CITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm

Size: px
Start display at page:

Download "CITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm"

Transcription

1 CITY COUNCIL WORK SESSION MEETING AGENDA April 17, :30 6:30pm 1) Call to Order 2) 2017 Park Dedication Fund Budget 3) 2016 Positive General Fund Audit Balance Discussion 4) Adjourn

2 WS Item 2 CITY OF MINNETRISTA BUSINESS / DISCUSSION ITEM Subject: Prepared By: 2017 Park Dedication Fund Budget Discussion David Abel, Community Development Director Meeting Date: April 17, 2017 Issue: Each year city staff conducts an annual park review to identify park improvement items to be completed the following year. This is done by reviewing the city s Parks, Trails and Open Space Plan. The results are presented to the parks commission for review and consideration for the Capital Improvement Plan (CIP) for the following year. The parks commission then forwards a recommendation to the city council for consideration. The city council should discuss the 2017 Park Dedication Fund and CIP item for Lisle Park. The documents attached include the proposed 2017 Park Dedication Fund Budget and the Lisle Park master plan. The parks commission reviewed the proposed CIP at their August 10 th, 2016 meeting and voted 5-0 to recommend approval of improvements in the amounts listed on the attached spreadsheet. Overview /Background: During the budgeting process for 2017, the city council discussed the Park Dedication Fund and Park s CIP at their October 17, 2016 work session. The parks commission and city staff are recommending replacing the playground equipment at Douglas Park and continuing to convert parks to rubber mulch. The largest projected/budgeted capital expenditure for 2017 was playground equipment in Lisle Park. This item was originally budgeted/planned in 2016 but was moved to a future year for discussion after analysis of costs and priority of the parking lot in the same area. The attached spread sheet shows $300,000 slated for Lisle Park playground equipment in During the October 2016 work session the city council discussed whether playground equipment should be the next improvement in the park or if the multi-use building and multipurpose rink should occur next. After some discussion on this matter, the council agreed to ear mark $300,000 in Lisle Park and have a more detailed follow up discussion sometime in The city approved a preliminary plat which acted as the master plan for the Hunters Crest development. Given the size of the development the developer put together a phasing plan which consisted of seven different phases for build out of the development. The developer than came in for finial plat approval for each phase they were proposing to construct at that time. At the time of finial plat approval for each phase, park dedication is negotiated for that phase. Park dedication for Lisle Park was negotiated as part the Hunters Crest 5 th, 6 th, & 7 th additions. In summary, the park dedication for Lisle Park is as follows: the City received the land which encompasses Lisle Park (15 acres); a cash Mission Statement: The City of Minnetrista will deliver quality services in a cost effective and innovative manner and provide opportunities for a high quality of life while protecting natural resources and maintaining a rural character.

3 payment of $556,000 was to be paid for all three phases. The Hunters Crest 7 th addition has yet to be platted so the City has not received the cash contribution for that phase. Approximately $40,000 is estimated to be due once the 7 th addition is platted. Thus far the City received $516,000 in park dedication. On August 28 th, of 2008 the City kicked off the beginning of a six month planning process to develop a master plan for what is now known as Lisle Park. The process began with a public open house to solicit input from residents as to what amenities they would like to see in this park. Over the next six months the parks commission held numerous open houses and discussed different concepts at their regular parks commission meetings. Through this public process with public input the parks commission was able to recommend that the city council adopt the attached master plan for future development of Lisle Park. To date, portions of the master plan have been completed and paid for out of the park dedication fund by the city. Items completed are: grading, storm water infrastructure, water infrastructure, irrigation system, paved trail loop, ball field, seeding/sod, landscaping, planting trees, tennis courts & parking lot. Of all the improvements to date the total cost is $1,025,000. There is $38,000 yet to pay for the parking lot constructed last year. Discussion: In 2015 the city council approved a professional services proposal which included the first steps in the process to develop a more detailed master plan for the playground, parking lot and a splash pad. This provided a preliminary budget/scope to help aid in the decision of next improvements. The preliminary budget/estimate of probable costs is included in your packet. You will see from the estimate that it would cost in-between $776,500 to $1,040,750 to fully construct the playground as called out in the master plan. The cost for a multi-purpose park building with utilities would range from $1 to $2 million and a hockey rink would cost $205,000 to $285,000. For informational purposes we have included a park review that Gary Peters had coordinated with Minnesota/Wisconsin Playground. We have also included the park inventory with maintenance schedules from the city s Parks, Trails & Open Space Plan. This information helps show that there are needs within the existing parks systems and further examination is needed for incorporating those items in the parks CIP and long range financial planning. Fiscal Impact: The 2016 year end cash balance of the park dedication fund was $881,015. The 2017 CIP proposed expenders is $447,500 which brings the fund balance to $541,525. The main revenue item that occurs intermittently is park dedication fees related to the next phases of Woodland Cove and other future developments. The cash contribution for Woodland Cove was agreed upon in the master development agreement in Among other Mission Statement: The City of Minnetrista will deliver quality services in a cost effective and innovative manner and provide opportunities for a high quality of life while protecting natural resources and maintaining a rural character.

4 improvements there is land, trails and a park deeded to the city. The developer is also paying a total of $695,000 of cash contribution to the park dedication fund. The amount owed is prorated based on the percentage of the total units being developed within each phase of the development and paid at the time of each final plat being recorded. There is $478,908 that remains to be paid as future phases are platted. Conclusion: The Council should discuss the 2017 park dedication fund budget. Mission Statement: The City of Minnetrista will deliver quality services in a cost effective and innovative manner and provide opportunities for a high quality of life while protecting natural resources and maintaining a rural character.

5 1 City of Minnetrista 2 Parks, Trails and Open Space 3 Capital Improvement Plan Inflation Assumptions 7 Revenues 5% 5% 5% 5% 5% 5% 5% 5% 5% 8 Expenses 5% 5% 5% 5% 5% 5% 5% 5% 5% 9 Investment Income 2% 2% 2% 1% 1% 2% 2% 2% 2% Actual Actual Actual Actual Actual YTD/Predicted Budget Projected YE Expenses 14 Game Farm Road 20,000 14,433 14,433 14,433 15,000 15,000 15,000 15,000 15, Lisle Park Tennis Courts 271, Lisle Park - Additional Parking Lot 406, Lisle Park -Playground equipment 300, misc other improvements 35,008 9,268 2,334 9,374 20,867 15,000 10,000 20,000 21,000 22,050 22, Douglas 44, Linden 33, Slow Creek 26, Friendship 9, Capital Outlay ,558 4,095 29,893 10,000 10,000 10,500 11,025 11, Gillespie Property - 40,415 11, Total Expenses 55,008 9,268 19,892 68, , , ,500 45,000 46,500 48,075 48, Revenues 28 Bond Proceeds/other financing sources 10, Park Dedication Fees 25,000 38, , , ,349 52, , ,000 50, ,000 50, Investment Income 11,639 10,870 (6,015) 16,888 14,425 18,000 8,010 10,831 12,147 12, Grant 100, Property Tax Levy 33 Total Revenues 46,807 49, , , ,774 70, , ,831 62, ,460 50, Balance sheet AJE's - (408) 109 2,872 (2,325) 12,548 (12,548) additional projected activity for year 35 Cash Balance 753, , ,390 1,259,109 1,214, , , , , , ,313 Page 6 - Parks, Trails and Open Space Improvement Plan

