Santa Barbara County Airport Land Use Compatibility Plan Update. February 6, 2017

Size: px
Start display at page:

Download "Santa Barbara County Airport Land Use Compatibility Plan Update. February 6, 2017"

Transcription

1 Santa Barbara County Airport Land Use Compatibility Plan Update February 6,

2 Welcome Santa Maria Public Airport New Cuyama Airport Vandenberg Air Force Base Lompoc Airport Santa Ynez Valley Airport Santa Barbara Municipal Airport 2

3 Review Land Use Compatibility Factors 3

4 Overflight Layer Overflight Based on flight tracks, airport operations, community factors (e.g., areas of substantial noise complaint) 4

5 Airspace Protection Layer Airspace FAR Part 77 Surfaces 5

6 Noise Layer Noise Noise Contours from Existing Studies Represents future conditions at the airports 6

7 Safety Layer Safety Caltrans Generic Zones Adjusted for each airport based on operating conditions 7

8 Compatibility Factors - Update Santa Maria Public Airport (SMX) New Master Plan in process Recommendation Leave Compatibility Factors as is Vandenberg Air Force Base (AFB) No change to AICUZ Recommendation Leave Compatibility Factors as is Lompoc Airport (LPC) Recommendation Leave Noise and Overflight Layers as is Recommendation Review Safety Zone 6 and Airspace Protection 14

9 Compatibility Factors - Update New Cuyama (L88) No Airport Layout Plan (ALP) or Master Plan Recommendation We have Draft Generic Safety Zones, other factors to be discussed Santa Ynez Airport (IZA) New ALP Recommendation Review all compatibility factors based on ALP Santa Barbara Municipal Airport (SBA) New Master Plan is complete, but not adopted Recommendation Leave Noise and Airspace Protection Layers as is Recommendation Review Safety Zones and Overflight 15

10 Next Steps Development displacement analysis and Initial Study (IS) Resolve potential land use conflicts CEQA Environmental Review IS/Mitigated Negative Declaration (MND) Environmental Impact Report 16

11 Development Displacement Analysis Why a development displacement analysis? Required by law (Muzzy Ranch case) Adoption of the ALUCP may result in displacement of planned future land uses within areas around each airport due to incompatibility with the safety and noise compatibility policies/criteria Restricting development in one area could lead to increased development pressure in other areas This could lead to changes in land use patterns, shifts in population density/intensity, and secondary impacts (e.g., increases in traffic, noise) 17

12 Development Displacement Analysis Analysis centered on Safety Zones and Noise Contours Focused on vacant parcels within areas covered by each airport s safety zones and noise contours (study area) Existing land uses, federal/tribal lands not subject to ALUCP Identify vacant parcels/parcels with infill potential using various data sets, aerial photography, and assistance of agencies 18

13 Development Displacement Analysis 19

14 Development Displacement Analysis Analyze parcels for potential displacement Calculate potential loss of residential dwelling units (number of units) Calculate potential loss of commercial/industrial area (total area [square footage]) In the event that potential displacement is identified We will work with agencies to try to resolve any potential land use conflicts before moving forward Adjust policies Adjust compatibility factors 20

15 CEQA Environmental Review First step Initial Study Results of displacement analysis: Mitigated Negative Declaration (IS/MND), or Environmental Impact Report (EIR) 21

16 General Plan Integration/Implementation Airport Master Plan/Airport Layout Plan Prepare Draft ALUCP Public and Stakeholders Board ALUCP Local Agencies Implement Caltrans Handbook TAC Overrule 22

17 General Plan Integration/Implementation Once an ALUCP has been adopted or amended by an ALUC, general plans and any applicable specific plans be amended as necessary to be consistent with the ALUCP (Gov. Code 65302(a)-(b) ) Alternatively, local agencies have the option of taking the steps necessary to overrule all or part of the ALUCP (Id. at (c)) State law provides that an agency do one or the other within 180 days of adoption of the ALUCP by the ALUC (Id. at (b)-(c)) Failure to initiate either option within the time frame allotted will require local agencies to submit all land use development actions involving property within the AIA to the ALUC for review (PUC (a)) 23

