1 Ground Handling Social Dialogue Support The limitation of ramp handling licenses at Rome Fiumicino Airport 1 Workshop Legal Survey Barcelona Dec. 8, 2016

2 2 A quick look at history After year 2000 the ground handling market scenario at FCO airport has seen an increase of «full handling» operators due to «market opening» as a result of the implementation of Council Directive 96/67/EC (implemented in Itally with a 1999 decree). Third parties handling This has led to both Operational and Market issues. 7 Self handling Merger between two handlers Bankruptcy of one company 5 Operational Issues Ramp congestion due to about 7000 units among GSE and other vehicles operating on the Apron Shortage of areas in the ramp (about 1000 sqm missing in ramp logistics). Pressure at lowering costs Market Issues High competitive pressure Social tensions Reduced quality levels Difficulties in business sustainability Bankruptcies Continuous damages to the public perception of Rome Fiumicino

3 Timeframe for in depth analysis 1/3 Starting in 2011, ADR and ENAC carried out a technical analysis of FCO handling operations. To highlight the critical aspects of the ramp operations, a dynamic simulation model of vehicle traffic was used. This allowed a thorough assessment of the parameters and variables related to the service's performance and the safety of operations. Multiple analyses have been carried out with the following objectives: check the saturation of the operational areas (both for vehicles and facilities) assigned to the handlers; highlight the operational bottlenecks arising from the handling activities and, in particular, by the flow of aircraft and vehicles on the apron area; identify and analyze the safety risks in circulation of vehicles and aircraft in the air side; assess the current level of safety; analyze the impact on the handling operations of the airport development works.

4 Timeframe for in depth analisys 2/3 Key Findings Market fragmentation between several handlers (six in 2013) Some handlers with very low market share Total amount of ramp equipment not optimized High average age of vehicle fleets Proof of the saturation of Apron, in respect of the relationship between demand and availability of parking areas for handlers GSE Shortage of space availability On the basis of the methodology used, the risks associated with handlers activities on the airport were "tolerable" (applying the internationally recognized matrix of the ICAO risk). It was therefore found that the control and mitigation measures had to be applied in the short term, to sensibly reduce the level of risk down to "acceptable". Among the mitigation measures identified, the limitation of the ground handling operators in the ramp would have allowed to improve operational safety and quality of service for airport users.

5 Timeframe for in depth analisys 3/3 Simulations were performed in order to evaluate the need of each type of GSE (trucks, cars, tractors, buses, stairs, pushbacks, GPU units) in the peak hour. Reduction directly related to the n of GH operators. As confirmation of the necessity of the limitation, a benchmark was performed to assess the liberalization level in other European airports. The following table highlights the relationship between the levels of traffic and the number of full handlers (2013 data).

6 The measure adopted by ENAC (CAA) On February 18, 2014 ADR submitted to ENAC a request for the limitation of the ground handling licenses for ramp activities. In response to the request and by approving the related studies, the General Director of Italian Civil Aviation Authority s decision of 13 rd October 2014 imposed the following limitations: Services subject to limitations: Baggage Handling (cat.3, Annex A, Legislative Decree n 18/99) Cargo and Mail Handling (physical handling of freight and mail, incoming, departing and in transit between the air terminal and the aircraft - Cat.4, Annex A, Legislative Decree n 18/99) Ramp handling (Cat.5 All.to A, Legislative Decree no. 18/99 with the exception of point 5.7 transport, loading on the plane of food and beverages, and its unloading) Service providers to third parties admitted to the market: no. 3 Self-handling carriers admitted to the market: no. 2 Duration of restrictions: 7 years

7 The public tender to award the licenses April 2015 Civil Aviation Authority published the tender for the selection of 3 providers of handling services to third parties Tender opened to all national and EU operators able to meet the specific minimum requirements Candidates eligibility requirements Economic & Financial capability : Bank references Statement of accounts Turnover (global and on specific limited services) Technical capability : Experience Business plan Service Quality Procedures Resources Cope with ENAC s certification requirements Experience (at least last 3 years) on GH operations in an airport with traffic of at least 25 Mil. WLU Awarding criteria Focus on quality and resources availability Higher score + 60 BONUS POINTS if the competitor committed to adopt the social protection clause SLAs to be signed with ADR

8 Award and implementation of the limitation Tender and results Five companies submitted offers: Alitalia Aviapartner, Aviation Services Consulta (with temporary joint venture with Marconi Handling) WFS Ground Italy. On December 23 rd 2015 ENAC awarded the licenses to operate to the following companies: Alitalia Aviation Services Aviapartner On 4 th March 2016 the licenses were declared effective and in the following period the new service contracts with SLAs have been undersigned by ADR and the handling licenses. Limitations have been fully implemented from May 18 th, With the active cooperation of the Unions, about 235 workers changed employer.

