Landside Safety Programs
|
|
- Rosa Atkins
- 5 years ago
- Views:
Transcription
1 Landside Safety Programs Ali Ousmane Mahamane AVN Aviation Safety Spring 2013
2 The paper is about the landside safety programs. Landside facilities are facilities related to ground access, vehicle movement and building on the ground. Airports road are the first part of the landside a traveler has access to, the parking lot comes in second place and then the terminal. As many accidents occur the federal government established some regulations regarding the operation and construction of the ground facilities at the Airport. Examples of ground programs are the Ground Accident Prevention and Accident Prevention Program. As a result the overall aviation industry become safer but is insecurity is still an issue.
3 Table of content 1. Introduction Background or History Safety issue description Measure outcomes.5 5. Conclusion.6
4 1 Introduction This report is about the landside safety programs implemented by Federal Aviation Administration (FAA) aiming to have a safer aviation industry. Safety is achieved through a control of the working environment and control of people s actions. Facilities play an important role in operating an airport properly. Land side facilities are those related to the movement of passengers, baggage and vehicles; which includes any infrastructure from the airport ground access to the terminal. This topic is important to any airport because desirable landside infrastructures provide the airport with a decent flow of passengers, vehicles and baggage; indeed most passenger fatalities occur as a result of vehicle accidents (Wells, A. T. Commercial aviation Safety p. 50). The FAA programs regarding those facilities should have a particular attention as they dictate the management and operational policies for a safer environment. Infrastructure construction requirements, the safety equipment needed inside the terminal, parking lot regulations are few examples of the FAA landside program policies. In other words, landside facilities are ground access facilities such as roads, transit links, parking buildings, the terminal curb and the terminal itself. Background or History Section The first contact with the landside that passengers have is with the airport roads. Indeed they represent the community-to-airport boundary and the access modes are: private vehicles, rental cars, courtesy vehicles, taxicabs, buses and subways. And public transportation represents 20 percent of the access trips. Four types of roads connect the community to the terminal: primary airport access roads, terminal area access roads, terminal frontage roads, and service roads. The primary access airport roads circulate passenger from the city highways to the airport signalized
5 2 intersections with an average speed ranging from 20 to 25 miles per hour, with an average of 700 vehicles per hour at a medium hub airport. The terminal area access roads connect the primary airport access roads to the terminal building and parking facilities, roads are long enough to provide a smooth channeling of traffic and the traffic is separated at an early stage with appropriate signage. Terminal frontage roads distribute vehicles directly to the terminal building. And the service roads are used for the delivery of goods, flight kitchen supplies and air cargo. Also it is used for maintenance, baggage, freight, fuel traffic. After the roads the next component of an airport landside is the terminal curb area required for loading and unloading of passengers and their luggage. Parking facilities are also incorporated into airport landside facilities. As a matter of fact for passenger s convenience parking lots are located less than 1,000 feet from the terminal which represent a walking distance. Or in larger airport a remote parking facilities is provided and served with shuttle buses(national Safety Council. (n.d.). Aviation Ground Operation (5th ed.). N.p). The previous facilities made up and airport landside structure, in a normal situation everything happens as planned. Even though Safety is the industry s number one priority. Today s statistics confirm that travelling by air is one the safest things that a person can do said Giovanni Bisignani, Director General and CEO of International Air Transport Association (IATA)(Corporate Communications. (2009, February 19). More Accidents But Fewer Fatalities in In IATA.). The slight default with the environment in which the personnel operates, human factors effects, wrong allocation of resources, failure adhere to the standards puts landside facilities safety at stake. As airlines suffer high costs from damage that result from ground-related occurrences. The analysis shows a rate of one ground handling incident with resulting aircraft damage per 5000 flights. Investigation into incident causes
6 3 reveals that 61% of the incidents are caused when an interface is established between the aircraft and ground handling equipment. And surprisingly most incidents occur when the aircraft is parked, of which 90% is caused by actors and 10% by the aircraft itself ( National Aerospace Laboratory. (2008). Safety of ground handling. N.p.: A.D. Balk.) In 1987 according to the National Transportation Safety Board 0.9 percent of the accidents are classified as landside accidents. While from 1982 to 1986 aviation ground accident represent an average of 1.5 percent of the accidents.( Wells, A. T. (n.d.). Flight Safety A Primer for General Aviation Pilots (pp. 9). airlines suffer approximately US$ from damage that results from ground-related occurrences. Recently an even higher estimate of US$ has been indicated by the Flight Safety Foundation( National Aerospace Laboratory. (2008). Safety of ground handling. N.p.: A.D. Balk.). As accidents occur, aviation is getting less safe and the federal government decided to regulate the overall aviation industry. Table 1 shows the incident distributions for Schiphol Airport where 26.4% of the total number of incidents is categorized as ground incidents. Of this total, 0.9% result in aircraft damage. Table 1- Incident Distributions Incident Distributions In-flight incidents 73.5% Ground incidents without aircraft damage Ground incidents with aircraft damage 25.5% 0.9% Source: National Aerospace Laboratory-2008
