Exe Estuary Zonation and Codes of Conduct Review: Project Proposal

Size: px
Start display at page:

Download "Exe Estuary Zonation and Codes of Conduct Review: Project Proposal"

Transcription

1 Exe Estuary Zonation and Codes of Conduct Review: Project Proposal Exe Estuary Management Partnership Commissioned by:

2 CONTENTS 1. Introduction 1.1. Exe Estuary Management Partnership 1.2. South East Devon Habitat Regulations Partnership 1.3. Partnership Working 2. Zonation Review 2.1. Proposal for revised zoning on the Exe Estuary 2.2. Proposal for establishment of a Voluntary Exclusion Zone in the estuary north of Dawlish Warren 2.3. Summary: review of zonation 3. Codes of Conduct 3.1. Proposal for improved codes of conduct for specific user groups 3.2. Summary: review of codes of conduct

3 1. INTRODUCTION 1.1. Exe Estuary Management Partnership The Exe Estuary Management Partnership (EEMP) has existed since the mid-1990s. Due to the complex array of organisations with (sometimes overlapping) management responsibilities for different aspects of the Estuary, a partnership approach is the most effective model by which to achieve consistent management of the Estuary resource as a whole. The EEMP seeks to conserve and enhance the estuary s special nature and promote sustainable economic and social activity by managing competing demands and addressing any conflicts as they arise, to ensure that interests and activities are harmonised. The EEMP is the management group responsible for the delivery of the SPA management scheme. The framework for the co-ordinated management of the Exe is provided by the Exe Estuary Management Plan , which can be found on the EEMP website at: Partners of the EEMP include Devon County Council, East Devon District Council, Teignbridge District Council, Exmouth Town Council, Dawlish Town Council, Starcross Parish Council, Woodbury Parish Council, Natural England, RSPB, Lympstone Fishery and Harbour Association, the RYA, Powderham Estate, the Environment Agency, and Devon and Severn IFCA. An Exe Estuary Officer is employed by the EEMP to act on its behalf. The Partnership retains joint authority for the work through quarterly Management Group meetings, with a Forum Chair and Vice Chair representing the views of the local community as elected representatives South East Devon Habitat Regulations Partnership Teignbridge, East Devon District and Exeter City Councils have established the South East Devon Habitat Regulations Partnership (SEDHRP), to help protect three internationally important conservation sites for future generations to enjoy: the Exe Estuary, Dawlish Warren and the East Devon Pebblebed Heaths. The SEDHRP will off-set the effects of new development and population growth on these conservation sites, providing safe areas for all users to enjoy and caring for the bird populations they support. The SEDHRP working group includes the EEMP, Clinton Devon Estates, Devon Wildlife Trust, the RSPB, Natural England and the National Trust, and funding has come via contributions from developers of new housing across the three council areas, within a 10km zone of influence. The work of this partnership is guided by the South-east Devon European Site Mitigation Strategy, which can be found at: and implemented by two Habitat Mitigation Officers and a Devon Loves Dogs Project Officer, overseen by the Habitat Regulations Delivery Manager. The Mitigation Strategy estimates that approximately 30,000 new homes are likely to be developed within the zones of influence, and proposes a package of mitigation measures, both on-site and off-site, that would be necessary to protect the integrity of the sites in respect of this level of future growth and the commensurate increase in recreational pressures.

4 1.3. Partnership Working In order to mitigate for the potential impacts of new housing development on the Exe Estuary and Dawlish Warren, the EEMP is keen to work closely with the SEDHRP. With a history of managing the Exe in a co-ordinated and cost-effective manner, the EEMP is considered to be an effective route to progress with a number of proposed management measures from the South-east Devon European Site Mitigation Strategy. The EEMP have been commissioned to take forward some of the work of the SEDHRP for 2016/17, which include revised zoning on the Exe Estuary, including the establishment of a Voluntary Exclusion Zone (VEZ) in the estuary north of Dawlish Warren, and improved codes of conduct for specific user groups. The following chapters include detail of the proposals for these pieces of work, which directly quote and are informed by the South-east Devon European Site Mitigation Strategy.

5 2. ZONATION REVIEW 2.1. Proposal for revised zoning on the Exe Estuary: Informed by the Southeast Devon European Site Mitigation Strategy Background Zoning partitions different types of access, determining the overall distribution of visitors on land and water, in both time and space. Zoning is positive in that it creates dedicated areas for particular activities, rather than limiting access. There are numerous examples from around the UK coast of zones for particular water based activities, such as water-skiing or kitesurfing. These zones are often set out in codes of conduct, usually developed with local users and user groups. The codes of conduct are sometimes also linked to byelaws, and the implementation of the zones is often driven by safety issues rather than with the aim to minimise disturbance. Clubs can address a wide range of issues and adapt quickly to change, particularly where members communicate through forums and electronic discussion rooms. Working with local groups or clubs is a good way to resolve a lack of awareness or to highlight conservation issues or coastal byelaws. Clubs can provide a means for getting information across and help implement any zoning if they have been involved from the outset. Zones are usually established to reflect local conditions, safety issues and site specific factors, and there appears to be little information available to recommend sizes of zones, the space needed for particular activities, etc. There are existing zones for particular activities on the Exe Estuary. Details of these zones can be found on a range of different websites, leaflets and signs. There are a number of issues with the current zones, according to the mitigation strategy: They are mapped differently on websites and in various leaflets. For example the existing code of conduct for kitesurfers shows a voluntary exclusion zone between Exmouth and Lympstone that is markedly different from the zone mapped on the Exe Kiteboarders website. They are not communicated to users very well. There is little information available as to how and why the zones have been established, meaning users have relatively little understanding of why they are there. There is relatively little enforcement of the use of particular zones, for example water-skiing frequently takes places in the upper parts of the estuary. There are some overlaps with different zones which creates a potential conflict between users, for example the dedicated water-ski and powerboating areas shown in the Exe Activities leaflet both overlap with the buoyed voluntary exclusion area for kitesurfing.

