CONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park
|
|
- Lilian Wilkinson
- 6 years ago
- Views:
Transcription
1 OMPREHENSIE REREATIONAL MASTER PLAN ONTEXT MAP to irginia ivil War Trails NOT TO SALE iver tr rara A Riverside Mountains to Sea Trail Rowe Environmental School The Ararat River reenway is located along the eastern edge of the ity of Mount Airy, North arolina and has potential for connections to regional trails such as the Mountains to Sea Trail and the irginia ivil War Trails. (Image at left courtesy of the Surry ounty Master Plan). D EE LO P M E N T O ST S 11
2 ARARAT RIER REENWAY reenway Phase 1: North Segment - Riverside to Puckett property (end of ity property control) Riverside Improvements + 3,975 linear feet of greenway trail development) Quantity ost Unit Subtotal Riverside Improvements Develop naturally surfaced trails on hillside 540 $2.00 lf $1, Repave and restripe existing parking lot 30,000 $0.90 sf $27, Repave existing Oak Street (canoe/kayak access road) 6,750 $0.90 sf $6, Asphalt and stone base for new parking, loading, and canoe access 20,500 $2.50 sf $51, turnaround Install vehicular lockable gates 3 $12, each $36, Install 5' wide, 4" depth concrete sidewalk 1,000 $3.00 sf $3, anoe/kayak access 1 $3, each $3, Light existing soccer field (including installation) 1 $90, each $90, Signage (replace existing entrance sign + regulatory/warning signs) 1 $12, allowance $12, Install 4' height 3-rail wood fence 2,800 $15.00 lf $42, Install 8' wide fence gate (2-4' wide sections) 3 $ each $1, ' Thermoplastic coated metal bench with back 2 $ ea $ Large trash receptacles 13 $ ea $9, Riverside subtotal $283, Quantity ost Unit Subtotal reenway Trail Development (3,975 lf) reenway trail site preparation (clearing, grubbing, erosion control) 3,975 $12.00 lf $47, ' wide multi-use asphalt trail + 2' wide gravel shoulder 3,475 $41.00 lf $142, ' wide concrete trail (beneath Pine Street bridge) 500 $ lf $150, orrugated metal culvert (20 lf)* 1 $1, each $1, Weighted/lockable gates 1 $3, pair $3, ' Thermoplastic coated metal bench with back 2 $ each $ reenway trail signage (regulatory/warning signs) 1 $3, allowance $3, reenway trail kiosk 1 $3, allowance $3, reenway trail subtotal $352, Subtotal North $636, ontingency 20% $127, TOTAL Phase 1: North Segment - Riverside to Puckett property $763, * osts reflect 48" diameter corrugated metal pipe, however, formal design may determine smaller size is adequate. Example of greenway trail signage along the American Tobacco Trail in Durham, North arolina. Example of a trailhead along the West Orange Trail in Florida. 1 2 D EE LO P M E N T O ST S
3 OMPREHENSIE REREATIONAL MASTER PLAN Future connection to Lovillʼs reek reenway at rar Driv e A er Riv PHASE 1: NORTHERN SEMENT SALE: 1 =300ʼ Rive rside 15 acre Riverside 3,875 linear feet of greenway trail Riverside Mulched nature trails on hillside 10ʼ wide asphalt greenway trail Begin greenway trail Existing gravel parking lot Existing picnic shelter LEEND Trailhead New lights for existing soccer field Amenity expansion area Existing basketball court anoe/kayak access 6ʼ wide mulch nature trail Picnic area Future connection Ararat River 10ʼ wide asphalt greenway trail reenspace orrugated metal culvert Pine Street 8ʼ-0 min. Existing asphalt parking lot Future skate park Existing Build-A-Dream Playground Existing shelter and restrooms anoe access turnaround ross-section KEY MAP ing area 10ʼ wide concrete greenway trail eetn r t S tio 1 N 03 e -sec n i P oss r Public Works Department Riverside Rowe Environmental School N D EE LO P M E N T O ST S 13
