Don t stress over. 20 July 25 August. Pick up this leaflet for all the information you need to travel during the re-signalling works

Size: px
Start display at page:

Download "Don t stress over. 20 July 25 August. Pick up this leaflet for all the information you need to travel during the re-signalling works"

Transcription

1 Don t stress over DISRUPTIONS AT NOTTINGHAM STATION 20 July 25 August Pick up this leaflet for all the information you need to travel during the re-signalling works We re helping you stay on the move TRAVEL

2 Major re-signalling works 20 July 25 August This summer, Nottingham station will be affected by the Nottingham re-signalling works, which will cause major disruptions to train services between 20 July 25 August. In this leaflet you ll find information about the works and how service changes will affect you, so that you can be prepared and plan your journeys without worry. Discounted travel A discount will apply on tickets purchased for travel between 20 July 25 August (excluding Advance Purchase tickets) that involve travel on a rail replacement bus. An increased number of cheaper Advance Purchase fares will also be made available during this time. Discounted travel is only available on journeys where East Midlands Trains is the primary train operator. For travel between Derby and Nottingham, CrossCountry Trains is the primary train operator on this route and will be offering a reduced Off Peak return fare for travel any time throughout the day. Season ticket Discount Customers who are yet to purchase a season ticket are advised to purchase five weekly season tickets during the Nottingham re-signalling works, to take advantage of the discount, as opposed to purchasing a monthly season ticket. A discount will only be available on tickets to/from Nottingham on selected journeys between 20 July 25 August, and where East Midlands Trains is the primary train operator. 2

3 Frequently asked questions What is the Nottingham re-signalling works? It is a project by Network Rail to improve Nottingham station and transform the railways around the city. Big changes to tracks and signalling will mean more reliable services and fewer delays at Nottingham station, and the railways will be able to cope with an increasing demand for rail travel in the future. What will the project involve? 100 million investment A new platform at Nottingham station 143 new signals Six miles of new track Two renewed level crossings Two level crossings replaced with footbridges. Why is this work being done? This is the biggest transformation of the railway through Nottingham for 50 years. When the layout and signalling were originally designed in the 1960s, the number of passenger trains was much lower. Now with trains to London every half hour, and services to Mansfield, Worksop, Norwich, Liverpool, Leeds and others, the railway is congested and signalling equipment is in need of modernisation. This work will future-proof the station and work in conjunction with the proposed line-speed improvements and the rebuilding of the station to offer a much improved journey for passengers. Register for updates 3

4 Why is the work taking place during the summer period? Services are always quieter during the summer period with fewer commuters and business travellers. During the five weeks chosen for the Nottingham re-signalling project, we expect services to be around quieter than at other times of the year. We do recognise that many passengers use our services to travel between Nottingham and Skegness over the summer holidays, and we have worked hard to maintain the best possible service we can for our passengers on this route. Train services will continue to run between Grantham and Skegness and Newark and Lincoln at all times and on 23 out of the 37 days, we will be able to run direct train services from Nottingham to Skegness. Why is the work taking 37 days? This will enable Network Rail to carry out the work in the shortest time possible. If the work had been planned to take place over weekends, as is the case with a lot of engineering work, this would have taken around a year s worth of weekend closures in and around Nottingham to complete the works. What is the best station to use to travel to london? We are advising people to travel from East Midlands Parkway station, which is located on the A453 near to Ratcliffe-on-Soar power station. There are three trains an hour to/from London from this station and journey times are around 1 hour and 34 minutes. Five buses an hour will run between Nottingham and East Midlands Parkway, or alternatively passengers can use the 1,000 space car park for the discounted price of 6 per day. There is also free parking for disabled passengers at this station. Sign up online today for the latest updates at 4

5 What steps have you taken to provide a better service? We have invested in additional car parking spaces at East Midlands Parkway for passengers connecting to London services. Passengers who already hold a car parking season ticket for Nottingham can use this ticket to park at East Midlands Parkway visit the Ticket Office for more information. We have carried out research and worked closely with Nottingham City Council to assess how many buses are needed and develop the best possible bus routes for passengers. We have around 100 East Midlands Trains and Network Rail Managers providing extra assistance at key locations throughout the duration of the re-signalling project, and we are also providing additional cycle storage facilities at Beeston, East Midlands Parkway, Newark Castle and Grantham stations. Will this affect all east midlands trains journeys? No. The rest of our network will operate a full and normal service throughout the summer. The routes that will operate as normal include: Sheffield, Chesterfield, Derby, East Midlands Parkway, Leicester, Market Harborough, Kettering, Corby, Wellingborough, Bedford and Luton to London Liverpool to Sheffield/Chesterfield Derby to Matlock Derby to Crewe Newark to Lincoln Grantham to Skegness. Around three quarters of our passengers will not be affected at all by the work at Nottingham. What advice Do you have? Do continue to travel with us during the summer, but be prepared, allow additional time for your journey and check for the latest updates before you travel at 5

6 At a glance Below is a summary of the changes to the train services for each of the affected routes. Details and a map for each route can be found further on within this leaflet. Nottingham London (p.9) Train services to/from London will start and terminate at East Midlands Parkway, with three services per hour running between East Midlands Parkway and London. A frequent bus service will operate five times an hour between Nottingham and East Midlands Parkway to connect with train services to London. There are 1,000 car parking spaces available at East Midlands Parkway for just 6 per day. Matlock Derby Nottingham (p.10) Trains will run as normal between Matlock, Derby and Beeston. For services through to Nottingham, passengers should change at Derby for an express bus service, which will run at 15 minute intervals. This service is operated by CrossCountry Trains. Three buses per hour will also run between Beeston and Nottingham. Liverpool Norwich (p.11) Train services will continue to operate on this route, but will follow a diversionary route and not call at Nottingham or Grantham. All services will instead call at East Midlands Parkway, where express replacement bus services will run to Nottingham, Grantham and Newark. Passengers travelling from Langley Mill and Alfreton should use replacement bus services for travel to Nottingham. Northern train services will continue to run from Langley Mill and Alfreton to Leeds via Sheffield. 6

