The HOP Offers Route Refinements

Size: px
Start display at page:

Download "The HOP Offers Route Refinements"

Transcription

1 The HOP Offers Route Refinements Hill Country Transit District, operator of The HOP, Central Texas regional public transit system, frequently reviews fixed routes in efforts to ensure the routes are able to maintain published schedules, and to ensure the most efficient route service is made available to the riding public. Effective January 2, 2015, The HOP plans to implement route changes for routes 4, 7, 21, and 30. DESCRIPTION OF CHANGES Route 4 Will no longer travel through the HEB parking lot on Trimmier, and will instead turn from southbound Trimmier onto eastbound Lowe s Blvd. Route 30 serves the HEB with sheltered bus stops both northbound and southbound. Will be extended beyond eastbound Highway 190 access road at Stan Schlueter, continuing on the eastbound access road to serve Modoc stops, currently served by Route 30. Route 30 is excessively long and cannot continue to maintain its published schedule with this change, route 4, which has more time available, will provide the same service stops as route 30 currently serves along this corridor. Upon reaching Stan Schlueter on its westbound return trip, route 4 will resume its current inbound route. Route 7 Route 7 began January When implemented, it was designed to be longer (18.6 miles) than is typically acceptable for a route, but the intent was to determine the locations with the greatest demand for service. In order for route 7 to be operated safely and be able to make scheduled connections with route 5, adjustments to route 7 are needed. A new Wal Mart is under construction and may open as early as This is a very important stop for the public transit system, and route 7 must be modified in order to serve the Wal Mart, preferably along southbound Bunny Trail. Specific changes are shown in a map developed to represent the travel for the modified route 7. The primary changes are: modify travel along the southbound Robinette corridor; eliminate travel along Stan Schlueter between Littlerock and Highway 195 instead traveling along Bunny Trail before serving A&M Central Texas. The new route will continue to serve CTC, Metroplex, and A&M, and will still connect with route 5. Additionally, it will be able to serve the new Wal Mart as well as the residential areas growing along Bunny Trail. The route change will also reduce travel distance from 18.6 miles to 16.8 miles, and travel time will be reduced thereby improving the route s ability to safely meet its scheduled connection.

2 Route 21 Route 21 currently travels outbound, moving south along WS Young, then west along Elms, then south along Trimmier, east along Stan Schlueter, then south again on WS Young; on its return trip toward downtown Killeen, the route travels straight north along WS Young from Stagecoach to Veterans Memorial Blvd. Route 21 will continue to operate the same route as it currently does, except for this specific area, through which it will operate in the opposite direction as it does currently. It will instead travel straight south along WS Young from Veterans Memorial Blvd to Stagecoach on its outbound trip. On its return trip northbound, the route will travel west along Stan Schlueter from WS Young, then north on Trimmier, east on Elms, and back north along WS Young. Route 30 Route 30 carried more than 7,400 passengers in August and again in September 2014, with a performance ratio of 23.8 and 2.4 respectively, one of the highest in the system. It also is one of the longest routes at 17.8 miles, and two factors make it very difficult to perform safely and on time. Changes are needed to correct these two problems. Currently, route 30 travels east along Stan Schlueter to Highway 190 eastbound, thereafter continuing to the Wal Mart on Modoc in Harker Heights. As presented herein, route 4 is proposed for modifications whereby route 4 can serve Modoc instead of route 30. Route 30, with the new change, can also provide new service along Shawn, Pepper Mill Hollow, and Chantz, with only three stops affected each such stop has a stop either directly across the street from the lost stop, or only a block away. Route 30 can also travel inbound toward downtown along westbound Elms, again increasing service area. These changes are greatly beneficial, and result in a new length of 13.8 for route 4 and of 13.3 for route 30. This improves the efficiency of both routes, and improves the safety and schedule adherence for route 30. The speed and cycle length for the routes will be more efficient, as shown herein: ROUTE CURRENT MPH PROPOSED MPH/CYCLE LENGTH (No change) (Total mileage impact: 2.7)

3 PUBLIC HEARINGS The HOP will hold public hearings in Killeen and Harker Heights at times, dates, and locations shown below to receive comments regarding these proposed changes. The HOP wishes to implement the changes January 2, Information is also available on The HOP web site at DATE / DAY TIME LOCATION Nov 4, 2014 Tuesday 5:00 PM Harker Heights Council Chambers at 5:30 PM City Hall Nov 6, 2014 Thursday 5:00 PM Killeen Council Chambers at 5:30 PM City Hall Below, please see the current and proposed timetables and route maps for these three route changes.

