1964 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District
|
|
- Hannah Malone
- 5 years ago
- Views:
Transcription
1 1964 HISD REPORTS This is a description of the HISD reports compiled annually by HISD. HISD-4 HISD-4T HISD-5 HISD-6 HISD-7 HISD-8 HISD-9 Highway Mileage on State, State Toll, County and Municipal Systems by County and by District Highway Mileage on State Toll Systems by County, and by District State Primary Mileage by Types, by County, and by District State Secondary Mileage by Types, by County, and by District County Highway Mileage by Types, by County, and by District Municipal Highway Mileage by Types, by County, and by District State Highway System Mileage, Annual Vehicle Miles of Travel, and Square Yards of Surfacing
2 FORM SHA-HISD-4 HIGHWAY ON STATE, STATE TOLL, COUNTY, AND MUNICIPAL SYSTEMS (1) STATE (4 + 5) (2) INTERSTATE (3) PRIMARY (4) PRIMARY (2 + 3) (5) SECONDARY (6) COUNTY (7) MUNICIPAL (8) ALL SYSTEMS ( ) , , NO , , NO , , , , , NO , , , , NO , , , , NO , , , NO , , , , CITY GRAND 4, , , , , , MILES OF TOLL ROADS NOT INCLUDED IN ABOVE S. CITY (NOT INCLUDED IN ABOVE S) CITY IS LINEAR MILES AND INCLUDES MILES OF ALLEYS COUNTY URBAN MILES IS INCLUDED IN COUNTY. AS OF JANUARY 1, 1965
3 FORM SHA-HISD-4T HIGHWAY ON STATE TOLL SYSTEMS (1) STATE (4 + 5) (2) INTERSTATE (3) PRIMARY (4) PRIMARY (2 + 3) (5) SECONDARY (6) COUNTY (7) MUNICIPAL (8) ALL SYSTEMS ( ) NO. 2 NO. 3 NO. 4 NO. 5 NO. 6 NO. 7 CITY GRAND AS OF JANUARY 1, 1965
4 FORM SHA-HISD-5 SHA PRIMARY BY SURFACE TYPE A & B C D & E F & G H & I J K & L NO NO NO NO NO NO GRAND 1, , A & B = UNIMPROVED, C = GRADED AND DRAINED, D = SOIL SURFACED, E = GRAVEL OR STONE, F & G = LOW TYPE BITUMINOUS, H & I = HIGH TYPE BITUMINOUS, J = PORTLAND CEMENT CONCRETE, K = BRICK, L = BLOCK AS OF JANUARY 1, 1965
5 FORM SHA-HISD-6 SHA SECONDARY BY SURFACE TYPE A & B C D & E F & G H & I J K & L NO NO NO NO NO NO GRAND 3, , A & B = UNIMPROVED, C = GRADED AND DRAINED, D = SOIL SURFACED, E = GRAVEL OR STONE, F & G = LOW TYPE BITUMINOUS, H & I = HIGH TYPE BITUMINOUS, J = PORTLAND CEMENT CONCRETE, K = BRICK, L = BLOCK AS OF JANUARY 1, 1965
6 FORM SHA-HISD-7 COUNTY BY SURFACE TYPE A & B C D & E F & G H & I J K & L , NO , , NO. 3 1, , , NO. 4 1, , , , NO. 5 1, , NO , NO , GRAND 14, , , , A & B = UNIMPROVED, C = GRADED AND DRAINED, D = SOIL SURFACED, E = GRAVEL OR STONE, F & G = LOW TYPE BITUMINOUS, H & I = HIGH TYPE BITUMINOUS, J = PORTLAND CEMENT CONCRETE, K = BRICK, L = BLOCK COUNTY URBAN INCLUDED IN THE ABOVE AS OF JANUARY 1, 1965
7 FORM SHA-HISD-8 MUNICIPAL BY SURFACE TYPE A & B C D & E F & G H & I J K & L NO NO NO NO NO NO GRAND 1, A & B = UNIMPROVED, C = GRADED AND DRAINED, D = SOIL SURFACED, E = GRAVEL OR STONE, F & G = LOW TYPE BITUMINOUS, H & I = HIGH TYPE BITUMINOUS, J = PORTLAND CEMENT CONCRETE, K = BRICK, L = BLOCK CITY MILES (NOT INCLUDED IN ABOVE ). THE CITY INCLUDES MILES OF ALLEYS. AS OF JANUARY 1, 1965
