Bucharest, Romania October 29th 2014

Size: px
Start display at page:

Download "Bucharest, Romania October 29th 2014"

Transcription

1 Bucharest, Romania October 29th 2014

2 PTT.br Report of the FIFA World Cup Brazil 2014 Euro-ix 2014 Salvador Rodrigues da Silva Neto Equipe de Engenharia PTT.br

3 First of All CONGRATULATIONS TO THE BRAZIL 2014 FIFA WORLD CUP CHAMPIONSHIP WINNER!!!

4 Reference IXP - Internet exchange Point PTT Ponto de Troca de Tráfego

5 Goals This presentation intend to show highlights from the PTT.br report about the 2014 FIFA World Cup Brazil event. The target is to focus on infrastructure, traffic analyses, freezing period, impacts and benefits. Other relevant topics like planning and preparations will also be covered in summary.

6 Introduction Place of Brazil in the world BRAZIL Brazil is located in the South America continent. It is Km 2 wide.

7 PTT.br Current locations No connection between locations

8 PTT.br Host cities - World Cup PTT.br was already present in 11 of the 12 host cities

9 PTT.br Host cities - World Cup Activated PTT Cuiabá covering 12 host cities Cuiabá was last city activated

10 PTT.br - Structure of PTT.br in São Paulo In São Paulo there are 30 PIX connected to the Central PIX.

11 PTT.br - Structure of PTT.br in São Paulo In São Paulo there are 30 PIX connected to the Central PIX. Every Point-of-presence of PTT whichever location is connected via fiber optics to the Central and is called PIX.

12 PTT.br - Preparations for the games PTT.br thinks of the Worl Cup event since 2011 The network remodeling begun in 2012 estimated a lifetime duration until 2016 Visit to LINX to share their experience with the London 2012 Olympics preparations PTTForum (brazilian event that meet all brazilian AS) happens every year The 2013 PTTForum announced the preparations for the World Cup and the freezing period so that they could anticipate their connection growth

13 PTT.br - Live streaming of soccer games In Brazil the rights to make live video streaming of the event and the games are on TV Globo TV Globo is the largest open channel TV in Brazil and the second largest in the world The internet transmissions occurred exclusively through AS28604 Globo.com The Globo.com is the Web Portal of the largest media group in Brazil The Globo.com is connected to the São Paulo PTT.br and Rio de Janeiro PTT.br The expected traffic was high, as we had already seen a preview of the FIFA Confederations Cup Brazil 2013

14 PTT.br - Live streaming of soccer games Globo.com was attended on its infrastructure requests to PTT.br, that were: - 3 x 100Gbps connection capacity in São Paulo - 4 x 10Gbps connection capacity in Rio de Janeiro

15 Priorities before the World Cup PTT.br The priority until 60 days before the event was to maintain the existing locations doing capacity upgrade to support the amount of traffic that would be generated during the World Cup The largest number of capacity upgrades occurred in São Paulo PTT.br and Rio de janeiro PTT.br because of the amount of traffic already exchanged, opening ceremony, closing ceremony, the Press Center and streaming of existing video content.

16 PTT.br - Priorities before the World Cup It was expected that the amount of traffic would be higher in São Paulo and Rio de Janeiro because it was where the AS28604 is connected. The remaining locations received investments in accordance with the required demands Participants requests for activation and upgrade of connections in the Portal (My.ptt.br) Preparation of operating procedures to be executed during the World Cup if necessary

17 PTT.br - Physical upgrades before the World Cup Infrastructure activities executed before Operational Freezing Period at São Paulo PTT.br: Upgrade the Core Network Activation of other 2 Route Servers. In total 4 RSs Activation 7 Interfaces 100Gb for participants Capacity upgraded to PIXes 13 PIXes changed 116 new 10Gb interfaces active

18 PTT.br - Physical upgrades before the World Cup Infrastructure activities executed before Operational Freezing Period at São paulo PTT.br: Upgrade the Core Network Activation of other 2 Route Servers. In total 4 RSs Installation of 4 systems point to point DWDM Migration / Activation new network equipments Capacity upgrade to PIXes Activation of redundancy between the Central PIXes

19 PTT.br - Hours before freezing Closing of activities before the beginning of the freezing May 10th, 2014 around 22:30

20 PTT.br - Calendar Operational Freezing Period

21 PTT.br - Calendar Operational Freezing Period PTTForum 7 Freezing Period

22 PTT.br - Calendar Operational Freezing Period 60 DAYS START END MAY JUNE JULY GAMES The first 30 days of freezing were used to verify some final adjustment before the start of the World Cup.

23 PTT.br - Calendar Operational Freezing Period PTTForum FREEZING START DEC JAN FEB MAR APR MAY JUN 160 DAYS Participants were warned in PTT Forum 7 December 3th, 2013 five months before the period Operational Freezing

24 PTT.br - Importance of Operational Freezing The freezing period had as proposed not to receive new connections and changes in the active structure to ensure network stability and minimize external interference The model used was similar to that adopted by LINX (London Internet Exchange) months before Olympic games London in 2012 During this period the PTT.br team was dedicated in support Freezing was a success, because during the period we did not have problems in the structure of PTT.br

25 PTT.br - Requests for activation and / or upgrade Dec/13 to Sep/ Dec Jan Feb Mar Apr May Jun Jul Aug Sep Comparative chart with monthly order entry activation and / or upgrade

26 PTT.br - Requests for activation and / or upgrade Dec/13 to Sep/ Dec Jan Feb Mar Apr May Jun Jul Aug Sep Activation is the entry of a new participant Upgrade is to increase connection capacity of an already active participant

27 PTT.br - Requests for activation and / or upgrade Dec/13 to Sep/ Dec Jan Feb Mar Apr May Jun Jul Aug Sep Freezing period 136 requests for activation and / or upgrade were opened in April

28 PTT.br - Requests for activation and / or upgrade Dec/13 to Sep/ Dec Jan Feb Mar Apr May Jun Jul Aug Sep Freezing period Participants failed on planning?

