1 PCBS DELINEATION WORK PLAN BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK (FORMER BLUE ISLAND LANDFILL) BLUE ISLAND, COOK COUNTY, ILLINOIS PREPARED FOR: CITY OF BLUE ISLAND SOUTH GREENWOOD AVENUE BLUE ISLAND, ILLINOIS PREPARED BY: V3 COMPANIES 120 NORTH LASALLE STREET, SUITE 1550 CHICAGO, ILLINOIS JULY 2009

2 TABLE OF CONTENTS 1.0 INTRODUCTION Contact Information Identified Site Conditions Phase II Investigations Investigation Objectives FIELD INVESTIGATION PROGRAM Soil Sampling ANALYTICAL PROGRAM...4 FIGURES Figure 1 Figure 2 Figure 3 Site Location Map Soil Boring/Monitoring Well Location Map Proposed PCBs Delineation Borings TABLES Table 1 Sampling and Analysis Plan PCBs Delineation Work Plan City of Blue Island Blue Island Industrial Park July 2009

3 1.0 INTRODUCTION This PCBs Delineation Work Plan (PDWP) was prepared by V3 Companies (V3) on behalf of the City of Blue Island, Illinois. This document outlines the proposed investigation work scope to be performed at the Blue Island Northeast Mixed-Use Commercial Park (Site) located at the southeast corner of the intersection of Vincennes Avenue and 119 th Street in Blue Island, Illinois. The Site location is identified on Figure 1. V3 completed a Phase I Environmental Site Assessment (ESA) of the Site in October The property was initially owned by Illinois Brick Company, who operated a clay pit for making bricks, until it was sold to John Sexton Contractors in John Sexton Contractors operated a landfill/burn pit at the site from 1952 to The landfill ceased waste disposal operations in The property was historically an unpermitted landfill because its use and eventual cessation of operations pre-dated the Illinois solid waste regulations. The landfill covers approximately 87-acres, which are vacant except for the presence of a few commercial operations and former light industrial operations. In addition to the Phase I ESA, V3 has conducted three Phase II ESAs and overseen a geotechnical investigation from August 2006 to March A total of 108 soil borings have been advanced at the Site by V3 as part of the environmental and geotechnical investigations (Figure 2). Additionally, four geotechnical investigations were conducted by others at the Site prior to V3 s Phase I ESA. V3 prepared a Quality Assurance Project Plan (QAPP) on behalf of The City of Blue Island, which was submitted to the USEPA in June 2009 and USEPA approved it on July 31, The QAPP includes V3 s Standard Operating Procedures (SOPs), including our field procedures, field equipment and laboratory testing methods. Please refer to the QAPP for descriptions of these and other SOPs. 1.1 Contact Information City of Blue Island USEPA Brownfield Consultant Jodi Prout Community Development Director City of Blue Island South Greenwood Blue Island, IL (708) Ms. Deborah Orr US Environmental Protection Agency Mail Code SB-7J 77 W. Jackson Blvd. Chicago, IL (312) Mr. Craig McCammack, P.G. Senior Project Manager V3 Companies 120 North LaSalle Street, Suite 1550 Chicago, IL (312) x3554 PCBs Delineation Work Plan City of Blue Island 1 Blue Island Industrial Park July 2009

4 1.2 Identified Site Conditions The Phase I ESA conducted by V3 identified the following Recognized Environmental Conditions (RECs) pertaining to the Site: 1. Historic Crude Oil ASTs and USTs 2. Historic Fuel Oil Tank 3. Former Railroad Tracks 4. Nature and Characteristics of Landfill-Related Wastes 5. Nature and Characteristics of Landfill Leachate, Groundwater, and Methane Gas 6. Potential that Landfill Cap has been compromised (via soil erosion, potential wetlands, open water areas, and installation of underground utilities) 7. Nature and Characteristics of Surface Fill Materials 8. Potential Environmental Impacts from Off-Site Operations 1.3 Phase II Investigations V3 conducted three Phase II investigations and oversaw a geotechnical investigation from August 2006 to March The investigations were conducted to address the RECs identified in the Phase I ESA and to characterize subsurface conditions. A total of 108 soil borings were advanced at the Site by V3 as part of the Phase II ESAs and geotechnical investigations (Figure 2). Analytical results indicated that concentrations of several constituents exceeded Illinois Environmental Protection Agency (IEPA) Remediation Objectives (ROs). In addition, PCBs concentrations exceed the Toxic Substances Control Act (TSCA) hazardous level of 50 ppm, in one sample collected from soil boring BI-GP-29 (4-6 ). The PCBs concentration in this sample, which was collected from landfill materials, was 169 milligrams per kilogram (mg/kg). 1.4 Investigation Objectives The focus of the PCBs delineation is to: Determine the vertical and horizontal extent of TSCA level PCBs encountered in soil boring BI-GP-29; Collect sufficient data to aid V3 in developing a remediation plan for the PCBs impact at this location. Receive approval from the USEPA to conduct a self-implementing cleanup of TSCAlevel PCBs contaminated soil. The SAP (Table 1) presents the analytical data V3 proposes to obtain to characterize environmental subsurface conditions in the delineation area. V3 notes that the development and implementation of an appropriate remediation plan are not addressed in this work plan. PCBs Delineation Work Plan City of Blue Island 2 Blue Island Industrial Park July 2009