7 Nottingham Lincoln (p.12) Train services will continue to run from Newark Castle to Lincoln throughout the re-signalling works. From Saturday 20 July to Friday 9 August, connecting bus services will run between Newark Castle and Nottingham, with an hourly bus service from Rolleston, Fiskerton, Bleasby, Thurgaton, Lowdham, Burton Joyce and Carlton to Nottingham. From 10 August to 23 August, trains will be running between Nottingham and Lincoln (between ). Services will follow the normal calling patterns with slightly extended journey times. There will also be an hourly express bus service between Newark and East Midlands Parkway, connecting with services to Leicester and beyond throughout the re-signalling works. Nottingham Skegness (p.14) Train services will continue to run between Grantham and Skegness at all times. Direct train services will also be running between Nottingham and Skegness on the following days (between ): Weekdays Mon 22 July to Fri 26 July Mon 12 August to Fri 23 August Weekends Sat 20 and Sun 21 July Sat 27 and Sun 28 July Sat 10 August and Sun 11 August Sat 17 August and Sun 18 August At all other times, an hourly bus service will run between Nottingham and Grantham with an hourly train service connecting at Grantham for services through to Skegness. There will also be an hourly express bus service from Grantham to East Midlands Parkway throughout the day to connect with services to Leicester/ Liverpool and Norwich. During the re-signalling works, additional buses will be on standby at Nottingham station at all times. A normal, strengthened train service will run from Nottingham to Skegness from 19 May to 19 July, and then again from Monday 26 August. 7

8 At a glance Continued Nottingham Loughborough Leicester (local services) (p.16) Train services will run between Leicester and East Midlands Parkway, where there is a connecting bus service through to Nottingham, which will run approximately every 10 minutes. An hourly train service will run between Leicester and Loughborough. Passengers travelling from Syston, Sileby, Barrow-upon-Soar can continue to travel to Leicester by train. For travel to/from Nottingham, there will be a train service to Loughborough and East Midlands Parkway, with a bus connection to Nottingham. Mansfield/Worksop Nottingham (p.17) A frequent bus service will run in place of the normal train service for the duration of the works (20 July 25 August) with four buses per hour running between Nottingham and Mansfield and an hourly service running from Nottingham to Worksop. Sign up now Register online today for the latest updates at find shirley on twitter Tweet your questions or follow twitter/shirley_updates for Shirley s travel advice and useful tips 8

9 For train and bus times, visit Nottingham London SHEFFIELD on all journeys to & from Nottingham on this route* DERBY EAST MIDLANDS PARKWAY Loughborough BEESTON NOTTINGHAM LEICESTER Market Harborough Kettering Corby Wellingborough Bedford Luton Luton Airport Parkway LONDON ST PANCRAS Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from this station *This does not apply for journeys between Nottingham and Derby as CrossCountry Trains are the primary operator on this route. Three trains per hour from London to East Midlands Parkway, one continues to Beeston. Five express buses per hour between East Midlands Parkway and Nottingham. Great reasons to travel from East Midlands Parkway: 1,000 car parking spaces and just 6 parking at East Midlands Parkway. 1hour 34mins from East Midlands Parkway to London. 9

10 For access to all train and bus timetables, visit Matlock Derby Nottingham MATLOCK MATLOCK BATH CROMFORD WHATSTANDWELL AMBERGATE on all journeys to & from Nottingham on this route* BELPER DUFFIELD DERBY SPONDON LONG EATON ATTENBOROUGH BEESTON NOTTINGHAM Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from this station *This does not apply for journeys between Nottingham and Derby as CrossCountry Trains are the primary operator on this route. Train from Matlock terminating at Beeston. Change at Derby for an express bus service to Nottingham (four buses running each hour). This service is operated by CrossCountry Trains. Three buses per hour between Beeston and Nottingham. 10

11 t Liverpool Norwich LIVERPOOL LIME STREET LIVERPOOL SOUTH PARKWAY HUNTS CROSS HOUGH GREEN WIDNES WARRINGTON CENTRAL BIRCHWOOD IRLAM MANCHESTER OXFORD ROAD STOCKPORT HAZEL GROVE MANCHESTER PICCADILLY CHINLEY EDALE HOPE BAMFORD HATHERSAGE GRINDLEFORD DORE SHEFFIELD on all journeys to & from Nottingham on this route DRONFIELD CHESTERFIELD EAST MIDLANDS PARKWAY LANGLEY MILL ALFRETON NOTTINGHAM GRANTHAM PETERBOROUGH WHITTLESEA MARCH ELY BRANDON THETFORD HARLING ROAD ECCLES ROAD ATTLEBOROUGH WYMONDHAM NORWICH Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from this station Train service diversion route, not calling at Nottingham or Grantham. All call at East Midlands Parkway. Five buses per hour between East Midlands Parkway and Nottingham. One bus per hour between East Midlands Parkway and Grantham. Two buses per hour between Alfreton and Nottingham, One stopping at Langley Mill. Limited services between Chesterfield and Langley Mill and Nottingham and Grantham. For services between Norwich and Grantham change at Peterborough. Train services from Alfreton to East Midlands Parkway (southbound only). 11

12 For access to all train and bus timetables, visit Nottingham Lincoln Dates valid: Sat 20 July Fri 9 Aug Sat 24 Aug Sun 25 Aug (Sat 10 Aug Fri 23 Aug after 2000 and before 0800 only) SWINDERBY LINCOLN HYKEHAM BURTON JOYCE CARLTON NOTTINGHAM THURGARTON LOWDHAM BLEASBY FISKERTON ROLLESTON COLLINGHAM NEWARK CASTLE NEWARK NORTH GATE EAST MIDLANDS PARKWAY ON ALL JOURNEYS To & from highlighted stations to anywhere on this route Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from these stations Normal service between Newark Castle and Lincoln. Direct hourly bus service from Newark Castle to Nottingham. Hourly bus service between Nottingham and Newark Castle calling at same stations as normal timetable, refer to timetables online for details. Direct hourly bus between Newark Castle and East Midlands Parkway, connecting into services for Leicester. 12

13 t Dates valid: Sat 10 Aug Fri 23 Aug (between only) LINCOLN HYKEHAM SWINDERBY THURGARTON LOWDHAM BURTON JOYCE CARLTON NOTTINGHAM BLEASBY FISKERTON ROLLESTON COLLINGHAM NEWARK CASTLE NEWARK NORTH GATE EAST MIDLANDS PARKWAY ON ALL JOURNEYS To & from highlighted stations to anywhere on this route Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from these stations Train service between Nottingham and Lincoln (running slower than a normal service). Direct hourly bus between Newark Castle and East Midlands Parkway, connecting into services for Leicester. 13