4 Route 4 Current Map and Timetable

5 Route 4 Proposed Map and Timetable January 2, 2015

6

7

8 Route 21 Current Map and Timetable

9

10 Route 30 Current Map and Timetable

11 Route 30 Proposed Map and Timetable January 2, 2015

PROPOSED FOR IMPLEMENTATION

PROPOSED FOR IMPLEMENTATION PROPOSED FOR IMPLEMENTATION Capital Transit Schedule & Route Revision Objective: Update the current Capital Transit schedules and routes to provide a higher level of reliability, add service to Riverside

More information

Appendix 4.1 L. No-Build Project Descriptions

Appendix 4.1 L. No-Build Project Descriptions Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant

More information

2018 Service Changes Ada County

2018 Service Changes Ada County 2018 Service Changes Ada County System Benefits 15 minute headways on State Street during peak hours o 30 minutes on Saturdays 30 minute headways on Emerald all day on weekdays More frequent and direct

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

PROGRESS PARK CONNECTOR

PROGRESS PARK CONNECTOR PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council TORONTO STAFF REPORT ACTION REQUIRED Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road Dnte: February 16,2009 To: From: Toronto and East York Community

More information

Wake Bus Plan. Short Range Transit Plans. Proposed Transit Service Projects and Changes. GoTriangle. Volume 2 DRAFT

Wake Bus Plan. Short Range Transit Plans. Proposed Transit Service Projects and Changes. GoTriangle. Volume 2 DRAFT Wake Bus Plan Short Range Transit Plans Proposed Transit Service Projects and Changes Volume 2 GoTriangle DRAFT Table of Contents Information on the Wake Bus Plan Short Range Transit Plans Project Sheet

More information

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington & 77 McDonnell- - Monday thru Friday NORTHBOUND Effective: March 18, 2019 & Valley Industries 4:53A 4:59A 5:10A 5:18A 5:27A 5:39A 5:33A 5:39A 5:50A 5:58A 6:07A 6:19A 6:13A 6:19A 6:31A 6:39A 6:49A 7:02A 6:53A

More information

Revised January 9, 2019 Metropolitan Atlanta Rapid Transit Authority Proposed Bus Service Modifications for April 13, 2019

Revised January 9, 2019 Metropolitan Atlanta Rapid Transit Authority Proposed Bus Service Modifications for April 13, 2019 Revised January 9, 2019 Metropolitan Atlanta Rapid Transit Authority Proposed Bus Service Modifications for April 13, 2019 REVISED: 1/9/2019 MARTA proposed modifications for Routes 49, 50, 850 and 853

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Summary of Proposed NH 120 Service

Summary of Proposed NH 120 Service Proposed NH 120 Bus Route Moody Building Etna Road Summary of Proposed NH 120 Service The Upper Valley Lake Sunapee Regional Planning Commission (UVLSRPC) working together with a Steering Committee comprised

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

The following describes each route change. Each route is subject to minor adjustments prior and during implementation.

The following describes each route change. Each route is subject to minor adjustments prior and during implementation. Chapter 6 Final Route Recommendations This chapter describes Part 2 route recommendations reflecting increased coordination between the City of Lawrence transit system (The T) and University of Kansas

More information

Tech Ridge Express COMMUTER. Home Depot. Tech Ridge Park & Ride. Lamar. Braker. Rundberg 2 LEGEND. Red River NOTES

Tech Ridge Express COMMUTER. Home Depot. Tech Ridge Park & Ride. Lamar. Braker. Rundberg 2 LEGEND. Red River NOTES 9 Tech Ridge Express COMMUTER Home Depot Tech Ridge Center Ridge, 52,, 2, 25, 92, 80 Center Line Howard Parmer McCallen Pass Braker Rundberg Koenig 8 290 University of Texas 5th Republic Square Central

