Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002

Size: px
Start display at page:

Download "Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002"

Transcription

1 Overview of Satellite Navigation Transition CAASD Industry Day with Users May 7, 2002

2 Safety First and Foremost Navigation The Separation Safety Triad Communications Surveillance Three Legs of the Safety Stool

3 IMC Failure Mode 1 Pilots and Controllers Use Position Reporting to Compensate for Loss of Surveillance, Using Existing Non-radar Procedures Navigation Position Reporting Communications Surveillance

4 IMC Failure Mode 2 Navigation Single Aircraft Nav Failures and NAVAID Failures Managed Thru Communications and Surveillance Radar Vectors Wide Area of Nav Failure Could Overburden Controllers Communications Surveillance

5 Interference is line-of-sight B Interference airspace volume increases with altitude A C Distance From Emitter Source

6 Airborne Emitter Swallows All In Line-of-sight Interference airspace volume increases with altitude A C B Distance From Emitter Source

7 IMC Failure Mode 3 Navigation Single Aircraft Failure Procedures Exist NORDO Procedures Comply with Last Clearance Ground Comm Failure Uses Adjoining ATC Facilities to Reestablish Communications Communications Surveillance

8 IMC Failure Mode 4 Contingencies Exist for Loss of Communications and Surveillance Navigation Maintain Last Clearance Expect Contact From Other ATC Facility Communications Surveillance e.g., Facility Outage

9 IMC Failure Mode 4 Navigation An ADS-B Scenario in Non-radar airspace with radar-like separation Maintain Last Clearance Dead Reckoning Advisory Services From ATC Communications Surveillance

10 IMC Failure Mode 5 Navigation Interference with the Loss of Communications Navigation ATC Unable To Sustain Separation In Weather and Multiple Aircraft Without Navigation A Controller Without Communications Becomes a Spectator Communications Surveillance

11 Where are we on the curve? System Disruption Likelihood of Occurrence Technology Exists? Threat??? Scenarios publicly known Ground emitter Intermittent emitter Airborne emitter How much insurance is needed to provide critical Infrastructure protection?

12 Drivers Workload within interference area Sustaining separation Radar Non-radar Assuring safe recovery and landing of aircraft in IMC Minimizing disruption of air transportation to reduce threat Minimum investment for users in backup capability Some benefit to be realized for carrying redundant capability Training reduction Relief on dual redundant carriage of avionics Dispatch reliability Current rules for navigation Part 91 capable of navigation and landing as flight planned

13 General Assumptions DoD needs continued TACAN/DME/ILS Precision landing capability (ILS) at least on one runway at those airports necessary for recovery of aircraft during an interference event All Category II/III ILS systems retained New runway landing capabilities can be served by ILS, GPS(WAAS) or GPS(LAAS) Approach lights retained at where Category I ILS s shut off Sufficient VOR s retained for VOR-VOR direct navigation and landing with VOR non-precision approach at selected airports (minimum operating network) DME s retained to support INS/FMS redundancy Nav coverage richer where surveillance is limited CONUS gaps Alaska Offshore

14 Issues During an Interference Event Response time in detecting size of service volume disruption Will controllers know size of interference area quickly to tactically make adjustments How do pilots get the information to make route change decisions Controller workload Pilot workload Response time to find and shut down interference Dispatch out of, through and into areas of know interference Recovery of operational contingency and backup aircraft caught in interference area Terrain avoidance in interference area in IMC En route low altitude RNAV routes Terminal maneuvering Procedural separation in absence of navigation

15 Size (volume) of Interference is a critical to extent of retained ground-based infrastructure Newark ± 100 nm Phoenix ± 180 nm DoD test ± 320 nm

16 Greater navigation infrastructure retained where surveillance coverage is lacking for low altitude operations Lack of Surveillance Coverage Secondary Surveillance Coverage at 6,000 ft AGL Mitre CAASD

17 Scaled Response Operational Contingency Backup Capability Redundant Capability Operations Disruption Intentional Interference Event Threat Mitigation Removing Operational Disruption in 121/135 Operations Significantly Reduces Jamming as a Target

18 Options for backup Current mix of navigation and landing aids Reduced number of navigation and landing aids What is retained? Which ones and where? How are they linked as a system?? New capability physically separated from SATNAV Low-cost inertial LORAN X Other technology No Backup Redundant capability Backup capability Operational Contingency

19 Operational Contingency Procedural methods dealing with interference events Examples may include: VMC alternate for landing Flight in radar coverage (GA) radar vectors clear of area or to VMC conditions Depart and maintain VFR until clear of interference Squawk NONAV code etc. Designed to provide pilot options in the event of interference not unlike NORDO, where controllers can expect certain actions by the pilot. Provides limited relief from carrying a backup capability in certain airspace.

