SALISBURY NHS FOUNDATION TRUST

Size: px
Start display at page:

Download "SALISBURY NHS FOUNDATION TRUST"

Transcription

1 SALISBURY NHS FOUNDATION TRUST PAPER SFT 1868 TITLE CAPITAL DEVELOPMENT REPORT TO THE TRUST BOARD FOR THE PERIOD FEBRUARY 2008 MAY 2008 PURPOSE OF PAPER The purpose of this paper is to up-date the Board on developments with some of the more significant capital schemes on the Salisbury District Hospital site since the date of the last report (January 2008). EXECUTIVE SUMMARY The main highlight of this report includes the near completion of the GUM relocation project. Updates are included for the Laundry storage, Cardiac Catheter Unit and the Emergency Department development, along with other significant schemes in the approved capital programme for 2008/2009. An update on progress with Phase 3 and the associated enabling scheme is included in line with Trust Board s request when the OBC was approved in July ACTION REQUIRED BY THE BOARD To note the progress of the Trust s significant capital building schemes. Peter Hill Acting Chief Executive Page 1 of 11

2 SALISBURY NHS FOUNDATION TRUST TRUST BOARD 9 June 2008 PAPER: SFT 1868 CAPITAL DEVELOPMENT REPORT The purpose of this report is to update the Board on developments with some of the more significant capital schemes since the last report (January 2008). Emergency Department redevelopment (Phase 2) To afford all the requisite improvements in the Emergency Department (ED), a third phase will be required to supplement the funding in the current capital programme for 2008/09. A separate paper was approved by the Board at their May 2008 meeting, that to achieve the additional clinical space to meet the User s key requirements within the existing ED footprint, some further new build is a priority. This will also enable a phased programme of building work to proceed without major decant of the emergency service. See Appendix A for further details. Cardiac Catheter Lab This scheme will see a Cardiac Catheter laboratory containing two treatment rooms and supporting accommodation built above the existing Orthopaedic Clinic at SDH North. Only one of the treatment unit will be equipped initially, transferring the existing equipment from the existing laboratory within Endoscopy. The proposed extension to the Emergency Department (as noted above) is sited adjacent to the Cardiac scheme and will be procured together under a design and build contract. See Appendix B for further details. Relocation of GUM service This scheme will see the GUM service relocated at the top of the SDH Central corridor, close to the Green by the bus stop. It will displace the Community Child Health offices that will temporarily move to the former Speech Therapy building, pending a permanent location being sourced. Following further option appraisal and consultation, this scheme replaced the original plan to relocate GUM in the Old Pharmacy Block. See Appendix C for further details. Page 2 of 11

3 Laundry storage This scheme has seen secure cabins provided close to the dirty end of the laundry for temporarily holding dirty linen. In addition, a double storey height extension will be linked to the clean end of the Laundry. This will replace the need for using the former Winterslow ward at SDH South. See Appendix D for further details. SDH redevelopment project (Phase 3 Paediatrics) The project has formally moved into the sketch design stage from February The enabling project to move the library from SDH North into the former Wilton ward is under review in the light of the 13 week RTT. The ward needs to remain in use for the foreseeable future. An alternative location for the library is under consideration. Final completion of the paediatrics part of Phase 3 is scheduled for the summer of 2010, as set out in the approved OBC. See Appendix E for further details. Spinal Unit refurbishment This scheme will see areas of the Spinal Unit upgraded, redecorated and flooring replaced. Infection control improvements will see wash hand basins installed on the wards and the assisted bathroom upgraded. See Appendix F for further details. Medical Records expansion This scheme will see space in level 1 of the PFI building occupied as medical records storage. See Appendix G for further details. Other significant schemes in the Approved Capital Programme for 2008/2009 An update is attached in the Annex. Peter Hill Acting Chief Executive 29 May 2009 Page 3 of 11