29 PTT.br - Monitoring during the 2014 FIFA World Cup The PTT.br NOC is located in the NIC.br office at São Paulo city

30 PTT.br - Monitoring during the 2014 FIFA World Cup Distance between São Paulo and Rio de Janeiro 400 Km

31 PTT.br - Monitoring during the 2014 FIFA World Cup During the live streaming of Internet games, two 3 rd support analyst of the PTT.br staff stayed at PTT.br Network Operation Center (NOC) in São Paulo One 3 rd support analyst of the PTT.br staff was allocated in Rio de Janeiro during the whole event to act in case of emergencies

32 PTT.br - Monitoring during the 2014 FIFA World Cup Peak traffic Traffic of AS28604 in São Paulo PTT.br Highest peak AS28604 Occurred on the second day of World Cup It was a Friday

33 PTT.br - Monitoring during the 2014 FIFA World Cup Peak traffic Traffic of AS28604 in São Paulo PTT.br Highest peak AS28604 Occurred on the second day of World Cup It was a Friday

34 PTT.br - Monitoring during the 2014 FIFA World Cup Peak traffic Traffic of AS28604 in Rio de Janeiro PTT.br Highest peak AS28604 Occurred on the fifth day of World Cup It was a Monday

35 PTT.br - Monitoring during the 2014 FIFA World Cup Peak traffic Traffic of AS28604 in Rio de Janeiro PTT.br Highest peak AS28604 Occurred on the fifth day of World Cup It was a Monday

36 PTT.br - Monitoring during the 2014 FIFA World Cup Closing Traffic of AS28604 in São Paulo PTT.br

37 PTT.br - Monitoring during the 2014 FIFA World Cup Closing Traffic of AS28604 in São Paulo PTT.br Traffic peak of 50Gbps It was a Sunday

38 PTT.br - Monitoring during the 2014 FIFA World Cup Closing Traffic of AS28604 in Rio de Janeiro PTT.br

39 PTT.br - Monitoring during the 2014 FIFA World Cup Closing Traffic of AS28604 in Rio de Janeiro PTT.br Traffic peak of 2Gbps It was a Sunday

40 PTT.br All Locations Aggregated Exchanged Traffic Growth Petabytes

41 PTT.br All Locations Aggregated Exchanged Traffic Growth ~46 PetaBytes - September 2013 ~120 PetaBytes - September Petabytes

42 PTT.br All Locations Aggregated Exchanged Traffic Growth Petabytes World Cup Zoom Apr/2014 May/2014 Jun/2014 Jul/2014 Aug/2014 Sep/2014

43 PTT.br Sao Paulo Exchanged Traffic Comparison per Day Terabytes Aggregated Video A Video B Globo.com

44 PTT.br Sao Paulo Exchanged Traffic Comparison per Day Terabytes Aggregated Video A Video B Globo.com Games Start Games End

45 PTT.br Sao Paulo Exchanged Traffic Comparison per Day Terabytes Aggregated Video A Video B Globo.com Games Start Games End

46 PTT.br Sao Paulo Exchanged Traffic Comparison - Single Day Terabytes Aggregated Video A Video B Globo.com

47 PTT.br Sao Paulo Exchanged Traffic Comparison - Single Day 250 Jul 1 st 2014 Tuesday 200 Terabytes Aggregated Video A Video B Globo.com

48 PTT.br Sao Paulo Exchanged Traffic Comparison - Single Day Terabytes Aggregated Video A Video B Globo.com

49 PTT.br Sao Paulo Exchanged Traffic Comparison - Single Day 250 Jul 8 th 2014 Tuesday 200 Terabytes Aggregated Video A Video B Globo.com

50 PTT.br Sao Paulo Exchanged Traffic Comparison - Single Day Terabytes 150 Aggregated Video A Video B Globo.com

51 PTT.br Sao Paulo Exchanged Traffic Comparison - Single Day 300 Jul 13 th 2014 Sunday Terabytes 150 Aggregated Video A Video B Globo.com

52 PTT.br - After the Operating Freezing After operating freezing the activities of activation and upgrade process back to normal, but with a high number of requests Since the end of the operating freezing PTT.br team is working to lower the requests for activation and upgrade of capacity

53 PTT.br - What were the results of the preparations?

54 PTT.br - What were the results of the preparations? All work done resulted in an event no problem infrastructure supporting traffic generated during the period Some participants did not support the amount of traffic generated mainly in the first days and saturated their connections Some upgrades made by some participants will be used to the traffic growth for a long time (Legacy Cup) Improving the exchange of traffic at various locations and improving the quality of the Internet in Brazil

55 PTT.br - The future Olympic games 2016 Preparations have already begun for Olympic games 2016 in Rio The Participants that will need connection upgrade can already request at site My.ptt.br The message we leave is : "Participants should not delay! Time may be not enough!