8 STATE HIGHWAY SYSTEM FORM SHA-HISD-9, ANNUAL VEHICLE MILES OF TRAVEL AND SQUARE YARDS OF SURFACING FOR THE ALLOCATION OF MAINTENANCE FUNDS JULY 1, JUNE 30, 1965 ACTUAL AS OF JANUARY 1, 1965 MAINLINE DIVIDED NON-DIVIDED ANNUAL VEHICLE MILES OF TRAVEL LANE AUX./SPURS SERVICE ROADS * & RAMPS *SQUARE YARDS OF SURFACING ,291, ,156, ,729, ,232, ,410, ,795, ,534,38 2,163, ,771, ,265, NO ,448, ,850, ,641, ,995, ,151, ,087, ,027, ,909, ,089, ,780, ,056, ,862,85 NO ,271,567, ,548,278, ,819,845, ,073, ,932, ,005, NO ,533,147, ,083, ,898,231, ,889, ,612, ,502, NO ,139, ,290, ,724,14 129,534, ,383,688,64 5,780,35 1,424, ,201, ,614, ,020, NO ,445, ,119, ,255,62 627,820,66 2,528, ,000,57 3,841, ,370, NO ,872, ,270, ,268, ,410, ,015,34 4,836, ,476, ,327, SUB 4, , ,757,495, ,355, TOLL FACILITIES ,587,45 1,936, GRAND STATE-WIDE 5, , ,285,082, ,291, * INCLUDES MAINLINE LANES, RAMPS, SERVICE ROADS AND AUXILIARY LANES NOTE: I-83 (JONES FALLS EXPRESSWAY) WITHIN CITY (5.75 MI.) IS MAINTAINED BY CITY AND REIMBURSED OUT OF STATE ROADS COMMISSION FUNDS
1963 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District
1963 HISD REPORTS This is a description of the HISD reports compiled annually by HISD. HISD-4 HISD-4T HISD-5 HISD-6 HISD-7 HISD-8 HISD-9 Highway Mileage on State, State Toll, County and Municipal Systems
More informationA. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1
Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia
More informationDirections to US Drives
Directions to US Drives From Interstate Highway 90 (East or West of Buffalo) (Via Interstate 290 & Interstate 190) Follow the highway signs to Niagara Falls, one of the Seven Natural Wonders of the World.
More informationSouthern Beltway Projects Summary
Southern Beltway Projects Summary The Pennsylvania Turnpike Commission is proposing the construction of a 30-mile, tolled fourlane limited-access highway, known as the Southern Beltway that will be located
More informationCONTACT: Michelle T. Holland
FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationSCOPE Chapter 2D shall Apply to Any Road or
SCOPE Chapter 2D shall Apply to Any Road or Street other then Low-Volume Roads, Expressways, and Freeways Low Volume Roads: Shall be a Facility Lying Outside Built-Up Areas & Having a Traffic Volume Less
More informationROADWAY INVENTORY. The biggest and badest
ROADWAY INVENTORY The biggest and badest Thanks in Advance for your Attention THE CONFERENCE 2 Presentation Overview Roadway Inventory Purpose Extent Structure Content Maintenance Use Availability Challenges
More informationSmart Safety Tidal Flow Barrier
ITS New Zealand Summit 2012 Auckland Harbour Bridge Martin Leak Managing Director, Resolve Group Ltd Auckland, N.Z. Auckland Harbour Bridge - demand for service: Opened in May 1959 with 4 lanes and an
More informationFY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY
Brewster Road Widening and North Avenue Bridge PA04009 This project will provide for the widening of Brewster Road at the south end of the airport as well as the replacement and realignment of the North
More informationSR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5
SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.
