Rail Vikas Nigam limited Kolkata. Details of tenders/contracts awarded upto June'2012
|
|
- Brent Powers
- 6 years ago
- Views:
Transcription
1 Rail Vikas Nigam limited Kolkata Details of tenders/contracts awarded upto June'2012 Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow April NIL NIL NIL NIL NIL NIL NIL NIL May 1 Construction of Roadbed, Major and Minor Cr Cr % = MIs Larsen Toubro, ECC Division 3rd 24 months + Bridges and Track Linking (Excluding Supply floor Transmission line Railway, 6months ( Defect of Rails, Thick Web switches and Line PSC Electrification Business Unit, Mount liability period) Sleeper), S & T and OHE & General Poonamali Road, Manapakkam, Chennai- Electrical work in connection with 3rd line between Panskura- Kharagpur (45 Km) on Kharagpur Division of South Eastern Railway in West bengal State, India. June NIL NIL NIL NIL NIL NIL NIL NIL July NIL NIL NIL NIL NIL NIL NIL NIL August NIL NIL NIL NIL NIL NIL NIL NIL September NIL NIL NIL NIL NIL NIL NIL NIL October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL December NIL NIL NIL NIL NIL NIL NIL NIL January'10 1 Design, Supply, Erection, Testing & 8.16 Cr. 7.94Cr. 5.63% RVNUKOUEUPSI/OT/09/01N M/s.PSC Engineers Pvt. Ltd. 18 months Commissioning Of 132/27 Kv, 2 X (below) 01-11/2241 Dt IT Building(3rd Floor),Benfish,31, days (Defect MVA, Traction-Sub-Station, with an G.N.Block, Sector -V, Salt Lake City, liability period) additional bay and replacement of one Kolkata existing 13/20MVA capacity, modification of 132KV incomming and out going 25KV Power Supply, TSS feeding post, with other associated works at Balichak Sub-Station, along with modification of opposite gantry in connection with 3rd line between Panskura- Kharagpur under Kharagpur Division Of South Eastern Railway in the State of West IRpnn~1. February'10 NIL NIL NIL NIL NIL NIL NIL NIL March'10 NIL NIL NIL NIL NIL NIL NIL NIL Aoril'10 NIL NIL NIL NIL NIL NIL NIL NIL ~
2 I Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more /below May'10 1 Construction of Road bed, Major and Minor Cr Cr % No. RVNUKOU2009/PST- MIs Premco Rail Engineers Limited, 18 months + Bridges and Track Linking (Excluding Supply (Above) MOU/Tender (Part-I)/3204 dt. B-304, City Centre Block-DC, Sector - I, 6months ( Defect of Rails, Thick Web Switches and Line PSC Salt Lake City, Kolkata liability period) Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd line between Posoita - Manoharpur (11.6Km) on Chakradharpur Division of South Eastern Railway in Jharkhand State, India" June'10 1 Construction of Road bed, Major and Minor Cr Cr % No. RVNUKOU2010/RGA- MIs KEC International Ltd. 18 months Bridges and Track Linking (Excluding Supply (Above) TMZlRoadbed/KEC/3423 MIs Asia Communication & Electronics days (Defect of Rails, Thick Web Switches and Line PSC Sdn. Bhd. & MIs Unique Builders (JV) liability period) Sleeper), S&T and OHE & General Electrical O/c KEC International Limited,1 st Floor, work in connection with construction of 3rd Building No.9A, DLF Cyber line between Rajgoda - Tamluk Doubling City, Phase - III, (13.5 Km) Phase -II of Panskura - Haldia Gurgaon Haryana (India) Doubling in Kharagpur Division of South Eastern Railway