56 Conclusions - Internet transmission of the 2014 FIFA World Cup over PTT.br IX was successfully done; - São Paulo PTT.br network infrastructure already established to support demand of big video streaming content providers brought enough robustness to support the 2014 FIFA World Cup event. - Traffic demanded by the 2014 FIFA Worl Cup demonstrated to be lower than traffic demanded by streaming content providers.

57 Thanks Thanks to Globo.com that authorized the use information of traffic exchange on AS28604 in São Paulo PTT.br and Rio de Janeiro PTT.br during the world cup

58 Information This presentation will also be done tomorrow by a member of PTT.br staff at LacNog 2014

59 PTT.br PTT Forum 8 São Paulo, Brazil The PTT Fórum 8 event will take place in São Paulo, Brazil on the 24 th and 25 th of November PTT Fórum normal audience is composed by Brazilian Autonomous Systems (AS) and PTT.br IX participants (some of them are international companies). The event will be translated between Portuguese and English. The event will be part of the Brazilian Internet Infrastructure week together with an IPv6 Forum and GTER/GTS (Network Engineering, Operation and Security Working Groups).

60 Thank you ptt.br October 29 th 2014

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

Network Operations Performance

Network Operations Performance User Forum 2013 Network Operations Performance Operations performance in 2012 Ged Boydell Head Operational Analysis & Reporting 23 January 2013 Traffic and Capacity/Delay headlines 32000 30000 28000 26000

More information

Hospitality partnership for Installers. May 2017

Hospitality partnership for Installers. May 2017 Hospitality partnership for Installers May 2017 Contents What is happening in the hotel market? What does this mean for their TV and wifi needs? What is the business opportunity and vision? How will a

More information

Fifa World Cup shakes Brazilian Tourism trends

Fifa World Cup shakes Brazilian Tourism trends Fifa World Cup shakes Brazilian Tourism trends The Study Main findings 10 main source countries 10 International arrivals Domestic travel Host cities Outbound Tourism from Brazil Trends The Study A study

More information

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat) INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/10-WP/08 South American Regional Office - Regional Project RLA/06/901 05/09/12 Assistance for the Implementation of a Regional ATM System, taking into account

More information

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items: TO: FROM: Mayor and Council Interim City Manager Rebecca Underhill, Director of Finance DATE: February 28, 2014 SUBJECT: Water Meter Project Analysis On March 28, 2012, Acting City Manager Mike Loftin

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 1 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

Tourism Snapshot. June 2015 Volume 11, Issue 6. A focus on the markets in which Destination Canada (DC) and its partners are active.

Tourism Snapshot. June 2015 Volume 11, Issue 6. A focus on the markets in which Destination Canada (DC) and its partners are active. Tourism Snapshot Tourism PEI / Paul Baglole A focus on the markets in which Destination Canada (DC) and its partners are active. www.destinationcanada.com June Volume 11, Issue 6 Key highlights Over the

More information

TABLE OF CONTENT LIST OF FIGURES

TABLE OF CONTENT LIST OF FIGURES CIVINET POLAND TABLE OF CONTENT 1 INTRODUCTION 3 2 GENERAL INFORMATION ABOUT THE NETWORK 3 2.1. Terms of reference 3 2.2. Support funding 3 2.3. Fee structure 3 2.4. Membership 4 2.5. Financial administration

More information

Cruise worldwide 2012

Cruise worldwide 2012 Cruise worldwide 2012 20,12 M passengers Nationalities 12,16M North America 5,64M Europe 2,32 Rest of the world 2% of global tourism Portugal Cruise passengers 783 750 945 738 1 066 963 1 219 614 1 314

More information

gringoes.com - Brazil Travel, Brazil Guide, Brazil - Brazil travel, Brazil guide, Brazil travel guide, Sao Paulo guide, with articles on Brazilian

gringoes.com - Brazil Travel, Brazil Guide, Brazil - Brazil travel, Brazil guide, Brazil travel guide, Sao Paulo guide, with articles on Brazilian Brazil Travel Guide gringoes.com - Brazil Travel, Brazil Guide, Brazil - Brazil travel, Brazil guide, Brazil travel guide, Sao Paulo guide, with articles on Brazilian culture, Sao Paulo entertainment and

More information

MARKET NEWSLETTER No 57 January 2012

MARKET NEWSLETTER No 57 January 2012 OVERVIEW OF INTRA-EUROPEAN UNION TRADING BETWEEN 2007/08 AND 2010/11 The data on intra-eu trade reported in this month s newsletter have been taken from the EUROSTAT database. However, it is important

More information

SYSTEM BRIEF DAILY SUMMARY

SYSTEM BRIEF DAILY SUMMARY SYSTEM BRIEF SUMMARY * ANNUAL (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR ON

More information

PERFORMANCE REPORT NOVEMBER 2017

PERFORMANCE REPORT NOVEMBER 2017 PERFORMANCE REPORT NOVEMBER 2017 Note: New FY2018 Goal/Target/Min or Max incorporated in the Fixed Route and Connection Dashboards. Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND In June

More information

Report for Jan-Nov-2006 pdf. General Statistics

Report for Jan-Nov-2006 pdf. General Statistics Report for Jan-Nov-006 pdf Time range: /8/006 07:3:37 - /3/006 3:50:6 Generated on Mon Jan 0, 007-9:3:5 General Statistics Summary Summary Hits Total Hits 97,06 Average Hits per Day 89 Average Hits per