4 Other significant schemes in the Approved Capital Programme for 2008/09 The purpose of this Annex is to up-date the Trust Board on other schemes that make up a significant part of the current Capital Programme. Scheme and description Flexible endoscopes replacement programme (7213) Phase 1 successfully completed. Phase 2 to be implemented during 2008/09 Phase 3 to follow during 2009/10 Child Health to Old Kitchen (7217) Completion date March 2008 March 2009 March 2010 Budget cost incl VAT 645k 255k The structural repairs and clearance works to part of the former old kitchens building at SDH Central (adjacent to the Renal Dialysis Unit) are complete. This area will be refurbished and equipped for administrative/storage during this year. No decision has been made on the eventual occupants. March k Demolition (7249) For asbestos removal and demolition of redundant wards on SDH South prior to redevelopment for a nursing home and/or radiotherapy unit or the like. Former Medical Physics reuse of area (7413) Level 4 of SDH North Sector 16 was vacated with Medical Physics moving to SDH South in March Utilisation of Level 4 space is awaiting proposals from Genetics. Site signage (7229) To be confirmed Level 4 To be confirmed 200k 235k A project to review, replace and update signage across the whole of the hospital site, internally and externally. As part of a phased project, this year will see the project scope and action plan developed, along with some quick fix signage improvements. On going 50k Efficiency schemes (7703) Funding available to support efficiency projects with rapid payback revenue savings identified during the period. On going 300k Page 4 of 11

5 APPENDIX A EMERGENCY DEPARTMENT RECONFIGURATION FEASIBILITY 7408C0 COSTS ( ) APPROVED SPEND TO DATE FORECAST OUT-TURN VARIANCE + / - TO APPROVAL 997, ,000 Nil Following the approval to a third phase of the ED project, an amount of 1m has been provisionally allocated to the draft 2009/2010 capital programme. START ON SITE September 2009 September 2009 Nil OPERATIONAL DATE August 2010 August 2010 Nil The dates shown above are those given in the Options for the Emergency Department paper presented to the Board in May 2008 at Appendix D. This was based on a full design team approach. Using a design and build contract for the new ED extension in combination with the Cardiac Unit, it is probable that the complete ED reconfiguration can be achieved earlier than that given in the paper. PREPARED BY SUE BIDDLE MANAGER 27 MAY 2008 Page 5 of 11

6 APPENDIX B CARDIAC CATHETER LAB IN DESIGN 7212C0 COSTS ( ) APPROVED SPEND TO DATE FORECAST OUT-TURN VARIANCE + / - TO APPROVAL 700,000 NIL 500, ,000 Expenditure of 700k is for 2008/09 only. Funding for 2009/10 has yet to be confirmed. The extension for ED will now been added to this scheme and the funding will need to be adjusted. START ON SITE November 2008 January months OPERATIONAL DATE September 2009 November months There has been good progress with regular User team meetings to firm up the Cardiac project brief. There will be a minor delay to overall completion of the Cardiac Unit due to the decision to combine this project with the ED extension. PREPARED BY SUE BIDDLE MANAGER 27 MAY 2008 Page 6 of 11

7 APPENDIX C RELOCATION OF GUM SERVICE CONSTRUCTION NEARING COMPLETION 7438C0 COSTS ( ) APPROVED SPEND TO DATE FORECAST OUT-TURN VARIANCE + / - TO APPROVAL 339,518 5, ,518 NIL Works on site nearing completion. RELOCATE COMMUNITY CHILD HEALTH OFFICES End February 2008 End February 2008 NIL OPERATIONAL DATE GUM RELOCATED End June th June 2008 NIL The move of the existing GUM service from Block 21 at SDH South will free up part of the site being investigated for a nursing home. PREPARED BY SUE BIDDLE MANAGER 27 MAY 2008 Page 7 of 11

8 APPENDIX D LAUNDRY STORAGE ALTERNATIVE SCHEME DESIGN TO BE RE-TENDERED 7779C0 COSTS ( ) APPROVED SPEND TO DATE FORECAST OUT-TURN VARIANCE + / - TO APPROVAL 518, ,926 NIL Discussions with PB regarding linking the new extension to the existing building are ongoing with ETS. Relocation of existing engineering plant as enabling work was completed in 2007/08. START ON SITE (STORE EXTENSION) OPERATIONAL DATE (STORE EXTENSION) End February 2008 To be determined NIL End May 2008 To be determined NIL Full planning permission (S/2007/2433) was granted on 18 January 2008 for the repositioning of bike and smoking shelters and construction of laundry storage building together with 3 no. storage containers. An alternative design is being considered to maximise storage space which will require re-tendering and a new planning approval. PREPARED BY JERRY HENDERSON MANAGER 27 MAY 2008 Page 8 of 11