20 Backup Capability Avionics carried on board the aircraft to navigate and land within an interference area. The backup capability allows dispatch and departure within an area of interference through modification to the flight planned route. Pilots can fly through areas of interference using ground-based navigation aids. Pilots can land at designated recovery airports equipped to support NPA and ILS approaches. Some loss of efficiency or inability to reach the filed destination may occur Less direct routing Destination may only be served by SATNAV

21 Backup Capability (Con t) VOR minimum operating network ILS on at least the primary (best wind) runway for the airport Multiple runway ILS s removed, lighting retained Some ILS s retained at delay constrained airports All CAT II/III ILS s retained until GPS (LAAS) delivered DME s retained Operationally: VOR departure procedure VOR-VOR direct en route VOR non-precision approach VOR radial to ILS final Radar vectors to ILS final En Route and Airport VOR s may be relocated at replacement time to improve coverage and reduce outer markers Military Continued use of TACAN and ILS

22 VOR Proposal for Minimum Operating Network Victor Airways and Jet Routes begin reduction in 2007 leading to no airways by 2012 Replaced with VOR-VOR direct aids and Airport VOR aids Airport VOR supports either VOR NPA, or VOR radial to ILS Minimum Operational Network of VOR s attained by 2012 No location in the CONUS further than 75 miles from VOR at 5,000 feet AGL line-of-site Mountainous locations treated differently due to altitude and icing concerns Replace/relocate MON VOR s and reduce impact of masking radials from 2008 through 2012

23 LORAN as a backup Best theoretical Part 91 backup RNAV backup for RNAV Integrated antenna with GPS One sensor in an integrated avionics package Capable of providing alternative independent path for differential corrections for GPS Coverage in mountainous terrain for navigation and differential correction for GPS But.

24 LORAN X Not the LORAN C avionics as flown today Existing installed avionics only useful for en route nav Existing avionics declining as GPS overtakes panel space in aircraft Must be able to support non-precision approach Meets availability though all-in-view receiver Each transmitter stick used instead of chains H-field antenna for improved signal-to-noise (p-static) Affordable as card in GPS box, not stand alone receiver Avionics in 5 7 years (no MASPS/MOPS or TSO)

25 LORAN must be able to support non-precision Approaches to be a credible backup to GPS Accuracy Threshold 0.43 nm Goal 0.16 nm (RNP 0.3) Monitor Limit Threshold 0.5 nm Goal 0.3 nm Integrity 10-7 Integrity Alert 10 seconds Continuity of Service > ,200 remaining LORAN-C VFR receivers 8,735 remaining IFR receivers remaining

26 Alaska and Coastal Long-range NDBs IMC operations in Alaska and offshore airspace require procedural separation dependent upon navigation being available. Low-level helicopter operations in the Gulf and terrain and coverage in Alaska

27 Redundant Capability Avionics carried provide equivalent capabilities as SATNAV, including RNAV and RNP to dispatch and fly to planned destination independent of interference. Pilots can fly through areas of interference using INS/FMS with updates provided by DME and VOR/DME. Pilots can fly RNAV non-precision approaches to landing or to an ILS final approach. Issue: INS or INS/FMS departures in IMC relating to loss of precision over time - ability to fly departure procedures Operationally: Calibrate INS at gate Recalibrate at runway end Depart Update position from DME, DME-DME, or VOR RNAV/RNP to non-precision approach RNAV to non-precision approach RNAV to ILS approach

28 Regulatory Action Options Airspace Class A & B Class of Operators Military [self-regulating] Part 121 & 135 Safety High speed High density IMC Workload Capacity Efficiency Predictability of Service Dispatch Reliability Threat Denial Proposal: Backup or Redundant Capability required for safety and workload for Part 91 & 121/135 operators in Class A and B airspace Redundancy advantageous for dispatch reliability and reducing intentional interference

29 Navigation and Landing Timeline VOR Minimum Operating Network ILS CAT I Retain on at least one runway ILS CAT II/III Current runways retained for capacity GPS IIIA GPS 1&2 3-9 GPSIIIB Block II F L GPSIIIC 3 rd GEO WAAS ft & ¾ mile vis (LPV) > LAAS CAT I 6 airports + options for 0 to 40 per year LAAS CAT II/III R&D Required DME TACAN Long Range NDB Alaska and Coastal LORAN??? Decision on Continued Use In Late 2002 APV 1.0