7 4 Also studies show that the majority (84%) of ground incidents is caused when the aircraft is standing, i.e. when the aircraft is stationary. The distribution is shown in Chart 1. For Schiphol Airport this percentage is slightly higher (92%). Chart 1- Distribution of phase Standing Pushback Taxi To Runway Towing Taxi-in Docking Source: National Aerospace Laboratory-2008 Attached in the appendix is the result of the comparison between the general ground incident/accident data and the data at the Schiphol Airport. Results in the attached document are from the National Aerospace Laboratory-2008 Safety of ground handling. A.D. Balk Safety Issue description As hangars are part of the landside the construction and operation are critical. Location is important as any aircraft should be able to move rapidly in an emergency; the hangar should also provide adequate aisle space, access to fire extinguisher, hoses, sprinkler-control valves and fire alarm. Valuable aircraft parts are to be stored in a separate building or if stored in the hangar a physical barrier made of materials with the lowest fire rating of one hour should isolate the parts from other departments. And hangar work docks should be constructed of fire-resistance materials. Finally hangar electrical service should conform to the National Electrical Code and National Fire Protection Association (NFPA) 70.
8 5 As far as the automotive maintenance buildings are concern issues reside with the equipment as a matter of fact safety bars, welding areas and torch cutting should be establish and the construction should be conform to the NFPA 10 and 13. The landside is also made of freight terminal which should have it airfreight deal handled manually and in old buildings for safety reasons, also stored material should be at a height where they can be accessed by any fire-extinguishing system. And construction can be made similar to a commercial ware house and should comply with the building codes and NFPA standards. Aircraft service facilities in the ramp pits should be located as near to the aircraft service connection as possible, also electrical power pits in ramps should have a stationary motorgenerator located alongside the terminal concourse while mobile ground power units should not be permitted. Warning signs are regulated by the national Electrical Code 1999, section (c) and the electrical wiring should be conform to the National Electrical Code, NFPA 70. Another issue is the location of the fuel pits, indeed the pits should be at a minimum distance of 50 feet away from the terminal building. Measures Outcomes In response to the unsafe condition of the ground operation the IATA launched the Ground Accident Prevention (GAP) program. The GAP program developed information and products in a practical format designed to eliminate accidents and incidents on airport ramps (aprons) and adjacent taxiways, and during the movement of aircraft into and out of hangars (Ground Accident Prevention (GAP) (n.d.). In Flight Safety Foundation). The Accident Prevention Program(APP) is Federal Aviation Administration (FAA) program presented in 1968 to reduce the accident rate and is available for pilots at local Flight Standards
9 6 District Offices (FSDO). The program consists of reducing the accidents through airmen education first. The program was developed by the FAA in 1968 regarding the increasing rate of the aviation accidents. The National Accident Prevention Program is made of a national Accident Prevention Program manager and staffs in the FAA headquarters in Washington, DC; and nine other regional Accident Prevention Program managers coordinate the activities; resolving safety problems, analyzing video surveillance and reporting on safety improvements is their duties. The reduction in the overall accidents proved the validity of the concept: preventing accidents through education. Also they manage the FSDO by reviewing the accident/ incident reports to identify airmen deficiencies. Today the program continues to decrease the number of accidents in a steady way. Wells, A. T. (n.d.). Flight Safety A Primer for General Aviation Pilots (pp. 14) Also the safety management system (SMS) with its minimum safety standards helps airports to meet intent of International Civil Aviation Organization standards in a way that complements existing Part 139.The SMS defines the safety policies as well as the dissemination of the safety information of the airport. Conclusion or Summary The accident prevention program is the key to the aviation safety. With the decreased in the number of accident, the landside safety program implemented is success. And those regulations made the industry more organized and safer. But as far as the security is concern passengers threat is still an issue in current time also regarding this more efficient security measure should be taken to prevent those threats without hindering the comfort of passenger such as taking their shoes off; I think this is too harsh policies need to reasonable and allow the passengers some sort
10 7 of freedom. I am aware that there will never be a perfectly safe industry but I believe that if everyone follows the rules by the book the aviation industry will be very close to that perfection. Finally I would like to tell aviators that ground handling safety is a shared responsibility between operators, airports and staffs.