9 APPENDIX E PHASE 3 PAEDIATRICS IN DESIGN 7994C0 COSTS ( ) APPROVED SPEND TO DATE FORECAST OUT-TURN VARIANCE + / - TO PAEDIATRICS SCHEME (08/09 ALLOCATION) 575,000 26, ,000 NIL RELOCATE THE LIBRARY 175, ,000 NIL TOTAL APPROVAL 08/09 750,000 26, ,000 NIL Spend to date is for preliminary design fees. Enabling scheme is to relocate the library from Level 3. Location to be determined. PAEDIATRICS SCHEME START ON SITE March 2009 March 2009 NIL START ON SITE ENABLING WORKS (MOVE LIBRARY) OPERATIONAL DATE (MOVE LIBRARY) To be confirmed To be confirmed NIL To be confirmed To be confirmed NIL Paediatrics scheme first phase commences on site in the New Year and is the first of three phases within Sectors 5 and 6 of SDH North. PREPARED BY LAURENCE ARNOLD MANAGER 27 MAY 2008 Page 9 of 11

10 APPENDIX F SPINAL UNIT - UPGRADE AND REFURBISHMENT IN CONTRACT 7202C0 COSTS ( ) APPROVED SPEND TO DATE FORECAST OUT-TURN VARIANCE + / - TO APPROVAL 302, ,000 NIL Main building contract award to Castleway Construction Ltd ( 113,761). Numerous other small works being carried out e.g. double glazing, medical gases, patient lighting and patient entertain systems etc. START ON SITE 9 th June th June 2008 NIL OPERATIONAL DATE 8 th August th August 2008 NIL Dates reflect main building works contract. PREPARED BY EMMA GULLIVER MANAGER 27 MAY 2008 Page 10 of 11

11 APPENDIX G MEDICAL RECORDS EXPANSION TENDER EVALUATION 7236C0 COSTS ( ) APPROVED SPEND TO DATE FORECAST OUT-TURN VARIANCE + / - TO APPROVAL 381, ,000 NIL Tender returns received from racking suppliers and are being evaluated. Floor loading information has been given to Parsons Brinkerhoff for comment. START ON SITE August 2008 August 2008 NIL OPERATIONAL DATE November 2008 November 2008 NIL Dates dependant on securing agreement from the PFI Consortium. PREPARED BY LAURENCE ARNOLD MANAGER 27 MAY 2008 Page 11 of 11

Update on Capital Schemes April SIG Update April SARC/The Rowan 96k

Update on Capital Schemes April SIG Update April SARC/The Rowan 96k Update on Capital Schemes April 2014 1. SARC/The Rowan 96k 2. ED & 24 Bedded Ward at Antrim Area Hospital 1.1m + 406k for Pre-Assessment Area Design & Construction Work is on-going to complete a number

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update SALISBURY NHS FOUNDATION TRUST Paper: SFT 1922 Title: Transport Strategy & Green Travel Update Purpose of the Paper: To present an update on the Trust Transport Strategy and present a range of proposals

More information

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update Paper: SFT 2035 SALISBURY NHS FOUNDATION TRUST Title: Transport Strategy & Green Travel Update Purpose of the Paper: To present an update on the Trust Transport Strategy and present a range of proposals

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

2. A report on the capital spend position as at 31 st May 2014.

2. A report on the capital spend position as at 31 st May 2014. Northern Health and Social Care Trust General Capital This paper sets out: 1. The Capital Programme for 14/15 focusing on Below Delegated to be funded from General Capital. This was approved by Trust Board

More information

9. The above process has been checked and verified by Director, Head of Service or Deputy (report author to complete) Name of DSO Jonathan Regal

9. The above process has been checked and verified by Director, Head of Service or Deputy (report author to complete) Name of DSO Jonathan Regal DELEGATED POWERS REPORT NO. SUBJECT: Lease of office and St Vitus Hall at St Agnes Parish Centre, Caddington Road, London, NW2 Control sheet All of the following actions MUST be completed at each stage

