Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Size: px
Start display at page:

Download "Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods"

Transcription

1 I. General Plan 1. Project Information Country: Tanzania Project Name: Second Water Sector Support Project (WSSP II) Project ID: P Project Agency: Ministry of Water and Irrigation Dar es Salaam Water Supply and Sewerage Authority Dar es Salaam Water Supply ans Sewerage Corporation 3. Date of the Plan: April Period Covered by this Plan: First 18 Months II. Thresholds for Review, Approaches and Methods A. Goods, Works and Non-Consulting Services Category Approaches and Methods (US$ millions) Review (US$ millions) Open International Open National Request for Quotation (RfQ) Works < Goods, IT, and nonconsulting services B. Consulting Services 2 5 < Category Review Short List of National s (US$ million) (US$ millions) Consulting Services Engineering and Construction Supervision s (Firms) Individual s 0.3 NA. NA. [Overall Project Risk is SUBSTANTIAL] Notes: Terms of Reference: Terms of Reference for all contracts shall be cleared by the Bank, regardless of whether the assignment is for prior or post review. Advertisement: Consultancy Service for Contracts estimated to cost US$ 300,000 equivalent and above per contract shall be advertised in UNDB online in addition to advertising in National News Paper(s) of wide circulation and/or Regional News Paper(s). 1

2 Page 1 PROCUREMENT PLAN Tanzania : Second Tanzania Water Sector Support Project General Information Country: Tanzania Banks Approval Date of the Original Plan: Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P GPN Date: Project Name: Second Tanzania Water Sector Support Project Loan / Credit No:,, IDA / V0310 Executing Agency(ies): Dar Es Salaam Water Supply and Sewarage Authority, Ministry of Water and Irrigation, Dar es Salaam Water and Sewerage Corporation WORKS TZ-DAWASA-6497-CW-RFB / Construction of Mbezi Beach Waste Water Treatment Plant, Pumping Station, and SEWERAGE Network and their Operation (DBO) Component 3: Dar es Salaam Sanitation Improvement Request for Bids Open - International TZ-MOW CW-RFB / Drilling Works for Ground Water Monitoring Network in Wami- Ruvu and Internal Drainage Basins Resources Management (IWRM) TZ-MOW CW-RFB / Construction of office and water laboratory buildings for Wami- Ruvu Basin Water Board (BWB) Headquarter at Morogoro and Water Users Association (WUA) Offices at Msowero and rehabilitation and extension of office building for Wami-Ruvu BWB in Dodoma. Resources Management (IWRM) TZ-MOW CW-RFB / Civil Works Construction and Installation of Water Resources Monitoring Gauges in all the nine Basins in Tanzania Resources Management (IWRM) TZ-MOW CW-RFB / Construction of Office Block for the Proposed Water Resources Centre of Excellency (COE) in Dar es Salaam Resources Management (IWRM) TZ-DAWASCO CW-RFB / Construction of Public toilets in selected areas TZ-DAWASCO CW-RFB / Construction of Decentralized Fecal Sludge Management (FSM) treatment (about 50 units@usd120,000 per unit starting with 10 units first phase) TZ-DAWASCO CW-RFB / Construction of transfer stations (about 30 units@usd40,000 per unit) first phase TZ-DAWASCO CW-RFB / Construction of off-grid water supply small piped schemes to serve about 100,000 USD 50 per capita (several packages-first phase) TZ-DAWASCO CW-RFB / Construction of Condominium sewerage (about 250 houses/scheme TZ-DAWASA-6487-CW-RFB / Construction of water Supply Distribution Networks Part 1 from University Reservoir to Bagamoyo Request for Bids Open - International 0.00 Canceled TZ-DAWASCO CW-RFB / Construction of water supply distribution network Part 1. (from University reservoir to Bagamoyo) Request for Bids Open - International 0.00 Canceled TZ-DAWASCO CW-RFB / Construction of Water Supply Distribution Network Part I, from University Reservoir to Bagamoyo Town Request for Bids Open - International 0.00 Under Review TZ-DAWASCO CW-RFB / of Performance Based Contracts to reduce NRW in selected DMAs (multiple) Request for Bids Open - International GOODS