30 Part 91 Options (IMC) Interference in Area GPS Only GPS/VOR GPS/WAAS GPS/WAAS + VOR GPS/WAAS + VOR/ILS GPS Only + LORAN-x GPS/ILS + LORAN-x Dispatch Depart En Route Arrival Approach & Landing Not Applicable No No No No VOR-DP VOR to VOR VOR-AR VOR-NPA No No No No VOR to VOR-DP VOR-AR VOR-NPA VOR VOR-DP VOR to VOR VOR-AR VOR or ILS RNAV RNAV RNAV RNAV-NPA RNAV RNAV RNAV ILS

31 121/135 Carrier Options (IMC) Interference in Area GPS Only GPS/VOR GPS/INS (DME-DME) GPS/FMS (VOR/DME) Dispatch Depart En Route Arrival Approach & Landing No No No No No VOR Direct VOR-DP VOR to VOR VOR-AR VOR-NPA Yes? RNAV RNAV-AR RNAV-NPA Yes? RNAV RNAV-AR RNAV-NPA GPS/VOR + ILS GPS/FMS + ILS Yes VOR-DP VOR to VOR VOR-AR Yes RNAV RNAV RNAV VOR or ILS RNAV-NPA or ILS GPS/ILS + LORAN-x Yes RNAV RNAV RNAV ILS

32 Surface Terminal A Flight with Interference Interference Area Redundancy Departure Transition Dispatch into areas of known interference not authorized without backup capability RNAV capability or VOR-Direct Flight Plan En Route Backup Arrival Transition Ocean Terminal Surface

33 Interference Known Before Departure or Interference Reported While Airborne Surface Terminal If airborne at time of event divert around area of known interference Departure Transition Flight plan around area of known interference Arrival Transition En Route Ocean Terminal Surface

34 Interference Known Before Departure or Interference Reported While Airborne For Arrival Case Arrival Transition Ocean Surface Terminal Departure Transition Dispatch into areas of known interference not authorized without backup capability En Route Terminal Surface RNAV to ILS Final or Divert to Alternate

35 Oceanic RNAV Through Area of Interference for Up to 30 minutes ( nm) Ocean Dispatch into areas of known interference not authorized without backup capability Terminal Surface

36 Part 121/135 Continue Through Area As Planned Using RNAV 3 2 Part 91 Request Climb or Radar Vector Climb up to 5000 AGL Proceed Direct to VOR Continue to next VOR Continue to next VOR Free of Interference Request RNAV and Altitude Change 4 1 Airport VOR En Route VOR 6000 MSL Interference Area 4000 MSL 5000 AGL 4000 MSL VOR MSL Ground Level VOR 1

37 Part 121/135 RNAV Through Interference Area Request Clearance VOR Direct To Next VOR Until Clear of Interference SLC Airport VOR En Route VOR Interference Area Request Clearance Proceed to VOR NPA Approach & Landing

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

Appendix E NextGen Appendix

Appendix E NextGen Appendix Appendix E NextGen Appendix NEXTGEN BACKGROUND This appendix is intended to supplement the information provided in the chapter to give additional technological background to NextGen. ADS-B Services ADS-B,

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

CE 563 Airport Design

CE 563 Airport Design CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

2008 FUture of Navigational Aids

2008 FUture of Navigational Aids 2008 FUture of Navigational Aids Region 1 Debbie Alke, Montana 406-444-2506 Region 2 David Greene, Wisconsin 608-266-2480 Region 3 Joe Pestka, Missouri 573-526-7912 Region 4 Susan V. Chernenko, West Virginia

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

IFR 91.157 Must be instrument rated to fly special VFR at Night (civil twilight to civil twilight, sun 6 degrees below horizon) 91.159 Unless in a holding pattern of 2 minutes or less, VFR cruising altitude

More information

Required Navigation Performance (RNP) in the United States

Required Navigation Performance (RNP) in the United States Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update Presented to: By: Date: CGSIC Leo Eldredge, FAA September 24, 2008 Agenda WAAS Architecture WAAS Services Overview

More information

Pi Aero Instrument Rating Syllabus

Pi Aero Instrument Rating Syllabus This syllabus was created in order to maintain a high level of positive training as well as meet the minimum hours required by the Federal Aviation Regulations Part 61. There are four sections to this

More information

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 New generation aircraft in the instrument approach domain Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017 Agenda Video A little bit of history Today s situation A350 XWB solutions for final approaches

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Pro Line 21 King Air upgrades Baseline package includes the latest AFD version 10.4 and FMS software

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures National Airspace System Performance Workshop Near Term Potential for System Capacity Gains from RNP and RNAV Procedures By Bill Dunlay Leigh Fisher Associates 1 Purpose and Agenda Briefly describe features