5 2.0 FIELD INVESTIGATION PROGRAM A track-mounted Geo-Probe will be used to advance soil borings at the delineation area. The following sections of the PDWP describe the media to be sampled, number and location of samples, general sampling methods, and field and laboratory protocols. Refer to Figure 3 and Table 1 for an overview of the delineation boring grid and sampling program, and to the QAPP for V3 s SOPs. The goal of this investigation is to delineate PCBs impacts in soil adjacent to BI-GP-29. Given the historic use, complexity of former Site operations, and the nature of landfill materials, it is possible that an additional investigation phase may be needed to completely delineate PCBs impacts. However, depending on the extent of PCBs impacts, it is also possible to delineate the impacted area during the remediation activities. Once the data from the field investigation has been evaluated, V3 will discuss this with the City of Blue Island, and mutually determine if additional investigation is necessary or whether delineation may be completed as part of the remediation activities. 2.1 Soil Sampling The sampling plan is based on protocols described in 40 CFR (Determination of the number of samples to collect and sample collection locations) and 40 CFR (Sample size and procedure to collect a sample) for the delineation of PCBs-impacted soils. A square based grid system will be laid out over the impacted area prior to the installation of soil borings. The grid system will be orientated on a magnetic north-south line centered on BI-GP-29 and an east-west perpendicular line also centered on BI-GP- 29. The grid will be based on a lateral spacing of 5 feet (approximately 1.5 meters) for the sampling points. The delineation area will be approximately 20 feet by 20 feet in dimension (Figure 3). A hand-held GPS unit will be used to locate BI-GP-29 and to record the positions of the sampling points. One soil boring will be advanced in the center of each 5-foot grid cell (total of 16 borings) to a maximum depth of 10 feet below ground surface. Three grab samples will be collected from each boring, at three depth intervals (0.5-1 foot, feet and feet). Then from the four borings within each 10-foot by 10-foot grid cell, the four grab samples from each depth interval will be composited into one sample. Thus, a total of four composite samples from each of the three depth intervals across the 20-foot by 20-foot delineation area (a total of 12 samples) will be submitted to the laboratory for analysis of PCBs (Table 1). Appropriate duplicate, MS/MSD and equipment blank samples will also be collected for PCBs analysis (Table 1). A photo-ionization detector (PID) will be used to monitor ambient air conditions during drilling, and to screen soil samples for the presence of VOCs. Performance of field activities, including site observations and conditions, will be recorded by V3 s field geologist. This will also include the preparation of soil boring logs. Soil samples will be described and classified using the Unified Soil Classification System (USCS), noting stratigraphy, moisture, and density properties. Refer to the QAPP for a complete discussion of field protocols. PCBs Delineation Work Plan City of Blue Island 3 Blue Island Industrial Park July 2009

6 3.0 ANALYTICAL PROGRAM Sample analyses will be performed by STAT Analytical Laboratories located in Chicago, IL. Samples will be analyzed according to Table 1 - Sampling and Analysis Plan. Refer to the QAPP for field and analytical laboratory protocols. N:\2006\06039\Reports\Work Plans\PCBs\Blue Island PCBs Work Plan DRAFT doc PCBs Delineation Work Plan City of Blue Island 4 Blue Island Industrial Park July 2009

7 FIIGURES

8 ± West Parcels East Parcel ,000 Feet V3 Companies 120 N. LaSalle St, Suite 1550 Chicago, IL phone fax TITLE: Site Location Map PROJECT AND SITE LOCATION: Blue Island Northeast Mixed-Use Commercial Park 119th St & Vincennes Av, Blue Island, IL BASE LAYER: PROJECT NO. FIGURE: SHEET: OF: USGS Topographic Map (1993) TIF 1 CLIENT: City of Blue Island QUADRANGLE: DATE: SCALE: City Hall S. Greenwood Avenue Blue Island, Illinois Blue Island, IL 12/18/08 See Scale Bar 1 1