9 9 After six months: general improvement of quality Time of delivery for the last luggage Domestic Flights (waiting time in mm, ss in 90% of cases) mm,ss Time of delivery for the last luggage International Flights (waiting time in mm, ss in 90% of cases) mm,ss 45 41, % , ,32-29% 29,49 34,37-21% 27,27 32,22-33% 21, ,20-26% 19, , % , ,12-26% 37,04 45,57 45,28-18% -18% 37,45 37, ,53-16% 31, Jul Aug Sept Oct Nov 0 Jul Aug Sept Oct Nov Following the limitation of 18 May 2016, considerable reduction of the time of delivery for the last bag both for domestic flights (up to -36%) and for international ones (up to -35%)

10 10 After six months: general improvement of quality Waiting time on board for the first passenger disembarkation All Flights (waiting time in mm, ss in 90% of cases) mm,ss 5,5 5,31 5,33 5,0-23% -25% 4,5 4,0 4,14 4,10 3,5 3, % 4,41 4,04 4,18-2% 4,12 4,18-9% 3,56 2,5 2,0 1,5 1,0 0,5 0,0 Jul Aug Sept Oct Nov Following the limitation of 18 May 2016, considerable reduction of waiting time on board for the first passenger disembarkation, especially during the peak of the summer season (up to -25%)

11 11 Quality improves in unrestricted areas too Waiting time at the check-in Domestic Flights (waiting time in mm, ss in 90% of cases) mm,ss Waiting time at the check-in International Flights (waiting time in mm, ss in 90% of cases) mm,ss ,16-8% 13,07 15,03-18% 12,16 11,50-14% 13,29-23% , % ,48 8,00-30% 5,54 4,23 5,37 +13% 3,53 period negatively impacted by other events (Alitalia IT systems) 5,06 +31% 3,54 +14% 4,29 3, ,13 10,25-16% 9, Jul Aug Sept Oct Nov 0 Jul Aug Sept Oct Nov Following the limitation of 18 May 2016, considerable reduction of waiting time at the check-in for international flights (up to -23%); waiting time inferior to 6 minutes for domestic flights

12 THANK YOU! 12

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport Ground Handling Social Dialogue Support The limitation of ramp handling licenses at Rome Fiumicino Airport Final conference Copenhagen 27-2 April 2017 2 A quick look at history at Rome Fiumicino After

More information

TWINNING EGYPT ITALY STRENGTHENING THE AVIATION OVERSIGHT STANDARDS OF THE EGYPTIAN CIVIL AVIATION AUTHORITY

TWINNING EGYPT ITALY STRENGTHENING THE AVIATION OVERSIGHT STANDARDS OF THE EGYPTIAN CIVIL AVIATION AUTHORITY TWINNING EGYPT ITALY STRENGTHENING THE AVIATION OVERSIGHT STANDARDS OF THE EGYPTIAN CIVIL AVIATION AUTHORITY Twinning are EU initiatives to assist neighboring countries in the construction of their national

More information

BRUTuS Program A Case study on Apron Safety Collaboration

BRUTuS Program A Case study on Apron Safety Collaboration BRUTuS Program A Case study on Apron Safety Collaboration Dirk Geukens, Senior Safety Expert ACI-NA World Conference September 27, 2016 Montreal Brussels Airport Aircraft Movements Passengers Cargo 220,000

More information

The Commission states that there is a strong link between economic regulation and safety. 2

The Commission states that there is a strong link between economic regulation and safety. 2 European Cockpit Association Piloting Safety ECA POSITION ON THE PROPOSAL FOR REGULATION ON COMMON RULES FOR THE OPERATION OF AIR TRANSPORT SERVICES IN THE COMMUNITY - Revision of the Third Package of