3 Page 2 TZ-MOW GO-RFB / Supply of Water Users Associations Survival Working Kits Resources Management (IWRM) TZ-MOW GO-RFB / Supply of eighteen four-wheel Drive Vehicles for the Basin Water Boards and MoWI's Division of WR. Resources Management (IWRM) TZ-MOW GO-RFB / Supply of Motorbikes and Bicycles (100 of each) to support 100 WUAs Resources Management (IWRM) TZ-MOW GO-RFB / Supply of office data management tools and equipment including ICT equipment Resources Management (IWRM) TZ-MOW GO-RFB / Supply of Communication Strategy Materials Resources Management (IWRM) TZ-MOW GO-RFP / Supply of water quality monitoring equipment and tools Resources Management (IWRM) TZ-MOW GO-RFB / Supply of surface and groundwater monitoring network gauges monitoring instruments for large dams and sediment monitoring equipment Request for Bids Open - National TZ-DAWASCO GO-RFB / Supply of Domestic Water Meters for Utility Modernization and Expansion of Water Supply Distribution System (Packages 2B & 2F) Request for Bids Open - National 0.00 Under TZ-DAWASCO GO-RFB / Supply of domestic water meters Request for Bids Open - National 0.00 Canceled TZ-DAWASCO GO-RFB / Supply and installation of SCADA System, i.e. Bulk meters, pressure meters, central station meters, telemetry for network management and clampon and acoustic equipment for leak detection TZ-DAWASCO GO-RFB / Renewal of pipeline (pipes for network rehabilitation) 0.00 Canceled TZ-DAWASCO GO-RFB / Supply of PVC Pipes and Fittings for Network Rehabilitation TZ-DAWASCO GO-RFB / Supply of Billing equipment (this is specific to hand held meter reading/billing tools) 0.00 Canceled TZ-DAWASCO GO-RFB / Supply of Data Loggers NON CONSULTING SERVICES CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract TZ-DAWASA-6490-CS-QCBS / for review of design and construction supervision of Mbezi Beach waste water treatment plant, pumping station and sewerage network Review TZ-DAWASA-6494-CS-CQS / Preparation of ESIA and RAP for the Mbezi Beach Waste Water Treatment Plant Component 3: Dar es Salaam Sanitation Improvement Post Open - National 0.00 Under TZ-MOW CS-QCBS / Modernizing Hydrological and Meteorological Monitoring Systems

4 Page 3 TZ-MOW CS-QCBS / Operational Decision Support System through Enhanced Hydro- Meteorological Services TZ-MOW CS-CQS / Technical Assistance for strengthening Ground water Resources Development and Management in Tanzania Open - National TZ-MOW CS-CQS / Technical Assistance on Supporting of IWRMD at National and Basin Levels Open - National TZ-MOW CS-CQS / Technical Assistance on Preparation of Water Resources Use Charges Regulations Open - National TZ-MOW CS-CQS / Consultancy for Development and of Laboratory Information Management System Open - National 0.00 Under TZ-MOW CS-CQS / Consultancy for Conceptualization and strategic planning for COE Open - National TZ-MOW CS-QCBS / Consultancy services for National Hydrological Aquifer Mapping TZ-MOW CS-QCBS / Operational Decision Support System Through Enhanced Hydro- Meteorological Services Open - International TZ-MOW CS-QCBS / Modernizing Hydrological and Monitoring Systems Open - International TZ-MOW CS-CQS / the study of institutional set up for water Resources Centre of Excellence Open - National TZ-MOW CS-CQS / Design and Supervision for Centre of Excellence Building Open - National TZ-MOW CS-QCBS / design review and supervision of construction of office and laboratory buildings for Wami- Ruvu Basin Water Boards Headquarter Morogoro and Water Users Associations Offices at Msowero and rehabilitation and extension at Dodoma Open - International TZ-MOW CS-QCBS / Catchment Conservation in Wami- Ruvu Basin Open - International TZ-MOW CS-QCBS / Institutional development support technical assistance COE Open - International TZ-MOW CS-CQS / preparation of future investments Open - International TZ-DAWASA-6480-CS-QCBS / Construction Supervision of Distribution Networks Part 1- from University Reservoir to Bagamoyo Open - International 0.00 Canceled TZ-DAWASCO CS-QCBS / NRW consultancy: asset management, hydraulic model, DMA installation for NRW management, NRW management Material Handbook, customer metering and billing (multiple) Open - International TZ-DAWASCO CS-QCBS / Provision of Consultancy Services for Preparation of Detailed Engineering Design, Bidding Documents and Construction Supervision of the Off-Grid Sanitation Works in Dar es Salaam Open - International