6 Aims Suggested zones as detailed in the Habitat Regulations mitigation strategy are: A dedicated kitesurfing/windsurfing zone off the Duck Pond. The zone would ensure kite/windsurfers were not going up the river and ensure the area disturbed by such activities is minimised. The kite/windsurfing voluntary exclusion zone to be reviewed to explore whether it should be discontinued if a dedicated kitesurfing/windsurfing zone is created, or whether the voluntary exclusion zone should be extended to all users. The necessary area of zostera bed should be covered by the zone. The powerboating zone is positioned accordingly to ensure no overlap with the kite/windsurfing voluntary exclusion zone. The use of the powerboating zone should be for the period 1 April to 1 September only. The existing water-skiing zone positioned in approximately the same place, slightly modified to fit alongside the kite/windsurfing voluntary exclusion zone. Off the Exmouth Seafront a line indicating a western limit for all watersport / personal water craft / boating activities, ensuring the areas around Dawlish Warren/Warren Point and off-shore are undisturbed. A dedicated zone (all year round) for personal water craft remaining in the current location. Any additional zoning needs should be explored. These zones can be shown clearly on a single map and can be designed so as to provide space for users while also ensuring key areas for birds (such as the mussel beds, zostera beds and freshwater channel near the Duck Pond) are outside the zones. The zones should be backed up within the byelaws and a clear explanation provided for why they are necessary. The zones should be marked with buoys in the estuary where possible and details of the locations circulated among estuary users. Zones should be promoted through codes of conduct and through future work that the EEMP proposes it takes forward with signage, interpretation boards and leaflets. Dawlish Warren A voluntary landing zone is currently used at Warren Point to restrict visitors to Soft Sand Bay. The water users code of practice at Dawlish Warren should be included in the review and options to restrict landing of craft on Warren Point should be explored in depth.

7

8 2.2. Proposal for establishment of a Voluntary Exclusion Zone in the estuary north of Dawlish Warren: Informed by the South-east Devon European Site Mitigation Strategy Background The intertidal area to the North of Dawlish Warren is the most important high-tide roosting site in the Estuary. It is proposed that a Voluntary Exclusion Zone is established in the estuary and covers the intertidal mudflats and saltmarsh owned by the Devon Wildlife Trust. This area is significant for a high proportion of the Estuary s brent geese, oystercatchers, bar-tailed godwits, wigeon and teal birds in providing both a feeding area at low tide and is of particular importance in providing a high tide roosting area. As a result of coastal changes at Dawlish Warren foreshore and rising sea levels, undisturbed high tide roosts in the estuary are becoming increasingly difficult for birds to find. Aims Identified in a report by the Exe Estuary Management Partnership, informed by the Exe Estuary Recreational Framework, the opportunity exists as part of an overall revision of zones to create a largely undisturbed high tide roost in an area aligned to the boundary of the National Nature Reserve. This will provide a refuge of significant importance for overwintering birds against increases in recreational activity. The report does, however point out that the area is well used by crab tilers and bait diggers, with more than 4500 tiles laid within the proposed boundary. Considered negotiations with crab tillers and bait diggers will be required, regarding the extent & timing of their exclusion from the area. There should be no new crab tiles laid and existing tiles in the existing IFCA exclusion zone should be removed, unless the process of removal is shown to be more damaging to the intertidal area. The Exe Disturbance Study by Footprint Ecology (2011) states The parts of the estuary with the lowest levels of access (the Bight to the north of Dawlish Warren and at Powderham) are also the parts of the estuary with the highest bird counts. Furthermore, results from the study show that Bait digging on the intertidal, dog walking with dogs off leads on the intertidal, walking on the shore and intertidal and kitesurfing are the activities which account for the majority of major flight events. Any plan to establish a Voluntary Exclusion Zone in this location will need to take into account the existence of Eales Dock, which is a small, privately owned dock at the end of Shutterton Creek, on the landward side of the railway. Research shows that there is established use of the site as a dock and that the current owner is looking to develop the business. Careful negotiation with the owner will be required in order to ensure that any potential disturbance by water craft launching from here is minimised. This might include the distribution of a code of conduct for water users that use the dock, if necessary. It is proposed that all recreational activity within the Voluntary Exclusion Zone would be restricted all year round, with the exception of allowances for water craft

9 accessing Eales Dock (launching/recovery exclusion for 2 hrs either side of high tide). Objectives, recommendation/proposal and required outcomes 1. The EEMP is commissioned by the SEDHRP to revise zones for water activities on the Exe. These zones are to very closely adhere to those recommended in the mitigation strategy or for alternatives to be suggested, with sound and clear reasons given. The cost of buoy markers, will also be explored, but is likely to require additional funds, particularly if large areas of the estuary require buoys to highlight zones. Ongoing maintenance costs of the buoys will also need to be taken into consideration. The EEMP will work with user groups to identify the new zones. In order to achieve the objectives of the SEDHRP, revised zones must function to serve the protection of SPA features. Zones to be shown clearly on a single map and be designed so as to provide space for users while also ensuring key areas for birds (such as the mussel beds, zostera beds and freshwater channel near the Duck Pond) are outside activity zones. The revised activity zones should be backed up within the byelaws (detailed in the mitigation strategy) and clear explanation provided for why they are necessary. The zones should be marked with buoys in the estuary where possible and details of the locations circulated among estuary users. Suggestions for monitoring the effectiveness of zones on the estuary is also required. 2. In recognition of the area as the main roosting site on the estuary, a Voluntary Exclusion Zone is to be established to the north of Dawlish Warren, aligned to the NNR boundary. The EEMP will liaise with key stakeholders, for example, Devon Wildlife Trust, crab tilers, bait diggers, D&SIFCA and Eales Dock. A safe, clear, buoy or other marking system is required to establish the area visually, the funding for which would need to be explored. Ongoing maintenance costs of the buoy or marking system will need to be taken into consideration in the longer term. After the area has been established, close monitoring will be required to see if it is working. If it is not, an Exclusion Zone protected by statutory legislation should replace it. This monitoring will be undertaken via mitigation wardens, supported by other organisations such as the EEMP and volunteers.

