Northwest Corridor LRT Line to Irving/DFW

Size: px
Start display at page:

Download "Northwest Corridor LRT Line to Irving/DFW"

Transcription

1 Northwest Corridor LRT Line to Irving/DFW SCOPING March 10, 2005

2 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions Next Steps

3 DART Project Development Process System Planning Ongoing Major Investment Study 1999 PE / Environmental Documentation Scoping March 10, 2005 Needs Assessment Select Alternative Record of Decision 2000 Spring 2007 Refine Alignment Final Design Approvals Pending Construction Operation Public meetings 1/21/04 (Project Introduction) 4/28/04 (Corridor Alternatives) 11/20/04 (Line Section Analysis)

4 NW to Irving/DFW 2000 MIS 2002 DFW Access Study

5 to North to North to Central to South I-3 Airport Access NW to Irving/DFW Corridor Analysis (4/28/04) North Central South I-2 Las Colinas Line Section Analysis (11/20/04) Alignment Refinement Potential Ridership Constructability Compatibility with Plans I-1 Urban Center Alignment Length Travel Time Activity Centers Station Population Station Employment Station Urbanization Station Access Station Needs TOD Potential Environmental Issues Public/Agency Support Capital Cost Cost per Mile ROW Acquisition Number of Crossings Design Complexity SH 114 Access Analysis to date: I-2 South Alignments Rated Highest

6 NW to Irving/DFW North (MIS Alignment) Central SH 161 SH 114 I-2 I-2 Lowest Potential Ridership Roadways/Development not Conducive to Transit Isolated Destinations Some TOD Potential Longest Route to DFW Some Opposition Good Ridership Potential Dense Development Limit TOD Potential SH 114 Expansion Plans Limited ROW Complex Design Complex Access Potential Displacement Avoid SH SH 161

7 NW to Irving/DFW South Preserved ROW I-2 Highest Ridership Potential Utilizes preserved rail ROW Public/Agency Support Shortest, Quickest Route to DFW Property Least Complex Good Transit Destinations High TOD Potential Pending Actions: Ridership Modeling Compare Alternatives Determine Parking Requirements & Bus activity Staff Recommendation DART Board Action System Plan Amendment Future Actions: Environmental Process Service Plan Amendment Alignment, Stations, Grade Separations Public Hearing

8 NW to I-3 13 th Station Irving/DFW DFW Access Issues: Engineering Issues Perimeter Taxiways Roadway Crossings Pedestrian Ways APM Tail track Operational Inefficiencies Atypical Terminus No System Expansion Other Rail Modes 13 th Station Interface Uncertain Operations

9 Northwest Corridor to Irving/DFW 13 th Station Terminal F DFW North I-3 DFW Access Options To North to 13 th Station To South to 13 th Station To South to DFW North (East) [Dash] To South to DFW North (West) To Central (Tunnel) to 13 th Station To South Surface to Terminal F To South Tunnel to Terminal F [DASH] I-1/I-2 Consider Project Phasing

10 Northwest Corridor to Irving/DFW I-1 & I-2 Line Section NW Hidden Ridge r rs B rme Beltline a to F DFW North UC ty i in r T U of D er v Ri llton arro California Crossing (future) South UC Federal Agency Participation USCOE FTA (Limited Involvement) FAA (Briefed 1/10/05) /C anch North Lake

11 FAA Issues: NW to Irving/DFW FAA to coordinate all DFW Rail Access EIS required for airport property use Includes I-1/I-2 Phase FAA: Lead Agency in Local Funded EIS Review entire corridor FAA must select the consultant to conduct the EIS (Significant Delays) DFW Beltline Hidden Ridge North Lake North UC California Crossing (future) South UC U of D

12 Northwest Corridor to Irving/DFW DFW North FAA Recommendation : Concur with Project Phasing Concept: Phase 1: To Irving Phase 2: To DFW Terminate the Irving Phase prior to DFW North Lake College as temporary terminus 13 th Station Terminal F Phase 2: To DFW I-3 Phase 1: To Irving I-1/I-2