18 General Plan Integration/Implementation Local plans can be made consistent with ALUCP through various methods Directly amend general/specific plans Adopt General Plan Airport Element Adopt ALUCP as Stand-Alone Adopt Airport Combining District or Overlay Zoning Ordinance Consistency does not require local plans to be identical to the ALUCP Eliminate direct conflicts with compatibility planning criteria Establish procedures that implement and ensure compliance 24

19 General Plan Integration/Implementation To accomplish this, local plans must: Delineate compatibility criteria to be applied to individual development actions Identify mechanisms to be used to apply relevant compatibility criteria to particular development projects Indicate the procedures to be followed in review and approval of development actions affecting lands within the AIA 25

20 Schedule 26

21 TAC Calls As follow up to this meetings, outreach to each agency/data request Meetings Path One: April Compatibility factor review/displacement Analysis update Early Summer Displacement Analysis Results/Recommendations Late Summer CEQA Review/path forward Path Two: Spring 2018 CEQA Review (Admin Draft EIR) 27

22 Discussion 28

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

NEGATIVE DECLARATION. NAME OF PROJECT: Fresno County Airport Land Use Compatibility Plan (ALUCP)

NEGATIVE DECLARATION. NAME OF PROJECT: Fresno County Airport Land Use Compatibility Plan (ALUCP) Negative Declaration Fresno County ALUCP December 3, 2018 NEGATIVE DECLARATION The Fresno County Airport Land Use Commission (ALUC) has reviewed the proposed project described below to determine whether

More information

Airport Protection Area

Airport Protection Area APPENDIX H Airport Protection Area The Airport Land Use Commission of Alameda County Hayward, California Resolution 93-01 At a meeting held January 13, 1993 Introduced by Commissioner Maestas Seconded

More information

Beale Air Force Base Land Use Compatibility Plan

Beale Air Force Base Land Use Compatibility Plan Beale Air Force Base Land Use Compatibility Plan Airport Land Use Commission for Sacramento, Sutter, Yolo, and Yuba Counties Sacramento Area Council of Governments Yuba County, California September 2010

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Comparison Between Old and New ALUC Plans

Comparison Between Old and New ALUC Plans A P P E N I X H Comparison Between Old and New ALUC Plans OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) sets forth land use compatibility criteria for the environs of Auburn Municipal,

More information

Chapter 1. Introduction. Placer County Airport Land Use Compatibility Plan

Chapter 1. Introduction. Placer County Airport Land Use Compatibility Plan Chapter 1 Introduction Placer County Airport Land Use Compatibility Plan 1 Introduction OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) contains the individual Compatibility Plan

More information

Butte County. Airport land use. compatibility plan OROVILLE MUNICIPAL, CHICO MUNICIPAL, RANCHAERO AIRPORTS PARADISE AND

Butte County. Airport land use. compatibility plan OROVILLE MUNICIPAL, CHICO MUNICIPAL, RANCHAERO AIRPORTS PARADISE AND CHICO MUNICIPAL, OROVILLE MUNICIPAL, PARADISE AND RANCHAERO AIRPORTS Butte County Airport land use compatibility plan Prepared for the BUTTE COUNTY AIRPORT LAND USE COMMISSION Adopted November 15, 2017

More information

Airport Background Data and Assumptions Report New Cuyama Airport. Santa Barbara County Airport Land Use Compatibility Plan Update

Airport Background Data and Assumptions Report New Cuyama Airport. Santa Barbara County Airport Land Use Compatibility Plan Update Airport Background Data and Assumptions Report Santa Barbara County Airport Land Use Compatibility Plan Update June 25, 212 Updated August 17, 217 Airport Background Data and Assumptions Report 1. Introduction

More information

Notice of Extended Comment Period for an Intent to Adopt a Negative Declaration

Notice of Extended Comment Period for an Intent to Adopt a Negative Declaration County of Santa Clara Department of Planning and Development Planning Office County Government Center, East Wing, 7 th Floor 70 West Hedding Street San Jose, California 95110-1705 (408) 299-5770 FAX (408)

