1 CROSSING SAFETY IMPROVEMENT PROGRAM FY Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS ILLINOIS COMMERCE COMMISSION MARCH 2018

2

3

4 INTRODUCTION The Illinois Commerce Commission (ICC) has the statutory responsibility to improve safety at public highway-rail crossings in the State of Illinois. Currently, there are 7,615 highway-rail grade crossings in Illinois, of which 763 are on state roads, and 6,852 are on local roads. There are 2,660 highway-rail grade-separated crossings (bridges) in the state. Another 3,628 grade crossings are on private property, which are not under the jurisdiction of the state, and there are also 139 private bridge structures. There are also 324 pedestrian grade crossings and 102 pedestrian grade separated crossings (bridges) in Illinois. Nationally, Illinois is second only to Texas in the total number of highway-rail crossings. Table A summarizes the distribution of highway-rail crossings by type and position. Table A Illinois Highway-Rail Crossings Crossing Type Crossing Position Crossings Public Roadway At-Grade 7,615 RR Over 1,720 RR Under 940 Pedestrian Pathway At-Grade 324 RR Over 67 RR Under 35 10,701 The ICC orders safety improvements at public highway-rail crossings on the local road system, with the cost of such improvements paid by the state, the railroads, and local governments. On state roads, the Illinois Department of Transportation (IDOT) pays the majority of the costs through the State Road Fund. For local roads, the Grade Crossing Protection Fund (GCPF) was created to pay the majority of the costs of improvements. RAILROAD CROSSING SAFETY THE THREE E s Illinois is one of the key transportation hubs in the nation. With approximately 7,385 miles of railroad track, its rail system is the country s second largest, including the nation s largest rail freight hub in Chicago. Illinois has the nation s third largest highway system, with 146,958 miles of highways, streets and roads and 26,770 bridges as of December Both the rail and highway systems are among the most heavily used in the nation in terms of volume of traffic, with much of the traffic concentrated in the Chicago metropolitan region. There, the urban mass transit system serves an average of over 608 million passengers a year over an extensive network of bus and rail routes. 1

5 Keeping the grade crossing portion of this transportation network operating safely and efficiently involves local, state and federal governments as well as the private sector. These safety efforts can be summarized as the Three E s - Education, Engineering and Enforcement. Education: The ICC is actively involved in developing programs to educate the public about the danger at highway-rail grade crossings. One example of this public education program is the ICC s participation in Operation Lifesaver. The Operation Lifesaver program is a public-private partnership designed to increase public awareness of grade crossing hazards. It also strives to improve driver and pedestrian behavior at railroad crossings by encouraging compliance with traffic laws relating to crossing signs and signals. Enforcement: Enforcement of existing traffic and trespass laws is key, especially the issuance of fines (up to $500) or community service to persons crossing railroad tracks after the warning signals have activated. Engineering: Grade crossing safety improvements are also critical to reducing collisions. The ICC orders physical and system improvements, including the installation and upgrading of grade crossing warning signs and signals and, where warranted, grade separations. While education and enforcement are absolutely essential, the focus of this report is the engineering of capital improvements to further railroad crossing safety on local roads IN REVIEW - Collision and Casualty Rates In 2017, preliminary statistics indicate there were 86 collisions at public crossings in Illinois, compared to 100 in 2016, a decrease of 9.3 percent. National preliminary figures for 2017 indicate 1,825 collisions occurred, compared to 1,743 in 2016, which is a 4.7% increase. 2

6 2,500 2,000 1, Year Trend in Collisions at Public Crossings: USA (Note: Data Provided by the Federal Railroad Administration) 2,081 1,644 1,771 1,789 1,781 1,970 Preliminary 1,783 1,700 1,743 1,825 1, Year Trend in Collisions at Public Crossings: Illinois (Note: Data Provided by the Federal Railroad Administration) Preliminary

7 The general public commonly thinks of grade crossing collisions as involving trains colliding with cars, and in a majority of incidents that is the case; however, each year a substantial number of collisions involve motor vehicles driving into the sides of trains. In 2017, 9.3% (8 of 86) of all collisions involved cars driving into the sides of trains, a percentage which has remained fairly constant over the years. The eight vehicle-train collisions in 2017 resulted in one fatality and two injuries. fatalities resulting from collisions at highway-rail crossings in Illinois increased from 20 in 2016 to 26 in Fatality statistics, however, are not a particularly good measure of safety. Fatalities are a function of random events, such as how many occupants were riding in a car involved in a collision, or multiple fatalities involved in the same incident (as in the death of eleven passengers involved in the Amtrak/steel truck collision that occurred near Bourbonnais, in 1999). Table B illustrates the distribution of fatalities by collision type in Table B Illinois Highway-Rail Grade Crossing Collisions Type of Collision Collisions Fatal Collisions Fatalities Train Struck Vehicle Vehicle Struck Train Pedestrian Note: There was one collision that resulted in five fatalities and two collisions that resulted in two fatalities. RAILROAD CROSSING SAFETY FUNDING The Grade Crossing Protection Fund (GCPF), appropriated to the Illinois Department of Transportation but administered by the ICC, was created by state law to assist local jurisdictions (counties, townships and municipalities) in paying for safety improvements at highway-railroad crossings on local roads and streets only. Assistance from the GCPF cannot be used for safety improvements at highway-rail crossings located on the state road or highway system. Those improvements are paid for by the Illinois Department of Transportation. Beginning with Fiscal Year 2010, each month $3.25 million in state motor fuel tax receipts is transferred from the Motor Fuel Tax (MFT) fund to the Grade Crossing Protection Fund. This amount provides the GCPF with $39 million annually to be used for safety improvements at highway-rail crossings on local roads and streets. The GCPF is typically used to help pay for the following types of projects: 4

8 Warning Device Upgrades: Installation of automatic flashing light signals and gates at public grade crossings currently not equipped with automatic warning devices; installation of automatic flashing light signals and gates at public grade crossings currently equipped only with automatic flashing light signals; signal circuitry improvements at public grade crossings currently equipped only with automatic warning devices; Grade Separations - New and Reconstructed: Construction, reconstruction, or repair of bridges carrying a local road or street over railroad tracks (overpass); construction, reconstruction, or repair of bridges carrying railroad tracks over a local road or street (subway); Grade Separations - Vertical Clearance Improvements: Lowering the existing highway pavement surface under a railroad bridge to improve vertical clearance for motor vehicles; Pedestrian Grade Separations: Construction of a bridge to carry pedestrian/bicycle traffic over or under railroad tracks; Interconnects: Upgrading the circuitry at grade crossings where warning signals are connected to the adjacent traffic signals so that the two systems operate in a synchronized manner; Highway Approaches: Improvements to the portion of the public roadway directly adjacent to the crossing surface; Connecting Roads: Construction of a roadway between a closed crossing and an adjacent open, improved crossing; Remote Monitoring Devices: Sensor devices in the circuitry of grade crossing warning devices which immediately alert the railroad to any failures in warning device operations; Crossing Closures: Provide an incentive payment to local agencies for the voluntarily closure of public highway-rail grade crossings; and Crossing Surface Renewals: Up to $2 million in assistance annually can be allocated for crossing surface improvements. The cost of railroad crossing safety improvements varies substantially depending on the nature of the work undertaken. A standard installation of gates with automatic flashing light signals on a two-lane road typically costs approximately $200,000-$300,000. Additional costs for road improvements could typically range from $2,000 to $100,000 depending on the road type and location. Grade separation structures are very costly. The GCPF has made contributions to pavement lowering (vertical clearance improvements) projects costing between $35,000 - $4 million, and new underpass structures costing more than $50 million. Bridges over railroads can cost from $600,000 for a rural structure to $40 million for a multi-lane multi-railroad urban structure. Typically, the ICC authorizes contributions from GCPF that pay up to 60% of the cost for grade separation projects and 85% to 95% for grade crossing improvements, although ICC policy is to allocate no more than $12 million from the GCPF to any individual project unless unusual circumstances warrant otherwise. When the numbers of crossing locations needing improvement are multiplied by project costs, the problem of allocating sufficient assistance from the GCPF becomes apparent. 5

9 CROSSING SAFETY IMPROVEMENT PROJECTS This report presents the railroad crossing safety capital improvements that ICC staff proposes to implement during FY 2019 and also looks ahead to the projects contemplated for FY 2020-FY In all cases it is assumed that any required local funding match will be available. In some cases local funding may not be available during the same fiscal year in which a crossing improvement has been programmed. In those circumstances the Rail Safety Section staff will recommend to the ICC that assistance from the GCPF for the project be reallocated to another fiscal year to accommodate the local agency. The ICC receives numerous requests from local communities and railroads for assistance from the Grade Crossing Protection Fund for safety improvements at public highway-rail crossings. During development of each multi-year crossing safety improvement program plan, the large number of potential projects requires the ICC to prioritize projects based upon several criteria, including the relative safety of the existing crossing and the volume and types of existing train and highway traffic. After each potential project is prioritized based on engineering requirements, geographic location is also taken into account so that safety improvements throughout the state can be addressed as equitably as possible. Projects not selected for the Plan are considered again as part of future 5-Year Plans. The project list for Fiscal Year 2019 (July 1, 2018 through June 30, 2019) includes capital improvement projects that local governments or railroads have previously submitted to the ICC for evaluation and approval, as well as projects based on established priorities. The project list for FY (out-year list) includes projects based on a continued effort to meet those established priorities: High Collision History - Each year the ICC places a high priority on upgrading public highway-rail grade crossings which have a pronounced history of train/vehicle collisions, or which have a high predictive value for future collisions. The FY Plan will address safety improvements at as many of these crossing locations as possible. Rail Corridors - The ICC has identified as a priority the need to improve public highway-rail grade crossings in rail corridors where conventional speed passenger trains operate. Highway and Pedestrian Grade Separations (Bridges) - The ICC is continually seeking locations where grade crossing blockages cause substantial motorist or emergency vehicle delay, or where heavy vehicular traffic represents a heightened threat of train/vehicle collisions. This Plan includes funding assistance for numerous highway/rail bridge projects on local roads and streets throughout the state. 6