13 NW to Irving/DFW FAA Recommendation Issues: North Lake Station As Terminus Access Parking (Beltline better choice as terminus) DFW Beltline Hidden Ridge North UC North Lake California Crossing (future) South UC Phase 2: Phase 1: To DFW I-3 To Irving I-1/I-2 U of D

14 DART NW to Irving/DFW DFW North February 23, DFW Access Coordination meeting DFW 13th Station Beltline Terminal F Hidden Ridge North UC North Lake California Crossing (future) South UC Phase 2: Phase 1: To DFW I-3 To Irving I-1/I-2 U of D The-T DCTA FTA FAA NCTCOG DFW

15 NW to Irving/DFW DFW North 13 th Station Terminal F February 23, DFW Access Coordination meeting All Rail Access to DFW will be coordinated with a Federal EIS LRT & Commuter Rail

16 NW to Irving/DFW California Crossing (future) South UC U of D llton arro Adds considerable process Official Notifications Official Review Extends length of study but may not impact overall schedule North UC /C anch North Federalizing Project: Lake r rs B rme Hidden Ridge a to F Phase 1: To Irving I-1/I-2 NW DFW Phase I can be extended to Beltline: Federal Fund portion of project Conduct Federal EIS FTA - Lead agency FAA - Co-Lead or Cooperating Agency Beltline Station must serve any DFW access option

17 Northwest Corridor to Irving/DFW Staff Recommendation (Pending Ridership Modeling) NW DFW a to F California Crossing (future) South UC U of D llton arro Phase 1: To Irving I-1/I-2 North UC /C anch North Lake r rs B rme Hidden Ridge

18 NW to Irving/DFW Scoping: Receive Early Public/Agency Input Purpose & Need Alternatives Significant Issues Agency Coordination Opportunities for Public Involvement

19 NW to Irving/DFW Scoping: Purpose & Need NW MIS Serve General NW-SE Travel Pattern Enhance Mobility Provide Additional Capacity Reduce Congestion Enhance Quality/Reliability of Transit Improve Safety & Operating Efficiency Strengthen Economic Conditions DFW Access Study To provide a seamless, customer sensitive, affordable, clearly achievable rail interface between the regional rail system and the DFW International Airport Central Terminal Area.

20 DFW North NW to Irving/DFW Scoping: Alternatives I-1/I-2 Alignment South? Central? North? Project Phasing Terminus Station Locations I-3:DFW Access 13th Station Terminal F South DFW to North to Central North Central South to South Hidden Ridge North Lake North UC California Crossing (future) South UC U of D

21 NW to Irving/DFW Scoping:Significant Issues Environmental Topics Included in EIS Land Use Air Quality Noise/Vibration Visual & Aesthetic Resources Wetlands Aquatic Habitat Wildlife Hydrology Water Quality Safety & Security Construction Impacts Cultural/Historic Resources 4(f) Parklands Environmental Justice

22 Northwest Corridor to Irving/DFW Scoping: Significant Issues NW a to F DFW 3 2 ty i in r T er v Ri 1 llton arro SPECIFIC ISSUES 1. Trinity River Crossing 2. Levee 3. Las Colinas APM 4. Campion Trail 5. Residential Adjacency 6. DFW Airport 7.???? 4 /C anch 5 r rs B rme 6

23 Northwest Corridor to Irving/DFW Scoping: Agency Coordination STATE TxDOT THC TR&W NW FTA FAA USACOE FHWA EPA a to F DFW FEDERAL r rs B rme /C anch Regional DFWIA NCTCOG ty i in r T er v Ri llton arro LOCAL The-T DCTA City of Irving City of Dallas DCURD

24 NW to Irving/DFW Scoping: Public Involvement Public Meetings ICAC Special Briefings Elected Officials Homeowner s Associations Boards (DCCCD, DFWIA, RTC) Organizations (Chambers, Schools, etc) Newsletter Quarterly Web Site Newsletters Presentations Documents