4 ARARAT RIER REENWAY reenway Phase 2: enter Segment - Puckett property to south of Hamburg Street Rowe Environmental enter + 4,875 linear feet of greenway trail development) Quantity ost Unit Subtotal Rowe Environmental enter Lockable vehicular gate 1 $12, allowance $12, Primary path: 10' wide asphalt trail 590 $35.00 lf $20, Secondary path: 6' wide mulch nature trail 1,000 $7.00 lf $7, Environmental enter (shelter/restrooms) 1 $175, allowance $175, Utilities/Toilets/Sanitary onnection* 1 $150, allowance $150, anoe access 1 $1, each $1, rading 1 $3, allowance $3, Asphalt parking and stone base (40 parking spaces maximum) 11,000 $2.50 sf $27, Landscaping (entrance, parking, grass) 1 $14, allowance $14, Picnic areas (2 tables, benches, trash receptacles) 4 $5, each $20, Signage 1 $5, allowance $5, ' Thermoplastic coated metal bench with back 2 $ ea $ Rowe Environmental enter subtotal $435, Quantity ost Unit Subtotal reenway Trail Development (4,875 lf) reenway trail site preparation (clearing, grubbing, erosion control) 4,875 $12.00 lf $58, ' wide multi-use asphalt trail + 2' wide gravel shoulder 4,625 $41.00 lf $189, ' wide concrete trail (beneath Hamburg Street bridge) 250 $ lf $75, orrugated metal culvert (20 lf)** 2 $1, each $2, Weighted/lockable gates 1 $3, pair $3, Pre-fabricated pedestrian bridge (10' wide, 60' span max.) 1 $75, each $75, ' Thermoplastic coated metal bench with back 2 $ each $ reenway trail signage (regulatory/warning signs) 1 $3, allowance $3, reenway trail subtotal $407, Subtotal enter $843, ontingency 20% $168, TOTAL Phase 2: enter Segment - Puckett property to south of Hamburg Street $1,012, * Additional utility costs may be incurred. ** osts reflect 48" diameter corrugated metal pipe, however, formal design may determine smaller size is adequate. Example of educational signage along the greenway in reensboro, North arolina. Holiday Nature enter along the White River in Indianapolis, Indiana. 1 4 D EE LO P M E N T O ST S
5 OMPREHENSIE REREATIONAL MASTER PLAN PHASE 2: ENTER SEMENT SALE: 1 =300ʼ 22 acre Rowe Environmental 4,875 linear feet of greenway trail Hamburg Street ross-section ive at R 8ʼ-0 min. Rowe Environmental r r Ara LEEND Trailhead Mulched nature trails Potential future land acquisition for expansion of Rowe Environmental Environmental enter Pre-fabricated pedestrian bridge 6ʼ wide mulch nature trail Picnic area Future connection Ararat River 10ʼ wide asphalt greenway trail reenspace orrugated metal culvert KEY MAP t ree t S burg ction Hamross-s e Hamburg Street anoe/kayak access Mount Airy Middle School Future asphalt parking Asphalt parking lot (40 spaces) Two-lane asphalt entrance road Riverside 10ʼ wide concrete greenway trail Rowe Environmental School N D EE LO P M E N T O ST S 15
6 ARARAT RIER REENWAY reenway Phase 3: South Segment - South to School School + 3,500 linear feet of greenway trail development) Quantity ost Unit Subtotal School rading/stock piling 27 $1, acre $40, Sediment and erosion control 1 $10, allowance $10, ehicular crossing 1 $16, allowance $16, Asphalt drives 22,000 $2.20 sf $48, ravel parking and drives 142,000 $0.75 sf $106, Striping 1 $3, allowance $3, Soccer Fields (includes fine grading) 4 $20, each $80, Irrigation and equipment 1 $70, allowance $70, "Premier soccer field" lighting 1 $110, allowance $110, Maintenance building 600 $90.00 sf $54, oncession building (restrooms, shelter) 1,800 $ sf $198, Utilities/Toilets/Sanitary onnection* 1 $150, allowance $150, Lockable gate and columns 1 $12, allowance $12, Paved loop trail (10' wide asphalt) 3,200 $35.00 lf $112, anoe access 1 $1, each $1, Asphalt