Ditch flows slowly to the north
|
|
- Leslie Judith Moody
- 5 years ago
- Views:
Transcription
1 Ditch flows slowly to the north Photo 1. Wetland DE: Looking west across Wetland DE from upslope. Ponded water, mucky mineral soils, and patches of emergent vegetation observed. Wetland DE appears to be supported from groundwater and surface runoff from the street to the west (N 113 th Place) (January 2, 2015). ESA PhotoPage 1
2 Wetland drains south Photo 2. Wetland K: Looking south into Wetland K. Wetland K flows south into Thornton Creek wetland complex. Wetland boundary is located at the toe of the roadway embankment slope and follows the toe of slope of a sewer easement that is approximately six to eight feet higher than the wetland elevation (January 13, 2015). ESA PhotoPage 2
3 Photo 3. Wetland K: Looking west at the toe of slope of the sewer easement embankment. Wetland K boundary follows toe of slope (January 13, 2015). ESA PhotoPage 3
4 Ditch drains north Photo 4. Jurisdictional Ditch A: Jurisdictional Ditch A is located along the road shoulder to I-5. Looking south into the drainage. Leaf litter and debris observed in Jurisdictional Ditch A (January 13, 2015). ESA PhotoPage 4
5 Ditch drains south Photo 5. Jurisdictional Ditch A: Jurisdictional Ditch A is located along the road shoulder to I-5. View of south end of Jurisdictional Ditch A looking north. Culvert drains south into the stormwater system. Leaf litter and debris observed in the drainage (January 13, 2015). ESA PhotoPage 5
6 Ditch drains to the south Photo 6. Jurisdictional Ditch B: Looking northwest at culvert inlet into Jurisdictional Ditch B. Note sidecasts from ditch maintenance to the right of the six inch drainage flow path (January 2, 2015). ESA PhotoPage 6
7 Culvert drains under I-5 Ditch drains north Photo 7. Jurisdictional Ditch C: Jurisdictional Ditch C is located on the west edge of the WSDOT right-of-way, west of the noise wall. Looking north along Jurisdictional Ditch (January 13, 2015). ESA PhotoPage 7
8 Photo 8. Jurisdictional Ditch C: Looking south at Jurisdictional Ditch. Wetland DE is located beyond the orange flag and flows north into Jurisdictional Ditch C. Stormwater pipes also empty into Jurisdictional Ditch C (January 13, 2015). ESA PhotoPage 8
9 Photo 9. Jurisdictional Ditch C: Culvert at north end of Jurisdictional Ditch C drains east under I-5. Remnant chunks of cement and asphalt observed at north edge of Jurisdictional Ditch C just before the culvert (January 2, 2015). ESA PhotoPage 9
10 Ditch drains to the south Photo 10. Jurisdictional Ditch H: Looking north along Jurisdictional Ditch H. Roadside ditch along I-5 off-ramp. Jurisdictional Ditch H receives runoff from surrounding roads and drains to the south into a stormwater drain. (January 2, 2015). ESA PhotoPage 10
11 Northern extent of stormwater feature located at the south end of Jurisdictional Ditch L. The feature is fed by the ditch upslope Photo 11. Jurisdictional Ditch L: Looking north at Jurisdictional Ditch L from top of sewer easement embankment. At the south end of Jurisdictional Ditch L is a constructed stormwater feature. Culvert at south end of Jurisdictional Ditch L drains into Wetland K. (January 2, 2015). ESA PhotoPage 11
12 Ditch drains south to stormwater feature at the south end of Jurisdictional Ditch L Photo 12. Jurisdictional Ditch L: Looking south along Jurisdictional Ditch L from upslope (January 2, 2015). ESA PhotoPage 12
13 Feature F on road prism of I-5 onramp Photo 13. Feature F. Looking north at eastern side of unregulated Feature F along the road prism to I-5 (January 2, 2015). ESA PhotoPage 13
14 Photo 14. Feature F. Unregulated Feature F is located along the road prism to I-5. View looking west along the slope (January 2, 2015). ESA PhotoPage 14
15 Culvert Drains to the south Photo 15. Stormwater Feature G. Looking north along Stormwater Feature G. Roadside swale along I-5 off-ramp. Stormwater Feature G receives stormwater flow from culvert at north end (January 2, 2015). ESA PhotoPage 15
16 Drains south Stormwater Drain Photo 16. Stormwater Feature J. Looking southeast at the southern extent of Stormwater Feature J, a roadside swale along the on-ramp to I-5. Stormwater Feature J receives runoff from the road, and drains to the south into a stormwater drain (January 2, 2015). ESA PhotoPage 16
17 Stormwater Feature M Beginning of scour lines marks boundary between Stormwater Feature M and Jurisdictional Ditch L Jurisdictional Ditch L flows east, then south Photo 17. Stormwater Feature M. Looking northwest into unregulated Stormwater Feature M, a roadside swale along the on-ramp to I-5. Unregulated Stormwater Feature M receives runoff from the road, and drains to the southeast into Jurisdictional Ditch L (January 2, 2015). ESA PhotoPage 17