in West Bengal State, India July 1 Construction of structural Shed with Gantry, Cr Cr. 3.80% No. RVNUKOU2010IDLCI MIs SIMPLEX INFRASTRUCTURES 12 months from Administrative and othr Buildings along with (Below) SIMPLEx/3608 dt LIMITED. Simplex House, 27, the date of issue ancillary works (Civil, tele Communication, Shakespear Sarani, Kolkata of LOA. Illumination and electrification) in connection,with setting up of Diesel Loco Component factory for manufacturing and sub assembling of EMD Locos, etc. of DAnkuni of Eastern Railway in the State of West Benaal INDIA. Auaust NIL NIL NIL NIL NIL NIL NIL NIL September 2 Construction of new line between Dankuni Cr Cr. 3.76% No. RVNUKOUDKAE - F. MIs totem Infrastructure Limited - MIs 30 month + 6 furfura Sharif via Jangaloara (20 km) in (Below) Sharif New LinelTotem - Premco Rail Engineers Limited (JV) Howrah Division of Eastern Railway in the Premco/4404 dt , Totem House, Dwarkapuri Colony, state of West Bengal, INDIA. Punjagutta, Hyderabad Design, Supply, Erection, Testing & Cr Cr % RVNUKOUGOL-MOUITSSNol M/s.G.E.T. Power Pvt. Ltd. 18 months Commissioning Of 132/27 Kv, 2 X (below) II , Developed Plot, Electrical and days (Defect MVA, Traction-Sub-Station, Feeding Post Electronic Industrial Estate, Perungudi, liability period) with othre associate works at Goelkera - Chennai Psoita section under Chakradharpur Division of South Eastern Railway in the State of Jharkhand. October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL \ ~ot '
3 Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow December 2 Package - I : "Construction of viaduct Cr Cr % No. RVNUKOUMETRO/JOKA- Simplex Infrastructure Limited 30 month from the including related works for km length Below BBD BAGITENDER/2/BEC File Simplex House, 27, Shakespear Sarani, date of issue of excluding station areas from CH (-)1250 to Vol-1/PACKAGE-1 dt, Kolkata LOA. CH between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD BAG corridor of Kolkata Metro Railwav Line." Package - II : "Construction of viaduct Cr Cr % No. RVNUKOUMETRO/JOKAincluding related works for km length Below BBD BAGITENDER/2/BEC File excluding station areas from CH to Vol-1/PACKAGE-11 dt, CH between Behala Chowrasta to Mominpur in Joka-BBD BAG corridor of Kolkata Metro Railway Line." Januarv'11 NIL NIL NIL NIL NIL NIL NIL NIL February'11 2 Execution of Desing & Construction of PSC 223 Cr Cr % No. RVNUKOUNOA-BARA- MIs CCCL - SAM India (JV) 30 month + 6 viaduct, Embankment and stations including (Below) DAKS/METROITENDER/(R)/1 Khivraj Complex, #2, 8th Floor, E&M works in connection with extension of dt , Anna Salai, Nandanam, Metro Railway line Naopara (excluding) - Chennai Baranagar - Dakshineswar of Kolkata Metro. \ Construction of Roadbed, Major and Minor Cr Cr. 6.59% No. RVNUKOUTMZ- MIs JMC - GPT - Vijaywargi - Bright 24 month + 6 Bridges, Track Linking (Excluding Supply of above BYSNJMC-GPT-Vijaywargi- Power, A- Rails and Line PSC Sleepers), S & T and Bright Power/161 dt. 104, Shapath - 4, Opp. Karnavati Club, OHE & General Electrical work in connection S.G. Road, Ahmedabad with Doubling between Tamluk (Junction Cabin) - Basulya Sutahata (24.4 Km) in Kharagpur Division of South Eastern Railway in State of West Bengal, India. March'11 2 Carrying out Detailed Design consultancy & 7.62Cr Cr. 6.04% No. RVNUKOUROB- MIs Consulting Engineering Services 30 months + 6 Construction Supervision for the proposed 4- (Below) BWN/DDC & CS/5502 dt. India Pvt Ltd. CES Centre, lane Cable stayed road over bridge over OM - 3 & 4, Sector - V, Saltlake City, Barddhaman yard in lieu of existing 2-lane Kolkata ROB Bridge No.