14 For access to all train and bus timetables, visit Nottingham Skegness MAP A NOTTINGHAM EAST MIDLANDS PARKWAY NETHERFIELD RADCLIFFE BINGHAM ASLOCKTON ELTON & ORSTON BOTTESFORD GRANTHAM ANCASTER RAUCEBY SLEAFORD HECKINGTON SWINESHEAD ON ALL JOURNEYS To & from highlighted stations to anywhere on this route HUBBERTS BRIDGE BOSTON WAINFLEET THORPE CULVERT SKEGNESS HAVENHOUSE 20 July 25 August 2013 Mon Tues Weds Thurs Fri Sat Sun Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from these stations Please refer to calendar for when this map is valid (between 20 July and 25 August, before 0800 and after 2000 all services will refer to map B times). One train per hour between Nottingham and Skegness, with normal timetable calling patterns. Hourly bus service from Grantham to East Midlands Parkway, connecting onto services to Leicester and Liverpool. 14

15 t MAP B NOTTINGHAM EAST MIDLANDS PARKWAY NETHERFIELD RADCLIFFE BINGHAM ASLOCKTON ELTON & ORSTON BOTTESFORD GRANTHAM ANCASTER RAUCEBY SLEAFORD HECKINGTON SWINESHEAD ON ALL JOURNEYS To & from highlighted stations to anywhere on this route HUBBERTS BRIDGE BOSTON WAINFLEET THORPE CULVERT SKEGNESS HAVENHOUSE Map A Train services operating between Nottingham and Skegness. Map B Bus services only between Nottingham and Grantham. Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from these stations Please refer to calendar for when this map is valid. Please note Refer to map B for all travel after 2000 and before 0800 for entire period (20 July 25 Aug). Train services will continue to run between Grantham and Skegness at all times. Two buses between Grantham and Nottingham, one express and one calling at all stops Hourly bus between Grantham and East Midlands Parkway, connecting onto services to Leicester and Liverpool. 15

16 For access to all train and bus timetables, visit Nottingham Loughborough Leicester (Local services) on all journeys to & from Nottingham on this route ATTENBOROUGH BEESTON EAST MIDLANDS PARKWAY NOTTINGHAM LOUGHBOROUGH BARROW UPON SOAR SILEBY SYSTON LEICESTER Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from this station One train per hour between Loughborough and Beeston. One train per hour between Leicester and Loughborough calling at all stations. Five buses per hour between East Midlands Parkway and Nottingham. 16

17 t Mansfield/Worksop Nottingham (Robin Hood Line) on all journeys to & from Nottingham on this route WORKSOP WHITWELL CRESWELL LANGWITH WHALEY THORNS SHIREBROOK MANSFIELD WOODHOUSE MANSFIELD SUTTON PARKWAY KIRKBY IN ASHFIELD NEWSTEAD HUCKNALL BULWELL NOTTINGHAM Train service Limited train service Disruption, Direct bus service no trains Stopping bus service discount applies to/from these stations Hourly express bus from Nottingham to Mansfield, calling at all stations to Worksop. Hourly express bus from Nottingham to Mansfield, also calling at Mansfield Woodhouse. Two buses per hour from Nottingham to Mansfield calling at all stations. 17

18 Did you know? Disrupted travel Between 20 July 25 August, train services will not run at all on certain routes to/from Nottingham. The project will have a major impact on travel, which is why we are providing alternative travel options and route maps. East midlands parkway East Midlands Parkway will be the main replacement station for Nottingham during this period, and rail replacement buses will take passengers between East Midlands Parkway and Nottingham. See inside for more information. Planning your journeys To make your journeys as smooth as possible during the Nottingham re-signalling project, please remember: Allow extra time for your journey when travelling on rail-replacement buses If you require assisted travel, book in advance by calling , option three No dogs on buses apart from assistance dogs All routes have limited bike capacity, subject to vehicle space. For further details visit No alcohol allowed on buses. find shirley on twitter Tweet your questions or follow twitter/shirley_updates for Shirley s travel advice and useful tips For more details, register for updates at The information in this leaflet was correct at the time of printing in July 2013 but may be subject to change without prior notice. East Midlands Trains does not accept liability for any inaccurate information. EMT360032

The resignalling scheme

The resignalling scheme & Nottingham Resignalling scheme The resignalling scheme What work is being carried out? s well as redeveloping the station, Network Rail is rebuilding the rail infrastructure around the city. The 100m

More information

East Midlands. Route Utilisation Strategy. February 2010

East Midlands. Route Utilisation Strategy. February 2010 East Midlands Route Utilisation Strategy February 2010 2 Foreword I am delighted to present Network Rail s Route Utilisation Strategy (RUS) for the East Midlands. This contains recommendations for a key

More information

National Passenger Survey TOC Report for East Midlands Trains Spring 2011

National Passenger Survey TOC Report for East Midlands Trains Spring 2011 National Passenger Survey TOC Report for 11 Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: 13 83 Email: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne

More information

RailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements

RailFAIR! RailFAIR! - Castle to Castle. Castle to Castle. Nottingham to Lincoln - Proposed Train Service Improvements - - Proposed Train Service Improvements TO GRIMSBY Show Your Support: www.railfair.co.uk TO SLEAFORD LINCOLN Hykeham Swinderby Collingham TO DONCASTER & THE NORTH NEWARK NORTHGATE NEWARK CASTLE TO PETERBROUGH

More information

Making rail accessible

Making rail accessible Making rail ible Helping older and disabled passengers Valid from 1 October 2016 Contents 1. Introduction 3 2. Assistance for customers 3 2.1 Travelling with assistance dogs 5 2.2 Our compensation policy

More information

East Midlands Rail Franchise Public Consultation

East Midlands Rail Franchise Public Consultation Scarborough Leeds York Manchester Liverpool Doncaster Sheffield Barton-on -Humber Crewe Chesterfield Matlock Worksop Lincoln Mansfield Grimsby Cleethorpes Skegness Stoke-on-Trent Derby ottingham Grantham

More information

Train times. Manchester to Sheffield The Hope Valley Line. 11 December May northernrailway.co.uk. Manchester Piccadilly