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension

Members of the Administrative Staff Committee. Award of Tender T Trans Canada Trail Extension To: From: Members of the Administrative Staff Committee W.H. Jackson, Director of Utility Services Meeting Date: August 26, 2015 Subject: Report USEC15-021 Award of Tender T-54-15 - Trans Canada Trail

More information

RAMSAY HEALTH CARE ANNUAL GENERAL MEETING 24 November 2009 CHRISTOPHER REX MANAGING DIRECTOR

RAMSAY HEALTH CARE ANNUAL GENERAL MEETING 24 November 2009 CHRISTOPHER REX MANAGING DIRECTOR RAMSAY HEALTH CARE ANNUAL GENERAL MEETING 24 November 2009 CHRISTOPHER REX MANAGING DIRECTOR OVERVIEW 1. Recap FY 2009 results 2. About Ramsay Health Care 3. The Ramsay Way 4. Operating environment - Australia

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

West of England. Priority Places Requiring Public Investment

West of England. Priority Places Requiring Public Investment West of England Priority Places Requiring Public Investment Development Urban Regeneration & Suburban Intensification Bristol Central Area Bristol Central Area; Stokes Croft, Temple Meads & St Philips

More information

Minute of Meeting Renfrewshire Health and Social Care Integration Joint Board

Minute of Meeting Renfrewshire Health and Social Care Integration Joint Board Minute of Meeting Renfrewshire Health and Social Care Integration Joint Board Date Time Venue Friday, 10 March 2017 09:30 Abercorn Conference Centre, Renfrew Road, Paisley, PA3 4DR PRESENT Councillors

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary

Report of Commissioning Director, Growth and Development. Wards Child s Hill, Golders Green and West Hendon. Summary ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 26 April 2016 Title Brent Cross Cricklewood Gowling Wragge Lawrence Graham (UK) LLP Report of Commissioning Director, Growth and Development Wards Child s

More information

North West London Hospitals NHS Trust

North West London Hospitals NHS Trust North West London Hospitals NHS Trust Policy Communication Cover Sheet Policy Name: Post Holder Responsible: Approved by: Replaces: PARKING POLICY Philip Sutcliffe, Director of Corporate Services Executive

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 SUBMISSION FROM THE HIGHLAND COUNCIL

Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 SUBMISSION FROM THE HIGHLAND COUNCIL Local Government and Regeneration Committee Public Service Reform Strand 3 January 2013 PSR3-10 SUBMISSION FROM THE HIGHLAND COUNCIL 1.0 1.1 1.2 1.3 1.4 2.0 2.1 Introduction Highland Council remains committed

More information

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT/20 WP/10 Attachement A PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT Region PROJECT DESCRIPTION (PD) Title of the Project Starting date Ending date Meetings on The Improvement of Air Traffic Services

More information

BOARD OF AIRPORT COMMISSIONERS -

BOARD OF AIRPORT COMMISSIONERS - 0 OF1 Los Angeks World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS - Meeting Date: O'IAA.A.)1.Alk-Tort/uQA212J`s-- Approved by: Samantha Bricker - Deputy Executive Director 11/16/2017 11-Pleviewed

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS PERTH AND KINROSS COUNCIL 8 16/278 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS Report by Senior Depute Chief Executive (Equality, Community Planning & Public Service

More information

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: ISLINGTON STATION TEMPORARY BUS TERMINAL ACTION ITEM RECOMMENDATIONS It is recommended that the Board: 1.

More information

Estates Divisional Publication Scheme Car Parking Information

Estates Divisional Publication Scheme Car Parking Information Estates Divisional Publication Scheme Car Parking Information The information you requested is as follows: - Please note Financial Year information provided relates to 2010 / 2011. Capacity 1 How many

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Message from the Managing Director... r...