-231 of Eastern Railway in the State of West Bengal, India. Project Management Consultancy for 2.96Cr. 2.74Cr. 8% (below) No. RVNUKOUGOL- M/s SNC-LAVALIN Infrastructure Pvt Ltd. 34 months Construction of Road bed, Major and Minor MOU/PMC/Price Bid/Pt (Formerly MIs Span Consultants Pvt Ltd.) Bridges, Track Linking, Tunnel, S&T and dt, Mindmill Corporate Tower, 4th & 5th OHE, TSS & General Electrical works in Floors, Plot No. 24A, connection with construction of 3rd line Sector 16A, Film City, between Goelkera - Manoharpur (27.50 Km) Noida (UP) on Chakradharpur Division of South Eastern Railwav in Jharkhand State lndia" April'11 NIL NIL NIL NIL NIL NIL NIL NIL Mav'11 NIL NIL NIL NIL NIL NIL.. NIL NIL
4 Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow June'11 1 Project Management Consultancy for 1.19 Cr Cr % NO. RVNUKOUDKAE- MIs S. N. Bhobe & Associates Pvt. Ltd. 30 months + 6 Construction of Road bed, Major and Minor Above F.Sharif/PMC/2010/1 dt. Unit No. - 10, Banking Complex No - II, Bridges, Track Linking (Excluding supply of Plot NO.9 & 10, Sector -19A, Vashi, Navi Rails and PSC Sleepers) S&T and OHE & Mumbai , India General Electrical works in connection with new line between Dankuni - Furfura Sharif (20 km) on Howrah Division of Eastern Railway in the State of West Benaal India" July'11 1 Construction of sheds, Structures, Porta 86Cr. 98Cr. 14% No. MIs Premco - Vardhman (JV) Axis 15 months + 6 Blocks, Water Supply Arrangement, (Above) RVNUKOUDMU/HLZl2/913 dt. Multi Complex, CF-9,3rd Sewerage, Drainage, Roads, Track, S&T, Floor, Rajarhat New Power Supply Arrangement, General Town, Kolkata Electrical Works and Supply, Erection & Commissioning 0 fmachinery & Plant in connection with setting up of DMU Factory of South Eastern Railwavin Haldia West Auaust'11 NIL NIL NIL NIL NIL NIL NIL NIL September'11 1 Construction of Road bed, Major and Minor 103 Cr Cr. 30.8% NO. RVNUKOUGOL-PST 3rd MIs. Unity- Triveni - BCPL (JV), 24 months + 6 Bridges, Tunnel and Track Linking (Above) Iine/UTBJV dt. 1252, Pushpanjali Apartments, (Excluding Supply of Rails, Thick Web Old Prabhadevi Road, Switches and Line PSC Sleeper) and OHE & Prabhadevi, General Electrical work in connection with Mumbai construction of 3rd line between Goelkera - Posoita (15.9 Km) on Chakradharpur Division of South Eastern Railway in the IState of Jharkhand. India October' Cr Cr. 2.89% RVNUKOUMETRO(ANV1 )/113 MIs. Afcons Infrastructure Ltd. Afcons 30 months +12 PACKAGE-ANV1: "CONSTRUCTION OF (below) 8 dated House, VIADUCT INCLUDING RELATED WORKS 16, Shah Industrial Estate, FOR 5.75 KM LENGTH EXCLUDING Veera Desai Road, Post Box No.11978, STATION AREAS FROM CH TO Azad Nagar, P.O. Andheri (W), CH BETWEEN KAVI SUBHASH Mumbai (NEW GARIA) TO VIP Bazar, IN Ph NEWGARIA-AIRPORT CORRIDOR OF Fax KOLKATA METRO RAILWAY LINE" Cr Cr. PACKAGE- ANV2: "CONSTRUCTION OF 2.05% RVNUKOUMETRO(ANV2)/113 MIs. Gammon India Limited, Gammon 30 months +12 (above) VIADUCT INCLUDING RELATED WORKS 9 dated House, FOR 5.27 KM LENGTH EXCLUDING Veer Savarkar Marg, STATION AREAS FROM CH TO Prabha Devi, CH BETWEEN VIP BAZAR TO Mumbai , NICCO PARK, IN NEWGARIA-AIRPORT Phone: CORRIDOR OF KOLKATA METRO FAX : RAILWAY LINE". \ ~ ~ 1 _
