be stored Competency requirements The CAA must establish requirements to ensure flight procedure designers' competency. The IFP design service provider must be responsible to ensure their designs are competent trained in IFP design. These requirements must be included in the national regulation. The Training program for IFP designer consists of: Initial training (theoretical and practical/ojt training). An initial training course should be based as a minimum on: ICAO Doc PANS-OPS; ICAO Doc 9613 PBN Manual; ICAO Doc 9906 Quality Assurance Manual for Flight Procedure Design; and Software tools used in the design. This may be acquired as part of the onthe-job training. Continuous training: A designer who has been declared fit to design autonomously IFP must maintain its competency. To do this, the CAA can ask him to design a certain number of IFP per year or to verify a certain number of IFP per year. These figures have to be discussed between the CAA and the main IFP service provider in order to reach a sufficient level of safety without too stringent constraints. Refresher training: Refresher training is aimed at addressing changes in the available criteria (PANS-OPS) and regulations, recurrent to strengthen skills and knowledge due to their disuse. If a designer wants to follow another initial procedure designers training, he will have to demonstrate to the CAA that a skill level at least equivalent is reached at the end of the course. Any new information regarding IFP design must be distributed to the IFP design services. CAA must that this action is in place. The IFP design provider should set up a mechanism to ensure that procedures designers have knowledge of the amendments of the design criteria and that the IFP are developed and reviewed in the light of these amendments. Once the theoretical initial training is completed, the designer is considered as a designer "in training" and a good practice is to require the IFP designer to undertake practical application of theoretical knowledge with the assistance of an experienced designer before designing an IFP in real situations. This could be achieved, e.g. with minimum of 2 IFP designs completed over period of 1 year. ISO 9001:2008 Certified Page 12 of 15

17 6. Oversight activities SIASA project 6.1. PANS OPS inspectors qualification PANS OPS inspectors need to acquire competency about the design of a flight procedure and about the oversight methodology: Flight procedure design competency: In order to have a sufficient PANS OPS knowledge to deal with every issue that can be encountered during the flight procedure design process, CAA inspectors should follow the same qualification process as designers, except OJT. Each CAA has to decide what kind of training, PANS OPS inspectors have to follow in order to acquire the competency. Oversight competency: In order to carry out oversight function, PANS OPS inspector must follow a training which includes auditing technique, safety assessment review technique, follow-up of designers' competency and criteria exemption request examination Audits The CAA may carry out audits in accordance with local procedures Review of safety assessment This action has to be done according to standards Criteria exemption requests examination The national regulation (law/order) must include a paragraph dealing with exemption request for design criteria. The CAA should establish a process to manage the exemption requests. As a minimum, it is advised to include that: A deviation request notification is sent as soon as possible to the CAA; A CAA contact is clearly identified; Documentation needed by the CAA in order to provide the exemption; Once the CAA has been notified and has received the full deviation request case, as specified above, the CAA must analyse the demand and the argument to decide whether this is acceptable or not. To achieve a satisfactory level of confidence, the CAA should get support and advice from Expert organization if independent from flight procedure design services, foreign CAA advisers if partnership is signed with them, operations department from the CAA in case of flyability issue, etc. Archiving the complete case with the final exemption request granted and signed by the CAA. ISO 9001:2008 Certified Page 13 of 15

18 6.5. Follow up of designers competency by the CAA A good practice to check the competency of IFP designers is for the CAA to receive the competency certificates from the hierarchy of the IFP designer. A list of people authorized to design for the State airspace may be kept updated by the CAA. This list may be used each time an approval request is asked. ISO 9001:2008 Certified Page 14 of 15

19 7. Useful Documentation 7.1. ICAO SIASA project Annex 4 - Aeronautical Charts Annex 11 - Air Traffic Services Annex 14 - Aerodromes Annex 15 - Aeronautical information services Doc PANS-ATM Doc Manual on Testing of Radio Navigation Air, vol I, vol II Doc Aircraft Operations, vol II Doc Aeronautical Chart Manual Doc Airport Service Manual Control of Obstacles Doc Stolport Manual Doc AN/904 Manual on the Use of the Collision Risk Model (CRM) for ILS operations Doc All Weather Operation manual Doc AN/911 Instrument Flight Procedure Construction Manual Doc PBN Manual Doc WGS Manual Doc Safety Management Manual Doc Guidelines for Electronic Terrain, Obstacle and Aerodrome Mapping Information Doc Manual for RNP-AR procedure design Doc Quality Assurance Manual for FPD, vol I, vol II, vol III, vol V and vol VI, Doc Continuous Descent Operations Manual (CDO) Doc Manual on Use of PBN in Airspace Design Doc Continuous Climb operations Manual (CCO) Doc PBN Operational Approval Manual ISO 9001:2008 Certified Page 15 of 15

