ARP Forecast Review Critical Aircraft Data Sources

Size: px
Start display at page:

Download "ARP Forecast Review Critical Aircraft Data Sources"

Transcription

1 ARP Forecast Review Critical Aircraft Data Sources <Audience> Kent Duffy FAA Office of Airports National Planning & Environmental Division, APP-400 December 14, 2015

2 Aviation Forecasts Airport sponsors generate aviation activity forecasts for use in defining scope and timing of airport development FAA is concerned with sponsor forecasts when used in FAA decision making, including: Key environmental issues (determination of Purpose and Need, noise, air quality, and land use analyses in an EA or EIS) Initial financial decisions including issuance of an LOI (Letter of Intent) and calculation of a BCA (Benefit Cost Analysis) Noise compatibility planning (Part 150) Determination of future Critical Design Aircraft Approval of development on an airport layout plan (ALP) 2

3 Draft AC: Critical Aircraft and Regular Use The most demanding aircraft type, or grouping of aircraft with similar characteristics, that make regular use of the airport Regular use is 500 annual operations, excluding touch and go operations An operation is either a takeoff or landing Regular use is used instead of substantial use Regular use is more representative of what this definition is trying to capture; i.e., planning and development for recurring and future activity at the airport Both itinerant and local operations count towards regular use Excludes touch-and-go operations Airport planning and design requires considering the specific safety and operational needs of all the aircraft which use the airfield Scheduled commercial service needs to meet regular use, as well Determining both an existing and future Critical Aircraft are required Grouping of aircraft with similar characteristics can be used to determine the Critical Aircraft 3

4 Data Sources: TFSMC: Traffic Flow Management System Counts Provides information on traffic counts by airport and/or by city pair Includes aircraft type and by hour of the day IFR flights captured by the FAA s enroute computers (95%+) Most VFR excluded Some low-altitude or non-radar IFR can also be excluded Source data are synthesized pilot flight plans and/or flights detected by radar Available at both non-towered and towered airports for IFR traffic Excellent source for validating larger aircraft in fleet (typically IFR) and critical aircraft Owned by ATO Systems Operations (AJR) National Offload Program (NOP) data is also available to airport by requesting it from ADO/ARP aspm.faa.gov 4 4

5 FAA Review of Sponsor Forecasts Forecast approval rests with FAA Airport District Office (ADO) / Regional Office FAA HQ may, however, review and provide recommendations as needed Items that FAA looks for during review Forecast based on latest available data Realistic assumptions Appropriate methodologies Forecasts provide justification for planning and development recommendations Forecasts are consistent the FAA Terminal Area Forecast Consistent with TAF? For all classes of airports, forecasts for total enplanements, based aircraft, and total operations are considered consistent with the TAF when the meet the following criterion: Five year period: Forecasts differ by less than 10% Ten year period: Forecasts differ by less than 15% Per ARP guidance: Review and Approval of Aviation Forecasts, June

6 HQ Review of Forecasts ADO/Region Submit to HQ when any of the following apply: Forecast is not consistent with the TAF Forecasts for projects that are expected to require an EIS or BCA At Region/ADO discretion: forecasts that have significant changes in fleet mix Exception: If the airport is a non-towered general aviation or reliever airport, and the five and ten-year forecasts do not exceed 200 based aircraft or 200,000 total annual operations, and the related development is not expected to require an EIS and/or BCA, then FAA Headquarters review is NOT required. If the forecast is not consistent with the TAF, differences must be resolved if the forecast is to be used in FAA decision making Review can take up to 45 days and need coordination with APO-100 6

7 Cities and metropolitan areas also evolve over the long-term **Cities / not Airports** Source: McKinsey Global Institute, Urban America: US Cities in the global economy, p.19, April

8 Backup 8

9 Critical Aircraft Determinations Existing Critical Aircraft: Documenting current aeronautical use of the airport: Operations count by aircraft make and model for the most recent 12-month period of activity available Revaluation can be required by ARP with issuance of AIP or PFC decision; initiation of master plan or update; new or updated ALP Future Critical Aircraft: Determination made using FAA-approved forecast Related but distinct from project justification given timeline in AIP Handbook Paragraph 3-12xx: The ADO has the option to determine that a project is justified based on existing activity at the airport or activity that is projected to be at the airport within the next five years. The ADO has the option to require the sponsor to submit letters of support from airport users if the justification is based on projected activity. The letter must describe the airport user s plans or anticipated activity by the most demanding airplane, or critical aircraft. Review: ARP (typically ADO) will review/approve both the existing and future Critical Aircraft determination 9 9