9 Figure 2.dgn 7/21/ :22:22 PM

10 FIGbor_well06039_24x36.dgn 7/21/ :14:17 PM

11 TABLES

12 TABLE 1 SAMPLING AND ANALYSIS PLAN Marshfield Avenue PCB Delineation Work Plan Blue Island Northeast Mixed-Use Commercial Park Blue Island, IL SOIL WATER PCBs AREAS OF INVESTIGATION SAMPLING LOCATIONS SAMPLING PROTOCOL BORING & SAMPLE DEPTH ANALYSES PERFORMED SAMPLES DESCRIPTION / RATIONALE EAST PARCEL OF LANDFILL Delineate Horizontal & Vertical PCB impacts associated with TSCA level PCB concentrations detected in soil boring BI- 4'-6' Grab Sample 0.5-1' X ' X ' X 4 Collect four composite soil samples from this depth interval Collect four composite soil samples from this depth interval Collect four composite soil samples from this depth interval The sampling grid will be based on a lateral spacing of 5 feet (approximately 1.5 meters) for the sampling points. The delineation area will be approximately 20 feet by 20 feet in dimension. One soil boring will be advanced in the center of each 5-foot grid cell (total of 16 borings) to a maximum depth of 10 feet below ground surface. Three grab samples will be collected from each boring, at three depth intervals (0.5-1 feet, feet and feet). Then from the four borings within each 10-foot by 10-foot grid cell, the four grab samples from each depth interval will be composited into one sample. Thus, a total of four composite samples from each of the three depth intervals across the 20-foot by 20-foot delineation area (a total of 12 samples) will be submitted to the laboratory for analysis of PCBs. QA/QC - Soil & Water Duplicate MS/MSD Equipment Blank X 1 X 1 X 2 Per QAPP, soil and water duplicates 1 per 20 and water only equipment blanks 1 per 20, minimum of one field blank per day. Collect MS/MSD from impacted sample if possible. TOTALS 16 N:\2006\06039\Reports\Work Plans\PCBs\PCB Delineation Work Plan\Blue Island Table 1 SAP FINAL xls Page 1 of 1 7/21/2009

List of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017

List of Environmental Reports and Documents Regarding Hazardous Materials. August 10, 2017 List of Environmental Reports and Documents Regarding Hazardous Materials August 10, 2017 Pier 70 1999 Annual Ground Water Monitoring Report for Piers 70 and 94, Tetra Tech, Inc., February 2000. 1999 Annual

More information

FIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C

FIGURES. Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City. CSI Job No C FIGURES Former Hoppy s Paint & Body and Knat s Barber Shop City of Plant City CSI Job No. 9680.33 C INFERRED EXTENT OF ARSENIC IMPACTED SOIL C.A. No. 262 Additional Soil Assessment Activities 607, 609,

More information

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016

CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM REPORT MARCH 1, 2016 CITY OF LYNDEN STORMWATER MANAGEMENT PROGRAM 2015 WATER QUALITY MONITORING REPORT CITY OF LYNDEN 300 4 TH STREET LYNDEN, WASHINGTON 98264 PHONE (360) 354-3446 MARCH 1, 2016 This document serves as an attachment

More information

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010

FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 FACT SHEET HUNTERS POINT SHIPYARD Parcel E-2 PCB Hot Spot Time-Critical Removal Action: 2010 Shoreline Hot Spot Area Central Portion - View North October 2009 This fact sheet provides information about

More information

M E M O R A N D U M. Status of the Environmental Cleanup of the Shipyard

M E M O R A N D U M. Status of the Environmental Cleanup of the Shipyard ECONOMIC AND WORKFORCE DEVELOPMENT MICHAEL COHEN, DIRECTOR CITY AND COUNTY OF SAN FRANCISCO GAVIN NEWSOM, MAYOR M E M O R A N D U M TO: Members of the Health Commission FROM: Michael Cohen CC: Mitch Katz,

More information

WORKSHOP SUMMARY BROWNFIELDS NUTS & BOLTS TRAINING - MARCH 25, 2008

WORKSHOP SUMMARY BROWNFIELDS NUTS & BOLTS TRAINING - MARCH 25, 2008 INTRODUCTION WORKSHOP SUMMARY BROWNFIELDS NUTS & BOLTS TRAINING - MARCH 25, 2008 On Tuesday March 25, 2008, the City of Blue Island hosted a Brownfields Nuts & Bolts Training Workshop, which also served

More information

SUTTER COUNTY. General Plan Update Technical Background Report

SUTTER COUNTY. General Plan Update Technical Background Report SUTTER COUNTY General Plan Update Technical Background Report February 2008 SUTTER COUNTY GENERAL PLAN UPDATE TECHNICAL BACKGROUND REPORT PREPARED FOR: SUTTER COUNTY PREPARED BY: PBS&J IN PARTNERSHIP

More information

AMS Gas Vapor Probe Systems (GVP)

AMS Gas Vapor Probe Systems (GVP) AMS Gas Vapor Probe Systems (GVP) AMS GVP systems are equipped with two different styles of 5/8in OD extensions: solid tile probe extensions, and hollow GVP rods. Extendable tile probe extensions are solid

More information

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward

Flying Cloud Airport (FCM) Zoning Process: Informing a Mn/DOT Path Forward : Informing a Mn/DOT Path Forward A Review of the Flying Cloud Airport (FCM) Joint Airport Zoning Board (JAZB) Process and the Draft Airport Zoning Ordinance B A RPZ RPZ A B C Zone Chad E. Leqve Director