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO

Welcome to the Business Owners Task Force. Perry Leonard Blagg Tire and Service President/COO Welcome to the Business Owners Task Force Perry Leonard Blagg Tire and Service President/COO Safety: West Nile Virus Alyssa Tenorio NorthGate Constructors Public Information Manager West Nile Virus Carried

More information

Schedule ROUTE. Weekend. Broward County Transit

Schedule ROUTE. Weekend. Broward County Transit For more details on our fares please visit our web site at Broward.org/BCT or call customer service: 954.357.8400. Reading A Timetable - It s Easy 1. The map shows the exact bus route. 2. Major route intersections

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015 Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2015 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,

More information

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016 Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2016 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,

More information

Attachment 2: Analysis of Map Content in the RTA Ride Guide Page 1. Route 3:

Attachment 2: Analysis of Map Content in the RTA Ride Guide Page 1. Route 3: Attachment 2: Analysis of Map Content in the RTA Ride Guide Page 1 The Transit Coalition has analyzed the graphical layout and design of the published bus route maps in the RTA Ride Guide. RTA should consider

More information

Marin County Transit District 2006 Draft Service Plan Revised: May 8 th, 2006

Marin County Transit District 2006 Draft Service Plan Revised: May 8 th, 2006 Marin County Transit District 2006 Draft Service Plan Revised: May 8 th, 2006... 2... 4... 8 Marin Local Fixed Route Service... 8... 14 MCTD School Routes Operating for School Year 2006/2007...14 Other

More information

2017 Proposed Service Changes. For Public Meetings January 2017

2017 Proposed Service Changes. For Public Meetings January 2017 2017 Proposed Service Changes For Public Meetings January 2017 Peninsula Corridor Electrification Project (PCEP) Schedule First Train Set Env. Clearance (Jan.) Delivered LNTP Award (Sept.) NTP (March)

More information

CHERRIOTS 2018 SERVICE PLAN 1

CHERRIOTS 2018 SERVICE PLAN 1 1. Introduction... 2 2. Changes from proposal... 3 2.1 Route 7 reroute... 3 2.2 Route 6 reroute... 3 3. Service plan... 4 3.1 Transferring at Chemeketa Community College... 4 3.1.1 Route 3... 4 3.1.2 Route

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised 2017/2018 Q3 Performance Measures Report Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised Contents Ridership & Revenue... 1 Historical Revenue & Ridership...

More information

ROUTE 17B AVALON VIA SHADELAND AVENUE

ROUTE 17B AVALON VIA SHADELAND AVENUE ROUTE 17B AVALON VIA SHADELAND AVENUE Route 17B Avalon Shadeland provides weekday service between Giant Eagle in Ohio Township and downtown Pittsburgh via Emsworth, Ben Avon, Avalon, Bellevue, Brighton

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

September 2019 Service Revisions

September 2019 Service Revisions September 2019 Service Revisions Preliminary Proposal Prepared for: Performance Monitoring and External Relations Committee Revised 10/31/2018 Spokane Transit assures nondiscrimination in accordance with

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Traffic Management Plan 2018

Traffic Management Plan 2018 Traffic Management Plan 2018 Jesuit College Preparatory School of Dallas Amendment to Planned Development No. 353 Dallas, Texas June 6, 2018 Prepared for Jesuit College Preparatory School of Dallas Prepared

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

ROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT

ROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT ROUTE EBA EAST BUSWAY ALL STOPS ROUTE EBS EAST BUSWAY SHORT The EBA East Busway All Stops and EBS East Busway Short routes provide the core Martin Luther King Jr. East Busway services. Route EBA operates

More information

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE Transit Market Areas While several factors influence the propensity to use transit, the primary predictors of transit productivity are the density of

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Inauguration 2017 Dulles Tower

Inauguration 2017 Dulles Tower Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The