More information

City of Upland, California September 2014 Draft

City of Upland, California September 2014 Draft Cable Airport Land Use Compatibility Plan City of Upland, California September 2014 Draft Cable Airport Land Use Compatibility Plan September 2014 Draft Prepared for City of Upland, California Prepared

More information

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1

APPENDIX K LAND USE. Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 APPENDIX K LAND USE Charles M. Schulz - Sonoma County Airport Draft Environmental Impact Report July 2011 K-1 Appendix K Land Use THIS PAGE INTENTIONALLY LEFT BLANK Charles M. Schulz - Sonoma County Airport

More information

CHAPTER 6 NOISE EXPOSURE

CHAPTER 6 NOISE EXPOSURE CHAPTER 6 NOISE EXPOSURE FAA requires that the NEM submitted for review represent the aircraft noise exposure for the year of submittal (in this case 2008) and for a future year (2013 for OSUA). However,

More information

Background Data: Blue Canyon Airport and Environs

Background Data: Blue Canyon Airport and Environs 5 Background Data: and Environs INTRODUCTION serves as an important emergency landing field amid mountainous terrain. The airport has existed on the site since the 1930s or 40s. The facility was operated

More information

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #4 June 8 & 9, 2016 Airport Land Use Compatibility Plan (ALUCP) Update Public Information Meeting #4 June 8 & 9, 2016 Agenda 1. Study Process 2. Noise Complaint Patterns 3. Proposed Overflight Areas (AOA) 4. Proposed Land

More information

Appendix C-1 Aviation

Appendix C-1 Aviation Appendix C-1 Aviation SACOG and Airport Land Use Compatibility Plans AIRPORT LAND USE COMMISSION & COMPATIBILITY PLANS State law defines the purposes of Airport Land Use Commissions as: (1) to protect

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY

AIRPORT LAND USE COMPATILIBILTY AIRPORT LAND USE COMPATIBILIITY CHAPTER 7 AIRPORT LAND USE COMPATILIBILTY CHAPTER 7 AIRPORT LAND USE COMPATIBILIITY 7.0 INTRODUCTION On airport aviation related development is typically compatible with aircraft operations. On airport

More information

The following criteria shall be applied within the boundaries of the AO District:

The following criteria shall be applied within the boundaries of the AO District: Sec. 419 (a) Purpose AIRPORT OVERLAY DISTRICT (AO) The purpose of the Airport Overlay District is to regulate and restrict the height of structures, objects, or natural growth, regulate the locations of

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Brown Field Municipal Airport Land Use Compatibility Plan San Diego County Regional Airport Authority Brown Field Municipal Airport Land Use Compatibility Plan Prepared for: San Diego County Regional

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

at: Accessed May 4, 2011.

at:   Accessed May 4, 2011. 3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.

More information

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport

More information

Airport Land Use Commission AIRPORT ENVIRONS. LAND USE PLAN for JOHN WAYNE AIRPORT

Airport Land Use Commission AIRPORT ENVIRONS. LAND USE PLAN for JOHN WAYNE AIRPORT Airport Land Use Commission AIRPORT ENVIRONS LAND USE PLAN for JOHN WAYNE AIRPORT Amended: April 17, 2008 AIRPORT ENVIRONS LAND USE PLAN April 17, 2008 Text of Plan Adopted April 17, 1975 Marine Corps

More information

Airport Land Use Commission. AIRPORT ENVIRONS LAND USE PLAN for FULLERTON MUNICIPAL AIRPORT

Airport Land Use Commission. AIRPORT ENVIRONS LAND USE PLAN for FULLERTON MUNICIPAL AIRPORT Airport Land Use Commission AIRPORT ENVIRONS LAND USE PLAN for FULLERTON MUNICIPAL AIRPORT Amended: November 18, 2004 AIRPORT ENVIRONS LAND USE PLAN November 18, 2004 Text of Plan Adopted April 17, 1975

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Background Data: Lincoln Regional Airport and Environs

Background Data: Lincoln Regional Airport and Environs 6 Background Data: and Environs INTRODUCTION /Karl Harder Field is a former military training airfield built during World War II on a mile-square section of open rangeland some three miles west of central

More information

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance

Flying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Flying Cloud Airport Joint Airport Zoning Board 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Presentation Agenda Purpose & Goals Review of FCM Zoning Historical Timeline