Train times. Manchester to Sheffield The Hope Valley Line. 11 December May northernrailway.co.uk. Manchester Piccadilly 23 Train times 11 December 2016 20 May 2017 Manchester to Sheffield The Hope Valley Line Manchester Piccadilly Ashburys Belle Vue Ryder Brow Reddish North Brinnington Stockport Bredbury Romiley Hazel Grove

More information

Train times. northernrailway.co.uk. Nottingham to Sheffield and Leeds. 15 May 10 December Leeds. Wakefield Kirkgate. Barnsley Interchange

Train times. northernrailway.co.uk. Nottingham to Sheffield and Leeds. 15 May 10 December Leeds. Wakefield Kirkgate. Barnsley Interchange 33 Train times 15 May 10 December 2016 Parking available Staff in attendance Bicycle store facility Bike & Go Tram Interchange stations Disabled assistance available Nottingham to Sheffield and Leeds Leeds

More information

Romiley. Marple Strines New Mills Central. Chinley Edale Hope (Derbyshire) Bamford Hathersage Grindleford

Romiley. Marple Strines New Mills Central. Chinley Edale Hope (Derbyshire) Bamford Hathersage Grindleford Manchester Piccadilly Parking available Staff in attendance Bicycle store facility Ashburys Belle Vue Ryder Brow Reddish North Brinnington Stockport Bredbury Romiley Hazel Grove Marple Strines New Mills

More information

Train times. Liverpool to Manchester Piccadilly via Warrington Central. 21 May 9 December northernrailway.co.uk

Train times. Liverpool to Manchester Piccadilly via Warrington Central. 21 May 9 December northernrailway.co.uk 16 Train times 21 May 9 December 2017 Liverpool to Manchester Piccadilly via Warrington Central Liverpool Lime Street Edge Hill Mossley Hill West Allerton Liverpool South Parkway Hunts Cross Halewood Hough

More information

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee

Open Report on behalf of Executive Director for Environment & Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Executive Director for Environment & Economy Report to: Date: 13 June 2016 Subject: Summary: Highways and Transport Scrutiny Committee Rail Update

More information

East Midlands Rail Franchise Consultation. Response from the Derwent Valley Line Community Rail Partnership

East Midlands Rail Franchise Consultation. Response from the Derwent Valley Line Community Rail Partnership East Midlands Rail Franchise Consultation Response from the Derwent Valley Line Community Rail Partnership This response has been produced by Alastair Morley, Community Rail Officer for the Derwent Valley

More information

Urmston Humphrey Park Trafford Park Deansgate

Urmston Humphrey Park Trafford Park Deansgate Liverpool Lime Street Edge Hill Mossley Hill West Allerton Liverpool South Parkway Hunts Cross Halewood Hough Green Widnes Sankey for Penketh Warrington Central Padgate Birchwood Glazebrook Irlam Flixton

More information

Train times. Manchester to Hazel Grove and Buxton. 21 May 1 October northernrailway.co.uk. Salford Crescent. Manchester Piccadilly.

Train times. Manchester to Hazel Grove and Buxton. 21 May 1 October northernrailway.co.uk. Salford Crescent. Manchester Piccadilly. 20 Train times 21 May 1 October 2017 Manchester to Hazel Grove and Buxton Salford Crescent Manchester Piccadilly Deansgate Manchester Oxford Road Levenshulme Heaton Chapel Stockport Hazel Grove Davenport

More information

Train times. northernrail.org. Liverpool to Manchester Piccadilly via Warrington Central. 13 December May 2016

Train times. northernrail.org. Liverpool to Manchester Piccadilly via Warrington Central. 13 December May 2016 16 Parking available Staff in attendance Bicycle store facility Metrolink Interchange stations Airport link Disabled assistance available Train times 13 December 2015 14 May 2016 Liverpool to Manchester

More information

JULY 2017 NEWSLETTER

JULY 2017 NEWSLETTER BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick JULY 2017 NEWSLETTER 1. EMT Franchise The DfT published the East Midlands Franchise Public Consultation document on July 20 th,

More information

TRANSFORMING TRANSPENNINE

TRANSFORMING TRANSPENNINE TRANSFORMING TRANSPENNINE MAY 2018 TIMETABLE We are now at a key milestone for our franchise, with the timetable change that comes into effect on Sunday 20 May 2018 the biggest and most important since

More information

Timetable Change Research. Re-contact survey key findings

Timetable Change Research. Re-contact survey key findings Timetable Change Research Re-contact survey key findings Key project objectives Measure the impact of the timetable changes on customers, what actions have they taken as a result Gauge how have the timetable

More information

East Midlands rail franchise - passenger research

East Midlands rail franchise - passenger research East Midlands rail franchise - passenger research Prepared for Transport Focus Conducted: May 2017 Published: September 2017 By John Connaughton CEO john.connaughton@illuminas.com T: +44 (0)20 7909 0935

More information

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes Appendix 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes Introduction 8.1 This appendix considers the following major

More information

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes Chapter 8 Capacity and Service Disbenefits Prepared by Christopher Stokes 8 CAPACITY AND SERVICE DISBENEFITS Prepared by Christopher Stokes 8.1 This chapter relates to the following questions listed by

More information

High Speed UK. Regional Mapping covering the East and West Midlands

High Speed UK. Regional Mapping covering the East and West Midlands High Speed UK Regional Mapping covering the East and West Midlands CC0 Potteries CC0 Trent Valley CC0 East Midlands CC0 West Midlands CC0 Rugby & Leicester Maps in reverse numerical order for enhanced

More information

Department for Transport

Department for Transport Department for Transport From the Secretary of State The Rt. Hon Patrick Mcloughlin Great Minster House 33 Horseferry Road London SW1P 4DR Tel: 0300 330 3000 Louise Ellman MP Web site: www.gov.uk/dft House

More information

INTEGRATED TRANSPORT AUTHORITY

INTEGRATED TRANSPORT AUTHORITY INTEGRATED TRANSPORT AUTHORITY Meadowhall Our Vision for South Rotherham and Improving your Bus Travel Information Booklet Summer 2010 2 3 Introduction This booklet sets out our proposals of a vision for

More information

Manchester Victoria 11 day blockade Easter 2016

Manchester Victoria 11 day blockade Easter 2016 Manchester Victoria 11 day blockade Easter 2016 The Project Where and what? 1 billion investment. Between March 25 th and April 3 rd Major work will take place in the Manchester Victoria area in connection