More information

Preliminary Site Evaluation

Preliminary Site Evaluation Preliminary Site Evaluation 100 Acre Site, US 72 Piperton, Tennessee Power Distributor: Chickasaw Electric Cooperative August 2010 SITE DATA SHEET PIPERTON US 72 SITE (100 ACRES): LOCATION & GENERAL DESCRIPTION

More information

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design

More information

INTERNATIONAL RULES AND INDUSTRY _ ISSUES OF OHS

INTERNATIONAL RULES AND INDUSTRY _ ISSUES OF OHS IMPLEMENTATION OF INTERNATIONAL RULES AND STANDARDS IN SHIPBREAKING INDUSTRY _ ISSUES OF OHS AND ENVIRONMENT S. S. Gadkar E &SS, Dy. D. G.(Tech) Directorate General of Shipping BACKGROUND The international

More information

Cruise Industry Perspective on OWS and Waste Management

Cruise Industry Perspective on OWS and Waste Management Cruise Industry Perspective on OWS and Waste Management MAX1 OWS Studies Conference Wilmington, NC, 24 June 2015 James R. Van Langen, P.E. Environmental, Safety, Quality & Sustainability Consultant Cruise

More information

RACER Properties in Saginaw Area

RACER Properties in Saginaw Area RACER Properties in Saginaw Area Bruce Rasher, Redevelopment Manager brasher@racertrust.org Saginaw Area, MI Overview See Buena Vista Township View map for details See Saginaw View map for details 2017

More information

Public Notice for Waiver of Aeronautical Land-Use Assurance. AGENCY: Federal Aviation Administration (FAA), DOT

Public Notice for Waiver of Aeronautical Land-Use Assurance. AGENCY: Federal Aviation Administration (FAA), DOT This document is scheduled to be published in the Federal Register on 09/06/2017 and available online at https://federalregister.gov/d/2017-18845, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Waukegan Public Library Reference Document Repository Catalogue

Waukegan Public Library Reference Document Repository Catalogue City of Waukegan and Area of Concern (AOC) Waukegan Properties near Lake Michigan Schedule of Property Records and plot plan, properties along Lake Michigan in Waukegan Waukegan Properties near Lake Michigan

More information

Notice of Intent of Waiver with Respect to Land; Fort Wayne International Airport, Fort Wayne, IN. AGENCY: Federal Aviation Administration (FAA), DOT.

Notice of Intent of Waiver with Respect to Land; Fort Wayne International Airport, Fort Wayne, IN. AGENCY: Federal Aviation Administration (FAA), DOT. This document is scheduled to be published in the Federal Register on 03/23/2018 and available online at https://federalregister.gov/d/2018-05888, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Pr oject Summar y. Survey of the prevalence of Escherichia coli O157:H7 on the surface of subprimal cuts of beef during winter months (Phase I)

Pr oject Summar y. Survey of the prevalence of Escherichia coli O157:H7 on the surface of subprimal cuts of beef during winter months (Phase I) Pr oject Summar y Survey of the prevalence of Escherichia coli O157:H7 on the surface of subprimal cuts of beef during winter months (Phase I) Principal Investigators: J. E. (Ken) Kennedy ABC Research

More information

AIR MONITORING REPORT

AIR MONITORING REPORT AIR MONITORING REPORT Boiler Room; Basement Pipe Chase Cleveland Middle School 1000 Walsh Street St. Paul, MN 55106 April 10 14, 2006 Nova Client No.: STPAU006/Project No: H06-0865 AIR MONITORING REPORT

More information

The May, 2016, meeting of the Waukegan Harbor Citizens Advisory Group was called to order at 6:00 pm by Chair Susie Schreiber.

The May, 2016, meeting of the Waukegan Harbor Citizens Advisory Group was called to order at 6:00 pm by Chair Susie Schreiber. Minutes of the May 19 th, 2016, CAG meeting held at Lilac Cottage, Waukegan Park District, Waukegan respectfully submitted by Thomas Chefalo, acting as Recording Secretary of the Waukegan Harbor Citizens

More information

Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes. Mather, California. 11 March 2009

Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes. Mather, California. 11 March 2009 Mather Restoration Advisory Board (RAB) Meeting Draft Summary Meeting Minutes 11 March 2009 Time: Place: 6:00 PM Air Force Real Property Agency (AFRPA) Conference Room 10503 Armstrong Avenue Mather, CA

More information

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Jackson and Union Counties, Illinois Proposed Action

More information

AN OVERVIEW OF DIOXIN CONTAMINATION AND ENVIRONMENTAL REMEDIATION PROCESS AT DA NANG AIRPORT

AN OVERVIEW OF DIOXIN CONTAMINATION AND ENVIRONMENTAL REMEDIATION PROCESS AT DA NANG AIRPORT AN OVERVIEW OF DIOXIN CONTAMINATION AND ENVIRONMENTAL REMEDIATION PROCESS AT DA NANG AIRPORT Presented by: Col. Dau Xuan Hoai (VIETNAM MOD), Dr. Andrew L. Sayers-Fay (USAID). CONTENT ENVIRONMENTAL REMEDIATION

