1 PROGRESS REPORT OCTOBER and NOVEMBER 2013 Published December 20, 2013
2 The Banks Project Results to Date
3 Bid Package #12 Progress Part 1 Elements (TC-30) Reconstruction of Freedom Way, Rosa Parks Street to Walnut Street Second Street pedestrian improvements, Elm Street to Main Street Public safety technologies Removal of Race Street south of Freedom Way (complete) Theodore M. Berry Way Round-A-Bout (complete) Mehring Way pedestrian signal (complete) October & November Progress Second Street waterproofing underway. Theodore M. Berry Way Round-A-Bout open; final lane striping complete. Public safety technology installation 80% complete. Garage wayfinding is 95% complete. Maintenance of traffic plans implemented as needed. New-worker safety orientations continue; weekly safety audits continue to yield positive results.
4 Bid Package #12 Progress Second Street Improvements
5 Bid Package #12 Progress Part 2 Elements (TC-29) Roebling Bridge Pedestrian Connector (complete) River Walk and Ohio River Trail along Mehring Way (complete) Broadway & East Pete Rose Way pedestrian bridge, Intermodal Staging Area October & November Progress Ohio River Trail/River Walk is open. Pete Rose Way pedestrian bridge and stair tower open; lighting ceremony held November 25. Broadway Lot completed and parking equipment installed; open for daily parkers and special events.
6 Pete Rose Way Pedestrian Bridge Trade Contract 29
7 Broadway & Pete Rose Way Pedestrian Bridge Stair Tower Trade Contract 29
8 Pete Rose Way Pedestrian Bridge Stair Tower Opening on November 25
9 Pete Rose Way Pedestrian Bridge Stair Tower Opening on November 25
10 Summary: Budget Report Completed Work All public parties construction work has continuously operated within budget. Current Work All TC 29 and TC 30 work proceeding within original engineer s estimates.
11 Budget Report Click the link below for Phase 2a construction budget and contract change order reports as of October 31 and November 30,
12 Development Update 92% Occupied on Inline Retail 100% Leased & Occupied on Residential Sold a portion of Phase 1A (including multifamily apartments and ground floor retail below the apartments) to NIC Riverbanks One, LLC which is an affiliate of the Nicol Investment Company with headquarters in Nashville TN 12
13 Economic Inclusion Report
14 Economic Inclusion Economic Inclusion outcomes as of October 31, 2013: Small Business Enterprise (SBE) participation for professional services is 19.5% vs. goal of 10%. Disadvantaged Business Enterprise participation Bid Package #12-1: 5.2% (vs. 9% commitment) Bid Package #12-2: 15.6% (vs. 16.3% commitment) Combined minority/female workforce participation is 17.56% (September 1, 2008 through October 31, 2013) vs. goal of 22% measured in work hours. Employees living within the 15-county Cincinnati-Middletwon Metropolitan Statistical Area (MSA) represented 100% of the construction workforce. (There are no local residency participation goals.) Click here for Economic Inclusion supporting documents:
15 Safety Report Phase 1 and Phase 2a construction with Messer as the construction manager closed out with no losttime accidents in over 416,000 hours worked. Current ongoing work in Phase 2a has also had no lost-time accidents with Jacobs Engineering providing safety oversight.
16 Cincinnati Parks Managed Work Smale Riverfront Park
17 Cincinnati Parks Managed Work Smale Riverfront Park
18 Cincinnati Parks Managed Work Smale Riverfront Park October & November Completed east end landscaping, east sidewalk, river wall cap replacement and railing installation. Work in Adventure Playground began in October, including underground storm, electric, and landscaping: trees, lawn, and irrigation installation. Playground area demolition, rough grading, and layout began in November. Progress on phase 4 Vine Street Fountain and Carousel project continued, with progress in underground storm and sanitary sewers, and water and electric utility installation. Phase 4 grade beams and forming/placement for a new north structural wall began in October. Slab on grade and column placement began in November and will continue through December. Fountain pump room design finalized and underground plumbing for fountain features was completed in late November.