5 I Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow Cr Cr. RVNUKOUMETRO(ANV3)/114 MIs. Afcons Infrastructure Ltd. Afcons 30 months +12 PACKAGE- ANV3: "CONSTRUCTION OF o dated House, VIADUCT INCLUDING RELATED WORKS 16, Shah Industrial Estate, FOR 5.16 KM LENGTH EXCLUDING Veera Desai Road, Post Box No.11978, STATION AREAS FROM CH TO Azad Nagar, P.O. Andheri (W), CH BETWEEN NICCO PARK TO Mumbai CBD-1, IN NEWGARIA-AIRPORT Ph CORRIDOR OF KOLKATA METRO Fax RAILWAY LINE". 4 PACKAGE- ANV4: "CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.40 KM LENGTH EXCLUDING STATION AREAS FROM CH TO CH BETWEEN CBD-1 TO RABINDRA TIRTHA, IN NEWGARIA- AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE" Cr Cr RVNUKOUMETRO(ANV4)/114 MIs. Larsen & Toubro Limited. TCTC 30 months +12 (below) 1 dated Building, Mount Poonamallee Road, Manapakkam,Chennai November'11 NIL NIL NIL NIL NIL NIL NIL NIL December'11 NIL NIL NIL NIL NIL NIL NIL NIL Januarv'12 NIL NIL NIL NIL NIL NIL NIL NIL February'12 Construction of 4-Lane Cable Stayed Road Cr Cr. 4.99% RVNUKOUROB-BWN/GPT- MIs GPT-RANHILL (JV), 25 months + 6 Over Bridge over Barddhaman Yard in lieu of Above RANHILU1/3012 dt. "Jeewansaatya" DD-6, existing 2-Lane ROB Bridge No.213 of Sector-I, Salt Lake City, Eastern Railway in the State of West Bengal, Kolkata India. March'12 NIL NIL NIL NIL NIL NIL NIL NIL April'12 JMS-1:- Construction of Joka, Thakurpukur, Cr Cr % RVNUKOUJOKA- Simplex Infrastructure Limited 24 months +12 Sakher Bazar and Behala Chowrasta Above MAJERHAT/JMS1/096 Simplex House, 27, Shakespear Sarani, Stations including all related works Dt Kolkata (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. 2 JMS-2:- Construction of Behala Bazar, Cr Cr 17.31% RVNUKOUJOKA- Gammon India Limited 24 months +12 Taratala and Majerhat Stations including all Above MAJERHAT/JMS2/097 Gammon House, Veer Savarkar Marg., related works (architectuire, electrical & Dt Prabha Devi. Mechanical (E&M), HVAC, Fire detection Mumbai and Fire suppression system and public health engineering works} in Joka-BBD Bag corridor of Kolkata Metro Railway Line. \ 1\ - \ y
6 Month No. of tender Name of the Work & Location Estimated Tendered Percenta LOA No. Agency Name Time of awarded ge above costing more Ibelow May'12 Design and construction of power supply & Cr Cr. 3.12% RVNUKOUEUNEW-METRO Isolux Ingenieria, SA 24 months +6 distribution, traction electrififcation, 750 VDC (below) LlNE(NOA - DAKE Section)Nol 12th floor, Building No - 10, Tower - C, third rail and SCADA system for a total II dt DLF Cyber City Sector - 25, Phase - II 1 length of km (approx) from Noapara Gurgaon , Hariyana. (ex) - Baranagar - Dakshineswar station in connection with the extension of existing Metro corridor kolkata. June'12 NIL NIL NIL NIL NIL NIL NIL NIL ~~ I 1 _