5 Page 4 TZ-DAWASCO CS-QCBS / Provision of Consultancy Services for Preparation of Detailed Engineering Design, Bidding Documents and Construction Supervision of the Off-Grid Water Supply Works in Dar es Salaam Post Open - National TZ-DAWASCO CS-QCBS / Consultancy for Construction supervision of distribution networks Part 1 - From University Reservoir to Bagamoyo. Open - International 0.00 Canceled TZ-DAWASCO CS-QCBS / Supervision of Construction of Water Supply Distribution Network Part 1, from University Reservoir to Bagamoyo Town Open - International INDIVIDUAL CONSULTANTS

Procurement Plan. 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] N/A

Procurement Plan. 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] N/A I. General Plan 1. Bank s approval Date of the procurement Plan [Original: February 11, 2010]: Revision of Updated Plan, February 2017 2. Date of General Notice: 3. Period covered by this procurement plan:

More information

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement Plan I. General 1. Bank s approval Date of the procurement Plan June 1, 2017 2. Date of General Notice: April 18, 2012 3. Period covered by this procurement plan: The procurement period of project covered

More information

INFRASTRUCTURE DEVELOPMENT IN TANZANIA

INFRASTRUCTURE DEVELOPMENT IN TANZANIA INFRASTRUCTURE DEVELOPMENT IN TANZANIA PROF JOSEPH MSAMBICHAKA MBEYA UNIVERSITY OF SCIENCE AND TECHNOLOGY 50 TH YEARS ERB ANNIVERSARY 5 TH TO 7 TH SEPTEMBER 2018 PRESENTATION LAYOUT 1. DEFINITION OF INFRASTRUCTURE

More information

Key Projects Carmichael Rail Line (CRL)

Key Projects Carmichael Rail Line (CRL) 01 Aarvee Associates Pty Ltd is a multi-disciplinary engineering design consultancy company established in 2011 and based at Brisbane, Australia. We are an ISO 9001, ISO 14001 and ASNZS 4801 certified

More information

Procurement Plan National PPFD

Procurement Plan National PPFD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan National PPFD I. General 1. Project information: Republic of Mozambique,

More information

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612) Operation Name: NATIONAL WATER SUPPLY & SANITATION

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Page 1 PROCUREMENT PLAN Turkey : Education for Resilience (EU Facility for SuTP) General Information Country: Turkey Banks Approval Date of the Original Plan: 2017-06-19 Revised Plan Date(s): (comma delineated,

More information

Large Scale Irrigation Modernization Project Procurement Plan

Large Scale Irrigation Modernization Project Procurement Plan I. General Large Scale Irrigation Modernization Project Plan 1. Bank s approval Date of the procurement Plan [Original: 5 may 2015]: Revision 2 of Updated Plan, March 28, 2017 2. Date of General Notice:

More information

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT PLAN (Textual Part) Project information: Republic of Congo- Integrated Public

More information

PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win Experience

PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win Experience ASIAWATER CONFERENCE 2012 KUALA LUMPUR CONVENTION CENTRE MALAYSIA 27 th 29 th March 2012 PERBADANAN BEKALAN AIR PULAU PINANG (PBAPP) : Twinning Partnership with PDAM Tirta Musi, Kota Palembang A Win Win

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

(Updated version, November 12, 2010)

(Updated version, November 12, 2010) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Procurement Plan I. General (Updated version, November 12, 2010) 1. Project information:

More information

Korea Eco-Label Program and Green Supply Chain Related Activities

Korea Eco-Label Program and Green Supply Chain Related Activities 2015/SOM2/CTI/DIA1/007 Korea Eco-Label Program and Green Supply Chain Related Activities Submitted by: Japan Dialogue on APEC Cooperation Network on Green Supply Chain Boracay, Philippines 11 May 2015

More information

Catchment and Lake Research

Catchment and Lake Research LARS 2007 Catchment and Lake Research Multilateral versus bilateral agreements for the establishment of river based organizations: comparison of legal, economic and social benefits in the Zambian experience.