6 15.5 acre hunters crest park - accepted master plan design PROJECT # FEBRUARY 11TH, 2008 city of minnetrista, minnesota Park Shelter Building A large multi-use building is part of the main park entrance containing an open picnic shelter area, restrooms, storage space, and an enclosed room to serve as the warming house & summer program room for kids activities. The patio area in front of the building has park orientation and trailhead information for users. The rear patio area contains additional picnic space, custom grill area and overlooks informal green space used for picnic activities, lawn games and winter general skating. Northern Parcel Simple bench seating area for an overlook of the pond and natural areas, a natural surfaced trail, horseshoe court and a couple of picnic tables Partridge Road Playground Area Most of the park contains manicured turf that may be irrigated. Natural landscaping shall be used in areas where naturalization best fits with the surroundings. Examples include naturalizing the pond edges, the perimeter of the site that is adjacent to more natural landscapes, etc. The natural landscapes will be designed to separate use areas within the park, provide wildlife habitat, and provide shade. il Landscape Asphalt Trails An 8 wide loop asphalt trail system with some seating areas in select locations for resting and viewing. Can also add distance markers, exercise stations and trail lighting. a Tr Asphalt trails allow access to the various recreational amenities within the park. A large internal loop system is created that is approximately 4/10 of a mile long, with an additional mini-loop around the sledding hill. Possible additions to the trail system include distance markers, exercise stations, trail lighting, and bench seating areas in select locations. The preferred connection to the regional trail would be between the ponds, if possible, otherwise there will be a connection by sidewalk on the southern end along Hunters Trail. A trailhead would be created by the main park building. s Trails er The centrally located ballfield area contains a skinned infield with a backstop and players benches with room for a small soccer field overlay. A multi-purpose paved rink accommodates winter hockey and skating use, summer in-line skating, a basketball half court on one end, and can also provide an area for future skateboard activities, if desired. Double tennis courts are provided on the northern end of the park with a bouncewall on one end. A small sledding hill is created by the playground. Sledding Hill Small hill for winter sledding and also acts as a natural separation of use areas nt Active Recreational Amenities Tennis Courts Double tennis courts with bouncewall and adjacent parking lot with 8-10 stalls Landscape Buffers A mixture of native trees and shrubs to be used in select areas for screening & buffering Hu Arbor structures with seating beneath are placed between the two main playground pods for easy viewing of both areas. The playground area to the south contains a sand play space and some playground equipment for the pre-school age group with easy viewing from the park shelter structure. The swings are located in a separate pod. The playground area to the north is the elementary and teen age group space with more unique and challenging equipment. A specialized garden space is created between the two play areas specifically for kids to interact with and touch, such as a sensory garden. Open Field / Green Space Area Playground Area * Arbor Seating Area * Sand Play Space * Pre-School Area * Swings * Elementary / Teen Area with challenging equipment * Children s Garden (Sensory) Multipurpose Rink A paved rink with boards that can be used for winter hockey, summer in-line skating, basketball half court, and possible future skateboard activities. Rink Multi-Use Building * Adjacent parking with stalls & room to double * Park Entrance / Focal Point * Trailhead * Open Picnic Shelter * Restrooms * Warming House / Program Room * Storage Future Regional Trail Treatment Ponds Picnic Green Space * Picnic Tables * Informal Green Space for lawn games * General Skating Area Possible Regional Trail Connection Sidewalk Connection To Regional Trail N Scale: 1 = 60-0

7 Lisle Park Concept INITIAL CENTRAL ISLAND: Circular walkway around a central garden with various native grasses and flowers FUTURE CENTRAL ISLAND: Circular walkway around a central Splash Pad with planting beds for separation between walk and splash pad K:\ \Cad\Exhibits\ Lisle Park Master.indd LEGEND 1. PICNIC SHELTER 2. SAND & WATER PLAY 3. PRESCHOOL PLAY 4. SWINGS 5. ELEMENTARY PLAY 6. CENTRAL ISLAND 7. PORTABLE RESTROOM 8. PARKING LOT 9. PHASED PARKING 10. STORMWATER POND 11. MULTIPURPOSE BLDG 12. HOCKEY RINK N Graphic Scale PLAYGROUND: Separation of age groups and play event areas Approx. 10,000-12,000 sf total Adjacent open air picnic shelter Adjacent lawn space Highly accessible spaces SPLASH PAD: Total area ( sf) Planting bed with fence for separation from walk PARKING: Approx. 30 initial spaces Approx. 30 future spaces Two entrance/exit points Playground MULTI-PURPOSE PARK BUILDING: Restrooms Storage Internal Warming House / Meeting Room Picnic Shelter Area WSB Project Number: Date: August 3, 2015 Master Plan

8 Concept Lisle Park 2 SPLASH PAD: One or two overhead elements mixed with ground sprays with flowers or nature inspired elements K:\ \Cad\Exhibits\ Lisle Park Master.indd UNIQUE & SENSORY INSPIRED: Unique Swings Various Movements Varying Levels of Challenge Accommodate Various Abilities PRE-SCHOOL & ELEMENTARY EQUIPMENT: A mixture of fun vibrant colors and some earth toned objects focused on nature inspired elements, such as: Flowers Rocks Wood Grasses Insects Theme WSB Project Number: Date: July 14, 2015 Colorful Nature

9 Preliminary Budget / Estimate of Probable Costs Lisle Park Playground & Splash Pad Master Plan Project City of Minnetrista, Minnesota WSB Project / Date: Estimate of preliminary budgets and probable costs are at a master plan level only and do not account for actual site conditions and other unknown factors that may affect overall quantities and construction costs, but are in comparison to similar projects in order for the City to establish working budgets for implementing the improvements. Estimate of Probable Costs for Construction No. Parking Lot Description (not phased) Low Range High Range 1.01 General earthwork, erosion control & mobilization $30, $50, Removals $3, $5, Asphalt Trails $30, $35, Stormwater (Catch Basins & Storm Lines) $30, $40, Restoration $15, $20, Landscape improvements (budget for plantings) $8, $10, Parking Lot Lighting (4-6 lights) $24, $36, Concrete Curb & Gutter $15, $20, Parking Lot Striping & Signage $3, $5, Asphalt Pavement $75, $100, Parking Lot SubTotal: $233, $321, Construction Contingency, Testing & Design Fees (25%) $58, $80, Parking Lot Grand Total: $291, $401, No. Playground Description Low Range High Range 2.01 General earthwork, erosion control & mobilization $50, $70, * Electrical Service $30, $45, * Water Service $20, $30, Playground Draintile System $9, $12, Playground Shelter with Concrete Pad $50, $75, Asphalt Trail Loop Connection $10, $12, Concrete Walks & Pads $20, $25, Concrete Stairs $10, $15, Concrete Curb Containers $24, $26, Page - 1 of 2

10 2.10 Poured in place rubber surfacing $100, $125, Wood fiber surfacing $12, $16, Sand surfacing $1, $1, Playground Equipment $200, $250, Specialty Items (site or landscape features) $10, $20, Standard Site Amenities (benches, tables, bike rack, etc.) $35, $45, Restoration $15, $20, Landscape improvements $25, $45, Playground SubTotal: $621, $832, Construction Contingency, Testing & Design Fees (25%) $155, $208, Playground Grand Total: $776, $1,040, No. Splash Pad Description Low Range High Range 3.01 Splash Pad Equipment & System (flow-through to run into basin) $150, $200, Splash Pad Surfacing $15, $25, Stormwater & Basin (outlet, plantings, etc.) $25, $35, Miscellaneous Utility Connections $10, $15, Splash Pad SubTotal: $200, $275, Construction Contingency, Testing & Design Fees (25%) $50, $68, Splash Pad Grand Total: $250, $343, No. Future Developments Low Range High Range A Multi-Purpose Park Building (includes utilities) $1,000, $2,000, B Hockey Rink: $205, $285, Wood Boards = $45,000 - $55,000 Concrete Surfacing = $100,000 - $150,000 Sports Lighting = $60,000 - $80,000 **Future Development Totals: $1,205, $2,285, * Highlighted items indicate the utilities that should be brought into the proposed areas for the splash pad in either the parking lot or the playground phase - whichever comes first. ** Future Development items do not have construction contingency, testing or design fees added into the figures shown. Page - 2 of 2