More informationnorth GREENFIELD parkway Garner, North Carolina
BULK build-to-suit north GREENFIELD parkway Garner, North Carolina FEATURES & SITE PLAN 250,000 SF BUILDING BUILDING SIZE 250,000 SF AVAILABLE SF 250,000 SF CLEAR HEIGHT 30' - 32' COLUMN SPACING Designed
More informationGroup similar facilities together separate dissimilar facilities.
Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle
More informationGeneral Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA
5 6 7 8 A A B B General Highway System SHEET 1 HILTON HEAD ISLAND URBAN AREA SECONDARY ROUTE - - - - - 9 WETLAND OR MARSH - - - - - - - - - CHURCH AND CEMETERY - - - - - - - - CEMETERY - - - - - LM 78
More informationDATA BOOK IV : COST ESTIMATE
The Study on Comprehensive Disaster Prevention around Mayon Volcano DATA BOOK IV : COST ESTIMATE DT IV List of (1/5) Clearing and Grubbing ha 59,192.92 Excavation (Road way & Drainage) Mech. cu.m 80.55
More informationOf the Virginia Coal Heritage Trail
CHAPTER III: ROUTE, MAPS & ROAD DESCRIPTIONS On the Virginia Coal Heritage Trail This Chapter addresses the #1 FHWA requirement for a CMP by providing maps identifying the corridor boundaries, location
More informationI-94 at Grand Avenue Interchange: The Ride before the Roller Coaster
I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster Introduction Presenters Lanyea Griffin, Executive Project Engineer, Illinois Tollway Rob Deming, Project Manager, Primera Engineers,
More informationIS A BUDGET ONLY DESCRIPTION QUANTITY UNIT
Miller Creek Consultants LLC CONCRETE RECAP 1/29/2009 ESTIMATE DATE: 1-Jan-09 Project: 4000 psi 95.00 Location: 3000 psi 88.00 PROJECT DATA PROJECT NAME: Concrete Estimate THIS IS A BUDGET ONLY DESCRIPTION
More informationNCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes
More information11 th Annual Conference Road Development in India Telangana State Initiatives
11 th Annual Conference Road Development in India Telangana State Initiatives 24 th August 2016 New Delhi Bikshapathi Kondai Engineer in Chief R&B, Telangana State New Telangana State - Infrastructure
More informationBuffalo Springs Ranch
Buffalo Springs Ranch Acton, Montana For additional details, contact: SCOTT R. GROSSKOPF Broker / Owner Member Landmark of Billings 1925 Grand Avenue, Ste. 144, Billings, MT 59102 Office: (406) 248-3101
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More informationInnova Business Park
Realty Services 2 nd Floor - Victoriaville Civic Centre 111 S. Syndicate Avenue P.O Box 800 Thunder Bay ON P7C 5K4 Innova Business Park Tel: (807) 625-3199 Fax: (807) 625-2977 Email: realty@thunderbay.ca
More informationBUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION
BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR A P R I L 2 0 0 6 CAPTION
More informationL&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)
National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44
More information18. EXAMPLES OF URBAN RENEWAL PROJECTS
TOPIC SUMMARY WORKSHEETS FOR STAGE 1 WORKING GROUPS & STEERING COMMITTEE Version 1 (2 September 2014) for development and discussion This worksheet has been prepared as background for the Stage 1 Working
More informationI-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning
Final Land Development Plan (FLDP) I-579 Urban Open Space CAP Project Sports & Exhibition Authority (SEA) of the City of Pittsburgh and Allegheny County Project bounded by Chatham St. / Centre Ave. / Washington
More informationCommunity Development Department Council Chambers, 7:30 PM, December 20, 2012
STAFF REPORT 2012-56P: Alley Vacation Community Development Department Council Chambers, 7:30 PM, December 20, 2012 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician
More informationFall 2016 Tender Release
Tender Close 001-05-00 001-05-80 Hwy. 1, Grade & Pave, Indian Head, km 54.77 to 55.53 & km 0.00 to 0.33 Grade and Pave Southern November 2016 November 2016 Length = 1.09 km Base = 12 000 t Asphalt Concrete
More informationWELCOME US 83 Public Meeting
WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:
More informationAcres Monterey County, California OPEN GROUND IN SALINAS VALLEY VEGETABLE AND STRAWBERRY PROPERTY
324 +- Acres Monterey County, California OPEN GROUND IN SALINAS VALLEY VEGETABLE AND STRAWBERRY PROPERTY EXCLUSIVELY PRESENTED BY: Morris Garcia License 00834407 (559) 994-7453 Cell Sarah Donaldson License
More informationELECTION SIGN GUIDELINES
ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political
More information4.5 ACRES AT AIRPORT ROAD AND ROUTE 22- LEHIGH VALLEY
4.5 ACRES AT AIRPORT ROAD AND ROUTE 22- LEHIGH VALLEY 2940 AIRPORT ROAD BETHLEHEM, PA 18017 Joseph Genay, CCIM, LEED-AP Senior Advisor 484.245.1031 joseph.genay@svn.com SVN IMPERIAL REALTY 1611 POND ROAD,
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationPRELEASING GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH PRELEASING 151,642 SF CONTACT:
PRELEASING 1001 GREENFIELD PARKWAY Garner, North Carolina OPTIONAL DOOR PAIR 200'-0" FIRE PUMP ELEC ROOF ACCESS LADDER SITE PLAN OPTIONAL DOOR PAIR 7 A B 200'-0" C 50' 50' D FIRE PUMP ELEC E ROOF ACCESS
More informationMEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting
COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationDepartment-owned Facilities...Page A-2. Department-operated Facilities...Page A-4. Plaza Configurations - Department-owned Facilities
Appendix A Current Toll Schedules Departmentowned Facilities...Page A2 Departmentoperated Facilities...Page A4 Plaza Configurations Departmentowned Facilities Alligator Alley...Page A6 Beachline East Expressway...Page
More informationCLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet
CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway
More informationClayfaulds Farm, Bonnybridge, Stirlingshire, FK4 2HA. Offers over 450,000
Clayfaulds Farm, Bonnybridge, Stirlingshire, FK4 2HA Offers over 450,000 Particulars of Sale Junction 6A M80 2 miles, Bonnybridge 2.5 miles, Denny 4 miles, Falkirk 6 miles, Cumbernauld 7 miles, Stirling
More informationOur Panelists SPEAKERS MODERATOR
SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation
More informationBend Municipal Airport Urban Renewal Plan. Tashman Johnson LLC Elaine Howard Consulting LLC
Bend Municipal Airport Urban Renewal Plan Tashman Johnson LLC Elaine Howard Consulting LLC Urban Renewal Background The purpose of urban renewal is to improve certain areas that are poorly developed or
More informationPolicy Number. Page Number: Interstate Commission for Adult Offender Supervision ICAOS Administrative Policy.