10 The ICC also has authority to utilize the GCPF to assist local communities with the cost of constructing pedestrian grade separations in areas where it is necessary to improve safety. This Plan includes funding assistance for several pedway/rail bridge projects throughout the state. Interconnected Crossings - The ICC and IDOT are continuing a program to identify and improve highway-rail grade crossings that require the interconnection of crossing warning signals with traffic control signals at adjacent highway intersections. FY 2019 PLAN Projects programmed for submittal to the ICC in FY 2019 are listed in Appendix 1. In FY 2019 it is anticipated the ICC will consider projects requiring commitments from the GCPF totaling nearly $43 million, including nearly $10 million for bridge projects. In FY 2019, the ICC will also set aside $5 million from the GCPF in contingency funds to address emergency projects which may require rapid resolution; experimental crossing safety projects; low-cost safety improvements at multiple crossings; and incentive payments to local agencies for the voluntary closure of public highway-rail grade crossings. It is anticipated that in the next four years the contingency funds will be used to help pay for low-cost improvements [replacement of incandescent lights with light emitting diode (LED) lights, for example] involving approximately 100 crossings not currently equipped with LED flashing light signals. These projects are summarized in Table C. TABLE C FY 2019 Projects by Project Type Estimated Assistance from the GCPF PROJECT TYPE CROSSINGS $MILLIONS Bridge Projects Grade Crossing Improvement Projects Low-Cost Emergency Projects; Experimental Projects; Voluntary Crossing Closure Incentive Payments; Crossing Surface Renewals 100 (Est) (Exact number of crossings in this category yet to be determined) 167 (Est) NOTE: At the time the FY 2019 portion of the Plan was prepared, it was anticipated that assistance from the GCPF would be available for each project noted in Appendix 1. GCPF assistance may cease for certain projects should the General Assembly fail to appropriate, or otherwise not make available, sufficient funds. 7

11 FY PLAN Projects programmed for submittal to the ICC in FY are listed in Appendix 2. For those four years, it is anticipated the ICC will consider projects requiring commitments from the GCPF totaling over $194 million, affecting over 500 crossings in over 60 counties. In addition, $20 million from the GCPF will be set aside in contingency funds during FY These projects are summarized in Table D. TABLE D FY Projects by Project Type Estimated Assistance from the GCPF PROJECT TYPE CROSSINGS $MILLIONS Bridge Projects Grade Crossing Improvement Projects Low-Cost Emergency Projects; Experimental Projects; Voluntary Crossing Closure Incentive Payments; Crossing Surface Renewals 400 (Est) (Exact number of crossings in this category yet to be determined) s 543 (Est) NOTE: At the time the FY portion of the Plan was prepared, it was anticipated that assistance from the GCPF would be available for each project noted in Appendix 2. GCPF assistance may cease for certain projects should the General Assembly fail to appropriate, or otherwise not make available, sufficient funds. FY 18 PROJECTS Projects programmed for FY 2018 are listed in Appendix 3. It is currently estimated that the ICC will issue Orders authorizing nearly $39 million in GCPF assistance for safety improvement projects at over 120 crossings in over 50 counties throughout the state by June 30, These projects are summarized in Table E below. Appendix 3 lists each individual project with specific location and cost information. TABLE E Active Projects by Project Type Amount of GCPF Assistance Approved by the ICC PROJECT TYPE CROSSINGS $MILLIONS Bridge Projects Grade Crossing Improvement Projects Low-Cost Emergency Projects; Experimental Projects; Voluntary Crossing Closure Incentive Payments; Crossing Surface Renewals s

12 Appendix 1 FY 2019 Projects by County County DOT # RR City Location Description of Improvement Adams M BNSF Paloma E 1500th Street Adams G BNSF Golden 2200th Avenue Carroll U DME Lanark Grange Road Champaign N IC Tolono CR 500 N Champaign W IC Pesotum CR 100 N Champaign J NS Champaign 1800N Coles M IC Mattoon 32nd Street Install Gates $290,000 Install Gates $410,000 Install Gates $270,000 Flashing Light Signals; Install Gates $378,750 Flashing Light Signals; Install Gates $410,000 Install Gates $290,000 Reconstruct Approaches; Install Gates; Modify Automatic Flashing Light Signals $385,000 Cook G CSX Chicago 63rd Street Reconstruct Grade Separation $3,500,000 Crawford U INRD Stoy N 450th Street DeWitt D IC DeWitt Power Road Douglas U CSX Camargo CR 1475 E Douglas D IC Tuscola CR 1550 N Effingham K IC Dieterich N 2000th Street Effingham E IC Teutopolis N 1700th Street Effingham A IC Effingham N 1600th Street Fayette E CSX Vandalia CR 1050 E Greene R KCS White Hall 2000N Greene E KCS White Hall McCarthy Avenue Hamilton V EVWR Mc Leansboro CH 3 Iroquois P IC Danforth CR 2300 N Iroquois T TPW Gilman N 600 East Road Flashing Light Signals; Install Gates $345,000 Install Gates; Modify Automatic Flashing Light Signals $280,000 Flashing Light Signals; Install Gates $295,000 Flashing Light Signals; Install Gates $420,000 Install Gates $280,000 Reconstruct Approach; Install Automatic Flashing Light Signals; Install Gates $330,000 Flashing Light Signals; Install Gates $325,000 Flashing Light Signals; Install Gates $695,000 Reconstruct Approaches; Install Gates; Modify Automatic Flashing Light Signals $335,000 Install Gates; Modify Automatic Flashing Light Signals $290,000 Flashing Light Signals; Install Gates $410,000 Install Gates $270,000 Install Gates $300,000

13 Appendix 1 FY 2019 Projects by County County DOT # RR City Location Description of Improvement Jefferson X UP Mount Vernon E Idlewood Road Light Signals; Install Cantilevers $300,000 JoDaviess E CC Nora E Canyon Road Flashing Light Signals; Install Gates $325,000 JoDaviess N CC Apple River Canyon Park Road Light Signals $295,000 JoDaviess W CC Scales Mound N Watson Road Flashing Light Signals; Install Gates $290,000 JoDaviess C CC Scales Mound Council Hill Road Light Signals $270,000 JoDaviess J CC Scales Mound N Hill Road Light Signals $295,000 JoDaviess S CC Galena W Buckhill Road Light Signals $250,000 JoDaviess B CC Galena Bouthiller Street Light Signals $270,000 JoDaviess V CC Galena S Main Street Light Signals $270,000 LaSalle Y NS Streator Cross Street Install Gates $280,000 LaSalle G UP Troy Grove Vermillion Street Install Gates $270,000 Logan T IC Mt Pulaski Chapel Light Signals $315,000 Logan U IC Latham 300th Street Macon E CSX Decatur Airport Road Macon P IC Decatur Martin Luther King Jr Drive Flashing Light Signals; Install Gates $285,000 Reconstruct Approaches; Install Gates; Modify Cantilevers $565,000 Reconstruct Approaches; Install Cantilever; Light Signals $670,000 Macon Y IC Decatur Martin Luther King Jr Drive Reconstruct Approaches; Install Gates; Install Automatic Flashing Light Signals $330,000 Madison W UP Alton Chessen Lane Install Gates $310,000 Madison X UP Roxana New Poag Road Light Signals $280,000 Marion J IC Kinmundy Edgar Road Flashing Light Signals; Install Gates $335,000 Marion D IC Alma Laughman Road Flashing Light Signals; Install Gates $505,000 Marion L IC Odin West Line Road Flashing Light Signals; Install Gates $425,000

14 Appendix 1 FY 2019 Projects by County County DOT # RR City Location Description of Improvement McDonough L BNSF Prairie City N 2200th Road McDonough J BNSF Tennessee 730th Road Flashing Light Signals; Install Gates $380,000 Flashing Light Signals; Install Gates $395,000 McHenry N UP Crystal Lake Main Street Install Gates $100,000 McHenry M UP Crystal Lake Crystal Lake Avenue Install Interconnect $450,000 McLean S TPW Meadows N 2480 E MenaRoad U IMRR Petersburg Worthington Road Peoria K KJRY GlasfoRoad Kingston Mines Perry C IC Coulterville Columbine Road Perry P IC Winkle Morning Glory Road Install Gates $280,000 Flashing Light Signals; Install Gates $360,000 Install Gates $215,994 Flashing Light Signals; Install Gates $569,000 Flashing Light Signals; Install Gates $526,500 Perry K IC Winkle Morning Glory Road Reconstruct Approaches; Install Gates $440,000 Perry D UP Tamaroa Maple Street Perry X UP Tamaroa Valier Carpet Road Piatt H NS Mansfield CR 1200 E Piatt P NS Mansfield CR 2750 N Piatt W NS Bement CR 1100 N Pike T KCS Nebo Union Street Pike J NS New Salem 310th Avenue Randolph C IC Sparta Ridge Road Sangamon L IC Spaulding Main Street Sangamon U KCS Curran Curran Road Sangamon S KCS Loami Waverly Road Flashing Light Signals; Install Gates $355,000 Flashing Light Signals; Install Gates $310,000 Flashing Light Signals; Install Gates $290,000 Flashing Light Signals; Install Gates $320,000 Install Gates $315,000 Reconstruct Approach; Install Gates; Install Automatic Flashing Light Signals $620,000 Flashing Light Signals; Install Gates $495,000 Install Gates $270,000 Reconstruct Approaches; Install Gates; Install Automatic Flashing Light Signals $305,000 Light Signals $290,000 Light Signals $290,000

15 Appendix 1 FY 2019 Projects by County County DOT # RR City Location Description of Improvement Sangamon H NS Buffalo Old US 36 Install Gates $270,000 Sangamon O UP Chatham Iron Bridge Road Construct Grade Separation $12,628,214 Shelby P UP Shelbyville CR 600 N St Clair P IC Belleville N 20th Street St Clair H IC Belleville Old Freeburg Road St Clair F IC Freeburg Old Freeburg Road St Clair T IC New Athens Black Quarter St. Clair W NS Brooklyn Canal Street St. Clair U TRRA East St. Louis Ridge Avenue Flashing Light Signals; Install Gates $440,000 Light Signals $260,000 Light Signals $280,000 Light Signals $315,000 Install Gates $270,000 Install Gates $300,000 Reconstruct Approaches; Install Gates; Modify Automatic Flashing Light Signals $370,000 Statewide TBD CN Statewide TBD Emergency Projects - Remote Monitors $861,600 Statewide TBD XXXX Statewide TBD Emergency Projects $5,500,000 Statewide TBD XXXX Statewide TBD Reconstruct Crossing Surfaces $4,000,000 Stephenson A CC Freeport S Farwell Bridge Road Light Signals $260,000 Stephenson P CC Freeport Holland Church Stephenson S CC Freeport Harlem Center Road Stephenson J CC Lena Bridge Street Stephenson Y CC Lena Five Corners Road Stephenson M CC Lena Crossroads Road Light Signals $260,000 Light Signals $260,000 Light Signals $285,000 Flashing Light Signals; Install Gates $335,000 Flashing Light Signals; Install Gates $290,000 Stephenson N CC Lena Waddams Grove Road Reconstruct Approaches; Install Gates; Modify Automatic Flashing Light Signals $360,000 Stephenson C CC Lena N Baker Road Tazewell H IC Pekin Koch Street Flashing Light Signals; Install Gates $315,000 Light Signals $280,000