More information

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff Includes all services between Derby and Cheltenham Spa Sunday 20 May Saturday 8 December 2018 Live train times online and on our Train

More information

to Bristol & Cardiff crosscountrytrains.co.uk Train Times: 23 May December 2010 Nottingham Derby Birmingham Cheltenham Spa Cardiff Bristol

to Bristol & Cardiff crosscountrytrains.co.uk Train Times: 23 May December 2010 Nottingham Derby Birmingham Cheltenham Spa Cardiff Bristol Nottingham Derby to Bristol & Cardiff Train Times: 23 May 2010 11 December 2010 Birmingham New Street Derby Burton-on-Trent Bromsgrove Willington Wilnecote University Water Orton Nottingham Beeston Attenborough

More information

Passenger Focus response to Department for Transport proposals for the East Midlands franchise

Passenger Focus response to Department for Transport proposals for the East Midlands franchise Passenger Focus response to Department for Transport proposals for the East Midlands franchise 7 August 2006 Passenger Focus response to the Department for Transport proposals for the East Midlands franchise

More information

MANTON WOOD FOR SALE / TO LET FROM 200,000-1,000,000 SQ FT A 63 ACRE DESIGN & BUILD INDUSTRIAL / DISTRIBUTION DEVELOPMENT

MANTON WOOD FOR SALE / TO LET FROM 200,000-1,000,000 SQ FT A 63 ACRE DESIGN & BUILD INDUSTRIAL / DISTRIBUTION DEVELOPMENT FOR SALE / TO LET FROM 200,000-1,000,000 SQ FT MANTON WOOD A 6 ACRE DESIGN & BUILD INDUSTRIAL / DEVELOPMENT A1 MOTORWAY M1 MOTORWAY MANTON WOOD S80 EG A DEVELOPMENT BY www.mantonwood.co.uk A NEW DESIGN

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

Leicester & Nottingham to Birmingham & Cardiff

Leicester & Nottingham to Birmingham & Cardiff Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff includes all services between Derby and Cheltenham Spa Train Times: 10 December 2017 to 19 May 2018 Live train times online and on our

More information

TAKING THE NORTH FURTHER

TAKING THE NORTH FURTHER TAKING THE NORTH FURTHER STAKEHOLDER NEWSLETTER JULY / AUGUST 2018 Dear Stakeholder Summer is here and things are definitely hotting up in terms of our transformation. The Class 185 upgrade is very close

More information

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017

LCR Railway Improvement Plan BID Travel and Transport Forum. Tuesday 28 th February 2017 LCR Railway Improvement Plan BID Travel and Transport Forum Tuesday 28 th February 2017 Liverpool City Region Railway Improvement Plan 2016-2019 Wirral Loop Line Track Renewal 3 January 18 June 2017 The

More information

Transport Monitoring Report

Transport Monitoring Report Transport Monitoring Report 2015 April 2016 Transport Policy Team Environment and Economy Transport Monitoring Report 2015 Contents Page 1. Introduction 1 2. Growth of Traffic 2 3. Countywide Growth 3

More information

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff Includes all services between Derby and Cheltenham Spa Sunday 9 December 2018 Saturday 18 May 2019 Live train times online and on our

More information

A5209. Bolton Standish. Ormskirk Skelmersdale. Wigan A58. Kirkby A58. St Helens Bootle A580 A57 M62. Sale. Warrington Widnes. Altrincham.

A5209. Bolton Standish. Ormskirk Skelmersdale. Wigan A58. Kirkby A58. St Helens Bootle A580 A57 M62. Sale. Warrington Widnes. Altrincham. Chilwell Retail Park Open, Part Food 65 209 Formby 8 Birkenhead Llandudno Rhyl Conwy 2 62 Flint Bangor Runcorn 6 Sandbach 30 34 Wrexham Leek 00 00 0 Newcastleunder-Lyme STOKE -ON-TRENT 23 3 20 5 Uttoxeter

More information

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys Summary Delivery Plan Control Period 4 Delivery Plan 2009 More trains, more seats Better journeys Network Rail aims to deliver a railway fit for the 21st century. Over the next five years (Control Period

More information

Transport Information 2018/19 Marple. Your Guide to Costs, Timetables & Routes Version 1

Transport Information 2018/19 Marple. Your Guide to Costs, Timetables & Routes Version 1 Transport Information 2018/19 Marple Your Guide to Costs, Timetables & Routes Version 1 Costs and Financial Support There are several different kinds of saver tickets available to students and we have

More information

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication

LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE. Correct at time of publication LONDON CHRISTMAS & NEW YEAR TRAVEL GUIDE Correct at time of publication 2018 Sat 22 December Sun 23 December Mon 24 December (Christmas Eve) Tues 25 December (Christmas Day) Weds 26 December (Boxing Day)

More information

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018

75,402 sq ft. 88,866 sq ft NOTTINGHAM. panattoni park CONSTRUCTION UNDER. Two industrial/warehouse units TO LET AVAILABLE Q3 2018 panattoni park Two industrial/warehouse units 88,866 sq ft TO LET AVAILABLE Q3 2018 75,402 sq ft TO LET AVAILABLE Q4 2018 /J26 UNDER CONSTRUCTION INDICATIVE IMAGE www.pp.com panattoni park NG16 NN7 4DE

More information

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018

Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018 Better rail journeys arriving in 2018 The Great North Rail Project between Preston and Blackpool 12 January 2018 Nine weeks into our transformation As we approach the halfway point of our extended closure

More information

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff Train Times: 21 May 2017 to 9 December 2017 Live train times online and on our Train Tickets app. going that bit further 1 online mobile

More information

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise. Introduction We welcome your input to the New Cross Country (NCC) consultation

More information

Midlands Connect Strategy: Powering the Midlands Engine

Midlands Connect Strategy: Powering the Midlands Engine Midlands Connect Strategy: Powering the Midlands Engine March 2017 Midlands Connect Powering the Midlands Engine Sir John Peace Chairman of Midlands Engine and Midlands Connect Foreword I am honoured to

