1 1 SAN FRANCISCO INTERNATIONAL AIRPORT Runway Safety Area Program ACI-NA Operations and Technical Affairs Conference April 7, 2011

2 RSA Status Completed RSA Studies Environmental Assessment ongoing and on track. EA Draft submittal in June. FAA Environmental determination expected in November. Construction phasing analysis complete. Operational impacts analysis complete. Proposed RSA schedule has been agreed to by FAA. Facilities has begun design work. 2

3 Existing Conditions Key: Non-standard Safety Areas Standard Safety Areas San Francisco Bay Runway 10L-28R Runway 10R-28L Runway 1L-19R Runway 1R-19L 3 3

4 Arrival and Departure Flows Departures West Plan Heavy Departures Arrivals 4 4

5 Arrival and Departure Flows Arrivals Southeast Plan Departures 5 5

6 RSA Study Convened Pier Working Group Conference Calls and Presentations to Airlines Cost Estimates Construction Environmental Mitigation SF Bay Fill Environmental Screening EMAS Analysis Risk Assessment ACRP Report Applied Research Associates (ARA) Created two separate RSA studies 6

7 RSA Study SFO RSA Working Group: FAA ATCT, Region, ADO; SFO Planning, Facilities, Operations, Finance, Legal, Governmental Affairs, Communications, COO Conducted according to FAA Order , Runway Safety Area Program, which describes the basic concept alternatives that airport sponsors need to consider. Wide range of alternatives identified and analyzed in order to meet Public Law Alternatives considered include filling SF Bay or relocation of U.S.101. to improve existing RSAs. Working Group considered operational and environmental impacts, along with determining feasibility of meeting the 12/31/2015 deadline. 7

8 Runways Five basic concepts considered: Construct standard safety areas Relocate/shift runway Reduce runway length Implement declared distances Install EMAS One preferred alternative declared distances. One enhanced preferred alternative: Includes runway extension to 10R to maintain existing takeoff and landing distances. Analyzed runways as a pair, rather than individually. 8

9 Runways Preferred Alternative Proposed project components include: Displace arrival thresholds by 300 ft to accommodate 600-ft long arrival RSA. Relocate Approach Light Systems. Shifting RW in 100 increments limits ALS pier work. Relocate co-located Glideslopes. 9

10 Runways Proposed project components include: Runway 10R threshold relocated 771 feet west: Maintains takeoff and landing distances for 10R Reduces bad WX delays with 499-foot threshold stagger. Relocate RW 28L Localizer. Realign taxiways to relocated Runway 10R threshold. 10

11 Runways Declared Distances 11

12 Runways 1-19 Summary Site constraints: SF Bay and Highway 101. Critical to evaluate as a pair of runways, rather than individually. Five basic concepts considered none deemed practicable. 37 Alternatives developed that combined the five basic concepts Narrowed to 15 by combining/deleting alternatives that were similar In order to narrow 15 alternatives to shortlist, evaluation matrix was developed Five alternatives shortlisted One preferred alternative Non-standard EMAS

13 Short List Selection Tool In order to narrow down the Refinement Alternatives to a Short List, a Decision Tree was developed. It is comprised of three main questions: 1. Close Taxiway A? 2. Reduce the effective runway length? 3. Add bay fill or construct a platform? 13 13

14 Runways 1-19 Evaluation Matrix Close Taxiway A? Yes No Reduce Runway? Reduce Runway? Yes No Yes No Bay fill Platform? Bay fill Platform? Bay fill Platform? Bay fill Platform? Yes No Yes No Yes No Yes No N/A N/A R9 R7 N/A IV-11 IV-15 R3, R4, R5, R8, R10, R11, R12 R1, R2, R6 14

15 Runways 1-19 Short List Alternatives 15 15

16 Runways 1-19 Short List Alternatives 16 16

17 Runways 1-19 Short List Alternatives 17

18 Runways 1-19 Short List Alternatives 18 18

19 Runways 1-19 Short List Alternatives 19 19

20 Runways 1-19 Preferred Alternative Proposed project components include: Install nonstandard EMAS on Runways 19L & 19R. Shift Runways south. Realign taxiways. Demolish existing runway ends and taxiways. Relocate RW 19L Glideslope. Relocate a light station/trestle with side bars by existing increment of 200 ft. 20

21 Runways 1-19 Preferred Alternative Proposed project components include: Shift both Runways south. Install nonstandard EMAS on ends of Runways 1L and 1R. Realign Taxiway A. Fill open surface water detention basins; replace with underground water drainage pipes, new stormwater detention basin, pump station, and outfall pipes. Relocate electrical substation outside of taxiway object free area. Realign airport security fence and vehicle service road