Message from the Managing Director... r... Message from the Managing Director... r... Our first full trading year has been a challenging and rewarding period for the team during the early life of the Company, a year during which we have gained

More information

YORKSHIRE AND THE HUMBER SPECIALISED COMMISSIONING OPERATIONAL GROUP

YORKSHIRE AND THE HUMBER SPECIALISED COMMISSIONING OPERATIONAL GROUP 1 Strategy and Direction YORKSHIRE AND THE HUMBER SPECIALISED COMMISSIONING OPERATIONAL GROUP Meeting held on Friday, 25 January 2013 At Sandal Rugby Club, Wakefield Decision Summary for PCT Boards 155/12

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

Report of the Strategic Director, Regeneration to the meeting of Bradford South Area Committee to be held on 28 January U

Report of the Strategic Director, Regeneration to the meeting of Bradford South Area Committee to be held on 28 January U Report of the Strategic Director, Regeneration to the meeting of Bradford South Area Committee to be held on 28 January 2016. U Subject: WINDERMERE ROAD & SURROUNDING STREETS - PETITION Summary statement:

More information

PARKWAY CONTINUES STRONG PERFORMANCE IN Q3 2009

PARKWAY CONTINUES STRONG PERFORMANCE IN Q3 2009 PRESS RELEASE PARKWAY CONTINUES STRONG PERFORMANCE IN Q3 2009 Highlights: Strong quarterly group revenue of $259.0 million, an 8% increase over Q3 2008 Net profit for the quarter excluding exceptional

More information

Why we re here: For educational purposes only

Why we re here: For educational purposes only Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)

More information

Feasibility of a Regional Health Insurance Mechanism for Caricom. 6 th Caribbean Conference. Presentation to the. November 23, 2011, Bermuda

Feasibility of a Regional Health Insurance Mechanism for Caricom. 6 th Caribbean Conference. Presentation to the. November 23, 2011, Bermuda Feasibility of a Regional Health Insurance Mechanism for Caricom Presentation to the 6 th Caribbean Conference on Health Financing Initiatives November 23, 2011, Bermuda Presenter: Raphael D. Barrett RDB_DAHCON_6

More information

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development To: Chair Tom Galloway and Members of the Planning and Works Committee

More information

1. Title: Instrumental development of the fire service for disaster prevention and technical rescue

1. Title: Instrumental development of the fire service for disaster prevention and technical rescue STANDARD SUMMARY PROJECT FICHE Project No. HU9911-02 1. Title: Instrumental development of the fire service for disaster prevention and technical rescue 2. Sub-programme: Environment 3. Geographical Location:

More information

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN

REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN NHS Lothian John Jack Director of Facilities 5th June 2008 REPORT ON CHARGING FOR CAR PARKING AND THE IMPLEMENTATION OF CEL1 (2008) WITHIN NHS LOTHIAN 1 Purpose of the Report 1.1 The purpose of this report

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

STAFF REPORT FOR ACTION

STAFF REPORT FOR ACTION Insert TTC logo here STAFF REPORT FOR ACTION Hillcrest Complex Property Study Date: November 30, 2016 To: From: TTC Board Chief Executive Officer Summary This report outlines a plan for staff to proceed

More information

PROJECT UPDATE AND CAPITAL VARIANCE REPORT

PROJECT UPDATE AND CAPITAL VARIANCE REPORT STAFF REPORT To: From: Board of Management Robin D. Hale Chief Operating Officer Subject: Date: 2012-10-17 Summary PROJECT UPDATE AND CAPITAL VARIANCE REPORT This report provides an update to the Board

More information

South East Queensland Stabling Site Selection Report January 2014

South East Queensland Stabling Site Selection Report January 2014 South East Queensland Stabling Site Selection Report January 2014 1 Contents Page 1. Introduction... 3 2. Project Background... 3 2.1 Stabling Options... 3 3. Site Selection Process... 4 4. Site Assessment

More information

RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT

RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT ASX ANNOUNCEMENT 30 August 2016 RAMSAY HEALTH CARE REPORTS 17.7% RISE IN FULL YEAR CORE EPS AND 16.8% RISE IN CORE NET PROFIT Financial Highlights Core net profit after tax 1 (Core NPAT) up 16.8% to $481.4

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Feasibility Study for a New Sport, Entertainment and Convention Facility in Townsville (September 2013) Information Abstract