19 Communications Report The Banks Project in the News October Communications 10 media mentions (Pete Rose Way closures for pedestrian bridge; sale of Phase 1 by developer; Ohio River Trail section complete). 7 Twitter messages sent. November Communications 9 media mentions (Downtown revitalization, Phase 2 gets green light, new Pete Rose Way pedestrian bridge and stair tower opens) 11 Twitter messages sent.
20 Progress: October & November 2013 For more information: Phil Beck, The Banks Project Executive (513)
THIS IS 2015: THE BANKS PROJECT YEAR IN REVIEW
Aerial view of Phase IIIA progress in December (Race Street extension to the left over Lot 2 parking facility construction). THIS IS 2015: THE BANKS PROJECT YEAR IN REVIEW This is 2015: The Banks Project
More informationTHIS IS 2018: THE BANKS PROJECT YEAR IN REVIEW
THIS IS 2018: THE BANKS PROJECT YEAR IN REVIEW THIS IS 2018: THE BANKS PROJECT YEAR IN REVIEW Celebrate again the 10th Anniversary of the groundbreaking, new dining and entertainment options, benchmarked
More informationJBSC chair and Cincinnati Reds CEO Bob Castellini cuts the 10th anniversary cakes with help from children born in April 2008 with an able assist from
JBSC chair and Cincinnati Reds CEO Bob Castellini cuts the 10th anniversary cakes with help from children born in April 2008 with an able assist from city, county and state officials and Freedom Center
More informationwelcome to our space
PLUM welcome to our space 312 Plum Street is located on the beautiful riverfront of downtown Cincinnati, surrounded by a growing number of popular amenities. what s inside? 4 fresh lobby 5 building amenities
More informationREDEFINING THE URBAN WORKPLACE
REDEFINING THE URBAN WORKPLACE Towering over the Ohio River at Covington s acclaimed RiverCenter, Madison Place is a unique Class A office building. With its expansive 27,000-square-foot floor plates on
More information26,619 Available SF Asking $15.50 Gross
26,61 Available SF Asking $15.50 Gross Joe Janszen Director +1 513 54 3011 joe.janszen@cushwake.com 201 E Fourth St Suite 00 Cincinnati, OH 45202 main +1 513 421 4884 fax +1 513 421 1215 cushmanwakefield.com
More informationWHY OMNICARE CENTER?...
ONE OF A KIND SPACE WHY OMNICARE CENTER?... Located at the southeast corner of 4th Street and Main Street, Omnicare Center is at the doorstep to Downtown Cincinnati s playground!! The Banks, Great American
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationFreedom Center Restaurant
FOR LEASE Freedom Restaurant 50 E. Freedom Way 4,314 SF space with ability to expand to 7,500 SF Includes all Furniture, Fixtures & Equipment $36/SF Gross Amenities In the last 12 months, the Freedom attracted
More informationFort Myers Downtown & Riverfront Redevelopment
Fort Myers Downtown & Riverfront Redevelopment Brought to you by the Fort Myers Community Redevelopment Agency (CRA) Fort Myers Community Redevelopment Agency The Fort Myers Community Redevelopment Agency
More informationCounty of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation
Silver Line Update Committee for Dulles March 2, 2017 Mark Canale Fairfax County Department of Transportation Phase 1 Summary Old Meadow Road Realignment design work proceeding, construction to be completed
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017
Crenshaw/LAX Transit Project Construction Update Community Meeting November 29 th, 2017 1 Project Overview Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationFirst rail. August 2011
August 2011 First rail A downtown resident showed his son in early August the first completed section of embedded track on Fourth Street in front of the Farmer s Market. During July, the Central Corridor
More informationChina Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017
China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;
More informationCarlisle Connectivity Projects Communication Plan and Project Status
Carlisle Connectivity Projects Communication Plan and Project Status Overview Communication Plan Communication Plan Communication Plan Objective The Borough staff will develop and execute timely and effective
More informationHead to University Avenue and save!