More information

HS8/HS9 Mk2 Route Loadings

HS8/HS9 Mk2 Route Loadings S8/S9 Mk2 Route Loadings Introduction Deriving the route loadings for a given service plan can be a difficult and tedious matter, and very prone to error. Furthermore, understanding what a given loading

More information

NOTTINGHAM - Radcliffe - BINGHAM - Orston - BOTTESFORD

NOTTINGHAM - Radcliffe - BINGHAM - Orston - BOTTESFORD NOTTINGHAM - Radcliffe - BINGHAM - Orston - BOTTESFORD Mondays to Saturdays am am am am am am am am am am am am am am am am am am am am am am am NS NS NS NS NS SSH Sch Sch Sch SSH Sch NOTTINGHAM Friar

More information

East Midlands and Domestic Tourism

East Midlands and Domestic Tourism East Midlands and Domestic Tourism East Midlands East Midlands comprises the counties of Nottinghamshire, Derbyshire, Leicestershire, Rutland, Northamptonshire and most of Lincolnshire. It has a population

More information

Bespoke occupier solutions up to 2 million sq ft for sale/to let

Bespoke occupier solutions up to 2 million sq ft for sale/to let Bespoke occupier solutions up to 2 million sq ft for sale/to let Unique Industrial/ Development Opportunity www.newarkgateway.co.uk CROSSROADS TO THE NORTH, SOUTH, EAST AND WEST Strategic Location ROAD

More information

Nottingham. Aberdeen. Dundee. Glasgow. Edinburgh. Newcastle. Carlisle. Leeds. York. Liverpool. Sheffield. Derby. Birmingham. Amsterdam.

Nottingham. Aberdeen. Dundee. Glasgow. Edinburgh. Newcastle. Carlisle. Leeds. York. Liverpool. Sheffield. Derby. Birmingham. Amsterdam. Aberdeen Dundee Edinburgh Glasgow Newcastle York Leeds Doncaster Manchester Liverpool Derby Nottingham Grimbsy Sheffield Lincoln Birmingham Cardiff Bristol Coventry Oxford Cambridge Stansted Airport Luton

More information

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550 UNDER CONSTRUCTION PANATTONI PARK NOTTINGHAM Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q1 2019 /J26 INDICATIVE IMAGE NN7 NG16 4DE 3RY /J26 Panattoni Park Nottingham is a 55

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3RY CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT,270 sq ft TO LET Q1 2019 junction 26-7 minutes Ample car & HGV parking with potential for more 50m yards on both sides 15m

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere) APPNDIX M2 CONNCIVIY IMPOVMNS ACHIVD BY HS2 AND HIGH SPD UK FO: MANCHS AIPO (extract from HS2 High Speed to Nowhere) Appendix M2 : Airport Page 292 Introduction & key results Page 293 imeline of comparative

More information

N ewsrail. WEEK ENDING 3 November 2007 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS

N ewsrail. WEEK ENDING 3 November 2007 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS N ewsrail E X P R E S S WEEK ENDING 3 November 2007 ITEM FOR TRAIN COMPANY ON RETAIL TRAIN TRAVEL ITEM SUBJECT OUTLETS STAFF AGENTS 352 1 National Rail New TOCs and franchise map changes 2 National Rail

More information

Mystery shop of rail ticket retailing. Internet checks

Mystery shop of rail ticket retailing. Internet checks Mystery shop of rail ticket retailing Internet checks March 2007 Mystery shop of rail ticket retailing - internet checks 1. INTRODUCTION 1.1. Background Passenger Focus undertook a mystery shopping programme

More information

Christmas Engineering Works

Christmas Engineering Works THE GREAT NORTH RAIL PROJECT COLLEAGUE UPDATE Christmas Engineering Works 2018 until 2019 Thursday 27 December Tuesday 01 January This past year has seen significant progress in Network Rail s Great North

More information

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY From Sunday 20 May 2018 customers across the North of England and into Scotland are set to benefit from improved connectivity, new journey opportunities and

More information

Derwent Valley Line Community Rail Partnership Annual Report Improving local stations and train services

Derwent Valley Line Community Rail Partnership Annual Report Improving local stations and train services Derwent Valley Line Community Rail Partnership Annual Report 2015-2016 Improving local stations and train services Read about: Station Awards for Belper, Ambergate and Cromford More children's artwork

More information

2. For each event listed in question 1, if the Commissioner did not attend, please specify the host of the event

2. For each event listed in question 1, if the Commissioner did not attend, please specify the host of the event Ref 5544/14 20 October Dear Re: Request under the Freedom of Information Act 2000 (FOIA) Thank you for your request for information, which was received by the Nottinghamshire Office of the Police and Crime

More information

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017 Liverpool Lime Street station engineering work Experience during October 2017 improvement work November 2017 Overview during the engineering work Between 30 September and 22 October engineering work at

More information

550,270 sq ft TO LET AVAILABLE Q1 2019

550,270 sq ft TO LET AVAILABLE Q1 2019 UNDER CONSTRUCTION 10 EASTWOOD NG16 3UA CROSS-DOCKED WAREHOUSE/DISTRIBUTION UNIT 550,270 sq ft TO LET Q1 2019 J26-7 minutes Ample car and HGV parking with potential for more 50m yards on both sides 15m

More information

Oakley Hay, Corby RANGE OF AREAS BETWEEN 3.17 ACRES (1.28 HECTARES) ACRES (7.16 HECTARES) SAT NAV: NN18 8HS

Oakley Hay, Corby RANGE OF AREAS BETWEEN 3.17 ACRES (1.28 HECTARES) ACRES (7.16 HECTARES) SAT NAV: NN18 8HS THREE GATEWAY COMMERICAL DEVELOPMENT SITES OF INTEREST TO OWNER OCCUPIERS RANGE OF AREAS BETWEEN 3.17 ACRES (1.28 HECTARES) - 17.72 ACRES (7.16 HECTARES) BUILDINGS OF BETWEEN 20,000 SQ FT AND 200,000 SQ

More information

How to read this timetable

How to read this timetable 21 Train times 11 December 2016 20 May 2017 Manchester to Manchester Airport local stopping services Parking available Staff in attendance Bicycle store facility Metrolink Interchange stations Disabled

More information

MARCH 2017 NEWSLETTER

MARCH 2017 NEWSLETTER BEDFORD COMMUTERS ASSOCIATION The Rail User Group for Bedford and Flitwick MARCH 2017 NEWSLETTER 1. EMT Franchise The consultation document for the franchise should have been published at the beginning

More information

Marketing Sheffield. Discount Rail Travel.