More information

Public Transit Services on NH 120 Claremont - Lebanon

Public Transit Services on NH 120 Claremont - Lebanon Public Transit Services on NH 120 Claremont - Lebanon Overview of Preferred Alternative April 12, 2011 Presentation Overview Study Goals Quick Review Methodology and Approach Key Findings Results of Public

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Kingston Transportation Master Plan Draft Report Transit Forecasting 1

Kingston Transportation Master Plan Draft Report Transit Forecasting 1 TRANSIT FORECASTING Transit Forecasting 1 INTRODUCTION A spreadsheet model was developed to identify existing transit deficiencies and additional transit service requirements. The model comprised transit

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot UPDATE Average streetcar travel times in continued to show similar trends as first observed in November. The most significant

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.4 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications associated

More information

ROUTE 103. Morrisville Shopping Shuttle ROUTE OVERVIEW

ROUTE 103. Morrisville Shopping Shuttle ROUTE OVERVIEW ROUTE 103 Morrisville Shopping Shuttle ROUTE OVERVIEW Route 103 is a Shuttle route that operates between Stowe and Morrisville. The route travels primarily along VT Route 100 and provides service to Stowe

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-032 WHEREAS, The San Francisco Municipal Transportation Agency has proposed the installation of parking and traffic modifications

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

PLEASE READ Proposal for Sustainable Service

PLEASE READ Proposal for Sustainable Service IMPORTANT PLEASE READ 019 Proposal for Sustainable Service 019 Service Change Proposal IMPLEMENT A SUSTAINABLE NETWORK Everett Transit completed its Long Range Plan in May, and the plan was adopted by

More information

Figure 1: Route 56B Hazelwood

Figure 1: Route 56B Hazelwood ROUTE 56B HAZELWOOD Route 56B is a radial route that operates on weekdays between Homestead and downtown Pittsburgh. Traveling inbound, the route begins in Homestead at the Waterfront shopping center,

More information

CONTACT: Michelle T. Holland

CONTACT: Michelle T. Holland FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS

More information

Central Oregon Intergovernmental Council

Central Oregon Intergovernmental Council Central Oregon Intergovernmental Council Regional Transit Master Plan (RTMP) Technical Advisory Committee March 8, 2013 Agenda Introductions (5 min) Project Update (5 min) Updated Demand Estimates (5 min)

More information

CHAPTER 5: Operations Plan

CHAPTER 5: Operations Plan CHAPTER 5: Operations Plan Report Prepared by: Contents 5 OPERATIONS PLAN... 5-1 5.1 Proposed Service Changes... 5-2 5.1.1 Fiscal Year 2017... 5-2 5.1.2 Fiscal Year 2018... 5-6 5.1.3 Fiscal Year 2019...

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

Wednesday, January 10 6:30-8:00 p.m. Adamsville Rec Center 3201 MLK Jr. Drive SW Atlanta, GA 30311

Wednesday, January 10 6:30-8:00 p.m. Adamsville Rec Center 3201 MLK Jr. Drive SW Atlanta, GA 30311 YOU RE INVITED IT S YOUR TURN TO DRIVE THE CONVERSATION ABOUT BUS SERVICE CHANGES MARTA will be holding community meetings and public hearings for feedback and comments for proposed bus service modifications

More information

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer Strategic Signal Timing Changes = BIG Results Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer Pre Signal Timing Updates Signal Timing Updates Average Retiming Interval Percent

More information

Appendix D Public Hearing Comments

Appendix D Public Hearing Comments Appendix D Public Hearing Comments Summary Document - WRTA CSA Comments, Online and Paper Survey Brochures Route 2 - Why not go to the Airport on every trip? It s a transport spot. - Keep Route 2 to the

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

MUSKEGON AREA TRANSIT SYSTEM PROPOSAL FOR FARE AND SERVICE ADJUSTMENTS TO BE PHASED IN BEGINNING JANUARY 1, 2018

MUSKEGON AREA TRANSIT SYSTEM PROPOSAL FOR FARE AND SERVICE ADJUSTMENTS TO BE PHASED IN BEGINNING JANUARY 1, 2018 MUSKEGON AREA TRANSIT SYSTEM PROPOSAL FOR FARE AND SERVICE ADJUSTMENTS TO BE PHASED IN BEGINNING JANUARY 1, 2018 The Muskegon Area Transit System is proposing a series of System Adjustments to be implemented