11 8 Reference -Wells, A. T. (1991). Commercial aviation Safety (p. 50). N.p.: TAB Books. -National Safety Council. (n.d.). Aviation Ground Operation (5th ed.). N.p -Corporate Communications. (2009, February 19). More Accidents But Fewer Fatalities in In IATA. Retrieved March 20, 2013, from -Ground Accident Prevention (GAP) (n.d.). In Flight Safety Foundation. Retrieved March 20, 2013, from -Wells, A. T. (n.d.). Flight Safety A Primer for General Aviation Pilots (pp. 3-9). -National Aerospace Laboratory. (2008). Safety of ground handling. N.p.: A.D. Balk. Retrieved April 16, 2013, from easa.europa.eu/essi/ecast/wp-content/uploads/2011/08/nlr-cr pdf
ATL SAFETY MANAGEMENT SYSTEMS. ACI Risk Management Conference January 12, 2017
ATL SAFETY MANAGEMENT SYSTEMS ACI Risk Management Conference January 12, 2017 Introduction Hartsfield-Jackson Atlanta International Airport (ATL) is the busiest and most efficient airport in the world
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationAFI Flight Operations Safety Awareness Seminar (FOSAS)
Open space to put your own picture AFI Flight Operations Safety Awareness Seminar (FOSAS) Safety awareness ICAO/Airbus Nairobi, 19-21 Sep. 2017 Safety in the past Single Engine Aircraft, Visual all weather
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More informationSafety 2010: A marginal average year in global Aviation Safety
Safety 2: A marginal average year in global Aviation Safety The year 2 was one of the best in aviation in terms of safety; however, as shown by the Safety Survey 2 data, runway safety remains a top priority.
More informationCHAPTER 1 EXECUTIVE SUMMARY
CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationINTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur
INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and
More informationCHAPTER 4: ALTERNATIVES
MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the
More information8 OAMARU AIRPORT ZONE
8 OAMARU AIRPORT ZONE 8.1 ZONE STATEMENT The Oamaru Airport Zone covers approximately 254 hectares of land north of Oamaru. The zone provides future opportunity for the development of the Oamaru Airport.
More informationThe Board concluded its investigation and released report A11H0002 on 25 March 2014.
REASSESSMENT OF THE RESPONSE TO TSB RECOMMENDATION A14-01 Unstable approaches Background On 20 August 2011, the Boeing 737-210C combi aircraft (registration C GNWN, serial number 21067), operated by Bradley
More information(Presented by IATA) SUMMARY S
18/04/2013 DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION Second Meeting (DGCA-MID/2) (Jeddah, Saudi Arabia, 20-222 May 2013) Agenda Item 7: Aviation Security and Facilitation SECURITY INITIATIVES
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationThe offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10
The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are
More informationSunshine Coast Airport Master Plan September 2007
Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT
More informationRoute Causes. The largest percentage of European helicopter. For helicopters, the journey not the destination holds the greatest risk.