7 Rail Vikas Nigam Limited Kolkata Details of tenders/contracts awarded upto September'2012 Month No. of tender awarded costing more Name of the Work & Location Estimated Tendered Percenta ge above /below LOA No. Agency Name Time of April NIL NIL NIL NIL NIL NIL NIL NIL May 1 Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web switches and Line PSC Sleeper), S & T and OHE & General Electrical work in connection with 3rd line between Panskura- Kharagpur (45 Km) on Kharagpur Division of South Eastern Railway in West bengal State, India Cr Cr % = M/s Larsen Toubro, ECC Division 3rd floor Transmission line Railway, Electrification Business Unit, Mount Poonamali Road, Manapakkam, Chennai months + 6months ( Defect liability period ) June NIL NIL NIL NIL NIL NIL NIL NIL July NIL NIL NIL NIL NIL NIL NIL NIL August NIL NIL NIL NIL NIL NIL NIL NIL September NIL NIL NIL NIL NIL NIL NIL NIL October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL December NIL NIL NIL NIL NIL NIL NIL NIL January'10 1 Design, Supply, Erection, Testing & Commissioning Of 132/27 Kv, 2 X 30/42 MVA, Traction-Sub-Station, with an additional bay and replacement of one existing 13/20MVA capacity, modification of 132KV incomming and out going 25KV Power Supply, TSS feeding post, with other associated works at Balichak Sub-Station, along with modification of opposite gantry in connection with 3rd line between Panskura- Kharagpur under Kharagpur Division Of South Eastern Railway in the State of West Bengal Cr Cr. 5.63% (below) RVNL/KOL/EL/PSI/OT/09/01/V ol-11/2241 Dt M/s.PSC Engineers Pvt. Ltd. IT Building(3rd Floor),Benfish,31, G.N.Block, Sector -V, Salt Lake City, Kolkata months days (Defect liability period) February'10 NIL NIL NIL NIL NIL NIL NIL NIL March'10 NIL NIL NIL NIL NIL NIL NIL NIL April'10 NIL NIL NIL NIL NIL NIL NIL NIL
8 Month No. of tender awarded costing more Name of the Work & Location May'10 1 Construction of Road bed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd line between Posoita - Manoharpur (11.6Km) on Chakradharpur Division of South Eastern Railway in Jharkhand State, India Estimated Tendered Percenta ge above /below Cr Cr % (Above) LOA No. Agency Name Time of No. RVNL/KOL/2009/PST- MOU/Tender (Part-I)/3204 dt M/s Premco Rail Engineers Limited, B-304, City Centre Block-DC, Sector - I, Salt Lake City, Kolkata months + 6months ( Defect liability period ) June'10 1 Construction of Road bed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper), S&T and OHE & General Electrical work in connection with construction of 3rd line between Rajgoda - Tamluk Doubling (13.5 Km) Phase II of Panskura Haldia Doubling in Kharagpur Division of South Eastern Railway in West Bengal State, India Cr Cr % (Above) No. RVNL/KOL/2010/RGA- TMZ/Roadbed/KEC/3423 Dt M/s KEC International Ltd. M/s Asia Communication & Electronics Sdn. Bhd. & M/s Unique Builders (JV) O/c KEC International Limited,1st Floor, Building No.9A, DLF Cyber City, Phase - III, Gurgaon Haryana (India) 18 months days (Defect liability period) July 1 Construction of structural Shed with Gantry, Administrative and othr Buildings along with ancillary works (Civil, tele