10 TFSMC Practical Notes Available reports: No login: Airport: Aggregate counts by date/aircraft type for top 2000 airports For other than top 2000 airports, must login and use city pairs report (this is a function of the system architecture to optimize for speed). Distributed OPSNET: hourly counts After login: Access: City Pair: includes Departure>Arrival pairs Run separate reports for A>D, and D>A, and combine in Excel FAA can request login; but contractors cannot (at present) 10 10

11 TFSMC Practical Notes By aircraft type, the counts often differ between arrivals and departures Typically, this is because of aircraft that opt to file IFR for arrival, but depart VFR (which would not be recorded by TFSMC) Can occur in the opposite direction at an airport where its easier to depart IFR to get into congested airspace, but then arrive VFR Differences tend to be less in magnitude with BizJet aircraft, which are nearly always flying IFR, and more pronounced with lighter GA aircraft Solution: Normalize counts by selecting the higher number of either arrivals or departures, and doubling it Example: Arrivals: 500 / Departures = 350. Calculated Ops: 500x2 = 1000 Essentially, this is an assumption that if an aircraft landed at an airport, it likely departed too 11 11

12 TFSMC: Example Data 12 12

13 Resources and Guidance FAA Terminal Area Forecast Forecasting Aviation Activity by Airport (APO Guidance) doc Review and Approval of Aviation Forecasts (FAA Airports Guidance) pdf FAA Forecast Review Checklist (for HQ review) ecasts_2008.pdf FAA Advisory Circular 150/5370-6B, Airport Master Plans (Ch. 7) 6B/150_5070_6b_chg1.pdf ACRP Synthesis Report 2 Airport Aviation Activity Forecasting FAA Aerospace Forecasts

and Forecast Review and Approval Process

and Forecast Review and Approval Process LONG BEACH, CALIFORNIA FAA Terminal Area Forecast (TAF) Overview and Forecast Review and Approval Process Paul Devoti Airport Planner Federal Aviation Administration paul.devoti@faa.gov 1 TAF Overview

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS Pocatello Regional Airport Airport Master Plan APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS The Airport and Airway Improvement Act of 1982

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Update on FAA Standard Operating Procedures (SOP)

Update on FAA Standard Operating Procedures (SOP) Update on FAA Standard Operating Procedures (SOP) SOP 2.0 - Airport Layout Plan (ALP) SOP 3.0 - Exhibit A Airport Property Map Presented to: Association of California Airports (ACA); ACA Annual Conference,

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

Airport Master Plan 1

Airport Master Plan 1 1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

1. Background and Proposed Action

1. Background and Proposed Action 1. Background and Proposed Action This chapter describes Hillsboro Airport and the planning background for the proposed project. The Port of Portland (the Port) is the sponsor for the Hillsboro Airport

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION 30 th Annual AAAE Basics of Airport Law Workshop and 2014 Legal Update October 19-21, 2014 AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION Desk Reference Chapters 4, 13, 14 & 25 Catherine M. van Heuven,

More information

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017 Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

Welcome to the Boise Airport Master Plan Update Open House

Welcome to the Boise Airport Master Plan Update Open House Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update

More information

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

CHAPTER 4 DEMAND/CAPACITY ANALYSIS CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

LONG BEACH, CALIFORNIA

LONG BEACH, CALIFORNIA LONG BEACH, CALIFORNIA 1 LONG BEACH, CALIFORNIA Airport Capacity Session Kent Duffy Senior Airport Planner Federal Aviation Administration kent.duffy@faa.gov 2 Agenda FAA Airport Capacity Guidance Airport

More information

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports FAA Update Dakota-Minnesota (DMA) Airports District Office Presented to: By: Date: Minnesota Council of Airports Chris Hugunin April 15, 2015 FY 2014 DMA ADO Total AIP Funding $107.2 Million / 136 Grants

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

Airport Issues in Considering Spaceport Development

Airport Issues in Considering Spaceport Development Airport Issues in Considering Spaceport Development Prepared for: Transportation Research Board (TRB) Annual Meeting Session 782 Presented by: Elliott Black Director Office of Airport Planning and Programming

More information

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY RSAT RUNUP ANALYSIS 1. INTRODUCTION The FAA Runway Safety Action Team (RSAT) is a team of FAA staff that works with airports to address existing and potential runway safety problems and issues. The RSAT

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

What's your fleet mix for design?