10 2.3. Summary: review of zonation The recommendations from the South-east Devon European Site Mitigation Strategy provide a useful starting point for consultation with user groups. To avoid potential user conflict, no zones should overlap where possible. Some degree of flexibility is required to allow user groups to help define their activity zones, providing Voluntary Exclusion Zones are protected and space is allowed for other users and safe navigation. Following a number of meetings of the South East Devon Habitat Regulations Partnership Officer Working Group, the following proposals were put forward to take to the initial Exe user group consultations. Exmouth Voluntary Exclusion Zone The same area as the existing Kitesurfing Voluntary Exclusion Zone (from current northern boundary in estuary to Duck Pond, but extended to all users during low tide when the Brent Geese are feeding on the eelgrass (Sept-Dec). To include: Kitesurfers / Windsurfers SUP Kayakers, Canoers Dogwalkers Bait diggers / Crab tilers Etc. Boats are OK to use this area at high time when the feeding ground (eelgrass) is covered (i.e. two hours either side of high tide). Dawlish Warren Voluntary Exclusion Zone New Voluntary Exclusion Zone proposed, within the existing boundary of the National Nature Reserve. The Dawlish Warren SSSI condition assessment particularly highlights that bird declines at the Warren, an important high tide roost, may be the cause of declines across the estuary, thus indicating that suitable, good quality high tide roosting sites may be critical to the ecological integrity of the SPA. This is the only new area that we re proposing for protection of the bird species of the Estuary.

11

12 3. CODES OF CONDUCT 3.1. Proposal for improved codes of conduct for specific user groups: Informed by the South-east Devon European Site Mitigation Strategy Background Codes of conduct set out clearly how users undertaking a particular activity should behave, and are most relevant to sporting activities, including watersports. Where there is plenty of space, relatively few users and few conflicts, there is unlikely to be a need for any agreed code of conduct. Developing good, clear codes with user groups ensures that safety issues, insurance, consideration of other users and nature conservation issues can be accommodated, ensuring users can enjoy their chosen activities while minimising any impacts. Codes of conduct are particularly relevant where there are a wide range of users, potentially not linked to a particular club, and a range of complicated issues, or where multiple activities overlap. Casual visitors, who visit a location sporadically, are unlikely to be fully informed of all local issues and politics. A code of conduct serves to set out where there are particular issues and provides the user with all the information they need to undertake their chosen activity safely, within the law and without creating conflict with others. Codes of conduct can be established by directly working with local users, even by the users themselves. Codes are likely to be most effective where they are developed with stakeholders and are not overly restrictive. One of the key issues with codes is ensuring that they are read and circulated widely and that visitors are aware of them. Getting people to sign up to voluntary codes of conduct is potentially tricky and may be difficult to achieve where many users are ad hoc, casual visitors and where there are multiple access points (i.e. no central location at which users can be intercepted). There are existing codes of conduct for the Exe Estuary. In reviewing these existing codes of conduct there is a clear opportunity to produce a new set of codes. The existing information for particular users is not easily accessible and there is relatively little guidance on how to reduce disturbance. Aims For kitesurfing/windsurfing, jet skiing, sailing, power boating, water skiing, canoeing, crab tiling, bait collection/shellfishing, and dog walking clear codes of conduct are required for the Exe Estuary and offshore area. The codes should be established through close working with the local clubs and they will need to be reviewed and promoted regularly. Codes will need to be clearly set out, available through local clubs, incorporated into club websites, circulated to all relevant forums/new members of clubs, etc. and set out on signs and other material (e.g. leaflets) as necessary. The codes will be consistent in how they look and in their content, so it is clear they are fair and instantly recognisable. They will have a brief section on the bird interest and other relevant background so it is clear to users why they are expected to

13 behave in a particular way. The codes should also include information relating to safety, other users, etc. For example: Kite/windsurfing: details of zones, a requirement to only use the Duck Pond zone from 1 September to 1 April so that kite/windsurfing does not take place in the rest of the estuary during this period; to maintain distance from Dawlish Warren all year round; a requirement to only use the Duck Pond area 2 hours either side of high tide; clear guidance on where users should set up their equipment; and a requirement to not be out on the water in prolonged cold weather. Jet Skiing/PWC use: a requirement to keep outside the estuary, launching from Exmouth and staying at sea or around the mouth of the estuary; no use of the area around Dawlish Warren and no landing within the NNR; promotion of the dedicated zone; and requirement to keep below 10 knots within the harbour limits. Sailing: clear guidance on location of roosts and a requirement to avoid sailing close to roost sites (a 200m buffer should be drawn around roost sites); a requirement for all races and events between September and March to take place only at high tide. Powerboating: clear guidance on zoning, with the existing powerboat zone boundary modified to ensure no conflict with kite/wind surfing; a requirement to use only at high tides (above 3.8m) and during the period 1 April to 1 September; at all other times within the estuary a requirement to be below the 10 knot speed limit; clear guidance on the location of roosts and a requirement to avoid roost sites (a 200m buffer to be drawn around roost sites). Waterskiing/wakeboarding: clear guidance on zoning, with the existing zone boundary modified to ensure no conflict with kite/wind surfing; a requirement that waterskiing/wakeboarding only takes place within the dedicated zone; for use of the zone to only take place 2 hours either side of high tide; with the time restriction only applied from 1 September to 1 April. Canoeing: guidance on where to canoe, requesting users to stick to the main channel within the estuary and a map shaded to show the main channel; the map should show the Clyst, the Bight, Shutterton Creek, Cockle Sand and Lympstone Lake as areas which canoeists should avoid between 1 September and 1 April; the map should highlight areas where canoeists can launch/land without likely disturbance; a requirement to avoid roost sites (the mitigation strategy suggests a 200m buffer drawn around roost sites). Crab tiling: as with the existing code, a requirement not to increase the number of tiles; to ensure tiles are low; not to undertake with a dog; and only to operate within the current zone (shown on a map). Further liaison is necessary regarding the proposed Voluntary Exclusion Zone, with the expectation that the area will not be used at all for some, if not all of the winter months. Bait digging and cockle raking: the code should require bait diggers to back-fill and dogs to be on leads; and should give a map/guidance on where to go with digging/raking allowed in areas away from the Duck Pond (i.e. avoiding the zostera beds), away from the Bight/Shutterton Creek and away from the north of the estuary above Starcross Yacht Club. As with crab tiling, further liaison is necessary regarding the Voluntary Exclusion Zone. Dog walking: a requirement for dogs to be on leads below MHWM inside the estuary during 1 September to 1 April; requests that dog walkers keep to the back of the