11 Gene Lehner Park 4180 Trillium Lane East 1.7 acres Mini Park The Gene Lehner Park is named after a former Park Commissioner. It was dedicated in 1994 as part of the Trillium Bay subdivision. It serves a greater area, including the Maple Forest, Stonebridge, and Wood End Shores subdivisions. There is a trail along County Road 44 that connects the park to other neighborhoods and the Lake Minnetonka Regional Park. The park features a tennis court, playground equipment, exercise stations along the trail, and a wood carving of a black bear. Several years ago, the bear s companion, a cub, wandered off and never returned. Some say it was stolen, other aren t so sure. Park Amenities- Trail Coating 2008 Park Sign 2004 Tennis Court/Fence 1994 Playground Equipment 1994 Picnic Table 2004 Trash Cans (2) 2003 Fitness Stations 1994 Trail 1995 Wood Carving 1994 Maintenance Schedule 2010 Paint Equipment - $1, Playground Equipment - $40, Trail Replacement - $37, Resurface Tennis Court - $5, Fence along retaining wall - $5, Playground border & park entrance - $8, Playground border - $8, Resurface Tennis Court - $5, Trail Coating - $19, Playground Equipment - $40, Trail Coating - $19, Playground Equipment - $40, Trash Cans - $ Replace Picnic Table - $ Replace Bench - $ Trail Replacement - $37, Trail Coating - $19,300 The Gene Lehner Park Bear may need some maintenance every now and then, as well. The playground is in good shape but will require a new base when the playground equipment is updated. Rubber

12 Douglas Park 3441 Tuxedo Rd 7,976 square feet Mini Park Douglas Park is located at the triangle formed by St Mary s Road, Tuxedo Road, and Wellesley Way. It is the park for the Douglas Beach neighborhood. The City claimed this parcel as tax-forfeited land in 1981, along with parcels at 5254 and 5269 St. Mary s Road. A neighborhood meeting was held to determine which of the three lots would be the best place for the neighborhood park and 3441 Tuxedo Road was selected. Originally developed in 1987, it housed a small set of playground equipment and a basketball court. The playground equipment was updated it In 2004, a major renovation added a picnic area and a new half basketball court. Park Amenities- Add Mulch to play area Paint Equipment Park Sign Basketball Court Playground Equipment Wood fiber base added Picnic Tables (2) Trash Can Maintenance Schedule Replace Fence with decorative fence - $15, Tree Work- $10, Replace Playground Equipment- $25, Resurface Basketball Court- $4, Replace Fence with decorative fence - $15, Replace Playground Equipment- $30, Resurface Basketball Court- $6, Trash Can- $ Replace Benches/Tables- $3,100 The Douglas Park will need further work done to achieve perfection. When the playground equipment is updated, it has been discussed to add a more decorative fence. The nature of the park and Tuxedo Road requires a fence, however the neighborhood has complained about the appearance of the current plain chain link fence. If the large cottonwood trees remain a problem for the park, they should be removed before the playground equipment and fence are updated.

13 Jennings Park 865 Jennings Cove Rd 1 acre Mini Park Jennings Park was dedicated in 1986 as part of the Jennings Cove Subdivision. It was originally developed in 1993 by adding a small set of playground equipment. The fast growth of the neighborhood created a demand for expanding the park equipment in 1996 and then adding a sport court in A pond was added in 1999 to help alleviate drainage concerns in the area. Park Amenities Resurface Trail Add pea gravel to play area Park Sign Sport Court/Fence Playground Equipment Playground Equipment Picnic Table Benches (3) Trash Cans (2) Trail Pond Excavated Maintenance Schedule Playground Equipment- $40, Rubber Mulch- $15, Tree Planting- $6, Playground Equipment- $40, Rubber Mulch- $15, Playground Equipment- $40, Rubber Mulch- $30, Replace Trash Cans- $ Replace Benches & Tables- $2, Park Redesign- $55,000 Jennings Park should be redesigned in the future, as the park amenities are not laid out properly for the drainage on the site. The court should not have sediment from the play areas draining across it to the pond. Sport Courts are typically more of a residential use and there is not much information available on how well they hold up in public parks. This should be monitored. A regular basketball court and/or tennis court may prove to be more durable in the long run. Currently, the court is mostly used for basketball. If the court reaches a point where major renovation is needed, that would be the appropriate time to explore the redesign of the park. If a major redesign does not occur, adding pedestrian pathways to the court would assist in keeping sediment off of it. When the playground is replaced, rubber or wood

14 Friendship Park 5676 Kramer Rd 25,334 square feet Neighborhood Mini Park Friendship Park is located in the Painters Creek Preserve Subdivision. It was built in 1999 and consists of playground equipment and a picnic area. An irrigation system was donated to the City by the Homeowner s Association in Park Amenities Pea gravel to play area Park Sign Play Equipment Irrigation Sidewalks Benches/Tables Maintenance Schedule Replace Benches & Tables- $1, Replace Play Equipment- $34, Rubber Mulch- $15, Irrigation Housing/Landscaping- $TBD Replace Benches & Tables- $1, Replace Play Equipment- $34, New Playground Border- $9, Replace Benches & Tables- $1, Replace Play Equipment- $34, Rubber Mulch- $15,775 This park is well designed and simple and will not take much effort to maintain. When the time comes to replace the playground equipment, rubber or wood mulch will be needed to use for the base to comply with ADA standards.

15 Slow Creek Park 5738 Sunnybrook Cir acres Mini Park Slow Creek Park was dedicated as part of the Sunnybrook Farms Subdivision in The park was partially constructed by the developer and the City over 2002 and It consists of a woodchip trail that snakes through the lowlands around the Creek and then terminates in an area where there is a small playground and a picnic area. Also, featured in this area is a bituminous trail that the City built along Game Farm Road to the school. Park Amenities Maintain woodchip trail Maintain woodchip trail Park Sign Pedestrian Bridge Playground Equipment Picnic Table Benches Trash Can Game Farm Rd Trail lf Maintenance Schedule Game Farm Trail Coating- $10, Maintain woodchip trail- $11, Park Trail Coating- $1, Maintain Woodchip Trail- $11, Repair Bridge- $TBD Stain Bridge- $TBD Convert Woodchip Trail to Gravel - $12, Replace Playground Equipment- $35, Rubber Mulch- $26, Convert Gravel Trail to Pavement - $TBD Replace Benches & Table- $1, Game Farm Trail Resurface- $24, Replace Trash Can- $ Park Trail Resurfacing- $3,187 Woodchip Trails require a great deal of maintenance in many situations. Over time, if the maintenance of this trail is as intensive as feared above, it could be replaced by a mowed turf trail.

16 Adler Nature View Park 8230 Highland Road 2.64 acres Special Use Park Adler Nature View Park was dedicated as part of the Turtle Creek Subdivision. It is located along the Dakota Rail. It is a special use park that features a bituminous trail. Park Amenities Park Sign Trail Maintenance Schedule Trail Coating- $ Trail Resurfacing- $12, Trail Resurfacing- $12,066 Kings Point Rd Fishing Pier Kings Point Road DNR Park Special Use Park The City of Minnetrista installed a fishing pier at the DNR s park on Kings Point Road in There have also been discussions about placing a picnic area in this park. Park Amenities Fishing pier Maintenance Schedule 2012 New Dock

17 Merz Marsh Park 4230 Highland Road 24.8 acres Neighborhood Park Merz Marsh Park, named after one of the first German settlers to the area, was dedicated in 2001 as part of the Turtle Creek Subdivision. Currently, it consists of a half basketball court, playground equipment, trails, and a soccer field. The park extends all the way to Six Mile Creek. Park Amenities Benches & Tables with Slabs-2005 Park Sign Half basketball court Soccer goals Trails- 443 lf Playground Equipment Maintenance Schedule Trail Coating- $2, Resurface Basketball Court- $4, Resurface Basketball Court- $6, Replace Playground Equipment- $26, Replace Playground Equipment- $30, Rubber mulch- $16, Resurface Trails- $6,300 Currently this park has no tables and benches and some should be added soon. Parking may become an issue if the soccer field is ever used. Neighborhood residents have already voiced some displeasure over the potential of lighting of the field.