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D

STAFF REPORT. Airport Land Use Consistency Determination Betteravia Plaza. MEETING DATE: January 21, 2016 AGENDA ITEM: 8D STAFF REPORT SUBJECT: Airport Land Use Consistency Determination Betteravia Plaza MEETING DATE: AGENDA ITEM: 8D STAFF CONTACT: Andrew Orfila RECOMMENDATION: Adopt findings for the Betteravia Plaza project

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

NORTHLAND-BELTLINE CORRIDOR

NORTHLAND-BELTLINE CORRIDOR NORTHLAND-BELTLINE CORRIDOR R E D E V E L O P M E N T S T R A T E G Y R E Q U E S T F O R Q U A L I F I C A T I O N S I N F O R M A T I O N M E E T I N G T U E S D A Y, 2 5 N O V E M B E R 2 0 1 4 AGENDA

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

General Aviation Land Use Planning

General Aviation Land Use Planning Our team. General Aviation Land Use Planning PURDUE ROAD SCHOOL - 2017 Presented by: Maria Muia, Ph.D., Senior Aviation Planner Woolpert, Inc. Brian Payne, Director Columbus Airport Nick Isenberg, Project

More information

Access to the site is obtainable from the paved driveway leading to the MWD facility.

Access to the site is obtainable from the paved driveway leading to the MWD facility. County of Riverside Public Safety Enterprise Communication Project Appendix A: Candidate Site Descriptions Overview The site is located adjacent to a Metropolitan Water District (MWD) facility on El Sobrante

More information

DEFINING BROWNFIELD SUCCESS AIR & WASTE MANAGEMENT ASSOCIATION BILOXI, MISSISSIPPI

DEFINING BROWNFIELD SUCCESS AIR & WASTE MANAGEMENT ASSOCIATION BILOXI, MISSISSIPPI DEFINING BROWNFIELD SUCCESS AIR & WASTE MANAGEMENT ASSOCIATION BILOXI, MISSISSIPPI . A LITTLE ABOUT PPM CONSULTANTS, INC. AIR, WATER, AND WASTE COMPLIANCE AIR PERMITTING, COMPLIANCE AND REPORTING WATER

More information

RE: Draft AC , titled Determining the Classification of a Change to Type Design

RE: Draft AC , titled Determining the Classification of a Change to Type Design Aeronautical Repair Station Association 121 North Henry Street Alexandria, VA 22314-2903 T: 703 739 9543 F: 703 739 9488 arsa@arsa.org www.arsa.org Sent Via: E-mail: 9AWAAVSDraftAC2193@faa.gov Sarbhpreet

More information

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The east half of Sections 21, 28, and 33, Township 37 North,

More information

This report was prepared by the Lake Zurich Police Department Traffic Safety Division. Intersection location and RLR camera approaches identified:

This report was prepared by the Lake Zurich Police Department Traffic Safety Division. Intersection location and RLR camera approaches identified: POLICE DEPARTMENT 200 Mohawk Trail Lake Zurich, Illinois 60047 (847) 719-1690 LakeZurich.org April 1, 2018 This report is being submitted regarding the red-light cameras. According to the Red Light Running

More information

Florida Registration No Florida Registration No

Florida Registration No Florida Registration No August 22, 2007 7863 Drew Circle, Unit 5 Fort Myers, Florida 33967 Office: (239) 337-9781 Fax: (239) 337-9783 www.williamsearthsciences.com Ms. Teresa N. Puckett, P.E. District One Geotechnical Engineer

More information

Official Journal of the European Union L 7/3

Official Journal of the European Union L 7/3 12.1.2010 Official Journal of the European Union L 7/3 COMMISSION REGULATION (EU) No 18/2010 of 8 January 2010 amending Regulation (EC) No 300/2008 of the European Parliament and of the Council as far

More information

Dipl. Ing. Ansonia Lillo Tor Dean University of Santo Tomás - Arica Chile

Dipl. Ing. Ansonia Lillo Tor Dean University of Santo Tomás - Arica Chile Dipl. Ing. Ansonia Lillo Tor Dean University of Santo Tomás - Arica Chile In Chile, the environmental matters have been faced up intensely during the past years. Despite this, just in the last year it

More information

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR Installation & Maintenance LISTED Tested to *UL 103HT & ULC-S641 Instructions MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

ISGS Data/Information for The Boring Company - Chicago Project

ISGS Data/Information for The Boring Company - Chicago Project ISGS Data/Information for The Boring Company - Chicago Project Robert A. Bauer Engineering Geologist Illinois State Geological Survey 6 Sep 2018 Champaign, IL Proposes: A closed-loop pair of 12 foot diameter

More information

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10.

HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND Drill Results Include 8.0% ZnEQ and 10. 1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE November 27, 2017 HANNAN CONTINUES DRILL SUCCESS OUTSIDE RESOURCE AREA AT KILBRICKEN, IRELAND

More information

David Magney Environmental Consulting

David Magney Environmental Consulting David Magney Environmental Consulting DELINEATION OF JURISDICTIONAL WATERS AND RIPARIAN HABITATS FOR LYONS CANYON RANCH, NEWHALL, CALIFORNIA Prepared for: UNITED STATES ARMY CORPS OF ENGINEERS and CALIFORNIA

More information

COMMUNITY RELATIONS PLAN BROWNFIELDS CLEANUP AND REDEVELOPMENT OF MASKER S THEATER & THOMPSON S WHARF PROPERTY 45 FRONT STREET BELFAST, MAINE REV.

COMMUNITY RELATIONS PLAN BROWNFIELDS CLEANUP AND REDEVELOPMENT OF MASKER S THEATER & THOMPSON S WHARF PROPERTY 45 FRONT STREET BELFAST, MAINE REV. COMMUNITY RELATIONS PLAN BROWNFIELDS CLEANUP AND REDEVELOPMENT OF MASKER S THEATER & THOMPSON S WHARF PROPERTY 45 FRONT STREET BELFAST, MAINE REV. 02 Prepared for: City of Belfast, Maine 131 Church Street

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

One East First Street Reno, NV

One East First Street Reno, NV AECOM City Hall Tower, 16th Floor One East First Street Reno, NV 89501 www.aecom.com 775.337.9565 tel 916.414.5850 fax Mr. David Whalen, P.E. City of Fernley Public Works 595 Silverlace Blvd. Fernley,

More information

MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005

MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005 MINUTES NAVAL WEAPONS STATION (NAVWPNSTA) SEAL BEACH RESTORATION ADVISORY BOARD (RAB) AND COMMUNITY MEETING March 8, 2005 Participants: Blake, Geoffrey Carmody, Jack Chauvel, Tim / Department of Toxic

More information

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2015-SW-014-AD; Amendment ; AD ]

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2015-SW-014-AD; Amendment ; AD ] [Federal Register Volume 80, Number 95 (Monday, May 18, 2015)] [Rules and Regulations] [Pages 28172-28175] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No:

More information

Land Use and Environmental Control

Land Use and Environmental Control ICAO-ACI/LAC Seminar on Bird Hazards, Environmental Protection and Land Use at Airports for the NAM/CAR/SAM (Americas) Regions Miami, 24-27 April 2001 Land Use and Environmental Control Michiel Vreedenburgh

More information

Table 1: Avocado Flats Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

Table 1: Avocado Flats Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle County of Riverside Public Safety Enterprise Communication Project Appendix A: Candidate Site Descriptions Overview The candidate area is located in Northern San Diego County, 0.65 mile south of the border

More information

7.1 General Information. 7.2 Landing Gear Footprint. 7.3 Maximum Pavement Loads. 7.4 Landing Gear Loading on Pavement

7.1 General Information. 7.2 Landing Gear Footprint. 7.3 Maximum Pavement Loads. 7.4 Landing Gear Loading on Pavement 7.0 PAVEMENT DATA 7.1 General Information 7.2 Landing Gear Footprint 7.3 Maximum Pavement Loads 7.4 Landing Gear Loading on Pavement 7.5 Flexible Pavement Requirements - U.S. Army Corps of Engineers Method

More information

Opportunities for Solitude in Salt Lake Ranger District Wilderness Areas; Uinta-Wasatch-Cache National Forest

Opportunities for Solitude in Salt Lake Ranger District Wilderness Areas; Uinta-Wasatch-Cache National Forest Opportunities for Solitude in Salt Lake Ranger District Wilderness Areas; Uinta-Wasatch-Cache National Forest Prepared by: Henry Lilly (graduate research assistant) Jeff Rose (co-investigator) Matthew

More information

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

Tunnel design underneath the operating runway of Incheon airport

Tunnel design underneath the operating runway of Incheon airport Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8 Tunnel design underneath the operating

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Notification and Reporting of Aircraft Accidents or Incidents. and Overdue Aircraft, and Preservation of Aircraft Wreckage,

Notification and Reporting of Aircraft Accidents or Incidents. and Overdue Aircraft, and Preservation of Aircraft Wreckage, This document is scheduled to be published in the Federal Register on 12/15/2015 and available online at http://federalregister.gov/a/2015-30758, and on FDsys.gov 7533-01-M NATIONAL TRANSPORTATION SAFETY

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Community Advisory Panel Meeting #

Community Advisory Panel Meeting # Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian

More information

ICP Test Report Certification Packet

ICP Test Report Certification Packet ICP Test Report Certification Packet Company name : Littelfuse, Inc. Product Series: Midget Fuse Product #: BLS, H, M, PJ Issue Date: July 14, 2010 It is hereby certified by Littelfuse, Inc. that there

More information

July 23, Ms. Shanna Schmitt, Project Manager Minnesota Pollution Control Agency VIC Program 520 Lafayette Road St. Paul, Minnesota