More information

Tinker Air Force Base, Oklahoma

Tinker Air Force Base, Oklahoma Table 5.4 Generalized Zoning within the Tinker AFB Clear Zones and Accident Potential Zones (Off-Installation) Category Acreage Residential 1,486 Commercial 191 Industrial 128 Public/Quasi-public 0 Recreational/Open/Agricultural/Low

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

Van Nuvs Airport Noise Programs Overview

Van Nuvs Airport Noise Programs Overview Van Nuvs Airport Noise Programs Overview Los Angeles World Airports (LAWA) devotes significant attention, staff, and financial resources to noise programs at Van Nuys Airport (VNY), including outreach,

More information

6.4 Aviation AVIATION FACILITIES AND SERVICES

6.4 Aviation AVIATION FACILITIES AND SERVICES 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related to encroachment of incompatible

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Background Data: Blue Canyon Airport and Environs

Background Data: Blue Canyon Airport and Environs Chapter 8 Background ata: and Environs Placer County Airport Land Use Compatibility Plan 8 Background ata: and Environs INTROUCTION serves as an important emergency landing field amid mountainous terrain.

More information

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #2 December 1, 2015

Airport Land Use Compatibility Plan (ALUCP) Update. Public Information Meeting #2 December 1, 2015 Airport Land Use Compatibility Plan (ALUCP) Update Public Information Meeting #2 December 1, 2015 Agenda 1. Welcome and Introductions 2. Status of Study 3. Long-term Planning Activity Level Annual Service

More information

AIR TRANSPORTATION ELEMENT

AIR TRANSPORTATION ELEMENT AIR TRANSPORTATION ELEMENT Sonoma County Permit and Resource Management Department 2550 Ventura Avenue Santa Rosa, CA 95403 Adopted by Resolution No. 08-0808 of the Sonoma County Board of Supervisors September

More information

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014 LAX Community Noise Roundtable Aircraft Noise 101 November 12, 2014 Overview Roles and Responsibilities for Aircraft Noise Relevant Federal Regulations Relevant California Regulations Aircraft Noise Metrics

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing

More information

Hearings will be held in the Shirley Huffman Auditorium in the Charles D. Cameron Public Services Building, 155 North First Avenue, Hillsboro, Oregon.

Hearings will be held in the Shirley Huffman Auditorium in the Charles D. Cameron Public Services Building, 155 North First Avenue, Hillsboro, Oregon. Hearings will be held in the Shirley Huffman Auditorium in the Charles D. Cameron Public Services Building, 155 North First Avenue, Hillsboro, Oregon. On September 24, 2013, the Board of County Commissioners

More information

Christchurch PBN Flight Paths Trial. Interim Report

Christchurch PBN Flight Paths Trial. Interim Report Christchurch PBN Flight Paths Trial Interim Report Christchurch PBN Flight Paths Trial Interim Report PBN trial partners have prepared the following summary outlining progress of the PBN flight paths trial.

More information

Airport Noise Management in Thailand

Airport Noise Management in Thailand Airport Noise Management in Thailand Krittika Lertsawat Legal Researcher, Project on the Environmental Adjudicating Process, Bangkok, Thailand Lalin Kovudhikulrungsri Ph.D. Candidate, School of Law, Leiden

More information

KPGD HIGH. Punta Gorda Airport Punta Gorda, Florida, United States. Diagram #1: KPGD Departures. NOISE ABATEMENT PROCEDURES by Whispertrack

KPGD HIGH. Punta Gorda Airport Punta Gorda, Florida, United States. Diagram #1: KPGD Departures. NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #1: Departures http://whispertrack.com/airports/ p. 1 of 6 Diagram #2: Arrivials http://whispertrack.com/airports/ p. 2 of 6 OVERVIEW Welcome to PGD. Abatement Procedures for all Aircraft. abatement

More information

Livermore Municipal Airport and Vicinity Data

Livermore Municipal Airport and Vicinity Data CHAPTER 4 Livermore Municipal Airport and Vicinity Data 4.1 Introduction Livermore Municipal Airport (LVK) is located in Alameda County; approximately 30 miles east of the City of San Francisco (see Figure