18
Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT
01051-09004 Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT DRAFT: June 30, 2010 Applicant: City of Arcata 736 F Street Arcata, CA 95521 Phone (707) 825-2154 Prepared by: Winzler
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationPhotographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:
Photograph ID: 1 west View of one of the monitoring well and the large parking lot on the south side of Center Street. Photograph ID: 2 Monitoring well located in the middle of the parking lot located
More informationGILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan
GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan PRELIMINARY ENGINEERING REPORT Abigail Eaton, Chair Intercounty Drains
More informationAGAWAM CONSERVATION COMMISSION April 26, 2018
MEMBERS PRESENT: Henry A. Kozloski, Chairman Sheryl Becker S. Page Fallon Frank Meagher MEMBERS ABSENT: Magda Galiatsos Jill Messick ALSO PRESENT: Pamela R. Kerr AGAWAM CONSERVATION COMMISSION Mr. Kozloski
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationLake Wissota Access Locations within the LaFayette Township. By Chad Martin
Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More informationPublic Service Department MONTHLY REPORT November 2017
- Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects
More informationAPPENDIX D: Open Water Strata and Land Site Locations and Descriptions
APPENDIX D: Open Water Strata and Land Site Locations and Descriptions Open Water Strata: Marine Waters W1 St. Joseph Sound W3 Clearwater Harbor south W5 Long Bayou/Cross Bayou W7 Boca Ciega Bay central
More informationProposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest
Proposed Arthurs Point Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1.0 APPLICANT The applicant for the proposed Arthurs Point Special Housing Area is
More informationTown of Danvers Planning Board
Town of Danvers Planning Board Danvers Town Hall One Sylvan Street Danvers, MA 01923 www.danvers.govoffice.com Margaret Zilinsky, Chair Kristine Cheetham William Prentiss Aaron Henry James Sears John Farmer,
More informationThe north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,
The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The east half of Sections 21, 28, and 33, Township 37 North,
More informationTreats 2,271,000 gallons of greywater from the water park using the constructed lagoon and wetland, saving $8,539 in sewer charges annually.
Carmel, IN Methodology for Landscape Performance Benefits Prepared by: Research Fellow: M. Elen Deming, Professor, University of Illinois Research Assistant: Paul Littleton, MLA Candidate, University of
More informationNorthern Rail Extension, Phase One
General Project and Funding 1. Where does Phase One start? The rail line for Phase One begins roughly at the northern boundary of the former Bradbury property, but also includes work along Tom Bear Trail
More informationMINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011
MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011 Mayor Bolender called the meeting to order at 7:00 p.m. The following Commissioners were present at roll call: Commissioner Dickmann,
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek West Conservation Area Date of visit: March 16, 2017 County: Orange Property Type: Restrictive Covenants
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Crow Branch Conservation Area Date of visit: 4/8/2015 County: Orange Property Type: Restrictive Covenants Local
More informationMORGAN CREEK GREENWAY Final Report APPENDICES
APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan
More informationRecent Erosion and Mass Wasting Observed in Sunset Cliffs Natural Park. Craig Barilotti and Camilla Ingram Sunset Cliffs Association
Recent Erosion and Mass Wasting Observed in Sunset Cliffs Natural Park Craig Barilotti and Camilla Ingram Sunset Cliffs Association 15 February 2011 Executive Summary A major source of nearshore pollution
More information2015 WORKSHOP Wednesday Field Sites
2015 WORKSHOP Wednesday Field Sites 1. George Road: Butler County: Active D&G site: The bus will stop on a hill where several crosspipes have been added and an infiltration basin has been installed at
More informationRIO VISTA MUNICIPAL AIRPORT
DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012
More informationMetro District 1500 W. County Road B 2 Roseville, MN Date: July 17, 2018
Metro District 1500 W. County Road B 2 Roseville, MN 55113 3174 Date: July 17, 2018 Ryan Hixson FHWA, Area Engineer Federal Highway Administration 380 Jackson Street, Suite 500 St. Paul, Minnesota 55101
More informationSection 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3
Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3
More informationTRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)
BAKER DESIGN CONSULTANTS Civil, Marine and Structural Engineering To: Alex Jaegerman FAICP Director of Planning & Development Town of Yarmouth 200 Main Street PO Box 907 Yarmouth, ME 04096 From: Barney
More informationAND PERMITTEE DATE LOCATION OF WORK
11 Sep 2003 Regulatory Branch PUBLIC NOTICE ------------- 1. Pursuant to Code of Federal Regulations 33 CFR 325.2(a)(8), the Chicago District issued permits or other approvals, withdrawals, appeals or
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationInteroffice Memorandum
Supplemental Information Agenda Item No. 5.1 May 1, 2014 Interoffice Memorandum May 1, 2014... Date Honorable Planning Commission... To Rick Carter, PE... From Agenda Item 5.1-2014-2019 Capital Improvement
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationHollaway Consulting Engineers, LLC Statement of Qualifications
Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationWaukegan & Calumet Rivers. All Hands Meeting
Waukegan & Calumet Rivers 516(e) Update All Hands Meeting David F. Bucaro, P.E. Chief, Economic Formulation & Analysis Section, Planning Branch May 18 th, 2011 Kensington Court Ann Arbor, MI 1 2 Waukegan
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek East Conservation Area Date of visit: 4/8/2015 County: Orange Property Type: Restrictive Covenants
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Crow Branch Conservation Area Date of visit: March 16, 2016 County: Orange Property Type: Restrictive Covenants
More informationGroup similar facilities together separate dissimilar facilities.
Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle
More informationNational Forests and Grasslands in Texas
United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationSWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT
RV PARK REQUIREMENTS SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION P.O. Box 1188 Bountiful, UT 84011-118 The following RV Park requirements were voted on and approved by the Swan Creek Village HOA Board of
More informationTriangle Land Conservancy Conservation Area Monitoring Report Carolina North
Triangle Land Conservancy Conservation Area Monitoring Report Carolina North Property Name: Bolin Creek East Conservation Area Date of visit: March 16, 2017 County: Orange Property Type: Restrictive Covenants
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More information14.1.a. Attachment: Engineering Standards Manual Draft (2016 : Approval of the Engineering Standards Manual) Packet Pg. 216
Packet Pg. 216 City of Fort Walton Beach Manual November 2012 14.1.a City of Fort Walton Beach Manual TABLE OF CONTE SECTION 1.00 INTRODUCTION... 3 SECTION 2.00 POLICY... 3 SECTION 3.00 - EROSION AND SEDIMENTATION
More informationSECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN
SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN River basin description. A general description of the river basin or subbasin, as appropriate, in which
More informationUnderstanding user expectations And planning for long term sustainability 1
Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated
More informationElectric System Serving Pierce County Current system and future investments
Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested
More information1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8
Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 25, 2001 Mr. Melvin Mayfield, P.Eng. Construction Services Coordinator Dear Mr. Mayfield: Central Region Landslide
More informationCity of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020
Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13
More informationBear Creek Habitat Improvement Project
06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain
More informationYale Lake IP Road Trail
Yale Lake IP Road Trail Implementation Plan Prepared For PacifiCorp 825 NE Multnomah St. Portland, OR 97232 Prepared By David Evans and Associates, Inc. 2100 SW River Parkway Portland, OR 97201 Flowing
More informationEAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationCITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016
CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment
More informationWelcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT
Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps
More informationAppendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute
Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property
More informationThe Rains at Kennesaw Mountain - Its Daily Impact
The Rains at Kennesaw Mountain - Its Daily Impact Sherman wrote that, prior to arriving at Kennesaw Mountain in June 1864, it had rained for 19 straight days. One of his soldiers said 21 days of rain.