16 Appendix 1 FY 2019 Projects by County County DOT # RR City Location Description of Improvement Tazewell J NS East Peoria Carver Lane Tazewell P TPW East Peoria Farmdale Road Warren L BNSF Kirkwood 40th Street Williamson U BNSF Herrin Bandyville Road Winnebago F CC Winnebago Markham Road Winnebago N CC Winnebago Spielman Road Winnebago J CC Freeport Klinger Road Reconstruct Approaches; Install Gates; Install Automatic Flashing Light Signals $320,000 Light Signals $280,000 Flashing Light Signals; Install Gates $580,000 Light Signals $280,000 Flashing Light Signals; Install Gates $310,000 Light Signals $260,000 Light Signals $315,000

17 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Adams X BNSF Augusta CR E 2650th Street Adams E BNSF Augusta CR N 2800th Avenue Adams L BNSF Augusta CR 2700 E Adams A BNSF Augusta CR N 2900th Avenue Adams Y BNSF Fowler CR 1700 N Adams X BNSF Camp Point E 2250th Street Adams A BNSF Camp Point E 2400th Street Adams J BNSF Golden N 2300th Place Alexander F UP Gale Clear Creek Levee Boone X UP Belvidere S Appleton Road Bureau K IAIS Mineral Lincoln Street Bureau S IAIS Mineral Central Street Champaign V IC Paxton 3600 N Champaign N IC Thomasboro 2300 N Flashing Light Signals; Install Gates $292,500 $325,000 Flashing Light Signals; Install Gates $472,500 $525,000 Flashing Light Signals; Install Gates $342,000 $380,000 Flashing Light Signals; Install Gates $328,500 $365,000 Flashing Light Signals; Install Gates $360,000 $400,000 Light Signals $369,000 $410,000 Flashing Light Signals; Install Gates $580,500 $645,000 Flashing Light Signals; Install Gates $324,000 $360,000 Flashing Light Signals; Install Gates $436,500 $485,000 Light Signals $279,000 $310,000 Flashing Light Signals; Install Gates $310,500 $345,000 Flashing Light Signals; Install Gates $333,000 $370,000 Flashing Light Signals; Install Gates $396,000 $440,000 Flashing Light Signals; Install Gates $382,500 $425,000 Champaign Y IC Savoy Curtis Road Install Grade Separation $9,023,038 $15,038,396 Champaign T NS Mahomet S Spring Lake Road Champaign J UP Royal Homer Lake Road Champaign B UP Royal 1800 N Champaign W UP Royal 2000 N Champaign Y UP Royal 2200 N Christian Y NS Stonington CR 2300 N Christian F NS Stonington CR 2000 E Christian M NS Stonington CR 2200 N Christian U NS Stonington E 2100 N Install Gates $279,000 $310,000 Light Signals $369,000 $410,000 Flashing Light Signals; Install Gates $498,000 $530,000 Light Signals $288,000 $320,000 Flashing Light Signals; Install Gates $483,000 $515,000 Flashing Light Signals; Install Gates $454,500 $505,000 Flashing Light Signals; Install Gates $363,000 $395,000 Flashing Light Signals; Install Gates $363,000 $395,000 Flashing Light Signals; Install Gates $508,000 $540,000

18 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Christian L NS Stonington CR 1900 N Christian G NS Stonington CR 1800 N Clark F CSX Marshall E Adenmoor Road Clark U CSX Martinsville CR 1030 E Clark X CSX Martinsville S Union Street Clark E CSX Martinsville CR 600 E Clark L CSX Martinsville Friendship Road Clinton H BNSF Shattuc Brink Road Clinton S NS Germantown Green Street Clinton Y NS Germantown Prairie Street Clinton S NS Bartelso Kennal Hill Road Crawford T INRD Oblong N 375th Street Crawford B INRD Palestine N Highway Street Cumberland T CSX Greenup CR 2100 E Cumberland A CSX Greenup CR 2050 E Cumberland U CSX Greenup CR 2000 E Cumberland B CSX Greenup CR 1975 E DeKalb K UP Shabbona Lee Road DeWitt B IC Farmer City Prairie Chapel Road Douglas C CSX Tuscola CR 1250 E Flashing Light Signals; Install Gates $508,000 $540,000 Flashing Light Signals; Install Gates $436,500 $485,000 Install Gates $288,000 $360,000 Flashing Light Signals; Install Gates $338,000 $410,000 Flashing Light Signals; Install Gates $578,000 $650,000 Flashing Light Signals; Install Gates $353,000 $425,000 Install Gates $288,000 $360,000 Flashing Light Signals; Install Gates $283,500 $315,000 Flashing Light Signals; Install Gates $427,500 $475,000 Flashing Light Signals; Install Gates $643,500 $715,000 Flashing Light Signals; Install Gates $346,500 $385,000 Flashing Light Signals; Install Gates $378,000 $420,000 Flashing Light Signals; Install Gates $424,000 $440,000 Flashing Light Signals; Install Gates $315,000 $350,000 Flashing Light Signals; Install Gates $495,000 $550,000 Flashing Light Signals; Install Gates $553,500 $615,000 Flashing Light Signals; Install Gates $571,500 $635,000 Install Gates $270,000 $300,000 Flashing Light Signals; Install Gates $310,500 $345,000 Flashing Light Signals; Install Gates $351,000 $390,000 DuPage F UP Elmhurst York Road Construct Pedestrian Grade Separation $2,000,000 $5,100,000 DuPage P WC Aurora North Aurora Road Construct Grade Separation $12,000,000 $29,000,000 Edgar S CSX Chrisman S Indiana Street Edgar Y CSX Chrisman S Illinois Street Install Gates $261,000 $290,000 Flashing Light Signals; Install Gates $342,000 $380,000

19 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Edgar F CSX Chrisman S Iowa Street Edwards H NS Albion CR 3000 E Effingham M IC Teutopolis CR 1900 E Effingham H IC Teutopolis N 1800th Road Fayette H CSX Hagerstown Elam Road Fayette S UP St. Peter 1325 N Fayette B UP St. Elmo 1750 N Ford N IC Guthrie 750N Road Franklin A UP Benton Linn Road Greene U KCS Carrollton North Park Drive Hamilton D EVWR McLeansboro 1400 N Hamilton S EVWR McLeansboro Pearl Street Hamilton Y EVWR McLeansboro Park Street Hamilton W EVWR Dahlgren CR 200 E Henderson G BNSF Lomax Rocket Street Henderson F BNSF Biggsville CR 1850 E Henry D BNSF Kewanee CR 2450 E Henry W IAIS Atkinson N School Street Henry W IAIS Colona CR 900 E Iroquois H CSX Woodland E 1300 N Iroquois W CSX Woodland E 1170 N Iroquois K CSX Milford N 2200 E Iroquois F IC Ashkum CR 2700 N Iroquois S UP Woodland Fountain Creek Road Flashing Light Signals; Install Gates $297,000 $330,000 Flashing Light Signals; Install Gates $459,000 $510,000 Flashing Light Signals; Install Gates $378,000 $420,000 Flashing Light Signals; Install Gates $355,500 $395,000 Flashing Light Signals; Install Gates $531,000 $590,000 Flashing Light Signals; Install Gates $351,000 $390,000 Flashing Light Signals; Install Gates $458,000 $490,000 Install Gates $270,000 $300,000 Install Gates $261,000 $290,000 Flashing Light Signals; Install Gates $355,000 $370,000 Flashing Light Signals; Install Gates $351,000 $390,000 Flashing Light Signals; Install Gates $274,500 $305,000 Install Gates $438,000 $470,000 Flashing Light Signals; Install Gates $585,000 $650,000 Flashing Light Signals; Install Gates $891,000 $990,000 Install Gates $369,000 $410,000 Install Gates $315,000 $350,000 Install Gates $279,000 $310,000 Flashing Light Signals; Install Gates $324,000 $360,000 Flashing Light Signals; Install Gates $313,000 $345,000 Flashing Light Signals; Install Gates $498,000 $530,000 Flashing Light Signals; Install Gates $405,000 $450,000

20 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Iroquois U UP Woodland E 1200 North Road Iroquois H UP Woodland N 2050 East Road Iroquois A UP Goodwine CR 500 N Iroquois N UP Goodwine CR 1800 E Iroquois V UP Woodland 1300 N Jasper Y INRD Oblong N 2200th Street Jasper G INRD Willow Hill N 1700th Street Jefferson J BNSF Waltonville E Stagecoach Road Jefferson H EVWR Belle Rive N Program Lane Jefferson W EVWR Opdyke Opdyke Lane Jefferson K EVWR Opdyke N Lighthouse Lane Jefferson V NS Bluford CR 2100 E Jefferson E NS Mount Vernon Harrison Street Johnson J UP Goreville Orchard Lane Flashing Light Signals; Flashing Light Signals; Install Gates $323,000 $355,000 Install Gates $324,000 $360,000 Flashing Light Signals; Install Gates $544,500 $605,000 Flashing Light Signals; Install Gates $297,000 $330,000 Install Gates $304,000 $320,000 Flashing Light Signals; Install Gates $391,500 $435,000 Flashing Light Signals; Install Gates $472,500 $525,000 Flashing Light Signals; Install Gates $373,500 $415,000 Flashing Light Signals; Install Gates $463,500 $515,000 Flashing Light Signals; Install Gates $765,000 $850,000 Flashing Light Signals; Install Gates $387,000 $430,000 Flashing Light Signals; Install Gates $328,000 $360,000 Kane O BNSF Big Rock Dauberman Road Construct Grade Separation $7,200,000 $15,000,000 Kane C DME Elgin Coombs Road Reconstruct Grade Separation $1,350,000 $2,250,000 Kankakee G IC Kankakee Brookmont Boulevard Reconstruct Grade Separation $12,000,000 $22,910,000 Kankakee S NS Kankakee CR N 4000 E Kankakee F UP Grant Park CR N Kendall B IR Oswego North Street Kendall H IR Oswego W Jackson Street Knox M BNSF East Galesburg Township Road 207 Knox J BNSF Galesburg CR 925 N Knox S BNSF Knoxville Henderson Road Install Gates $279,000 $310,000 Flashing Light Signals; Install Gates $531,000 $590,000 Install Gates $261,000 $290,000 Install Gates $261,000 $290,000 Flashing Light Signals; Install Gates $459,000 $510,000 Flashing Light Signals; Install Gates $360,000 $400,000 Install Gates $261,000 $290,000