22 RSA Construction RSA Construction expected to begin in April 2012 Airport has completed a schedule that meets the December 31, 2015 deadline (completion in October 2014) Construction phasing analysis complete for Runways 1/19. Looked at limited runway closings, closing runways individually, and closing both together. Operational impacts analysis complete. Shows closing Runways 1/19 simultaneously is preferable to closing individually. Airline briefing in May Construction will be done in three (3) phases 22

23 RSA Construction Phase 1, 2012 Work expected to begin in Spring of 2012 Construction activities include: Relocate RW 28L localizer; Pave RW 10R threshold relocation (Sept. completion); Begin pier work; Begin utility work for RWs 28L/R threshold displacement. RW 28L limited to landing only during paving. Southfield work also to begin during this phase. 23

24 RSA Construction Phase 2, 2013 Construction activities include: Relocate glide slopes for RWs 28L/R; Install new RW 28L approach lights; Relocate RW 28R approach lights; Displace RWs 28 L/R landing thresholds. Southfield work continues during this phase. Runway closures expected for two (2) days on each runway. 24

25 RSA Construction Phase 3, 2014 Full closure of both RWs 1/19 for approximately 4 months (June Sept.) Construction activities include: Relocate Taxiway A; Shift RWs 1/19 south; Construct new RW entrance taxiways; Relocate glideslope and approach lights for RW 19L; Install EMAS. Expected RW openings by second week of October, prior to Fleet Week. Substantial completion of RSA program 1 year ahead of Congressional mandate. 25

26 Next Steps Perform aerial survey in summer months. Complete NEPA and CEQA environmental review process. Obtain environmental permits. Complete design documents for Runways 10/28. Continue quarterly meetings with FAA and OAK Contract with ESCO for design services. This also reserves SFO s dates for installation. Contact: Michael Lawrance michael.lawrance@flysfo.com

PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport. December 28, 2017

PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport. December 28, 2017 PUBLIC NOTICE Passenger Facility Charge Application #8 San Francisco International Airport December 28, 2017 Introduction Pursuant to 14 Code of Federal Regulations ( CFR ) Part 158.24, the San Francisco

More information

Winona Runway Shift Project

Winona Runway Shift Project Winona Runway Shift Project Sandy DePottey Dakota-Minnesota ADO Fall MnDOT FAAWorkshop St Cloud, Minnesota November 5, 2014 Update on 0 0 Challenges we faced The main runway 12/30 at Winona Municipal Airport

More information

CHAPTER 2.0 ALTERNATIVES

CHAPTER 2.0 ALTERNATIVES CHAPTER 2.0 ALTERNATIVES 2.1 INTRODUCTION 2.1.1 SCOPE OF THE ALTERNATIVES ANALYSIS This chapter summarizes the screening analysis conducted to identify the range of reasonable and practicable alternatives

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

Dallas Executive Airport

Dallas Executive Airport 648 DECLARED DISTANCE OPTION 1a DISPLACE 31 THRESHOLD BY 97 Considers RSA Limiting Factor No runway extensions 13 31 TORA 6,451 6,451 TODA 6,451 6,451 ASDA 5,958 6,451 LDA 5,958 6,354 Runway 17-35 (3,8

More information

Chapter One PROJECT DESCRIPTION

Chapter One PROJECT DESCRIPTION Chapter One PROJECT DESCRIPTION Environmental Impact Report Monterey Peninsula Airport 1.1 INTRODUCTION This Environmental Impact Report (EIR) analyzes and documents the potential environmental impacts

More information

Appendix D Airfield Ongoing Projects Alternatives

Appendix D Airfield Ongoing Projects Alternatives Appendix D Appendix D D.1 Introduction The set of alternatives for each of the airfield facilities was compared with respect to each other and the existing condition. 1 The screening and evaluation process

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

D.1 Introduction. Ronald Reagan Washington National Airport

D.1 Introduction. Ronald Reagan Washington National Airport Appendix D. Alternatives D.1 Introduction Federal Aviation Administration (FAA) Orders 1050.1E, Environmental Impacts: Policies and Procedures, and 5050.4B, National Environmental Policy Act (NEPA) Implementing

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

II. Purpose and Need. 2.1 Background

II. Purpose and Need. 2.1 Background II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Appendix F Cultural Resource Consultation

Appendix F Cultural Resource Consultation Appendix F Cultural Resource Consultation FAA Consultation Letter to the California State Historic Preservation Officer Response Letter from the California State Historic Preservation Officer STATE

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

2015 PURDUE ROAD SCHOOL March 11, 2015

2015 PURDUE ROAD SCHOOL March 11, 2015 2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

MEETING MINUTES Page 1 of 5

MEETING MINUTES   Page 1 of 5 Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Friedman Memorial Airport Authority. Regular Meeting September 4, 2012