More information

IATA FUEL EFFICIENCY CAMPAIGN

IATA FUEL EFFICIENCY CAMPAIGN IATA FUEL EFFICIENCY CAMPAIGN Juergen Haacker Director, Operations Montreal, IATA Fuel Efficiency Campaign Jet fuel price driving airline fuel efficiency Increased 5% from 2003-2005 Industry is on track

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

LEGAL ISSUES IN SEARCH AND RESCUE UAV OPERATIONS

LEGAL ISSUES IN SEARCH AND RESCUE UAV OPERATIONS 04/10/2018 LEGAL ISSUES IN SEARCH AND RESCUE UAV OPERATIONS Geert De Cubber Belgian Royal Military Academy PROBLEM STATEMENT Unmanned tools (ground, air, marine robots) can play a critical role to save

More information

The path of Rome Fiumicino Airport to operational excellence. EURO Aviation IT Summit Budapest September 28, 2018

The path of Rome Fiumicino Airport to operational excellence. EURO Aviation IT Summit Budapest September 28, 2018 The path of Rome Fiumicino Airport to operational excellence EURO Aviation IT Summit Budapest September 28, 2018 2017 - ROME FIUMICINO (FCO) IN NUMBERS >200 DESTINATIONS 41Mln 100 55 6 +9% 5 8 25% PASSENGERS

More information

MINISTERIAL STATEMENT ON GIBRALTAR AIRPORT

MINISTERIAL STATEMENT ON GIBRALTAR AIRPORT Annex II 18/09/06 MINISTERIAL STATEMENT ON GIBRALTAR AIRPORT The Minister of Foreign Affairs and Cooperation of the Kingdom of Spain, Mr. Miguel Angel Moratinos, the Minister for Europe of the United Kingdom

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

Performance monitoring report for first half of 2016

Performance monitoring report for first half of 2016 Performance monitoring report for first half of 2016 Gatwick Airport Limited 1. Introduction Date of issue: 5 December 2016 This report provides an update on performance at Gatwick in the first half of

More information

Keflavik International Airport Airport Charges

Keflavik International Airport Airport Charges Keflavik International Airport Airport Charges Valid from July 1 st 2017 Contents 1. Introduction... 3 2. Definitions... 4 3. Airport charges... 5 3.1 Landing Charges... 5 3.2 Departure Charges... 5 3.3

More information

Dear participants of the conference!

Dear participants of the conference! Dear participants of the conference! Let me assure you of my sincere respect and greet you on behalf of Turkmenkhowayollary State Civil Aviation Department. First of all, I thank you for your attention

More information

Revision of the Third Air Package

Revision of the Third Air Package Not applicable Not applicable Not applicable Revision of the Third Air Package Recitals to note Recital 5 states that, To ensure consistent monitoring of the compliance with the requirements of the operating

More information

BILATERAL TEMPLATE AIR SERVICES AGREEMENT

BILATERAL TEMPLATE AIR SERVICES AGREEMENT BILATERAL TEMPLATE AIR SERVICES AGREEMENT Throughout this document: 1) an asterisk is used to indicate that a specific provision within an article is common to each of the traditional, transitional and

More information

matter? How is the market for large jets faring compared with that for their smaller counterparts, and are FBOs equipped to handle such aircraft?

matter? How is the market for large jets faring compared with that for their smaller counterparts, and are FBOs equipped to handle such aircraft? size Does matter? How is the market for large jets faring compared with that for their smaller counterparts, and are FBOs equipped to handle such aircraft? Words Mario Pierobon 36 BUSINESS AIRPORT INTERNATIONAL

More information

ACI EUROPE POSITION PAPER. Airport Slot Allocation

ACI EUROPE POSITION PAPER. Airport Slot Allocation ACI EUROPE POSITION PAPER Airport Slot Allocation June 2017 Cover / Photo: Madrid-Barajas Adolfo Suárez Airport (MAD) Introduction The European Union s regulatory framework for the allocation of slots

More information

Abruzzo Airport. Commercial Policy Development Routes

Abruzzo Airport. Commercial Policy Development Routes Abruzzo Airport Commercial Policy Development Routes Abruzzo Airport's main objective is to stimulate the development of air traffic by encouraging carriers to operate new routes and upgrade existing ones,

More information

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights.

