1 JULY 2014 BUSH INTERCONTINENTAL AIRPORT Project 500N-Terminal D, Phase III-Gate D9 A380 Conversion Project Manager: Randy Williams Everything is Bigger Terminal D at IAH The saying everything is bigger in Texas holds true on the Terminal D airside of George Bush Intercontinental Airport (IAH). Bigger aircraft, carrying more passengers, are visiting IAH these days and the Houston Airport System is working enthusiastically to accommodate them. Presently, only gate D12 can accommodate ADG VI and A380 aircraft. Due to anticipated demand, HAS has initiated modifications to Gate D9 to provide a second gate that can accommodate the larger aircraft. Design for conversion to allow for enplaning and deplaning of these aircraft under Phase III of Project 500N is in progress. Continued on next page.
2 Everything is Bigger Continued With only one gate currently able to accommodate these aircraft, work to convert Gate D9 to an ADG VI aircraft gate is being fast tracked. Many international carriers, including Emirates who just announced that it will be adding more seats to its flights out of Houston starting in December, are interested now, rather than later, in using the A380 at IAH which will increase passenger seating capacity. The conversion process of the gate will include: adding a gate entry from the gate Departure Level to a new fixed walkway and new Passenger Boarding Bridge (PBB), as well as replacement of the existing Boarding Entry at the gate that will be used to provide access to the lower door of the A380 and other proposed aircraft that will use the gate. New PBBs will require new equipment to accommodate the power, air, water and fueling at the larger gate. Some demolition will also be necessary for the construction upgrade. If approval by the City, design, and construction is on schedule, this gate should be converted for service by December 2014.
3 HOBBY / ELLINGTON AIRPORT Project 684B-Roadway Signage at Hobby Airport/Gateway Sign at Ellington Field Project Manager: Catherine McMullen World Class Airports The Consistent Message The Houston Airport System is in the process of multiple improvements to the world class airports of the City. Among these ongoing improvements is the project to keep the visual messages consistent at each of the airport gateways to Houston. This process to develop a uniform wayfinding system at the City s airports is where Project 684 comes in. With most of the new exterior signage in place at IAH, the project team is now moving into the B phase of the project. Project 684B will encompass the development of new signage at William P. Hobby Airport (HOU), as well as the addition of gateway signs at HOU and Ellington (EDF). With Hobby Airport in the midst of a major expansion program and roadway improvements getting underway at Ellington, the project management team and HAS feels this is an ideal time to begin the construction of the uniform wayfinding system to continue to enhance the passenger experience. Continued on next page.
4 World Class Airports Continued The work plan under Project 684B is to occur in four phases. This will begin with a site survey to include the review and analysis of the conceptual wayfinding system for both airports, as well as the review of all relevant and available plans regarding airport utilities or infrastructure that may impact the proposed signage. During the second phase of work, the Contractor would be required to develop cost estimates for the signage program. After design and approval of the plan, the new signs would be fabricated then installed reflecting the new message that the recently installed IAH signs convey. The installation will require replacing all of the existing signs at HOU and EFD with new foundations, structures and sign panels. This project has been designated as one of high priority by airport management as it will create a better experience for the traveling public. The Contractor will be required to coordinate construction with ongoing construction at HOU. The signage is anticipated to be in place to support the October 2015 opening of the Parking Garage and International Terminal.
5 BUSH INTERCONTINENTAL AIRPORT Project 565-Landside Roadway Rehabilitation Project Manager: Randy Williams Landside Roadway Rehabilitation Preparing For An Overhaul The Houston Airport System is not immune to the constant stress that vehicles and other elements put on the IAH landside roadways. Due to the stress from passenger vehicles, freight movement, weather and other impacting factors you will begin to see a major overhaul of the roadway system at IAH. Project 565 is the project that will rehabilitate the landside roadways at IAH that have been in service for four decades. The effort will correct problems which include cracking, joint failures, surface and drainage issues, and all pavement and structural deficiencies. Design plans for the project have been submitted. It has been determined that full panel replacement for Will Clayton Parkway, from Lee Road to the JFK flyovers, will be performed. The process for HAS to request construction bids for PN565 is underway. The roadway improvements will occur in phases so disruption to traffic will be minimal. All work should be completed by November In the end, the travelers at IAH will benefit from extra years of quality roadways that are safer and more appealing.
