Presentation to Working Group II-B, UTTIPEC
|
|
- Dylan Alexander
- 6 years ago
- Views:
Transcription
1 Integrated transit corridor development and street network/connectivity plan for the corridor/influence zone along with details of all intersections and mid-sections based on traffic and feasibility studies for the corridor/network: Outer Ring Road from Modi Mill Flyover to IIT Gate Presentation to Working Group II-B, UTTIPEC 1
2
3 Key Map showing the Project Corridor Ring Road OuterRing Road 3 1-E (A)
4 Project Corridor marked on Master Plan of Delhi Modi Mill(ROB-22) to IIT Gate 4 1-E (A)
5 Project Corridor marked on Zonal Development plan 1-E (A)
6 STUDY AREA CHARCTERISTICS ON GOOGLE MAP Modi Mill Outer 1-E (B)
7 LOCAL STREET NETWORK PLAN IIT Panchsheel Malviya Nagar Chirag Delhi Savitri Cinema Nehru Place Modi Mill (ROB-22) 1-E (C)
8 SURVEY BASE MAP EXISTING ROAD BUILDING FOOTPRINT ROAD LEVELS EXISTING BUS STOP Modi Mill flyover A Nehru Place Sri Aurobindo Marg IIT Panchsheel D Malviya a Nagar C Chirag Delhi Savitri Cinema 2-E 8(A)
9 Section -A TO OKHLA Building Footprints TO IIT ROW-45m ROW-45m 2-E 9(A)
10 Section -B Building Footprints Nehru Place ROW-45m 2-E 10(A)
11 Section -C Building Footprints Savitri Cinema Chirag Delhi ROW-45m 2-E 11(A)
12 Section -D Building Footprints Malviyanagar IIT Panchsheel ROW-45m 2-E 12(A)
13 PHOTO DOCUMENTATION 2-E (B)
14 3-arm signalized intersection of Outer Ring Road and Captain Gaur Marg 3 arm signalized intersection with unidirectional flyover (Kalkaji Flyover) Reduced width of carriageway due to Bhairon temple on LHS of Outer Ring Road General view of 4 arm signalized intersection with 2-way flyover at Nehru Place 2-E (B)
15 Ongoing metro construction work at Chiragh Delhi General View of Outer Ring Road near Panchsheel Metro construction under progress near the toe of Panchsheel flyover View showing IIT Gate 2-E (B)
16 16 2-E (B)
17 17 2-E (B)
18 18 2-E (B)
19 19 2-E (B)
20 2-E 20 (B)
21 2-E (C)
22 Key Plan showing Traffic Survey Locations Modi Mill flyover IIT Malviya Nagar Chirag Delhi Nehru Place Kalkaji LEGEND TVC Survey locations OD Survey Locations Pedestrian Survey Location Savitri Cinema 22 2-E (C)
23 Traffic and Travel Characteristics
24 Traffic Volume characteristics at intersections during Base Year ( 2016 ) S.No 1 Peak Hour Traffic Volume (in PCU) Morning Evening Outer Ring Road Aurobindo Marg (IIT Gate ) Outer Ring Road Maharishi Dayanand Marg (Panchsheel ) Outer Ring Road Josip Broz Tito Marg (Chirag Delhi ) Outer Ring Road GK 2 Main Road (Savitri Cinema ) Outer Ring Road Lala Lajpat Rai Road (Nehru Place ) Outer Ring Road Ma Anandmayee Marg (Kalkaji Mandir ) Outer Ring Road Captain Gaur Marg (Modi Mill ) E (C)
25 Key Plan Showing Speed and Delay Nodes 2-E (C) Speed and Delay Nodes Speed-Delay Survey Network
26 Speed and Delay characteristics along project corridor NODES DISTANCE JOURNEY TIME IN SECONDS STOPPED DELAY WITH REASON TIME EXCLUDING DELAY AVERAGE JOURNEY SPEED RUNNING SPEED FROM TO (m) (SECONDS) SECONDS (Km/h) (Km/h) Congestion Congestion Congestion Metro Construction Congestion Congestion
27 Traffic Zones delineated for the purpose of this study 27 2-E (C)
28 Desire line diagram for two wheelers in the study area 2-E (C)
29 Desire line diagram for four wheelers in the study area 2-E (C) 65
