1 A DISCUSSION PAPER ON THE DEVELOPMENT OF WALKING ROUTES IN ASSOCIATION WITH MARK HILL WIND FARM 25 th March 2006 Prepared by Force 9 Energy
2 INTRODUCTION This paper presents an outline of potential leisure/recreational facilities that could be developed in parallel with the wind farm at Mark Hill and in a manner that could be of benefit to the village of Barrhill and the wider community. This paper also responds directly to concerns raised previously by Barrhill Community Council about public access issues. The paper has been prepared by Force 9 Energy, developers of the proposed wind farm at Mark Hill. In previous discussion with the local community, Force 9 Energy has indicated its willingness to help develop a local network of walking routes. BACKGROUND Consultation has taken place with Mr Mark Wilson who is responsible for Land Management on Mark Hill and the surrounding area, representatives of Barrhill Community Council and Drew Moyes (a keen walker and supporter of the Carrick Way project). It is clear from those discussions that the main potential in terms of development of leisure interests for Barrhill is likely to be walking. It is also clear from consultation that changes have taken place over the years in terms of land use around Barrhill which makes it eminently possible for individuals to take responsible access onto certain areas whilst, at the same time, enabling land managers and others to carry out their day to day work effectively. It needs to be emphasised that members of the public wishing to take access will continue to be responsible for their own health, safety and actions. Reflecting this, certain routes have been defined so as to enhance the safety of the general public, avoid conflict with normal farming and sporting activities and avert disruption of ecologically sensitive areas. There are two main groups of walkers who may wish to walk in the Barrhill area: 1. Those who wish to walk long distance routes from one area to another (and who could bring additional economic benefit to the village). 1. Those who wish to use paths close to where they live, on a fairly regular basis but wish to minimise disturbance or inconvenience to animals, birds and people who either live or work on the land. Site visitors to the wind farm may also fall into this category.
3 DEVELOPMENT OF LONG DISTANCE ROUTES The Carrick Way is currently being developed to provide a high profile and well publicised pathway from Barr into the area. The current plan envisages The Carrick Way utilising a route from Barr towards the head of Muck Water, then to utilise routes along the Muck Water, crossing the Duisk River at Pinwherry and then to follow the direction of the River Stinchar towards Colmonell and, ultimately, Ballantrae. Such a plan would mean that Barrhill would not be on the direct route but served by a spur from the Carrick Way. The traditional right of way from Barrhill to Barr is under utilised as it goes by way of Black Clauchrie and Loch Scalloch. It not only involves additional distance but passes through fairly dense forestry and is currently difficult to locate once on the hill. There is also a route through the Arecleoch Forest connecting to Colmonell. Both routes are not considered to be of much benefit to walkers and are therefore under used. It would, however, be possible to create a direct link to Barrhill from Barr by extending the proposed wind farm tracks at the northern extremity of Mark Hill to connect with the Forest Enterprise track at Little Shalloch. This would enable walkers from Barr to choose whether to walk towards Barrhill or Pinwherry or potentially for the Carrick Way to pass through Barrhill. Barrhill is the only village served by a railway station and it is therefore an attractive starting / stopping point for walkers. It should also be noted that the creation of the wind farm and the associated removal of trees will open up some exceptionally good views for walkers. This report suggests that walkers by-pass the farmyard at Balluskie by utilising the proposed access route that is required (for the same reason) for the wind farm. This recognises that it is inappropriate for the general public to pass through the farmyard. Many walkers may also feel they are invading privacy at Balluskie Farmhouse, by utilising the steep driveway from the sewage works. It may also be possible to consider upgrading the pathway to the Martyr s Tomb and incorporating that path with a link to the station.