More information

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198) Operation Name: Norte Grande Road Infrastructure

More information

Rangitīkei District Council

Rangitīkei District Council Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict

More information

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484) Operation Name: AR Basic Municipal Services

More information

Code Denomination Type. 1.A KB/RRP/C/1/A High visibility vests for schools G. 1.B KB/RRP/C/1/B High visibility vests for Police Service G

Code Denomination Type. 1.A KB/RRP/C/1/A High visibility vests for schools G. 1.B KB/RRP/C/1/B High visibility vests for Police Service G Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 2 3 4 Activity No. Code Denomination Type 1 KB/RRP/G/1 Equipment for Road Safety Action

More information

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760) Operation Name: PE Sierra Irrigation Subsector (P104760)

More information

UNOPS IN THE CARIBBEAN

UNOPS IN THE CARIBBEAN UNOPS IN THE CARIBBEAN ENGLISH & DUTCH SPEAKING COUNTRIES / IWRM AIO SIDS UNOPS The United Nations Office for Project Services (UNOPS) is an operational arm of the United Nations, supporting the successful

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015

THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015 THE DANUBE WATER PROGRAM PHILIP WELLER, IAWD DANUBE STRATEGY PA 4,, 2015 STRUCTURE IAWD Representing the interests of all drinking water supply companies in the Danube catchment area for over 20 years

More information

Current Status of Airport PPP Projects

Current Status of Airport PPP Projects Current Status of Airport PPP Projects Presented by Aerodrome Standards & Safety Division DEPARTMENT OF CIVIL AVIATION MINISTRY OF TRANSPORT 1 Contents 1 Backgroud 2 Condition and Requirements of Project

More information

SPECIAL SESSIONS MONDAY

SPECIAL SESSIONS MONDAY SPECIAL SESSIONS MONDAY 9:30 12:20 Opening Ceremony Gran Cancun Room/ 12:40 14:10 HLP: Water and the SDGs Gran Cancun Room/ 14:10-15:30 LUNCH Lounge Zone Regular Session 1 Cozumel 1 SS-39(A): Sustainability

More information

Tanzania s Transport Hub: What Prospects for Regional Integration and Investment? 22 NOVEMBER 2016, JOHANNESBURG, CHELSEA MARKOWITZ

Tanzania s Transport Hub: What Prospects for Regional Integration and Investment? 22 NOVEMBER 2016, JOHANNESBURG, CHELSEA MARKOWITZ Tanzania s Transport Hub: What Prospects for Regional Integration and Investment? 22 NOVEMBER 2016, JOHANNESBURG, CHELSEA MARKOWITZ OUTLINE 1. Current Condition of Transport Infrastructure in Tanzania

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: Hazrat Shahjalal International Airport Expansion Project (I) Loan Agreement: June

More information

3rd International Forum on sustainable Tourism 20th to 22nd October 2008 Bamako - Mali

3rd International Forum on sustainable Tourism 20th to 22nd October 2008 Bamako - Mali TANZANIA S POLICY ON TOURISM DEVELOPMENT 3rd International Forum on sustainable Tourism 20th to 22nd October 2008 Bamako - Mali Ministry of Natural Resources and Tourism - Tanzania 1 Tanzania basic facts

More information

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Sierra Irrigation Subsector (P104760) Operation Name: Sierra Irrigation Subsector (P104760)

More information

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation

PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation PUERTO RICO: PATHWAY TO THE FUTURE Opportunities of an Economic Transformation Rebuilding Puerto Rico Mr. Omar J. Marrero, Esq. Executive Director Puerto Rico Public-Private Partnerships Authority & Central

More information

WATER MANAGEMENT IN ROMANIA. Elisabeta CSERWID National Institute of Hydrology and Water Management ROMANIA

WATER MANAGEMENT IN ROMANIA. Elisabeta CSERWID National Institute of Hydrology and Water Management ROMANIA WATER MANAGEMENT IN ROMANIA Elisabeta CSERWID National Institute of Hydrology and Water Management ROMANIA 2 I - Water management in Romania Romania general information Location: S-E Europe Surface: 238,391

More information

PCN Annex: GEF Data Sheet

PCN Annex: GEF Data Sheet PCN Annex: GEF Data Sheet PROJECT IDENTIFICATION Project Title: West Balkans Drina River Basin Management Country(ies): Bosnia-Herzegovina, Serbia, GEF Project ID: 7 Montenegro GEF (ies): World Bank GEF

More information

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA

PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA PRINCIPLES FOR DETERMINING THE COSTS OF AERONAUTICAL METEOROLOGICAL SERVICE FOR EN-ROUTE AND TERMINAL AIR NAVIGATION, UNITED REPUBLIC OF TANZANIA 1. Background Information Tanzania Meteorological Agency