30 Desire line diagram for LCVs in the study area 2-E (C) 66
31 Desire line diagram for Trucks in the study area 2-E (C)
32 Peak hour Traffic Volumes on different sections for Base year (2016) Volume (pcu) v/c MODI MILL INTERSECTION KALKAJI INTERSECTION NEHRU PLACE INTERSECTION PANCHSHEEL INTERSECTION CHIRAG DELHI INTERSECTION SAVITRI CINEMA INTERSECTION Volume (pcu) v/c Volume(pcu) v/c Volume (pcu) v/c Volume (pcu) v/c Volume (pcu) v/c E (C) 63
33 Peak hour Traffic Volumes on different sections for Design year (2036) Volume (pcu) v/c MODI MILL INTERSECTION KALKAJI INTERSECTION NEHRU PLACE INTERSECTION PANCHSHEEL INTERSECTION CHIRAG DELHI INTERSECTION SAVITRI CINEMA INTERSECTION Volume (pcu) v/c Volume(pcu) v/c Volume (pcu) v/c Volume (pcu) v/c Volume (pcu) v/c E (C) 69
34 IIT Panchsheel Chirag Delhi Nehru Place Malviya Nagar Savitri Cinema 3-E 34
35 PROPOSED IMPROVEMENT OPTIONS 35
36 COMPOSIT LAYOUT PLAN TO OKHLA Kalkaji Mandir Savitri Cinema Nehru Place IIT TO RK PURAM Panchsheel Malviya Nagar Chirag Delhi 36
37 Option-1 Existing Flyover B Proposed Underpass A A Captain Gaur Marg B Layout Plan for Ch to Ch 1.000
38 Option-2 D D Layout Plan for Ch to Ch 1.000
39 Option-3 Captain Gaur Marg Existing Flyover F F Proposed Flyover Layout Plan for Ch to Ch 1.000
40 Option-4 Captain Gaur Marg Proposed Flyover Existing Flyover G G Layout Plan for Ch to Ch 1.000
41
42
43
44
45
46
47
48
49
50
51 51
52 Ring Road from Bhairon Marg to DND Flyway 1.Length of Corridor: 5 Km 2. No. of s: 4 3. No. of Grade Separators: 3 Bhairon Marg PURANA QUILA Uni-Directional Flyover at NH-24 Bypass Uni-Directional Flyover at Sarai Kale Khan Barapullah Elevated Corridor over Ring Road Barapullah Elevated Corridor DND
53 Traffic and Travel Characteristics
54 Key Plan showing Traffic Survey Locations LEGEND TVC Survey locations OD Survey Locations Pedestrian Survey Location
55 Peak Hour Traffic Volume at s during Base Year ( 2016 ) S.No Peak Hour Traffic Volume (in PCU) Morning Evening 1 NH-24 Bypass and Ring Road Ring Road Bhairon Marg Sarai Kale Khan
56 Traffic Zones delineated for the study DELHI(UT)BOUNDARY 25 ZONE BOUNDARY ZONE NUMBER ZONE CENTROID
57 Travel Desire Line diagram for 2-Wheelers in the study area Rohini Haryana, Punjab, J&K etc. Shahdra MeeraBagh Pitampura Laxmi Nagar Gaziabad Dwarka Noida Greater-Noida Nehru Place Gurgaon Khanpur Faridabad Veh Trips VehTrips Veh Trips Above 2000 VehTrips
58 Travel Desire Line diagram for 4-Wheelers in the study area Rohini Haryana, Punjab, J&K etc. MeeraBagh Pitampura Shahdra Gaziabad Dwarka Noida Greater-Noida Gurgaon Khanpur Faridabad Veh Trips VehTrips Veh Trips Above 2000 VehTrips
59 Base Year (2016) Peak hour Traffic volume and V/C Ratio for different segments (Without Project) Bhairon Marg 1 2 3
60 Base Year (2016) Peak hour Traffic volume and V/C Ratio for different segments (With Project) Bhairon Marg 1 2 3
61 Design Year (2036) Peak hour Traffic volume and V/C Ratio for different segments (Without Project) Bhairon Marg 1 2 3
62 Design Year (2036) Peak hour Traffic volume and V/C Ratio for different segments (With Project) Bhairon Marg 1 2 3
63 CH 1000 Ring Road Sarai Kale Khan ROW-90 m Existing Flyover Proposed Flyover Layout Plan for Ch to Ch 1.000
64 To ITO Sarai Kale Khan Proposed Flyover at Sarai Kale Khan