draganm /Fotolia.com Route Causes For helicopters, the journey not the destination holds the greatest risk. BY RICK DARBY The largest percentage of European helicopter accidents in 00 05 studied by the
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationRates of reportable accidents were highest
U.K. Business Jet Accident Rates Comparatively High Engine problems were the most frequent factor in serious incidents among large aircraft. BY RICK DARBY Rates of reportable accidents were highest for
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationDallas Love Field Update. Dallas City Council Briefing February 18, 2015
Dallas Love Field Update Dallas City Council Briefing February 18, 2015 Purpose Construction Update Impacts of Wright Amendment Repeal Increase in operations/passengers/ projections Concessions performance
More informationFAA Update Society of American Military Engineers
FAA Update Society of American Military Engineers May 8, 2013 Presented by Joseph Miniace Regional Administrator FAA Central Region Current FAA FAA Mission is to provide the safest, most efficient aerospace
More informationTANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)
Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1
More informationCasper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM
Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, 2014 1:30 PM Casper/Natrona County International Airport Master Plan Update Policy
More informationLove Field Modernization Program Update: Master Planning Recommendations
Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and
More informationNorfolk International Airport
Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationFACILITATION PANEL (FALP)
International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR
More informationTERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN
TERRACE-KITIMAT AIRPORT SOCIETY 2018-19 APRON MANAGMENT PLAN Table of Contents List of Effective Pages... 3 Manual Distribution and Amendment Procedures... 5 Record of Amendments... 5 Apron Management
More informationAppendix B. Comparative Risk Assessment Form
Appendix B Comparative Risk Assessment Form B-1 SEC TRACKING No: This is the number assigned CRA Title: Title as assigned by the FAA SEC to the CRA by the FAA System Engineering Council (SEC) SYSTEM: This
More informationTRANSPORTATION RESEARCH BOARD. Passenger Value of Time, BCA, and Airport Capital Investment Decisions. Thursday, September 13, :00-3:30 PM ET
TRANSPORTATION RESEARCH BOARD Passenger Value of Time, BCA, and Airport Capital Investment Decisions Thursday, September 13, 2018 2:00-3:30 PM ET Purpose Discuss research from the Airport Cooperative Research
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More informationPunta Gorda Airport Master Plan Update
Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,
More informationPart 139 Aerodromes. Part 139 Compliance Matrix
Part 139 Compliance Matrix The rule references in this compliance matrix have been extracted from the Civil Aviation Rules system as the minimum compliance requirements for an applicant for the issue or
More informationJOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012
1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley
More informationAnalyzing Risk at the FAA Flight Systems Laboratory
Analyzing Risk at the FAA Flight Systems Laboratory Presented to: Workshop By: Dr. Richard Greenhaw, FAA AFS-440 Date: 29 November, 2005 Flight Systems Laboratory Who we are How we analyze risk Airbus
More informationTHE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE
THE AIRTRAIN AIRPORT ACCESS SYSTEM JOHN F. KENNEDY INTERNATIONAL AIRPORT AIRPORT ACCESS SERVICE The JFK AirTrain airport access system interfaces with two existing regional transit systems; the Long Island
More informationU.S. Hospital-based EMS Helicopter Accident Rate Declines Over the Most Recent Seven-year Period
F L I G H T S A F E T Y F O U N D A T I O N HELICOPTER SAFETY Vol. 20 No. 4 For Everyone Concerned with the Safety of Flight July August 1994 U.S. Hospital-based EMS Helicopter Accident Rate Declines Over
More informationTable of Contents. How to interpret data within this report. How to Interpret Data 2. Executive Summary 4. Aviation Safety Accomplishments 5
Table of Contents How to Interpret Data 2 Executive Summary 4 Aviation Safety Accomplishments 5 Statistical Summary 7 USFS Owned and/or Operated Statistics 14 Fixed-Wing (contract) Statistics 16 Airtanker
More informationAirport Safety Management Systems: Integrating Planning Into the Process
Airport Safety Management Systems: Integrating Planning Into the Process Kenneth Jacobs Senior Airport Planner FAA Airport Planning and Environmental Division ken.jacobs@faa.gov SMS Defined A process for
More informationFAA/HSAC PART 135 SYSTEM SAFETY RISK MANAGEMENT SAFETY ELEMENT TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1
SAFETY ELEMENT 4.2.3 - TRAINING OF FLIGHT CREWMEMBERS JOB AID Revision 1 The Federal Aviation Administration (FAA) is proactively moving away from compliance based safety surveillance programs to Systems
More informationRUNWAY SAFETY GO-TEAM METHODOLOGY