Feasibility Study for a New Sport, Entertainment and Convention Facility in Townsville (September 2013) Information Abstract Feasibility Study for a New Sport, Entertainment and Convention Facility in Townsville (September 2013) Information Abstract 1 Introduction: Townsville has two major sporting, entertainment and events

More information

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines IAH Terminal Redevelopment Project Memorandum of Agreement with United Airlines May 29, 2014 On April 24, HAS presented plans for a new Mickey Leland International Terminal (MLIT) Sufficient capacity for

More information

Sustainable Brisbane Walking Tour

Sustainable Brisbane Walking Tour Sustainable Brisbane Walking Tour 150 Charlotte Street 4 Star Green Star Office As Built v3 The refurbishment of this commercial office building focused on upgrading mechanical, electrical and hydraulic

More information

National Park Authority Board Meeting

National Park Authority Board Meeting Paper for decision 1. Introduction 1.1 Preparations for the introduction of four Camping Management Zones (covering less than 4% of the National Park) have progressed significantly since Scottish Ministers

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report

Your Transport Levy Your Transport Future. Sunshine Coast Council Transport Levy Annual Report Your Transport Levy Your Transport Future Sunshine Coast Council Transport Levy Annual Report 2016-2017 www.sunshinecoast.qld.gov.au T 07 5475 7272 F 07 5475 7277 Locked Bag 72 Sunshine Coast Mail Centre

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

EMBARGOED UNTIL MEETING

EMBARGOED UNTIL MEETING SMG(M) 04/02 Minutes: 7-15 NHS GREATER GLASGOW Minutes of the Meeting of the Greater Glasgow Acute Services South Glasgow Monitoring Group held at 2.00 p.m. on Friday, 5 th March 2004 in Floor E Conference

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Proposal to Redevelop Lower Kananaskis Lake Campgrounds in Peter Lougheed Provincial Park. What We Heard

Proposal to Redevelop Lower Kananaskis Lake Campgrounds in Peter Lougheed Provincial Park. What We Heard Proposal to Redevelop Lower Kananaskis Lake Campgrounds in Peter Lougheed Provincial Park What We Heard In December 2016, Alberta Parks proposed to make several changes to campgrounds in the Lower Kananaskis

More information

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM

MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

REPORT TO THE TRUST BOARD OF DIRECTORS MEETING HELD IN PUBLIC ON 25 MARCH 2014

REPORT TO THE TRUST BOARD OF DIRECTORS MEETING HELD IN PUBLIC ON 25 MARCH 2014 REPORT TO THE TRUST BOARD OF DIRECTORS MEETING HELD IN PUBLIC ON 25 MARCH 2014 Enc D REPORT FROM THE CHIEF EXECUTIVE PREPARED FOR THE TRUST BOARD Trust objectives supported by this paper The report supports

More information

The challenges of delivering multiple PPP projects IAIN F GRAHAM

The challenges of delivering multiple PPP projects IAIN F GRAHAM The challenges of delivering multiple PPP projects IAIN F GRAHAM Director of Capital Planning & Projects NHS Lothian iain.graham@nhslothian.scot.nhs.uk Scottish health & social care facilities conference

More information

Dublin City Council Social Housing Supply & Delivery Monthly Update Report. This report is presented to the Members of the City Council for noting.

Dublin City Council Social Housing Supply & Delivery Monthly Update Report. This report is presented to the Members of the City Council for noting. To the Lord Mayor and Report No. 213/2017 Members of Dublin City Council Report of the Assistant Chief Executive Dublin City Council Social Housing Supply & Delivery Monthly Update Report I attach update

More information

Ramsay Health Care Limited Results Briefing Half Year ended 31 December 2018

Ramsay Health Care Limited Results Briefing Half Year ended 31 December 2018 Ramsay Health Care Limited Results Briefing Half Year ended 31 December 2018 Craig McNally, Group Managing Director & Bruce Soden, Group Finance Director 28 February 2019 ramsayhealth.com Agenda Group

More information

Signage and Wayfinding Communications Briefing

Signage and Wayfinding Communications Briefing Signage and Wayfinding Communications Briefing The following information will be used to inform key audiences of the changes taking place as part of the signage and wayfinding project. A landing page,

More information

Councillors Noble (Chair), Gollick and Worton. There were no declarations of pecuniary or non-pecuniary interests.