More information

Number of tourism trips of residents increased namely for leisure

Number of tourism trips of residents increased namely for leisure Tourism Demand of Residents 1 st Quarter 2018 25 July 2018 Number of tourism trips of residents increased namely for leisure In the 1 st quarter 2018, residents in Portugal took a total of 4.5 million

More information

Annex/FANS 17. ADS/CPDLC Report EUR/SAM Corridor: Index. Systems Direction Navigation and Surveillance Division. 2. Traffic Data Summary

Annex/FANS 17. ADS/CPDLC Report EUR/SAM Corridor: Index. Systems Direction Navigation and Surveillance Division. 2. Traffic Data Summary Annex/FANS 17 ADS/CPDLC Report EUR/SAM Corridor: 2017 Systems Direction Navigation and Surveillance Division Index 2. Traffic Data Summary 3. Airlines Aircraft types 4. CRM 2017 results 5. Conclusions

More information

Noise Oversight Committee

Noise Oversight Committee Noise Oversight Committee May 8, 2014 Audio/Video recordings are made of this meeting 1 Item 1 Review and Approve Draft Meeting Minutes Minutes from March 19, 2014 2 Item 2 Review of Operations Report

More information

Visit Wales Research Update

Visit Wales Research Update Visit Wales Research Update 19 January 21 This update summarises tourism performance by drawing upon Visit Wales own research and information from other relevant sources. It is based upon information available

More information

Tourism Snapshot A focus on the markets in which the CTC and its partners are active

Tourism Snapshot A focus on the markets in which the CTC and its partners are active Tourism Snapshot A focus on the markets in which the CTC and its partners are active www.canada.travel/corporate June Volume 1, Issue 6 Key highlights CTC s overseas markets leaped 1% over the same month

More information

Board Box. October Item # Item Staff Page 1. Key Performance Indicators Sep 2018 M. Mungia Financial Report Aug 2018 H.

Board Box. October Item # Item Staff Page 1. Key Performance Indicators Sep 2018 M. Mungia Financial Report Aug 2018 H. Board Box October 2018 Item # Item Staff Page 1. Key Performance Indicators Sep 2018 M. Mungia 2-10 2. Financial Report Aug 2018 H. Rodriguez 11-15 ITEM 1 October 31, 2018 TO: FROM: RE: BOARD OF DIRECTORS

More information

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,

More information

BUSINESS BAROMETER December 2018

BUSINESS BAROMETER December 2018 Credit: Chris Orange BUSINESS BAROMETER December Credit: Nigel Moore 1 Contents Summary of findings 3 Annual monthly performance: visitor attractions..4 Visit Herts Team update 5 National context.8 Visitor

More information

Hokitika Gorge, West Coast. newzealand.com INDIA. Market information about our Visitors and our Active Considerers

Hokitika Gorge, West Coast. newzealand.com INDIA. Market information about our Visitors and our Active Considerers Hokitika Gorge, West Coast INDIA Market information about our Visitors and our Active Considerers newzealand.com PAST VISITORS HISTORIC VIEW TOTAL ARRIVALS YE MARCH 2018 AUS 1,495K 39% INDIA 63K 2% USA

More information

August 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

August 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport August 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport October 8, 2014 U.S. DOMESTIC INDUSTRY OVERVIEW FOR AUGUST 2014 All RNO Carriers Domestic Systemwide year over year comparison

More information

Tourism Snapshot A focus on the markets in which the CTC and its partners are active

Tourism Snapshot A focus on the markets in which the CTC and its partners are active Tourism Snapshot A focus on the markets in which the CTC and its partners are active www.canada.travel/corporate January 214 Volume 1, Issue 1 Key highlights Total arrivals from CTC s international markets

More information

October 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

October 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport October 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport December 4, 2013 U.S. DOMESTIC INDUSTRY OVERVIEW FOR OCTOBER 2013 All RNO Carriers Systemwide year over year comparison

More information

Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth

Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth Annual Weather Book RECORDED BY NW RESEARCH & OUTREACH CTR. By: Michael Leiseth Table I II 1 2 3 4 5 6 7 8 9, 10 11, 12 13, 14 15, 16 17 18 An average year in Crookston, MN. Seasonal extremes in Crookston,

More information

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective

Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective Managing And Understand The Impact Of Of The Air Air Traffic System: United Airline s Perspective NEXTOR NEXTOR Moving Moving Metrics: Metrics: A Performance-Oriented View View of of the the Aviation Aviation

More information

SSAA (VIC) MILDURA BRANCH - SUNRAYSIA PISTOL CLUB SCHEDULE OF EVENTS Class 1 Class 2 Class 3 Class 4 Sat Sun Wed Air Rimfire Less than.