More information

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 16 ARCHIVED on 30-Oct-2015 ISR21080 Implementing Agencies: Public Disclosure Authorized

More information

The United Republic of Tanzania Ministry of Natural Resources and Tourism TOURISM DIVISION The 2013 Tourism Statistical Bulletin

The United Republic of Tanzania Ministry of Natural Resources and Tourism TOURISM DIVISION The 2013 Tourism Statistical Bulletin The United Republic of Tanzania Ministry of Natural Resources and Tourism TOURISM DIVISION The 2013 Tourism Statistical Bulletin INTRODUCTION THE COUNTRY Tanzania covers 945,234 sq. km made up 942,832

More information

Tenders. Manitoba Infrastructure

Tenders. Manitoba Infrastructure Tenders Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Email: jocelyn@mhca.mb.ca Manitoba Infrastructure Reference

More information

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9

Ref: New Tariff for the Water and sewerage Company Inc. (WASCO) Page 1 of 9 + The National Water and Sewerage Commission(NWSC) through the power vested by the Water and Sewerage Act of 2005, as amended in 2008 section 37 ( C ), hereby makes the final determination for the new

More information

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840 Country: Africa Project ID: P100785 Project Name: West

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS

THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA CIVIL AVIATION AUTHORITY VACANT POSITIONS The Tanzania Civil Aviation Authority, (TCAA) was established by the enactment

More information

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA TRANSPOSITION AND IMPLEMENTATION OF THE UWWTD IN SERBIA CURRENT STATUS AND MAIN

More information

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To: KNOWLEDGE PARTNER PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders February 18 th, 2016 Presented To: Shri Ashok Gajapathi Raju Pusapati Hon ble Minister of Civil Aviation Indian aviation

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public

More information

Order of the Minister of Environment #39, August 22, 2011 Tbilisi

Order of the Minister of Environment #39, August 22, 2011 Tbilisi Registration Code 360050000.22.023.016080 Order of the Minister of Environment #39, August 22, 2011 Tbilisi On preparatory stages and procedure of the methodology for Elaborating structure, content and

More information

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS

13.1 REGIONAL TOURISM ISSUES AND SUMMARY OF FINDINGS 13 REGIONAL TOURISM T he County of Mariposa s recreation needs and facilities fall within two categories: regional tourism and local recreation. This Element focuses on regional tourism issues related

More information

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES

ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES HYDRO ASSET MANAGEMENT AND AUTOMATION: ANDRITZ DIGITAL SOLUTIONS AND CASE STUDIES DIEGO ALIPRANDI SALTO GRANDE HPP AUGUST 27 TH 2018 COMPREHENSIVE EXPERTISE OF ANDRITZ HYDRO We are a global supplier of

More information

Embassy of the United Republic of Tanzania

Embassy of the United Republic of Tanzania Statement on Sino-Tanzania Relations Embassy of the United Republic of Tanzania Beijing, China H.E. Benjamin W. Mkapa, former President of the United Republic of Tanzania described the relations between

More information

PPP Days 2010 PPPs Lessons from the Last 18 Months

PPP Days 2010 PPPs Lessons from the Last 18 Months PPP Days 2010 PPPs Lessons from the Last 18 Months Rajiv B Lall March 22, 2010 1 Private Sector Participation (PSP) in India Works & Services Contracts Management Contracts Operation Concessions Build

More information

Southern African Power Pool Report to SADC

Southern African Power Pool Report to SADC Southern African Power Pool Report to SADC By The SAPP Executive Committee arare, ZIMBABWE 23-25 APRIL 2007 1 CONTENTS 1. Status of the SAPP 2. Market Price Determination 3. SAPP Tariff Study 4. Diminishing

More information

Hungarian Public Road Nonprofit PLC

Hungarian Public Road Nonprofit PLC Hungarian Public Road Nonprofit PLC 2 Magyar Közút Nonprofit Zrt. The Hungarian Public Road Nonprofit PLC is responsible for the operation and maintenance of more than 31 000 km of national roads. www.kozut.hu

More information

Standard Summary Project Fiche centralised programmes Project Fiche: 5

Standard Summary Project Fiche centralised programmes Project Fiche: 5 Standard Summary Project Fiche centralised programmes Project Fiche: 5 1. Basic information 1.1 CRIS Number:2011/023-173 1.2 Title: Waste water treatment systems in Cetinje and Bijelo Polje 1.3 ELARG Statistical