18 Woods of Saga Hill Park 4900 Grandview Ave 2.1 acres Mini Park The Woods of Saga Hill Park was tax forfeited land originally taken by the City in the early 1960 s. The deed was misfiled, however, and the park was not developed until The mostly wooded park has a set of playground equipment and a bituminous trail with off-street parking. Park Amenities Playground Equipment Bituminous Trail- 880 lf Parking Lot Benches (2) Tables (2) Park Sign Maintenance Schedule Trail Coating- $5, Rubber Mulch- $25, Trail Resurfacing- $13, Replace Playground Equipment- $41, Replace Benches & Tables- $3, Trail Resurfacing- $13,000

19 Perennial Park 1270 Langewood Dr 18,569 square feet Mini Park Perennial Park was dedicated in 2000 as part of the Heatherwood Glenn subdivision. It has frontage both on County Road 110 North and Langewood Drive. It consists of a picnic shelter, grills, horseshoe pitch, and many perennial plants. There is also a trail that runs along Sunnyfield Road to the football field and a trail along County Road 110. Park Amenities Horseshoe Pit Trail Coating Park Sign Picnic Pavilion Horseshoe Pitch BBQs ft Trail Wood mulch around plant Benches (2) Maintenance Schedule Re-roof Pavilion- $5, Replace benches & tables- $3, Resurface Trail- $4, Re-roof Pavilion- $5, Replace benches & tables- $3, Resurface Trail- $4, Stain Pavilion- $TBD Re-roof Pavilion- $5, Replace benches & tables- $3, Resurface Trail- $4,375 Perennial Park may require some future plantings, as there always seems to have been a little bit of trouble getting the plants to stay alive through the years. Adding another horseshoe pitch has been suggested on occasion, as residents have commented that if there were a second pitch there could be some more organized shoeing going on.

20 Merriman Cemetery 585 County Road acres Historical Site The legendary Merriman Cemetery has often been forgotten and rediscovered. There appear to be several newspaper articles in the archives of the newly discovered abandoned cemetery. Well, that legacy is no more. Recently, the City Council added the historic cemetery to the park system. Last year, the City began to build a driveway to the site to allow for maintenance access. It has been discussed in the past to add some site amenities or perhaps even a gate. Planning Schedule Select site improvements, purchase, and install. This year was selected, as it is technically tax forfeited land and there is a three-year window for improving such sites. Painters Creek Estates Park 617 Painters Creek Drive 2.1 acres Undeveloped Park & Trail Corridor This undeveloped park was dedicated to the City in It consists of a creekside corridor and a larger open area. Most all of the open area is wetlands. At one time, the City was attempting to acquire a trail that rang along Painters Creek. Over time, this pursuit was abandoned, leaving remnants such as this. Since the parkland was dedicated, it cannot be sold. Currently, it appears that there are some residents that ride ATVs, horses, and bikes in this area. The current trail plan attempts to link Planning Schedule None

21 Dakota Rail Park 7222 County Road 110 W 1.33 acres Undeveloped Park This park is located where the Dakota Rail crossed County Road 110 W. It was purchased in 2003 for future use. Planning Schedule None. Timber Hills Park 651 County Road 92 15,252 square feet Undeveloped Park This park is located at the corner of County Road 92 and County Road 26. It was purchased in 2004 for future use. Planning Schedule If a trail system is developed along County Roads 92 and 26, then this park should be developed.

22 South Cusoke Park 4180 Trillium Lane East 1.8 acres Special Use Park South Cusoke park was dedicated as part of the South Saunders subdivision in A paved trail down to the lake was installed in Many retaining walls had to be built to support it. Area residents often inquire about placing playground equipment in this park but it is not suitable. Park Amenities Park Sign Trail- 500 lf Retaining Walls Light Parking Lot Maintenance Schedule Trail Coating- $2, Fog Seal Trail- $TBD Trail Resurfacing- $5,450

23 North Cusoke Park 2600 North Saunders Lake Drive acres Special Use Park North Cusoke Park was dedicated as part of the North Saunders Lake subdivision in It includes a pedestrian bridge over a channel in Saunders Lake. It is possible to launch canoes from this park, as well. Park Amenities Park Sign Pedestrian Bridge Trail Parking Lot Maintenance Schedule Trail Coating- $2, Fog Seal Trail- $TBD Trail Resurfacing- $5,450 The residents in South Saunders often contact the City in hopes of adding some playground equipment to the park. However, that particular park is unsuitable for such development. It would be possible to place some equipment in North Cusoke Park, however. If the area residents still feel that this is a priority, then North Cusoke could be developed into a

24 Williams Lane Park 3245 Williams Ln 22,624 square feet Undeveloped Park This park was dedicated as part of the Maple Leaf Estates subdivision in There are trailways through this area that lead to the park but there was no defined use for it. Planning Schedule None Chateau Way Park 1616 Chateau Way 3.3 acres Undeveloped Park The park on the corner of Chateau Way and County Road 15 was dedicated as part of the Chateau De Lac subdivision in At one time, it was discussed that this could be the center of a large, rural trail system. This property cannot be sold. Planning Schedule None

25 Lincoln Avenue Boat Launch Lincoln Ave ROW off of Halstead Dr Public Water Access This boat launch is a primary public access point for Halstead Bay. There is boat trailer parking and a turnaround available for use. Future subdivision was intended to improve parking and usability. It opened for use in Maintenance Schedule Undefined Tuxedo Road Boat Launch Tuxedo Road ROW Public Water Access The boat launch on Tuxedo Road has been in operation since the early 1970 s. It has a parking lot on site. This site requires very minimal maintenance. Maintenance Schedule Possible Repave with Enchanted Lane Project

26 Linden Park 3900 Hunters Trail 3.85 Acres Neighborhood Mini Park Located in Hunters Crest, Linden Park sports a colorful playground, basketball and sand volleyball courts and a picnic pavilion. Park Amenities Playground Equipment Basketball Court Sand Volleyball Court Concrete walk Bituminous path Shelter Picnic table & bench Drinking fountain Maintenance Schedule Replace Volleyball Net $ Trail Coating $2, Basketball Court Coating $ 5, Replace Sand in Volleyball Court $3, Basketball Court Resurfacing $ 5, Reroof Pavilion - $TBD Linden Park will need general maintenance each year. The amenities in this park are fairly new and

27 Lisle Park 4600 Hunters Trail 15.5 acres Neighborhood Park The City Council accepted the Master Plan for this new park in Hunters Crest in This plan will be used as a guide for the development of Lisle Park. Phase I of the park development includes mass grading, trail, sod, utilities, and irrigation installation, and the installation of a ball field backstop. These amenities were completed in Future phases will be scheduled and completed as funds become available through the City s park dedication fund. Park Amenities Asphalt Loop Trail 2009 Irrigation 2009 Ballfield Tennis Courts & Parking Lot 2015 Maintenance Schedule Ballfield- $15, Additional Parking Lot- $200, Playground- $300, Playground- $300,000

28 P.O. Box Golden Valley, MN (F) City of Minnetrista Park Review (not an audit) Linden Park A. Surfacing: Engineered Wood Fiber is approximately 6-8 to low. B. Kompan Equipment: Structure: Looks to be in fine working order 2. Tot Structure: Need to check surfacing height and the installation instructions, the unit may be sitting to high. 3. Whirl: Need to check surfacing height and the installation instructions, the unit may be sitting to high. 4. Spring Toy: Need to check surfacing height and the installation instructions, the unit may be sitting to high. Note: Kompan equipment was purchased from St. Croix Recreation , now is represented by Ultimate Playgrounds Page 1

29 P.O. Box Golden Valley, MN (F) C. Landscapes Structure Equipment: Structure: Looks to be in fine working order. 2. Swings: Looks to be in fine working order. Notes: 1. Per Gary, the equipment was installed in Look to replace equipment Budget for equipment 75K, additional for surfacing and demo. Page 2