More information

Flight Inspection Services

Flight Inspection Services Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

Airplane Navigation Capabilities

Airplane Navigation Capabilities Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes

More information

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Pro Line 21 Hawker upgrades Baseline package includes the latest AFD software version 10.4 and FMS

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations

Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations Understanding Required Navigation Performance (RNP) and Area Navigation (RNAV)Operations White Paper Doc No.: WHTP-2013-16-10 May 2018 Safely guiding pilots and their passengers worldwide for over 35 years

More information

Introduction to Navigation

Introduction to Navigation FLIGHT OPERATIONS ENGINEERING Introduction to Navigation IN, Page 1 Introduction To Navigation Methods and Equipment Procedures Navigation and the FMC IN, Page 2 Navigation Knowing: Where you are Where

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S. Subject: APPROVAL OF U.S. OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION (B-RNAV) AND PRECISION AREA NAVIGATION (P-RNAV)

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

GBAS and GLS Avionics. Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010

GBAS and GLS Avionics. Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010 Dave Jensen, Product Manager India ACP GBAS Seminar New Delhi 29 January 2010 GLS Product Offerings Overview Airborne Architecture Product Offerings By Market Air Transport (AT) Business, Regional (BR)

More information

PRO LINE 21 FOR KING AIR. Taking your Pro Line 21 King Air into NextGen airspace.

PRO LINE 21 FOR KING AIR. Taking your Pro Line 21 King Air into NextGen airspace. PRO LINE 21 FOR KING AIR Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 King Air upgrade options SVS package 1 SVS package 2 SVS package 3 Comment Display Update The AFD 3010 update

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently.

Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently. Flight management systems have evolved to a level of sophistication that helps flight crews fly commercial airplanes more safely and efficiently. 20 Contribution of Flight Systems to Performance-Based

More information

VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation

VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE 4-76 GENERAL. Section 4 Class II Navigation A. Concepts, Direction, and Guidance. This

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

Contextual note SESAR Solution description form for deployment planning

Contextual note SESAR Solution description form for deployment planning Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course

AREA NAVIGATION (B-RNAV & P-RNAV) Online Course Page 1/12 TABLE OF CONTENT LEGAL CAUTION... 2 (RNAV)... 2 INTRODUCTION... 2 ARINC 424:... 2 (RNAV):... 2 Basic Area Navigation (BRNAV):... 2 Closed Termination:... 2 Course to a Fix:... 2 FLY-BY waypoints:...

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

MAP SYMBOLS APPENDIX F BASEMAP AIRPORT TIS AND TAS TRAFFIC NAVAIDS Rev. A Garmin G1000 Pilot s Guide for Cessna Nav III

MAP SYMBOLS APPENDIX F BASEMAP AIRPORT TIS AND TAS TRAFFIC NAVAIDS Rev. A Garmin G1000 Pilot s Guide for Cessna Nav III MAP SYMBOLS AIRPORT Unknown Airport Non-towered, Non-serviced Airport BASEMAP Interstate Highway State Highway Towered, Non-serviced Airport US Highway National Highway Non-towered, Serviced Airport Towered,

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

SUPPLEMENT S06. Transport Canada Approved Flight Manual Supplement For GARMIN 400W/500W SERIES GPS WASS NAVIGATION SYSTEM

SUPPLEMENT S06. Transport Canada Approved Flight Manual Supplement For GARMIN 400W/500W SERIES GPS WASS NAVIGATION SYSTEM Transport Canada Approved Flight Manual Supplement For This supplemental manual is applicable to Garmin 400W/500W Series GPS WASS Navigation System equipped airplanes. This Supplement must be attached

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

Pilot RVSM Training Guidance Material

Pilot RVSM Training Guidance Material Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

34 th Airline/ATS Safety Forum

34 th Airline/ATS Safety Forum 34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest

More information

MINIMUM FLIGHT ALTITUDES

MINIMUM FLIGHT ALTITUDES MINIMUM FLIGHT ALTITUDES 1. Introduction Minimum flight altitudes are created first to ensure safety, awareness and adequate radio navigation reception for aircraft flying at the same time in specific

More information

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. surface analysis charts. radar summary charts. significant weather

More information

SBAS Frequently Asked Questions

SBAS Frequently Asked Questions SBAS Frequently Asked Questions 1. What is SBAS? 2. Where are SBAS networks in operation or under development? 3. What are the benefits of SBAS? 4. What is SBAS interoperability? 5. Will SBAS provide a

More information

PRO LINE FUSION UPGRADE FOR YOUR CITATION CJ3. Your all-in-one approach for airspace modernization and situational awareness.