RUNWAY SAFETY GO-TEAM METHODOLOGY INTRODUCTION The ICAO Runway Safety Programme (RSP) promotes the establishment of Runway Safety Teams (RSTs) at airports as an effective means to reduce runway related
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationREPORT A-017/2010 DATA SUMMARY
REPORT A-017/2010 DATA SUMMARY LOCATION Date and time Site Monday, 7 June 2010; 12:00 local time 1, approximately Girona Airport AIRCRAFT Registration EI-DAX Type and model BOEING 737-800 Operator Ryanair
More informationNoise Mitigation Program
Noise Mitigation Program Quick Facts 78% decrease year over year in complaints related to scheduled engine-run ups which is attributable to the new Ground Run-Up Enclosure (GRE) that went into operation
More informationNPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20
NPF/SIP/2011-WP/20 Aerodrome Safety Saulo Da Silva International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nadi, Fiji, 28 March-1
More informationREPORT IN-011/2012 DATA SUMMARY
REPORT IN-011/2012 DATA SUMMARY LOCATION Date and time Site Saturday, 13 April 2012; 20:17 UTC Seville Airport (LEZL) (Spain) AIRCRAFT Registration EI-EBA EI-EVC Type and model BOEING 737-8AS BOEING 737-8AS
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationFINAL REPORT. of civil aviation safety investigation. No. I Date: Artem Avia, Ucraine. Genex Ltd., Belarus
FINAL REPORT of civil aviation safety investigation OCCURRENCE TYPE Owner Operator Manufacturer Aircraft Registration Location Date and time Serious Incident Artem Avia, Ucraine Genex Ltd., Belarus Antonov
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps
More informationA practical approach to SMS implementation Colombian Civil Aviation Authority
A practical approach to SMS implementation Colombian Civil Aviation Authority Colonel (r) Miguel Camacho Martinez Chief, Safety Management Systems Regional Aviation Safety Group Pan America (RASG-PA) Workshop
More informationGround movement safety systems and procedures - an overview
Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)
More information2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)
2018 Airport Master Plan Overview of Development Concepts Greg Ballentine (WSP) Thank You Stakeholder and community consultation has included discussions with over 40 stakeholder groups including airport
More informationTERMINAL DEVELOPMENT PLAN
5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationCIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS
CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION SECOND AFRICA-INDIAN OCEAN (AFI) AVIATION SECURITY AND FACILITATION SYMPOSIUM
2 nd AFI SECFAL Symposium/2017 (ACI) 17/05/2017 English Version INTERNATIONAL CIVIL AVIATION ORGANIZATION SECOND AFRICA-INDIAN OCEAN (AFI) AVIATION SECURITY AND FACILITATION SYMPOSIUM (Wednesday, 24 May
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationSMS HAZARD ANALYSIS AT A UNIVERSITY FLIGHT SCHOOL
SMS HAZARD ANALYSIS AT A UNIVERSITY FLIGHT SCHOOL Don Crews Middle Tennessee State University Murfreesboro, Tennessee Wendy Beckman Middle Tennessee State University Murfreesboro, Tennessee For the last
More informationDescription of Airport Charges. Swedavia AB Appendix 3 to Conditions of Services, Swedavia AB
Description of Airport Charges Swedavia AB 2016 Appendix 3 to Conditions of Services, Swedavia AB Contents 1 Swedavias Charges... 3 2 Aircraft Related Charges... 4 2.1 Take-Off Charge... 4 2.2 Emission
More informationLondon City Airport. 43 years
ACCIDENT Aircraft Type and Registration: No & Type of Engines: Dassault Falcon 7X, VQ-BSO 3 Pratt & Whitney Canada PW307A engines Year of Manufacture: 2009 (Serial no: 64) Date & Time (UTC): Location:
More informationReduced Surface Emissions through Airport Surface Movement Optimization. Prof. Hamsa Balakrishnan. Prof. R. John Hansman
Reduced Surface Emissions through Airport Surface Movement Optimization Prof. Hamsa Balakrishnan Prof. R. John Hansman Aeronautics & Astronautics and Engineering Systems Motivation Opportunities to improve
More informationWATERBORNE TRANSIT. April 21, 2010
WATERBORNE TRANSIT CONCEPTS STUDY April 21, 2010 1 Overview: Summary of previous 2004/2005 Ferry Service analysis Results of recent study focusing on ferry service from Newport News Conclusions 2 2004/2005
More informationFUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities
FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective
More informationU.S. FOREST SERVICE AVIATION SAFETY MANAGEMENT SYSTEMS
U.S. FOREST SERVICE AVIATION SAFETY MANAGEMENT SYSTEMS FY 216 AVIATION SAFETY SUMMARY Table of Contents How to Interpret Data 2 Executive Summary 3 Safety Management System 4 Accomplishments 5 Statistical
More information2009 Muskoka Airport Economic Impact Study
2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end
More informationRONALD REAGAN WASHINGTON NATIONAL AIRPORT NOVEMBER 2016
2. Purpose and Need 2.1 Background The Metropolitan Washington Airports Authority (the Authority) is preparing an Environmental Assessment (EA) of potential environmental impacts associated with the proposed
More informationRegional Jets ,360 A319/ , , , ,780
Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.
More informationDRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03
DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationUS $ 1,800 1,600 1,400 1,200 1,000
IATA ECONOMIC BRIEFING JULY 9 INFRASTRUCTURE COSTS SUMMARY Historical data indicates that during recession periods infrastructure providers usually increase their prices while other prices are falling
More informationReview of air navigation matters 2.3 Air navigation specific activities: Aerodromes and Ground Aids (AGA)
C/CAR WG/7 - WP/08 International Civil Aviation Organization 16/06/09 Revised North American, Central American and Caribbean Office (NACC) Seventh Central Caribbean Working Group Meeting (C/CAR WG/7) Mexico
More informationDestination Lindbergh
Technical Appendix 16 Destination Lindbergh Appendix Contents Destination Lindbergh... TA 16-2 2050 Regional Transportation Plan Destination Lindbergh Destination Lindbergh is a comprehensive planning
More informationAERODROME LICENCE APPLICATION PROCESS
0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,
More informationICAO PLAN OF ACTION FOR KAZAKHSTAN
1. Background ICAO PLAN OF ACTION FOR KAZAKHSTAN 1.1. The ICAO USOAP audit of Kazakhstan was conducted in April 2009, with two Significant Safety Concerns (SSCs) identified in the area of aircraft operations
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationCommercial Aviation Safety Team (CAST)/ International Civil Aviation Organization (ICAO) Common Taxonomy Team (CICTT)
Commercial Aviation Safety Team (CAST)/ International Civil Aviation Organization (ICAO) Common Taxonomy Team (CICTT) Overview/Outreach Briefing Yuri Fattah, ICAO Co-chair Corey Stephens, CAST Co-chair
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationTUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page
TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationCOUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018
COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development Per Individual
More informationGATE-TO-GATE SAFETY. Improving aviation safety by better understanding and handling of interfaces
GATE-TO-GATE SAFETY Improving aviation safety by better understanding and handling of interfaces Alfred Roelen roelen@nlr.nl National Aerospace Laboratory Flight Safety and Aircraft Operations Department
More informationREPORT 2014/111 INTERNAL AUDIT DIVISION. Audit of air operations in the United Nations Operation in Côte d Ivoire
INTERNAL AUDIT DIVISION REPORT 2014/111 Audit of air operations in the United Nations Operation in Côte d Ivoire Overall results relating to the effective management of air operations in the United Nations
More informationIATA Fuel Efficiency Program
IATA Fuel Efficiency Program IATA Fuel Efficiency Program The program was launched by IATA in 2004 in response to the rising price of fuel. It is focused on supporting the airlines to increase fuel efficiency
More informationBremerton National Airport Airport Master Plan Project Update February 12, 2013
Bremerton National Airport Airport Master Plan Project Update February 12, 2013 Project Team Century West Engineering Northwest firm founded in 1969 500+ airport projects completed throughout the Pacific
More informationTransportation Safety and the Allocation of Safety Improvements
Transportation Safety and the Allocation of Safety Improvements Garrett Waycaster 1, Raphael T. Haftka 2, Nam H, Kim 3, and Volodymyr Bilotkach 4 University of Florida, Gainesville, FL, 32611 and Newcastle
More informationREVIEW OF PERTH AIRPORT Noise Abatement Procedures
REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise
More informationReport to Congress Aviation Security Aircraft Hardening Program
Report to Congress Aviation Security Aircraft Hardening Program Washington, DC 20591 December 1998 Report of the Federal Aviation Administration to the House and Senate Committees on Appropriations pursuant
More informationCOUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019
COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development
More informationAIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018
AIRPORT PLANNING Joseph K CHEONG Technical Officer, Airport Operations & Infrastructure, ICAO HQ Secretary, Aerodrome Design and Operations Panel Lima, September 2018 TOPICS THE AVIATION SYSTEM CHICAGO
More informationERA Regional Airline Conference April 10, 2008
Ground Accidents Safety And Operational Issues Bob Vandel FSF EVP ERA Regional Airline Conference 2008 April 10, 2008 1 2 Safety - Freedom from danger, risk or injury Flight Personnel Aircraft Maintenance
More informationPRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA
SIMULATION ANALYSIS OF PASSENGER CHECK IN AND BAGGAGE SCREENING AREA AT CHICAGO-ROCKFORD INTERNATIONAL AIRPORT PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationGerald R. Ford International Airport Authority Master Plan Update A World Class Gateway
Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land
More informationAIRFIELD SAFETY IN THE UNITED STATES
International Civil Aviation Organization 24/11/09 North American, Central American and Caribbean Office (NACC) Twenty Second Meeting of Directors of Civil Aviation of the Eastern Caribbean (E/CAR/DCA/22)
More informationTABLE OF CONTENTS 1.0 INTRODUCTION...
Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More information