25 NW to Irving/DFW Project Schedule Current Project Implementation Schedule - Irving/DFW LRT Corridor Work Program Year PE/EA, I - 1 & 2 Line Sections PE/EA, I - 3 Line Section To Be Determined FD, I - 1 Line Section FD, I - 2 Line Section FD, Irving - 3 Line Section To Be Determined Const., I - 1 & 2 Line Sections Const., I - 3 Line Section Rev. Ops., I - 1 & 2 Line Sections Rev. Ops., I - 3 Line Section To Be Determined To Be Determined

26 NW to Irving/DFW Decisions Final Alignment Phasing Station Locations Parking, Buses, Access Grade Separations Environmental Impacts Mitigation

27 NW to Irving/DFW Next Steps: Ridership Modeling Agency Scoping Meeting Staff Recommendation to Board Project Phasing I-1/I-2 Alignment System Plan Amendment Environmental Documentation Develop I-3 Implementation Schedule Service Plan Amendment Alignment, Station Locations, Grade Separations

28 2000 Station Area Activity* NW to Station 6 Station 5 Station 4 N C S Irving/DFW I Station Area Activity* N *Includes Population, Employment and Students (1/2 Mile Radius) Station 6 Station 5 Station 4 C S

29 2000 Station 5 Activity Mix* NW to Irving/DFW Students Emp Pop I-2 0 North Central South 2030 Station 5 Activity Mix* Students Emp Pop *1/2 Mile radius 0 North Central South

30 NW to Irving/DFW 13 th Station I-3 DFW Tunnel Alternative (South to Central) Short and Direct Expensive and Complex Recommendation: Defer Tunnel Consideration South to North Second Rated Alternative 1.8 miles longer than to South + Time (2.25 minutes) + Money ($50M/mile) Greater complexity Greater potential to impact SH 114 Traffic South to South Highest Rated Alternative Shortest, fastest surface alignment to 13 th Station Lowest Cost Least Complex Lower potential to impact SH 114 Traffic

31 NW to Irving/DFW I-3 (DFW Access) South to South Through DFW to Multi-Modal Station (West) Addresses Operational Issues Less Complex Engineering Advantages to DFW, DART and Region No Direct Commuter Rail Service to DFW Rejected by The T and NCTCOG Commuter Rail 13 th Station Multi-Modal Station LRT

32 NW to Irving/DFW I-3 (DFW Access) Commuter Rail Analysis LRT Perimeter Taxiway Challenges: 1. Vertical Clearance LRT North LRT South Commuter Rail 2. Limited ROW LRT North 1 LRT

33 LRT NW to Irving/DFW I-3 (DFW Access) Com. Rail Analysis Perimeter Taxiway Challenges: 1. Vertical Clearance LRT North LRT South Commuter Rail 2. Limited ROW LRT North LRT

34 NW to Irving/DFW I-3 (DFW Access) Analysis Commuter Rail 2 LRT Perimeter Taxiway Challenges: 1. Vertical Clearance LRT North LRT South Commuter Rail 2. Limited ROW LRT North 1 LRT

35 NW to Irving/DFW Perimeter Taxiway Commuter Rail Original Configuration: Cross over SH Clearance Up to 1.9% Grade Pass under Taxiway 22 Clearance Up to 1.8% Grade New Configuration (500 shift) Cross over SH Clearance Up to 4.0% Grade Pass under Taxiway 22 Clearance Up to 5.0 % Grade LRT LRT

36 NW to Irving/DFW I-3 Possible Solutions: Move Taxiway Reduce Airport Roads Single Track Move SH 114 Tunnel/Aerial LRT South Alternative