1 I. Authority The Executive Committee is vested with the power to adopt a policy on behalf of the Interstate Commission during periods when the Interstate Commission is not in session. The Executive Committee
More informationMetropolitan Washington Airports Authority (MWAA)
RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President
More informationTenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)
Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY
More informationNational Recreation Trail Update Form
National Recreation Trail Update Form Introduction Thank you for taking the time to complete this form. Your assistance will help ensure that the National Recreation Trail (NRT) database is complete and
More informationISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE FOR PRINCIPAL ARTERIALS
Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 DATE: August 27, 2014 ISSUE SUMMARY: FUNCTIONAL CLASSIFICATION NETWORK UPDATE FOR PRINCIPAL ARTERIALS FROM: Tom Worthan, TAQC Chairman
More informationAlternative Interstate 11 Corridor From Wickenburg to Mexico Border
Alternative Interstate 11 Corridor From Wickenburg to Mexico Border Prepared by: Sanjeev Ramchandra, M.Ed. sanjeev_ramchandra@yahoo.com June 2016 Updated: December 2017 Summary / Overview of Proposed I-11
More information2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:
D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in
More informationProject Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design
RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall
More informationC O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION
Corporate Services Commission REQUEST RECEIVED: March 10, 2015 EVENT CODE: 2015-005 C O M M U N I T Y E V E N T W O R K O R D E R ROAD USE NOTIFICATION EVENT NAME: Canada Day EVENT ORGANIZER CONTACT ORGANIZATION
More informationDELIVERED GREENFIELD PARKWAY Garner, North Carolina 1001 GREENFIELD NORTH CONTACT:
DELIVERED 1001 GREENFIELD PARKWAY Garner, North Carolina OPTIONAL DOOR PAIR 50'-0" 750-0 200'-0" 50 50 FIRE PUMP ELEC SLOPE DN ROOF ACCESS LADDER SLOPE DN SITE PLAN 151,642 SF OPTIONAL DOOR PAIR 750'-0"
More informationNavigating Indiana Road Signage
Navigating Indiana Road Signage JOE BRUNO Traffic Administration Engineer Indiana Department of Transportation Presentation Overview Background Logo Program (Gas, Food, Lodging, & Camping Services) Attraction
More informationPage 1. Rennillo Deposition & Discovery A Veritext Company
Page 1 1 IN RE: 2 3 4 Ohio Department of Transportation 5 Pre-Bid Meeting 6 REVISED TRANSCRIPT 7 8 9 July 5, 2011 10 9:05 a.m. 11 12 13 14 15 Taken at: 16 Ohio Department of Transportation 17 906 Clark
More informationNoise Abatement Decision Report
Mid County Parkway NADR Noise Abatement Decision Report Noise Study Report, January 212 Riverside County, California 8-RIV-MCP PM./16.3; 8-RIV-2 PM 28./34.3 EA 8-F32 (PN 8125) April 212 This page intentionally
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationImportant Lane Closures, April 3 9, 2011
March 31, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures, April 3 9, 2011 RESCHEDULED: Lane Shifts of Westbound Route 7 at Route
More informationEAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009
EAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009 EAST SIDE TRANSPORTATION INITIATIVE AREA First Nations Northern Affairs Communities Metis Peoples PROCESSES EAST SIDE ROAD AUTHORITY (ESRA) CROWN
More informationDulles Toll Road Rate Setting Process
Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On
More informationBUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION
BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR AUGUST 2005 CAPTION TYPE
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationhttps://www.indiamart.com/atlantiscabins/
+91-8071808132 Atlantis Cabins https://www.indiamart.com/atlantiscabins/ We Atlantis Cabins are engaged in manufacturing and supplying a wide range of portable cabins,site office cabins. These cabins are
More informationDATE COURSE TITLE LOCATION HOURS. February 27 Flow & Dynamics with Fluids, Hydraulics, and Pneumatics...Augusta *6 Sponsored by Motion Industries
J o i n t E n v i r o n m e n t a l Tr a i n i n g C o o r d i n a t i n g C o m m i t t e e Winter/Spring 2018 JETCC Training Schedule DATE COURSE TITLE LOCATION HOURS February 22 Care of Emergency Generators...Orono
More informationGO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.
GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop. I-10 & Mesa Continuous Until further notice The right turn-only
More informationCity of Redding Airports
City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated
More informationKaufland, Chirnside Park
Kaufland, Chirnside Park WRITTENCONSENT OF 66 Maroondah Highway, Chirnside Park, A TOWN PLANNING APPLICATION 9/6/8 SJE Victoria, 6 ARTISTS IMPRESSION DRAWING LIST SHEET NUMBER SHEET NAME TP- TITLE SHEET
More informationFall 2015 Tender Release
Tender Close 001-05-00 Hwy. 1, Thin Overlay, 4km past the sintaluta access to 4km short of the JCT. Hwy 1, km 43.25 to 53.40 Thin Overlay Southern December 2015 January 2016 Length = 10.15 km Asphalt Concrete
More informationNational Recreation Trail Application for Designation
National Recreation Trail Application for Designation Introduction Thank you for your interest in the National Recreation Trail (NRT) program. Completed NRT application packages must be submitted by December
More informationWelcome to the Cross County Trail Public Input Session!
Welcome to the Cross County Trail Public Input Session! Please sign in on the table below! What are we doing here? Camden County has proposed a bicycle and pedestrian trail spanning across the entire county.
More informationPlanning and development of urban transportation system Experience from Tokyo
Planning and development of urban transportation system Experience from Tokyo Sept 22, 2016 Bureau of Urban Development Tokyo Metropolitan Government Takahiro ANZAI Contents 1 Outline of Tokyo Railway
More informationTHE 429 OCOEE, FL. ...Orlando s Premier Distribution Location. Developed By:
THE PARK @ 429 OCOEE, FL Developed By:...Orlando s Premier Distribution Location Table of Contents Development Overview Property Specifications and Site Plan Building Specifications Why The Park @ 429
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationA bridge on Chicago Road over Little Indian Creek is currently scheduled for rehab, but may be replaced
This Transcript was taken 11/18/1999 From a speech by John A. Wilson - County Board Member & Chairman of the Public Infrastructure & Development Committee at the Township Officials Fall Meeting Jetting
More informationTHE ALBERTA GAZETTE, SEPTEMBER
VILLAGE OF CEREAL Order No. 16915 IN THE MATTER OF THE "Municipal Government Act": File No. 241(A)3 AND IN THE MATTER OF an application by the Council of the Village of Cereal, in the Province of Alberta,
More informationAWARD INTERSTATE. Bid Amount: Less Than 5 Million. Report created on : 4/20/18. Letting Date: 3/28/2018. Estimated Construction Cost.
: Less Than 5 Million INTERSTATE 202 112417 LOCATION: VARIOUS (NFO)PM2N-060-F18, P401 ADAMS CONSTRUCTION COMPANY 1 $1,418,249.41 $1,440,244.38 ROANOKE PM02458 MONTGOMERY VA SALEM DISTRICT SGR - 2018 PLANT
More informationHolland Charter Township Industrial Park
MULTIPLE SIZED PARCELS/SPLITS AVAILABLE 1 1 2 2 3 3 Grand Grand Haven Haven 18 Miles 18 miles PARCELS MAY BE SPLIT OR COMBINED TO MEET YOUR SITE REQUIREMENTS AVAILABLE SIZES: 3.23-26+/- Acres 7 5 5 6 6
More informationHollaway Consulting Engineers, LLC Statement of Qualifications
Deliberate, Strategic, Connected.Delivering tangible solutions for aviation design and construction management. Hollaway Consulting Engineers, LLC Statement of Qualifications Professional Experience Sheri
More informationTRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712
TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda - Revised Thursday, March 22, 2018 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,
More informationTires Versus Pavement: Pilots, mechanics, and airport managers on the same page
Tires Versus Pavement: Pilots, mechanics, and airport managers on the same page Pilots often think tire pressure and condition are a mechanic s worry, not theirs. Similarly, the pavement strength of the
More informationCity of Durango 5.8 FUNDING TRAILS DEVELOPMENT
5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4