21 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF LaSalle G UP Troy Grove N 41st Road LaSalle N UP Troy Grove E 9th Road LaSalle M UP Troy Grove N 39th Road Lake O WC Mundelein Near Hawley Street Lawrence S CSX Bridgeport CR 750 E Lee C BNSF Steward Steward Road Livingston W NS Dwight CR N 3300 E Livingston D NS Dwight CR N 3200 E Livingston E TPW Fairbury 1900 E Macon R CSX Long Creek Twin Bridges Road Macon L CSX Decatur S 44th Street Macon T CSX Decatur E Green Hill Road Macon K CSX Decatur E Eldorado Street Macon R CSX Decatur 23rd Street Macon E IC Warrensburg Lincoln Memorial Macon P IC Warrensburg N Glasgow Road Macon P IC Mt Zion McDonald Road Macon E NS Decatur Brush College Road Macon E NS Decatur Brush College Road Madison D CSX Collinsville Lockmann Road Madison X CSX Collinsville Lebanon Road Madison F NS Edwardsville Quercus Grove Road Install Gates $279,000 $310,000 Close Public Crossing; Construct Access Road $65,000 $65,000 Install Gates $279,000 $310,000 Construct Grade Separation; Construct Pedestrian Crossing $2,000,000 $6,000,000 Flashing Light Signals; Install Gates $540,000 $600,000 Install Gates $270,000 $300,000 Install Gates $279,000 $310,000 Install Gates $270,000 $300,000 Install Gates $304,000 $320,000 Flashing Light Signals; Install Gates $297,000 $330,000 Install Gates $279,000 $310,000 Modify Interconnect; Install Gates; Install Automatic Flashing Light Signals $342,000 $380,000 Flashing Light Signals; Install Gates $306,000 $340,000 Flashing Light Signals; Install Gates $297,000 $330,000 Install Gates $306,000 $340,000 Construct Grade Separation (1 of 2 Payments) $6,000,000 $45,500,000 Construct Grade Separation (2 of 2 Payments) $6,000,000 $45,500,000 Close Grade Separation; Construct Access Road $0 $0 Relocate Grade Separation; Reconstruct Roadway Improvements $9,213,000 $15,355,000 Install Gates $279,000 $310,000 Madison V UP Godfrey Pearl Street Install Pedestrian Gates $50,000 $150,000 Marion U BNSF Wamac E 17th Install Gates $261,000 $290,000

22 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Marion N IC Farina CR 1900 E Marion V IC Farina Sigrist Road Marion V NS Centralia Perrine Avenue Marion K UP Kell Route 161 Extension Marion A UP Kell Lois Lane Marion A UP Salem Basom Road Marion G UP Kinmundy CR 1400 E Marion N UP Kinmundy CR 1500 N Marion C UP Kinmundy CR 1800 N Marion D UP Kinmundy CR 1900 N Marion Y UP Kinmundy W 4th Street McDonough V BNSF Tennessee CR 800 N McHenry S UP Harvard Oak Grove Road Monroe P UP Valmeyer Harris Road Monroe F UP Valmeyer Miles Road Monroe C UP Fults Unnamed Road Montgomery B UP Taylor Springs Seyborn Avenue Montgomery H UP Taylor Springs E Main Street Morgan N KCS Franklin Steinmeyer Road Morgan A KCS Franklin Frank Alex Road Morgan W KCS Murrayville Woodson Franklin Road Ogle K BNSF Chana E Fowler Road Ogle L BNSF Chana S Skare Road Ogle T BNSF Chana E Hemstock Road Flashing Light Signals; Install Gates $553,500 $615,000 Flashing Light Signals; Install Gates $490,500 $545,000 Flashing Light Signals; Install Gates $324,000 $360,000 Install Gates $355,500 $395,000 Flashing Light Signals; Install Gates $624,000 $660,000 Flashing Light Signals; Install Gates $499,500 $555,000 Flashing Light Signals; Install Gates $333,000 $370,000 Install Gates $261,000 $290,000 Flashing Light Signals; Install Gates $612,000 $680,000 Install Gates $279,000 $310,000 Flashing Light Signals; Install Gates $396,000 $440,000 Flashing Light Signals; Install Gates $373,500 $415,000 Install Gates $270,000 $300,000 Flashing Light Signals; Install Gates $495,000 $550,000 Install Gates $315,000 $350,000 Flashing Light Signals; Install Gates $526,500 $585,000 Install Gates $294,500 $310,000 Flashing Light Signals; Install Gates $304,500 $320,000 Install Gates $279,000 $310,000 Install Gates $261,000 $290,000 Install Cross bucks; Install Gates $261,000 $290,000

23 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Ogle G BNSF Chana E Grist Mill Road Ogle N BNSF Chana S Stone Hill Road Ogle Y BNSF Polo N Union Road Ogle X DME Byron Mill Road Ogle V UP Rochelle First Avenue Peoria F BNSF Laura N Whittaker Road Peoria A UP Speer County Line Road Perry T IC Duquoin Tanglefoot Road Pike Y NS Griggsville CR 3100 E Pike E NS Baylis 340th Street Pike P NS Baylis 312th Street Pike C NS Barry 275th Street Pike W NS Hull Old High School Road Pike U NS Hull 150th Street Randolph S IC Tilden Campbell Rd Randolph Y IC Coulterville Boyd Road Randolph M IC Coulterville N 4th Street Rock Island P BNSF Joslin 290 Street N Rock Island L BNSF Joslin 300th Street N Rock Island A BNSF Joslin 66 Avenue N Rock Island W BNSF Rock Island 18th Street Rock Island D BNSF Rock Island 17th Street Rock Island D IAIS Carbon Cliff N 1st Avenue Saline K IC Eldorado Wasson Road Install Gates $270,000 $300,000 Install Gates $261,000 $290,000 Construct Grade Separation; Close Public Crossing $7,782,000 $17,800,000 Flashing Light Signals; Install Gates $418,500 $465,000 Flashing Light Signals; Install Gates $499,500 $555,000 Flashing Light Signals; Install Gates $495,000 $550,000 Flashing Light Signals; Install Gates $378,000 $410,000 Flashing Light Signals; Install Gates $478,000 $510,000 Flashing Light Signals; Install Gates $493,000 $525,000 Flashing Light Signals; Install Gates $413,000 $445,000 Flashing Light Signals; Install Gates $333,000 $370,000 Flashing Light Signals; Install Gates $477,000 $530,000 Flashing Light Signals; Install Gates $508,000 $540,000 Flashing Light Signals; Install Gates $328,500 $360,500 Flashing Light Signals; Install Gates $234,000 $260,000 Install Gates $234,000 $260,000 Install Gates $315,000 $350,000 Install Gates $270,000 $300,000

24 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Sangamon A KCS Loami Loami Road Sangamon K NS Buffalo S Carpenter Road Install Gates $279,000 $310,000 Flashing Light Signals; Install Gates $373,500 $415,000 Sangamon R UP Chatham Woodside Road Construct Grade Separation $4,423,072 $26,000,000 Shelby T UP Shelbyville 1500 N Shelby C UP Shelbyville 1750 N Shelby W UP Findlay 1900 E Shelby D UP Findlay 1975 E Shelby H UP Shelbyville CR 500 N Install Gates $270,000 $300,000 Install Gates $279,000 $310,000 Flashing Light Signals; Install Gates $342,000 $380,000 Flashing Light Signals; Install Gates $369,000 $410,000 St Clair L ALS Sauget Falling Springs Road Install Grade Separation $0 $0 St Clair Y CSX Washington Park Black Lane St Clair Y IC New Athens Nuerenberger Road St Clair U IC Lenzburg Golden Rule Mine St Clair H IC Lenzburg S Main Street St Clair E IC Marissa W Lyons Street St Clair T IC Belleville Freedom Drive Flashing Light Signals; Install Gates $292,500 $325,000 Flashing Light Signals; Install Gates $403,000 $435,000 Flashing Light Signals; Install Gates $328,000 $360,000 Flashing Light Signals; Install Gates $443,000 $475,000 Flashing Light Signals; Install Gates $403,000 $435,000 Flashing Light Signals; St Clair J TRRA Sauget Falling Springs Road Construct Grade Separation $9,192,000 $15,320,000 Statewide TBD CN Statewide Statewide Emergency Projects - Remote Monitors $861,600 $1,723,200 Statewide TBD TBD Statewide Statewide Emergency Projects $20,000,000 $5,500,000 Statewide TBD TBD Statewide Statewide Reconstruct Crossing Surfaces $8,000,000 $4,000,000 Tazewell M IMRR South Pekin Garman Road Union K UP Mill Creek Timber Road Vermilion Y CSX Alvin County 2950 N Vermilion S CSX Danville Jones Road Vermilion H UP Rankin E 3550 N Road Flashing Light Signals; Install Gates $315,000 $350,000 Flashing Light Signals; Install Gates $598,500 $665,000 Flashing Light Signals; Install Gates $388,000 $420,000 Install Gates $438,000 $470,000