STATISTICAL REPORT Fiscal YEAR SUMMARY. Houston Airport System P.O. Box Houston, TX
STATISTICAL REPORT 215 Fiscal YEAR SUMMARY P.O. Box 616 Houston, TX 7725 16 Table of Contents 1 Aircraft Operations 2 3 George Bush Intercontinental 4 William P. Hobby 5 Originating Enplaned 6 7 8 Passenger
More informationHouston Airport System IAH Master Plan 2035 Summary
Summary INTRODUCTION The Houston Airport System owns/operates three airports George Bush Intercontinental Airport (IAH) the city s largest airport and global gateway, serving over 40 million passengers
More informationLos Angeles International Airport (LAX) Airside $907M
Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking
More informationHouston Airport System Infrastructure Program. Devon Tiner, P.E., PMP Assistant Director Building Standards. August 9, 2018
Houston Airport System Infrastructure Program Devon Tiner, P.E., PMP Assistant Director Building Standards August 9, 2018 Houston Airports System 54 million passenger movements (2017) 4.6% increase over
More informationKansas City Aviation Department. August 25, 2015
Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning
More informationCITY OF HOUSTON INTEROFFICE CORRESPONDENCE FROM: DATE: SUBJECT: The passenger traffic for each of the airlines for the previous 5 years.
CITY OF HOUSTON INTEROFFICE CORRESPONDENCE TO: Council Member Oliver Pennington FROM: Director of Aviation DATE: May 1, 2012 SUBJECT: Response to Memo Proposed International Terminal at Hobby Airport:
More informationGREATER ORLANDO AVIATION AUTHORITY
GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3
More informationLRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050
(All s are located at the Seaport, unless otherwise noted) Facility/ Name Detailed Description SP20000000 01 Cruise Terminal H Improv. Cruise Terminal H Improvements $13,050 $13,050 2016 Upgrade Terminal
More informationHollaway Consulting Engineers, LLC Statement of Qualifications
Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri
More information75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) AIRPORTS (ENR 2016)
COMMERCIAL AVIATION #2 AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) #3 AIRPORTS (ENR 2016) 75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS PILOTING YOUR SUCCESS FROM THE GROUND UP Designing and
More informationMarch 4, Investor Conference
March 4, 2014 Investor Conference Disclaimer This Investor Presentation is provided for your general information and convenience only, is current only as of its date and does not constitute an offer to
More informationKansas City Aviation Department. Community Listening Session
Kansas City Aviation Department Community Listening Session Listening Session Purpose The Kansas City Aviation Department is moderating these community listening sessions in order to gather feedback from
More informationCity of Tallahassee, FL Department of Aviation
City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and
More information2018 City of Houston Investor Conference. Kenneth Gregg, Interim Deputy Director of Finance
2018 City of Houston Investor Conference Kenneth Gregg, Interim Deputy Director of Finance April 24, 2018 1 Disclaimer This Investor Presentation is provided for your general information and convenience
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationTrends Shaping Houston Airports
Trends Shaping Houston Airports Ian Wadsworth Chief Commercial Officer April 2014 Our mission is to connect Houston with the world Connect the people, businesses, cultures and economies of the world to
More informationParking Operations and Management Presentation. Houston Airport System Presented by Liliana Rambo, CAPP Parking Director IPI-Chair Elect
Parking Operations and Management Presentation Houston Airport System Presented by Liliana Rambo, CAPP Parking Director IPI-Chair Elect Parking Overview The Houston Airport System seeks to provide premier
More informationAviation - Summary of Funding Sources CAPITAL IMPROVEMENT PLAN ($ Thousands)
Allocation Aviation - Summary of Funding Sources 2013-2017 CAPITAL IMPROVEMENT PLAN ($ Thousands) 2013-2017 88 5,500 5,500 5,588 Design 26,757 56,143 6,650 2,350 6,500 200 71,843 98,600 Construction 86,057
More informationBrief Recap of Project to Date
CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Brief Recap of Project to Date Schematic Design: Design Development Meetings June 26 & 27, 2018 Project Description
More informationPFC Quarterly Status Report September 30, 2016
PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority
More informationStatistical Report Calendar Year 2013
Statistical Report Year 213 Houston Airports P.O. Box 616 Houston, TX 7725-16 Request for User Input The intent of the monthly and annual statistical reports is to provide data that is both relevant and
More informationCity of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018
City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan Public Workshop #2 April 19, 2018 DISCUSSION TOPICS Introduction About the Master Plan Public Workshop #1 Recap
More informationChapter 1: Introduction Draft
Chapter 1: Draft TABLE OF CONTENTS 1... 4 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2 TABLE OF EXHIBITS Exhibit 1.1-1 ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map...