14 shore/avoid key areas for birds (a map should be included); guidance that dog walkers should avoid roost areas and take note of signs, etc. around roosts; a requirement that dog walkers should not let their dogs chase birds or other wildlife. Messages within this code should be consistent with other local sites (Pebblebeds and Dawlish Warren) and also should link with the dog project and byelaws. A general code of conduct for all users should also accompany the above, and provide further general guidance such as avoiding putting birds to flight, avoiding activities (1 September - 1 April) around the shore/foreshore that will cause disturbance, such as kite flying, model aircraft flying and driving on the foreshore. This guidance should also provide a more general environmental section, promoting environmental awareness and sustainability issues, e.g. not leaving litter, helping with beach cleans, etc. What is in effect a code of conduct for Dawlish Warren is published on the internet, together with a guide for water users, a guide for anglers and information for dog walkers, all in leaflet form. It is proposed to create a specific code of conduct for the reserve and increase the prominence of this information with the aim of increasing visitors awareness of the vulnerability of the site and the measures they are personally responsible for to help safeguard it. The code will: Highlight areas where particular activities are/are not permitted (such as dogs off leads) Highlight activities which are not permitted (e.g. barbeques) Explain temporally variable requests (e.g. avoiding walking along the shoreline at high tide) Include specific requirements such as not feeding livestock and not leaving litter Sufficient information should be included within the code for visitors to be able to understand the requirements. For example, wardens on site have become aware that visitors are not necessarily aware of the tidal cycles and so do not recognise the state of the tide during their visit. Therefore information needs to include visual aids e.g....at high tide when the water is at or above the fenceline indicated on the map Written in a friendly style, and briefly explaining the reason behind each point, the code of conduct is to be included on interpretation panels, the website, in the reserve leaflet, and in the proposed Dawlish Warren newsletter as a reminder for regular users. It will also be made available on the ExePlorer water taxis that run trips to Warren Point in the summer to ensure that visitors who may not reach the visitor centre are aware of it. As part of the visitor management plan, it will need regular reviewing depending on changes at the site brought about by coastal geomorphological processes. It will be most effective if the Dawlish Warren code of conduct is included with the ones for the Exe Estuary, such that there is a specific general code for Dawlish Warren, that includes a detailed map of the site and site specific information, but that is produced in the same style as the Exe Estuary codes. The development of this code will require close working with Teignbridge District Council Countryside Rangers based at Dawlish Warren and the Devon Wildlife Trust.

15 Revised codes of conduct should be produced in a consistent way for all main activities on the Exe Estuary and at Dawlish Warren. These codes should be similar in design and wording, and should work together (but not necessarily be branded in the same way). They should address safety issues, consideration for other users and conservation issues and be developed with users. After the codes of conduct are developed they will be closely monitored to ensure they are working. Once the codes are completed, and alongside the monitoring data, it should be possible to review the byelaws and ensure a mechanism is in place for the codes of conduct to be enforced. If monitoring data reveals that codes of conduct are not working then enforcement would be necessary. At the same point it would be necessary to consider whether a permit system should be established for particular activities such as kitesurfing and personal water craft use. Recommendation/proposal and required outcomes That the EEMP produces revised codes of conduct for the Exe Estuary and Dawlish Warren. The Exe Estuary Officer to work with the Delivery Officer to produce the following separate codes which together form a pack: kitesurfing/windsurfing, jet skiing, sailing, power boating, water skiing, canoeing, crab tiling, bait collection/shellfishing, dog walking, angling, Dawlish Warren and a general code covering all users. The work will involve close liaison with local clubs for all main activities on the Exe, close liaison with Teignbridge District Council Countryside Rangers and the Devon Wildlife Trust, design work for producing leaflets (final design to be agreed with Officer Working Group), ensuring revised zones are included; a final print run of codes; incorporation on the Exe Estuary Management Partnership and proposed dog project websites and promotion through local recreational clubs and businesses. Once concluded, both the revised zones and the codes of conduct will inform the design of new interpretation boards for the estuary and updated versions of the EEMP leaflets Summary: review of codes of conduct A set of 10 codes of conduct created / updated for users of the Exe Estuary. One combined code to cover Dawlish Warren. Include zone map for water activities (where appropriate). Promote codes of conduct through interpretation, leaflets, websites, newsletters, user groups and local businesses.

Code of Conduct Review. West Exe Mixed User Meeting. Minutes

Code of Conduct Review. West Exe Mixed User Meeting. Minutes Code of Conduct Review Minutes 18:00 Tuesday 14 th November 2017 Location: Starcross Fishing & Cruising Club, Brunel Tower, The Strand, Starcross, Exeter EX6 8PR Attendees Stephanie Clark, Exe Estuary

More information

EXE ESTUARY MANAGEMENT PARTNERSHIP

EXE ESTUARY MANAGEMENT PARTNERSHIP EXE ESTUARY MANAGEMENT PARTNERSHIP MANAGEMENT GROUP MINUTES Langstone Cliff Hotel, Mount Pleasant Road, Dawlish Warren 9:15am Wednesday 21 st June 2017 Present Chair: Councillor Jeffrey Trail BEM, DCC

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Draft Marine and Harbour Facilities Strategy

Draft Marine and Harbour Facilities Strategy Draft Marine and Harbour Facilities Strategy Vision The Coromandel peninsula is a destination of choice for safe, sustainable and accessible marine and harbour facilities that are fit for purpose to meet

More information

Bon Portage Island Conservation Campaign

Bon Portage Island Conservation Campaign Bon Portage Island Conservation Campaign Protecting a Coastal Treasure Final Report to Nova Scotia Habitat Conservation Fund September 2012 Protection of Bon Portage Island Over the course of this two-year

More information

Land Management Summary

Land Management Summary photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the

More information

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation.

IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. IOW Ramblers Submission Paper to the Sept 2016 ROW Improvement Plan Consultation. The current Island Rights of Way Improvement Plan is a comprehensive document and much of its content is still relevant

More information

National Park Authority Board Meeting

National Park Authority Board Meeting Paper for decision 1. Introduction 1.1 Preparations for the introduction of four Camping Management Zones (covering less than 4% of the National Park) have progressed significantly since Scottish Ministers

More information

Greenslade Pleasure Boats Stuart Rawlinson - Parkstone Bay Marina

Greenslade Pleasure Boats Stuart Rawlinson - Parkstone Bay Marina MINUTES OF A MEETING OP THE passenger boat operators HELD ON Tuesday 19 th November 2013 AT 10.00 a.m. IN THE BOARD ROOM OF THE HARBOUR OFFICE OF POOLE HARBOUR COMMISSIONERS PRESENT: Brian Murphy HM, Poole

More information

Living & Working Access and Recreation

Living & Working Access and Recreation Living & Working Access and Recreation 5.9 Access and Recreation Background 5.9.1 The countryside has increasingly become a popular destination for visitors and an important resource for informal recreation.

More information

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

Case Study: 1. The Clarence River Catchment

Case Study: 1. The Clarence River Catchment Case Study: 1. The Clarence River Catchment The NSW coastline is a great natural asset, making an enormous contribution to the economy. The resources of coastal catchments such as the Clarence River Catchment,

More information

Site description: 2.7 miles of intertidal habitat located about 2 miles north of Depoe Bay in Lincoln County, Oregon (Figure 16).

Site description: 2.7 miles of intertidal habitat located about 2 miles north of Depoe Bay in Lincoln County, Oregon (Figure 16). 8 Boiler Bay Site description: 27 miles of intertidal habitat located about 2 miles north of Depoe Bay in Lincoln County, Oregon (Figure 16) Designation: Boiler Bay was a research reserve before TSP publication,

More information

Living & Working Tourism

Living & Working Tourism Living & Working Tourism 5.10Tourism Background 5.10.1 Tourism is a major rural industry in Dorset, contributing over 600 million in visitor expenditure and supporting over 21,000 jobs directly and indirectly

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

Access: The rocky shoreline is only accessible via private property.

Access: The rocky shoreline is only accessible via private property. 10. Whale Cove Site description: Whale Cove is a small cove fringed by private homes and condominiums with diverse and relatively undisturbed rocky intertidal and subtidal habitat located approximately

More information

Loch Rannoch Conservation Association Strategic Development - 5 Year Action Plan

Loch Rannoch Conservation Association Strategic Development - 5 Year Action Plan Loch Rannoch Conservation Association Strategic Development - 5 Year Action Plan Foreword from Chair On behalf of the Loch Rannoch Conservation Association Board I am pleased to promote our 5 Year Action

More information

MARBLE RIVER PROVINCIAL PARK

MARBLE RIVER PROVINCIAL PARK MARBLE RIVER PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN March 2003 MARBLE RIVER PROVINCIAL PARK Purpose Statement and Zoning Plan Primary Role The primary role of Marble River Park is to protect

More information

Interpreting the Lagan Valley Regional Park. The Lagan Navigation: The unfolding story of a proud heritage Dr Andy Bridge

Interpreting the Lagan Valley Regional Park. The Lagan Navigation: The unfolding story of a proud heritage Dr Andy Bridge Interpreting the Lagan Valley Regional Park The Lagan Navigation: The unfolding story of a proud heritage Dr Andy Bridge A bit about us Designated an AONB under the Amenity Lands Act (NI) 1965 The Regional

More information

WATERSPORTS ADVENTURE TRAILS CONCEPT GUIDE AND QUALITY CRITERIA

WATERSPORTS ADVENTURE TRAILS CONCEPT GUIDE AND QUALITY CRITERIA WATERSPORTS ADVENTURE TRAILS CONCEPT GUIDE AND QUALITY CRITERIA 1. Overall Objectives of the Watersports Adventure Trails. The Balades Nautiques" (Watersports Adventure Trails) can be loosely interpreted

More information

Title/Name of the area: Chwaka Bay, Zanzibar

Title/Name of the area: Chwaka Bay, Zanzibar Title/Name of the area: Chwaka Bay, Zanzibar Presented by: Dr. Charles Lugomela, Ag. Head, Department of Aquatic Sciences and Fisheries, University of Dar es Salaam, P.O. Box 35064 Dar es Salaam, Tanzania

More information

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016 DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER Spring 2016 WELCOME The Port handles 13 million passengers, 2.5 million freight vehicles and up to 119 billion of UK/European trade. It supports 22,000 jobs,

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment

SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment NON EXEMPT HAVANT BOROUGH COUNCIL Cabinet SOUTH HAYLING BEACH MANAGEMENT PLAN Executive Head Of Planning & Built Environment REPORTNO FOR DECISION Portfolio: CLLR D. GUEST - PLANNING & BUILT ENVIRONMENT

More information

The tourism value of the natural environment and outdoor activities in

The tourism value of the natural environment and outdoor activities in The tourism value of the natural environment and outdoor activities in the South West Produced on behalf of the South West Coast Path Association By The South West Research Company Ltd January 2016 1 Contents

More information

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089

Safety & Airspace Regulation Group Code of Practice. Issue 13, August 2013 CAP 1089 Safety & Airspace Regulation Group Code of Practice Issue 13, August 2013 Civil Aviation Authority 2013 All rights reserved. Copies of this publication may be reproduced for personal use, or for use within

More information

CHAPTER 13 Tourism and Recreation. Kildare County Development Plan , Volume 1

CHAPTER 13 Tourism and Recreation. Kildare County Development Plan , Volume 1 Chapter 6 Rural Housing Strategy CHAPTER 13 Tourism and Recreation 197 13 TOURISM AND RECREATION 13.1 Background 13.2 Goal Tourism is one of the growth sectors in our economy. Kildare is rich in natural