April 2011 Head to University Avenue and save! Liberty Tax Service at 1731 University Ave. W. in is offering a special for first-time customers who drive through the construction zone to get their taxes
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017
Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017 1 Project Overview Mainline Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationPRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction
PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury
More informationAGENDA ITEM I-6 Public Works
AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming
More informationFISCHLER PROPERTY COMPANY LLC 1605 HENDRY STREET FORT MYERS, FL
FISCHLER PROPERTY COMPANY LLC 1605 HENDRY STREET FORT MYERS, FL 33901 WWW.FISCHLERCO.COM FOR SALE 1013 EMBERS PKWY., CAPE CORAL, FL 33993 ENTITLED LAND FOR DEVELOPMENT EMBERS LAKE ESTATES for information
More informationCrenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017
Crenshaw/LAX Transit Project Construction Community Meeting July 26 th, 2017 1 Project Overview Design-Build Contractors: Mainline - Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More information310 4th Avenue South, Nashville, Tennessee ,200 SF. Restaurant. at SOBRO HAMPTON INN FUTURE 2,200 SF RETAIL SPACE
310 4th Avenue South, Nashville, Tennessee 37201 Restaurant at SOBRO FUTURE RETAIL SPACE OVERVIEW The subject Hampton Inn & Suites is located in the SoBro area of Downtown Nashville and performs in the
More informationIRONTON-RUSSELL BRIDGE REPLACEMENT
IRONTON-RUSSELL BRIDGE REPLACEMENT 2012-2016 District 9 Ohio Department of Transportation Ironton-Russell Bridge Replacement Existing Ironton-Russell Bridge Ironton-Russell Bridge Replacement Existing
More informationCrystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.
Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)
More informationJess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources
Eric Silva, AICP Assistant Director, Development Services Division Miami-Dade Regulatory and Economic Resources Albert Hernandez, P.E. Deputy Director, Planning and Engineering Miami-Dade Transit Jess
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting July 12 th, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting July 12 th, 2018 1 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More informationPremier downtown mixed-use development.
AT0 Premier downtown mixed-use development. AT0 PROPERTY HIGHLIGHTS Located in the heart of the Cincinnati CBD Adjacent to Fountain Square, Aronoff Center, Contemporary Arts Center, C Museum Hotel and
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More information18. EXAMPLES OF URBAN RENEWAL PROJECTS
TOPIC SUMMARY WORKSHEETS FOR STAGE 1 WORKING GROUPS & STEERING COMMITTEE Version 1 (2 September 2014) for development and discussion This worksheet has been prepared as background for the Stage 1 Working
More informationState of the City. Mayor Chin Ho Liao City of San Gabriel November 3, 2016
State of the City Mayor Chin Ho Liao City of San Gabriel November 3, 2016 Budget & Strategic Plan Mission Statement & Vision OUR VISION: San Gabriel will be a premiere city in the region. Building on its
More informationROYAL VIEW DEVELOPMENT
GRETNA BUILDING FOR LEASE ROYAL VIEW DEVELOPMENT PROPOSED RENDERINGS AVAILABLE FOR PRE-LEASE + + LEASE RATE AND AVAILABILITY MINIMUM SPACE: MAXIMUM SPACE: LEASE RATE: 1,278 SF 16,500 SF $16.50 - $22.00
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationInvesting in Brampton s downtown
Investing in Brampton s downtown 1 REVITALIZING DOWNTOWN BRAMPTON The Next Chapter Public Information Session November 2, 2011, 7 9 pm AGENDA Welcome and opening remarks: City of Brampton Southwest Quadrant
More informationRegional Connector Transit Project Community Leadership Council. 2 nd Hope Station & Flower St Committees January 17, 2017
Regional Connector Transit Project Community Leadership Council 2 nd Hope Station & Flower St Committees January 17, 2017 1 EAT SHOP PLAY LOCAL 2 Eat Shop Play Local > Free Metro marketing campaign > Make
More informationConstruction Staging Area Blue Jays Way (357 King Street West)
REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto
More informationRESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019
RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019 Welcome & Introductions - Deb Zywna AGENDA FY 20 Resort CIP Proposed Projects - Kathy Warren ORDFBC Design Guidelines
More informationCenter at 600 Vine is at the center of where you want to be. BUILDING FEATURES
Center at 600 Vine is at the center of where you want to be. Downtown Cincinnati s resurgence began just a few steps from this magnificent office property. With the development of Restaurant Row, nearby
More informationTEMPE BEACH PARK - RECOMMENDATIONS
TEMPE BEACH PARK - RECOMMENDATIONS Tempe Beach Park has the potential to become a regional destination park, but it suffers from a host of physical and operational problems, as well as structural flaws.