37 Scenario 1 $26.6 M $9.0 M Addison Annual Operating Cost $21.0 M 13 th Station Hulen Total Annual O&M = $56.6 M Scenario 2 Addison Scenario 3 Addison 13 th Station $9.0 M $26.6 M $1.9 M (LRT) 13 th Station $21.0 M Hulen Total Annual O&M = $30.0 M Hulen Total Annual O&M = $28.5 M

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

I-3 DFW Extension Public Hearing. June 2, 2011

I-3 DFW Extension Public Hearing. June 2, 2011 1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings

More information

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012 US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

Link Union Station (LINK US)

Link Union Station (LINK US) Link Union Station (LINK US) Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017 Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Project Overview

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Union Station Queens Quay Transit Link Study

Union Station Queens Quay Transit Link Study Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon

I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, :00 AM to Noon I-35 Corridor Segment Committee 1 Meeting Notes 616 Six Flags Dive, Arlington, Texas March 3, 2010 9:00 AM to Noon Welcome Mark Mathews, the Facilitator, welcomed the I-35 Corridor Segment Committee 1

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

Grove Field Airport Environmental Assessment

Grove Field Airport Environmental Assessment Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

SCOPING INFORMATION PACKET

SCOPING INFORMATION PACKET SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,

More information

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018 West Santa Ana Branch Transit Corridor Community Meetings March 12, 13, 17 & 19, 2018 Purpose of this Meeting > Update on Public Scoping comments received > Why Metro is revisiting the Northern Alignments

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

Fort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR

Fort Lauderdale City Commission Transit Presentation. July 21, 2009 CAR Fort Lauderdale City Commission Transit Presentation July 21, 2009 CAR 109 0932 Agenda Overview City Transit Vision Commission Direction 2035 LRTP Long Range Transportation Plan THOR Transit/Housing Oriented

More information

Ontario Municipal Board Commission des affaires municipales de l Ontario

Ontario Municipal Board Commission des affaires municipales de l Ontario Commission des affaires municipales de l Ontario ISSUE DATE: July 25, 2014 CASE NO: PL130788 PROCEEDING COMMENCED UNDER subsection 17(36) of the Planning Act, R.S.O. 1990, c. P.13, as amended Subject:

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Miami Orlando Passenger Rail Project Overview

Miami Orlando Passenger Rail Project Overview Miami Orlando Passenger Rail Project Overview 1 The Historical Significance of Florida East Coast Industries Henry Flagler transformed Florida when he built his railroad FEC Railway connected cities along

More information

Public Informational Meeting

Public Informational Meeting Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives

More information

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013

LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions. Board of Airport Commissioners February 5, 2013 LAX Specific Plan Amendment Study (SPAS) Final EIR and Related Actions Board of Airport Commissioners February 5, 2013 1 Background The LAX Master Plan Program serves as the airport s long range development

More information

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

Executive Summary This document contains the Master Plan for T. F. Green Airport. The goal of a master plan is to provide a framework of potential future airport development in a financially feasible manner,

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS: SH 130 Project, Segments 5 & 6, Travis, Caldwell and Guadalupe counties; DFW Connector, Tarrant County; North Tarrant Express (NTE),

More information

Project Advisory Group. May 23, 2013

Project Advisory Group. May 23, 2013 Project Advisory Group May 23, 2013 1 Introductions and Review Review the three recommended Alternatives for detailed evaluation Next Steps Schedule and upcoming meetings Other discussion 2 Delay the Open

More information

PUBLIC SCOPING MEETING APRIL 2018

PUBLIC SCOPING MEETING APRIL 2018 Photo credit: Patrick Schneider PUBLIC SCOPING MEETING APRIL 2018 Welcome to the meeting! The Federal Aviation Administration (FAA) is preparing an Environmental Impact Statement (EIS) to evaluate the

More information

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures

NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures NextGen: New Technology for Improved Noise Mitigation Efforts: DFW RNAV Departure Procedures DFW International Airport Sandy Lancaster, Manager Noise Compatibility October 13, 2008 OUTLINE About DFW Airport