More information

Aircraft landings in Aoraki/Mount Cook National Park

Aircraft landings in Aoraki/Mount Cook National Park Topic Paper: Aircraft landings in Aoraki/Mount Cook National Park 1. Purpose This paper: sets out the context for aircraft landings within Aoraki/Mount Cook National Park (the Park); and identifies specific

More information

Overview of Boston Logan Operations and Noise from Overflights. Presentation to Massport Board March 19, 2015

Overview of Boston Logan Operations and Noise from Overflights. Presentation to Massport Board March 19, 2015 Overview of Boston Logan Operations and Noise from Overflights Presentation to Massport Board March 19, 2015 Contents How the Airport Operates Massport s Noise Abatement Program for Logan Recent Trends

More information

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013

SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning

More information

Update Noise Management Action Plan. 10 Commitments to our Neighbours June 21, 2018 CENAC meeting Cynthia Woods

Update Noise Management Action Plan. 10 Commitments to our Neighbours June 21, 2018 CENAC meeting Cynthia Woods Update Noise Management Action Plan 10 Commitments to our Neighbours June 21, 2018 CENAC meeting Cynthia Woods Our Action Plan: 10 commitments that will challenge us to do better. 2 Commitments to the

More information

Public Release AICUZ Study Air Installations Compatible Use Zones (AICUZ) Study NAS Pensacola and NOLF Saufley. May 2011

Public Release AICUZ Study Air Installations Compatible Use Zones (AICUZ) Study NAS Pensacola and NOLF Saufley. May 2011 Public Release - 2010 AICUZ Study Air Installations Compatible Use Zones (AICUZ) Study NAS Pensacola and NOLF Saufley Pensacola, FL May 2011 NAS Pensacola and NOLF Saufley Mission of NAS Pensacola and

More information

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority Noise Abatement 101 July 13, 2017 1 Objectives Provide context and a better understanding for how and why flights may operate at Tampa International Airport the way they do. Provide an overview of laws,

More information

Noise-Based Use Restrictions

Noise-Based Use Restrictions Noise-Based Use Restrictions Presentation to: Noise Compatibility Committee October 26, 2017 Topics Legislative and regulatory background to noise restrictions Grandfathered Use Restrictions Airport initiatives

More information

Exhibit H: Statement of Overriding Considerations

Exhibit H: Statement of Overriding Considerations Exhibit H: Statement of Overriding Considerations Case No: CPC 2012 3357 GPA SP As approved by the City Planning Commission February 14, 2013 Statement of Overriding Considerations Los Angeles World Airports

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

26 October 2017 JAZB Meeting #2. Flying Cloud Airport Joint Airport Zoning Board

26 October 2017 JAZB Meeting #2. Flying Cloud Airport Joint Airport Zoning Board 26 October 2017 JAZB Meeting #2 Flying Cloud Airport Joint Airport Zoning Board Meeting Agenda Approval of Minutes from September 21, 2017 JAZB Meeting Introduction of new JAZB member (Eden Prairie representative)

More information

Portland International Jetport FAR Part 150 Update

Portland International Jetport FAR Part 150 Update Portland International Jetport FAR Part 150 Update Part 150 Noise Advisory Committee Meeting 4 December 2002 Harris Miller Miller & Hanson Inc. In association with: Vanasse Hangen Brustlin, Inc. Simat,

More information

FIRST PUBLIC WORKSHOP

FIRST PUBLIC WORKSHOP Lambert-St. Louis International Airport Master Plan & 14 CFR Part 150 Noise Compatibility Plan Update FIRST PUBLIC WORKSHOP February 12 th 2009 Why prepare a Master Plan Update Now? Last full Master Plan

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM)

Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) INTRODUCTION The Noise Abatement Plan (FCM Plan) for the Flying Cloud Airport has been prepared in recognition of the need to make the

More information

APPENDIX F. FAA and Orange County ALUC References

APPENDIX F. FAA and Orange County ALUC References APPENDIX F FAA and Orange County ALUC References Mail Processing Center Federal Aviation Administration Southwest Regional Office Obstruction Evaluation Group 2601 Meacham Boulevard Fort Worth, TX 76193