July 23, Ms. Shanna Schmitt, Project Manager Minnesota Pollution Control Agency VIC Program 520 Lafayette Road St. Paul, Minnesota Wenck Associates, Inc. 1802 Wooddale Drive Suite 100 Woodbury, MN 55125-2937 (651) 294-4580 Fax (651) 228-1969 wenckmp@wenck.com www.wenck.com July 23, 2014 Ms. Shanna Schmitt, Project Manager Minnesota

More information

Figure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including:

Figure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including: Barr Engineering Company 4700 West 77th Street Minneapolis, MN 55435-4803 Phone: 952-832-2600 Fax: 952-832-2601 www.barr.com An EEO Employer Minneapolis, MN Hibbing, MN Duluth, MN Ann Arbor, MI Jefferson

More information

INVESTIGATING THE GRANDE ECORE & RED RIVER: A HANDS- ON INQUIRY

INVESTIGATING THE GRANDE ECORE & RED RIVER: A HANDS- ON INQUIRY INVESTIGATING THE GRANDE ECORE & RED RIVER: A HANDS- ON INQUIRY Paul Nagel, PhD Coordinator, Louisiana Geography Education Alliance Jacqueline L. Mason, Ed.D Assistant Professor, Science Education Northwestern

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

[Docket No. FAA ; Directorate Identifier 2015-CE-028-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2015-CE-028-AD; Amendment ; AD ] [Federal Register Volume 80, Number 228 (Friday, November 27, 2015)] [Rules and Regulations] [Pages 73955-73957] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR

More information

Table 1: Margarita (SDSU) Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

Table 1: Margarita (SDSU) Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle County of Riverside Public Safety Enterprise Communication Project Appendix A: Candidate Site Descriptions Margarita (SDSU) Communication Site Margarita (SDSU) Communication Site Overview The site is located

More information

(i) Adopted or adapted airworthiness and environmental standards;

(i) Adopted or adapted airworthiness and environmental standards; TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN

More information

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by: Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared

More information

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations

NZQA registered unit standard version 4 Page 1 of 5. Maintain safety standards on the apron area of an airport. Aviation > Airport Operations Page 1 of 5 Title Maintain safety standards on the apron area of an airport Level 4 Credits 4 Purpose People credited with this unit standard are able to, on the apron area of an airport: identify and

More information

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

The role of Flight Data Analysis in the aircraft manufacturer s SMS.

The role of Flight Data Analysis in the aircraft manufacturer s SMS. WELCOME 09/06/2015 The role of Flight Data Analysis in the aircraft manufacturer s SMS. Monica Fiumana Martin Falcón monica.falcon@embraer.com.br Air Safety Department Embraer The role of Flight Data Analysis

More information

APPENDIX H. Contaminated Overview Study

APPENDIX H. Contaminated Overview Study APPENDIX H Contaminated Overview Study WATERMAIN & SEWER REPLACEMENT / RELINING, DOWNTOWN BRAMPTON, ON CONTAMINATION OVERVIEW STUDY CH2M Project n o : 161-15936-00 Date: July 2017 WSP Canada Inc. 51 Constellation

More information

Chapter 3. Burke & Company

Chapter 3. Burke & Company Chapter 3 Burke & Company 3. WRTA RIDERSHIP AND RIDERSHIP TRENDS 3.1 Service Overview The Worcester Regional Transit Authority (WRTA) provides transit service to over half a million people. The service

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Special Conditions: CFM International, LEAP-1A and -1C Engine Models; Incorporation

Special Conditions: CFM International, LEAP-1A and -1C Engine Models; Incorporation This document is scheduled to be published in the Federal Register on 11/14/2014 and available online at http://federalregister.gov/a/2014-27019, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Glossary and Acronym List

Glossary and Acronym List AFS Safety Assurance System (SAS) Overview Glossary and Acronym List This document lists and defines many SAS acronyms and terms. This is not intended to be a complete list of terms and definitions. TERM

More information

Purpose and Need for the Proposed Project

Purpose and Need for the Proposed Project Purpose and Need for the Proposed Project Introduction Snohomish County Airport/Paine Field (PAE) is located in Snohomish County, Washington, approximately 20 miles north of Seattle. Figure A1 depicts

More information

FLIGHT OPERATIONAL QUALITY ASSURANCE (FOQA) PROGRAM

FLIGHT OPERATIONAL QUALITY ASSURANCE (FOQA) PROGRAM LETTER OF AGREEMENT between FEDERAL EXPRESS CORPORATION and THE AIR LINE PILOTS in the service of FEDERAL EXPRESS CORPORATION as represented by THE AIR LINE PILOTS ASSOCIATION, INTERNATIONAL FLIGHT OPERATIONAL

More information

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS EXECUTIVE SUMMARY ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS PAGE NO. CHAPTER 1-INTRODUCTION... 1-1 1.01 General...1-1 1.02 Purpose and Scope of Study...1-1 1.03 The Planning Process...1-2

More information

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace

ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative

More information

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter

More information

EXECUTIVE SUMMARY. Partial Amended Submission to the Commission on the Limits of the Continental Shelf in Respect of the North Area

EXECUTIVE SUMMARY. Partial Amended Submission to the Commission on the Limits of the Continental Shelf in Respect of the North Area EXECUTIVE SUMMARY Partial Amended Submission to the Commission on the Limits of the Continental Shelf in Respect of the North Area Pursuant to Article 76 of the United Nations Convention on the Law of

More information

The date, site name, report author, report recipient, and report number are presented above.