More informationRye Planning Board_. Saturday, April 17, 2010 MINUTES OF THE SITE WALK
Rye Planning Board_ Saturday, April 17, 2010 MINUTES OF THE SITE WALK Members Present: Chairman, Jaci Grote; Vice-Chair, Donald Cavallaro, Clerk, Martin Zivic; Mel Low; Selectmen s Rep. Priscilla Jenness;
More informationUnited States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017
NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic
More informationTOWN OF EPPING, NEW HAMPSHIRE PLANNING BOARD MEETING. THURSDAY May 26, 2011
TOWN OF EPPING, NEW HAMPSHIRE PLANNING BOARD MEETING THURSDAY May 26, 2011 PRESENT Mike Morasco, Steve Colby, Dave Crowell, Dave Reinhold; Selectmen s Representative Bob Jordan; Alternate Brian Reed; Planner
More informationLower Salford Township Planning Commission Meeting September 26, 2012
Lower Salford Township Planning Commission Meeting September 26, 2012 Chairman Manus McHugh called to order the Lower Salford Township Planning Commission meeting at 7:27 p.m. Other Planning Commission
More informationPORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors
PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT APPENDIX 17. 3 Water Receptors Contents Section Page 1 Water Receptors... 1-1 1.1 Surface Water Features/Receptors in the Study Area
More informationSome Historical Aspects of Urban Water Systems
Some Historical Aspects of Urban Water Systems Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL 35487 Ancient springs at Delphi, Greece (site of Oracle)
More informationAuburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
More informationSECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY
WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new
More informationConservation of Critical Environmental Resources in Chatham Park
Conservation of Critical Environmental Resources in Chatham Park Elaine Chiosso, Haw Riverkeeper Haw River Assembly Haw River As Seen From Chatham Park "Spreading southwestward from the banks of the Haw
More informationWeekly construction update
November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41
More informationCity Park Mile High Loop 2015 Trail Condition and Assessment
City Park Mile High Loop 2015 Trail Condition and Assessment The following assessment is provided to Denver Parks and Recreation by the City Park Alliance to assist with recommendations for maintenance
More informationNEPA COMPLIANCE CHECKLIST FOR APPROPRIATE USE OF CE S
NEPA COMPLIANCE CHECKLIST FOR APPROPRIATE USE OF CE S Los Padres National Forest Name of Project: Decision to be Implemented: Mitigations and Design Criteria: Description of Public Involvement: Findings
More informationTRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationLevel IV Ecoregions of the Northeast Glacial Lakes Watershed Project Area
Level IV Ecoregions of the Northeast Glacial Lakes Watershed Project Area Ecoregions are areas having similar ecosystems and environmental resources including geology, physiography, vegetation, climate,
More informationPublic Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019
APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR
More informationKennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement
Kennesaw Mountain Trail Club Trail Skills Workshop ~ Dips and Drains Presented by: Jay M Dement KEY CONCEPTS: Control Erosion and Users Where Do Trails Come From, and How Do They Work: Concept of trail
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationBEACON LINE RAIL TRAIL BREWSTER TO HOPEWELL JUNCTION
BEACON LINE RAIL TRAIL BREWSTER TO HOPEWELL JUNCTION OCTOBER 2017 DRAFT CONCEPT PLAN Page left intentionally blank TABLE OF CONTENTS EXECUTIVE SUMMARY Executive Summary...i CHAPTER 01: INTRODUCTION Introduction...2
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More information2013 Regional Water System Improvements Program Public Hearing March 14, 2013
In support of Illinois Environmental Protection Agency State Revolving Fund Loan Application 2013 Regional Water System Improvements Program Public Hearing March 14, 2013 Village of Oak Lawn Customer Communities:
More informationPARK SITE MASTER PLANS WEST PARK
PARK SITE MASTER PLANS Queen Creek Road to the north, Ocotillo Road to the south, Sossaman Road to the west, and Hawes Road to the east. The land adjacent to West Park is either inactive agricultural land
More informationPreliminary Site Evaluation
Preliminary Site Evaluation 100 Acre Site, US 72 Piperton, Tennessee Power Distributor: Chickasaw Electric Cooperative August 2010 SITE DATA SHEET PIPERTON US 72 SITE (100 ACRES): LOCATION & GENERAL DESCRIPTION
More informationBrevard County Utility Services Department
Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES
More information1947 Noyestar Road, Walden, VT
1947 Noyestar Road, Walden, VT Curtis Trousdale, Owner, Broker, Realtor Cell: 802-233-5589 curtis@preferredpropertiesvt.com 2004 Williston Road, South Burlington VT 05403 www.preferredpropertiesvt.com
More informationCASS COUNTY MICHIGAN. Drain Commissioner
CASS COUNTY MICHIGAN Drain Commissioner Enbridge Pipeline Replacement 2013 Annual Report Table of Contents Beginning Page Number Forward... 2 I. County Drains. 3 II. Intercounty Drains.. 5 III. Lake Level
More informationCity of Billings. Public Works Administration. Public Works Department 2224 Montana Ave Billings, MT Office (406)
City of Billings Public Works Administration Public Works Department 2224 Montana Ave Billings, MT 59101 Office (406) 657-8230 MEMORANDUM From: Kelly Frank, Public Works Administrative Coordinator Date:
More informationHead Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan
Milan Trail Huggers ATV Club P.O. Box 42 Milan, NH 03588 Maintaining Trails in Milan, Stark and Dummer Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan
More informationOSSIAN TOWN COUNCIL Regular Meeting May 12, :00 p.m. Ossian Town Hall 507 North Jefferson
OSSIAN TOWN COUNCIL Regular Meeting May 12, 2014-7:00 p.m. Ossian Town Hall 507 North Jefferson Council President, Brad Pursley called the meeting to order at 7:00 p.m. with Council members Josh Barkley,
More informationJanuary 19, 2018 Project No C Via
Mr. Thomas McDonald, P.E. Professional Engineer II (C/E) Water Management NYS Canal Corporation 30 S Pearl Street Albany, NY 12207 January 19, 2018 Project No. 16-5719C Via email: thomas.mcdonald@canals.ny.gov
More informationApplication for Permit to Develop in a Floodplain Area
Application for Permit to Develop in a Floodplain Area The undersigned hereby makes application for a permit to develop in a designated floodplain area. The work to be performed is described below and
More information!( 79!( 77 Pine Creek Pine Log State Forest Ecofina Creek WMA Northwest Florida Beaches International Airport Intracoastal Waterway 388³ ell LEGEND SA
!( 79!( 77 Pine Creek Pine Log State Forest Ecofina Creek WMA Northwest Florida Beaches International Airport Intracoastal Waterway 388³ ell LEGEND SAJ-105 Boundary - 43,977 Acres Ward Creek West Bay North
More informationCOASTAL CONSERVANCY. Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I. File No Project Manager: Richard Retecki
COASTAL CONSERVANCY Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I File No. 03-142 Project Manager: Richard Retecki RECOMMENDED ACTION: Authorization to disburse up to $455,000
More informationVersion Isolated & Non-Waters Only 1 of 3
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers SECTION I: BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): July 6, 2010. B. DISTRICT
More informationChapter 4.0 Alternatives Analysis
Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities
More informationCommon Ground Drainage Channel Diversion. Design Report
Common Ground Drainage Channel Diversion Design Report Resource Management International Inc Consulting Engineers May 2017 COMMON GROUND DRAINAGE CHANNEL DIVERSION PREPARED FOR: QUILL LAKES WATERSHED NO.
More informationElectric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts
Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested
More informationAttachment G STREAM IMPACTS. Ridge Road Extension Alternatives Analysis
Attachment G STREAM IMPACTS for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA 33617
More informationTown of Washington Town Board March 9, 2017
Town of Washington Town Board March 9, 2017 The Town Board of the Town of Washington held their regular meeting on Thursday, March 09, 2017, at the Town of Washington Town Board. The meeting was called
More informationInformation for File # TJH
Information for File # 2015-01952-TJH Applicant: Chisago County Corps Contact: Tom Hingsberger Address: 180 E. 5 th Street, Suite 700, St. Paul, Minnesota 55101-1638 E-Mail: thomas.j.hingsberger@usace.army.mil
More informationFigure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including:
Barr Engineering Company 4700 West 77th Street Minneapolis, MN 55435-4803 Phone: 952-832-2600 Fax: 952-832-2601 www.barr.com An EEO Employer Minneapolis, MN Hibbing, MN Duluth, MN Ann Arbor, MI Jefferson
More informationTown of Canandaigua 5440 Routes 5 & 20 West Canandaigua, New York 14424
Page 1 of 7 Canandaigua Drainage Advisory Committee Meeting Minutes APPROVED June 12, 2018 Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, New York 14424 DRAINAGE ADVISORY COMMITTEE Established
More information