SSAA (VIC) MILDURA BRANCH - SUNRAYSIA PISTOL CLUB SCHEDULE OF EVENTS Class 1 Class 2 Class 3 Class 4 Sat Sun Wed Air Rimfire Less than. Sunday 31 Dec - New Years Eve Monday 1 Jan - New Years Day 3-Jan 1 ISSF Air 15 Unlimited Rimfire 14 Unlimited Centrefire 56 Classic Pistol 6-Jan 1 ISSF Air 15 Unlimited Rimfire 14 Unlimited Centrefire

More information

PERFORMANCE REPORT DECEMBER 2017

PERFORMANCE REPORT DECEMBER 2017 PERFORMANCE REPORT DECEMBER 2017 Note: New FY2018 Goal/Target/Min or Max incorporated in the Fixed Route and Connection Dashboards. Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND Keith

More information

Overview of Japan s Sustainable Tourism Development

Overview of Japan s Sustainable Tourism Development Overview of Japan s Sustainable Tourism Development UNWTO Conference at Hyderabad, India Kazuyoshi Hasegawa Director of the Board & Secretary General Japan Association of Travel Agents April 2013 Index

More information

Coast to coast. STR Coastal Town Review Coastal Towns Market Review Report_JE.indd 3

Coast to coast. STR Coastal Town Review Coastal Towns Market Review Report_JE.indd 3 Coast to coast. STR Coastal Town Review 16 Coastal Towns Market Review Report_JE.indd 3 4//17 8:31:38 AM Table of Contents Introduction...3 United Kingdom...4 Blackpool...6 Bournemouth...8 Brighton...

More information

BRAZIL AEROSPACE BUSINESS SUMMIT

BRAZIL AEROSPACE BUSINESS SUMMIT hosted by: BRAZIL AEROSPACE BUSINESS SUMMIT 04-08 December 2017 in São José dos Campos, SP OVERVIEW 1. Sector overview 2. Brazilian aerospace cluster capabilities 3. Abroad project 4. Framework program

More information

METRO OPERATIONS COMMITTEE

METRO OPERATIONS COMMITTEE Los Angeles County Metropolitan Transportation Authority Item 1 CHIEF OPERATIONS OFFICER S S REPORT METRO OPERATIONS COMMITTEE Lonnie Mitchell Chief Operations Officer May 19, 20 1 Employee Recognition

More information

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association

International Transport Forum Paris February Jeffrey M. Zupan Regional Plan Association International Transport Forum Paris February 2013 Jeffrey M. Zupan Regional Plan Association Who Are We? Regional Plan Association Not for profit research, planning and advocacy organization in the New

More information

RIDERSHIP TRENDS. October 2017

RIDERSHIP TRENDS. October 2017 RIDERSHIP TRENDS October 2017 Prepared by the Division of Strategic Capital Planning December 2017 Table of Contents Executive Summary...1 Ridership...3 Estimated Passenger Trips by Line...3 Estimated

More information

LATIN AMERICA MEDIA KIT

LATIN AMERICA MEDIA KIT LATIN AMERICA MEDIA KIT 2017 AVIATION PLATFORM WWW.AEROMAGAZINE.COM.BR TWITTER.COM/AERO_MAGAZINE WWW.FACEBOOK.COM/AEROMAGAZINE INSTAGRAM.COM/AEROMAGAZINE AERO MEDIA - LATIN AMERICA EVENTS 2.000 Year 18.167

More information

Annual Performance Report. easier, faster, safer

Annual Performance Report. easier, faster, safer Annual Performance Report 2017 Content Introduction Choosing performance indicators Update on Corridor Traffic KPI 01: Traffic Volume (Total) KPI 02: Corridor Punctuality OM 01: Traffic Volume (Per Corridor

More information

CARICOM Single ICT Space Digital Transformation is a Journey

CARICOM Single ICT Space Digital Transformation is a Journey CARICOM Single ICT Space Digital Transformation is a Journey CARICOM ICT Cluster of Agencies The Agenda Ecosystem & Characteristics Req of the Single ICT Space Caribbean Competitiveness Progress Major

More information

July 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

July 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport July 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport August 31, 2012 U.S. DOMESTIC INDUSTRY OVERVIEW FOR JULY 2012 All RNO Carriers Systemwide year over year comparison Average

More information

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised 2017/2018 Q3 Performance Measures Report Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised Contents Ridership & Revenue... 1 Historical Revenue & Ridership...

More information

Residents ensure increase on overnight stays in hotels and similar establishments

Residents ensure increase on overnight stays in hotels and similar establishments 13 July 2018 Tourism Activity May 2018 Residents ensure increase on overnight stays in hotels and similar establishments Hotels and similar establishments registered 2.0 million guests and 5.4 million

More information

Tourism Portfolio Committee Cape Town International Airport Overview

Tourism Portfolio Committee Cape Town International Airport Overview 12 June 2015 Tourism Portfolio Committee Cape Town International Airport Overview CONTENTS 1. Welcome 2. Traffic and route development 3. Impact of new VISA regulations 4. Baggage performance trends 5.

More information

Rotorua. newzealand.com. argentina. Market information about our Visitors and our Active Considerers

Rotorua. newzealand.com. argentina. Market information about our Visitors and our Active Considerers Rotorua argentina Market information about our Visitors and our Active Considerers newzealand.com PAST VISITORS HISTORIC VIEW TOTAL ARRIVALS YE MARCH 2018 AUS 1,495K 39% INDIA 63K 2% USA 340K 9% GERMAN

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives Johannesburg International Airport Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006 BACKGROUND JNB current Master Plan Approved by ACSA Board in 1999 20-22 mppa?