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

TOWPATH MOWING GUIDELINES

TOWPATH MOWING GUIDELINES TOWPATH MOWING GUIDELINES 24 September 2007 CONTENTS Introduction Scope and Status of Guidelines Influences on the Guidelines Health and Safety Biodiversity INTRODUCTION Towpath management is a key issue

More information

Tourism and the Cairngorms National Park // Update 2006

Tourism and the Cairngorms National Park // Update 2006 Tourism and the Cairngorms National Park // Update 2006 Tourism and the Cairngorms National Park // Update 2006 One Year on... Since finalising the Sustainable Tourism Strategy last March, the Cairngorms

More information

Yorkshire Forum for Water Customers

Yorkshire Forum for Water Customers 2017-2018 Yorkshire Forum for Water Customers A statement from the Yorkshire Forum for Water Customers on Yorkshire Water s performance Contents Background 03 Our role 06 Reflection on the year 2017/2018

More information

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA)

POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE. Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority (SPA) To: POLICE AND FIRE & RESCUE SCRUTINY SUB-COMMITTEE On: 22 MAY 2018 Report by: DIRECTOR OF ENVIRONMENT & COMMUNITIES Heading: Consultation, Annual Review of Policing 2017/18 by Scottish Police Authority

More information

Tourism Development Plan for Scotland Questionnaire

Tourism Development Plan for Scotland Questionnaire Draft National Tourism Development Plan Public Consultation 2013 Tourism Development Plan for Scotland Questionnaire We would like your views on this Plan and, in particular, your comments on opportunities

More information

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme. ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts

More information

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements. Southampton Airport Masterplan FAQ 4 October 2018 Background Southampton Airport Today Q: How many passengers currently use Southampton Airport and how has this changed over the last 5 years? A: Over the

More information

North York Moors National Park Authority. Director of Planning s Recommendation

North York Moors National Park Authority. Director of Planning s Recommendation 24 March 2011 List Number 8 North York Moors National Park Authority Ryedale District Parish: Hawnby App Num. NYM/2010/0910/FL Proposal: Location: Applicant: Erection of a 6 metre scaffold/telegraph pole,

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Location reference: Management Area reference: Policy Development Zone: Marazion to Longrock MA19 PDZ8

Location reference: Management Area reference: Policy Development Zone: Marazion to Longrock MA19 PDZ8 Location reference: Management Area reference: Policy Development Zone: Marazion to Longrock MA19 PDZ8 Chapter 4 PDZ8 12 February 2011 DISCUSSION AND DETAILED POLICY DEVELOPMENT The Marazion area contains

More information

Civil and military integration in the same workspace

Civil and military integration in the same workspace Civil and military integration in the same workspace Presented by PLC 1 introduction Civilian and Military ATCOs work alongside each other in various countries and are employed in a number of different

More information

Recreation Management Plan Lake Baroon and Ewen Maddock Dam

Recreation Management Plan Lake Baroon and Ewen Maddock Dam Lake Baroon and Ewen Maddock Dam December 2013 Contents Overview... 3 The Value of Our Natural Areas... 4 Management Approach... 6 Funding... 7 Recreation Management... 8 Conditions of Access and Use...

More information

1 INFORMATION REQUIREMENTS

1 INFORMATION REQUIREMENTS 1 INFORMATION REQUIREMENTS 1.1 BACKGROUND 2 1.2 WHAT IS THE DISTRICT PLAN 3 1.3 DISTRICT PLAN STRUCTURE 4 1.4 HOW TO USE THE DISTRICT PLAN 5 1.5 STRATEGIC FRAMEWORK 6 Whanganui District Plan (15 January

More information

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health

More information

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES PROCESS OVERVIEW PROCESS AIMS PROCESS STAGES PROCESS PROCEDURES STAGE 1: BUSINESS PLANNING SCHEDULE STAGE 2: OUTLINE PLANNING PERMISSION STAGE 3: FULL PROPOSAL CONSIDERATION GENERAL PROCEDURES VALIDATION

More information

Paper Reference. Paper Reference(s) 6993/01 Edexcel GCE Travel and Tourism Advanced Unit 7: Responsible Tourism

Paper Reference. Paper Reference(s) 6993/01 Edexcel GCE Travel and Tourism Advanced Unit 7: Responsible Tourism Centre No. Candidate No. Paper Reference 6 9 9 3 0 1 Surname Paper Reference(s) 6993/01 Edexcel GCE Travel and Tourism Advanced Unit 7: Responsible Tourism Tuesday 20 January 2009 Afternoon Time: 1 hour

More information

Clam Harbour Provincial Park

Clam Harbour Provincial Park Clam Harbour Provincial Park Public Engagement Session Thursday, September 14 th, 2017 5:30pm 7:30pm Webbers Store 11470 Nova Scotia Trunk 7 Lake Charlotte, NS Agenda Overview of the Provincial Parks System

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY 21 Dec 17 Introduction Amesbury has a vibrant nightlife with three public houses, two hotel bars and a nightclub within the town centre as

More information

Revalidation: Recommendations from the Task and Finish Group

Revalidation: Recommendations from the Task and Finish Group Council meeting 12 January 2012 01.12/C/03 Public business Revalidation: Recommendations from the Task and Finish Group Purpose This paper provides a report on the work of the Revalidation Task and Finish

More information

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation

Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Regulating Air Transport: Department for Transport consultation on proposals to update the regulatory framework for aviation Response from the Aviation Environment Federation 18.3.10 The Aviation Environment

More information

Department of Environment, Climate Change & Water NSW. Stakeholder feedback

Department of Environment, Climate Change & Water NSW. Stakeholder feedback Department of Environment, Climate Change & Water NSW Stakeholder feedback 1 Stakeholders group Blue Gum High Forest Group Guardians of Lane Cove NP Sydney Metropolitan Wildlife Service Ku-ring-gai Historical

More information

The overarching aim of this strategy is to ensure that Devon can achieve its potential to be a first class visitor destination.