All aviation except commercial aviation. Including but not limited to business aviation, air taxi operations and technical flights. Capacity declaration Amsterdam Airport Schiphol: Summer 2019 1. Definitions The following definitions apply: Commercial Aviation: General Aviation: Night departure slot: Night arrival slot: Night slot:

More information

OUR WORLD WORKS FOR YOU

OUR WORLD WORKS FOR YOU OUR WORLD WORKS FOR YOU ABOUT WFS 22,800 Airport service professionals working for you all over the world. 198 Global locations on five continents. 1,2 billion Annual sales, enabling us to invest in the

More information

Commercial Space Transportation in Italy. A framework in development

Commercial Space Transportation in Italy. A framework in development 2nd ICAO/UNOOSA Space Symposium Commercial Space Transportation in Italy. A framework in development G. Di Antonio, M. Sandrucci, B. Marasa ENAC Policy on Commertial Space Transportation presented at 1st

More information

The SES Performance Scheme. ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan May 2013

The SES Performance Scheme. ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan May 2013 The SES Performance Scheme ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan 21-23 May 2013 1 EU s Single Aviation Market Before 1992: fragmented national markets based on restrictive bilateral

More information

Airspace Infringement

Airspace Infringement Airspace Infringement A KEY RISK DEMANDING DEDICATED ACTION Airspace Infringement Workshop 24 January 2008, Brussels Peter Stastny, EUROCONTROL SRU and Alexander Krastev, EUROCONTROL DAP/SSH 1 European

More information

ICAO REGIONAL FACILITATION SEMINAR

ICAO REGIONAL FACILITATION SEMINAR ICAO REGIONAL FACILITATION SEMINAR Portuguese CAA priorities in the area of Facilitation 2014 Development of the Nacional Facilitation Programme and Assistance to Passengers with reduced mobility (PRM)

More information

Performance monitoring report for first half of 2015

Performance monitoring report for first half of 2015 Performance monitoring report for first half of 2015 Gatwick Airport Limited 1. Introduction Date of issue: 11 November 2015 This report provides an update on performance at Gatwick in the first half of

More information

OUR WORLD WORKS FOR YOU

OUR WORLD WORKS FOR YOU OUR WORLD WORKS FOR YOU ABOUT WFS 26,400 Airport service professionals working for you all over the world. 6,3 million Tonnes of cargo handled per annum worldwide. 198 Global locations on five continents.

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Regulation 261/2004 denied boarding, cancellation and delay. Italian experience

Regulation 261/2004 denied boarding, cancellation and delay. Italian experience Regulation 261/2004 denied boarding, cancellation and delay Italian experience BRUSSELS, 22 OCTOBER 2010 HOTEL BRISTOL STEPHANIE WWW.STUDIOPIERALLINI.IT Legislation - Italian Law no. 12 dated as of 10

More information

Global Civil and Military Simulation & Training Market ( Edition) July 2017

Global Civil and Military Simulation & Training Market ( Edition) July 2017 Global Civil and Military Simulation & Training Market (2017-2021 Edition) July 2017 Global Civil and Military Simulation & Training Market Report Scope of the Report The report titled Global Civil Aviation

More information

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT Presentation by Mrs. Folasade Odutola, Director, Air Transport Bureau International Civil Aviation Organization 1 Chicago Convention, 1944 The aims and objectives

More information

Aviation Safety. International Conference on Contemporary Issues in Air Transport, Air Law & Regulation. Professor Brian F. Havel.

Aviation Safety. International Conference on Contemporary Issues in Air Transport, Air Law & Regulation. Professor Brian F. Havel. International Conference on Contemporary Issues in Air Transport, Air Law & Regulation Aviation Safety Professor Brian F. Havel Fulbright Visiting Chair in Comparative Law and Legal Pluralism, McGill University

More information

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports)

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports) ACI EUROPE POSITION on the revision of EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports) 10 JULY 2011 EU Directive 2002/30 European airports have a long history of noise

More information

Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018. Environmental capacity; available number of slots for Commercial Aviation

Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018. Environmental capacity; available number of slots for Commercial Aviation Capacity declaration Amsterdam Airport Schiphol; winter 2017/2018 Environmental capacity; available number of slots for Commercial Aviation The number of slots available for landing and take-off operations

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Dott.ssa Benedetta Valenti

Dott.ssa Benedetta Valenti June 13th, 2016. New rules and procedures with regard to the introduction of noise-related operating restrictions at Union airports Dott.ssa Benedetta Valenti benedetta.valenti@ssalex.com From June 13