20 7.2. ICAO IFP Process Flow Diagram ISO 9001:2008 Certified Page 16 of 15

21 7.3. Acronyms and abbreviations SIASA project AIS AIRAC ANSP ARINC 424 ARP ATS CAA Doc EASA GNSS HRP ICAO IFP OJT MOC NAVAIDS PANS OPS PBN SIASA Aeronautical Information Services Aeronautical Information Regulation and Control Air Navigation Service Provider A Specified Navigation System Data Base standard Aerodrome Reference Point Air Traffic Services Civil Aviation Authority Document European Aviation Safety Agency Global Navigation Satellite System Heliport Reference Point International Civil Aviation Organization Instrument Flight Procedure On The Job Training Minimum Obstacle Clearance Navigation Aids Procedure for Air Navigation Services-Operations Performance Based Navigation Support the Improvement of Aviation Safety in Africa ISO 9001:2008 Certified Page 17 of 15

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

IRELAND SAFETY REGULATION DIVISION

IRELAND SAFETY REGULATION DIVISION NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November

More information

Quality Assurance Manual for Flight Procedure Design

Quality Assurance Manual for Flight Procedure Design Doc 9906 AN/472 Quality Assurance Manual for Flight Procedure Design Volume 1 Flight Procedure Design Quality Assurance System Approved by the Secretary General and published under his authority First

More information

Asia Pacific Regional Aviation Safety Team

Asia Pacific Regional Aviation Safety Team International Civil Aviation Organization (ICAO) Regional Aviation Safety Group (Asia & Pacific Regions) Asia Pacific Regional Aviation Safety Team GUIDANCE FOR AIR OPERATORS IN ESTABLISHING A FLIGHT SAFETY

More information

ADQ Regulators Working Group

ADQ Regulators Working Group ADQ Regulators Working Group Common Understanding 01/2013 Application of the provisions of Commission Regulation (EU) 73/2010 to NOTAM Edition: 1.4 Date: 20 October 2016 Reference: ARWG CU 01/2013 ARWG

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

AERODROME SAFETY COORDINATION

AERODROME SAFETY COORDINATION AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome

More information

Aerodrome s Inspector Workshop Sint Maarten 11 to 15 June 2012

Aerodrome s Inspector Workshop Sint Maarten 11 to 15 June 2012 Aerodrome s Inspector Workshop Sint Maarten 11 to 15 June 2012 1 Certification what, why and how. Outline: - ICAO requirements and guidance associated with aerodrome certification. - Requirements of and

More information

Competency of Surveyors

Competency of Surveyors Competency of Surveyors Session 2.1: Obstacle Identification & Data Collection 5 December 2017 AERODROME SAFEGUARDING WORKSHOP (Cairo, Egypt, 4-6 December 2017) Presented by: Michelle Soliman, Aerodrome

More information

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017 Part 171 CAA Consolidation 10 March 2017 Aeronautical Telecommunication Services - Operation and Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 171 provides the

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

ICAO Annex 14 Standards and Aerodrome Certification

ICAO Annex 14 Standards and Aerodrome Certification ICAO Annex 14 Standards and Aerodrome Certification Punya Raj Shakya Regional Officer Aerodromes and Ground Aids, ICAO Asia/Pacific Regional Office (Bangkok) ICAO Workshop for Pacific Island States, 12-15

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)

More information

THE QUALITY ASSURANCE MANUAL FOR FLIGHT PROCEDURE DESIGN

THE QUALITY ASSURANCE MANUAL FOR FLIGHT PROCEDURE DESIGN Doc 9906-AN/472 THE QUALITY ASSURANCE MANUAL FOR FLIGHT PROCEDURE DESIGN VOLUME 6 FLIGHT VALIDATION PILOT TRAINING AND EVALUATION (Development of Flight Validation Pilot Training Programme) Notice to Users

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

Training and licensing of flight information service officers

Training and licensing of flight information service officers 1 (12) Issued: 16 August 2013 Enters into force: 1 September 2013 Validity: Indefinitely Legal basis: This Aviation Regulation has been issued by virtue of Section 45, 46, 119 and 120 of the Aviation Act