The overarching aim of this strategy is to ensure that Devon can achieve its potential to be a first class visitor destination. Devon Tourism Strategy 2013-2016 1.0 Introduction This strategy, produced by the Devon Tourism Partnership (), aims to provide an overarching guiding framework for the development of the tourism sector

More information

Hauraki Maori Trust Board STRATEGIC PLAN

Hauraki Maori Trust Board STRATEGIC PLAN Hauraki Maori Trust Board STRATEGIC PLAN FOR THE CUSTOMARY FISHERIES OF HAURAKI 2002-2052 1 This strategic planning document was developed for and approved by the Hauraki Maori Trust Board on 12 February

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues

Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues V9 Last Updated 03.10.2017 1 Brief Description Physical access to the waters of Lake Tahoe is one of the key issues surrounding the Shoreline Plan

More information

VERP Assignment for Ft. Fisher State Recreation Area

VERP Assignment for Ft. Fisher State Recreation Area Case Background VERP Assignment for Ft. Fisher State Recreation Area Fort Fisher State Recreation Area is a jewel of the southeastern coast of North Carolina. Comprised of a wide variety of maritime ecosystems,

More information

Recreation Management Plan Lakes Atkinson/Somerset/Wivenhoe

Recreation Management Plan Lakes Atkinson/Somerset/Wivenhoe Lakes Atkinson/Somerset/Wivenhoe November 2013 Contents Overview... 3 The Value of Our Natural Areas... 4 Management Approach... 6 Funding... 7 Recreation Management... 9 Conditions of Access and Use...

More information

Sustainable Procurement Policy for Heathrow Airport Limited

Sustainable Procurement Policy for Heathrow Airport Limited Sustainable Procurement Policy for Heathrow Airport Limited Date of policy: May 2017 Author: Dianne Armstrong / Chris Allen Approved by: Exec David Ferroussat Procurement Director Pete Hughes - Head of

More information

Customer consultation

Customer consultation Customer consultation Anglian Waterways navigation charges 2018/19 July 2017 Introduction We need to increase the boat registration charges payable for any boat kept, used or let for hire on our Anglian

More information

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC Proposal 1. I propose that the

More information

HAMPTON-IN-ARDEN PARISH COUNCIL ANNUAL MEETING

HAMPTON-IN-ARDEN PARISH COUNCIL ANNUAL MEETING HAMPTON-IN-ARDEN PARISH COUNCIL ANNUAL MEETING Held at THE MEETING ROOM On WEDNESDAY 9 th MAY 2012 Present: Councillors: Mr M Blomer Mr C Bowen Mr J Doidge Mr M James Dr G Lewis (Chair) Mrs A Rolf Ms B

More information

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 15.1.1 Harbour East-Marine Drive Community Council December 3, 2015 TO: SUBMITTED BY: Chair and Members of Harbour East - Marine Drive Community

More information

Sustainable Tourism and Dartmoor National Park - Past, Present and Future

Sustainable Tourism and Dartmoor National Park - Past, Present and Future Richard Drysdale Sustainable Tourism Officer Planning Summer School Exeter University September 10, 2009 The Past Purposes of National Parks Sustainable Tourism The Present Dartmoor Partnership Sustainability

More information

The Airport Charges Regulations 2011

The Airport Charges Regulations 2011 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 CAP 1210 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 Civil Aviation Authority 2014 All rights reserved. Copies of this

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it

WELSH GOVERNMENT RESPONSE P Ensure Disabled People can Access Public Transport As and When They Need it WELSH GOVERNMENT RESPONSE P-05-710 Ensure Disabled People can Access Public Transport As and When They Need it The petition submitted by Whizz Kidz seeking action to ensure that disabled people can access

More information

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy

TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently

More information

BROUGHTON ARCHIPELAGO PROVINCIAL PARK

BROUGHTON ARCHIPELAGO PROVINCIAL PARK BROUGHTON ARCHIPELAGO PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN March 2003 BROUGHTON ARCHIPELAGO PROVINCIAL PARK Purpose Statement and Zoning Plan Primary Role The primary role is to contribute

More information

Submission to NSW Koala Strategy Consultation Process. March 2017

Submission to NSW Koala Strategy Consultation Process. March 2017 Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

Wildlife Management from a Regulatory Perspective

Wildlife Management from a Regulatory Perspective Wildlife Management from a Regulatory Perspective Description Operators of aircraft have a reasonable expectation that any wildlife hazard which may exist at an airport they use will be managed to a level

More information

The Challenges for the European Tourism Sustainable

The Challenges for the European Tourism Sustainable The Challenges for the European Tourism Sustainable Denada Olli Lecturer at Fan S. Noli University, Faculty of Economy, Department of Marketing, Branch Korça, Albania. Doi:10.5901/mjss.2013.v4n9p464 Abstract

More information

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009

PERTH AND KINROSS COUNCIL. Enterprise and Infrastructure Committee 4 November 2009 PERTH AND KINROSS COUNCIL 4 09/494 Enterprise and Infrastructure Committee 4 November 2009 STRATEGIC PRIORITIES FOR TOURISM AND AREA TOURISM PARTNERSHIP ARRANGEMENTS Report by Depute Director (Environment)

More information

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

Statement of continued support by the Chief Executive Officer (CEO)

Statement of continued support by the Chief Executive Officer (CEO) General Period covered by your Communication on Progress (COP) for Qatar Airways: From: Sept. 2009 To: Sept. 2011 Statement of continued support by the Chief Executive Officer (CEO) I am pleased to confirm

More information

MSc Tourism and Sustainable Development LM562 (Under Review)

MSc Tourism and Sustainable Development LM562 (Under Review) MSc Tourism and Sustainable Development LM562 (Under Review) 1. Introduction Understanding the relationships between tourism, environment and development has been one of the major objectives of governments,

More information

Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta

Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Tay Estuary and Montrose Basin Local authority Angus Council, Dundee City Council Main catchment Dundee coastal Summary of flooding impacts

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

Decision Strategic Plan Commission Paper 5/ th May 2017

Decision Strategic Plan Commission Paper 5/ th May 2017 Decision Strategic Plan 2017-2019 Commission Paper 5/2017 5 th May 2017 Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland Tel: +353 1 6611700 Fax: +353 1