4 The creation of such a long distance route (and possibly shorter routes) should ensure that Barrhill is considered as a venue for the South Carrick Walking Festival which is held annually and would not entail entry into fields containing livestock as the proposed access route will be fenced. Consideration could also be given to the provision of a parking area at Duisk Bridge (there is flat ground where the Barrhill rubbish coup used to be). SUGGESTED SHORT ROUTES It is apparent from consultation that a number of shorter routes can be developed but it may not be practicable to develop and thereafter maintain all the routes at the same time. It is also apparent that by-passing Balluskie Farmyard, as described earlier, allows the number of routes from Barrhill to be maximised. The following routes are set out below for consideration. Route 1: Gateway at Duisk Bridge by-pass Balluskie (using proposed fenced access road to wind farm) and head towards redundant sheep dip to the NE of Balluskie Farm. Thereafter, adopt new road through young plantation (Peat Gate) towards Laggan Farm. This route has good views of the Galloway Hills. It would then be possible to use the public road to walk towards Darnaconnar (ie looking at views towards Feoch Burn and Standard once Feoch Bank has been felled) or consider a circular route via Low Laggan (ruined cottage) and then by forming a pathway within Sunnybrae so as to return to Duisk Bridge. Consultation with the owner of Blair Farm could improve route of pathway for this route as it has been noted that new woodland/change of use of land is underway. Route 2: Gateway at Duisk Bridge by-pass Balluskie (using proposed fenced access road to wind farm) and head towards redundant sheep dip to the NE of Balluskie Farm. Head SW to junction of road servicing Knockmalloch Farm. Head towards Knockmalloch Farm. At Knockmalloch Farm there are two options as follows:
5 Route 2 (a): Walk along the road beside Mill Burn to Mill Loch and onward to Loch Farroch. It would then be possible to join up with a section of the proposed long distance route for the Carrick Way and thereby return to Duisk Bridge. Route 2 (b) Continue from Knockmalloch to Knockytinnel and pass through ancient woodland of Common Plantation towards Barbae Hill (Trig point / view point). Adopt link road into Craigcannochie area (lower blocks of trees all felled) and down onto Muck Road and either onward towards Pinwherry or, for those with sufficient energy, along the sections of the Carrick Way towards the head of the MuckWater. FURTHER MATTERS FOR SURVEY/CONSIDERATION We suggest that the following matters are given due consideration: 1. To develop a route on the western side of the railway between Pinwherry and Barrhill. There are good views for walkers towards the Galloway Hills from the western side of the Duisk Valley (particularly in the vicinity of Farden Hill) and there may be the possibility of making improvements to a fairly substantial (but little visited) cairn close to Daltangan Park/White Cairn. There is also a little used track from Farden Hill to Colmonell. 2. Is there a route from the Village (or Scaurhead) to the curling pond? 3. To survey Laggan Cairn (Mr Wilson indicated that nothing remains other than the site). 4. The construction of a network of access tracks linking the turbines at Mark Hill wind farm would offer further possibilities for short, simple walks including some excellent views which will be opened up after clear felling of the site. OTHER LEISURE INTERESTS/MATTERS FOR CONSIDERATION The road to the proposed wind farm is unlikely to be suitable to attract cyclists. Barrhill could however promote cycling on the public road from Barrhill Station towards Chirmorrie and onward to New Luce.
6 Installation of artwork at strategic points on the routes in recognition that the area has a shortage of sites/buildings of historic interest, there is the suggestion to liaise with appropriate arts funding bodies to look at open-air art installations to provide destinations and create an image. Explore viability of improvements to Loch Farroch or Near Eye Stanks for fishing or as a location. Mr Wilson indicated that the South Ayrshire River Trust should be consulted on such a matter as they have survey data relating to the burns which Loch Farroch feeds into namely the Cammock Burn, Feoch Burn, Duisk River and Stinchar River. He confirmed the loch currently contains brown trout but that they are small in size. The creation of shelters at Loch Farroch or elsewhere should be considered actively as part of the overall development. HEALTH AND SAFETY ISSUES In planning the network of attractive, accessible routes described in this project, it has been necessary to consider the following: 0Farmyard safety the general public should not take access through a farmyard or in close proximity to animals that are being worked with or in close proximity to machinery. 1Those who work, live or depend on the land for their livelihood so that they can work safely and effectively. 2The danger that Livestock can present in terms of both aggression and hygiene. 3That certain roads are used as drove roads for livestock and that road use is not limited to vehicles. 4Livestock has access on to roads in a number of locations where roads pass through fields. 5Shooting/sporting interests. 6The requirement for individuals to take responsible access. 7Local walkers who wish to walk with dogs. 8Other constraining factors which may not be obvious to a walker such as the location of high voltage cables, restricting improvement works, private water supplies, flooding, breeding programmes or other ecological issues. 9Many editions of the Ordnance Survey Maps contain inaccurate information making desk top review unreliable. This highlights a need for signage.