More information

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011 DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen

More information

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS) Rulemaking Directorate Terms of Reference for a rulemaking task Requirements for Air Traffic Services (ATS) ISSUE 1 9.7.2014 Applicability Process map Affected regulations and decisions: Affected stakeholders:

More information

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet NNF Work-shop on Navigation, Safety and Technology Dato: 2. February 2016 Gunn Marit Hernes Luftfartstilsynet Scope Present an overview of the main regulatory activities currently undertaken by EASA in

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY 1. INTRODUCTION (22 July 2015) 1.1 These administrative

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

Andres Lainoja Eesti Lennuakadeemia

Andres Lainoja Eesti Lennuakadeemia Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No. Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework

More information

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 145 CAA Consolidation 10 March 2017 Aircraft Maintenance Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 145 prescribes rules governing the certification

More information

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 January 2018 AMENDMENTS Location Date Amended by Description CONTENTS 17.1 GENERAL... 4 17.1.1 Applicability...

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 174 METEOROLOGICAL SERVICES FOR AVIATION Published by Air Safety Support International Ltd Air Safety Support International Limited 2017 First Issue

More information

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Quality Management System (QMS)

Quality Management System (QMS) Quality Management System (QMS) Abbas NIKNEJAD Regional Officer, AIM/ATM Annex 15 provisions related to QMS Quality: Degree to which a set of inherent characteristics fulfils requirements (ISO 9000*).

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION INTERNATIONAL CIVIL AVIATION ORGANIZATION Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9-11 October 2017) Agenda Item 5: Regional

More information

Cooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training of Airworthiness Inspectors

Cooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training of Airworthiness Inspectors COSCAP- Training of Airworthiness Inspectors Part V _ STATE SAFETY OVERSIGHT SYSTEM (ICAO Doc 9734, Part I) By Nadia Konzali COSCAP-GS Project Coordinator FLIGHT PLAN 1. Civil aviation regulations; 2.

More information

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY (DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY 26 May 04 TABLE OF CONTENTS CONTENTS... PAGE SECTION 1: INTRODUCTION...3 SECTION 2: RVSM OPERATIONAL CONCEPT...3 SECTION 3: AFI

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Aerodrome Certification Applicable provisions

Aerodrome Certification Applicable provisions Aerodrome Certification Applicable provisions ICAO CAR/SAM Seminar on Aerodrome Certification October 2017 Avner Shilo Technical Officer, Airport Operations and Infrastructure, ICAO Agenda The Chicago

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM References ICAO SARPS Annex 14 Vol. I, 7 th Edition, July 2016 ICAO SARPS Annex 15, 15 th Edition, July 2016

More information

Availability and Competence of Technical and Inspection Personnel in Civil Aviation Administrations

Availability and Competence of Technical and Inspection Personnel in Civil Aviation Administrations Availability and Competence of Technical and Inspection Personnel in Civil Aviation Administrations Stephen P. Creamer Director, Air Navigation Bureau International Civil Aviation Organization (ICAO) Council

More information

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe

More information

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand Part 105 CAA Consolidation 15 December 2012 Parachuting - Operating Rules Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 105 prescribes rules relating to parachute operations,

More information

RMT.0464 ATS Requirements The NPA

RMT.0464 ATS Requirements The NPA RMT.0464 ATS Requirements The NPA Fabio GRASSO EASA ATM/ANS Regulations Officer IFISA - FISO Seminar #7 08.09.2016 TE.GEN.00409-001 ATM/ANS CRs Regulation 2016/1377 Main objectives are to: implement Essential

More information

FINAL REPORT OF THE ICAO COORDINATED VALIDATION MISSION IN THE REPUBLIC OF FINLAND

FINAL REPORT OF THE ICAO COORDINATED VALIDATION MISSION IN THE REPUBLIC OF FINLAND ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME Continuous Monitoring Approach FINAL REPORT OF THE ICAO COORDINATED VALIDATION MISSION IN THE REPUBLIC OF FINLAND ( to September 07) International Civil

More information

Aircraft Maintenance Organisations - Certification. Contents

Aircraft Maintenance Organisations - Certification. Contents Contents Rule objective... 3 Extent of consultation... 3 New Zealand Transport Strategy... 4 Summary of submissions... 5 Examination of submissions... 6 Insertion of Amendments... 6 Effective date of rule...