Communication, Illumination and electrification) in connection with setting up of Diesel Loco Component factory for manufacturing and sub assembling of EMD Locos, etc. of DAnkuni of Eastern Railway in the State of West Bengal, INDIA Cr Cr. 3.80% (Below) No. RVNL/KOL/2010/DLC/ M/s SIMPLEX INFRASTRUCTURES SIMPLEX/3608 dt LIMITED. Simplex House, 27, Shakespear Sarani, Kolkata months from the date of issue of LOA. August NIL NIL NIL NIL NIL NIL NIL NIL September 2 Construction of new line between Dankunifurfura Sharif via Jangaloara (20 km) in Howrah Division of Eastern Railway in the state of West Bengal, INDIA Cr Cr. 3.76% (Below) No. RVNL/KOL/DKAE - F. Sharif New Line/Totem - Premco/4404 dt M/s totem Infrastructure Limited - M/s Premco Rail Engineers Limited (JV) 6, Totem House, Dwarkapuri Colony, Punjagutta, Hyderabad month + 6 Design, Supply, Erection, Testing & Commissioning Of 132/27 Kv, 2 X 30/42 MVA, Traction-Sub-Station, Feeding Post with othre associate works at Goelkera - Psoita section under Chakradharpur Division of South Eastern Railway in the State of Jharkhand Cr Cr % (below) RVNL/KOL/GOL-MOU/TSS/Vol- M/s.G.E.T. Power Pvt. Ltd. II Dt , Developed Plot, Electrical and Electronic Industrial Estate, Perungudi, Chennai months days (Defect liability period) October NIL NIL NIL NIL NIL NIL NIL NIL November NIL NIL NIL NIL NIL NIL NIL NIL
9 Month No. of tender awarded costing more Name of the Work & Location Estimated Tendered Percenta ge above /below LOA No. Agency Name Time of December 2 Package - I : "Construction of viaduct including related works for km length excluding station areas from CH (-)1250 to CH between Joka to Behala Cr Cr % Below No. RVNL/KOL/METRO/JOKA- BBD BAG/TENDER/2/BEC File Vol-1/PACKAGE-I dt Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani, Kolkata month from the date of issue of LOA. Chowrasta including depot approach at Joka, in Joka-BBD BAG corridor of Kolkata Metro Railway Line." Package - II : "Construction of viaduct including related works for km length excluding station areas from CH to CH between Behala Chowrasta to Cr Cr % Below No. RVNL/KOL/METRO/JOKA- BBD BAG/TENDER/2/BEC File Vol-1/PACKAGE-II dt Mominpur in Joka-BBD BAG corridor of Kolkata Metro Railway Line." January'11 NIL NIL NIL NIL NIL NIL NIL NIL February'11 2 Execution of Desing & Construction of PSC 223 Cr Cr % No. RVNL/KOL/NOA-BARA- M/s CCCL - SAM India (JV) 30 month + 6 viaduct, Embankment and stations including E&M works in connection with extension of Metro Railway line Naopara (excluding) - Baranagar - Dakshineswar of Kolkata Metro. (Below) DAKS/METRO/TENDER/(R)/1 dt Khivraj Complex, #2, 8th Floor, 480, Anna Salai, Nandanam, Chennai Construction of Roadbed, Major and Minor Bridges, Track Linking (Excluding Supply of Rails and Line PSC Sleepers), S & T and OHE & General Electrical work in connection with Doubling between Tamluk (Junction Cabin) - Basulya Sutahata (24.4 Km) in Kharagpur Division of South Eastern Railway in State of West Bengal, India Cr Cr. 6.59% above No. RVNL/KOL/TMZ- BYSA/JMC-GPT-Vijaywargi- Bright Power/161 dt M/s JMC - GPT - Vijaywargi - Bright Power, A - 104, Shapath - 4, Opp. Karnavati Club, S.G. Road, Ahmedabad month + 6 March'11 2 Carrying out Detailed Design consultancy & Construction Supervision for the proposed 4- lane Cable stayed road over bridge over Barddhaman yard in lieu of existing 2-lane ROB Bridge No.