More information

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011 DATE April 0, 0 TO FROM RE MEMORANDUM Congestion Management Program Files Ariel Godwin, CMP Manager Boston Region MPO Staff Limited-Access Highway Counts and Traffic Volumes, Summer 00 This memorandum

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK

More information

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour

More information

Schedule ROUTE. All Week. Broward County Transit

Schedule ROUTE. All Week. Broward County Transit For more details on our fares please visit our web site at Broward.org/BCT or call customer service: 954.357.8400. Reading A Timetable - It s Easy 1. The map shows the exact bus route. 2. Major route intersections

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 Subject: FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY From: VDOT-News To: Time: Tuesday, December 12, 2017 9:05:36 AM -08:00 RELEASE: IMMEDIATE Michelle Holland,

More information

The TransAm Eastern Express - Westbound Map Set #23 Watkins Mill State Park, MO to Atchison, KS 66.0 Miles / Cumulative Climbing: 2,955

The TransAm Eastern Express - Westbound Map Set #23 Watkins Mill State Park, MO to Atchison, KS 66.0 Miles / Cumulative Climbing: 2,955 The TransAm Eastern Express - Westbound Map Set #23 Watkins Mill State Park, MO to Atchison, KS 66.0 Miles / Cumulative Climbing: 2,955 PART #1 WATKINS MILL STATE PARK TO PARADISE, MO PARADISE CYCLING

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 24, 2010 SUBJECT: ACTION ITEM EXTENSION TO EXHIBITION LOOP RECOMMENDATIONS It is recommended that the Commission: 1.

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

Work in 2015 and Annual Mobility- Management Plan

Work in 2015 and Annual Mobility- Management Plan Work in 2015 and Annual Mobility- Management Plan KPH-Turcot July 14, 2015 2 Presentation Outline Division into sectors Work in 2015 without disruptions West sector Center sector East sector South sector

More information

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour www.peachpass.com NOVEMBER 2013 Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour In This Issue GA 400 Tolls End on November 22 Lanes Closures for GA 400/I-85

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

Approval of August 2019 Service Changes

Approval of August 2019 Service Changes Approval of August 2019 Service Changes Operations, Safety & Security Committee April 9, 2019 Rob Smith AVP Service Planning and Scheduling 1 Today s Consideration Approve proposed August 2019 service

More information

Presentation Outline

Presentation Outline Presentation Outline Overview of Planning Process Initial Service and Fare Considerations RTC RIDE Fixed-route RTC ACCESS Paratransit Fares Next Steps Regional Transportation Commission, Washoe County

More information

GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30

GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30 MARYLAND GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30 BUDGET Cost neutral Option 1 Serve Arundel Mills Mall PROPOSED CHANGE Add service to Arundel Mills Mall on all trips. The time between

More information

MARTA SERVICE CHANGES

MARTA SERVICE CHANGES MARTA SERVICE CHANGES Effective April 14, 2018 Several of MARTA's bus routes are being modified to improve overall service and on-time performance. The following changes will go into effect on Saturday,

More information

WELCOME US 83 Public Meeting

WELCOME US 83 Public Meeting WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:

More information

Figure 1: Route 86A East Hills

Figure 1: Route 86A East Hills ROUTE 86A EAST HILLS Route 86A is a radial route that operates between Wilkinsburg and downtown Pittsburgh. It operates via East Hills, Brushton, Homewood, East Liberty, Friendship, Shadyside, Bloomfield,

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Americans with Disabilities (ADA) Paratransit Plan

Americans with Disabilities (ADA) Paratransit Plan Americans with Disabilities (ADA) CTS provides its Public Services in accordance with the Federal Act of 1964 Title VI of the Civil Rights Act No person in the United States shall, on the ground of race,

More information

Table E1 Summary of Annual Revenue Service Hours. System LTC Routes 581, , , , ,082 (Quick Start)