More informationCOMMERCIAL AND GENERAL AVIATION Historic and forecast FDOT aviation activity information on file for Pensacola Regional Airport:
Existing Facilities Pensacola Regional Airport is served by a number of airside and landside facilities. Two intersecting, grooved asphalt runways serve the airport. These runways are runway 17/35 (7,004
More informationChapter 1: Introduction
Chapter 1: TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA
More informationKansas City, Missouri (direct, non-stop destination from RSW)
Kansas City, Missouri (direct, non-stop destination from RSW) Kansas City straddles the Missouri-Kansas state line, sometimes causing travelers to wonder which state they are in. Here are a few tips to
More informationThe presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3
This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationInterviewer Comments Section
William P Hobby (HOU) Central Concourse ( ), West Concourse (Includes International) ( ) George Bush Intercontinental (IAH) Terminal A ( ), B ( ), C ( ), D ( ), E ( ) Interviewer Comments Section Date
More informationSouthwestFloridaInternational Airport
SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom
More information14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice
14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class
More informationRNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan
RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan Project Schedule Today Slide 40 Project Vision To provide an achievable, flexible, fiscally, and environmentally
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationJACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007
JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1
More informationFUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities
FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective
More informationBrisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators
MEETING MINUTES Event: Date & Time: Venue: Attendees: Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2017 @ 2pm Brisbane Airport Meeting Room Ground Transport Operators Agenda Item
More informationINFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE
INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease
More information10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM
10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More informationDALLAS LOVE FIELD MAY 2015 DRAFT
8. Funding Plan This section presents a potential funding plan for implementing the CIP projects recommended in the Master Plan Update, along with an assessment of the ability of the Airport sponsor (i.e.,
More informationPUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT
PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International
More informationDallas Love Field Capital Program. September 16, 2015
Dallas Love Field Capital Program September 16, 2015 1 The Dallas Airport System Dallas Love Field, Dallas Executive Airport, Downtown Vertiport A $86 million City of Dallas enterprise Operated by the
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationFort Wayne International Airport Master Plan Study. Executive Summary
Fort Wayne International Airport Master Plan Study Executive Summary March 2012 Introduction Airport Background Forecast of Aviation Activity Development Plans Recommended Airfield & Access Development
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More informationTransportation Research Board. Session Lessons Learned from Large Airport Development. Orlando Airport Experience
Transportation Research Board Session 513 - Lessons Learned from Large Airport Development Orlando Airport Experience Agenda Airport Statistics and Background Capital Improvement Plan Lessons Learned Planning
More informationState of Hawaii, Department of Transportation, Airports Division. PATA Hawai i. September 13, 2018
State of Hawaii, Department of Transportation, Airports Division PATA Hawai i September 13, 2018 Department of Transportation DOTA Continues Major Initiatives in 2018 Airports Division Enhance financial
More informationState of the Airport Robert S. Bowen, Executive Director October 18, 2018
Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing
More informationMeeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012
Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationIAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines
IAH Terminal Redevelopment Project Memorandum of Agreement with United Airlines May 29, 2014 On April 24, HAS presented plans for a new Mickey Leland International Terminal (MLIT) Sufficient capacity for
More informationFort Lauderdale Hollywood International Airport
ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County
More informationCologne, Germany (direct, non-stop destination from RSW)
Cologne, Germany (direct, non-stop destination from RSW) Cologne is the largest city in the German federal State of North Rhine-Westphalia and the fourth populated city in Germany (after Berlin, Hamburg,
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationAGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.
AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special
More informationAIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationWELCOME! TSPE DFW MID-CITIES. January Chapter Meeting
WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested
More informationCity of Kansas City AIRPORT COMMITTEE BRIEFING. Major Renovation Evaluation for Kansas City International Airport.