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016 Part 149 CAA Consolidation 1 February 2016 Aviation Recreation Organisations - Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 149 prescribes rules governing the

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No / EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Draft Brussels, C COMMISSION REGULATION (EU) No / of [ ] laying down requirements and administrative procedures related to Air Operations pursuant to Regulation

More information

Development of the Global AIM Strategy (AIM Projects)

Development of the Global AIM Strategy (AIM Projects) Development of the Global AIM Strategy (AIM Projects) Roberta Luccioli ICAO AIM Technical Officer Interregional EUR/MID PANS AIM Workshop (Paris, 10-12 July 2018) Outline Status-quo: ICAO AIM provisions

More information

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft DRAFT COMMISSION REGULATION (EU) / of XXX laying down rules and procedures for the operation of unmanned aircraft THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European

More information

Terms of Reference for a rulemaking task

Terms of Reference for a rulemaking task Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1

More information

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes

More information

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane)

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane) Page 1 of 9 Title Demonstrate flying skills for an airline transport pilot licence (aeroplane) Level 6 Credits 35 Purpose People credited with this unit standard are able, for an airline transport pilot

More information

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat) E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA (Ljubljana, 7 to 8 March 2002) International Civil Aviation

More information

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND Page 1 of 6 1.0 PURPOSE This Order is issued to provide requirements and guidance on the qualifications, duties and responsibilities, staffing and training requirements for inspectors in order to ensure

More information

Aerodrome Obstacle Survey Information Checks

Aerodrome Obstacle Survey Information Checks United Kingdom Overseas Territories Aviation Circular OTAC 139-20 Aerodrome Obstacle Survey Information Checks Issue 2.00 26 May 2017 Effective on issue GENERAL Overseas Territories Aviation Circulars

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER DESIGN CRITERIA INSTRUMENT FLIGHT PROCEDURES AIR NAVIGATION ORDER VERSION : 1.0 DATE OF IMPLEMENTATION : 15-10-2009 OFFICE OF PRIME INTEREST : Air Navigation Standards (ANS) 15/10/2009 ANO-006-DRAN-1.0

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information

Implementation challenges for Flight Procedures

Implementation challenges for Flight Procedures Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,

More information

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM 23-25 March 2015 WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness Stephen George Bruno Moitre Rapporteurs WG1 Remotely Piloted Aircraft Systems (RPAS)

More information

Assessment of Flight and Duty Time Schemes Procedure

Assessment of Flight and Duty Time Schemes Procedure Assessment of Flight and Duty Time Schemes Procedure Purpose Fatigue is a major human factors hazard because it affects a crew member s ability to perform their tasks safely. Operator fatigue management

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers Page 1 of 6 1.0 PURPOSE 1.1. This order provides direction and guidance to the Inspectors in the process of certification of ANSPs as required by the Civil Aviation (Air Navigation Services) Regulations.

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

Summary Report by Activity Area for COSCAP- SA

Summary Report by Activity Area for COSCAP- SA EFFECTIVE SAFETY OVERSIGHT 1 USOAP Corrective Action Plan Follow-up for all States 2 USOAP CMA support for all States. Review of CAP implementation status Review of CC & SAAQ status as part of on-site

More information

What is safety oversight?

What is safety oversight? What is safety oversight? ATM SAFETY MANAGEMENT SYSTEM AUDITORS SEMINAR FOR CAR/SAM REGIONS Mexico City, Mexico, 05-09 December 2005 ICAO Universal Safety Oversight Audit Programme /USOAP Safety oversight

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI.

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI. GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, NEW DELHI. CIVIL AVIATION REQUIREMENTS SECTION -7: FLIGHT CREW STANDARDS TRAINING & LICENCING

More information

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar Critical Elements of a State s Aviation Security Oversight System Cairo, Egypt, 26 to 28 January 2015 Module

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained

More information

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study. Change History Version Status Date Affected Pages Author Cause and Summary of the Change 00.01 draft 2017-01-22 all M. Mlynarik New document 00.02 draft 2017-01-29 all M. Mlynarik Internal reviews 00.03

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 141 CAA Consolidation 10 March 2017 Aviation Training Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 141 prescribes rules governing the certification

More information

AIR NAVIGATION COMMISSION

AIR NAVIGATION COMMISSION 13/2/04 AIR NAVIGATION COMMISSION ANC Task No. CNS-7901: Conflict resolution and collision avoidance systems PRELIMINARY REVIEW OF PROPOSED AMENDMENTS TO ANNEX 6, PART II TO INCLUDE PROVISIONS CONCERNING

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information