Marketing Sheffield. Discount Rail Travel. Marketing Sheffield Discount Rail Travel welcometosheffield.co.uk/conference @ConferenceSheff Make Your Booking With our partner, East Midlands Trains, we are pleased to offer discounted return rail travel

More information

Transport Monitoring Report

Transport Monitoring Report Transport Monitoring Report 2017 April 2018 Transport Policy Environment and Economy Transport Monitoring Report 2017 Contents Page 1. Introduction 1 2. Growth of Traffic 2 3. Countywide Growth 3 4. Rural

More information

INDUSTRIAL UNITS FROM 3, ,000 SQFT

INDUSTRIAL UNITS FROM 3, ,000 SQFT WELL-ESTABLISHED INDUSTRIAL ESTATE B U S I N E S S P A R K, LONG BENNINGTON, nottingham, NG23 5FF INDUSTRIAL UNITS FROM 3,000-220,000 SQFT (North) Junction (To and From the North) Long Bennington Junction

More information

Build to suit 20,000 sq ft 600,000 sq ft Distribution and Industrial units Junction 28, M1 45 acre site

Build to suit 20,000 sq ft 600,000 sq ft Distribution and Industrial units Junction 28, M1 45 acre site Build to suit 20,000 sq ft 600,000 sq ft Distribution and Industrial units Junction 28, 45 acre site Site ready for development with completed infrastructure Fast track planning available The Scheme Prominently

More information

Central Retail Park Manchester, M4 6DL

Central Retail Park Manchester, M4 6DL Central Retail Park 163,000 sq ft Major Refurbishment in 2015 Open A1 (part food) Proposed Scheme: Refurbished Retail Units MARCH 2013 2012-029 Hadfield Cawkwell Davidson Great Ancoats Street, Manchester

More information

Train times. northernrail.org. Liverpool to Manchester Airport and Warrington Bank Quay via Earlestown. 13 December May 2016

Train times. northernrail.org. Liverpool to Manchester Airport and Warrington Bank Quay via Earlestown. 13 December May 2016 15 Parking available Staff in attendance Bicycle store facility Metrolink Interchange stations Disabled assistance available Airport link Train times 13 December 2015 14 May 2016 Liverpool to Manchester

More information

INDUSTRIAL UNITS FROM 3, ,000 SQFT

INDUSTRIAL UNITS FROM 3, ,000 SQFT WELL-ESTABLISHED INDUSTRIAL ESTATE, LONG BENNINGTON, nottingham, NG23 5FF INDUSTRIAL UNITS FROM 3,000-220,000 SQFT (North) Junction (To and From the North) Long Bennington Junction (To and From the South)

More information

ECCLES STATION NEWS JUNE 2016 NEWS

ECCLES STATION NEWS JUNE 2016 NEWS ECCLES STATION NEWS JUNE 2016 NEWS Passengers travelling through Oxenholme, Cumbria will have a smoother, more reliable journey following a weekend of upgrade work by Network Rail's orange army. Engineers

More information

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has

More information

For public transport information phone Buses 192 X92. Easy access on all buses

For public transport information phone Buses 192 X92. Easy access on all buses From 23 July 192 and X92 Times changed. Buses are also rerouted in Stockport town centre due to the temporary closure of Wellington Road South Buses 192 X92 Easy access on all buses Hazel Grove Stepping

More information

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir,

33 Horseferry Road HP20 1UA London SW1P 4DR. Tuesday 10 th October Dear Sir, East Midlands Rail Franchise Programme Office Consultation Co-ordinator c/o Buckinghamshire County Council Zone 2/21 County Hall Department for Transport Walton Street Great Minster House Aylesbury 33

More information

East Midlands rail franchise: passengers experiences and aspirations. September 2017

East Midlands rail franchise: passengers experiences and aspirations. September 2017 East Midlands rail franchise: passengers experiences and aspirations September 2017 1 Introduction Passengers are now the majority funders of the day-to-day railway and should be at the heart of all decisions.

More information

Change for the better: Stagecoach and the East Midlands Franchise

Change for the better: Stagecoach and the East Midlands Franchise Change for the better: Stagecoach and the East Midlands Franchise Time Destination 0001 A message from Ian Dobbs Chief Executive, Rail Division Stagecoach Group I am excited that Stagecoach has the opportunity

More information

Marketing Sheffield. Discount Rail Travel.

Marketing Sheffield. Discount Rail Travel. Marketing Sheffield Discount Rail Travel welcometosheffield.co.uk/conference @ConferenceSheff Make Your Booking With our partner, East Midlands Trains, we are pleased to offer discounted return rail travel

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere) APPNIX H2 CONNCTIVITY IMPROVMNTS ACHIV BY HS2 AN HIGH SP UK FOR: HURSFIL (extract from HS2 High Speed to Nowhere) Appendix H2 : Page 244 Introduction & key results Page 245 Timeline of comparative journey

More information

East Midlands Rail Franchise Public Consultation. September 2017

East Midlands Rail Franchise Public Consultation. September 2017 East Midlands Rail Franchise Public Consultation September 2017 1. The Associated Society of Locomotive Engineers and Firemen (ASLEF) is the UK s largest train driver s union representing approximately

More information

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017 Cabinet Date of Meeting 6 December 2017 Cabinet Member Cllr Daryl Turner Cabinet Member for Natural and Built Environment Lead Director Mike Harries Corporate Director for Environment and Economy Subject

More information

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere) APPNDIX L2 CONNCTIVITY IMPROVMNTS ACHIVD BY HS2 AND HIGH SPD UK FOR: LICSTR (extract from HS2 High Speed to Nowhere) Appendix L2 : Leicester Page 262 Introduction & key results Page 263 Timeline of comparative

More information

Technical specifications. Memorable business events

Technical specifications. Memorable business events Technical specifications Memorable business events Locations A1(M) M6 A1(M) M1 M6 Nottinghamshire Sherwood Nottinghamshire M5 M42 M6 M40 rest A1(M) Bedfordshire M1 M11 A11 A14 Suffolk Elveden Suffolk M4