30 P.O. Box Golden Valley, MN (F) Merz Marsh Park A. Surfacing: Engineered Wood Fiber is at the appropriate level. B. Park Structure Equipment (now called Play & Park Structures): structure: 2-5 Structure: Looks to be in fine working order C. GameTime Equipment: 1. Swings: Looks to be in fine working order. Notes: 1. Per Gary, the equipment was installed in Look to replace equipment Budget for equipment 55K, additional for surfacing and demo. The structure is aging fast, powder coating & sheet plastic fading, PVC coating on decks is peelings. Should look to replace sooner. When replacing the site should be leveled. For the park you need to replace the soccer goals. Also, I would add 1-2 grills since you have a picnic shelter on site. Page 3

31 P.O. Box Golden Valley, MN (F) Gene Lehner Park A. Surfacing: Pea rock needs to be replaced, it does not meet ADA or the fall height requirements. B. Landscape Structures Equipment: structure: Needs to replaced now, it does not meet ADA or any of the safety standards 2. Swings: same as above, also the 3 rd seat needs to me removed. Notes: 1. Per Gary, the equipment was installed in Look to replace equipment NOW. 3. Budget for equipment 55K, additional for surfacing, demo & border. Page 4

32 P.O. Box Golden Valley, MN (F) Slow Creek Park A. Surfacing: Engineered Wood Fiber is approximately 6-8 to low. B. Landscape Structures Equipment: Structure: Looks to be in fine working order. 2. Free Standing Climbers: Looks to be in fine working order. 3. Digger: Needs to be re-installed, the footing is exposed. 4. Swings: Looks to be in fine working order. Note: 1. Per Gary, the equipment was installed in Look to replace equipment Budget for equipment 50K, additional for surfacing & demo. Page 5

33 P.O. Box Golden Valley, MN (F) Woods of Saga Hill Park A. Surfacing: Rubber Mulch, no improvements required.\ B. Little Tikes Equipment: Structure: Looks to be in fine working order. Notes: 1. Per Gary, the equipment was installed in Look to replace equipment Could last long, in good shape and well shaded 3. Budget for equipment 50K, additional for demo, re-use surfacing. Page 6

34 Friendship Park P.O. Box Golden Valley, MN (F) A. Surfacing: Pea rock needs to be replaced, it does not meet ADA or the fall height requirements B. GameTime Equipment: Structure: Looks to be in fine working order. However, it does not meet the current ADA standards. 2. Swings: Looks to be in fine working order. The belt seat in the bay with tot seat needs to be changed to a tot seat or ADA seat. 3. Spring Toy: Looks to be in fine working order. 4. Digger: Looks to be in fine working order. Note: 1. Per Gary, the equipment was installed in Look to replace equipment Budget for equipment 60K, additional for surfacing, demo & border. Page 7

35 Jennings Cove Park P.O. Box Golden Valley, MN (F) A. Surfacing: Pea rock needs to be replaced, it does not meet ADA or the fall height requirements B. GameTime Equipment: structure: Looks to be in fine working order. However, it does not meet the current ADA standards. Also, this unit is a DuraScape/PrimeTime hybrid unit, parts for DuraScape are no longer available. 2. Swings: Looks to be in fine working order. Note: 1. Per Gary, the equipment was installed in 1993 for phase 1 & phase 2 was in Look to replace equipment NOW. 3. Budget for equipment 60K, additional for surfacing, demo & border. Page 8

36 Douglas Park P.O. Box Golden Valley, MN (F) A. Surfacing: Engineered Wood Fiber is approximately 6-8 to low. B. GameTime Equipment: structure: Looks to be in fine working order. However, it does not meet the current ADA standards. 2. T-Swing: Looks to be in fine working order However, it needs to be re-installed, something wrong with the footing. Note: 1. Per Gary, the equipment was installed in Look to upgrade NOW 3. Budget for equipment 35K, additional for surfacing, & demo. Page 9

CITY COUNCIL WORK SESSION MEETING AGENDA November 6, :30 6:30pm

CITY COUNCIL WORK SESSION MEETING AGENDA November 6, :30 6:30pm CITY COUNCIL WORK SESSION MEETING AGENDA November 6, 2017 5:30 6:30pm 1) Call to Order 2) Park Dedication and Environmental Enhancement Fund Budget Discussion 3) Surface/Storm Water Fund Budget Discussion

More information

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION PIONEER PARK INTRODUCTION Pioneer Park is a 7 acre neighborhood park located east of Interstate 270 and south of Manchester Road along Tallie Road. The park is situated in a residential neighborhood with

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Capital Prioritization

Capital Prioritization 14 Capital Prioritization 279 279 280 Park & Recreation CAPITAL PRIORITIZATION As described in Chapter 8, the recommendations presented in Chapter 9 are prioritized to provide a guide for future capital

More information

35 Bee Tree Park Planning Zone 3

35 Bee Tree Park Planning Zone 3 35 Bee Tree Park Planning Zone 3 2701 Finestown Road Visit Date: August 2016 St. Louis County Parks Master Plan Page 1 35 Bee Tree Park 2701 Finestown Road St. Louis County Parks Master Plan Planning Zone

More information

NEW MEADOWS PARK PROPOSED MASTER PLAN

NEW MEADOWS PARK PROPOSED MASTER PLAN NEW MEADOWS PARK PROPOSED MASTER PLAN A vision for your neighborhood park, the draft master plan is ready for your review. Tuesday September 12 th, 2017 5:30-7:00 PM Hellgate School District #4 middle

More information

17 Mathilda Welmering Park Planning Zone 3

17 Mathilda Welmering Park Planning Zone 3 17 Mathilda Welmering Park Planning Zone 3 8301 Mathilda Visit Date: September 2016 St. Louis County Parks Master Plan Page 1 Description: The six acre Mathilda Welmering Park is named for two streets

More information

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK LUCY LANEY COMMUNITY SCHOOL N 33RD AVE N 33RD AVE SINGLE-FAMILY RESIDENTIAL MULTI-USE DIAMOND

More information

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018

AGENDA MEMORANDUM Community Services Department. CSAB Meeting Date: April 10, 2018 AGENDA MEMORANDUM Community Services Department CSAB Meeting Date: April 10, 2018 To: Community Services Advisory Board From: Dana A. Souza, Director Date: April 4, 2018 Legislative Quasi-Judicial SUBJECT:

More information

City of Haslett. City of East Lansing. City of East Lansing

City of Haslett. City of East Lansing. City of East Lansing Central Park North (Nancy L. Moore Park) Lake Park North Expansion White Park Expansion #2 White Park Expansion #1 County East East Haslett East East TF87-212 Acquisition $90,000.00 Park. TF08-138 Acquisition

More information

Community Advisory Committee Meeting #3 April 21, 2015

Community Advisory Committee Meeting #3 April 21, 2015 Community Advisory Committee Meeting #3 April 21, 2015 Purpose (charge) of the CAC: Be Knowledgeable, Be an Engaged Representative, Develop Master Plan, & Prioritize Plan 1 Welcome/ Introductions Review

More information

Community Park Capital Project. February 6, 2017

Community Park Capital Project. February 6, 2017 Community Park Capital Project February 6, 2017 Construction Budget Estimate Bid Recommended $10,318,690 $7,725,000 Staff Recommended +$1.1M $8,850,000 +$2.6M -$1.47M Pre-Bid Estimate 11/22/2016

More information

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming

Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table of Contents Appendix B - Undeveloped Parks and Existing Parks with Remaining Development Programming Table

More information

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District

Chapter eight. Parks and Recreation. Introduction. Crystal Lake Park District Chapter eight Parks and Recreation Introduction One of the indicators of quality of life in a city is the parks and recreation system. The City of Crystal Lake is fortunate to have an excellent parks and

More information

PARKS & BEACHES PROJECTS

PARKS & BEACHES PROJECTS #18 72ND STREET PARK, LIBRARY, #19 BLUEWAYS & AQUATIC CENTER $1.1 MILLION $60 MILLION New facility to include: Create Kayak Launches with All Wheels Skate Park Floating Docks and Seating at: Library/Media