Friedman Memorial Airport Authority. Regular Meeting September 4, 2012 Friedman Memorial Airport Authority Regular Meeting September 4, 2012 UNFINISHED BUSINESS Airport Solutions Blaine County Report Airport Solutions City of Hailey Report Airport Solutions Airport Manager

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

REPORT TO THE BOARD OF DIRECTORS

REPORT TO THE BOARD OF DIRECTORS REPORT TO THE BOARD OF DIRECTORS RECOMMENDATION TO PURCHASE ENGINEERED MATERIAL ARRESTING SYSTEMS FROM ENGINEERED ARRESTING SYSTEMS CORPORATION AT RONALD REAGAN WASHINGTON NATIONAL AIRPORT MARCH 2013 ACTION

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

The San Diego Region s Air Transportation Future

The San Diego Region s Air Transportation Future The San Diego Region s Air Transportation Future June 22, 2006 1 Ryan N. Hall, Airport System Planner II San Diego County Regional Airport Authority Presentation Overview 1. The law 2. The ballot measure

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

FAA RECAT Phase I Operational Experience

FAA RECAT Phase I Operational Experience FAA RECAT Phase I Operational Experience WakeNet-Europe Workshop 2015 April 2015 Amsterdam, The National Aerospace Laboratory (NLR) Tittsworth (FAA Air Traffic Organization) Pressley (NATCA / IFATCA) Gallo

More information

Public Information Meeting. September 2015

Public Information Meeting. September 2015 W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers

More information

CatExes vs. EAs When and How to Prepare

CatExes vs. EAs When and How to Prepare CatExes vs. EAs When and How to Prepare Panel: Steve Culberson, Ricondo & Associates Frank Smigelski, FAA Mary Vigilante, Synergy Tuesday December 10, 2013 Washington, DC 1 So you have a project Do I have

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS

CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CHAPTER 9 RUNWAYS AND AIRFIELD DEVELOPMENTS CANBERRA AIRPORT IS THE ONLY 24 HOUR BOEING 747, B777-300 AND A340 CAPABLE AIRPORT...BETWEEN BRISBANE AND MELBOURNE. 9 Runway and airfield developments Airports

More information

LOS ANGELES INTERNATIONAL AIRPORT MAY 2014

LOS ANGELES INTERNATIONAL AIRPORT MAY 2014 1. Purpose and Need 1.1 Introduction The City of Los Angeles, through its aviation department, Los Angeles World Airports (LAWA), proposes to construct improvements to the Runway Safety Area (RSA) for

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 2.0 PURPOSE AND NEED The Purpose and Need Statement in a NEPA document is a formal declaration of the overall goals and objectives of a proposed project. This statement documents the justification for

More information

FAA Office of Airport Safety and Standards

FAA Office of Airport Safety and Standards FAA Office of Airport Safety and Standards Airport and Runway Safety and Technology Presented to: Pan American Regional Aviation Safety Team (PA-RAST) By: Michael Meyers, Deputy Manager Airport Engineering

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

CHAPTER 2 ALTERNATIVES

CHAPTER 2 ALTERNATIVES CHAPTER 2 ALTERNATIVES 2.1 ALTERNATIVES INTRODUCTION An Environmental Impact Statement (EIS) describes and discusses the significant environmental impacts that would be caused by the Proposed Action, its

More information

Study Committee Meeting. September 2015

Study Committee Meeting. September 2015 W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,

More information

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE BRIEFING ON RONALD REAGAN WASHINGTON NATIONAL AND WASHINGTON DULLES INTERNATIONAL AIRPORTS CAPITAL CONSTRUCTION PROGRAM APRIL 2015 2015 Use & Lease

More information

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment

Morristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment 1.0 INTRODCTION Morristown Municipal Airport (hereinafter referred to as MM or Airport ) is a busy general aviation reliever airport owned by the Town of Morristown and operated by DM AIRPORTS, LTD. (hereinafter

More information

KSFO RNAV TO GLS DEMONSTRATION

KSFO RNAV TO GLS DEMONSTRATION Delta Air Lines - Noah Flood GLS GLS DTT 1.9 DTT 1.9 GLS1 GLS1 KSFO RNAV TO GLS DEMONSTRATION Key Components Three Key Components 1. Global Navigation Satellite System A. GPS/Galileo/GLONASS 2. Ground

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

AGENCY SCOPING MEETING

AGENCY SCOPING MEETING AGENCY SCOPING MEETING Environmental Impact Statement (EIS) Conducted for the Friedman Memorial Replacement Airport in the Wood River Region of South Central Idaho December 4, 2007 1:00 p.m. 4:00 p.m.