-231 of Eastern Railway in the State of West Bengal, India Cr Cr. 6.04% (Below) No. RVNL/KOL/ROB- BWN/DDC & CS/5502 dt M/s Consulting Engineering Services India Pvt. Ltd. CES Centre, DM - 3 & 4, Sector - V, Saltlake City, Kolkata months + 6 Project Management Consultancy for Construction of Road bed, Major and Minor Bridges, Track Linking, Tunnel, S&T and OHE, TSS & General Electrical works in connection with construction of 3rd line between Goelkera - Manoharpur (27.50 Km) on Chakradharpur Division of South Eastern Railway in Jharkhand State, India 2.96 Cr Cr. 8% (below) No. RVNL/KOL/GOL- MOU/PMC/Price Bid/Pt.II/5780 dt M/s SNC-LAVALIN Infrastructure Pvt. Ltd. (Formerly M/s Span Consultants Pvt. Ltd.) Mindmill Corporate Tower, 4th & 5th Floors, Plot No. 24A, Sector 16A, Film City, Noida (UP) April'11 NIL NIL NIL NIL NIL NIL NIL NIL May'11 NIL NIL NIL NIL NIL NIL NIL NIL 34 months
10 Month No. of tender awarded costing more Name of the Work & Location June'11 1 Project Management Consultancy for Construction of Road bed, Major and Minor Bridges, Track Linking (Excluding supply of Rails and PSC Sleepers) S&T and OHE & General Electrical works in connection with new line between Dankuni - Furfura Sharif (20 km) on Howrah Division of Eastern Railway in the State of West Bengal, India Estimated Tendered Percenta ge above /below 1.19 Cr Cr % Above July'11 1 Construction of sheds, Structures, Porta Blocks, Water Supply Arrangement, Sewerage, Drainage, Roads, Track, S&T, Power Supply Arrangement, General Electrical Works and Supply, Erection & Commissioning o fmachinery & Plant in connection with setting up of DMU Factory of South Eastern Railwayin Haldia, West 86 Cr. 98 Cr. 14% (Above) LOA No. Agency Name Time of NO. RVNL/KOL/DKAE- F.Sharif/PMC/2010/1 dt M/s S. N. Bhobe & Associates Pvt. Ltd. Unit No. - 10, Banking Complex No - II, Plot No. 9 & 10, Sector -19A, Vashi, Navi Mumbai , India No. M/s Premco - Vardhman (JV) RVNL/KOL/DMU/HLZ/2/913 dt. Multi Complex, ,3rd Floor, Rajarhat New Town, Kolkata Axis CF- 30 months months + 6 August'11 NIL NIL NIL NIL NIL NIL NIL NIL September'11 1 Construction of Road bed, Major and Minor 103 Cr Cr. 30.8% NO. RVNL/KOL/GOL-PST 3rd M/s. Unity Triveni - BCPL (JV), Bridges, Tunnel and Track Linking (Excluding Supply of Rails, Thick Web Switches and Line PSC Sleeper) and OHE & General Electrical work in connection with construction of 3rd line between Goelkera - Posoita (15.9 Km) on Chakradharpur Division of South Eastern Railway in the State of Jharkhand, India. (Above) line/utbjv/1517 dt , Pushpanjali Apartments, Old Prabhadevi Road, Prabhadevi, Mumbai October'11 PACKAGE-ANV1: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.75 KM LENGTH EXCLUDING STATION AREAS FROM CH TO CH BETWEEN KAVI SUBHASH (NEW GARIA) TO VIP Bazar, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE Cr Cr. 2.89% (below) RVNL/KOL/METRO(ANV1)/113 8 dated M/s. Afcons Infrastructure Ltd. Afcons House, 16, Shah Industrial Estate, Veera Desai Road, Post Box No.11978, Azad Nagar, P.O. Andheri (W), Mumbai Ph Fax months months +12 PACKAGE- ANV2: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.27 KM LENGTH EXCLUDING STATION AREAS FROM CH TO CH BETWEEN VIP BAZAR TO NICCO PARK, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE Cr Cr. 2.05% (above) RVNL/KOL/METRO(ANV2)/113 9 dated M/s. Gammon India Limited, Gammon House, Veer Savarkar Marg, Prabha Devi, Mumbai , Phone : FAX : months +12