65 Cross Section for Proposed flyover at Sarai Kale Khan
66 Right turning ramp at Sarai Kale Khan intersection
67 EXISTING FLYOVER ROW-90 m ROW-90 m Ring Road - NH-24 Bypass ( Integration with Proposal of NHAI)
68 B B To ITO Ring Road To ASHRAM ROW-90 m PROPSED UNDERPASS Layout Plan for Ch to Ch 4.000
69 Cross Section for Proposed Underpass
70 Proposed Tunnel To Purana Quila Proposal of Underground Tunnel at ITPO Area
71 /
Road Development in India - State Initiatives
Road Development in India - State Initiatives PWD, Delhi Government Initiatives, Issues, Opportunities, and Challenges Er. Manu Amitabh (Principal Director, New Initiatives & CPM PWD ) Public Works Department
More informationContents. 1. DMRC Advertising A Brief Insight. 2. Benefits of advertising at DMRC. 3. Media Options & Solutions
Contents 1. DMRC Advertising A Brief Insight 2. Benefits of advertising at DMRC 3. Media Options & Solutions Advertising at Delhi Metro - A Brief Insight Deep Penetration & Huge Commutership Over the years,
More informationLINGAYA S UNIVERSITY TRANSPORT DEPARTMENT
BUS ROUTE NO.- 1D BUS NO. HR38S5132 (BITTO TOUR & TRAVELS) MR. JITENDER KUMAR (PROCTORIAL) (MOB- 9015347080) 1. VIKAS PURI H3 (DDA MARKET) 6:30 AM 2. VIKAS PURI (OXFORD SCHOOL) 6:34 AM 3. VIKAS PURI KG
More informationEPCA Report No. 33 (March 2007) Report on intercity public transport needs In the matter of W.P. (C) No of 1985; M.C. Mehta v/s UOI & others
EPCA Report No. 33 (March 2007) Report on intercity public transport needs In the matter of W.P. (C) No.13029 of 1985; M.C. Mehta v/s UOI & others 1. The city of Delhi is getting measures to combat its
More informationShri N.S. Kang, IAS Addl. Secy & DG (CGHS) Dr. D.C.Joshi, Director (CGHS)
Shri N.S. Kang, IAS Addl. Secy & DG (CGHS) asdgcghs-mohfw@nic.in Dr. D.C.Joshi, Director (CGHS) cghsdirector@gmail.com Dr. Pradeep Kumar adhq.cghs@yahoo.com Dr. Poonam Puri, Additional Director (SZ), CGHS
More informationPRESENTING THE NEXT LEVEL IN BUSINESS DESTINATION AMENITIES
PRESENTING THE NEXT LEVEL IN BUSINESS DESTINATION AMENITIES As businesses go futuristic, smarter offices become more relevant. This not just enhances efficiency but also maximises ease of business. At
More informationL&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)
National Highways Authority of India (Ministry of Shipping, Road Transport & Highways) 4 Laning of the Existing 2 Lane Section from Km. 80.050 (Jadcherla) to Km. 135.740 (end of Kothakota Bypass) On NH-44
More informationAlternatives Study of Alignment
Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:
More informationPROPOSED BRT SYSTEM NETWORK
TRANSPORT DEMAND FORECAST & DEVELOPMENT OF AN INTEGRATED MULTI-MODAL PUBLIC TRANSPORT NETWORK FOR NCT of DELHI PROPOSED BRT SYSTEM NETWORK presentation by RITES Ltd March 04, 2011 DELHI METRO AND BRT CORRIDORS
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationREIMBURSEMENT FACILITY
List - B S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Name of the Hospital and Address Aarogya Hospital Sector-VI, Vaishali Ghaziabad Ahooja Eye & Dental Institute 560/1, Dayanand Colony, New Railway Road, Gurgaon-122001
More informationDELHI METRO TRAIN WRAPS & (Authorised Marketing Associate for Advertising through Delhi Metro Trains on Line I, II, III & IV)