More information

AGENDA MAPLE PLAIN PARKS COMMISSION MAPLE PLAIN CITY HALL NOVEMBER 20, :30 PM

AGENDA MAPLE PLAIN PARKS COMMISSION MAPLE PLAIN CITY HALL NOVEMBER 20, :30 PM I. CALL TO ORDER AGENDA MAPLE PLAIN PARKS COMMISSION MAPLE PLAIN CITY HALL NOVEMBER 20, 2017 5:30 PM II. III. IV. ADOPT AGENDA CONSENT AGENDA A. Approve the October 16, 2017 regular meeting minutes NEW

More information

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21

Fun Facts. How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 It Starts in Parks Fun Facts How many Baseball fields do we have? a. 2 b. 14 c. 16 d. 21 Fun Facts How many people visit Central Winds Park Annually? a. Over 100,000 b. 20,000 c. 10,000 d. 1,000 It Starts

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access

More information

Webber Park Master Plan Charrette Summary

Webber Park Master Plan Charrette Summary SMALL GROUP #1 - September 29, 2011 Webber Park Master Plan Charrette Summary More trash cans, especially near picnic grounds A year round pool is very needed-physical & mental health are significantly

More information

Villages at Buffalo Run East

Villages at Buffalo Run East Villages at Buffalo Run East Neighborhood Park Subhead to title page goes here. Public Design Meeting April 9, 2015 Capital Improvement Program Commerce City s $137 million CIP is the result of a 2013

More information

NORTH HEMPSTEAD BEACH PARK MASTER PLAN

NORTH HEMPSTEAD BEACH PARK MASTER PLAN NORTH HEMPSTEAD BEACH PARK MASTER PLAN COMMUNITY DESIGN CHARRETTE Supervisor Judi Bosworth Viviana L. Russell Peter J. Zuckerman Angelo P. Ferrara Anna M. Kaplan Lee R. Seeman Dina M. De Giorgio VISIONING

More information

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE

BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE BASSETTS CREEK SECTION CONTENTS: BASSETTS CREEK BRYN MAWR LUCE LINE GLENWOOD AVE MULTI-USE DIAMONDS VINCENT AVE N MORGAN AVE N PENN AVE N DOG PARK MULTI-USE FIELDS PLAYGROUND AK E RD S CHESTNUT AVE DA

More information

7. Plan Implementation

7. Plan Implementation 7. Plan Implementation 7.1 Implementation Timeline This section includes a list of achievable park and recreation actions. In the Implementation Action Matrix that follows, the implementation actions have

More information

Northeast Quadrant Distinctive Features

Northeast Quadrant Distinctive Features NORTHEAST QUADRANT Northeast Quadrant Distinctive Features LAND USE The Northeast Quadrant includes all the area within the planning area that is east of Interstate 5 and to the north of State Route 44.

More information

M E S T I Z O C U R T I S P A R K

M E S T I Z O C U R T I S P A R K ARAPAHOE CONNECTION TO BUS ROUTE AT ND AND LAWRENCE, FUTURE LIGHT RAIL STATION LEGEND SOCIAL TRAIL FLAGSTONE PAVING TO RESTORE/MAINTAIN CONCRETE PAVING DIAGONAL CURVILINEAR SOCIAL ROUTE IS OUT OF HISTORIC

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm

Community Input Meeting. Fairgrounds Master Planning Update. January 7, 2016, 7 pm Community Input Meeting Fairgrounds Master Planning Update January 7, 2016, 7 pm Fiesta Hall Santa Clara County Fairgrounds 355 Tully Road, San Jose, CA Tonight s Agenda 1) Board of Supervisors Direction

More information

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK

NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK NORTH OF BROADWAY SECTION CONTENTS: COTTAGE PARK FARVIEW PARK GLEN GALE PARK IRVING TRIANGLE JORDAN PARK NEWTON PARK PERKINS HILL PARK N ILIO NA VE N JAM ES AV E PLAYGROUND PAR K PRO PER TY B OUN DAR Y

More information

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County Silver Lake Park An Environmental Jewel for the Citizens of Prince William County The Prince William Park Authority Mission Statement states: The Prince William County Park Authority will create quality

More information

French Regional Park Creative Play Area

French Regional Park Creative Play Area French Regional Park Creative Play Area A TURF MAINTENANCE STRIP EXISTING BASSWOOD TREE PLAY AREA SIGN EXISTING MAPLE TREES B BIKE PARKING C SLIDE TREE TOWER SHADE UMBRELLA PICNIC TABLE SEATING K-5 NET

More information

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e

J. Recreation Plan of Conservation and Development. The Town of Hebron. Section 2. Preservation of Unique Assets. 1 P a g e The Town of Hebron Section 2 2014 Plan of Conservation and Development Preservation of Unique Assets J. Recreation Open spaces, parks, sports fields, and recreational programs are considered essential

More information

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan

Chapter 6. Action Program. Heart of the Lakes Area Recreation Plan Heart of the Lakes Area Recreation Plan 1. Design and construct the following trails (please see the following map): a. the Speedway Trail 1) primary pathway the main trail 2) secondary pathway the proposed

More information

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018 BRYAN REGIONAL PARK Presented by: Burditt Consultants November 13, 2018 AGENDA 1. Project Purpose & Mission 2. Project Vision & Goals 3. Stakeholder Feedback 4. Program Overview 5. Phase A Plan Overview

More information

2014 SPLOST Final Draft County-wide Parks System Rehabilitation

2014 SPLOST Final Draft County-wide Parks System Rehabilitation Page 1 of 5 ADA Improvements (County Wide) Accessibility projects related to trails/walkways, door entrances, pool access, curb cuts, ramps, etc. Additionally, ADA Audit of facilities to identify and prioritize

More information

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority.

Birthplace of the Oil Industry Trail Town Crawford County, Pennsylvania. for the Titusville Redevelopment Authority. TITUSVILLE Birthplace of the Oil Industry - 1895 Trail Town - 2013 City of Titusville Fleming Park Crawford County, Pennsylvania for the Authority By: STIFFLER McGRAW Engineers Surveyors Architects & TABLE

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior. COMMUNITY DESCRIPTION Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior. The township is largely rural but has one main population

More information

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager

Recreation and Park Commission, Capital Committee. Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager Date: May 29, 2013 To: Recreation and Park Commission, Capital Committee Through: Philip A. Ginsburg, General Manager Dawn Kamalanathan, Capital and Planning Manager From: Subject: Mary Hobson, Project

More information

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park.

Acquisition in fee simple of approximately one-half acre of property on the shore of Spring Lake to expand the Lakeside Beach Park. Lakeside Beach TF00-136 $122,550.00 in fee simple of approximately one-half acre of property on the shore of Spring Lake to exp the Lakeside Beach. 2000 River Ravines TF00-150 $910,000.00 in fee simple

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior

More information

ADA Compliance Projects Summary Sheet

ADA Compliance Projects Summary Sheet District Letter Dated Project % to ADA Amount Granted Buffalo Grove March 10, 2014 Woodland Park - asphalt path 100% $4,500.00 Buffalo Grove March 10, 2014 Wellington Commons Bike path repairs including:

More information

CONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park

CONTEXT MAP COMPREHENSIVE RECREATIONAL MASTER PLAN. to Virginia Civil War Trails. Riverside Park. Mountains to Sea Trail. Rowe Environmental Park OMPREHENSIE REREATIONAL MASTER PLAN ONTEXT MAP to irginia ivil War Trails NOT TO SALE iver tr rara A Riverside Mountains to Sea Trail Rowe Environmental School The Ararat River reenway is located along

More information

City of Sierra Madre STUDY AREA PROFILE

City of Sierra Madre STUDY AREA PROFILE City of Madre STUDY AREA PROFILE STUDY AREA ID #112 BASE MAP PARK METRICS WHERE ARE PARKS MOST NEEDED AMENITY QUANTITIES AND CONDITIONS PARK NEEDS FRAMEWORK PROJECT COST ESTIMATES PROJECT REPORTING FORM