parking and stone base (40 parking spaces maximum) 11,000 $2.50 sf $27, Landscaping (trees and turf) 1 $90, allowance $90, Signage 1 $16, allowance $16, School subtotal $1,144, Quantity ost Unit Subtotal reenway Trail Development (3,500 lf) reenway trail site preparation (clearing, grubbing, erosion control) 3,500 $12.00 lf $42, ' wide multi-use asphalt trail + 2' wide gravel shoulder 3,000 $41.00 lf $123, ' wide concrete trail (beneath S. Renfro Street/US 52 Bus. bridge) 500 $ lf $150, orrugated metal culvert (20 lf)** 1 $1, each $1, Weighted/lockable gates 1 $3, pair $3, ' Thermoplastic coated metal bench with back 2 $ each $ reenway trail signage (regulatory/warning signs) 1 $3, allowance $3, reenway trail subtotal $323, Subtotal South $1,468, ontingency 20% $293, TOTAL Phase 3: South Segment - South to School $1,762, * Additional utility costs may be incurred. ** osts reflect 48" diameter corrugated metal pipe, however, formal design may determine smaller size is adequate. roup gathering at a picnic shelter in Floyd Lamb State, Nevada. Fishing is another activity enjoyed along the Ararat River (Photo Floyd Lamb State, Nevada). 1 6 D EE LO P M E N T O ST S
7 OMPREHENSIE REREATIONAL MASTER PLAN PHASE 3: SOUTHERN SEMENT SALE: 1 =300ʼ 33 acre School trail 3,500 linear feet of greenway LEEND Trailhead School River Ararat reet o St enfr ection S. Rross-s Elementary School S. Renfro Street ross-section 6ʼ wide mulch nature trail Picnic area Future connection Ararat River 10ʼ wide asphalt greenway trail reenspace orrugated metal culvert 10ʼ wide concrete greenway trail Asphalt entrance drive KEY MAP (3) Recreational soccer fields 8ʼ-0 min. oncessions building ravel parking lot (typ.) Riverside Rowe Environmental Premier soccer field 10ʼ wide asphalt trail loop End of greenway trail anoe/kayak access School N D EE LO P M E N T O ST S 17
8 ARARAT RIER REENWAY This page left intentionally blank. 1 8 D EE LO P M E N T O ST S
PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION
PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with
More informationTRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT
AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access
More informationSTORY MILL COMMUNITY PARK
OWNER: City of Bozeman Department or Parks and Recreation P.O. Box 1230, 415 N. Bozeman Street Bozeman, MT 59715 Tel: (406)-582-2908 APPLICANT: The Trust for Public Land 1007 E. Main Street, Suite 300
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationNEW MEADOWS PARK PROPOSED MASTER PLAN
NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle
More informationMERRYMEETING TRAIL A&B. Topsham. Head of Tide Park Trail (Tedford Road to Cathance Road) Length: 1.79 Miles Anticipated Cost: $719,000.
1 MERRYMEETING TRIL Head of Tide Park Trail (Tedford Road to athance Road) Topsham Length: 1.79 Miles nticipated ost: $719,000 D athance Road athance Road Section 1 connects residential neighborhoods and
More informationTrail Feasibility Study
VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way
More informationM E S T I Z O C U R T I S P A R K
ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC
More information2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:
D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in
More information6.5 DURANGO EXCELS AT PARK CONNECTIVITY
City of Durango 6.5 DURANGO EXCELS AT PARK CONNECTIVITY The City of Durango excels at park connectivity as evidenced by the success of the Animas River Trail (ART) project. While it is clear there are
More informationAcquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.