25 Appendix 2 FY Projects by County County DOT # RR City Location Description of Improvement GCPF Vermilion P UP Rankin 3700 N Vermilion W UP Rankin E 3800 N Wabash A NS Bellmont CR 550 E Warren E BNSF Kirkwood Unnamed Road Washington C IC Richview Hawaii Road Washington A IC Radom Maryland Road Wayne W NS Ellery Dutch Bank Road White F EVWR Maunie Main Street White A EVWR Maunie Morgan Street White H EVWR Carmi CR 1250 E Will N UP Crete Crete-Monee Road Will N UP Crete Crete-Monee Road Woodford E TPW Eureka CR 1700 E Flashing Light Signals; Install Gates $428,000 $460,000 Install Gates $301,500 $335,000 Flashing Light Signals; Install Gates $472,500 $525,000 Install Gates $373,500 $415,000 Reconstruct Approach; Install Automatic Flashing Light Signals; Install Gates $472,500 $525,000 Flashing Light Signals; Install Gates $414,000 $460,000 Flashing Light Signals; Install Gates $423,000 $470,000 Flashing Light Signals; Install Gates $405,000 $450,000 Flashing Light Signals; Install Gates $388,000 $420,000 Construct Grade Separation (1 of 2 payments) $4,552,560 $7,587,600 Construct Grade Separation (2 of 2 payments) $4,552,560 $7,587,600 Install Gates $270,000 $300,000

26 Appendix 3 FY 2018 Projects by County County DOT # RR City Location Description of Improvement GCPF Bond P BNSF Sorento Dorris Creek Road Bond X BNSF Sorento Reno Road Bond N BNSF Sorento Doe Run Road Bond W BNSF Sorento Ayers Road Bond M BNSF Smithboro Ski Club Road Bureau S BNSF Neponset CR 100 E Bureau A IAIS Tiskilwa CR 1790 E Install Gates $224,783 $249,759 Install Gates $125,816 $251,631 Install Gates $217,066 $241,185 Install Gates $297,692 $330,770 Install Gates $214,915 $238,796 Install Gates $270,000 $300,000 Install Gates $279,000 $310,000 Carroll R BNSF Milledgeville Ideal Road Reconstruct Grade Separation $2,082,600 $3,471,000 Champaign J IC Thomasboro CR 2200 N Champaign B UP Villa Grove CR 100 N Christian T UP Rosamond CR 2100 E Christian V UP Ohlman CR 1825 E Christian C UP Ohlman CR 1800 E Flashing Light Signals; Install Gates $352,723 $366,200 Flashing Light Signals; Install Gates $319,500 $355,000 Flashing Light Signals; Install Gates $301,500 $335,000 Install Gates $285,000 $300,000 Flashing Light Signals; Install Gates $335,000 $350,000 Clinton D BNSF Centralia Sand Ridge Road Reconstruct Crossing Surface $33,537 $52,499 Clinton M BNSF Centralia Lippert Road Reconstruct Crossing Surface $36,593 $56,778 Clinton H BNSF Centralia Felton Road Flashing Light Signals; Install Gates $292,500 $325,000 Cook D BNSF Hodgkins Santa Fe Drive Reconstruct Crossing Surface $39,807 $64,704 Cook P BNSF Brookfield Maple Avenue Install Gates $57,156 $114,311 Cook D BNSF Hodgkins 67th Street Reconstruct Crossing Surface $39,807 $64,704 Cook N UP Chicago Heights E 17th Street Close Public Crossing $60,000 $137,500 Cook P UP Chicago Heights E 23rd Street Close Public Crossing $70,000 $147,500 Crawford D INRD Stoy 600th Street Crawford L INRD Stoy Main Street DeKalb F UP Shabbona Chicago Road Install Gates; Modify Automatic Flashing Light Signals $0 $155,445 Reconstruct Access Road; Reconstruct Approaches; Install Gates; Modify Automatic Flashing Light Signals $127,400 $312,845 Install Gates $252,000 $280,000

27 Appendix 3 FY 2018 Projects by County County DOT # RR City Location Description of Improvement GCPF DeKalb U UP Shabbona Rollo Road DeKalb B UP Shabbona Suydam Road DeWitt T IC Clinton Kleeman Drive Douglas K CSX Newman Broadway Street Douglas L CSX Newman N King Street Douglas D CSX Atwood N Main Street Install Gates $252,000 $280,000 Install Gates $252,000 $280,000 Install Gates $234,000 $260,000 Install Cantilevers; Modify Automatic Flashing Light Signals; Install Gates $410,207 $431,797 Flashing Light Signals; Install Gates $372,685 $392,300 Install Cantilevers; Install Gates $358,275 $377,131 DuPage F BNSF Lemont Lemont Road Reconstruct Crossing Surface $65,813 $99,997 DuPage U UP Elmhurst Maple Avenue Reconstruct Crossing Surface $110,713 $219,284 DuPage B UP Elmhurst Myrtle Avenue Reconstruct Crossing Surface; Remove Track; Relocate Automatic Flashing Light Signals; Relocate Gates $128,202 $286,803 Franklin B IC Benton Eakin Grove Church Fulton X BNSF Vermont Sullivan Road Fulton W BNSF Vermont Bailey Road Install Gates $216,000 $240,000 Install Gates $261,000 $290,000 Install Approach; Install Automatic Flashing Light Signals; Install Gates $509,659 $547,177 Fulton U BNSF Vermont Heitz Road Reconstruct Grade Separation $1,898,400 $3,164,000 Greene W KCS White Hall Cinderella Lane Greene Y KCS Roodhouse Grand Street Grundy D CSX Minooka Ridge Road Grundy Y CSX Morris Nettle School Install Gates $253,350 $281,500 Install Gates $334,850 $366,500 Install Cantilevers; Modify Automatic Flashing Light Signals; Modify Gates $150,000 $300,000 Install Gates $305,970 $332,073 Grundy B WC Minooka Ridge Road Reconstruct Grade Separation $5,313,762 $8,856,270 Hamilton J EVWR Delafield CR 1600 N Hamilton R EVWR Delafield CR 600 E Iroquois L IC Danforth CR 2000 N Iroquois J IC Buckley CR 500 N Install Gates $256,500 $270,000 Install Gates $256,500 $270,000 Flashing Light Signals; Install Gates $274,471 $287,019 Flashing Light Signals; Install Gates $301,991 $316,344 Iroquois H TPW Gilman 1100E Road Reconstruct Crossing Surface $54,486 $78,255 Jasper M INRD Newton S Liberty Avenue Reconstruct Crossing Surface $54,611 $83,111

28 Appendix 3 FY 2018 Projects by County County DOT # RR City Location Description of Improvement GCPF Jefferson U NS Dix/Rome N Old Centralia Lane Jefferson X UP Bonnie E Lang Lane Jefferson B UP Mount Vernon N Brownsville Road Jefferson P UP Mount Vernon E Freesia Road Jefferson D UP Mount Vernon E Bakerville Road JoDaviess T BNSF East Dubuque Frentress Lake Road Reconstruct Approaches; Install Gates; Modify Automatic Flashing Light Signals $289,487 $304,723 Flashing Light Signals; Install Gates $324,000 $360,000 Flashing Light Signals; Install Gates $364,345 $377,205 Install Gates $243,000 $270,000 Flashing Light Signals; Install Gates $279,000 $310,000 Install Gates; Modify Automatic Flashing Light Signals $20,762 $20,762 Johnson M UP Buncombe West Vienna Street Reconstruct Crossing Surface $53,849 $119,364 Kane H BNSF Aurora Rathbone Avenue Reconstruct Crossing Surface $40,249 $67,170 Kane H BNSF Aurora Old Indian Trail Reconstruct Crossing Surface $47,214 $72,227 Kane D BNSF Aurora Pierce Street Reconstruct Crossing Surface $57,721 $85,704 Kane F BNSF Aurora Clearwater Drive Reconstruct Crossing Surface $40,563 $66,300 Kane E UP Elgin Lawrence Avenue Install Gates; Modify Automatic Flashing Light Signals $234,000 $260,000 Knox A BNSF Galesburg N Farnham Street Reconstruct Grade Separation $2,000,000 $3,347,400 Knox H BNSF Galesburg CR 100 E Knox K BNSF Galesburg CR 100 E LaSalle D IR Wedron E 2153rd Road LaSalle W UP Troy Grove N 3809th Livingston A NS Dwight CR N 1900 E Install Gates $234,577 $246,923 Install Gates $274,500 $305,000 Install Crossing Surface; Install Gates; Modify Automatic Flashing Light Signals $375,500 $490,000 Close Public Crossing; Remove Public Crossing $50,000 $97,500 Flashing Light Signals; Install Gates $306,000 $340,000 Livingston C TPW Chatsworth 1st Street Reconstruct Crossing Surface $67,908 $135,344 Macon E CSX Decatur Airport Road Reconstruct Crossing Surface $97,849 $101,644 Macon N IC Decatur Clinton Street Macon J IC Decatur Franklin St Road Macon F IC Mt Zion Baltimore Avenue Macon B IC Mt Zion Main Street Flashing Light Signals; Install Crossbucks $292,500 $325,000 Install Gates $271,603 $301,780 Install Gates $265,146 $294,607 Install Gates $285,403 $317,115

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)

(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties) District 1 (Cook, DuPage, Will, McHenry, Kane and Lake Counties) District 2 -Jane Byrne Interchange reconstruction in Chicago o $76.6 million; $31.8 million spent o Spread over four separate contracts

More information

STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION TRANSPORTATION BUREAU / RAIL SAFETY SECTION

STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION TRANSPORTATION BUREAU / RAIL SAFETY SECTION STATE OF ILLINOIS ILLINOIS COMMERCE COMMISSION TRANSPORTATION BUREAU / RAIL SAFETY SECTION Michael E. Stead Rail Safety Program Administrator April 1, 2016 To all Township Supervisors and Highway Commissioners

More information

Cooling Centers (Full Listing)

Cooling Centers (Full Listing) Cooling Centers (Full Listing) Office Address City Zip Calumet Park Englewood Garfield Humboldt Park Lower North Northwest 831 West 119 th 5323 South Western 500 North Pulaski 2753 West North 2650 West

More information

CROSSING SAFETY IMPROVEMENT PROGRAM. FY Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS

CROSSING SAFETY IMPROVEMENT PROGRAM. FY Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS CROSSING SAFETY IMPROVEMENT PROGRAM FY 2012-2016 Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS ILLINOIS COMMERCE COMMISSION APRIL 2011 INTRODUCTION The Illinois Commerce