More information

Successful Experiences in Rio Grande/Rio Bravo Watershed Management

Successful Experiences in Rio Grande/Rio Bravo Watershed Management Successful Experiences in Rio Grande/Rio Bravo Watershed Management 5 th th World Water Forum Istanbul, Turkey March 22-23, 23, 2009 Introduction A watershed with many voices a medley of cultures, customs,

More information

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965) Public Disclosure Authorized AFRICA Mozambique Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 27-Dec-2017 ISR30661 Implementing Agencies:

More information

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD

FROM: Donald J. Polmann, Director of Science and Engineering ( New Water Plan - Quarterly Report - Approve Submittal to SWFWMD TAMPA WATER Supplying Water To The Region DATE: February 1,2008 TO: J err y L. Maxwell, General Manager AGENDA ITEM C18 FROM: Donald J. Polmann, Director of Science and Engineering ( SUBJECT: New Water

More information

OFFICIAL MEDIA & PRESS KIT Updated November 2014

OFFICIAL MEDIA & PRESS KIT Updated November 2014 OFFICIAL MEDIA & PRESS KIT Updated November 2014 This information packet will be useful in learning more about the Palmdale Water District. For further information, please visit our website at http://www.palmdalewater.org/

More information

COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION

COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION INVITATION TO SUBMIT PROPOSAL FOR THE OPERATION OF A FIXED BASE OPERATOR FACILITY AT GENERAL MITCHELL

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

KNOWLEDGE NOTE 1-3. Hydro-meteorological Disasters Associated with Tsunamis and Earthquakes. CLUSTER 1: Structural Measures

KNOWLEDGE NOTE 1-3. Hydro-meteorological Disasters Associated with Tsunamis and Earthquakes. CLUSTER 1: Structural Measures Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized KNOWLEDGE NOTE 1-3 CLUSTER 1: Structural Measures Hydro-meteorological Disasters Associated

More information

NRW situa*on of the urban Water U*li*es in Egypt

NRW situa*on of the urban Water U*li*es in Egypt Holding Company for Water and Wastewater NRW situa*on of the urban Water U*li*es in Egypt Eng. Mamdouh Raslan Deputy Chairman Marseille 22 January 2013 Water Resources Most of the popula-on is concentrated

More information

Manila, November Consultative Group Meeting. Slum Upgrading. Farouk Tebbal, Andrea Merrick

Manila, November Consultative Group Meeting. Slum Upgrading. Farouk Tebbal, Andrea Merrick Consultative Group Meeting Manila, 8-98 9 November 2007 Slum Upgrading Farouk Tebbal, Andrea Merrick Slum Upgrading on the Global Agenda Unprecedented national urban upgrading programmes upgrading at scale

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name Rio Bogota Environmental Infrastructure Region LATIN AMERICA AND CARIBBEAN Sector Sewerage (70%); Flood protection

More information

Document No: TCAA/FRM/ANS/AIS-30 Title: AIC Page 1 of 7. The following circular is hereby promulgated for information, guidance and necessary action

Document No: TCAA/FRM/ANS/AIS-30 Title: AIC Page 1 of 7. The following circular is hereby promulgated for information, guidance and necessary action FAX: (255 22) 2844300, 2844302 PHONE: (255 22) 2198100 AFS: HTDQYOYO Email: tcaa@tcaa.go.tz, ais@tcaa.go.tz Website: www.tcaa.go.tz UNITED REPUBLIC OF TANZANIA TANZANIA CIVIL AVIATION AUTHORITY Aeronautical

More information

Contract (Description)

Contract (Description) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized A1 A3 A8 Contract Reference Contract (Description) PART A: Sector Policy, Legal, Regulatory,

More information

SES Water WRMP19 Non-household consumption forecast

SES Water WRMP19 Non-household consumption forecast WRMP19 Non-household consumption forecast AR1156 5 th September 2017 Report title: Report number: WRMP19 Non-household consumption forecast AR1156 Date: 5/09/2017 Client: Author(s): SES Water Dene Marshallsay

More information

Policy PL Date Issued February 10, 2014

Policy PL Date Issued February 10, 2014 Subject RENEWABLE ENERGY ON CROWN LAND Compiled by Renewable Energy Program, Biodiversity Branch Replaces Policy Directives Waterpower Site Release Crown Land Onshore Windpower Development - Crown Land