More informationDay and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 2 July 2018 Ref: N0202 Day and night work: Hills M2 Motorway tunnel portals and Coral Tree
More informationBORDER WEST EXPRESSWAY (LOOP 375)
BORDER WEST EXPRESSWAY (LOOP 375) 2015 Project Update Agenda 1 2 3 4 Team Overview Project Details Questions 2 Teams Owner Texas Department of Transportation Independent Engineer HDR Engineering Atkins
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationMONTANA CONSTRUCTION REPORT 06 / 14 / 2016
MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl
More informationC H A P T E R 3 R E V I E W O F E X I S T I N G T R A N S P O R T A T I O N F A C I L I T I E S
C H A P T E R 3 R E V I E W O F E X I S T I N G T R A N S P O R T A T I O N F A C I L I T I E S INTRODUCTION As part of the planning process, an inventory of the existing transportation system in Klamath
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationWhite Oak Creek. Recreational Use Attainability Analysis Summary of Findings. Texas Institute for Applied Environmental Research Stephenville, Texas
White Oak Creek Recreational Use Attainability Analysis Summary of Findings Texas Institute for Applied Environmental Research Stephenville, Texas August 8, 2016 Sulphur Springs, Texas August 9, 2016 Mount
More informationVancouver Island Rail ISLAND CORRIDOR FOUNDATION
Vancouver Island Rail ISLAND CORRIDOR FOUNDATION June 2015 VANCOUVER ISLAND RAIL CORRIDOR June 2015 2 Railway Infrastructure Improvement Funding Total $20.9M Project - Update Regional Districts Railway
More informationHADNALL PARISH COUNCIL
HADNALL PARISH COUNCIL Minutes of the Annual Meeting held at Hadnall Village Hall on 14 th May 2018 at 7.00pm. AM/18/1 AM/18/2 AM/18/3 AM/18/4 Election of Chairman It was proposed, seconded and resolved
More informationToll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities. South Florida
Toll Rates for Florida Turnpike System and Florida Department of Transportation (FDOT) Toll Facilities South Florida Effective: October 29, 207 S.R. 82 (HEFT) Miami-Dade and Broward Counties S.R. 82 (HEFT)
More informationPennsylvania Turnpike Commission 03/30/ YEAR CAPITAL PLANNING PROCESS
Pennsylvania Turnpike Commission 3/3/29 1 YEAR CAPITAL PLANNING PROCESS PRIORITIZED LISTING OF FINAL COPY FOR FISCAL YEAR 26-27 FOR ALL EXCEPT INDEPENDENTLY FUNDED PROGRAM, ALL TYPES, ALL PHASES (in $)
More informationWEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.
NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationMINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011
MINUTES OF THE OAK CREEK PLAN COMMISSION MEETING TUESDAY, NOVEMBER 8, 2011 Mayor Bolender called the meeting to order at 7:00 p.m. The following Commissioners were present at roll call: Commissioner Dickmann,
More information6.4 Aviation AVIATION FACILITIES AND SERVICES
2035 Transportation Plan 6.4 Aviation This chapter describes existing aviation facilities and services in Placer County and projected needs. This chapter also discusses potential aviation issues related
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationTeltow Contracting, Inc.
Tim Horton s we are a Sub Leonard C. Carnaghi AEW 199,395.50 201,609.52 586 791-7171 24388 Sorrentino Count Brian Clinton MI 48035 Date Started: 4-01-08 Finished 7-15-08 Work Performed: storm, water, grading
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More informationBULK DISTRIBUTION CENTER
PRE-LEASING 00 Garner, North Carolina FEATURES & SITE PLAN BUILDING BUILDING SIZE AVAILABLE SF CLEAR HEIGHT 32' COLUMN SPACING Designed to specifications LOADING 55 dock-high doors LIGHTING High bay fluorescent
More informationChapter 6. Action Program. Heart of the Lakes Area Recreation Plan
Heart of the Lakes Area Recreation Plan 1. Design and construct the following trails (please see the following map): a. the Speedway Trail 1) primary pathway the main trail 2) secondary pathway the proposed
More information