What's your fleet mix for design? What's your fleet mix for design? (Hint: it's not the Airport Master Plan s fleet mix) Presented to: By: 4 States Airport Conference Brian M. Tompkins, P.E., C.M. State Airport Engineer Iowa Dan E. Wilson,

More information

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: South Dakota Airports Conference FAA Update Dakota-Minnesota (DMA) Airports District Office Presented to: By: Date: South Dakota Airports Conference Chris Hugunin & Dave Anderson March 18, 2015 FY 2014 DMA ADO Total AIP Funding $107.2

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Planning. In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower

Planning. In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower Planning In preparing for battle I have always found that plans are useless, but planning is indispensable. Dwight D. Eisenhower Adventure is just bad planning. Roald Amundsen, Norwegian Explorer Failure

More information

Initiated By: AFS-400

Initiated By: AFS-400 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Development and Submission of Special Date: 04/14/2015 AC No: 90-112A Instrument Procedures to the FAA Initiated

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Creating a Clear Vision with your Airport Layout Plan

Creating a Clear Vision with your Airport Layout Plan Creating a Clear Vision with your Airport Layout Plan Presentation & Panel Discussion NCAA 38 th Annual Conference The Economic Impact of Aviation March 28, 2017 Pinehurst, NC Photo Credit: Jason Barnette

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. Ultimate Operations 5th Working Group Briefing 9/25/18 Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate Operations 5th Working Group Briefing 9/25/18 Meeting Purpose Discuss methodology of Ultimate build scenario operations

More information

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity. Chapter 3: Forecast Introduction Forecasting provides an airport with a general idea of the magnitude of growth, as well as fluctuations in activity anticipated, over a 20-year forecast period. Forecasting

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

II.J. 14 CFR and Publications

II.J. 14 CFR and Publications References: 14 CFR Parts 1, 61, 91; NTSB Part 830; AC 00-2; FAA-H-8083-25; POH/AFM; AIM Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should

More information

Master Planning AirTAP Fall Forum. Mike Louis, Dan Millenacker

Master Planning AirTAP Fall Forum. Mike Louis, Dan Millenacker Master Planning 2007 AirTAP Fall Forum Mike Louis, Dan Millenacker 1 Measures in the State Aviation System Plan (SASP) 2 Goals for the Airport System Are consistent with the prior System Plan and the Statewide

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

Time-series methodologies Market share methodologies Socioeconomic methodologies

Time-series methodologies Market share methodologies Socioeconomic methodologies This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning

More information

Recommended Performance Measures

Recommended Performance Measures Recommended Performance Measures January 2009 1 RECOMMENDED PERFORMANCE MEASURES Performance measures are utilized by the North Central Texas Council of Governments (NCTCOG) to monitor the performance

More information

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. Spring 2015 Blacksburg, Virginia

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. Spring 2015 Blacksburg, Virginia CEE 4674 Airport Planning and Design Runway Length Calculations Addendum 1 Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University Spring 2015 Blacksburg,

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

SECTION 5.0 FORECASTS OF AVIATION DEMAND

SECTION 5.0 FORECASTS OF AVIATION DEMAND SECTION 5.0 FORECASTS OF AVIATION DEMAND SECTION 5.0 FORECASTS OF AVIATION DEMAND 5.1 GENERAL This section provides an update of aviation activity forecasts for through the year 2021. The aviation activity

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES

Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose

More information

Alternatives. Introduction. Range of Alternatives

Alternatives. Introduction. Range of Alternatives Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,

More information

Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion in Omnibus Funding

Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion in Omnibus Funding Session Ten: Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau in Omnibus

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview EPHRATA MUNICIPAL AIRPORT Chapter 1 Introduction and Project Overview The Port of Ephrata in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Ephrata Municipal

More information

FAA Requirements for Engine-out Procedures and Obstacle Clearance

FAA Requirements for Engine-out Procedures and Obstacle Clearance FAA Requirements for Engine-out Procedures and Obstacle Clearance Presentation to: CAAC Engine-out Procedures Seminar Name: Chuck Friesenhahn Date: 11/29/2005 Flight Standards Senior Advisor, Advanced

More information

AIRWORTHINESS CERTIFICATION OF AIRCRAFT AND RELATED PRODUCTS. 1. PURPOSE. This change is issued to incorporate revised operating limitations.