7 FURTHER CONSIDERATIONS IN DEVELOPMENT OF SAFE ROUTES FOR LOCAL WALKERS The most sensitive areas to disturbance by walkers are along the Duisk River. Much of the ground is wetland, used by breeding birds and most of the fields on the valley side are grazed by livestock during the summer months. The fields closest to the river / active farmyards are also more likely to be stocked with cattle that could become aggressive to people on foot as they are likely to have young calves at foot. The farmyards of Glenwhask, Belhamage and Glenduisk are in active use and, as such, unsuitable for use by the general public. Most of the sporting drives and stalking activities using long distance rifles are centred on Glenwhask Farm, Belhamage Farm, Ballochmorrie Farm and Glenduisk Farm. This means pedestrian access on the roads within these areas cannot be recommended. Laggan Farm, Knockmalloch Farm, Knockytinnal Farm and Craigcannochie Farm are dwellings that are unoccupied and the economic benefits relating to sporting interests limited in such areas. Such areas also provide long distance views, if not afforested with trees older than 15 to 20 years of age. The Forest at Feoch Bank is to be felled during This will result in views from the public road between Laggan Farm and Darnaconnar and towards the Feoch Burn and Standard being opened up. MAPS A series of four maps accompanies this report. Map one shows existing routes and tracks. Map two highlights those areas of sensitivity which, for reasons explained earlier, must be avoided. Map three illustrates the routes that could be adopted. Map four is taken from Force 9 Energy s Environmental Statement and shows the network of tracks linking the proposed turbines. NEXT STAGE We trust that Barrhill Community Council and the local community of Barrhill welcome the recommendations in this report. Feedback is welcomed at this stage and further discussions will help to identify priorities for development.
Countryside Trails Dunkeld
R A N G E R S E RV I C E Countryside Trails Dunkeld WELCOME Welcome to this southern end of Atholl Estates. The countryside here is a wonderful blend of lochs, woodland and heather moor. There is a large
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More informationReference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date:
Schedule of Planning Applications Committee Date: 21 st January 2014 Reference: 06/13/0594/F Parish: Fritton & St Olaves Officer: Mrs M Pieterman Expiry Date: 20-01-2014 Applicant: Proposal: Site: Lord
More informationAppendix 8 Sawston Greenway Review
Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationAppendix 7 Local Green Spaces - Detailed Evidence
Appendix 7 Local Green Spaces - Detailed Evidence Neigh Bridge Country Park, Somerford Keynes General information Neigh Bridge Country Park is situated at the southern entrance to Somerford Keynes village.
More informationFelixstowe Branch Line FAQ
Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationLiving & Working Access and Recreation
Living & Working Access and Recreation 5.9 Access and Recreation Background 5.9.1 The countryside has increasingly become a popular destination for visitors and an important resource for informal recreation.
More informationProposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:
Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of
More informationResponse to the London Heathrow Airport Expansion Public Consultation
Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation
More informationTOWN TRUST. Bury St Edmunds Railway Station
BURY ST EDMUNDS TOWN TRUST conserving buildings of historic interest The future of Bury St Edmunds Railway Station Part I Report October 2015 1 The future of Bury St Edmunds Railway Station NOTE: This
More informationTRUMPINGTON MEADOWS COMMUNITY MEETING (MEETING 1) held at Trumpington Meadows Primary School Meeting Room 2 on 27th November 2017, 19:30 21:00 MINUTES
TRUMPINGTON MEADOWS COMMUNITY MEETING (MEETING 1) held at Trumpington Meadows Primary School Meeting Room 2 on 27th November 2017, 19:30 21:00 MINUTES Guests Tim Watkins Project Manager, Western Orbital,
More informationSnowdoniaNationalParkAuthority SupplementaryPlanningGuidance: VisitorAccommodation October2012
SnowdoniaNationalParkAuthority SupplementaryPlanningGuidance: VisitorAccommodation October2012 8 SNOWDONIA NATIONAL PARK AUTHORITY SUPPLEMENTARY PLANNING GUIDANCE: 8 VISITOR ACCOMODATION Contents 1 Introduction...