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting January 31 st, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting January 31 st, 2018 1 Project Overview Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationSUMMIT POINTE RETAIL LEASING SIGNATURE PROPERTIES
RETAIL LEASING SIGNATURE PROPERTIES Be Part of the Premiere Coastal Virginia Destination Leasing Team Contacts CHRIS READ Senior Vice President +1 757 228-1803 chris.read@colliers.com JEFF PARKER, CCIM
More informationArea Surrounding Maplewood Manor
BAY CITY, MICHIGAN HOUSING COMMISSION Neighborhood Revitalization Plan Area Surrounding Maplewood Manor January 13, 2014 CITY COMMISSION DRAFT PLAN PRESENTATION BAY CITY, MICHIGAN 1 Planners Phil McKenna,
More informationMASTER PLAN EXECUTIVE SUMMARY
Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and
More informationCenter at 600 Vine is at the center of where you want to be. BUILDING FEATURES
Center at 600 Vine is at the center of where you want to be. Downtown Cincinnati s resurgence began just a few steps from this magnificent office property. With the development of Restaurant Row, nearby
More informationHome of Southbank Partners. Riverfront Commons. Southbank Partners. Covington Newport Bellevue Ft. Thomas Dayton Ludlow
Home of Southbank Partners Riverfront Commons Southbank Partners Covington Newport Bellevue Ft. Thomas Dayton Ludlow Riverfront Commons Fostering a vision of Northern Kentucky s Future Riverfront Commons
More informationExtending TRACKS. Design and engineering effort nears completion. Animation shows how light rail will operate in Hopkins
February 2017 Issue 16 www.swlrt.org Extending TRACKS Design and engineering effort nears completion The Southwest LRT Project has finalized its civil design and is finalizing systems and Operations and
More informationRequest Conditional Use Permit (Indoor Recreational Facility) Staff Planner Kevin Kemp
Applicant Property Owner Holland Plaza Shopping Center, LLC Public Hearing March 9, 2016 City Council Election District Rose Hall Agenda Item 1 Request Conditional Use Permit (Indoor Recreational Facility)
More informationTRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT
AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access
More informationCity of Manassas Park
Presented to: City of Manassas Park November 15, 2005 Overview of Presentation Background of Park Center Manassas Park Team Overview of Clark Realty What is Park Center? Master Plan Development Schedule
More informationBUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018
BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO
More informationN. Central St. & W. Jackson Ave. Streetscape Projects
N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications
More informationNew Orleans Municipal Yacht Harbor
New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &
More informationMonday, September 18, 2017 Sunday, October 1, 2017
Monday, September 18, 2017 Sunday, October 1, 2017 CONSTRUCTION UPDATE* Hurricane Irma cleanup is complete and some landscaping repairs are underway. The project was secure and no major damages were encountered.