AIRWORTHINESS CERTIFICATION OF AIRCRAFT AND RELATED PRODUCTS. 1. PURPOSE. This change is issued to incorporate revised operating limitations. 8130.2D 2/15/00 AIRWORTHINESS CERTIFICATION OF AIRCRAFT AND RELATED PRODUCTS 1. PURPOSE. This change is issued to incorporate revised operating limitations. 2. DISTRIBUTION. This change is distributed

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History MIA BASELINE ACTIVITY FORECASTS, DERIVATIVE DATA AND FLEET MIX PROJECTIONS RESULTS SUMMARY ACCEPTANCE BRIEFING FOR THE AIRPORT AND SEAPORT COMMITTEE (ASC) JULY 15, 2010 Study Design Outline Background

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

CHAPTER TWO THE PROPOSAL

CHAPTER TWO THE PROPOSAL CHAPTER TWO THE PROPOSAL 2.0 AIRPORT SPONSOR S PROPOSED PROJECT The Airport Sponsor s Proposed Project includes the following elements, which are depicted in Exhibit 2-1, Sponsor s Proposed Project: Expand

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

AirportInfo. Airport Improvement Program

AirportInfo. Airport Improvement Program AirportInfo Airport Improvement Program April 2014 Airport Improvement Program (AIP) AIP provides grants to airport sponsors for the planning and development of public-use airports. To be eligible for

More information

CONTENTS Preface Guidebook Overview Part 1 - Master Plans: Setting the Stage Airport Master Plans

CONTENTS Preface Guidebook Overview Part 1 - Master Plans: Setting the Stage Airport Master Plans CONTENTS Preface Guidebook Overview What s New... 2 Purpose of the Guidebook... 2 The Florida Philosophy of Airport Master Planning... 2 Guidebook Structure and Use... 3 Part 1 - Master Plans: Setting

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application

Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application Sept 29 - Oct 1, 2015 Kualal Lumpur Shyam Parhi Washington DC What is driving Airports GIS? Reduce costs to Airports,

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

MEETING MINUTES Page 1 of 5

MEETING MINUTES   Page 1 of 5 Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Airport Planning at the. Local and National Levels. Presented to: ICAO Airport Planning Workshop for the SAM Region

Airport Planning at the. Local and National Levels. Presented to: ICAO Airport Planning Workshop for the SAM Region Airport Planning at the Federal Aviation Administration Local and National Levels. Presented to: ICAO Airport Planning Workshop for the SAM Region Presented to: By: By: Will Reinhardt, FAA Office of Airports

More information

Forecast Data specific to SDM... 6 Aviation Industry Trends Collection of Other Data... 12

Forecast Data specific to SDM... 6 Aviation Industry Trends Collection of Other Data... 12 Working Paper 2 Forecasts of Aviation Demand Table of Contents 2.1 Forecast Overview... 1 2.2 Identification of Aviation Demand Elements... 2 2.3 Data Sources... 3 2.4 Historical and Existing Aviation

More information

APPENDIX E: MINORITY REPORT

APPENDIX E: MINORITY REPORT APPENDIX E: MINORITY REPORT PLANNING ADVISORY COMMITTEE FINAL REPORT JUNE 2016 Appendix E Minority Report R P Joe Smith 2211 NE 21 st Avenue Portland, Oregon 97212 Memo to: Board of Commissioners, Port

More information

TRB and ACRP Research Updates: Practical Application

TRB and ACRP Research Updates: Practical Application TRB and ACRP Research Updates: Practical Application 2014 ACI Environmental Affairs Conference Danielle J. Rinsler, AICP FAA Office Airports, Airport Planning and Environmental Division Baltimore, MD Advisory

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

TXDOT AVIATION DIVISION

TXDOT AVIATION DIVISION TXDOT AVIATION DIVISION Airport Project Development & Selection Process Today s Topics Project Development Process Working with TxDOT Aviation Division Funding Sources National Plan of Integrated Airports