Lakeside Beach TF00-136 $122,550.00 in fee simple of approximately one-half acre of property on the shore of Spring Lake to exp the Lakeside Beach. 2000 River Ravines TF00-150 $910,000.00 in fee simple
More informationCITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm
CITY COUNCIL WORK SESSION MEETING AGENDA April 17, 2017 5:30 6:30pm 1) Call to Order 2) 2017 Park Dedication Fund Budget 3) 2016 Positive General Fund Audit Balance Discussion 4) Adjourn WS Item 2 CITY
More informationCity of Sierra Madre STUDY AREA PROFILE
City of Madre STUDY AREA PROFILE STUDY AREA ID #112 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT REPORTING FORM
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationBirthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.
TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE
More informationRiverside County Transportation Department Summary of Bids
COUNTY'S ESTIMATE HARDY & HARPER, INC. Schedule 1: Project No. B6-0472 Santa Ana, CA 92705 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID AMOUNT 1 731521 MINOR CONCRETE (SIDEWALK)
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationCapital Prioritization
14 Capital Prioritization 279 279 280 Park & Recreation CAPITAL PRIORITIZATION As described in Chapter 8, the recommendations presented in Chapter 9 are prioritized to provide a guide for future capital
More informationCity of Haslett. City of East Lansing. City of East Lansing
Central Park North (Nancy L. Moore Park) Lake Park North Expansion White Park Expansion #2 White Park Expansion #1 County East East Haslett East East TF87-212 Acquisition $90,000.00 Park. TF08-138 Acquisition
More informationNORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK
NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK N ILIO NA VE N JAM ES AV E PLAYGROUND PAR K PRO PER TY B OUN DAR Y
More informationPARKS & BEACHES PROJECTS
#18 72ND STREET PARK, LIBRARY, #19 BLUEWAYS & AQUATIC CENTER $1.1 MILLION $60 MILLION New facility to include: Create Kayak Launches with All Wheels Skate Park Floating Docks and Seating at: Library/Media
More information35 Bee Tree Park Planning Zone 3
35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone
More information7. Plan Implementation
7. Plan Implementation 7.1 Implementation Timeline This section includes a list of achievable park and recreation actions. In the Implementation Action Matrix that follows, the implementation actions have
More informationWelcome to the future of Terwillegar Park a Unique Natural Park
Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines
More information17 Mathilda Welmering Park Planning Zone 3
17 Mathilda Welmering Park Planning Zone 3 8301 Mathilda Visit Date: September 2016 St. Louis County Parks Master Plan Page 1 Description: The six acre Mathilda Welmering Park is named for two streets
More informationTable B-1: P&RS Park and Facility Inventory by Classification 1 Outdoor Recreation Amenities Park Structures
Appendix B: Park and Facility inventory APPENDIX B: PARK AND FACILITY INVENTORY Table B-1: P&RS Park and Facility Inventory by Classification 1 Outdoor Recreation Amenities Site Amenities Park Structures
More informationGale Rossi Facilities and Maintenance Manager, City of Albany 548 Cleveland Avenue Albany, CA 94710
RDG 14 April 2017 Gale Rossi Facilities and Maintenance Manager, City of Albany 548 Cleveland Avenue Albany, CA 94710 RE: Albany Hill / Final Concepts and Costs for Albany Hill Projects CC: Chelle Putzer,
More informationRating: 5.0 (scale of 1-10)
95 Community Trail System Groundcover: 2-metre paved path, 1- metre grass buffer on either side. Location: Fort St. John Ownership: City of Fort St. John Rating: 5.0 (scale of 1-10) Strategic value: Linear
More informationUnincorporated Quartz Hill -Lancaster- Palmdale STUDY AREA PROFILE
Unincorporated Quartz Hill -Lancaster- Palmdale STUDY AREA PROFILE STUDY AREA ID #19 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST
More information4.0 FACILITIES INVENTORY
4.0 FACILITIES INVENTORY 4.1 PARK LEVEL OF SERVICE STANDARDS (LOS) Based on current City of Longview Parks and Recreation Level of Service (LOS) Standards (Figure G), the City currently has a deficiency
More informationAppendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan
Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and
More informationCorktown Parks. Public Meeting. City of Toronto
Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)
More informationDEPARTMENT OF PARKS & RECREATION
DEPARTMENT OF PARKS & RECREATION 2016 Budget Presentation 1 RONALD ZUBER, DIRECTOR March 7, 2016 2015 ACCOMPLISHMENTS OFFICE OF DIRECTOR Hosted the National Junior Disability Championships from July 16
More informationNational Recreation Trail Update Form
National Recreation Trail Update Form Introduction Thank you for taking the time to complete this form. Your assistance will help ensure that the National Recreation Trail (NRT) database is complete and
More informationCity of Walnut STUDY AREA PROFILE
City of Walnut STUDY AREA PROFILE STUDY AREA ID #133 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT REPORTING FORM
More informationNORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK
NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK LUCY LANEY COMMUNITY SCHOOL N 33RD AVE N 33RD AVE SINGLE-FAMILY RESIDENTIAL MULTI-USE DIAMOND
More informationHOMER GLEN AREA COMMUNITY PARKS
HOMER GLEN AREA COMMUNITY PARKS VILLAGE OF HOMER GLEN PARK PROPERTIES Owned and Maintained by the Village of Homer Glen Heritage Park 14110 W. 151 st Street This 103 acre park, located adjacent to Village
More informationAssessing Your Trails, Keeping Them Safe and Enjoyable
Jon Wood, PLA, ASLA Associate Vice President Stewart Bert Lynn, PLA, ASLA, LEED AP Project Manager Mecklenburg County Asset and Facility Management Assessing Your Trails, Keeping Them Safe and Enjoyable
More informationOR MISSION TRAIL ELEMENTARY
Leawood: overview OVERLAD PARK 24: p.70 I-LA PARK 32: p.72 TOMAHAWK PARK 23: p.69 31: p.71 GEZER PARK OR MISSIO TRAIL ELEMETARY 22: p.68 W 133rd St W 135th St KASAS CITY MO - other segments Beginning/end
More informationOutdoor Developed Areas
The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines
More informationWhat s covered. What s not covered. Options for those not covered. ABA Coverage
The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines
More information2014 SPLOST Final Draft County-wide Parks System Rehabilitation
Page 1 of 5 ADA Improvements (County Wide) Accessibility projects related to trails/walkways, door entrances, pool access, curb cuts, ramps, etc. Additionally, ADA Audit of facilities to identify and prioritize
More informationThe Baker/Carver Regional Trail is intended to
Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.
More informationNational Recreation Trail Application for Designation
National Recreation Trail Application for Designation Introduction Thank you for your interest in the National Recreation Trail (NRT) program. Completed NRT application packages must be submitted by December
More informationAppendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming
Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table of Contents Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table
More informationCorabelle Park. Inventory. Future Development
Corabelle Park Size: Approximately 4 acres Site Description: Corabelle Park is a relatively new park within the Murray County Park System. It is located on the south side of Corabelle Lake just off gravel
More informationTrail Etiquette. Hours of Operation. Trail Accessibility
Trail Guide The Elmhurst Park District, with 28 parks and over 460 acres of land, offers nearly six miles of paved or asphalt park trails and maintains an additional 3.6 miles of trails within Elmhurst.