More information

4.0 FACILITIES INVENTORY

4.0 FACILITIES INVENTORY 4.0 FACILITIES INVENTORY 4.1 PARK LEVEL OF SERVICE STANDARDS (LOS) Based on current City of Longview Parks and Recreation Level of Service (LOS) Standards (Figure G), the City currently has a deficiency

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

RIDGEFIELD PARKS February 2016

RIDGEFIELD PARKS February 2016 RIDGEFIELD PARKS February 2016 Hayden Park Neighborhood Park Amenities Sign with Name of Park and City of Ridgefield Logo Lamp Post Parking Area Play Set Swings Sign with Playground Rules Durable Benches

More information

Corktown Parks. Public Meeting. City of Toronto

Corktown Parks. Public Meeting. City of Toronto Corktown Parks Public Meeting City of Toronto 15-04-20 Agenda 1. Reasons for Study 2. Consultation to Date 3. Parks Evaluation 4. Community Context 5. Bright St. Playground 6. Orphans Green (Dog Off Leash)

More information

Southwest Quadrant Distinctive Features

Southwest Quadrant Distinctive Features SOUTHWEST QUADRANT Southwest Quadrant Distinctive Features LAND USE The 31.17 square mile Southwest Quadrant includes all the area within the planning area west of I-5 and south of the Sacramento River.

More information

Trail Etiquette. Hours of Operation. Trail Accessibility

Trail Etiquette. Hours of Operation. Trail Accessibility Trail Guide The Elmhurst Park District, with 28 parks and over 460 acres of land, offers nearly six miles of paved or asphalt park trails and maintains an additional 3.6 miles of trails within Elmhurst.

More information

SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK

SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK SHINGLE CREEK SECTION CONTENTS: BOHANON PARK CREEKVIEW PARK SHINGLE CREEK PARK SHINGLE CREEK REGIONAL TRAIL WEBBER PARK SPLASH PAD Good condition. PARK BUILDING BRYANT AVE N Good condition and unique to

More information

Langton Lake Park Implementation Planning Session One 6 June Attendees signed in

Langton Lake Park Implementation Planning Session One 6 June Attendees signed in 27 Attendees signed in Meeting summary Following an overview of the Parks and Recreation Renewal Program and the key directions of the Parks and Recreation System Master Plan, meeting participants were

More information

B10. Agate Beach State Recreation Site

B10. Agate Beach State Recreation Site B10. Agate Beach State Recreation Site Location Within the City of Newport, just south of the Yaquina Head Outstanding Natural Area. The park is located along the west side of Highway 101 at the mouth

More information

Stittsville Parks Information Session

Stittsville Parks Information Session Stittsville Parks Information Session Amberway Park, Blackstone Park, Bryanston Gate Park & William Bradley Park Thursday, February 8, 2018 Open House 6:30-8:45pm Presentation 7pm Goulbourn Recreation

More information

Summary of Recreation Sites Development Name:

Summary of Recreation Sites Development Name: Development Name: Eau Pleine Site Number: 1 Owner: WVIC Eau Pleine Tailwater Boat Launch Lanes 1 Concrete plank landing, access to Eau Pleine tailwater & Lake DuBay. (45 planks long, 62.5') Picnic Tables

More information

CLIVE ELEMENTARY SCHOOL

CLIVE ELEMENTARY SCHOOL CLIVE ELEMENTARY SCHOOL This narrative, in conjunction with the revised cost estimate attached, represents the opinion of the Superintendency and recommendation to the Board of Education for consideration.

More information

City of Oak Harbor Parks & Descriptions

City of Oak Harbor Parks & Descriptions City of Oak Harbor Parks & Descriptions North West Section Koetje Park - NE 7 th Avenue (3.5 acres) Neighborhood and Community Park with playgrounds on one tot lot, one soccer/practice field, picnic tables,

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Business Item No

Business Item No Metropolitan Parks and Open Space Commission Meeting date: February 6, 2018 For the Community Development Committee meeting of February 20, 2018 For the Metropolitan Council meeting of February 28, 2018

More information

City of Keller Parks and Facilities Inventory

City of Keller Parks and Facilities Inventory City of Keller Parks and Facilities Inventory April 2013 1. BEAR CREEK PARK 44 ACRES 1 Basketball Court with 2 goals 4 Drinking Fountains 1 Large Pavilion with 4 picnic tables, electricity and fireplace

More information

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017

Frederickson LUAC. Community Plan Update. Parks & Recreation. September 25, 2017 Frederickson LUAC Community Plan Update Parks & Recreation September 25, 2017 Kimberly Freeman Resource Stewardship Superintendent kimberly.freeman@co.pierce.wa.us 253-798-4261 Joseph Coppo Senior Parks

More information

Minutes of the Tuesday May 22, 2018 Planning and Zoning Commission Meeting

Minutes of the Tuesday May 22, 2018 Planning and Zoning Commission Meeting Minutes of the Tuesday May 22, 2018 Planning and Zoning Commission Meeting The May 22 nd, 2018 Regular Planning and Zoning Commission meeting was called to order at 6:00 pm. Roll Call. The Following Commissioners

More information

Trail Feasibility Study

Trail Feasibility Study VOLUSIA COUNTY MPO CITY OF NEW SMYRNA BEACH FINAL REPORT JUNE 30, 2009 Trail Feasibility Study What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way

More information

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road

LANDING S PARK CONCEPTUAL PLAN HAMILTON ANDERSON JANUARY City of Novi, Michigan. The Park at 13 Mile and Old Novi Road HAMILTON ANDERSON JANUARY 2012 LANDING S PARK CONCEPTUAL PLAN January 2012 Page 1 of 15 January 2012 PROJECT GOALS Activate the park by introducing new elements Provide clear access to the water and enhance

More information

Rating: 5.0 (scale of 1-10)

Rating: 5.0 (scale of 1-10) 95 Community Trail System Groundcover: 2-metre paved path, 1- metre grass buffer on either side. Location: Fort St. John Ownership: City of Fort St. John Rating: 5.0 (scale of 1-10) Strategic value: Linear

More information

Parks, Recreation and Cultural Needs Assessment and Facilities Plan. November 21, 2016 City Council Worksession

Parks, Recreation and Cultural Needs Assessment and Facilities Plan. November 21, 2016 City Council Worksession Parks, Recreation and Cultural Needs Assessment and Facilities Plan November 21, 2016 City Council Worksession History and Process FY16/17 Budget Appropriation for Needs Assessment, Dean and Stonewall

More information

and plant some trees, but that was only accomplished through state and federal work-relief programs.

and plant some trees, but that was only accomplished through state and federal work-relief programs. PEAVEY LOCATION AND HISTORY Peavey Park sits in the Phillips Community on a large block bounded by major streets: Franklin Avenue, Chicago Avenue, and Park Avenue. The southern continue through to Chicago

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

City of Somersworth. Recreation Division

City of Somersworth. Recreation Division City of Somersworth Recreation Division 2018 Park Inventory Table of Contents I. Ash Street Park..1-3 II. Jules Bisson Park..6-10 III. Malley Farm Recreational Area.11-12 IV. Mast Point Dam Recreation

More information

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION

CLEVELAND PARK LOCATION AND HISTORY EXISTING CONDITIONS AND CHARACTER LOCATION CLEVELAND PARK LOCATION LOCATION AND HISTORY Attempts to create a neighborhood park and playground in the Cleveland neighborhood began in 1926, when the park board designated for acquisition the block

More information

HOMER GLEN AREA COMMUNITY PARKS

HOMER GLEN AREA COMMUNITY PARKS HOMER GLEN AREA COMMUNITY PARKS VILLAGE OF HOMER GLEN PARK PROPERTIES Owned and Maintained by the Village of Homer Glen Heritage Park 14110 W. 151 st Street This 103 acre park, located adjacent to Village

More information

FOLWELL PARK LOCATION AND HISTORY LOCATION

FOLWELL PARK LOCATION AND HISTORY LOCATION FOLWELL PARK LOCATION LOCATION AND HISTORY Folwell Park is a large (by neighborhood park standards) tract of land located south of Dowling Avenue between Humboldt and Knox Avenues. The land for the park