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

2018 Training Program

2018 Training Program 2018 Training Program Best Practice Course Period Course Fee Page Airport Business Management 16 to 20 Apr $ 930 5 Airport Airside Operations 25 to 29 Jun $ 930 6 Airport Security Operations 2 to 4 Jul

More information

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB

Description of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB Description of Airport Charges Swedavia AB 2016 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission

More information

Cleveland Hopkins International Airport Preliminary Merger Analysis

Cleveland Hopkins International Airport Preliminary Merger Analysis City of Cleveland Frank G. Jackson, Mayor Operational Issues Cleveland Hopkins International Airport Preliminary Merger Analysis As of today, Continental and United have not even admitted that they are

More information

Toronto Pearson: Toronto Pearson:

Toronto Pearson: Toronto Pearson: Case Studies Toronto Pearson: Optimization study Check-in and baggage outbound (December 2014 March 2015) Toronto Pearson: Baggage operation improvement (March 2015 - ) OPTIMIZATION STUDY CHECK-IN AND

More information

L 342/20 Official Journal of the European Union

L 342/20 Official Journal of the European Union L 342/20 Official Journal of the European Union 24.12.2005 COMMISSION REGULATION (EC) No 2150/2005 of 23 December 2005 laying down common rules for the flexible use of airspace (Text with EEA relevance)

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

AERONAUTICAL INFORMATION CIRCULAR Belgium and Luxembourg

AERONAUTICAL INFORMATION CIRCULAR Belgium and Luxembourg AERONAUTICAL INFORMATION CIRCULAR AIM Belgium Control Tower Tervuursesteenweg 303 1830 Steenokkerzeel BELGIUM FAX: +32 (0) 2 206 24 19 AFS: EBVAYOYX Email: aip.production@belgocontrol.be URL: www.belgocontrol.be

More information

Classification: Public

Classification: Public Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

MEPs to vote on "Better Airports" Package

MEPs to vote on Better Airports Package EUROPEAN COMMISSION MEMO Brussels, 6 December 2012 MEPs to vote on "Better Airports" Package The European Parliament will next week debate and vote on a comprehensive package of proposed measures to help

More information

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports)

ACI EUROPE POSITION. on the revision of. EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports) ACI EUROPE POSITION on the revision of EU DIRECTIVE 2002/30 (noise-related operating restrictions at community airports) 6 SEPTEMBER 2011 EU Directive 2002/30 Introduction 1. European airports have a long

More information

LUFTHAVNS VIKAR AIRLINE SUPERVISION & SERVICES CPH

LUFTHAVNS VIKAR AIRLINE SUPERVISION & SERVICES CPH AIRLINE SUPERVISION & SERVICES CPH LUFTHAVNS VIKAR Airline Supervision & Services in CPH Who are we? Lufthavnsvikar is the largest independent provider of flexible and affordable all-round airport solutions

More information

Notice for commencement of consultations on airport charges at Sofia Airport,

Notice for commencement of consultations on airport charges at Sofia Airport, Proposal for the level of Airport Charges and the applicable Incentive discounts for traffic development at Sofia Airport for the period 1 st January 31 st December 2018 1. Landing Charge 1.1. The Landing

More information

AIR CARGO RECOVERY DRIVERS AND ROADBLOCKS Airports Council International North America Calgary

AIR CARGO RECOVERY DRIVERS AND ROADBLOCKS Airports Council International North America Calgary AIR CARGO RECOVERY DRIVERS AND ROADBLOCKS Airports Council International North America Calgary DAN MUSCATELLO Landrum & Brown September 9, 0 Metric Tons (in millions) GLOBAL AIR CARGO VOLUMES Global air

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

Terms of Reference for a rulemaking task

Terms of Reference for a rulemaking task Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1

More information

Runway Scheduling Limits Summer 2015

Runway Scheduling Limits Summer 2015 Appendix 1 Runway Scheduling Limits Summer 2015 Arrivals Hour (UTC) 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Average Total Summer 2014 38 39 37 40 40 41 40 43 43 41 41 44 44 43 38 44 20 39.8

More information

The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011

The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011 The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011 Why SESAR needs SATCOM? Controllers need real time information... Past