More informationTrail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding
I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes
More informationChapter eight. Parks and Recreation. Introduction. Crystal Lake Park District
Chapter eight Parks and Recreation Introduction One of the indicators of quality of life in a city is the parks and recreation system. The City of Crystal Lake is fortunate to have an excellent parks and
More informationSouthwest Quadrant Distinctive Features
SOUTHWEST QUADRANT Southwest Quadrant Distinctive Features LAND USE The 31.17 square mile Southwest Quadrant includes all the area within the planning area west of I-5 and south of the Sacramento River.
More informationBID FORM. Bid by: Name of Bidder. Address: Address: To the Texas Department of Transportation hereinafter called the Agent.
BID FORM TxDOT CSJ No. Project Description: This project includes reconstruction of a hangar access taxiway with trench drain and pipe drainage system; local reconstruction of failing pavement on Taxiway
More informationAKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"
6 2 24"X36" SHEET: "=6' 23 4 2 2 8 2 5 6 6 2 28 8 26 2 2 8 22 9 Yellowstone Drive Texas Firm Registration Taylor, Texas 654 No. F36 (52) 5-4328 6 25 2 Portland, TX 834 23 8 9 illy G. Webb Drive Portland,
More informationB10. Agate Beach State Recreation Site
B10. Agate Beach State Recreation Site Location Within the City of Newport, just south of the Yaquina Head Outstanding Natural Area. The park is located along the west side of Highway 101 at the mouth
More informationRIDGEFIELD PARKS February 2016
RIDGEFIELD PARKS February 2016 Hayden Park Neighborhood Park Amenities Sign with Name of Park and City of Ridgefield Logo Lamp Post Parking Area Play Set Swings Sign with Playground Rules Durable Benches
More informationADDENDUM NO. TWO AB
ADDENDUM NO. TWO AB2018-28 Notice is hereby given that on June 22, 2018 at 11:00 A.M. (Prevailing time), sealed bids will be opened and read in public by the Purchasing Department in the Mercer County
More informationVillages at Buffalo Run East
Villages at Buffalo Run East Neighborhood Park Subhead to title page goes here. Public Design Meeting April 9, 2015 Capital Improvement Program Commerce City s $137 million CIP is the result of a 2013
More informationSECTION 4. PUBLIC RECREATION
SECTION 4. PUBLIC RECREATION Brooker Creek Preserve is the largest remaining tract of wild land in Pinellas County and contains many species not found anywhere else in the County. As such, these wild lands
More informationAuburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
More informationCamping (Primitive) Camping (RV) Electrical Potable Water Grill Established Fire Pit Picnic Table
Alden - 9th Road River Mile 777 Map: 38.20833, -98.32031 Managing Agency: Kansas Department of Wildlife, Parks & Tourism Nearest Community: Alden, Rice County Kansas Developed Amenities Provided Parking
More informationLANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road
HAMILTON ANDERSON JANUARY 2012 LANDING S PARK CONCEPTUAL PLAN January 2012 Page 1 of 15 January 2012 PROJECT GOALS Activate the park by introducing new elements Provide clear access to the water and enhance
More informationUnincorporated East Rancho Dominguez STUDY AREA PROFILE
Unincorporated East Rancho Dominguez STUDY AREA PROFILE STUDY AREA ID #31 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES
More informationCity of Glendale - Southside STUDY AREA PROFILE
City of Glendale - Southside STUDY AREA PROFILE STUDY AREA ID #168 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT
More informationCommunity Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm
Community Input Meeting Fairgrounds Master Planning Update January 7, 2016, 7 pm Fiesta Hall Santa Clara County Fairgrounds 355 Tully Road, San Jose, CA Tonight s Agenda 1) Board of Supervisors Direction
More informationMONTGOMERY TOWNSHIP OPEN SPACE & PATHWAYS COMMITTEE
MONTGOMERY TOWNSHIP OPEN SPACE & PATHWAYS COMMITTEE Meetings: 2 nd Wednesday of each month @ 6:30 PM in the Municipal Building Questions? Call the Open Space Coordinator, Lauren Wasilauski, at (908) 359-8211
More informationWest Orange Trail. Clean, Green, Fun!