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationWicklow Mountains Path Survey
Wicklow Mountains Path Survey Ballinacor Croaghanmoira Fananierin Start to Finish: T 11723 86602 to T 11175 89057 Altitude (lowest highest): 385m 664m Weather: Hot Access: Coolgarrow forest entrance Surveyed
More informationID: 283 Distance: 6.2 miles Height gain: 500 Metres Map: Explore OL 19 Contributor David and Chris Stewart
Walkingworld Wild Boar Fell ID: 283 Distance: 6.2 miles Height gain: 500 Metres Map: Explore OL 19 Contributor David and Chris Stewart Features Birds, Great Views, Hills or Fells Description: Wild Boar
More informationExplore the Bay the Green Way
Explore the Bay the Green Way Botany Bay Trail Pre-Feasibility Study Report Nick Benson Sutherland Shire Environment Centre August 2002 1 Botany Bay Trail Explore the Bay the Green Way Opportunities for
More informationConsultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England
Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationLlandudno Junction. Regeneration Proposals for the Future. December 2009
Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration
More informationCarrick Way Development and Management Plan. Final Report
Donaldson Environmental Consultants, Flat 3/2, 170 Wilton Street, Glasgow G20 6BS Tel: 0141 946 3987 Email: dec50@btinternet.com Carrick Way Development and Management Plan Final Report January 2006 Contents
More informationProposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement
Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne Statement of Community Involvement Prepared by WYG Environment Planning Transport Ltd on behalf of the
More informationDate: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council
Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering
More informationBody Worlds Sci-Bono A Few Lessons Learned
Body Worlds Exhibition @ Sci-Bono A Few Lessons Learned 1. Introduction In 2013 Sci-Bono Discovery Centre hosted its most successful travelling exhibition. This exhibition, Body Worlds, attracted over
More informationAppendices A (Our ambition for nature (A3 plan) and further information)
Appendices A (Our ambition for nature (A3 plan) and further information) Penny Hill Farm Nature Conservation vision Key: Tenancy boundary Meadow restoration & Mowing/meadow F33 Mowing/meadow Progress towards
More informationHawke s Bay Regional Parks Network. Pekapeka Regional Park Individual Park Plan
Hawke s Bay Regional Parks Network Pekapeka Regional Park Individual Park Plan 2015-2024 Hawke s Bay Regional Council 159 Dalton Street Private Bag 6006 Napier 4110 Hawke s Bay New Zealand Telephone: 0800
More informationDAVA WAY. Notes on multi-use access
DAVA WAY Notes on multi-use access The Dava Way is a 24 mile (38km) waymarked long distance route based largely on the dismantled Highland Railway Line between Forres, near the Moray Coast in north-east
More informationWicklow Mountains Path Survey
Wicklow Mountains Path Survey Glenmacnass Tonelagee Start to Finish: O 114 030 to O 085 016 Altitude (lowest highest): 370m 817m Weather: Sunny day, hot Access: Military Road, Glenmacnass Surveyed by:
More information20th November 2013 CONTACT OFFICER: GENERAL MANAGER (TELEPHONE )
AGENDA ITEM NO: 8 EAST DUNBARTONSHIRE LEISURE AND CULTURE TRUST EDLCT 29/13/MG 20th November 2013 GENERAL MANAGER CONTACT OFFICER: GENERAL MANAGER (TELEPHONE 0141 777 3146) SUBJECT TITLE: COMMONWEALTH
More informationAeron & Arth walks 4 walks for all the family to enjoy
Aeron & Arth walks walks for all the family to enjoy Please take note that the maps illustrating these walks are intended as a rough guide only. You should use the most recent version of the relevant Ordnance
More informationRegulatory Committee
Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director
More informationLorg Wind Farm. Addendum To Pre-Application Consultation Report
Lorg Wind Farm Addendum To Pre-Application Consultation Report November 2015 Lorg Wind Farm Pre-Application Consultation Report Addendum Contents 1. Introduction... 1 Summary of Non-Statutory Consultation...