More information

Easter boosts results in tourism accommodation

Easter boosts results in tourism accommodation 14 June 2017 Tourism Activity April 2017 Easter boosts results in tourism accommodation Hotel establishments recorded 1.9 million guests and 5.1 million overnight stays in April 2017, figures that relate

More information

COURSE DATES & PRICES 2019 NORTH AMERICA

COURSE DATES & PRICES 2019 NORTH AMERICA COURSE DATES & PRICES 2019 NORTH AMERICA SANTA MONICA SHORT TERM - CUT DURATION DAYS OF THE WEEK START DATES ABC CUT 1 5 DAYS MONDAY - FRIDAY Jan 7, 14 Feb 4, 18 Mar 4, 11 Apr 1, 15, 22 May 6, 20 Jun 3,

More information

COURSE DATES & PRICES 2019 NORTH AMERICA

COURSE DATES & PRICES 2019 NORTH AMERICA COURSE DATES & PRICES 2019 NORTH AMERICA SANTA MONICA SHORT TERM - CUT DURATION DAYS OF THE WEEK START DATES ABC CUT 1 5 DAYS MONDAY - FRIDAY Jan 7, 14 Feb 4, 18 Mar 4, 11 Apr 1, 15, 22 May 6, 20 Jun 3,

More information

December 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

December 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport December 2012 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport January 29, 2013 U.S. DOMESTIC INDUSTRY OVERVIEW FOR DECEMBER 2012 All RNO Carriers Systemwide year over year comparison

More information

Network Manager Adding value to the Network 29 September 2011

Network Manager Adding value to the Network 29 September 2011 Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety

More information

PERFORMANCE REPORT JANUARY Keith A. Clinkscale Performance Manager

PERFORMANCE REPORT JANUARY Keith A. Clinkscale Performance Manager PERFORMANCE REPORT JANUARY 2018 Keith A. Clinkscale Performance Manager INTRODUCTION/BACKGROUND Keith A. Clinkscale Performance Manager FIXED ROUTE DASHBOARD JANUARY 2018 Safety Max Target Goal Preventable

More information

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End SAM/IG/4 Appendix E to the Report on Agenda Item 5 5-E1 APPENDIX E 1. Airport demand/capacity analysis Sep 2008 Apr 2010 1.1 Prepare ATFM survey N/A Aug 2008 Project RLA/06/901 RO Finalised 1.2 Send survey

More information

Significant increase in accommodation activity but slightly less than in the previous month

Significant increase in accommodation activity but slightly less than in the previous month Tourism activity February 2015 15 April, 2015 Significant increase in accommodation activity but slightly less than in the previous month Hotel establishments recorded approximately 2.2 million overnight

More information

Tourism Snapshot. A focus on the markets in which the CTC and its partners are active. February 2015 Volume 11, Issue 2.

Tourism Snapshot. A focus on the markets in which the CTC and its partners are active. February 2015 Volume 11, Issue 2. Tourism Snapshot Tourism Whistler/Mike Crane A focus on the markets in which the CTC and its partners are active www.canada.travel/corporate February Volume 11, Issue 2 Key highlights The strong beginning

More information

ATM Network Performance Report

ATM Network Performance Report ATM Network Performance Report 2018. Page 1 of 16 Table of contents Summary... 3 Network Wide Performance... 4 Airborne delay... 4 Sydney... 6 Airborne delay... 6 Notable events... 6 Melbourne... 9 Airborne

More information

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018

Distributed Multi-Nodal ATFM Project Overview & Progress. ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/ Sep 2018 Distributed Multi-Nodal ATFM Project Overview & Progress ICAO MID ATFM/TF/1 & ICAO World Cup 2022 TF/1 23 27 Sep 2018 Introduction DISTRIBUTED MULTI-NODAL AIR TRAFFIC FLOW MANAGEMENT What We Are Trying

More information

2017/ Q1 Performance Measures Report

2017/ Q1 Performance Measures Report 2017/2018 - Q1 Performance Measures Report Contents Ridership & Revenue... 1 Historical Revenue & Ridership... 1 Revenue Actual vs. Planned... 3 Mean Distance Between Failures... 5 Maintenance Cost Quarter

More information

Evipaccesstickets.com

Evipaccesstickets.com Evipaccesstickets.com 213-977-7572-800-709-6595 vipaccess@evipaccesstickets.com *EVIP Access is in no way associated with FIFA, the Organizing Committee for the FIFA World Cup, Brazil 2014, Events Tickets

More information

Qantas Airport Retail Retailer Forum. June 2011

Qantas Airport Retail Retailer Forum. June 2011 Qantas Airport Retail Retailer Forum June 2011 Agenda 6 months in Review Airport Retail & Advertising Restructure Retail Development Overview Key Business Strategies Trading Performance Marketing Strategy

More information

State of the Aviation Industry

State of the Aviation Industry State of the Aviation Industry Presentation to the ACI Airport Economics & Finance 10 th 11 th February London, United Kingdom Laurie N. Price Director of Aviation Strategy Mott MacDonald Aviation Current

More information

O Hare Noise Compatibility Commission Technical Committee April 19, Proposed Interim Fly Quiet Runway Rotation Plan

O Hare Noise Compatibility Commission Technical Committee April 19, Proposed Interim Fly Quiet Runway Rotation Plan O Hare Noise Compatibility Commission Technical Committee April 19, 2016 Proposed Interim Fly Quiet Runway Rotation Plan O HARE MODERNIZATION ROD - FLY QUIET Record of Decision (ROD) was issued on September

More information

USING SPECIAL INTERESTS TO DRIVE TRAVEL. Chris Atkinson TNZ Marketing Communications Manager Sectors Wednesday 12 March, 9am

USING SPECIAL INTERESTS TO DRIVE TRAVEL. Chris Atkinson TNZ Marketing Communications Manager Sectors Wednesday 12 March, 9am USING SPECIAL INTERESTS TO DRIVE TRAVEL Chris Atkinson TNZ Marketing Communications Manager Sectors Wednesday 12 March, 9am Agenda 1. Introduction 2. Special Interest (SI) overview and definition 3. Recap:

More information

DASHBOARD DEC YOUR MONTHLY UPDATE FOR IOWA ONE CALL

DASHBOARD DEC YOUR MONTHLY UPDATE FOR IOWA ONE CALL Executive Summary Per the Board s request, we have added this Executive Summary to the Monthly Dashboard. We ll be including it from now on. It will provide you with a running total of the number of tickets

More information

BARRIER ISLAND STATION NEWSLETTER

BARRIER ISLAND STATION NEWSLETTER Dear Barrier Island Station Owners: BARRIER ISLAND STATION NEWSLETTER Happy New Year! We hope everyone had a wonderful holiday. It s hard to believe another year is behind us! Regardless of what time of

More information

3Q15 Results Conference Call

3Q15 Results Conference Call Results Conference Call November/2015 Economic-Financial Office and Investor Relations Office Notice This presentation may contain forward-looking statements referring to SABESP s business outlook. operating

More information

Latest market insights and marketing plans from VisitBritain/VisitEngland. Anke Monestel, VisitEngland 8 th February 2018

Latest market insights and marketing plans from VisitBritain/VisitEngland. Anke Monestel, VisitEngland 8 th February 2018 Latest market insights and marketing plans from VisitBritain/VisitEngland Anke Monestel, VisitEngland 8 th February 2018 1 Inbound tourism trends 2 Friday, February 9, 2018 2003 2004 2005 2006 2007 2008

More information

Domestic Visitation to the Northern Territory

Domestic Visitation to the Northern Territory \ YEAR ENDING SEPTEMBER Domestic Visitation to the Northern Territory 20 Year ending September 20 YEAR ENDING SEPTEMBER 20 DOMESTIC OVERNIGHT VISITORS IN THE NORTHERN TERRITORY VISITORS 1.55 MILLION NIGHTS

More information

U.S. DOMESTIC INDUSTRY OVERVIEW FOR OCTOBER 2010 All RNO Carriers Systemwide year over year comparison

U.S. DOMESTIC INDUSTRY OVERVIEW FOR OCTOBER 2010 All RNO Carriers Systemwide year over year comparison Inter-Office Memo Reno-Tahoe Airport Authority Date: November 22, 2010 To: Chairman and Board of Trustees From: Krys T. Bart, A.A.E., President/CEO Subject: RENO-TAHOE INTERNATIONAL AIRPORT OCTOBER 2010

More information

Sound Transit Operations June 2016 Service Performance Report. Ridership

Sound Transit Operations June 2016 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Jun-15 Jun-16 % YTD-15 YTD-16 % ST Express 1,622,222 1,617,420-0.3% 9,159,934 9,228,211 0.7% Sounder 323,747 361,919 11.8% 1,843,914 2,099,824 13.9% Tacoma Link 75,396

More information

Passenger and Cargo Statistics Report

Passenger and Cargo Statistics Report Passenger and Cargo Statistics Report RenoTahoe International Airport September 2016 U.S. DOMESTIC INDUSTRY OVERVIEW FOR SEPTEMBER 2016 All RNO Carriers Domestic Systemwide year over year comparison Average

More information

TOURISM NEW ZEALAND OUR VISITORS UNDERSTANDING <1% <1% <1% HISTORIC VIEW TOTAL ARRIVALS YE APRIL 2017

TOURISM NEW ZEALAND OUR VISITORS UNDERSTANDING <1% <1% <1% HISTORIC VIEW TOTAL ARRIVALS YE APRIL 2017 TOURISM JAPAN 102K 3% NEW ZEALAND UNDERSTANDING OUR VISITORS Our market infographics are drawn from two different sources. HISTORIC VIEW: Past Visitor Research This is information collected about those

More information

International Visitation to the Northern Territory. Year ending December 2017

International Visitation to the Northern Territory. Year ending December 2017 International Visitation to the Northern Territory Year ending December 2017 The following is a summary of information relevant to the Northern Territory (NT) tourism industry including visitation results

More information

Passenger and Cargo Statistics Report

Passenger and Cargo Statistics Report Passenger and Cargo Statistics Report RenoTahoe International Airport December 2015 U.S. DOMESTIC INDUSTRY OVERVIEW FOR DECEMBER 2015 All RNO Carriers Domestic Systemwide year over year comparison Average

More information

Performance monitoring report for the second half of 2015/16

Performance monitoring report for the second half of 2015/16 Performance monitoring report for the second half of 2015/16 Gatwick Airport Limited 1. Introduction DATE OF ISSUE: 7 JUNE 2016 This report provides an update on performance at Gatwick in the second half

More information

Urban Climate Change Research Network and ARC3.2

Urban Climate Change Research Network and ARC3.2 Urban Climate Change Research Network and ARC3.2 1 UCCRN Mission Provide knowledge that enables cities and metropolitan regions to fulfill their climate change leadership potential in both mitigation and

More information

Weekly Performance Update

Weekly Performance Update Pr. Rupert Vancouver Grain Monitoring Program Weekly Performance Update January, 19 For (1-19 CY) Summary 1. Stocks in Store (' tonnes) Country Elevators % of Working T his Week Last Week Var. fro m Last