More information

Chapter 1 Introduction and Project Overview

Chapter 1 Introduction and Project Overview Chapter 1 Introduction and Project Overview Kittitas County in cooperation with the Federal Aviation Administration (FAA) is updating the Airport Master Plan for Bowers Field Airport (FAA airport identifier

More information

AUDIT COMMITTEE CHARTER

AUDIT COMMITTEE CHARTER Qantas Airways Limited Adopted ABN 16 009 661 901 AUDIT COMMITTEE CHARTER Objectives 1. The objectives of the Qantas Audit Committee are to assist the Board in fulfilling its corporate governance responsibilities

More information

- Define temporary airspace structures and procedures to offer multiple airspace

- Define temporary airspace structures and procedures to offer multiple airspace ASP SE Oro navigacija by director general order o. V-195 signed on 15 May 2007 approved Rules on reservation of airspace in Republic of Lithuania. - Define temporary airspace structures and procedures

More information

Review of Airport Noise Issues East Airfield Development Area

Review of Airport Noise Issues East Airfield Development Area Review of Airport Noise Issues East Airfield Development Area Orlando International Airport April 21, 2011 Agenda Review of Meeting Minutes from April 21 When last we met Airport Noise 101 Cyrus Callum

More information

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION

AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION 30 th Annual AAAE Basics of Airport Law Workshop and 2014 Legal Update October 19-21, 2014 AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION Desk Reference Chapters 4, 13, 14 & 25 Catherine M. van Heuven,

More information

Overview of Congestion Management Issues and Alternatives

Overview of Congestion Management Issues and Alternatives Overview of Congestion Management Issues and Alternatives by Michael Ball Robert H Smith School of Business & Institute for Systems Research University of Maryland and Institute of Transportation Studies

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

COMMUNITY NOISE MITIGATION SUGGESTIONS

COMMUNITY NOISE MITIGATION SUGGESTIONS COMMUNITY NOISE MITIGATION SUGGESTIONS Toronto Pearson is one of North America's fastest growing global hub airports, handling nearly 40 million passengers today, and well on its way to reaching greater

More information

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop November 2017 1 14 CFR Part 150 Overview Establishes the methodology

More information

The Noise & Environmental office reviews airline schedules and night-time performance of the airlines operating at the Airport.

The Noise & Environmental office reviews airline schedules and night-time performance of the airlines operating at the Airport. OVERVIEW Addressing the impact of aircraft noise has been an ever present and high priority at since the Airport Authority purchased the Airport from Lockheed in 1978. To further compliance with the state

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

CITY OF BELLFLOWER ORDINANCE NO. 1320

CITY OF BELLFLOWER ORDINANCE NO. 1320 CITY OF BELLFLOWER ORDINANCE NO. 1320 AN ORDINANCE APPROVING ZONING ORDINANCE TEXT AMENDMENT CASE NO. ZOTA 16-04 AMENDING SECTIONS 17.44.235, 17.88.050, AND 17.88.100 OF TITLE 17 OF THE BELLFLOWER MUNICIPAL

More information

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN Background to BARNZ BARNZ is an incorporated society comprising 19 member airlines

More information

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013

Federal Aviation Administration. Airport Land Use Compatibility Advisory Circular ACI-NA / FAA. FAA HQ Washington, DC March 27, 2013 Airport Land Use Compatibility Advisory Circular ACI-NA / FAA FAA HQ Washington, DC March 27, 2013 The purpose of this meeting is to discuss FAA s update of the Airport Compatible Land Use Advisory Circular.