Councillors Noble (Chair), Gollick and Worton. There were no declarations of pecuniary or non-pecuniary interests. MEETING: Dearne Area Council DATE: Monday, 4 April 2016 TIME: 10.00 am VENUE: Meeting Room, Goldthorpe Library MINUTES Present Councillors Noble (Chair), Gollick and Worton. 43 Declarations of Pecuniary

More information

Love Field Modernization Program Update: Master Planning Recommendations

Love Field Modernization Program Update: Master Planning Recommendations Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and

More information

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02. Hutt Valley Tramping Club PO Box 30 883 LOWER HUTT 5045 Tukituki Catchment Proposal Environmental Protection Agency Private Bag 63 002 WELLINGTON 6140 29 July 2013 Submission on the Tukituki Catchment

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

THE WATERPARKS FROM FEASIBILITY TO OPERATION DELIVERING THE BUSINESS PLAN. Roger Currie Neuman Aqua Ltd / Water Technology Inc. 28 th September 2017

THE WATERPARKS FROM FEASIBILITY TO OPERATION DELIVERING THE BUSINESS PLAN. Roger Currie Neuman Aqua Ltd / Water Technology Inc. 28 th September 2017 THE WATERPARKS FROM FEASIBILITY TO OPERATION DELIVERING THE BUSINESS PLAN Roger Currie Neuman Aqua Ltd / Water Technology Inc. 28 th September 2017 WTI & Neuman Aqua Great Wolf Lodge Alton Towers Sandcastle

More information

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces. A trusted partner Multiplex is a trusted partner for all types of retail projects from Greenfield developments to refurbishments and vibrant mixed-use precincts, in both cities and regional locations.

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

City of Rockingham. Secret Harbour Surf Life Saving Club Redevelopment Project

City of Rockingham. Secret Harbour Surf Life Saving Club Redevelopment Project City of Rockingham Secret Harbour Surf Life Saving Club Redevelopment Project ASHLEY PITTARD Manager Community Infrastructure Planning Surf Club Development Multiple Layers The Pavilion - Design and Construction

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014. RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

STRATEGIC REVIEW 2015/16

STRATEGIC REVIEW 2015/16 STRATEGIC REVIEW 2015/16 STRATEGIC REVIEW 2015/16 Executive Summary Over the last 12 months the company has continued to develop, successfully broadening our client base, introducing new services, winning

More information

A.8 - Invitation letter sent for stage 2 exhibition

A.8 - Invitation letter sent for stage 2 exhibition A.8 - Invitation letter sent for stage 2 exhibition 3Ts rogramme Office The Royal Sussex County Hospital Sussex House 1 Abbey Road Brighton BN2 1ES Tel: (01273) 523375 RedevelopmentoftheRoyalSussexCountyHospital

More information

Tullibody Action Group Vision for New Civic Centre

Tullibody Action Group Vision for New Civic Centre Tullibody Action Group Vision for New Civic Centre August 2017 Prepared by Sandra Macaskill, Caskieco, M 07986 163002 E Caskieco@aol.com CaskieCo 1 1. Introduction 1.1. Tullibody Action Group (TAG) came

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

Ridership Growth Strategy (RGS) Status Update

Ridership Growth Strategy (RGS) Status Update For Information Ridership Growth Strategy (RGS) Status Update Date: July 10, 2018 To: TTC Board From: Deputy Chief Executive Officer Summary The TTC s Ridership Growth Strategy (RGS), with all its components,

More information

Update on the development of the Regional Real Time Passenger Information (RTPI) System

Update on the development of the Regional Real Time Passenger Information (RTPI) System Agenda Item 11 Update on the development of the Regional Real Time Passenger Information (RTPI) System Committee Strategy and Programmes Date of meeting 23 November 2018 Date of report 30 October 2018

More information

The Trust has already submitted this draft 14/15 General Capital Plan (including MES) to the DHSSPS in early May.