More information

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land

More information

GENERAL AVIATION AIRPORT AGREEMENTS

GENERAL AVIATION AIRPORT AGREEMENTS 33 rd Annual Basics of Airport Law Workshop and 2017 Legal Update Session #17 GENERAL AVIATION AIRPORT AGREEMENTS W. Eric Pilsk Kaplan Kirsch & Rockwell Corinne C. Nystrom, A.A.E., Airport Director Mesa-Falcon

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

Operational Evaluation of a Flight-deck Software Application

Operational Evaluation of a Flight-deck Software Application Operational Evaluation of a Flight-deck Software Application Sara R. Wilson National Aeronautics and Space Administration Langley Research Center DATAWorks March 21-22, 2018 Traffic Aware Strategic Aircrew

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS

Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS Chapter Two FORECAST OF AVIATION DEMAND A. DESCRIPTION OF FORECAST ELEMENTS The forecast of aeronautical activity at the (GED) during the 20-year planning period (2002-2021) is a key element of the Master

More information

agis a brief overview

agis a brief overview agis a brief overview Steve Welebny Photogrammetrist Keystone Aerial Surveys Villanova University 1 Villanova University 2 Nav Aid Cost VOR Install = $250,000 20 year life cycle cost = $1,100,000 ILS Install

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013 Airport Land Use Compatibility Advisory Circular ACI-NA / FAA FAA HQ Washington, DC March 27, 2013 The purpose of this meeting is to discuss FAA s update of the Airport Compatible Land Use Advisory Circular.

More information

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting

More information

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77 APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77 Subparts A through C PART 77 - OBJECTS AFFECTING NAVIGABLE AIRSPACE Subpart A General 77.1 Scope. 77.2 Definition of terms. 77.3 Standards. 77.5 Kinds of

More information

CHAPTER 2 AVIATION ACTIVITY FORECAST

CHAPTER 2 AVIATION ACTIVITY FORECAST CHAPTER 2 AVIATION ACTIVITY FORECAST Aviation activity forecasts at the Airport are presented in this chapter for the period ending in 2027. The forecasts developed in this chapter provide needed input

More information

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. January 27, 2009 Blacksburg, Virginia

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. January 27, 2009 Blacksburg, Virginia Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University January 27, 2009 Blacksburg, Virginia 1 Runway Design Assumptions (FAA 150/5325-4b) Applicable to

More information

Glossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station.

Glossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station. Glossary Part I Acronyms/Data Terminology AC -- Air Carrier. AFSS -- Automated Flight Service Station. AIFSS -- Automated International Flight Service Station. ARTCC -- Air Route Traffic Control Center.

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

FAC Webinar June 29, 2016

FAC Webinar June 29, 2016 RECENT DEVELOPMENTS: FAA GUIDANCE AND DIRECTIVES FAC Webinar June 29, 2016 Scott Knight, Hillsborough County Aviation Authority Debra Braga, Jacksonville Aviation Authority Peter J. Kirsch, Kaplan Kirsch

More information

FAC Webinar June 29, 2016

FAC Webinar June 29, 2016 RECENT DEVELOPMENTS: FAA GUIDANCE AND DIRECTIVES FAC Webinar June 29, 2016 Scott Knight, Hillsborough County Aviation Authority Debra Braga, Jacksonville Aviation Authority Peter J. Kirsch, Kaplan Kirsch

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

Master Plan Update. Palm Beach International Airport. Master Plan Update. PREPARED FOR Palm Beach County Department of Airports OCTOBER 2006

Master Plan Update. Palm Beach International Airport. Master Plan Update. PREPARED FOR Palm Beach County Department of Airports OCTOBER 2006 Master Plan Update Palm Beach International Airport Master Plan Update PREPARED FOR Palm Beach County Department of Airports OCTOBER 2006 PREPARED BY IN ASSOCIATION WITH Ricondo & Associates, Inc. TB102006004WPB

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

1.0 OUTLINE OF NOISE ANALYSIS...3

1.0 OUTLINE OF NOISE ANALYSIS...3 Table of Contents 1.0 OUTLINE OF NOISE ANALYSIS...3 2.0 METHODOLOGY...3 2.1 BACKGROUND...3 2.2 COMPUTER MODELING...3 3.0 EXISTING NOISE ENVIRONMENT...4 3.1 EXISTING SANTA MONICA MUNICIPAL AIRPORT NOISE...4

More information