More information

General Aviation Land Use Planning

General Aviation Land Use Planning Our team. General Aviation Land Use Planning PURDUE ROAD SCHOOL - 2017 Presented by: Maria Muia, Ph.D., Senior Aviation Planner Woolpert, Inc. Brian Payne, Director Columbus Airport Nick Isenberg, Project

More information

Appendices. Merced County Airport Land Use Compatibility Plan

Appendices. Merced County Airport Land Use Compatibility Plan Appendices Merced County Airport Land Use Compatibility Plan A P P E N D I X A Foundations of Airport Land Use Compatibility Planning INTRODUCTION This appendix outlines the policy foundations upon which

More information

APPENDIX F LAND USE PLANNING FOR AIRPORTS AND POCATELLO REGIONAL AIRPORT LAND USE COMPLIANCE

APPENDIX F LAND USE PLANNING FOR AIRPORTS AND POCATELLO REGIONAL AIRPORT LAND USE COMPLIANCE APPENDIX F LAND USE PLANNING FOR AIRPORTS AND POCATELLO REGIONAL AIRPORT LAND USE COMPLIANCE Pocatello Regional Airport Airport Master Plan APPENDIX F LAND USE PLANNING FOR AIRPORT AND POCATELLO REGIONAL

More information

Applying Smart Growth Principles and Strategies to Resolving Land Use Conflicts Around Airports

Applying Smart Growth Principles and Strategies to Resolving Land Use Conflicts Around Airports MTI Report 06-05 Applying Smart Growth Principles and Strategies to Resolving Land Use Conflicts Around Airports Mineta Transportation Institute Created by Congress in 1991 MINETA TRANSPORTATION INSTITUTE

More information

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

COMPREHENSIVE LAND USE PLAN SANTA CLARA COUNTY PALO ALTO AIRPORT

COMPREHENSIVE LAND USE PLAN SANTA CLARA COUNTY PALO ALTO AIRPORT COMPREHENSIVE LAND USE PLAN SANTA CLARA COUNTY PALO ALTO AIRPORT ADOPTED By the SANTA CLARA COUNTY AIRPORT LAND USE COMMISSION San Jose, California November 19, 2008 Prepared by Walter B. Windus, PE Aviation

More information

Windmills & Airspace Can We Work Together?

Windmills & Airspace Can We Work Together? May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s

More information

KPAO HIGH. Palo Alto Arpt Of Santa Clara Co Airport Palo Alto, California, United States Diagram #1: Noise Abatement Procedures All Runways

KPAO HIGH. Palo Alto Arpt Of Santa Clara Co Airport Palo Alto, California, United States Diagram #1: Noise Abatement Procedures All Runways NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #1: Abatement Procedures All Runways p. 1 of 6 Diagram #2: Abatement Procedures All Runways p. 2 of 6 OVERVIEW Palo Alto (airport) is located within one-half

More information

Classification: Public AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019)

Classification: Public AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019) AIRSPACE AND FUTURE OPERATIONS CONSULTATION (JANUARY-MARCH 2019) LOCAL AUTHORITY BRIEFING 8 FEBRUARY 2019 Westerly operations Easterly operations PRESENTATION OVERVIEW Intro Airspace and Future Operations

More information

APPENDIX E. Comment Letters on the Initial Study/Proposed Mitigated Negative Declaration

APPENDIX E. Comment Letters on the Initial Study/Proposed Mitigated Negative Declaration APPENDIX E Comment Letters on the Initial Study/Proposed Mitigated Negative Declaration STATE OF CALIFORNIA BUSINESS. TRANSPORTATION AND HOUSING AGENCY EDMUND G. BROWN. JR.. Governor DEPARTMENT OF TRANSPORTATION

More information

Applewood Heights Community Open House

Applewood Heights Community Open House Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected

More information

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES This chapter provides the detailed descriptions of the recommended Part 150 noise abatement, land use management, and program management measures

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: June 4, 2014 SUBJECT: Specific Plan Amendment 14-01; Amending the Use Designation of 23.97 Acres within

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

Session 15 The Law of Airport Noise 101

Session 15 The Law of Airport Noise 101 Session 15 The Law of Airport Noise 101 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 1, 17, 18 Catherine van Heuven Kaplan Kirsch &

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

TPAC STAFF REPORT. MEETING DATE: November 7, 2013 AGENDA ITEM: 4

TPAC STAFF REPORT. MEETING DATE: November 7, 2013 AGENDA ITEM: 4 TPAC STAFF REPORT SUBJECT: Park and Ride Plan Update MEETING DATE: November 7, 2013 AGENDA ITEM: 4 STAFF CONTACT: Julio Perucho, Peter Imhof RECOMMENDATION: Review project status and provide guidance on

More information