The Trust has already submitted this draft 14/15 General Capital Plan (including MES) to the DHSSPS in early May. NORTHERN HEALTH AND SOCIAL CARE TRUST Proposals for Capital Plan 2014/15 1.0 Introduction: This report details the high priority general capital bids across all the Directorates / Service areas and identifies

More information

Community Transport projects : grant funding

Community Transport projects : grant funding Community Transport projects : grant funding Committee Operations Date of meeting 1 May 2015 Date of report 22 April 2015 Report by Assistant Chief Executive (Operations) 1. Object of report To recommend

More information

City of Kingston Report to Council Report Number

City of Kingston Report to Council Report Number To: From: Resource Staff: City of Kingston Report to Council Report Number 15-423 Mayor and Members of Council Date of Meeting: November 3, 2015 Subject: Executive Summary: Cynthia Beach, Commissioner,

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

A summary of Draft Makara Peak Mountain Bike Park Master Plan

A summary of Draft Makara Peak Mountain Bike Park Master Plan A summary of Draft Makara Peak Mountain Bike Park Master Plan OVEMBER 216 Image: Peter Marshall 2 3 Introduction Since it was established in 1998, the Makara Peak Mountain Bike Park (Makara Peak) has grown

More information

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD

More information

A student guide to accommodation 2016/17

A student guide to accommodation 2016/17 A student guide to accommodation 2016/17 Welcome I would like to extend a warm welcome to all prospective students. Here at Accommodation Services we are committed to assisting students in the transition

More information

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD 2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;

More information

South Australian Budget June 2014

South Australian Budget June 2014 South Australian Budget 2014 15 June 2014 On 19 June 2014 South Australian Treasurer the Hon Tom Koutsantonis MP delivered the 2014 15 Budget. The main theme of the Budget is investment in public transport

More information

Rangitīkei District Council

Rangitīkei District Council Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.

More information

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3

More information

THE ICAO TECHNICAL COOPERATION PROGRAMME: A Partner in Implementing Aviation Projects and Achieving Civil Aviation Goals

THE ICAO TECHNICAL COOPERATION PROGRAMME: A Partner in Implementing Aviation Projects and Achieving Civil Aviation Goals DGCA - 50/DP/7/4 THE ICAO TECHNICAL COOPERATION PROGRAMME: A Partner in Implementing Aviation Projects and Achieving Civil Aviation Goals International Civil Aviation Organisation 01/08/2013 50th Conference

More information

Moraine Park Technical College

Moraine Park Technical College Moraine Park Technical College Table of Contents Section 1 Executive Summary 1 Section 2 Existing Facilities Owned Facilities 3 Facility Room Inventory 4 Leased Facilities 5 Floor Plans Beaver Dam Campus

More information

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

Swallow House, 10 Swallow Street, Birmingham, B1 1BD Committee Date: 20/02/2014 Application Number: 2013/08477/PA Accepted: 29/11/2013 Application Type: Full Planning Target Date: 28/02/2014 Ward: Ladywood Swallow House, 10 Swallow Street, Birmingham, B1

More information

IAT Annual Conference 'Driving Forward

IAT Annual Conference 'Driving Forward Zero to Hero Transformation of Ireland s National Road Network IAT Annual Conference 'Driving Forward Sean O Neill Topics Overview How It All came together. TII & National Road Network & History A Little

More information

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE Committee Date: 22/01/2015 Application Number: 2014/05949/PA Accepted: 08/12/2014 Application Type: Full Planning Target Date: 02/02/2015 Ward: Sutton Vesey Bridge School, Longmoor Campus, Coppice View

More information

MINUTES of the Meeting of Tollesbury Parish Council held in the Pavilion on Tuesday 6 th February 2018 commencing at 7.30pm.

MINUTES of the Meeting of Tollesbury Parish Council held in the Pavilion on Tuesday 6 th February 2018 commencing at 7.30pm. MINUTES of the Meeting of Tollesbury Parish Council held in the Pavilion on Tuesday 6 th February 2018 commencing at 7.30pm. Present: Cllrs Bell, Crees, Goody, Nixon, O Donnell, S Slodzik, Symes In the

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager 4(3)(i) 12/570 Alterations and replacement windows at Milnathort Town Hall, 1

More information