More information

Compliance Document for New Zealand Building Code for Backcountry Huts

Compliance Document for New Zealand Building Code for Backcountry Huts Compliance Document for New Zealand Building Code for Backcountry Huts Prepared by the Department of Building and Housing Department of Building and Housing 2009 This Compliance Document is protected by

More information

PREFERRED SUPPLIER ARRANGEMENT - BUILDING & OTHER GOOD AND SERVICES SUPPLIES (5 Jan 2018)

PREFERRED SUPPLIER ARRANGEMENT - BUILDING & OTHER GOOD AND SERVICES SUPPLIES (5 Jan 2018) PREFERRED SUPPLIER ARRANGEMENT - BUILDING & OTHER GOOD AND SERVICES SUPPLIES (5 Jan 2018) NORTH QUEENSLAND REGION - NORTHERN DISTRICT, PAVEMENT STRENGTHENING AND REHABILITATION ON THE FLINDERS HIGHWAY

More information

Technical Assistance to support implementation of

Technical Assistance to support implementation of Technical Assistance to support implementation of water & sanitation programme This project is funded by the European Union Project implemented by IGIP GmbH in consortium with NAMA S.A. and EXERGIA S.A.

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

SERENJE NAKONDE ROAD PROJECT PROJECT

SERENJE NAKONDE ROAD PROJECT PROJECT SERENJE NAKONDE ROAD PROJECT PROJECT 2 nd German Africa Infrastructure Forum Munich 3 rd -4 th December 2014 Eng. Amos Phiri Contracts Manager (PPIU COMESA-EAC-SADC TRIPARTITE) Serenje Nakonde Road Project

More information

DIRECTOR S ORDER #41: Wilderness Preservation and Management

DIRECTOR S ORDER #41: Wilderness Preservation and Management These are relevant sections about Wilderness Management Plans from National Park Service 2006 Management Policies, Director s Orders #41 and Reference Manual 41. National Park Service U.S. Department of

More information

AGENDA ITEM _C2 TAMPA WATER. Completion Date

AGENDA ITEM _C2 TAMPA WATER. Completion Date TAMPA WATER Supply'mfl Water To The Region AGENDA ITEM _C2 DATE: February 6, 2007 TO: J err y L. Maxwell, General Manager FROM: Donald J. Polmann, Director of Science and Engineering SUBJECT: New Water

More information

International Ship and Port Facility Security Code (ISPS) Maritime Transportation Security Act (MTSA)

International Ship and Port Facility Security Code (ISPS) Maritime Transportation Security Act (MTSA) Vessel Security International Ship and Port Facility Security Code (ISPS) Maritime Transportation Security Act (MTSA) Who do security regulations apply to? 33CFR101 applies to all vessels and facilities

More information

Technical Assistance to support implementation of

Technical Assistance to support implementation of Technical Assistance to support implementation of water & sanitation programme This project is funded by the European Union Project implemented by IGIP GmbH in consortium with NAMA S.A. and EXERGIA S.A.

More information

WORKSHOP ON COMPILATION OF INTERNATIONAL MERCHANDISE TRADE STATISTICTS ADDIS ABABA, 8-11 NOVEMBER, 2004 COUNTRY REPORT

WORKSHOP ON COMPILATION OF INTERNATIONAL MERCHANDISE TRADE STATISTICTS ADDIS ABABA, 8-11 NOVEMBER, 2004 COUNTRY REPORT WORKSHOP ON COMPILATION OF INTERNATIONAL MERCHANDISE TRADE STATISTICTS ADDIS ABABA, 8-11 NOVEMBER, 2004 COUNTRY REPORT BY: SALEH MZEE SALEH THE CHIEF GOVERNMENT STATISTICIAN (OCGS) ZANZIBAR- TANZANIA NOVEMBER,

More information

BUSINESS OPPORTUNITIES IN TANZANIA

BUSINESS OPPORTUNITIES IN TANZANIA BUSINESS OPPORTUNITIES IN TANZANIA FACT PACK June 2015 Business Sweden in Nairobi TANZANIA BRIEF FACTS BASIC FACTS Population: 49,639,138 (2014) Area: 947,300* sq. km Capital: Dar es Salaam Languages:

More information

THE SAN JUAN RIVER BASIN PROJECT

THE SAN JUAN RIVER BASIN PROJECT Formulation of a Strategic Actions Program for the Integrated Management of the Hydrological Resources and Sustainable Development of the San Juan River Basin and its Coastal zone PROCUENCA SAN JUAN THE

More information

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017 China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;

More information

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of environment, mining and spatial planning Department of project

More information

INFRASTRUCTURE GAP

INFRASTRUCTURE GAP INFRASTRUCTURE GAP 2016-2025 GAP BY SECTORS THROUGH 2025 Other 28% Transportion 36% Strategic pillar: Telecoms 17% Energy 19% Total gap: US$ 159,6 billion Source: AFIN NATIONAL INFRASTRUCTURE PLAN STATE

More information

The Timok River Basin in Serbia

The Timok River Basin in Serbia The Timok River Basin in Serbia UNECE Workshop on Integrated Transboundary Water Resources Management in SEE, Sarajevo, 18-20 May, 2009 Dragana Ninković, Dipl.-Ing. Dušan Dobričić, Dipl.-Ing. Content 1.

More information

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI PPCR/SC.4/5 October 9, 2009 Meeting of the PPCR Sub-Committee Washington, D.C. October 28, 2009 REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI Proposed Sub-Committee Decision The Sub-Committee reviewed

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management The Study on Nationwide Water Resources Development and Management in the Socialist Republic of Vietnam JAPAN INTERNATIONAL COOPERATION AGENCY Figure 8.15 Huong River Irrigation Scheme F-17 SEA SEA Thuan

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

MONTHLY REPORT Issue No. R02-18 February 2018

MONTHLY REPORT Issue No. R02-18 February 2018 Southern African Power Pool Energising the region for economic development 1 MONTHLY REPORT Issue No. R02-18 February CONTENTS Meetings, Workshops and Conferences.. 1 50 th SAPP Management Committee Meetings...

More information

GCRMN Number of sites regularly monitored

GCRMN Number of sites regularly monitored GCRMN Number of sites regularly monitored What is being Monitored Monitoring Partnerships Engagement in international efforts Outputs/reports Recent key findings Notable successes and challenges Presented

More information

Endless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director

Endless investment opportunities in public infrastructure and services Carlos Herrera Investors Servicing Director Endless investment opportunities in public infrastructure and services 2014-2015 Carlos Herrera Investors Servicing Director PROINVERSION The State agency for the private investment promotion. Promotes

More information

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO) EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO

More information

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI WMO RAVI Hydrological Forum 2016 Oslo, 1 Danube, the 2nd longest in Europe. 2857 km Flows across 10 European states River basin - 817 000 km2 1/11

More information

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625) Operation Name: Vilcanota

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake Local Government Project Title Category Approved Projects Regional District of Alberni Clayoquot Asset Management Implementation Project Capacity Building -Asset Management $ 196,000.00 Regional District

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure Public-Private Partnerships (P3) for Social Infrastructure Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure John Gibson March 2010 Presentation Outline The Alberta Infrastructure

More information

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466) Operation Name: CO Integrated Mass Transit

More information

Ministry of Natural Resources and Tourism Tourism Division. The 2009 Tourism Statistical Bulletin

Ministry of Natural Resources and Tourism Tourism Division. The 2009 Tourism Statistical Bulletin Ministry of Natural Resources and Tourism Tourism Division The 2009 Tourism Statistical Bulletin INTRODUCTION THE COUNTRY Tanzania covers 945,234 sq. km made up 942,832 sq. km of mainland Tanzania (formerly

More information

NATIONAL REPORT OF TANZANIA ON SEA LEVEL ACTIVITIES AND OBSERVING NETWORK

NATIONAL REPORT OF TANZANIA ON SEA LEVEL ACTIVITIES AND OBSERVING NETWORK NATIONAL REPORT OF TANZANIA ON SEA LEVEL ACTIVITIES AND OBSERVING NETWORK Mohammed Ngwali Tanzania Meteorological Agency, Zanzibar Office P. O. Box 340, Zanzibar, Tanzania. Tel: +255 24 2231958; Fax: +

More information

SAN FRANCISCO INTERNATIONAL AIRPORT

SAN FRANCISCO INTERNATIONAL AIRPORT 1 SAN FRANCISCO INTERNATIONAL AIRPORT Runway Safety Area Program ACI-NA Operations and Technical Affairs Conference April 7, 2011 RSA Status Completed RSA Studies Environmental Assessment ongoing and on

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information