More information

2010 SPRING TURKEY SEASONS DATES, APPLICATION DATES & OPEN COUNTIES/SPECIAL HUNT AREAS

2010 SPRING TURKEY SEASONS DATES, APPLICATION DATES & OPEN COUNTIES/SPECIAL HUNT AREAS 2010 SPRING TURKEY SEASONS DATES, APPLICATION DATES & OPEN COUNTIES/SPECIAL HUNT AREAS NORTHERN ZONE SEASON DATES 1 st Season Monday, April 12 - Friday, April 16 2 nd Season Saturday, April 17 - Thursday,

More information

CROSSING SAFETY IMPROVEMENT PROGRAM. FY Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS

CROSSING SAFETY IMPROVEMENT PROGRAM. FY Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS CROSSING SAFETY IMPROVEMENT PROGRAM FY 2011-2015 Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS ILLINOIS COMMERCE COMMISSION APRIL 2010 INTRODUCTION The Illinois Commerce

More information

CROSSING SAFETY IMPROVEMENT PROGRAM. FY Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS

CROSSING SAFETY IMPROVEMENT PROGRAM. FY Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS CROSSING SAFETY IMPROVEMENT PROGRAM FY 2008-2012 Plan PROPOSED GRADE CROSSING PROTECTION FUND PROJECTS FOR LOCAL ROADS AND STREETS ILLINOIS COMMERCE COMMISSION APRIL 2007 INTRODUCTION The Illinois Commerce

More information

ICCVB Municipal Hotel/Motel Tax Rates Data Compiled March/April 2018

ICCVB Municipal Hotel/Motel Tax Rates Data Compiled March/April 2018 ICCVB Municipal Hotel/Motel Tax Rates Data Compiled March/April 2018 The municipality/county name and local hotel/motel tax rate % appear below under each Certified Bureau. All data is self-reported by

More information

9/10/5 Commerce and Business Administration Business Management Community Studies and Surveys File, , Box 1:

9/10/5 Commerce and Business Administration Business Management Community Studies and Surveys File, , Box 1: Record Series Number The materials listed in this document are available for research at the University of Illinois Archives. For more information, email illiarch@illinois.edu or search http://www.library.illinois.edu/archives/archon

More information

Grade Crossings in High Speed Rail Corridors

Grade Crossings in High Speed Rail Corridors Grade Crossings in High Speed Rail Corridors 59 th ANNUAL ILLINOIS TRAFFIC ENGINEERING & SAFETY CONFERENCE October 21, 2010 Champaign, IL Michael E. Stead Rail Safety Section Illinois Commerce Commission

More information

Office of the State Comptroller Local Government Division Municipalities in Illinois with TIF Districts (updated 8/08/06)

Office of the State Comptroller Local Government Division Municipalities in Illinois with TIF Districts (updated 8/08/06) Addison Village DUPAGE Aledo City MERCER Alorton Village ST. CLAIR Alsip Village COOK Alton City MADISON Andalusia Village ROCK ISLAND Antioch Village LAKE Arcola City DOUGLAS Arlington Heights Village

More information

ARKANSAS 2003 TRAFFIC CRASH STATISTICS

ARKANSAS 2003 TRAFFIC CRASH STATISTICS ARKANSAS 23 TRAFFIC CRASH STATISTICS Prepared by: Arkansas State Police Highway Safety Office 1 State Police Plaza Drive Little Rock, AR 7229 www.asp.arkansas.gov TABLE OF CONTENTS INTRODUCTION 23 ARKANSAS

More information

Bulletin August 2013 COUNTY, MUNICIPAL & TOWNSHIP PERMISSIVE MOTOR VEHICLE LICENSE TAX REVENUE RECEIVED BY TYPE OF JURISDICTION IN 2012

Bulletin August 2013 COUNTY, MUNICIPAL & TOWNSHIP PERMISSIVE MOTOR VEHICLE LICENSE TAX REVENUE RECEIVED BY TYPE OF JURISDICTION IN 2012 (3) (4) (5) ADAMS - - - - 43,874 53,413 97,287 ALLEN 544,173 - - 544,251 301,869-846,120 ASHLAND 301,358 - - 301,401 95,991 38,463 435,855 ASHTABULA 319,512 326,226 430,584 1,076,490 453,686 357,595 1,887,771

More information

TOURISM, ARTS & HERITAGE CABINET ECONOMIC IMPACT OF KENTUCKY S TRAVEL AND TOURISM INDUSTRY 2016 AND 2017

TOURISM, ARTS & HERITAGE CABINET ECONOMIC IMPACT OF KENTUCKY S TRAVEL AND TOURISM INDUSTRY 2016 AND 2017 TOURISM, ARTS & HERITAGE CABINET ECONOMIC IMPACT OF KENTUCKY S TRAVEL AND TOURISM INDUSTRY 2016 AND 2017 KentuckyTourism.com/Industry 502-892-3231 PREPARED BY CERTEC, INC. FOR KENTUCKY TOURISM, ARTS AND

More information

LIHTC Properties in Illinois 15th District (John Shimkus

LIHTC Properties in Illinois 15th District (John Shimkus LIHTC Properties in Illinois 15th District (John Shimkus - R) LIHTC (1997 to 2016) Source: HUD LIHTC Through 2016 nprofit Placed PRAIRIE MEADOWS HOMES 1200 DAISY LN HOOPEON IL 60942 2009 $356,072 Insufficient

More information

2005 Indiana County Highway Department Wage and Salary Survey

2005 Indiana County Highway Department Wage and Salary Survey Purdue University Purdue e-pubs Indiana Local Technical Assistance Program (LTAP) Publications Indiana Local Technical Assistance Program (LTAP) 10-2005 2005 Indiana Highway Department Wage and Salary

More information

PART 12 - Directory Services 1st Revised Sheet 1 SECTION 3 - Directory Distribution

PART 12 - Directory Services 1st Revised Sheet 1 SECTION 3 - Directory Distribution PART 12 - Directory Services 1st Revised Sheet 1 GENERAL All terms and conditions set forth in this Section, including but not limited to those applicable to line(s) and network access line shall be fully

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

NEW METROPOLITAN AND MICROPOLITAN STATISTICAL AREA DELINEATIONS

NEW METROPOLITAN AND MICROPOLITAN STATISTICAL AREA DELINEATIONS NEW METROPOLITAN AND MICROPOLITAN STATISTICAL AREA DELINEATIONS The Office of Management and Budget (OMB) has released a new list of core-based statistical areas: metropolitan, micropolitan and combined

More information

2002 and 2001 Iowa Land Values

2002 and 2001 Iowa Land Values 2453 2024 2859 2368 2278 2213 1878 1731 1744 1627 OSCEOLA O BRIEN HARRISON SHELBY AUDUBON GUTHRIE DALLAS POLK JASPER 1897 1789 FREMONT 2002 and 2001 Iowa Land Values 2407 2137 2670 2498 CHEROKEE 2114 2086

More information

MISSOURI BALANCE OF STATE CONTINUUM OF CARE

MISSOURI BALANCE OF STATE CONTINUUM OF CARE MISSOURI BALANCE OF STATE CONTINUUM OF CARE WINTER POINT-IN-TIME SHELTERED AND UNSHELTERED HOMELESS COUNT Prepared By TABLE OF CONTENTS DATA INFORMATION BALANCE OF STATE CONTINUUM OF CARE MAP AND TOTAL

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike

LPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike LPA Location Federal Funds Awarded to LPA Allen County Allen County Bridge #271: South County Line Road over St Marys River $1,091,200.00 Boone County On CR 500W, approximately 750' South of Middle Jamestown

More information

2009 Seat Belt Usage Survey

2009 Seat Belt Usage Survey 2009 Seat Belt Usage Survey Site surveys conducted by officers of the Iowa State Patrol, Department of Public Safety Statistics compiled and survey written by the Office of Driver Services, Iowa Department

More information

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014

Chicago St. Louis High-Speed Rail. Braidwood Construction. Local Officials Briefing August 7, 2014 Chicago St. Louis High-Speed Rail Braidwood Construction Local Officials Briefing August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»

More information

Course Course Course Class Day City/Location Code Date Time MON 8:30 AM 2:30 PM TUES 8:00 AM 2:00 PM TUES

Course Course Course Class Day City/Location Code Date Time MON 8:30 AM 2:30 PM TUES 8:00 AM 2:00 PM TUES OCTOBER St. Francis Hospital, 1215 Franciscan Drive S LCH100412 OCT 1 ROCK FALLS Rock Falls Hotel, 2105 First Avenue South C KEM100212 OCT 2 St. Clare's Hospital, 915 E. 5th Street S ALT100212 OCT 2 SHELBYVILLE

More information

A bridge on Chicago Road over Little Indian Creek is currently scheduled for rehab, but may be replaced

A bridge on Chicago Road over Little Indian Creek is currently scheduled for rehab, but may be replaced This Transcript was taken 11/18/1999 From a speech by John A. Wilson - County Board Member & Chairman of the Public Infrastructure & Development Committee at the Township Officials Fall Meeting Jetting

More information

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 41 Electric Service Schedule Ill. C. C. No. 1

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 41 Electric Service Schedule Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 41 Electric Service Schedule Ill. C. C. No. 1 1. STATE A. Electricity Excise Tax Section 2-4 of the Electricity Excise Tax Law imposes an electricity excise tax

More information

Bulletin October 15, COUNTY VOTED 2013 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE (For collection in 2014)

Bulletin October 15, COUNTY VOTED 2013 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE (For collection in 2014) Bulletin 2014-03 October 15, 2014 COUNTY VOTED 2013 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE (For collection in 2014) 9-1-1 Belmont 1.0 Coshocton.2 Defiance 1.0 Delaware.45 Fulton.7 Hardin.75

More information

Rauner's Devastating Cuts to Education

Rauner's Devastating Cuts to Education Rauner's Devastating Cuts to Education New Fiscal Analysis Estimates Impact To Each School District Under Rauner Plan, Which Leads to Massive Teacher Layoffs, Larger Class Sizes, Program Cuts and Huge

More information

B-2 SHELF, contd. Box 3: Walnut Area Centennial Book (Bureau Co. Illinois) Big Bureau & Bright Prairies