The date, site name, report author, report recipient, and report number are presented above. Engineering Management Support, Inc. Memorandum To: Jesse Aviles, EPA RPM, VB/I70 Superfund Site From: Timothy C. Shangraw Date: October 17, 2017 Re: POLREP #27 - Vasquez Boulevard/Interstate 70 (VB/I70)

More information

This page is intentionally blank. Draft Only

This page is intentionally blank. Draft Only Source Water Intake Protection Plan City of Muskegon Water Supply WSSN 4570 The City of Muskegon Water Filtration Plant Muskegon, Michigan Draft Only October 2017 Prepared by: Tetra Tech, Inc. 10306 Eaton

More information

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION

USE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION luo Regulation 1 (10) OPS M1-32 Issued: 4 December 2018 Enters into force: 7 December 2018 Validity: indefinitely Legal basis: Aviation Act (864/2014), Sections 5, 9 and 57 Act on Transport Services (320/2017),

More information

Preliminary Environmental Site Assessment Sunapee Lake Wild Goose Property Newbury, NH

Preliminary Environmental Site Assessment Sunapee Lake Wild Goose Property Newbury, NH Preliminary Environmental Site Assessment Sunapee Lake Wild Goose Property Newbury, NH Prepared for: The New Hampshire Fish and Game Department Prepared by: Fay, Spofford & Thorndike Engineers Planners

More information

Federal Aviation Administration. Summary

Federal Aviation Administration. Summary Federal Aviation Administration Memorandum Date: February 16, 2006 From: Kim Smith, Manager, Small Airplane Directorate, ACE-100 To: See Distribution Prepared by: Ervin Dvorak, (816) 329-4123 Subject:

More information

Maximising Beneficial Reuse through the use of a Novel Dredging Contract

Maximising Beneficial Reuse through the use of a Novel Dredging Contract Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007

More information

Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium

Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium Lower St. Johns River Tributaries Fecal Coliform Basin Management Action Plan Jacksonville Environmental Symposium WBIDs Addressed in This BMAP This BMAP includes 10 of the 75 (cycle 2) fecal coliform

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Sheraton at the Falls

Sheraton at the Falls New York State Association for Solid Waste Management Sheraton at the Falls Niagara Falls March 14-16, 2016 ENDORSED BY NYSDEC Register by February 15 to receive a FREE Duffel Bag Sponsored By: 5 Continuing

More information

Moraine Valley Community College Campus Tree Care Plan Table of Contents

Moraine Valley Community College Campus Tree Care Plan Table of Contents Moraine Valley Community College Campus Tree Care Plan 2016-2021 Table of Contents I. CAMPUS TREE CARE PLAN PURPOSE:... 1 II. RESPONSIBLE DEPARTMENT... 1 III. THE CAMPUS TREE ADVISORY COMMITTEE... 1 IV.

More information

National Transportation Safety Board Washington, D.C

National Transportation Safety Board Washington, D.C E PLUR NATIONAL TRA SAFE T Y N IBUS UNUM S PORTATION B OAR D National Transportation Safety Board Washington, D.C. 20594 Safety Recommendation Date: November 28, 2012 In reply refer to: A-12-68 through

More information

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Continental Divide National Scenic Trail Legislative History and Planning Guidance Continental Divide National Scenic Trail Legislative History and Planning Guidance Legislation, Policy, and Direction Regarding National Scenic Trails The National Trails System Act, P.L. 90-543, was passed

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS

C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS C. APPROACH FOR IDENTIFYING THE BEST ROUTES FOR THE NEEDED TRANSMISSION SYSTEM IMPROVEMENTS CL&P s approach for identifying the best routes for the needed transmission system improvements included a determination

More information

Public Notice for Waiver of Aeronautical Land-Use Assurance. AGENCY: Federal Aviation Administration (FAA), DOT

Public Notice for Waiver of Aeronautical Land-Use Assurance. AGENCY: Federal Aviation Administration (FAA), DOT This document is scheduled to be published in the Federal Register on 07/18/2016 and available online at http://federalregister.gov/a/2016-16937, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

Recreation Opportunity Spectrum for River Management v

Recreation Opportunity Spectrum for River Management v Recreation Opportunity Spectrum for Management v. 120803 Introduction The following Recreation Opportunity Spectrum (ROS) characterizations and matrices mirror the presentation in the ROS Primer and Field

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Assessment of Pathogen Strategies

Assessment of Pathogen Strategies Assessment of Pathogen Strategies Bacteria levels in receiving waters are a primary concern for federal, state, and local agencies. The primary sources of bacteria are generally attributed to combined

More information