More information

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101 TRANSPORTATION ADVISORY BOARD 1) Call to Order 2) Adoption of Agenda Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101 NOTICE OF A MEETING of the PLANNING COMMITTEE Thursday, June

More information

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee Memorandum DATE August 10, 2018 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT Dallas Love Field Master Plan Update On Monday, August

More information

DOWNTOWN BRT ALTERNATIVE - 19th AVE

DOWNTOWN BRT ALTERNATIVE - 19th AVE DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing

More information

Chapter 4. Development Alternatives

Chapter 4. Development Alternatives Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined

More information

DRAFT PLAN & DRAFT EIR

DRAFT PLAN & DRAFT EIR DRAFT PLAN & DRAFT EIR April 27, 2017 Transportation Authority of Marin Meeting Matt Maloney, MTC Principal Planner Plan Bay Area 2040 establishes a 24-year regional vision for growth and investment. Image

More information

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017) ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,486,222 Award Type 1 - Strategic Awards to Small Transit Providers 2 - RTC Has

More information

GREATER ORLANDO AVIATION AUTHORITY

GREATER ORLANDO AVIATION AUTHORITY GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3

More information

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives June 1, 2018 Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Dallas Executive Airport Marketing Plan

Dallas Executive Airport Marketing Plan Dallas Executive Airport Marketing Plan Briefing for the Transportation & Environment Committee Department of Aviation December 13, 2010 Briefing Objectives Review Executive Airport Goals Growth opportunities

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment Figure ES-5 shows all of the possible LRT routes and stations identified for study in the Draft EIS/EIR. The features and impacts of each of the build alternatives are described in the following section.

More information

Metro Green Line to LAX. January, 2012

Metro Green Line to LAX. January, 2012 Metro Green Line to LAX 2 Agenda Context Airport Connection Types Project Process Questions and Discussion Los Angeles Lacks a Strong Airport Transit Connection 3 Airports in the U.S. with current or planned

More information

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016 CBT Phase 1/Wave Extensions AGENDA What is the CBT Phase 1 Project? Who are the Project Partners? Where is the Project Located?

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting November 3, 2011 Introduction Local lead agency: Metro Federal lead agency: Federal Transit

More information

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES November 6, 2017 Regular Meeting of Council Recommendation THAT Council: Approve the Maplewood Village Centre and

More information

Fort Lauderdale Hollywood International Airport

Fort Lauderdale Hollywood International Airport ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

Westbrook Station. Transit Oriented Development Opportunity

Westbrook Station. Transit Oriented Development Opportunity DEVELOPM Westbrook Station Transit Oriented Development Opportunity OPPOR Table of Contents Prime Real Estate Development Opportunity page 1 Calgary City of Opportunity page 3 What is Transit Oriented

More information

Item # 28. Chief Capital Management Officer Report. November 20, 2008

Item # 28. Chief Capital Management Officer Report. November 20, 2008 Item # 28 Chief Capital Management Officer Report November 20, 2008 1 Metro Gold Line Eastside Extension Project Update November 2008 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground)

More information

The Atlanta BeltLine. & Sustainable Development GAFM Conferance. // March 25, 2014

The Atlanta BeltLine. & Sustainable Development GAFM Conferance. // March 25, 2014 The Atlanta BeltLine & Sustainable Development GAFM Conferance // March 25, 2014 04/22/2014 Atlanta BeltLine // 2013 Page 1 // Organizational Structure Project Owner and Sponsor Redevelopment Authority

More information

Why we re here: For educational purposes only

Why we re here: For educational purposes only Transportation 2050 Why we re here: For educational purposes only Transportation 2050 Bus Elements PUBLIC TRANSIT DEPARTMENT City of Phoenix Citizens Committee on the Future of Phoenix Transportation (CCFPT)

More information

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff Route 110 Alternatives Analysis Public Meeting #2 April 27, 2015 East Farmingdale Fire Department 930 Conklin Street Source: Parsons Brinckerhoff Agenda Welcome/Project Background Jonathan Keyes Director,