DELHI METRO A Presentation on TRAIN WRAPS & Delhi s Pride AMetro Ride INSIDE TRAIN BRANDING (Authorised Marketing Associate for Advertising through Delhi Metro Trains on Line I, II, III & IV) INTRODUCTION
More informationDRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017
DRAFT 11.08.17 4801 24TH AVE NE URBAN DESIGN MERIT PRESENTATION 17-002 DPD#3027312 16 NOVEMBER 2017 PROJECT BACKGROUND URBAN DESIGN ANALYSIS VACATION / NO-VACATION COMPARISON URBAN DESIGN MERIT INTRODUCTION
More informationDPR's Submitted for Delhi
DPR's Submitted * All the Cost Parameters are Rs in lakhs S. No Project Code Project Title Sector Agency Status Status Date Proposed Vetted Approved 1 DEL-001 Corridor Improvement of S.P. Mukherjee Marg
More informationLondon Borough of Barnet Traffic & Development Design Team
London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair
More informationRegional Rapid Transit System in NCR Driver of Balanced and Sustainable Regional Development Vinay Kumar Singh, MD, NCR Transport Corporation
NARAH PANIPAT GOHANA BARAUT SONEPAT BAGHPAT TO BHIWANI ROHTAK KUNDLI MEERUT UTTAR PRADESHNH24 BAHADURGARH JHAJJAR GHAZIABAD HAPUR DELHI South-West HARYANA NOIDA TO MURADABAD GULAOTHI GURGAON FARIDABAD
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationName of retail store Address and Weekly Holiday Contact No. 1 Andrews Ganj Road No.4, Qr. No.9 & 11, Andrews Ganj, New Delhi (Wednesday )
S. No. Name of retail store Address and Weekly Holiday Contact No. 1 Andrews Ganj Road No.4, Qr. No.9 & 11, Andrews Ganj, New Delhi (Wednesday ) 26265816 2 ASI (Janpath) ASI Building, Janpath, New Delhi
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More informationSCOPING INFORMATION PACKET
SCOPING INFORMATION PACKET Project Description The proposed project would provide a direct link connecting several light rail lines in operation or in construction, including the Metro Gold Line to Pasadena,
More informationNetwork Size and Growth
16.50 25.10 30.30 11.40 5.10 9.63 10.00 8.26 64.94 km 208.24 Overview Network Size and Growth At present, metro systems are operational in seven cities in India Bengaluru, Chennai, Delhi, Gurgaon, Jaipur,
More informationSouth of Fraser Transportation Priorities March 2017 Engagement
March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The
More informationStatus Report as on March 2017 Department of Women and Child Development, Govt of NCT of Delhi, ICDS
Report as on March 2017 Department of Women and Child Development, Govt of NCT of, ICDS Total Jan Aahaar Vans-41 Functinal - 28, - 13 S.NO. Name of NGO Address of NGO 1 Dalit Prahari D-126/1, Kh. No.-510/211-212,Harijan
More informationInformation for Investors
Information for Investors Why to Invest in Commercial? High Return on investment Rental (6-10%) It is the annual rent earned on a property divided by the market value of the property. In Residential Property
More informationhba Adjoining Tech Zone, Sector 27, Yamuna Expressway (Opp. Gautam Budh Universrty & Night Safari)
Adjoining Tech Zone, Sector 27, Yamuna Expressway (Opp. Gautam Budh Universrty & Night Safari) Gives you every reason to celebrate your life... Here you find enough space inside your home as well as outside
More informationCorridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:
Corridor of growth Corridor Description and Rating Areas Included: NEW GURGAON Sectors 76, 77, 78, 79, 79A, 79B, 80, 81, 81A, 82, 82A, 83, 84, 85, 86, 88, 88A, 88B, 89, 89A, 90, 91, 92, 93, 95 and 95A
More informationAssignment 9: APM and Queueing Analysis
CEE 4674: Airport Planning and Design Spring 2014 Assignment 9: APM and Queueing Analysis Solution Instructor: Trani Problem 1 a) An international airport has two parallel runways separated 800 meters
More informationPROJECT : IT/ RETAIL PARK
PROJECT : IT/ RETAIL PARK Destination Greater Noida Connectivity City of the Future Connectivity Air 60 min drive from Indira Gandhi International Airport (T3). 40 min drive from proposed air port. Road
More informationLUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS
LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118
More informationUBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019
UBC RAPID TRANSIT OPINION STUDY RESULTS January 2019 UBC RAPID TRANSIT OPINION STUDY RESULTS In field November 14 20, 2018 Conducted by Research Co. (Mario Canseco) Online survey of 1,900 adults in Metro
More informationPOYSHA INDUSTRIAL ESTATE. N.I.T. Faridabad
N.I.T. Faridabad Welcome to Haryana Take a closer look at this vibrant, fast-growing State where you will nd the perfect infrastructure for a perfect location for an enduring and pro table investment.
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationTechnical Paper 1 Traffic report
Technical Paper 1 Traffic report 1 Contents List of Tables... 3 List of Figures... 4 Preface... 6 Terminology... 7 1 Executive summary... 8 1.1 1.2 1.3 1.4 1.5 1.6 Background to this report... 8 Traffic
More informationDETAILS OF BUS ROUTES DELHI PUBLIC SCHOOL MATHURA ROAD
DETAILS OF BUS ROUTES DELHI PUBLIC SCHOOL MATHURA ROAD MR-05 Discontinued with effect from 16 th August 2018. DTC 34, School Bus 02 performs 03 routes, PRIVATE BUS 02 AS ON DATE 01.11.2018. JUNIOR ROUE
More informationDecisions where applications for information rejected. 4. No. of times various provisions were invoked. 4b.
Annexure-I NATIONAL UNIVERSITY OF EDUCATIONAL PLANNING AND ADMINISTRATION (Declared by the Govt. of India under Section 3 of the UGC Act 1956) 17-B, Sri Aurobindo Marg, New Delhi-110016 Proforma for Annual
More informationBESTECH GROUP. BESTECH has an envious portfolio to its credit, with a formidable in-house construction arm engaged across the four verticals.
1 BESTECH GROUP BESTECH, a Real Estate Conglomerate, with an expertise of over two decades encompassing developments relating to Residential, Commercial, Retail and Hospitality. Established as one of the
More informationCorrigendum No. 1. for
Corrigendum No. for Open Bid for licensing of bare spaces divided amoungst Packages at metro stations of lines,,, & 6 for commercial utilizations (Bid No. 6M0006) Bid Document & Draft License Agreement
More informationF.No.ll(163)/2017/PWD-II/Vs/ )\Aq\Dated:
GOVT. OF NCT OF DELHI CRETARIAT: 5 LEVEL: I DELHI SECTT.: I.P.ESTATE: NEW DELHI F.No.ll(163)/2017/PWD-II/Vs/ )\Aq\Dated: CD No. 057447589I' To, Dy. Secretary, Delhi Legislative Assembly, Question Branch,
More informationInterstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by
Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section
More informationPlanning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.