B-2 SHELF, contd. Box 3: Walnut Area Centennial Book (Bureau Co. Illinois) Big Bureau & Bright Prairies B-2 SHELF Soldiers of the American Revolution Buried in Illinois Report of Adj. General, Volume IV, 1886 The 33 rd Division, Volumes 1 & 2 History of the 33 rd Division, Volume 1 Illinois in the World

More information

Townships Eligible to Apply for Township Sign Grant 2018

Townships Eligible to Apply for Township Sign Grant 2018 Townships Eligible to Apply for Township Sign Grant 2018 For more information on the Ohio Dept. of Transportation s Township Sign Grant Program, please visit the program s website at: http://www.dot.state.oh.us/divisions/planning/localprograms/pages/township_safety_s

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Weekly East Tennessee Construction Report for May 31-June 6, 2018 Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane

More information

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR A P R I L 2 0 0 6 CAPTION

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

County subdivisions in Illinois (townships, precincts, city)

County subdivisions in Illinois (townships, precincts, city) http://iecam.crc.illinois.edu County subdivisions in Illinois (townships, precincts, city) 2005-2008 Beverly township, Adams County Burton township, Adams County Camp Point township, Adams County Clayton

More information

IN 2008 MD Treatments

IN 2008 MD Treatments 2008 20 34 290 55 55 0 7 14 3.5 Berrien Map created on 02/05/08 94 Cook 94 12 35 20 90 12 12 94 6 20 41 80 _144-01 421 La Porte 65 Porter St. Jose 6 _144-01, Oak Ridge Lake 30 30 Will 35 57 421 Starke

More information

The Railroad Commission of California

The Railroad Commission of California Introduction to the CPUC Rail Academy Roger Clugston Deputy Director, Office of Rail Safety 1 California Public Utilities Commission Presentation to: League of California Cities Public Works Officers Institute

More information

LSA STATE Basketball Team Records. From 1985 to Boys Division

LSA STATE Basketball Team Records. From 1985 to Boys Division LSA STATE Basketball Team Records From 1985 to 2017 Boys Division 1 Top Ten Most Times Participated Place Times School 1 31 Peoria Christ 2 25 Palatine Immanuel 25 Rockford Lutheran 4 21 Roselle Trinity

More information

O.C.G.A GEORGIA CODE Copyright 2014 by The State of Georgia All rights reserved. *** Current Through the 2014 Regular Session ***

O.C.G.A GEORGIA CODE Copyright 2014 by The State of Georgia All rights reserved. *** Current Through the 2014 Regular Session *** O.C.G.A. 15-6-3 GEORGIA CODE Copyright 2014 by The State of Georgia All rights reserved. *** Current Through the 2014 Regular Session *** TITLE 15. COURTS CHAPTER 6. SUPERIOR COURTS ARTICLE 1. GENERAL

More information

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

LIN ENGINEERING, LTD. Consulting Engineers

LIN ENGINEERING, LTD. Consulting Engineers LIN ENGINEERING, LTD. Consulting Engineers ESTABLISHED IN 1991 Background After receiving his BS from National Cheng-Kung University in Taiwan in 1970, Paul Lin attended graduate school at the University

More information

Bulletin June 25, 2010 COUNTY VOTED 2009 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE

Bulletin June 25, 2010 COUNTY VOTED 2009 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE Bulletin 2010-03 June 25, 2010 COUNTY VOTED 2009 PROPERTY TAX LEVIES BY PROGRAM CATEGORY, COUNTY AND RATE AGING AND SENIOR SERVICES Adams.5 Allen.8 Ashland.6 Ashtabula 1.0 Athens.75 Auglaize 1.0 Belmont.8

More information

Archived. Appendix - Medicaid Case Management Providers Pregnant Women and Children s Programs

Archived. Appendix - Medicaid Case Management Providers Pregnant Women and Children s Programs MEDICAID CASE MANAGEMENT PROVIDERS - PREGNANT WOMEN AND CHILDREN'S PROGRAMS Adair County Health Dept. 1001 South Jamison Kirksville, MO 63501 Audrain Co Health Dept 605 E Promenade P.O. Box 957 Mexico,

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

FFA Membership Statewide Report

FFA Membership Statewide Report hip Statewide Report Section 1 I 1 Dakota 67 23 Yes 34% I 1 Eastland 86 98 Yes 114% I 1 Forreston 112 46 Yes 41% I 1 Freeport 121 125 Yes 103% I 1 Galena 110 61 Yes 55% I 1 Lena-Winslow 76 52 Yes 68% I

More information

County Location Entity City State MI-Lenawee Stair Public Library Morenci MI MI-Lenawee Lenawee District Lbrary Adrian MI MI-Lenawee Adrian Township

County Location Entity City State MI-Lenawee Stair Public Library Morenci MI MI-Lenawee Lenawee District Lbrary Adrian MI MI-Lenawee Adrian Township County Location Entity City State MI-Lenawee Stair Public Library Morenci MI MI-Lenawee Lenawee District Lbrary Adrian MI MI-Lenawee Adrian Township Adrian MI MI-Lenawee Dover Township Clayton MI MI-Lenawee

More information

ILLINOIS INFRASTRUCTURE BRIDGES WITH POTENTIAL IMPACTS TO ILLINOIS AGRICULTURE

ILLINOIS INFRASTRUCTURE BRIDGES WITH POTENTIAL IMPACTS TO ILLINOIS AGRICULTURE ILLINOIS INFRASTRUCTURE BRIDGES WITH POTENTIAL IMPACTS TO ILLINOIS AGRICULTURE Prepared for: ILLINOIS CORN MARKETING BOARD AND ILLINOIS SOYBEAN ASSOCIATION Prepared by: 775 Ridge Lake Boulevard, Suite

More information

Illinois Community College Board. Table 1 A SUMMARY PROFILE OF THE ILLINOIS PUBLIC COMMUNITY COLLEGES

Illinois Community College Board. Table 1 A SUMMARY PROFILE OF THE ILLINOIS PUBLIC COMMUNITY COLLEGES Illinois Community College Board Table 1 A SUMMARY PROFILE OF THE ILLINOIS PUBLIC COMMUNITY COLLEGES District Size 2016 Tax Rates Extended Student Enrollment 2016 Tax Educ. All Annual FY 18 Annual Dist.

More information

SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN

SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN 76 422 3 4 3 422 79 79 79 7 579 8 422 1 76 3 22 SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR 29-2 DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY Legend TIP Projects TIP Routes Major Roads ««MORRIS

More information

Washington 36-32; Mason City (IA) W Carroll 51-15; Harvard 43-33

Washington 36-32; Mason City (IA) W Carroll 51-15; Harvard 43-33 This week Last week Team Record Sectional Tourney Finishes Notable Dual Wins Dual Losses Aurora Christian 4-3 Newman State Xmas (MN)- 23 Montini 51-18; St Charles 1 1 E 42-20; Washington 50-21 2 2 3 3

More information

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR AUGUST 2005 CAPTION TYPE

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

QUIET ZONE IMPLEMENTATION PLAN

QUIET ZONE IMPLEMENTATION PLAN QUIET ZONE IMPLEMENTATION PLAN Overview: o Recommended Strategy April 2008 o Status of Quiet Zone Plan o BNSF, ICC, & IDOT Crossing Closure Incentive Offers o Quiet Zone Implementation Costs o Funding

More information

Floyd M Large. Flo M Large. Mary M Large. Mavis M Large. Elsie M Large. Donivan M Large

Floyd M Large. Flo M Large. Mary M Large. Mavis M Large. Elsie M Large. Donivan M Large Subj: Date: From: To: (no subject) 1/1/2005 6:56:24 PM Central Standard Time Gramps37 LWin140967 Narrow your search by category: All Records Birth, Marriage, & Death Military Immigration Newspapers Directories

More information

IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009

IDOT Proposed Projects for American Recovery & Reinvestment Act of 2009 District 1 COOK COUNTY Route/Street Location Improvements Est. Cost City I 57 AT 167TH ST BRIDGE DECK OVERLAY $1,000,000 OAK FOREST 1-75807-0200 I 57 AT 125TH ST BRIDGE NEW DECK $1,435,000 CALUMET PARK

More information

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014 Chicago St. Louis High-Speed Rail Enos Park Neighborhood Association May 13, 2014 1 Illinois High-Speed Rail Program 2 Chicago-St. Louis Corridor» IDOT has actively developed the corridor since the mid1980

More information

Wayne County 2016 Local Government Budgets and Taxes

Wayne County 2016 Local Government Budgets and Taxes Wayne County 2016 Local Government Budgets and Taxes Dr. Larry DeBoer, Purdue University Department of Agricultural Economics Tamara Ogle, Purdue Extension Community Development 1. LOCAL GOVERNMENTS, 2016

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT TABULATION FOR BID NO

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT TABULATION FOR BID NO DISTRICT ONE Page 1 of 10 Pages District 1 Headquarters P.O. Box 278 Wynne, Arkansas 72396 Phone - (870) 238-8144 COUNTY ITEM QUANTITY PRICE EXTENSION PRICE EXTENSION PRICE EXTENSION ITEM 1: Bag# 1-1 2330

More information

JEWEL STORES BY CITY. LOCATION ADDRESS CITY Collections E Algonquin Rd Algonquin $ S Randall Rd Algonquin $ 48.00

JEWEL STORES BY CITY. LOCATION ADDRESS CITY Collections E Algonquin Rd Algonquin $ S Randall Rd Algonquin $ 48.00 140 W Lake St 140 W Lake St Addison $ 12.50 Addison $ 12.50 1501 E Algonquin Rd Algonquin $ 33.00 103 S Randall Rd Algonquin $ 48.00 12001 S Pulaski Alsip $ 67.00 966 IL Route 59 Antioch $ 32.00 122 N

More information

IMPORTED FIRE ANT AREAS IN TENNESSEE QUARANTINED AREAS FOR YEAR 2007

IMPORTED FIRE ANT AREAS IN TENNESSEE QUARANTINED AREAS FOR YEAR 2007 IMPORTED FIRE ANT AREAS IN TENNESSEE QUARANTINED AREAS FOR YEAR 2007 NOTE: Italics indicate a new county or a change from year 2006. 1. Anderson County That portion of the county lying southeast of a line

More information

Mississippi Home Comporation Income Limits and Maximum Rents Effective 4/1/2018

Mississippi Home Comporation Income Limits and Maximum Rents Effective 4/1/2018 ADAMS 37,800 30% 12,140 16,460 20,780 23,500 25,400 27,300 29,150 31,050 303 357 519 611 682 752 ALCORN 46,400 30% 12,140 16,460 20,780 23,500 25,400 27,300 29,150 31,050 303 357 519 611 682 752 AMITE

More information

Chicago and Alton Railroad

Chicago and Alton Railroad CHICAGO AND ALTON RAILROAD..................................................... Art. of consol. in IL, March 14, 1906 690.908 mi. First main track 159.434 mi. Second and other main tracks 359.308 mi. Yard

More information

Main Line System Recommendations

Main Line System Recommendations (Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the

More information

Davita - Centralia Dialysis 1231 State Rte. 161 Centralia, IL In-center HD; PD supplies.