More informationCWMGIEDD FROM ABERCRAVE
Abercrave to Cwmgiedd Walk Page 1 Starting from The Abercrave Inn. Grid Ref: SN 824128 From the Abercrave Inn, an 11.3km (7 miles) walk to the foothills of the Cribarth Mountain, then through forest to
More informationRoundhouse Way Transport Interchange (Part of NATS City Centre Package)
Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal
More informationAPPLICANT NAME PROJECT DESCRIPTION AWARD
Scotland - Round 1 Awards APPLICANT NAME PROJECT DESCRIPTION AWARD Highlands & Islands Bute Forest Ltd The project will launch a community timber products business, attract tourists to the Island and create
More informationan engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as
Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:
More informationPUBLIC CONSULTATION - THE PURPOSE
PUBLIC CONSULTATION - THE PURPOSE ² To review the sites identified for housing development; ² To introduce new sites that have come forward since the last Public Consultation with potential for housing
More information1.1.1 Landscape character This is the upper part of a bowl-shaped landform, extending east from the Rothiemurchus character area, contained by the
1.1 Glen More 1.1.1 Landscape character This is the upper part of a bowl-shaped landform, extending east from the Rothiemurchus character area, contained by the arc of the high granite pluton of the Cairngorms
More informationNORTH RIGGINS CAIRNIE, HUNTLY, ABERDEENSHIRE
NORTH RIGGINS CAIRNIE, HUNTLY, ABERDEENSHIRE NORTH RIGGINS, CAIRNIE, HUNTLY, ABERDEENSHIRE, AB54 4TT A charming traditional farmhouse and steading in a peaceful rural setting. Huntly 6.5 miles, Inverurie
More informationNational Park Authority Board Meeting
Paper for decision 1. Introduction 1.1 Preparations for the introduction of four Camping Management Zones (covering less than 4% of the National Park) have progressed significantly since Scottish Ministers
More informationInfrastructure for Growth
A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has
More informationStrategic Transport Forum 7 th December 2018
Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft
More informationAppendix A: Summary of findings drawn from an analysis of responses to the questionnaire issued to all households in Trimley St Martin
Transport and Works Act 1992 The Network Rail (Felixstowe Branch Line Improvements Level Crossing Closure) Order Trimley St Martin Parish Council Statement of Case The statement of Case of the Parish Council
More informationROAD AND TRAIL PROJECT APPROVAL
ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:
More informationTOWPATH AND ACCESS IMPROVEMENTS BIRMINGHAM AND BLACK COUNTRY CANALS
TOWPATH AND ACCESS IMPROVEMENTS BIRMINGHAM AND BLACK COUNTRY CANALS BACKGROUND Department for Transport grants Early 2013, the Parliamentary Under-Secretary for Transport, Norman Baker MP, announced 62m
More informationWimpole Estate Multi-use Trail 2017 Frequently asked questions
Wimpole Estate Multi-use Trail 2017 Frequently asked questions Why does the National Trust want to create new trails? We want to play our part in helping to reconnect the nation with the outdoors. At the
More informationWest Wirral (Dee Estuary)
View of Hilbre Island from West Kirby with walkers at low tide. West Wirral (Dee Estuary) West Kirby is the start of the 12 mile long Wirral Way, the backbone of Wirral Country Park, the old Hooton to
More informationFUTURE AIRSPACE CHANGE
HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement
More informationCUMNOCK ACTION PLAN 2017 ANNUAL UPDATE
CUMNOCK ACTION PLAN 2017 ANNUAL UPDATE Do you fancy getting involved Supporting your local community through volunteering Thinking about volunteering? Want to get involved in activities and events in your
More informationBus Priority Package. Presentation to Leigh Business Forum. 11 December 2015
Bus Priority Package Presentation to Leigh Business Forum 11 December 2015 Over 25 miles of bus routes improved What is the bus priority package? Key Strategic Benefits Shorter journey times, more punctual
More informationAbbey Chesterton bridge Questions & Answers
Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound
More informationPerth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager
Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13
More informationThe London Borough of Barnet (Brent Cross Cricklewood) Compulsorv Purchase Order (No. S)2016
Gina Emmanuel 94 Brent Terrace London, Nw2 IBY 24.08.2016 Sent to: npcu(5)communities.rsi.gov.uk The London Borough of Barnet (Brent Cross Cricklewood) Compulsorv Purchase Order (No. S)2016 Dear Sir/Madam,
More informationA Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures
West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued
More informationLand at Craigtoun St Andrews. Residential Development Opportunity
Land at Craigtoun St Andrews Residential Development Opportunity Land at Craigtoun, St Andrews Residential Development Opportunity The Opportunity On behalf of Mount Melville Limited, Savills is pleased
More informationLYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS
APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District
More informationThames Estuary Path Basildon, Castle Point and Eastern Thurrock Overview
Thames Estuary Path Basildon, Castle Point and Eastern Thurrock Overview This overview plan shows the Thames waterfront focused around Vange Creek and Wat Tyler Country Park. The area covers 3 Local Authorities
More informationLand Management Summary
photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the
More informationAirport Master Plans
October 2004 (Revised February 2005) Briefing Airport Master Plans The risks and potential pitfalls for local authorities The 2003 Air Transport White Paper (ATWP) asked airport operators to produce or
More information2.2 For these reasons the provision of tourist signing will only be considered:
TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without
More informationKirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.
ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts
More informationMember-led Review of Cycling Infrastructure
Member-led Review of Cycling Infrastructure Survey Results: A1 Cambridge to Royston June 17 cambridgeshire.gov.uk Contents 1. Introduction... 3. About you... 3.1 Age... 3. What is your gender?... 3.3 Do
More informationPERTH AND KINROSS LOCAL REVIEW BODY
PERTH AND KINROSS Minute of Meeting of the Perth and Kinross Local Review Body held in the Hay Room, Dewar s Centre, Glover Street, Perth on Tuesday 23 August 2016 at 10.45am. Present: Councillors M Lyle,
More informationPark-specific management and policies Wainuiomata Recreation Area
Park-specific management and policies Wainuiomata Recreation Area 6.8 Wainuiomata Recreation Area 6.8.1 Legal status Title held: Legislative status: Wellington Regional Council Administered under Local
More informationForeword. Loch Ness from the summit of the High Route
Foreword 4 The Great Glen Way runs for just over 77 miles (125 km) from Fort William to Inverness. It starts beside Britain s highest mountain, Ben Nevis; follows its greatest geological fault along the
More informationCouncillor Briefing on Elvetham Chase
Councillor Briefing on Elvetham Chase In partnership with the Calthorpe Estate, Wates Developments vision for Elvetham Chase is to provide an outstanding new community for Hart District that will become
More informationSeek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and
3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital
More informationMuch of the information which follows is included by kind permission of the Tynedale Council (now defunct) and is based on its brochure.
The Tyne Green Trail This easy going circular walk is on level ground throughout. It follows the course of the River Tyne between Hexham Bridge and the turning point just past Watersmeet. The return is
More informationHIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015
HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7.30pm on 23 MARCH 2015 Present: Councillor A Walters (Chairman) Councillors C Cant, J Freeman and J Salmon (Uttlesford District Council).
More informationScheme Objective 1: To improve the operation of the A96 and inter-urban connectivity through:
FAADAG (the Forres Area A96 Dualling Action Group) offers the following feedback to Transport Scotland (and in copy to SWECO), as invited pursuant to the most recent Route options design update issued
More informationNorth Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange,
North Herts District Council Local Plan Timeline for Response to Council s Request for Strategic Housing Land Land to the North of the Grange, Letchworth Garden City Introduction As part of central government
More informationSpeed control humps - Scotland, England and Wales
Traffic Advisory Leaflet 3/91 September 1991 Speed control humps - Scotland, England and Wales Introduction Road humps are an extremely effective means of keeping vehicle speeds low. The standard round
More informationADVICE ON Cattle Grids
ADVICE ON 2 Definition A cattle grid, for highway purposes, is a device designed to prevent the passage of animals, or animals of any particular description, but to allow the passage of all or some other
More informationMember-led Review of Cycling Infrastructure
Member-led Review of Cycling Infrastructure Survey Results: Huntingdon Road, Cambridge June 217 cambridgeshire.gov.uk Contents 1. Introduction... 3 2. About you... 3 2.1 Age... 3 2.2 What is your gender?...