West Orange Trail Clean, Green, Fun! The West Orange Trail - when completed - will be a 36-mile, multipurpose recreational greenway containing a 14-foot wide paved surface to be enjoyed by walkers, joggers,
More information203.0100 Removing Small Pipe Culverts CATEGORY STATION LOCATION EACH 0010 2+00-16+50 0010 7+13-8+41 LT. 155 3 0010 4+42 CL 1 10,660 9+90-13+73 RT. 390 3 7+63'SB' 67' LT. 1 14+25'GV' 49' LT. 1 17+05'GV'
More informationHeader i
Header i 048285014.10 Header Sub Title Body Text here. Body text here. Body text here. Section 1... 1 Executive Summary... 1 Opportunities and Constraints... 3 Overall Opportunities and Constraints Map
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationPark Design and Location Criteria
Park Design and Location Criteria This section is presented in the interest of assisting park and recreation agencies in the development of a system of parks and recreation areas. A recreation system is
More informationANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY
ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY PASCO COUNTY MPO JULY 2015 PROJECT OVERVIEW... INTRODUCTION EXECUTIVE SUMMARY CONTEXT... TAMPA BAY AREA, PINELLAS, & PASCO COUNTY S MULTI-USE TRAIL PLANS
More informationEakin Community Park. Getting There
Eakin Community Park Quiet woods along the Accotink Creek are the hallmark of Eakin Community Park. Actually a string of smaller parks, Eakin is made-up of Mantua Park, Kern Drive Park, Eakin Park, Woodburn
More informationReserve Reports Providence Master Homeowners Association
Reserve Reports Providence Master Homeowners Association Reserve Reports Providence Master Homeowners Association RESERVE SUMMARY REPORTS Providence Master Homeowners Association component inventory and
More informationSection XIII. Cost Estimates
Section XIII Cost Estimates 13-01. INTRODUCTION SECTION XIII COST ESTIMATES a. General. Preliminary cost estimates for development of proposed new and renovation or replacement actions at Lake Shelbyville
More informationCity of LA Valley Glen - North Sherman Oaks STUDY AREA PROFILE
City of LA Valley Glen - North Sherman Oaks STUDY AREA PROFILE STUDY AREA ID #61 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES
More informationUnincorporated Charter Oak Islands - Covina - Covina Islands STUDY AREA PROFILE
Unincorporated Charter Oak Islands - Covina - Covina Islands STUDY AREA PROFILE STUDY AREA ID #11 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK
More informationLincoln Woodstock. Riverfront Park and Trail System. Project Description
Lincoln Woodstock Riverfront Park and Trail System Project Description Rev: 6 Dated: May 16, 2008 Table of Contents I. Executive Summary Page 3 II. The Riverfront Park Page 4 III. The Trail System Page
More informationTHOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics
THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction As an open meadow park positioned along the Mahoning River,
More informationUnincorporated Northeast Antelope Valley STUDY AREA PROFILE
Unincorporated Northeast Antelope Valley STUDY AREA PROFILE STUDY AREA ID #17 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES
More informationEast Carolina Council Facility Study East Carolina Scout Reservation Camp Boddie Pamlico Sea Base
East Carolina Council Facility Study East Carolina Scout Reservation Camp Boddie Pamlico Sea Base 1 VISION OF CAMP BODDIE EAST CAROLINA SCOUT RESERVATION 1. Attract Out Of Council Troops Use our natural
More information3. COLTA / HUGA CONNECTIONS - PRELIMINARY
9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The
More informationHudson Highlands Fjord Trail Draft Master Plan. April 29, 2015
Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation
More informationLake Apopka Trail Loop Design Guidelines
November 2002 Prepared for 14908 Tilden Road Winter Garden, FL 34787 Prepared by 140 North Orlando Avenue Suite 295 Winter Park, FL 32789 November, 2002 I. INTRODUCTION...1 II. DESIGN GUIDELINES FOR TRAILS...3
More informationRailroad Safety Trail
2.1 INTRODUCTION AND PROJECT SETTING 2.1 Introduction & Project Setting Introduction This study is the result of a directed effort on the part of the City of San Luis Obispo to carry out previously established
More informationNortheast Quadrant Distinctive Features
NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.