More information

Kent Visitor Economy Barometer 2016

Kent Visitor Economy Barometer 2016 Kent Visitor Economy Barometer 2016 In 2016 Kent s Tourism Businesses saw 2 Summary 2016 saw a strong performance for attractions, although fluctuations did occur from month to month. Accommodation providers

More information

Sound Transit Operations December 2014 Service Performance Report. Ridership

Sound Transit Operations December 2014 Service Performance Report. Ridership Ridership Total Boardings by Mode Mode Dec-13 Dec-14 % YTD-13 YTD-14 % ST Express 1,266,130 1,396,787 10.3% 16,605,299 17,661,976 6.4% Sounder 248,710 285,016 14.6% 3,035,735 3,361,317 10.7% Tacoma Link

More information

Results of Tourism Activity Mexico, March 2017

Results of Tourism Activity Mexico, March 2017 Results of Tourism Activity Mexico, March Undersecretariat of Planning and Tourism Policy Available in http://www.datatur.sectur.gob.mx/sitepages/versionesrat.aspx DIRECTORy ENRIQUE DE LA MADRID CORDERO

More information

December 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

December 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport December 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport January 24, 2014 U.S. DOMESTIC INDUSTRY OVERVIEW FOR DECEMBER 2013 All RNO Carriers Domestic Systemwide year over year

More information

International Visitation to the Northern Territory. Year ending September 2017

International Visitation to the Northern Territory. Year ending September 2017 International Visitation to the Northern Territory Year ending September 2017 The following is a summary of information relevant to the Northern Territory (NT) tourism industry including visitation results

More information

NOISE OVERSIGHT COMMITTEE January 16, Audio recordings are made of this meeting

NOISE OVERSIGHT COMMITTEE January 16, Audio recordings are made of this meeting January 16, 2019 Audio recordings are made of this meeting ITEM 1 REVIEW AND APPROVAL OF NOVEMBER 28 TH MEETING MINUTES ITEM 2 REVIEW OF MONTHLY OPERATIONS REPORTS MSP OPERATIONS 31,371 JAN-15 29,038 35,119

More information

#1. Why is the City doing this project?

#1. Why is the City doing this project? Community Workshop #2 January 2016 #1. Why is the City doing this project? Broadway and Lincoln are in constant change Broadway and Lincoln are in constant change Broadway and Lincoln are in constant change

More information

Sailing Details - Wandkalender 2016

Sailing Details - Wandkalender 2016 Sailing Details - Wandkalender 2016 If you are searching for the ebook Sailing Details - Wandkalender 2016 in pdf form, then you've come to the faithful site. We present the utter option of this book in

More information

Advisory Circular. File No.: Z U Issue No.: 01

Advisory Circular. File No.: Z U Issue No.: 01 Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5

More information

Finding Rationality in an Irrational World: The Economics of Successful Hotel Negotiations

Finding Rationality in an Irrational World: The Economics of Successful Hotel Negotiations Finding Rationality in an Irrational World: The Economics of Successful Hotel Negotiations Isaac Collazo, Vice President, Performance Strategy & Planning, InterContinental Hotels Group (IHG) Maria Lowry,

More information

Assessing the Impacts of ENSO on South American Agriculture

Assessing the Impacts of ENSO on South American Agriculture Assessing the Impacts of ENSO on South American Agriculture Mark Brusberg United States Department of Agriculture Office of the Chief Economist / Presented to: The International Symposium on Synergistic

More information

Passenger and Cargo Statistics Report

Passenger and Cargo Statistics Report Passenger and Cargo Statistics Report Reno-Tahoe International Airport December 2014 U.S. DOMESTIC INDUSTRY OVERVIEW FOR DECEMBER 2014 All RNO Carriers Domestic Systemwide year over year comparison Average

More information

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84 Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84 MR. DON GETTY PROJECT MANAGER Kentucky Lock Addition Nashville District 19 July 2017 The views, opinions and findings contained

More information

International Visitation to the Northern Territory. Year ending March 2017

International Visitation to the Northern Territory. Year ending March 2017 International Visitation to the Northern Territory Year ending March 217 The following is a summary of information relevant to the Northern Territory tourism industry including visitation results from

More information

RIDERSHIP TRENDS. January 2018

RIDERSHIP TRENDS. January 2018 RIDERSHIP TRENDS January 2018 Prepared by the Division of Strategic Capital Planning March 2018 Table of Contents Executive Summary...1 Ridership...3 Estimated Passenger Trips by Line...3 Estimated Passenger

More information

PM Measurements at the Port of Patras

PM Measurements at the Port of Patras POSEIDON Pollution monitoring of ship emissions: an integrated approach for harbours of the Adriatic basin Priority 2: Environmental Protection Topic 1: Sources of land-based and sea-based pollution Deliverable

More information

AUGUST 2008 MONTHLY PASSENGER AND CARGO STATISTICS

AUGUST 2008 MONTHLY PASSENGER AND CARGO STATISTICS Inter-Office Memo Reno-Tahoe Airport Authority Date: October 2, 2008 To: Statistics Recipients From: Tom Medland, Director Air Service Business Development Subject: RENO-TAHOE INTERNATIONAL AIRPORT PASSENGER

More information

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline Domestic Scheduled Enplaned Passengers by Airline Alaska Airlines 7,070 4,331 63.2% 59,552 42,265 40.9% 1.2% 1.0% Virgin America 0 803-100.0% 12,231 803 1423.2% 0.3% 0.0% Allegiant Air 1,333 2,063-35.4%

More information