More informationThe Clyde Walkway. Cambuslang Bridge to Strathclyde Country Park. Thanks to
Thanks to The Clyde Walkway is a partnership venture based on co-operation and agreement. North Lanarkshire, South Lanarkshire and Glasgow City Councils would like to acknowledge the help and support of
More informationCity of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3
-- WORKSHOP REPORT -- Project: Client: Event: South Beach Basketball Court City of Fremantle Community Consultation Forum Date: 12 th November 2015 6:00pm 8:00pm Author: Joel Levin, Aha! Consulting Contents:
More informationThe Mendip Way. Route Directions and Maps Uphill to Wells
The Mendip Way Route Directions and Maps Uphill to Wells Website: www.mendiphillsaonb.org.uk Email: mendip@mendiphillsaonb.org.uk Facebook & Twitter: @MendipHillsAONB Phone: 01761462338 1 Uphill to Loxton
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationFrodsham Wind Farm Local Liaison Committee Meeting
Frodsham Wind Farm Local Liaison Committee Meeting Date: 05.02.16 Time: 1800-2000 Venue: Castle Park, Frodsham Invited: The Operator (Frodsham Wind Farm Limited) The Main Contractor (Cheetham Hill Construction
More informationBHS ADVICE ON Dimensions of Width, Area and Height
BHS ADVICE ON Dimensions of Width, Area and Height 2 In providing specifications for equestrian ways and facilities, The British Horse Society considers all equestrian users, which may result in a high
More informationErmine Street Environmental Enhancements
Ermine Street Environmental Enhancements As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme
More informationTourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)
Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:
More informationPLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY
PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY 21 Dec 17 Introduction Amesbury has a vibrant nightlife with three public houses, two hotel bars and a nightclub within the town centre as
More informationSchedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:
Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings
More informationTimetable Change Research. Re-contact survey key findings
Timetable Change Research Re-contact survey key findings Key project objectives Measure the impact of the timetable changes on customers, what actions have they taken as a result Gauge how have the timetable
More informationUSING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL
USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL Jackie Davies, Senior Technical Officer (UTC), Bristol City Council Traffic Signals Synopsis Bristol City Council has received
More informationThe Strategic Commercial and Procurement Manager
Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose
More informationENTER EXCEPTIONAL RESIDENTIAL DEVELOPMENT OPPORTUNITY
FOR SALE Aviator Park, Station Road, Addlestone, Surrey KT15 2PG ibrochure - www.cbre-ibrochure.co.uk/addlestone ENTER EXCEPTIONAL RESIDENTIAL DEVELOPMENT OPPORTUNITY LOCATED WITHIN THE HIGHLY DESIRABLE
More informationIsland Eastern Corridor Boardwalk-Cycleway Feasibility Study
For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront
More informationThe Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013
The Edinburgh Glasgow Improvement Programme Strategic Environmental Assessment (SEA) Consultation Document October 2013 Transport Scotland Rail Directorate Table of Contents 1.0 Introduction 2.0 The Edinburgh
More informationAppendix 9 Melbourn Greenway Review
Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationTourism Development Plan for Scotland Questionnaire
Draft National Tourism Development Plan Public Consultation 2013 Tourism Development Plan for Scotland Questionnaire We would like your views on this Plan and, in particular, your comments on opportunities
More informationEAST WEST RAIL EASTERN SECTION. prospectus for growth
EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote
More informationTo: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.
Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken
More informationWolverhampton City Council
Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION
More informationRiverside Heights, Norwich. Travel Plan
RIVERSIDE HEIGHTS, NORWICH Client: Engineer: Taylor Wimpey East Anglia Create Consulting Engineers Limited Hungate House Princes Street Norwich Norfolk NR3 1AZ Tel: 08454507908 Email: enquiries@createconsultingengineers.co.uk
More informationTHE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05
OBJ/148/ W 031 E20 SNIVELLERS THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION BY
More informationVisit West Lothian Strategic Action Plan
Visit West Lothian Strategic Action Plan Visit West Lothian in association with West Lothian Council Visit West Lothian s Mission, Vision & Values Our Vision is: To position West Lothian as a desirable
More informationSouth Lanarkshire Core Paths Plan Statutory Final Consultative Draft October 2010
South Lanarkshire Core Paths Plan Statutory Final Consultative Draft October 2010 South Lanarkshire Core Paths Plan Consultative Draft Contents Introduction What the law says about core paths and core
More informationRail Delivery Group. Consultation on the future of the East Midlands rail franchise
Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,
More information