More informationOur Region. Mountains of Northeast Tennessee
Rails to Trail Our Region Our Region Mountains of Northeast Tennessee Brief History / Whose Idea David Ornduff, City of Elizabethton 1991 Protect the corridor *Steve Darden, Mayor of Johnson City 2005,
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationExperience the environment
Experience it. Experience the environment The Grand is where CREATIVE, STATE-OF-THE-ART OFFICE meets inviting outdoor spaces featuring vibrant landscaping, pedestrian walkways and a two acre PROMINENT
More informationMartin Young (870) Roddy Thrasher (870)
Moore Road Great Dane Drive Nestle Way Subject Property Craighead County Shop Army Reserve National Guard Center 19.1+/- Acres in Industrial Park Nestle Road, Nestle Way & Cottage Home Trail Jonesboro
More informationWELCOME! TSPE DFW MID-CITIES. January Chapter Meeting
WELCOME! TSPE DFW MID-CITIES Check-in/Networking Announcements / Lunch Service Speaker Presentation 11:30AM 12:00PM 12:00PM 12:15PM 12:15PM 1:00PM January Chapter Meeting Thank You to Our Sponsors Interested
More informationWhittier Bridge Project
Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More informationRecommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:
Report to Council To: Mayor Linton and Members of Council Prepared By: Wes Snarr, Managing Director of Corporate Services Report: COR-45 Date: 12 Jul RE: Recomendation for Award of Request for Tenders
More informationTrinity River Vision Update
Trinity River Vision Update Presented to the City Council by: Mark Rauscher, Program Manager Planning & Development Department / Program Management Office August 23, 2011 1 Purpose of the Briefing Overview
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationFOR LEASE SUMMIT POINTE CHESAPEAKE VA, 23320
FOR LEASE SUMMIT POINTE CHESAPEAKE VA, 23320 CONTACT US RETAIL LEASING CHRIS READ Senior Vice President T +1 757 228 1803 chris.read@cbre-norfolk.com JEFF PARKER, CCIM Senior Vice President T +1 757 213
More informationCity Manager Briefing Report
City Manager Briefing Report September 2014 Eric M. Soroka, ICMA-CM City Manager This report is prepared in order to inform the City Commission of the status of major projects and ongoing matters. If you
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)
More information"This is the catalyst we've been waiting for," Norristown Planning Director Jayne Musonye said of the project.
From the Philadelphia Inquirer $60M Montco transportation project gets rolling Jessica Parks, Inquirer Staff Writer POSTED: Wednesday, September 11, 2013, 1:08 AM http://www.philly.com/philly/news/20130911
More informationCity Manager Briefing Report
City Manager Briefing Report May 2013 Eric M. Soroka, ICMA-CM City Manager This report is prepared in order to inform the City Commission of the status of major projects and ongoing matters. If you have
More informationAttachment 1: Revitalizing Yonge Downtown Yonge Street
Attachment 1: Revitalizing Yonge Downtown Yonge Street Photo credit: Downtown Yonge BIA Attachment - Revitalizing Yonge Downtown Yonge Street 1 Photo credit: Downtown Yonge BIA Photo credit: Downtown Yonge
More informationDRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017
DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION
More informationItem # 28. Chief Capital Management Officer Report. November 20, 2008
Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)
More informationViaduct Demolition at Girard Interchange
i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95
More informationT H E T O W N C E N T E R
T O W N C E N T E R T H E T O W N C E N T E R S imply redefining retail and entertainment in Southern Indiana: Jeffersonville Town Center is the first open-air retail center in the area combining upscale
More informationAstoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019
Astoria Boulevard ADA Upgrade and Station Renewal January 7, 2019 Major Scope of Work Replace Street and Platform Stairs Work Description Install Two Street-to-Mezzanine Elevators Install Two Mezzanine-to-Platform
More informationPIZZA HUT & WINGSTREET
PIZZA HUT & WINGSTREET NNN Investment 257 South Marschall Road Shakopee, Minnesota 55379 7486 La Jolla Boulevard, Suite 173 La Jolla, California 92037 EXECUTIVE SUMMARY PROPERTY Pizza Hut & WingStreet
More informationDowntown Stillwater. Lot 34 & 35 Redevelopment. Final Presentation / City Council Workshop. March 28, 2016
Downtown Stillwater Lot 34 & 35 Redevelopment Final Presentation / City Council Workshop March 28, 2016 Sean Garretson, AICP AJ Kirkpatrick, AICP To Be or Not to Be (a destination) that is the Question!