More information

Denis Connolly. Hecny Transportation Consultant 2003 Nov 2005

Denis Connolly. Hecny Transportation Consultant 2003 Nov 2005 Denis Connolly A highly experienced General Manager with a pragmatic & commercial approach. Extensive international background gained via both interim and permanent roles with major companies- worked in:

More information

SEA BOARD OF DIRECTORS: 2017 STATUTORY FINANCIAL STATEMENTS AND NON-FINANCIAL REPORT APPROVED

SEA BOARD OF DIRECTORS: 2017 STATUTORY FINANCIAL STATEMENTS AND NON-FINANCIAL REPORT APPROVED SEA BOARD OF DIRECTORS: 2017 STATUTORY FINANCIAL STATEMENTS AND NON-FINANCIAL REPORT APPROVED SEA Group results Passenger traffic: 31.6 million, up 8.9% (22 million at Milan Malpensa, growth of 14.1%)

More information

PILOTMOVERS IS DELIGHTED TO BE RECRUITING FOR B 737 CAPTAINS FOR YTO AIRLINES

PILOTMOVERS IS DELIGHTED TO BE RECRUITING FOR B 737 CAPTAINS FOR YTO AIRLINES PILOTMOVERS IS DELIGHTED TO BE RECRUITING FOR B 737 CAPTAINS FOR YTO AIRLINES YTO AIRLINES Founded on May 28th, 2000, Shanghai YTO Express (Logistics) Co., Ltd. is a large famous private express enterprise

More information

PART D SECTION 2 STAND ALLOCATION

PART D SECTION 2 STAND ALLOCATION D-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 7 March 2014 PART D SECTION 2 STAND ALLOCATION 1. Overview To optimize the overall utilization of aircraft parking facilities, aircraft stands for passenger

More information

Brexit Preparedness seminar on transport. Council Working Party (Article 50 Format) 29/11/2018

Brexit Preparedness seminar on transport. Council Working Party (Article 50 Format) 29/11/2018 Brexit Preparedness seminar on transport Council Working Party (Article 50 Format) 29/11/2018 Aviation - Key sectoral aspects to consider Market Access Safety Security Aviation Market Access (1) Issue

More information

Nikolaos Papagiannopoulos. Juan Francisco García Lopez

Nikolaos Papagiannopoulos. Juan Francisco García Lopez Nikolaos Papagiannopoulos Business Information Systems & Technology, Athens International Airport Juan Francisco García Lopez Innovation and Strategy Manager, Indra Improving Turnaround Management by Increasing

More information

Moving Towards a Customer Centric Approach. Dr. Philippe Villard Head, Policy & Economics

Moving Towards a Customer Centric Approach. Dr. Philippe Villard Head, Policy & Economics Moving Towards a Customer Centric Approach Dr. Philippe Villard Head, Policy & Economics pvillard@aci.aero Introduction to Airport Service Quality What is Airport Service Quality? ACI s customer satisfaction

More information

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018 AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO

More information

Notice for commencement of consultations on airport charges at Sofia Airport,

Notice for commencement of consultations on airport charges at Sofia Airport, Proposal for the level of Airport Charges and the applicable Incentive discounts for traffic development at Sofia Airport for the period 1 st January 31 st December 2019 1. Landing Charge 1.1. The Landing

More information

United Kingdom Civil Aviation Authority

United Kingdom Civil Aviation Authority United Kingdom Civil Aviation Authority Proposed Changes to CAA Scheme of Charges 1 INTRODUCTION 1.1 Details of revisions proposed to apply from 1 April 2017 are shown in red within this Enclosure. Current

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2009R0272 EN 21.03.2013 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION REGULATION (EC) No 272/2009 of 2 April

More information

EASA rulemaking in ATM/ANS. Entry Point North annual AFIS Seminar 5th and 6th of September 2012, Malmö

EASA rulemaking in ATM/ANS. Entry Point North annual AFIS Seminar 5th and 6th of September 2012, Malmö EASA rulemaking in ATM/ANS Entry Point North annual AFIS Seminar 5th and 6th of September 2012, Malmö Single European Sky II Four pillars of Single European Sky II Single European Sky legislation on ATM»

More information

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE.