More information

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks. September 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Brewers Park and Clinton Park Renewal Concept Plans RECOMMENDATION THAT the

More information

Winnebago County Community Park

Winnebago County Community Park Directions to Community Park From Interstate Hwy. 41 to Oshkosh exit 124, which is Hwy. 76/Jackson Street. East on Hwy 76/ Jackson Street to left on County Road Y, 1/4 mile. Winnebago County Park is on

More information

DEPARTMENT OF PARKS & RECREATION

DEPARTMENT OF PARKS & RECREATION DEPARTMENT OF PARKS & RECREATION 2016 Budget Presentation 1 RONALD ZUBER, DIRECTOR March 7, 2016 2015 ACCOMPLISHMENTS OFFICE OF DIRECTOR Hosted the National Junior Disability Championships from July 16

More information

AGENDA REGULAR PARKS COMMISSION MEETING May 26, :15 A.M Monticello Public Works Office

AGENDA REGULAR PARKS COMMISSION MEETING May 26, :15 A.M Monticello Public Works Office Park Commission Agenda: 05/26/2016 AGENDA REGULAR PARKS COMMISSION MEETING May 26, 2016 9:15 A.M Monticello Public Works Office To enhance community pride through developing and maintaining city parks

More information

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm Dover Park Master Plan Community Design Event Tuesday, May 22, 5 7 pm Agenda I. Introduction / Overview 20 minutes II. Small Group Design Activity 60 minutes III. Small Group Report Out IV. Conclusion

More information

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R)

Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Appendix G.1: 6-20 year capital improvements program (CIP) - Repair and replacement (R&R) Action Park/projects Total 2,014 2,015 2,016 2,017 2,018 2,019 2020+ Athletic fields ac stop ep ace e t, o e u

More information

Appendix C - Existing Developed Parks

Appendix C - Existing Developed Parks Appendix C - Existing Developed Parks Table of Contents Appendix C Existing Developed Parks Table of Contents... Pg. i Introduction... Pg. ii Amos P. Catlin Park... Pg. 1 Beacon Hill Park... Pg. 1 Cambridge

More information

EXISTING CONDITIONS AND CHARACTER

EXISTING CONDITIONS AND CHARACTER DEMING HEIGHTS PARK LOCATION AND HISTORY Located in the Audubon Park neighborhood, Deming Heights Park is surrounded by a residential area. The first land for the park was acquired in 1913 along with the

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Wilds. Headwaters. Lakes. Oxbows. Falls

Wilds. Headwaters. Lakes. Oxbows. Falls 56 5 4 3 Wilds Headwaters Lakes Oxbows Falls 57 Zones It could be said the on-the-ground essence of this master plan appears within the next 6 pages of this report. As we learned in the preceding Cultural

More information

,271

,271 Reserve Analysis by Berrera and Company (January 2016) Page 1 Section I: Capital Reserve Funding - Estimated Cash Reserve Balances And Unfunded Liability: Effective 1/1/2019 Assumption Table: Interest

More information

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008 Lake Myra County Park Wake County, North Carolina Community Forum #2 June 12, 2008 Welcome and Introduction Meeting Agenda Welcome Introductions of Project Team Master Plan Process Community Forum #1 Updates

More information

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group

CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group CAPITAL PROJECTS LIST Pierce County Parks Impact Fee Working Group CAPITAL PROJECT LIST Based on extensive public outreach in 2008 and 2013-2014, the 2014 Parks, Recreation, and Open Space (PROS) Plan

More information

WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2

WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2 WEST JORDAN PARKS, RECREATION AND TRAILS MASTER PLAN Advisory Committee Meeting #2 MONDAY, NOVEMBER 5, 2018, 6:00 P.M.; PARKS DEPT. CONFERENCE ROOM ATTENDEES: Lisa Dean Larry Gardner Duane Harding David

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN CITY OF SOLDOTNA CITY HALL 77 N BIRCH ST. SOLDOTNA, AK 99669 STEPHANIE QUEEN, AICP SOLDOTNA CITY MANAGER SQUEEN@SOLDOTNA.ORG 907.714.1240 866.593.6994 KYLE KORNELIS, P. E., PUBLIC WORKS DIRECTOR KKORNELIS@SOLDOTNA.ORG

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

20 Grant s Trail. Planning Zone 3. Visit Date: September St. Louis County Parks Master Plan

20 Grant s Trail. Planning Zone 3. Visit Date: September St. Louis County Parks Master Plan 20 Grant s Trail Planning Zone 3 Visit Date: September 2016 Page 1 20 Grant s Trail Planning Zone 3 Visit Date: September 2016 Page 2 20 Grant s Trail Planning Zone 3 Visit Date: September 2016 Page 3

More information

Crookston Parks & Recreation Survey (Night To Unite 2016)

Crookston Parks & Recreation Survey (Night To Unite 2016) Crookston Parks & Recreation Survey (Night To Unite 2016) Overview There were 95 surveys that were filled out at this year s Night To Unite Event in Central Park on Tuesday, August 2nd. People that filled

More information

Public Works Department. Fiscal Year 2019 Projects

Public Works Department. Fiscal Year 2019 Projects Public Works Department Fiscal Year 2019 Projects Palm Avenue Drainage Improvements Description: Neighborhood drainage improvement and flood abatement Phase: Currently in design (began FY18) Schedule:

More information

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS

APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS Appendices Gwinnett County 2004 Comprehensive Parks and Recreation Master Plan APPENDIX E: SUMMARY OF PUBLIC MEETING QUESTIONNAIRE RESULTS March 2004 Monteith Brown Planning Consultants & The Jaeger Company

More information

Capital Planning City of Ocean City 1

Capital Planning City of Ocean City 1 City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block

More information

Inner Harbor 2.0. The resulting Inner Harbor 2.0 Plan provides a road map for a more sustainable, attractive and active Inner Harbor.

Inner Harbor 2.0. The resulting Inner Harbor 2.0 Plan provides a road map for a more sustainable, attractive and active Inner Harbor. Inner Harbor 2.0 In 2012, recognizing that some of the Inner Harbor infrastructure had outlived its useful life, the City completed a State of Good Repair Study, while Waterfront Partnership, along with

More information

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018

Former Middle School Site Green Space & Brecksville Road Streetscape. March 27, 2018 Former Middle School Site Green Space & Brecksville Road Streetscape March 27, 2018 Brecksville Streetscape & Downtown Greenspace Project Schedule City of Indepenence 2017 2018 Meeting Schedule Tasks/Deliverables

More information

Table B-1: P&RS Park and Facility Inventory by Classification 1 Outdoor Recreation Amenities Park Structures

Table B-1: P&RS Park and Facility Inventory by Classification 1 Outdoor Recreation Amenities Park Structures Appendix B: Park and Facility inventory APPENDIX B: PARK AND FACILITY INVENTORY Table B-1: P&RS Park and Facility Inventory by Classification 1 Outdoor Recreation Amenities Site Amenities Park Structures

More information

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION WASHTENAW COUNTY PARKS AND RECREATION COMMISSION - BUDGET PROPOSED FISCAL YEARS JANUARY 1, DECEMBER 31, And PROJECTED FISCAL YEARS JANUARY 1, DECEMBER 31, Robert L. Tetens, Director TABLE OF CONTENTS Millage

More information

Concert Tent Anderson Building Entry

Concert Tent Anderson Building Entry Anderson Park Renovation Concept #1 Concert Tent Anderson Park Renovation Concept #2 Concert Tent Anderson Park Renovation Concept #3 Concert Tent Anderson Park Renovation Concept Tally Renovation Concept

More information

Reserve Reports Providence Master Homeowners Association

Reserve Reports Providence Master Homeowners Association Reserve Reports Providence Master Homeowners Association Reserve Reports Providence Master Homeowners Association RESERVE SUMMARY REPORTS Providence Master Homeowners Association component inventory and

More information