More informationHaving trouble reading this ? View it in your browser. Welcome
Page 1 of 6 Having trouble reading this email? View it in your browser. IN THIS ISSUE Remembering 2011 and Preparing for 2012 Copper Thefts Increase on West Rail Eiber Neighborhood Resident Recieves "Most
More informationDallas Love Field Update. Dallas City Council Briefing February 18, 2015
Dallas Love Field Update Dallas City Council Briefing February 18, 2015 Purpose Construction Update Impacts of Wright Amendment Repeal Increase in operations/passengers/ projections Concessions performance
More informationINVESTMENT SUMMARY. RESIDENTIAL COMMERCIAL ** *
2017 Annual Report Belton Gateway Phase 2 Rendering INVESTMENT SUMMARY RESIDENTIAL 2015 2016 2017* NUMBER OF PERMITS ISSUED 18 106 101 INVESTMENT VALUE $2 Million $18 Million $20 Million COMMERCIAL 2015
More informationExpo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed
Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information
More informationCrenshaw/LAX Transit Project Construction Update Community Meeting March 22 nd, 2018
Crenshaw/LAX Transit Project Construction Update Community Meeting March 22 nd, 2018 1 Project Overview Design-Build Contractor: Walsh Shea Corridor Constructors (WSCC) Southwestern Yard Maintenance Facility:
More information288.075, F.S. Florida Job Growth Infrastructure Application Response to Question 1A Provide the title and a detailed description of the public infrastructure improvements. The West River Riverwalk
More information2018 Appropriation Budget Table of Contents Board Approved August 18, 2017
INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary
More informationCommunity Park Capital Project. February 6, 2017
Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016
More informationLender Ordered Sale Commercial Site +/- 56 Acres in Dawson County
Lender Ordered Sale Commercial Site +/- 56 Acres in Dawson County P of 9 Table of Contents For more information, please contact: Darrell Chapman V.P. The Industrial Group (404) 876-1640 x 111 DChapman@BullRealty.com
More informationFormer Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018
Former Middle School Site Green Space & Brecksville Road Streetscape March 27, 2018 Brecksville Streetscape & Downtown Greenspace Project Schedule City of Indepenence 2017 2018 Meeting Schedule Tasks/Deliverables
More informationRAPID CITY REGIONAL AIRPORT
RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,
More informationa new urban landscape class a office & retail district murfreesboro, tennessee
a new urban landscape class a office & retail district murfreesboro, tennessee Fountains at Gateway Is Open For Business Fountains at Gateway is a new 31-acre Class A multitenant office and retail development
More informationAviation Department Board Workshop. December 7, 2010
Aviation Department Board Workshop December 7, 2010 1 Agenda North Perry Airport (HWO) FLL Economic Impact & Traffic Update Terminal Area Forecast FLL Airport Layout Plan & Master Plan Update Runway 9R/27L
More informationTransit Station Areas Shaping Vancouver, BC New Partners For Smart Growth Conference, Feb. 6, 2010
Transit Station Areas Shaping Vancouver, BC New Partners For Smart Growth Conference, Feb. 6, 2010 Matt Roewe, AIA LEED AP Director of Mixed Use & Major Projects Vancouver: An Anachronistic City Gordon
More informationLancaster Square
Lancaster Square 2018-2019 100 Block of North Queen Street East side of the 100 Block of North Queen Street 100 Block of North Queen Street Corner of North Queen and East Chestnut Demolition of the Hotel
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationUNITED KINGDOM BIRMINGHAM OFFICES QUARTER
UNITED KINGDOM OFFICES QUARTER 4 2 TAKE-UP 753,329 SQ FT 113,713 KEY DEAL 118,240 SQ FT TO BCU AT BELMONT WORKS, EASTSIDE CITY CENTRE SERVICED OFFICES SQ FT HEADLINE RENT 33 PSF Take-up > Annual take-up
More informationDamen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501
Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501 Bird s Eye View of Existing INTRODUCTION This project is part of the City s Building a New Chicago initiative in conjunction
More informationP D E C. Establishment of Opening Dates for New Carrollton Yard and College Park and New Carrollton Parking Garages
Washington Metropolitan Area Transit Authority Establishment of Opening Dates for New Carrollton Yard and College Park and New Carrollton Parking Garages P D E C Presented to the Board of Directors: Planning
More informationAN INVESTMENT IN CALIFORNIA S FUTURE
AN INVESTMENT IN CALIFORNIA S FUTURE Michelle Boehm, Southern California Regional Director Society of American Military Engineers (SAME) July 8, 2014 San Diego, CA WORLD LEADING INVESTMENT IN A WORLD LEADING
More information