Project No. 121-22908 N o v e m b e r 2 0 1 2 Traffic Impact Study Transportation Planning th GENIVAR Inc., 600 Cochrane Drive, 5 Floor, Markham, Ontario L3R 5K3 Telephone: 905.475.7270 Fax: 905.475.5994
More informationLUXURY RESIDES HERE WITH AFFORDABILITY SHRI RADHA SKY PARK SHRI RADHA SKY GARDENS-PHASE II. Call:
LUXURY RESIDES HERE WITH AFFORDABILITY GARDENS-PHASE II RERA REGN. No. UPRERAPRJ12851 RERA Website: www.up-rera.in GARDENS-PHASE II Panorama of breathtaking splendor BUDGET FRIENDLY HOMES 1-2-3 BHK Luxury
More informationLUXURY RESIDES HERE WITH AFFORDABILITY SHRI RADHA SKY PARK SHRI RADHA SKY GARDENS-PHASE II
LUXURY RESIDES HERE WITH AFFORDABILITY GARDENS-PHASE II RERA REGN. No. UPRERAPRJ12851 RERA Website: www.up-rera.in GARDENS-PHASE II Panorama of breathtaking splendor BUDGET FRIENDLY HOMES 1-2-3 BHK Luxury
More informationNORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY
NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS
More informationProject Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)
Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District Primary County (3 char abrv) Facility Name (i.e. route, rail, terminal,
More informationBuilding Level Planning Committee March 30, 2016
Arlington Public Schools Wilson School Site Evaluation Traffic Analysis and Pick-up/Drop-off location Building Level Planning Committee March 30, 2016 1 SAN ANTONIO-BEXAR COUNTY PEDESTRIAN SAFETY ACTION
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationWilliamsburg Town Hall Meeting
Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW
More informationFeasibility Study for the Improvement of the National Route 2 and Route 7 Final Report CHAPTER 8 EXISTING TRAFFIC CONDITIONS
CHAPTER 8 EXISTING TRAFFIC CONDITIONS 8 EXISTING TRAFFIC CONDITIONS Various traffic surveys have been carried out in order to analyze existing traffic condition in the study area. Traffic survey location
More informationPocket H-1593 C.R. Park New Delhi Tel No , Fax: Director
Pocket H-1593 C.R. Park New Delhi Tel No -011-40575122, 40575133 Fax: 011-40575144 E-mail: westwindengineers@gmail.com Director RITESH ROY Contact No:- +91-9958232626, 9810495353 1 EMPANELMENT OF HVAC
More informationConnectivity continues to remain one of the biggest concerns for north Chennai residents with thousands of commuters struggling every day
Employment North Chennai is primarily an industrial area and is governed by business and trader community, locomotive workshops, government offices and port related activities. Chennai Port and Ennore
More informationPhasing & Cost Estimates
15 Phasing & Cost Estimates Phasing & Cost Estimates Transport system development is highly costly and calls for long gestation period. Concerted efforts need to be made to mobilize resources from a variety
More informationDENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study
DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate
More informationMONTGOMERY COUNTY PUBLIC SCHOOLS BETHESDA-CHEVY CHASE MIDDLE SCHOOL #2 SAMAHA ASSOCIATES, PC
SITE B-CC MS #2 SITE ANALYSIS PROGRAM CONCEPT OPTIONS PRESENTED DEVELOPED CONCEPT OPTIONS 4, 5, AND 6 FEASIBILITY STUDY PLAN OPTION 1 FEASIBILITY STUDY SITE SECTION OPTION 1 FEASIBILITY STUDY SITE SECTION
More informationOne Under-rated achievement of the Delhi Master Plan MPD 2021 wins the ISOCARP award 2008 for Urban planning.
1 One Under-rated achievement of the Delhi Master Plan 2021 MPD 2021 wins the ISOCARP award 2008 for Urban planning. Citation by ISOCARP on the award to the MPD 2021 team "For the capacity to articulate
More informationDear All, Here is a further update on the Commission s effort to get meaningful section 4 compliance of the RTI Act.