Table E1 Summary of Annual Revenue Service Hours. System LTC Routes 581, , , , ,082 (Quick Start) L O N D O NT R A N S I TC O MMI S S I O N T r a n s i t N e t w o r k R a p i dt r a n s i t I n t e g r a t i o nf r a me w o r k FI NAL REPORT Augus t2016 Su bmi t t e dby : Di l l on Consul t i ng Li

More information

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN by John M. Ishimaru Senior Research Engineer Duane Wright Systems Analyst Programmer Mark E. Hallenbeck Director Jaime Kang Research

More information

I-26 Fixed Guideway Alternatives Analysis CHAPTER IV: Screen Two Alternatives. Draft Report February 2016

I-26 Fixed Guideway Alternatives Analysis CHAPTER IV: Screen Two Alternatives. Draft Report February 2016 I-26 Fixed Guideway Alternatives Analysis CHAPTER IV: Screen Two Alternatives Draft Report February 2016 Page intentionally left blank Table of Contents 1 Introduction... 1 1.1 Screen Two Alternatives...

More information

PVTA Service Changes

PVTA Service Changes PVTA Service Changes The following is a summary of the routes that will be impacted through the service modifications scheduled for August 27 th, September 3 rd, or September 5 th. For additional information

More information

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS

AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS AUTORIDAD DEL CANAL DE PANAMÁ EXECUTIVE VICE PRESIDENCY FOR OPERATIONS 3654-A (OPXI) ADVISORY TO SHIPPING No. A-29- August 31, TO : All Shipping Agents, Owners, and Operators SUBJECT: Modifications to

More information

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces

More information

East Hampton Airport (KHTO) Noise Abatement Plan 2016 Prepared by the Eastern Region Helicopter Council

East Hampton Airport (KHTO) Noise Abatement Plan 2016 Prepared by the Eastern Region Helicopter Council East Hampton Airport (KHTO) Noise Abatement Plan 2016 Prepared by the Eastern Region Helicopter Council DRAFT Original 1 The following presentation has been prepared by the Eastern Region Helicopter Council

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

M56. New Junction 11a Summary of the consultation report

M56. New Junction 11a Summary of the consultation report M56 New Junction 11a Summary of the consultation report August 2017 M56 New Junction 11a Summary of the public consultation The scheme The M56 New Junction 11a scheme is part of our continued programme

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

VFR Patterns on airport

VFR Patterns on airport VFR Patterns on airport Left Traffic South Alpha Call Tower: Kona Tower, Helicopter, Requesting Left Traffic South Alpha Upwind - remain East of the KOA VOR climb to 300 MSL or higher Crosswind - remain

More information

Service Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission

Service Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission Service Summary WINTER 2019 CHANGES TRIP LEVEL DETAIL Effective January 2, 2019 This document outlines Winter 2019 seasonal schedule changes for the Victoria Regional Transit System for implementation

More information

PORTLAND NORTH INTER-CITY EXPRESS SERVICE Freeport-Yarmouth-Cumberland-Falmouth-Portland Concept Report June 2014

PORTLAND NORTH INTER-CITY EXPRESS SERVICE Freeport-Yarmouth-Cumberland-Falmouth-Portland Concept Report June 2014 Greater Portland Transit District PORTLAND NORTH INTER-CITY EXPRESS SERVICE Freeport-Yarmouth-Cumberland-Falmouth-Portland Concept Report June 2014 In February 2014, Metro s Board of Directors approved

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 6, 2010 SUBJECT: LAKE SHORE BOULEVARD STREETCAR SERVICE ACTION ITEM RECOMMENDATION It is recommended that the Commission

More information

Otay Ranch Route Alternatives 1 A SR-125 Transit and Pedestrian Bridge October Otb 2010

Otay Ranch Route Alternatives 1 A SR-125 Transit and Pedestrian Bridge October Otb 2010 Route lternatives 1 SR-125 Transit and Pedestrian ridge October Otb 2010 Calvary Christian cademy East Palomar Street Santa Cora Community Park Lomas Verdes Olympic Parkway Santa Venetia lternative 1 Town

More information