PRO LINE FUSION UPGRADE FOR YOUR CITATION CJ3. Your all-in-one approach for airspace modernization and situational awareness. PRO LINE FUSION UPGRADE FOR YOUR CITATION CJ3 Your all-in-one approach for airspace modernization and situational awareness. A fully loaded package of baseline features that enable enviable options ADS-B

More information

CASAS ADVISORY PAMPHLET

CASAS ADVISORY PAMPHLET No. 18 CASAS ADVISORY PAMPHLET Subject: GUIDENCE ON THE APPROVAL OF SURINAMESE OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION

More information

Section 5. Radar Separation

Section 5. Radar Separation 7/24/14 JO 7110.65V CHG 1 4/3/14 JO 7110.65V Section 5. 5 5 1. APPLICATION a. Radar separation must be applied to all RNAV aircraft operating at and below FL450 on Q routes or random RNAV routes, excluding

More information

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource

More information

Enroute Charts Part 2 and Procedures. Some review PROCDURES

Enroute Charts Part 2 and Procedures. Some review PROCDURES Enroute Charts Part 2 and Procedures Some review PROCDURES IFR Altitudes Minimum Enroute Altitude (MEA) guarantees both obstruction clearance and navigation signal coverage where two segments of an airway

More information

129 th RQW/SE P.O. Box 103, MS#1 Moffett Federal Airfield, CA

129 th RQW/SE P.O. Box 103, MS#1 Moffett Federal Airfield, CA MID-AIR COLLISION AVOIDANCE (MACA) HANDBOOK 129 th RQW/SE P.O. Box 103, MS#1 Moffett Federal Airfield, CA 94035-0103 129TH RESCUE WING MOFFETT FEDERAL AIRFIELD, CA 1 NOV 2013 TABLE OF CONTENTS FLYING SAFETY

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

Proposed Provision of Navigation Services for the Next Generation Air. Transportation System (NextGen) Transition to Performance-Based Navigation

Proposed Provision of Navigation Services for the Next Generation Air. Transportation System (NextGen) Transition to Performance-Based Navigation This document is scheduled to be published in the Federal Register on 08/21/2012 and available online at http://federalregister.gov/a/2012-20464, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications

More information

Appendix K: MSP Class B Airspace

Appendix K: MSP Class B Airspace Appendix K: MSP Class B Airspace K All of the open sky covering the United States, from less than an inch off the ground all the way to outer space, is part of America s airspace. This airspace resource

More information

What is B-RNAV? 1. 1 Adaptado de [ ]

What is B-RNAV? 1. 1 Adaptado de  [ ] What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Understanding the Jeppesen. Updates: Changes, Errata and What s New

Understanding the Jeppesen. Updates: Changes, Errata and What s New Understanding the Jeppesen Updates: Changes, Errata and What s New www.understandingaviation.com info@understandingaviation.com Table of Contents Changes... 1 Errata... 5 What s New... 5 Changes Law Amendment

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

SUBPART C Operator certification and supervision

SUBPART C Operator certification and supervision An AOC specifies the: SUBPART C Operator certification and supervision Appendix 1 to OPS 1.175 Contents and conditions of the Air Operator Certificate (a) Name and location (principal place of business)

More information

Instrument Proficiency Check

Instrument Proficiency Check Pilot Name_ Certificate # Date Check these things: The name on the pilot certificate is the same on photo ID Medical is current Logbook has necessary endorsements to fly the airplane being used. Interview

More information

Risk assessment for drones operations

Risk assessment for drones operations Risk assessment for drones operations 16th of November 018 Catherine Ronflé-Nadaud DGAC /DSNA /DTI French Air Navigation Service Provider is responsible for delivering Air Traffic control services within

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Instrument Proficiency Check Flight Record

Instrument Proficiency Check Flight Record Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory

More information

Fly at the speed of ingenuity on your Learjet 85

Fly at the speed of ingenuity on your Learjet 85 rockwell collins Pro Line Fusion Avionics Fly at the speed of ingenuity on your Learjet 85 Image courtesy of Bombardier. Experience the most advanced avionics system ever offered on a mid-size jet. Achieve

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

Evolving and improving landing networks with EGNOS

Evolving and improving landing networks with EGNOS Evolving and improving landing networks with EGNOS Benoit Roturier - DSNA EU Space Week Marseille INTRODUCTION Satellite technology opportunities allow now ANSP and airports to complete/redesign approach

More information

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013 AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles

More information

EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY

EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY An Overarching Perspective Edition 24 October 2017 OBJECTIVE This Information Paper presents ATM planners and military

More information