City of Kansas City AIRPORT COMMITTEE BRIEFING Major Renovation Evaluation for Kansas City International Airport February 2, 2016 1 Agenda Briefly review Exhibit K Process to establish Program Requirements
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationPresentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport
Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD
More informationInput Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot
Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials
More informationMaster Plan Phase 2 Building on Partnerships
Master Plan Phase 2 Building on Partnerships June 9, 2017 Introduction Welcome Introduction of Staff Planning and Development Jeff Siddle Procurement Tom Thalheimer James Hanney DBE/WMBE Elita McMillon
More informationAIRFIELD SAFETY IN THE UNITED STATES
International Civil Aviation Organization 24/11/09 North American, Central American and Caribbean Office (NACC) Twenty Second Meeting of Directors of Civil Aviation of the Eastern Caribbean (E/CAR/DCA/22)
More information2018 Appropriation Budget Table of Contents Board Approved August 18, 2017
INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary
More informationPITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM
PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM FREQUENTLY ASKED QUESTIONS September 2017 Master Plan Update: 1. What is a Master Plan Update? The objective of a Master Plan Update (MPU)
More informationParking Products, Services, and Pricing. Walt Gray Parking Director
Parking Products, Services, and Pricing Walt Gray Parking Director George Bush Intercontinental Airport/Houston (IAH) Three Parking Garages: Two Economy Remote Lots: ~ A/B Garage - 5,000 ~ ecopark JFK
More information2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)
2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport
More informationDRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary
Master Plan GROWING 2017-2037 RESPONSIBLY to support our region Summary DRAFT 2 1 Introduction Over the next three decades, Southern Ontario is set to experience significant growth its population will
More informationDulles Toll Road Rate Setting Process
Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On
More informationAIRPORT COMMITTEE MEETING AGENDA September 06, :00 PM Moorhead Municipal Airport
AIRPORT COMMITTEE MEETING AGENDA September 06, 2017-4:00 PM Moorhead Municipal Airport 1. Call to Order 2. Agenda Amendments 3. Approval of Minutes A June 14, 2017 4. Citizens to be Heard 5. Airport Capital
More informationTABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.
TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...
More informationJuly 21, Mayor & City Council Business Session KCI Development Program Process Update
July 21, 2015 Mayor & City Council Business Session KCI Development Program Process Update History of KCI 2 Airport Funding KCI Improvements are Funded by Airlines & Travelers City tax revenues do not,
More informationMaster Plan Update Community Advisory Committee Kick-off Meeting
Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision
More informationAIRFIELD ACCESSIBILITY AND SAFETY INITIATIVE FAQs
Q1: What is the Airfield Accessibility and Safety Initiative? AIRFIELD ACCESSIBILITY AND SAFETY INITIATIVE FAQs A1: The Airfield Accessibility and Safety Initiative is a three-year infrastructure project
More informationPunta Gorda Airport Master Plan Update
Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,
More informationMaster Plan Phase 2 Workshop
Master Plan Phase 2 Workshop Tampa Airport: A Legacy of Innovation and Convenience Tampa Airport: A legacy of Innovation and Convenience The world s first airport people mover Tampa Airport: A legacy of
More informationAirport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017
Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Agenda (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR
More information2017 Appropriation Budget Table of Contents Board Approved August 19, 2016
INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary
More informationFLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017
FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY PAC Committee (PRELIMINARY DRAFT) WORK IN PROGRESS -
More informationPlanned Procurement Opportunities Report. June 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationTHE CASE OF A SUCCESSFUL PFC APPLICATION
THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationNEW PFC APPLICATION #5
NEW PFC APPLICATION #5 New PFC Application #5 Public Notice Norfolk International Airport Norfolk, VA Table of Contents PFC Program at Norfolk International Airport Class of Air Carrier Not Required to
More informationPUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application
PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport
More informationSAN JOSÉ INTERNATIONAL AIRPORT
SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft
More informationK.I.A where it all starts! Ghana Airports Company Ltd
K.I.A where it all starts! Ghana Airports Company Ltd Presentation at the Aviation Suppliers and Stakeholders Convention Topic: Integrated Airport Development: Airport Cities and Commercial Opportunities
More informationIntroduction to Off-Airport Baggage Processing Solutions IATA GAPS application July. Service by
Introduction to Off-Airport Baggage Processing Solutions IATA GAPS application - 2018 July Service by We re helping airports and airlines manage their capacity, expand without building more infrastructure
More informationCIVIL AVIATION AUTHORITY
CIVIL AVIATION AUTHORITY INFRASTUCTRE DEVELOPMENT: BOTTLENECKS AND SOLUTIONS IN AVIATION SECTOR by the Presentation to the ICPAU 5 th Economic Director Finance, Civil Aviation Authority, U 20 July Overview
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationOmaha Airport Authority Eppley Airfield
June 13, 2018 Omaha Airport Authority Eppley Airfield Terminal Development Program Industry Day Previous Master Plan Results 1996 2014 2 June 13, 2018 Eppley Airfield Terminal Development Program Industry
More informationSLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule
SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule Two sky bridges will connect the parking garage to the second level of the terminal, while an elevated roadway for depa will access
More informationHartsfield Jackson Update prepared for:
Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport
More information