More information

Environmental Assessment Las Vegas Area Airspace Optimization Project

Environmental Assessment Las Vegas Area Airspace Optimization Project Environmental Assessment Las Vegas Area Airspace Optimization Project John Williams, Senior Vice President, Ricondo & Associates, Inc. ACI-NA Environmental Affairs Committee Conference May 16, 2013 Halifax,

More information

Update on the Aspen/Pitkin County Airport Improvements

Update on the Aspen/Pitkin County Airport Improvements Update on the Aspen/Pitkin County Airport Improvements and EA Process Public Information Meeting September 10, 2015 Meeting Objectives Explain what has changed since we had our last meeting and how it

More information

3.9 AIRPORT SUPPORT FACILITIES

3.9 AIRPORT SUPPORT FACILITIES 3.9 AIRPORT SUPPORT FACILITIES This section details additional airfield facilities that may be required over the next 20 years. 3.9.1 Airport Rescue and Fire Fighting (ARFF) Station GEG is certified under

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update Appendix D Project Newsletters Tacoma Narrows Airport Master Plan Update This appendix contains the newsletters distributed throughout the project. These newsletters provided updates and information on

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

Wake Turbulence Standards

Wake Turbulence Standards Recategorization of ICAO Wake Turbulence Standards RECAT Phase I Overview Joint FAA/EUROCONTROL Project Three year study (25 meetings) RECAT Team Comprised of worldwide wake turbulence and aviation experts

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

Chapter 4. Development Alternatives

Chapter 4. Development Alternatives Chapter 4. Development Alternatives Chapter 4. DEVELOPMENT ALTERNATIVES This chapter identifies and evaluates airport development alternatives to fulfill the facility requirements for the airport as defined

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

Special Modification To Standards Process for Airplane Design Group VI. The Boeing Federal Aviation Administration

Special Modification To Standards Process for Airplane Design Group VI. The Boeing Federal Aviation Administration Special Modification To Standards Process for Airplane Design Group VI The Boeing 747-8 Presented to: ACI-NA First B-747-8 Airport Compatibility Meeting By: George Legarreta, Office of Airport Safety and

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014 CHICAGO DEPARTMENT OF AVIATION AND THE O HARE MODERNIZATION PROGRAM Current Construction Projects May 2, 2014 O HARE INTERNATIONAL AIRPORT CURRENT CONFIGURATION 2 PHASE 1 & COMPLETION PHASE 9L-27R Completed

More information

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th

More information

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

A Love Note from Me to You

A Love Note from Me to You Community Weekly Update for September 8- September 14, 2012 A Love Note from Me to You Dear Neighbors, Please be advised that we have a scheduled closure of our Preferential Runway 13R/31L (Denton) Friday

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Elevating the Upstate

Elevating the Upstate Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement

More information

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update

Chapter Seven Implementation Plan. Tacoma Narrows Airport. Master Plan Update Chapter Seven Implementation Plan Master Plan Update This chapter presents the 20-year improvement program for the continued development of the. The objectives of this chapter are to identify projects

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT 7 7.1 GENERAL The primary objective of this chapter is to evaluate potential development alternatives and identify

More information

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA

AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting

More information

NorCal Metroplex Update: Review of the FAA Initiative Interim Response

NorCal Metroplex Update: Review of the FAA Initiative Interim Response NorCal Metroplex Update: Review of the FAA Initiative Interim Response Presented By: Adam Scholten, Port of Oakland Airspace Consultant, HMMH April 18, 2018 Agenda The FAA s Initiative Summary of the FAA

More information

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007 Wake Vortex R&D Status Briefing NBAA Convention By: Steve Lang Date: September 2007 Topics for Today Wake Turbulence Program Overview Near Term Achievements The Future Wake Program Activities Near-Term

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

SAN FRANCISCO AIRPORT COMMISSION MINUTES

SAN FRANCISCO AIRPORT COMMISSION MINUTES SAN FRANCISCO AIRPORT COMMISSION MINUTES March 6, 2012 9:00 A.M. Room 400 - City Hall #1 Dr. Carlton B. Goodlett Place (400 Van Ness Avenue) City and County of San Francisco EDWIN M. LEE, MAYOR COMMISSIONERS

More information

Technical Advisory Committee Meeting February 29, 2016

Technical Advisory Committee Meeting February 29, 2016 Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2.

EXECUTIVE SUMMARY. Master Plan Update Phase 2/3 FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 1. INTRODUCTION 2. MASTER PLAN UPDATE Phase 2/3 Draft Final Summary Report Report Issued 2010 in association with Prepared for Broward County Aviation Department Main Office 555 Airport Blvd., Suite 300 Burlingame, CA 94010

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03 DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information