From: section4monitoring@googlegroups.com on behalf of Shailesh Gandhi [rtimonitoring@gmail.com] Sent: 13 August 2010 16:14 To: section4monitoring@googlegroups.com; subhashchandraagrawal@gmail.com; rakesh@nyayabhoomi.org;
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationTABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2
Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationMEMBERS OF THE GOVERNING COUNCIL
MEMBERS OF THE GOVERNING COUNCIL 1. Shri Virbhadra Singh Hon ble Union Minister Micro, Small & Medium Enterprises, New Delhi 2. Shri R.K. Mathur Secretary, Government of India, New Delhi 3. Shri S. Chandra
More informationChapter 2: Entire US287 Corridor
Chapter 2: Entire US287 Corridor The US287 Study Area spans four incorporated jurisdictions and two counties. Due to the length and density of infrastructure along the US287 Study Area, corridor-wide maps
More informationTRAFFIC ADVISORY LEAFLET
TRAFFIC ADVISORY LEAFLET 3/06 High Occupancy Vehicle Lanes December 2006 INTRODUCTION The concept of using designated lanes for buses is well understood and widely used by highway authorities in urban
More informationexpect faridabad's finest
expect faridabad's finest TO GURGAON ARAVALI M. V.N. INTERNATIONAL SCHOOL MANAV RACHNA TO BADKHAL BADKHA L MORE ESCORTS HOSPITAL FARIDABAD SEC-21D SEC-21C SEC-41-42 SRS MALL ESCORTS TRACTOR PLANT SEC-14
More informationCommunity Advisory Panel Meeting #
Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationjoin us To strengthen the New Beginning To share the look and feel of the Proposed Project And to Partner the Success backdrop Four years back two brands shared a platform at Golf Links NH 24 Ghaziabad
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationIGI AIRPORT (T-1)-NCR AREA
IGI AIRPORT (T-1)-NCR AREA NOTE NON-AC TAXI :- 1 Fare Rs.25/- for 1 st kilometer and Rs.14/- for subsequent Kilometer for Non-AC taxies. 2 Night charge 25% of the fare (11.00 PM to 5.00 AM) 3 Baggage charge
More informationIGI AIRPORT (T-1)-NCR AREA
IGI AIRPORT (T-1)-NCR AREA NOTE NON-AC TAXI :- 1 Fare Rs.25/- for 1 st kilometer and Rs.14/- for subsequent Kilometer for Non-AC taxies. 2 Night charge 25% of the fare (11.00 PM to 5.00 AM) 3 Baggage charge
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationI-35 Reconstruction Project
I-35 Reconstruction Project Business Community Meeting McLennan County Projects Jodi Wheatley, I 35 Information Specialist, TxDOT John Jasek, PE, Waco Area Engineer, TxDOT Jacob Bell, PE, Project Manager,
More informationMEMORANDUM. Lynn Hayes LSA Associates, Inc.
MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG
More informationLOCATION ANALYSIS PURVA ATTRIA. March 2013
LOCATION ANALYSIS PURVA ATTRIA March 2013 Contents 1 Bangalore City Overview 1 2 3 Micro-market Overview Key Residential & Commercial Development & Social Infra 2 3 4 Infrastructure Initiatives 4 4 5 5
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationBonita to Bridgeport January 24, 2019
Thank you for participating 6:00-6:05 Welcome 6:05-6:55 Presentation; clarifying questions 7:00-7:30 Talk with staff; write comments Concerns with Locally Preferred Alternative (LPA) route between Bonita
More informationTraffic Analysis Final Report
SR-71 Widening Project Project Approval/Environmental Documentation Traffic Analysis Final Report Prepared for Caltrans District 7 August 2012 6 Hutton Centre Drive, Suite 700 Santa Ana, California 92707
More informationMEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018
MEMORANDUM TO: Bob Zagozda, Chief Financial Officer Westside Community Schools FROM: Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig DATE: June 11, 218 6-11-18 SUBJECT: Sunset Hills Elementary School
More informationInfrastructure Projects in Mumbai Metropolitan Region & Maharashtra
Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra 20 th March 2013 By: SVR Srinivas (IAS), Addl Metropolitan Commissioner & MD MMRC & PRK Murthy, Chief T&C Division MMRDA & Director MMRC
More informationShop no. 10, Building no. 5, Takshila CHS Ltd., Opp. Pearl Residency, Off Mahakali Caves Road, Andheri (E), Mumbai ; Mumbai
S.No Store location ADDRESS Line 1 City Phone Number 316, 3rd Floor, Morya Estate, New Link 1 Andheri (West) Road, Andheri (W), Mumbai - 400 053. Mumbai 66753770 2 Andheri (East) 3 Bandra 4 Borivali 5
More informationOrganization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator
Organization Puget Date Sound Regional Council Regional Project Evaluation Committee Brian Nielsen, Program Administrator October 26, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel
More informationCenturion Way Chichester
Centurion Way Chichester Work book of plans to show details of the Centurion Way, its links, and potential developments and enhancements from linking to the South Downs National Park all the way to the
More informationBlackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
More informationRegulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council
TORONTO STAFF REPORT ACTION REQUIRED Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road Dnte: February 16,2009 To: From: Toronto and East York Community
More informationELOQUENCE: THE WELLNESS ELOCUTION GROUP I AWARD FOR MERITORIOUS PERFORMANCE
Health & Wellbeing Summit 2014 (10 12 December 2014, Summer Fields, Kailash Colony, New Delhi) ELOQUENCE: THE WELLNESS ELOCUTION Delhi Public, Survey No. 74, Hyderabad - 500008 Bhavan's B.P Vidya Mandir,
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationParking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,
More informationThe. immutable laws of success
The 5 7 2 6 3 4 5 5 3 2 62 772 3 42 6 7 2 5 4 2 3 immutable laws of success # Finding the right partner Success is a manifestation of the right partnerships that one builds. In Omaxe, you will find a partner
More informationPuri Pratham Project Highlights
Contact us now: India Mobile # +91.99.102.24999 +91.98.102.24999 9AM-9PM IST [All Days] E-mail Efficiently Designed Premium Apartment» Location Sector 84» Type 2BHK 3BHK» Sizes 1100 1400 Sq.Ft» Category
More information07/08 08/09 09/10 Total Carisbrooke Rest of Newport
1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the
More informationRappahannock-Rapidan Regional Commission 2010 Travel Time Survey
Rappahannock-Rapidan Regional Commission 2010 Travel Time Survey Rappahannock Rapidan Regional Commission 420 Southridge Pkwy. Suite 106 Culpeper, VA 22701 June 16, 2010 Introduction Travel time, or the
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More informationBUS ROUTES : DELHI PUBLIC SCHOOL VASANT KUNJ
BUS ROUTES : DELHI PUBLIC SCHOOL VASANT KUNJ K-01 (Vasant Kunj Area) DPS VK B-10 Market B-8 Gate (Opp GD Goenka School) B-7 Gate No. 2 (Near Jain Mandir) B-1 Gate B-2 Rock view Apartment Opp. B-1 Gate
More informationTransportation Improvement District (TID) Exercise New Castle County Unified Development Code
Transportation Improvement District (TID) Exercise New Castle County Unified Development Code Churchmans Crossing TID How should New Castle County deploy Transportation Improvement Districts (TIDs)? Site
More informationNorthern Beaches Transport Action Plan
Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million
More informationIAT Annual Conference 'Driving Forward
Zero to Hero Transformation of Ireland s National Road Network IAT Annual Conference 'Driving Forward Sean O Neill Topics Overview How It All came together. TII & National Road Network & History A Little
More informationSTATUS OF PPP PROJECTS AS OF 05 OCTOBER 2011
1. Daang Hari SLEx Link Project P 1.956 B ROW P 177.3 M Publication of Invitation to Participate and Bid July 20, 27 $ 43.5 M IC P 10.635 M and August 3, 2011 New 4 kilometer, 4-lane paved toll road that
More informationUS 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017
Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada
More information