More informationRiver Parks Trail: Tulsa, Oklahoma
River Parks Trail: Tulsa, Oklahoma Purpose: The purpose of the River Parks Trail is to maintain, preserve, develop, and promote the Arkansas River for the economic and cultural benefit of the community.
More informationBusiness Item No
Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018
More informationMORGAN CREEK GREENWAY Final Report APPENDICES
APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan
More informationTown of Queen Creek Park and Facility Rentals Click on each park or facility for additional information
Town of Queen Creek Park and Facility Rentals Click on each park or facility for additional information Queen Creek Library Ocotillo Road Hawes Road Desert Mountain Park Ellsworth Loop Road Ellsworth Road
More informationCAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group
CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group CAPITAL PROJECT LIST Based on extensive public outreach in 2008 and 2013-2014, the 2014 Parks, Recreation, and Open Space (PROS) Plan
More informationCHAPTER 5. Chapter 5 Recreation Element
CHAPTER 5 Recreation Element Chapter 5 Recreation Element The Recreation Element of the Meyers Area Plan is a supplement to the Recreation Element of the TRPA Regional Plan and the El Dorado County General
More information4. Improvement Plan Elements
4. Improvement Plan Elements Detailed description of all elements Leigh Creekside Park Improvement Plan Preliminary Conceptual Time Zone Layout Caveat: in the following plans and descriptions, specific
More informationTJ Park and Community Center ::: General Information
TJ Park and Community Center ::: General Information Located within the Arlington Heights Civic Association at 3501 South 2nd Street, Arlington, VA 22204, County Board-owned TJ Park offers various outdoor
More informationGardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY
Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly
More informationSIGNATURE ELEMENTS BICYCLE RACKS & FENCING NSSD HWY. 61 CAIRN & TRAIL SIGNS INTERPRETIVE KIOSK
SIGNATURE ELEMENTS BICYCLE RACKS & FENCING NSSD HWY. 61 CAIRN & TRAIL SIGNS INTERPRETIVE KIOSK 77 SIGNATURE ELEMENTS BICYCLE RACKS & FENCING: A kiosk, signs, fencing, and bike racks were designed as a
More informationWebber Park Master Plan Charrette Summary
SMALL GROUP #1 - September 29, 2011 Webber Park Master Plan Charrette Summary More trash cans, especially near picnic grounds A year round pool is very needed-physical & mental health are significantly
More information10.3 TRAIL DESIGN STANDARDS
10.3 TRAIL DESIGN STANDARDS BICYCLE AND PEDESTRIAN MASTER PLAN Introduction This chapter provides guidelines to both public and private entities for the future development of various types of trails. The
More informationDRAFT. Dorabelle Campground Rehabilitation
DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section
More informationMETROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)
METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior
More information01. PRIMARY MONUMENT WAYFINDING, TYP. 03. RULES/REGULATIONS, INTERPRETIVE SIGN, TYP. PARK MAP, WAYFINDING
Skateboard Park Picnic Area Reading Nest Story Tree and Fire Pit 5 River Access 6 Wetlands 7 Picnic Area YOU ARE HERE This park is open sunrise to sunset. 6 5 7 PARK ICON GREY CONCRETE SKATEABLE CAP WITH
More informationTHE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions
City of Buda Accepting Applications For Boards and Commissions The deadline is approaching to submit applications for the City of Buda's various boards and commissions. Deadline to submit a completed application
More information