Davita - Centralia Dialysis 1231 State Rte. 161 Centralia, IL In-center HD; PD supplies. Illinois Alsip 12250 South Cicero Ave. Ste. 105 Alsip, IL 60803 Fax: 708-389-1413 Davita - Alton 3511 College Ave. Alton, IL 62002-5009 618-465-4745 Antioch 311 Depot St. Antioch, IL 60002 Fax: 847-395-6327

More information

Hamilton, Clermont, Butler, Warren, Brown & Clinton Counties

Hamilton, Clermont, Butler, Warren, Brown & Clinton Counties Hamilton, Clermont, Butler, Warren, Brown & Clinton Counties Clinton Adams Twp E32 11 $169,159 10 $156,790 Hamilton Addyston W07 6 $31,958 4 $8,975 Hamilton Amberley E02 39 $286,442 37 $276,323 Clermont

More information

MoDOT Southwest District

MoDOT Southwest District Barry County Route 37: Add right-turn lane at Route 60 in Monett Route 60: Rehabilitate westbound bridge over railroad in Monett Route D: Resurface pavement between Route 248 and Route 265/413 in Crane

More information

July 9-13 Lincoln County Fair Troy July Lewis Co. Agriculture Fair Lewistown July Cooper Co. Prairie Home Fair Prairie Home July 10-13

July 9-13 Lincoln County Fair Troy July Lewis Co. Agriculture Fair Lewistown July Cooper Co. Prairie Home Fair Prairie Home July 10-13 Dates Fair Location April 25-27 Lone Jack Jamboree Lone Jack May 2-4 Truman Heritage Festival Grandview May 3-5 Azalea Festival Fredericktown May 10-11 Oak Grove MayFest Oak Grove May 17-18 Hillsboro Festival

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance

More information

BS&A Online - Employee Self Service Clients

BS&A Online - Employee Self Service Clients DuPage County Oak Brook Park District AL Barbour County AL Eufaula Water Works 2016 Flagler County FL Flagler Beach City 2013 Lake County FL Mount Dora City 2015 Manatee County FL Palmetto City 2014 Escambia

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS

AREMA C&S Manual Index (Includes 2018 Revisions) Volume SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS SECTION 3 - HIGHWAY RAIL GRADE CROSSING WARNING SYSTEMS 3.1 General Recommendations 3.1.1 36-1 Recommended Guidelines for Grade Crossing Warning Devices 5 Reaffirmed 2017 3.1.5 36-1 Recommended References

More information

Timesheets Clients. Fayette County GA. Carroll County AR. Gwinnett County GA. Pulaski County AR. Cook County IL. Brevard County FL.

Timesheets Clients. Fayette County GA. Carroll County AR. Gwinnett County GA. Pulaski County AR. Cook County IL. Brevard County FL. AR Carroll County AR Eureka Springs City 2013 Fayette County GA Peachtree City 2016 Pulaski County AR Jacksonville City 2012 Gwinnett County GA Suwanee City 2013 FL Brevard County FL West Melbourne City

More information

Purdue e-pubs. Purdue University. Government Fixed Asset Services, Inc. Indiana Local Technical Assistance Program (LTAP) Publications

Purdue e-pubs. Purdue University. Government Fixed Asset Services, Inc. Indiana Local Technical Assistance Program (LTAP) Publications Purdue University Purdue e-pubs Indiana Local Technical Assistance Program (LTAP) Publications Indiana Local Technical Assistance Program (LTAP) 5-4-2013 Indiana Local Technical Assistance Program Governmental

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

RAILROAD QUIET ZONE PROJECT

RAILROAD QUIET ZONE PROJECT RAILROAD QUIET ZONE PROJECT VILLAGE OF ROSELLE Village of Roselle 31 S. Prospect Street Roselle, IL 60172 9575 WEST HIGGINS ROAD, SUITE 600 ROSEMONT, IL 60018 TEL. (847) 823-0500 FAX (847) 823-0520 Table

More information

Chapter 2: Entire US287 Corridor

Chapter 2: Entire US287 Corridor Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps

More information

MONTGOMERY S ORIGINAL TOWN CENTER. Court Square and Dexter Avenue Downtown, Montgomery, Alabama MONTGOMERYMARKETDISTRICT.

MONTGOMERY S ORIGINAL TOWN CENTER. Court Square and Dexter Avenue Downtown, Montgomery, Alabama MONTGOMERYMARKETDISTRICT. S ORIGINAL TOWN CENTER Court Square and Dexter Avenue Downtown, Montgomery, Alabama What s Old Is New Again In The Heart OF AN Exciting City Montgomery s Market District has all the right ingredients for

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Criminal and Juvenile Justice Systems

Criminal and Juvenile Justice Systems Research and Program Evaluation in Illinois: The Extent and Nature of Drug and Violent Crime in Illinois' Counties JO DAVIESS STEPHENSON WINNEBAGO BOONE MCHENRY LAKE CARROLL OGLE DEKALB KANE DUPAGE COOK

More information

DATA AND CHARACTERISTICS OF THE ILLINOIS PUBLIC COMMUNITY COLLEGE SYSTEM

DATA AND CHARACTERISTICS OF THE ILLINOIS PUBLIC COMMUNITY COLLEGE SYSTEM DATA AND CHARACTERISTICS OF THE ILLINOIS PUBLIC COMMUNITY COLLEGE SYSTEM 28 TABLE OF CONTENTS Introduction... ix A Summary Profile of the Illinois Public Community Colleges... x Map of the Illinois Public

More information

CONTACT INFORMATION - APPENDIX A

CONTACT INFORMATION - APPENDIX A CONTACT INFORMATION - APPENDIX A LOCAL ISSUING AUTHORITY For a complete list of the Local Issuing Authorities throughout Georgia go to www.gaswcc.org and click on E & S Information and then Local Issuing

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

2018 Pharmacy Directory

2018 Pharmacy Directory GROUP MEDICARE PLANS Health Alliance MAPD HMO 2018 Pharmacy Directory This pharmacy directory was updated on September 1, 2017. For more recent information or other questions, please contact Health Alliance

More information

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION H ugh Kendall General Railway Signal Company IN T R O D U C T IO N Warning systems at railroad/highway

More information

Report on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System

Report on Installation of Wayside Horns at Railroad Crossings and Railroad Trench System City Council Agenda November 4, 2014 Mayor and Council Agenda Item No. B.01 Reviewed by City Mgr s office: /KLM Memo to: From: Manteca City Council Karen L. McLaughlin, City Manager Date: October 28, 2014

More information

Greene...6:30 P.M. Athens...5:00 P.M. Athens...12:00 P.M. Ross...12:00 P.M. Richland...5:00 P.M. Champaign...6:30 P.M.

Greene...6:30 P.M. Athens...5:00 P.M. Athens...12:00 P.M. Ross...12:00 P.M. Richland...5:00 P.M. Champaign...6:30 P.M. CALENDAR JUNE JULY AUGUST SEPTEMBER OCTOBER Auglaize...: P.M. Greene...: P.M. Richwood...: A.M. Mahoning...: A.M. Fulton...: P.M. Geauga...: P.M. Coshocton...: P.M. Marion...: A.M. Greene...: P.M. Richwood...:

More information

2017 MILLERCOORS "BEER MARKETING CHALLENGE"

2017 MILLERCOORS BEER MARKETING CHALLENGE 2017 MILLERCOORS "BEER MARKETING CHALLENGE" Winning Center will receive $3,000 in cash to be used to market your center any way you desire! To be eligible, ISBPA Centers must carry all Core 5 items (Miller

More information

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date. FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible

More information

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia

SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia Project Profile: SUPPORT THE ROUTE 58 PPTA: A Good Investment in Virginia In 1989, the General Assembly established the Route 58 Corridor Development Program to enhance economic development potential across

More information

Agenda Cover Memorandum

Agenda Cover Memorandum Agenda Cover Memorandum Meeting Date: April 9, 2012 Item Title: Photo Enforcement at Railroad Crossings Action Requested: Approval For discussion Feedback requested For your information Staff Contact:

More information

Course Course Course Class Day City/Location Code Date Time THUR 9:00 AM 3:00 PM FRI 8:00 AM 2:00 PM MON 8:30 AM 2:30 PM MON TUES TUES WED THUR SAT

Course Course Course Class Day City/Location Code Date Time THUR 9:00 AM 3:00 PM FRI 8:00 AM 2:00 PM MON 8:30 AM 2:30 PM MON TUES TUES WED THUR SAT APRIL Golden Corral, 1079 Collinsville Crossing Rd S COL041113 APR 25 Round Barn Banquet Ctr., 1900 Round Barn Road C BAZ042613 APR 26 Holiday Inn, 7550 East State Street S ROC042213 APR 29 MCL Cafeteria,

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia

More information

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak

HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES. William H. Watson. Amtrak HIGHWAY RAIL GRADE CROSSING 4 QUAD GATES William H. Watson Amtrak Union Station 100 Gaspee Street Providence, RI 02903-1133 (617) 345-7518 (6170 345 7820 FAX watsonw@amtrak.com ABSTRACT Design, installation

More information

IC Chapter 7.7. Railroad Grade Crossings Fund

IC Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7 Chapter 7.7. Railroad Grade Crossings Fund IC 8-6-7.7-1 "Grade crossing" Sec. 1. The term "grade crossing" as used in this chapter means a crossing of any railroad and any public highway, street