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE. EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE. Challenge The safety and security of the aviation system and the traveling public are top priorities for all airports. The continued growth in

More information

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association International Transport Forum Paris February 2013 Jeffrey M. Zupan Regional Plan Association Who Are We? Regional Plan Association Not for profit research, planning and advocacy organization in the New

More information

LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup

LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup LATAM Airlines Group presents technical airport infrastructure requirements for the Northeast hub based on study by the consulting firm Arup Study ordered by the Group indicates the airport infrastructure

More information

ADVANCED AIRPORT OPERATIONS SEPTEMBER HYATT PLACE LONDON HEATHROW

ADVANCED AIRPORT OPERATIONS SEPTEMBER HYATT PLACE LONDON HEATHROW ADVANCED AIRPORT OPERATIONS 2018 25-28 SEPTEMBER HYATT PLACE LONDON HEATHROW DAY I: 25 SEPTEMBER 09:00 Arrival, Coffee, Registrations Welcome Note, Introductions, Ice Breakers, Experience Exchange 09:30

More information

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport

More information

CAA Strategy and Policy

CAA Strategy and Policy CAA Strategy and Policy Ms Tamara Goodwin Senior Air Services Negotiator Department for Transport Great Minster House Zone 1/26 33 Horseferry Road London SW1P 4DR 14 July 2017 Dear Tamara APPLICATION BY

More information

Agenda Implementation of the air traffic flow management (ATFM) in the SAM Region

Agenda Implementation of the air traffic flow management (ATFM) in the SAM Region SAM/IG/2 10/10/08 International Civil Aviation Organization South American Regional Office SECOND WORKSHOP / GROUP MEETING ON IMPLEMENTATION SAM (SAM/IG/2) REGIONAL PROJECT RLA/06/901 Lima, Peru, 3 to

More information

AIRPORT PROCEDURE AIR 002

AIRPORT PROCEDURE AIR 002 INDEX 1. Objective and Scope of Application...2 2. References...2 3. DEFINITIONS...2 4. GENERAL PROVISIONS...3 5. GENERAL AVIATION SLOT MANAGEMENT - G.A.S.M...3 6. AIRCRAFT APRONS AND STANDS...3 7. PPR

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 21.4.2008 COM(2008) 175 final 2006/0130 (COD) COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMT pursuant to the second subparagraph of Article

More information

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011

More information

FROM LANDING TO TAKE-OFF: WE CARE COMPANY PRESENTATION

FROM LANDING TO TAKE-OFF: WE CARE COMPANY PRESENTATION FROM LANDING TO TAKE-OFF: WE CARE COMPANY PRESENTATION AGENDA 1. This is Swissport 2. Our Service Offerings 3. The Hub Concept 4. Global and Regional Presence 2 1. THIS IS SWISSPORT 3 WHAT WE DO THE COMPANY

More information

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant Certification Memorandum Guidance to Certify an Aircraft as PED tolerant EASA CM No.: CM-ES-003 Issue 01 issued 23 August 2017 Regulatory requirement(s): CS 23.1309(b)(1), CS 25.1309(a)(1), CS 27.1309(a),

More information

6 th CAPSCA Asia Pacific Meeting. Business Continuity Management Systems: Implementation Guidelines for Airports

6 th CAPSCA Asia Pacific Meeting. Business Continuity Management Systems: Implementation Guidelines for Airports 6 th CAPSCA Asia Pacific Meeting Business Continuity Management Systems: Implementation Guidelines for Airports Manila Philippines 22-25 April 2013 Mr. Craig Bradbrook Deputy Director General Airports

More information

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land

More information

EUR/SAM corridor airspace concept

EUR/SAM corridor airspace concept TWENTYENTH MEETING ON THE IMPROVEMENT OF AIR TRAFFIC SERVICES OVER THE SOUTH ATLANTIC (SAT21) (Lisbon, Portugal, 8 to 10 June, 2016) Agenda Item 2: Air traffic management (ATM) RNP 4 IN THE EUR/SAM CORRIDOR

More information

The support of an European ANSP

The support of an European ANSP The support of an European ANSP Euromed GNSS II project/medusa Final event on GNSS for aviation Patrizio Vanni (GNSS expert) International Strategies Office patrizio.vanni@enav.it MEDUSA final event on