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

Food and Agriculture Organisation (FAO) current work - global guidelines on ecolabelling and certification in capture fisheries and aquaculture

Food and Agriculture Organisation (FAO) current work - global guidelines on ecolabelling and certification in capture fisheries and aquaculture 9 August 2012 Food and Agriculture Organisation (FAO) current work - global guidelines on ecolabelling and certification in capture fisheries and aquaculture FAO descriptor on what eco-labels do: Large-scale

More information

Recreational Carrying Capacity

Recreational Carrying Capacity 9 th Annual Caribbean Sustainable Tourism Conference Recreational Carrying Capacity Graham C Barrow What is Recreational Carrying Capacity? It s not about fixing absolute numbers of visitors/tourists that

More information

Trans-national Partnership Working: NW England and SUSTAIN

Trans-national Partnership Working: NW England and SUSTAIN SUSTAIN Riga Trans-national Partnership Working: NW England and SUSTAIN Caroline Salthouse Sefton Borough Council & North West Coastal Forum SUSTAIN Riga Presentation Format Introduction to Sefton a Coastal

More information

EASA Safety Information Bulletin. SIB No.: Issued: 09 December 2013

EASA Safety Information Bulletin. SIB No.: Issued: 09 December 2013 EASA Safety Information Bulletin Subject: Ref. Publications: Applicability: Description: SIB No.: 2013-21 Issued: 09 December 2013 Use of Portable Electronic Devices during Commercial Air Transport Aircraft

More information

CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS A REVIEW OF SURFACE ACCESS. Response by Newcastle International Airport Ltd

CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS A REVIEW OF SURFACE ACCESS. Response by Newcastle International Airport Ltd CONSULTATION ON ISSUES AFFECTING PASSENGERS ACCESS TO UK AIRPORTS 1. Introduction A REVIEW OF SURFACE ACCESS Response by Newcastle International Airport Ltd Newcastle is the largest airport in the North

More information

Better Towpaths for Everyone. A national policy for sharing towpaths

Better Towpaths for Everyone. A national policy for sharing towpaths Better Towpaths for Everyone A national policy for sharing towpaths Contents Foreword 2 Introduction 3 Consultation 3 Principles of towpath use 4 Better infrastructure 5 Towpath Design Guide 5 Better signs

More information

Appendix A BC Provincial Parks System Goals

Appendix A BC Provincial Parks System Goals Appendix A BC Provincial Parks System Goals The British Columbia Provincial Parks System has two mandates: To conserve significant and representative natural and cultural resources To provide a wide variety

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

6 Tourism and Recreation

6 Tourism and Recreation 6 Tourism and Recreation One of the Authority s core responsibilities is to enable people to enjoy the Broads. Closely allied to this is the Authority's duty to protect the navigation. The Authority encourages

More information

54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS. Ulaanbaatar, Mongolia August 2017

54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS. Ulaanbaatar, Mongolia August 2017 DGCA 54/DP/3/44 54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS Ulaanbaatar, Mongolia 07 11 August 2017 AGENDA ITEM 3: AVIATION SAFETY AND AIR NAVIGATION KEY AREAS IN REGULATING

More information

Submission to Ministry of Transport: International Air Transport Policy Review. New Zealand Air Line Pilots Association

Submission to Ministry of Transport: International Air Transport Policy Review. New Zealand Air Line Pilots Association Submission to Ministry of Transport: International Air Transport Policy Review New Zealand Air Line Pilots Association Ministry of Transport - International Air Transport Policy 2 Objective of NZ international

More information

Development and implementation of a marketing strategy for the European ecolabel on textiles and shoes in Denmark

Development and implementation of a marketing strategy for the European ecolabel on textiles and shoes in Denmark Final Report Development and implementation of a marketing strategy for the European ecolabel on textiles and shoes in Denmark ENV.D.3/SER/2001/0039r Valør & Tinge Ltd Copenhagen 27 September 2002 TABLE

More information

VARGAS ISLAND PROVINCIAL PARK

VARGAS ISLAND PROVINCIAL PARK VARGAS ISLAND PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN February 2003 VARGAS ISLAND PROVINCIAL PARK Purpose Statement and Zoning Plan Primary Role The primary role of Vargas Island Park is to protect

More information

Bedfordshire and Luton Species Action Plan: Hazel Dormouse

Bedfordshire and Luton Species Action Plan: Hazel Dormouse Bedfordshire and Luton Species Action Plan: Hazel Dormouse Released November 2006 Last updated July 2010 Hazel dormouse, Muscardinus avellanarius Photo by Björn Schulz Bedfordshire Dormouse Group Hazel

More information

AIR SAFETY SUPPORT INTERNATIONAL

AIR SAFETY SUPPORT INTERNATIONAL Role purpose statement AIR SAFETY SUPPORT INTERNATIONAL AIRWORTHINESS SURVEYOR To produce and maintain the published means of compliance (OTARs) and Guidance Material (OTACs) with the aircraft certification

More information

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED

STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 CONDITIONS TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED STANSTED MOUNTFITCHET PARISH COUNCIL STANSTED AIRPORT PLANNING APPLICATION UTT/18/0460/FUL SECTION 106 S TO BE REQUIRED IF PLANNING APPLICATION IS APPROVED 1 INTRODUCTION 1.1 Stansted Mountfitchet Parish

More information

CAS Case Study: Mullion Harbour, adapting to a stormier future

CAS Case Study: Mullion Harbour, adapting to a stormier future t The National Trust Coastal Adaptation Strategy Case Study: Mullion Harbour Authors: Ed Bartlett, Alastair Cameron, Phil Dyke & Adrian Woodhall June 2010 CAS Case Study: Mullion Harbour, adapting to a

More information

MONTAGUE HARBOUR MARINE PROVINCIAL PARK

MONTAGUE HARBOUR MARINE PROVINCIAL PARK MONTAGUE HARBOUR MARINE PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN March 2003 1 MONTAGUE HARBOUR MARINE PROVINCIAL PARK Purpose Statement and Zoning Plan Primary Role The primary role of Montague

More information