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent

More information

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension by Bart Reed The Transit Coalition P.O. Box 567 San Fernando, CA 91341-0567 (818) 367-1661 1 Introduction Metro has released

More information

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Honolulu International Airport (HNL) Transit Rail Alignment Options Review

Honolulu International Airport (HNL) Transit Rail Alignment Options Review Honolulu International Airport (HNL) Transit Rail Alignment Options Review Presented to: Federal Transit, Region IX By: Debbie Roth, Acting Manager, Western-Pacific Region, Airports Division Steve Wong,

More information

Approval of August 2019 Service Changes

Approval of August 2019 Service Changes Approval of August 2019 Service Changes Operations, Safety & Security Committee April 9, 2019 Rob Smith AVP Service Planning and Scheduling 1 Today s Consideration Approve proposed August 2019 service

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019 Rapid Transit From Arbutus Street to UBC Policy and Strategic Priorities Council Meeting January 30, 2019 Agenda 1. A History of Planning for Broadway Rapid Transit 2. The Need for Broadway Rapid Transit

More information

Area of Potential Effect Report

Area of Potential Effect Report Area of Potential Effect Report Southeastern Pennsylvania Transportation Authority (SEPTA) King of Prussia Rail, Extension of the Norristown High Speed Line Upper Merion Township, Montgomery County, and

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Union Station Rail Corridor East

Union Station Rail Corridor East Union Station Rail Corridor East Community Advisory Committee CAC Meeting #2: Overview of Track Expansion Plans March 6, 2018 PURPOSE OF CAC MEETING #2 Future service requirements Infrastructure needed

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

Claremont Project Background and Update Community Meeting September 11, 2017

Claremont Project Background and Update Community Meeting September 11, 2017 Claremont Project Background and Update Community Meeting September 11, 2017 Topics Project Background Claremont Segment Information Project Timeline Upcoming Discussion Items Upcoming Meetings Questions

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008

More information

COMMENT PERIOD INTRODUCTION

COMMENT PERIOD INTRODUCTION To: Interested Persons From: Tom Buford File: Del Rio Trail Project Date: June 8, 2018 Community Development Department Reference: NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE DEL RIO

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

// Atlanta Streetcar System Plan

// Atlanta Streetcar System Plan // Atlanta Streetcar System Plan Citywide Conversation April 23, 2015 4/23/2015 Atlanta BeltLine // 2015 Page 1 // Overview A Supplement to the Connect Atlanta Plan and the ABI Strategic Implementation

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business

More information

Bonita to Bridgeport January 24, 2019

Bonita to Bridgeport January 24, 2019 Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita

More information

Corridor Management Committee Meeting. April 2, 2014

Corridor Management Committee Meeting. April 2, 2014 Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony

More information

October 23, 2017 Council Workshop

October 23, 2017 Council Workshop MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES October 23, 2017 Council Workshop COMMUNITY PLAN Purpose of Council Workshop Highlight What We Heard Phase 3 & Key

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING May 15, 2018 Master Plan Schedule Overview Progress Since Last Master Plan

More information

Recommended Performance Measures

Recommended Performance Measures Recommended Performance Measures January 2009 1 RECOMMENDED PERFORMANCE MEASURES Performance measures are utilized by the North Central Texas Council of Governments (NCTCOG) to monitor the performance

More information

Railway Master Plan in Tokyo (2016)

Railway Master Plan in Tokyo (2016) Railway Master Plan in Tokyo (2016) Future vision of railway network in Tokyo and necessary policies 7 July, 2017 Topic 1.Review of Railway Master Plan(2000) 2.New Railway Master Plan (2016) 3.Future vision

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Southwest LRT Alignment Video Narration

Southwest LRT Alignment Video Narration Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie.

More information

Newcastle Transport Program Newcastle Light Rail Determination Report

Newcastle Transport Program Newcastle Light Rail Determination Report Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction

More information