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR

More information

RPAS INTEGRATION INTO EU AIRSPACE. INTERNATIONAL CONFERENCE On CIVIL RPAS OPERATIONS

RPAS INTEGRATION INTO EU AIRSPACE. INTERNATIONAL CONFERENCE On CIVIL RPAS OPERATIONS RPAS INTEGRATION INTO EU AIRSPACE INTERNATIONAL CONFERENCE On CIVIL RPAS OPERATIONS Experimental flights and demonstration activities under IT-CAA permit to flight of the HERO VTOL-RPAS and application

More information

Unmanned Aircraft: Regulatory Framework in the EU EASA team High Level Conference on Drones Warsaw 24 November 2016

Unmanned Aircraft: Regulatory Framework in the EU EASA team High Level Conference on Drones Warsaw 24 November 2016 Unmanned Aircraft: Regulatory Framework in the EU EASA team High Level Conference on Drones Warsaw 24 November 2016 TE.GEN.00409-001 Achievements after Riga declaration (I) Draft Basic regulation (12/2015):

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Global Civil Aviation & Military Simulation & Training Market( ) Trends & Opportunities

Global Civil Aviation & Military Simulation & Training Market( ) Trends & Opportunities Global Civil Aviation & Military Simulation & Training Market(2016-20) Trends & Opportunities View Report Details Scope of the Report The report titled Global Civil Aviation and Military Training and Simulation

More information

Official Record Series 5

Official Record Series 5 Official Record Series 5 United Kingdom Civil Aviation Authority CAA Scheme of Charges (Aviation Security) No: 344 Publication date: 16 March 2018 Commencement date: 01 April 2018 The Civil Aviation Authority,

More information

Global Aviation Safety Workshop Abuja Nigeria. Group A Road 2. Group A Road 2 Inconsistent Regulatory Oversight

Global Aviation Safety Workshop Abuja Nigeria. Group A Road 2. Group A Road 2 Inconsistent Regulatory Oversight Global Aviation Safety Workshop Abuja Nigeria Group A Road 2 Inconsistent Regulatory Oversight Group A Road 2 Gap Analysis and Recommended Actions Step 1 Select the Region for Analysis Step 2 Identify

More information

ICAO Forecasts for Effective Planning and Implementation. Sijia Chen Economic Development Air Transport Bureau, ICAO

ICAO Forecasts for Effective Planning and Implementation. Sijia Chen Economic Development Air Transport Bureau, ICAO ICAO Forecasts for Effective Planning and Implementation Sijia Chen Economic Development Air Transport Bureau, ICAO Appendix C : Forecasting, planning and economic analyses The Assembly: Requests the Council

More information

Asia Pacific Aviation

Asia Pacific Aviation Asia Pacific Aviation Regional Safety and Outreach Martin Eran-Tasker Technical Director Association of Asia Pacific Airlines Overview AAPA Asia Pacific aviation Safety performance Challenges Priorities

More information

Requirements for wildlife control at aerodromes

Requirements for wildlife control at aerodromes Requirements for wildlife control at aerodromes Vasileios Stefanioros Aerodromes Regulations Officer Zsofia Olah Safety Investigation Officer TE.GEN.00409-001 Legal background Regulation (EC) 1108/2009

More information

1. INTRODUCTION 2. OTAS AND THE MFN CLAUSE

1. INTRODUCTION 2. OTAS AND THE MFN CLAUSE HOTEL ONLINE BOOKING SECTOR: THE COMMITMENTS OF BOOKING AND THE MOST FAVORED NATION CLAUSES. A CASE CONDUCTED IN COOPERATION WITH OTHER NATIONAL COMPETITION AUTHORITIES Giulia Cipolla 1 Keywords: Italian

More information

Global Air Traffic Management Forum on Civil/Military Cooperation (Montreal, 19-to 21 October 2009)

Global Air Traffic Management Forum on Civil/Military Cooperation (Montreal, 19-to 21 October 2009) Global Air Traffic Management Forum on Civil/Military Cooperation (Montreal, 19-to 21 October 2009) October 20, 2009 Block D of presentations: "Optimization of airspace use. haring experiences and best

More information

A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL. Capt Miguel Dau - COO

A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL. Capt Miguel Dau - COO A-CDM A SUCCESS CASE OF COLLABORATION GRUAIRPORT & GOL Capt Miguel Dau - COO 1 OLD STRUCTURE (CGA)- INFRAERO AIRPORT MANAGEMENT CENTER CENTRO DE GERENCIAMENTO AEROPORTUÁRIA The INFRAERO implemented the

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information