More information

STAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE

STAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE 27 November 2014 STAGECOACH-VIRGIN COMPANY AWARDED INTERCITY EAST COAST RAIL FRANCHISE 140m planned investment to deliver an improved service and more personalised travel Over 25m planned spend in improving

More information

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant

Workplace Parking Levies: the contribution of commuters to funding public transport. Sue Flack Consultant Workplace Parking Levies: the contribution of commuters to funding public transport Sue Flack Consultant Summary 1. 2. 3. 4. 5. Example of Nottingham, UK Use of Workplace Parking Levy Revenue Why Workplace

More information

London Bridge station opens upgrade works

London Bridge station opens upgrade works On board wi-fi rollout Dorking station highly commended at cycle awards Govia Railway Stakeholder Newsletter Period 9-10 February 2017-182016 Our stakeholder newsletter features business updates, news

More information

Changes to train times Easter Weekend Manchester to Stalybridge and Huddersfield

Changes to train times Easter Weekend Manchester to Stalybridge and Huddersfield 25 Changes to train times Easter Weekend Manchester to Stalybridge and Huddersfield 30 March 2 April 2018 Parking available Staff in attendance Bicycle store facility Metrolink Interchange stations Disabled

More information

Buses. Saturday 29 December Normal Saturday service.

Buses. Saturday 29 December Normal Saturday service. Buses Please remember to plan ahead and check with your bus operator before you travel on any of the dates listed below. Buses will run a normal or modified weekday service, or Saturday service with additional

More information

S T GEORGE S RETAIL PARK LEICESTER LE1 1SG

S T GEORGE S RETAIL PARK LEICESTER LE1 1SG PHASED SCHEME REFURBISHMENT & EGRESS IMPROVEMENTS UNDER WAY OPENING AUTUMN 2017 KITCHENS 7.5m Investment into Park Evolution THREE NEW FURNISHINGS UNITS TO BE CONSTRUCTED Planning Permission granted Wren

More information

40 ACRE HIGH PROFILE DEVELOPMENT SITE

40 ACRE HIGH PROFILE DEVELOPMENT SITE 40 ACRE HIGH PROFILE DEVELOPMENT SITE AVAILABLE ON A DESIGN AND BUILD BASIS Units from 26,500 to 800,000 sq ft WA8 0RN STRATEGIC NORTH WEST LOCATION BESPOKE DESIGN AND BUILD PACKAGES AVAILABLE FREEHOLD

More information

18th July Updated. Park & Ride Timetable. Including. Birstall, Enderby and Meynell s Gorse. Visit

18th July Updated. Park & Ride Timetable. Including. Birstall, Enderby and Meynell s Gorse. Visit Including Birstall, Enderby and Effective from Park & Ride Timetable 18th July 2011 Updated Park & Ride 15 Birstall, Enderby and Fast and frequent 7 7 non-stop into the City Monday - Saturday every 15

More information

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co. Easter Improvement Works London Euston Closed Friday 19 until Monday 22 April 2019 virgintrains.com/spanner nationalrail.co.uk/westcoast @virgintrains virgintrains What's happening? We recommend that

More information

Essential information for new arrivals in Derbyshire. local council

Essential information for new arrivals in Derbyshire. local council Essential information for new arrivals in Derbyshire local council In Derbyshire, there are people from different backgrounds, ages, cultures and religions, who we hope feel they belong to one community.

More information

TIMETABLE FINDING AID MIDLAND RAILWAY

TIMETABLE FINDING AID MIDLAND RAILWAY TIMETABLE FINDING AID for the MIDLAND RAILWAY and its CONSTITUENT COMPANIES FOREWORD MIDLAND RAILWAY & CONSTITUENT COMPANIES TIMETABLE FINDING AID This work is the result of a collaboration between the

More information

January EASTERN SECTION prospectus for growth

January EASTERN SECTION prospectus for growth January 2019 EASTERN SECTION prospectus for growth Contents 2 Foreword 4 Our objectives 5 Our offer 10 Our ask 11 How rail improvements will unlock growth 16 Moving forward Front row, from left to right:

More information

Prestigious Serviced Offices in a Magnificent Stately Home

Prestigious Serviced Offices in a Magnificent Stately Home 01302 243 932 Prestigious Serviced Offices in a Magnificent Stately Home Situated In The Heart Of England With Excellent Tr avel Links Across The UK And Only 70 Minutes By R ail to London KELHAM HALL BUSINESS

More information

Tram Passenger Survey

Tram Passenger Survey Key findings Autumn 2015 Foreword Jeff Halliwell Now in its third year, our Tram Passenger Survey has covered passengers views of their journey in six network areas in Britain. For the second time this

More information

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c. Abellio ScotRail Arriva Rail London Alliance Rail Arriva Trains Wales c2c Chiltern Railways Colas Rail CrossCountry DB Cargo (UK) Limited Devon & Cornwall Railway Direct Rail Services East Midlands Trains

More information

This annual report covers the year from May 2013 to April 2014

This annual report covers the year from May 2013 to April 2014 Stagecoach East Midlands is the region s largest bus operator and runs local bus services in Kingston upon Hull, throughout Lincolnshire, North Nottinghamshire and South Yorkshire. Every day our staff work

More information

CATEGORY NAME AWARD POINTS 2018 CITY NORTHAMPTON GOLD 172 SMALL CITY LOUGHBOROUGH GOLD 189 CHESTERFIELD GOLD 179 OADBY AND WIGSTON GOLD 177

CATEGORY NAME AWARD POINTS 2018 CITY NORTHAMPTON GOLD 172 SMALL CITY LOUGHBOROUGH GOLD 189 CHESTERFIELD GOLD 179 OADBY AND WIGSTON GOLD 177 CATEGORY NAME AWARD POINTS 2018 CITY NORTHAMPTON 172 SMALL CITY LOUGHBOROUGH 189 CHESTERFIELD 179 OADBY AND WIGSTON 177 GRIMSBY GILT 154 LARGE TOWN BELPER 177 MARKET HARBOROUGH 179 LONG EATON 174 SPALDING

More information

Tram Passenger Survey (TPS) All networks

Tram Passenger Survey (TPS) All networks Tram Passenger Survey (TPS) All networks Rosie Giles Tel: Email: Rosie.Giles@transportfocus.org.uk results March Insight Team, Transport Focus, Fleetbank House, - Salisbury Square, London, ECY JX Contents

More information