11 Month No. of tender awarded costing more Name of the Work & Location PACKAGE- ANV3: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.16 KM LENGTH EXCLUDING STATION AREAS FROM CH TO CH BETWEEN NICCO PARK TO CBD-1, IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE. Estimated Tendered Percenta ge above /below Cr Cr. RVNL/KOL/METRO(ANV3)/114 0 dated LOA No. Agency Name Time of M/s. Afcons Infrastructure Ltd. Afcons House, 16, Shah Industrial Estate, Veera Desai Road, Post Box No.11978, Azad Nagar, P.O. Andheri (W), Mumbai Ph Fax months +12 PACKAGE- ANV4: CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 5.40 KM LENGTH EXCLUDING STATION AREAS FROM CH TO CH BETWEEN CBD-1 TO RABINDRA TIRTHA, IN NEWGARIA- AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINE Cr Cr (below) RVNL/KOL/METRO(ANV4)/114 1 dated M/s. Larsen & Toubro Limited. TCTC Building, Mount Poonamallee Road, Manapakkam, Chennai months November'11 NIL NIL NIL NIL NIL NIL NIL NIL December'11 NIL NIL NIL NIL NIL NIL NIL NIL January'12 NIL NIL NIL NIL NIL NIL NIL NIL February'12 Construction of 4-Lane Cable Stayed Road Over Bridge over Barddhaman Yard in lieu of existing 2-Lane ROB Bridge No.213 of Eastern Railway in the State of West Bengal, India Cr Cr. 4.99% Above RVNL/KOL/ROB-BWN/GPT- RANHILL/1/3012 dt M/s GPT-RANHILL (JV), "Jeewansaatya" DD-6, Sector-I, Salt Lake City, Kolkata months + 6 March'12 NIL NIL NIL NIL NIL NIL NIL NIL April'12 JMS-1:- Construction of Joka, Thakurpukur, Sakher Bazar and Behala Chowrasta Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line Cr Cr % Above RVNL/KOL/JOKA- MAJERHAT/JMS1/096 Dt Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani, Kolkata JMS-2:- Construction of Behala Bazar, Taratala and Majerhat Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line Cr Cr 17.31% Above RVNL/KOL/JOKA- MAJERHAT/JMS2/097 Dt Gammon India Limited Gammon House, Veer Savarkar Marg., Prabha Devi. Mumbai months months +12
12 May'12 Month No. of tender awarded costing more 1 Name of the Work & Location Design and construction of power supply & distribution, traction electrififcation, 750 VDC third rail and SCADA system for a total length of km (approx) from Noapara (ex) - Baranagar - Dakshineswar station in connection with the extension of existing Metro corridor kolkata. Estimated Tendered Percenta ge above /below Cr Cr. 3.12% (below) LOA No. Agency Name Time of RVNL/KOL/EL/NEW-METRO Isolux Ingenieria, SA LINE(NOA - DAKE Section)/Vol-12th floor, Building No - 10, Tower - C, II dt DLF Cyber City Sector - 25, Phase - II Gurgaon , Hariyana. 24 months +6 June'12 NIL NIL NIL NIL NIL NIL NIL NIL July'12 NIL NIL NIL NIL NIL NIL NIL NIL August'12 NIL NIL NIL NIL NIL NIL NIL NIL September'12 NIL NIL NIL NIL NIL NIL NIL NIL
13 BID AWARD DETAILS w.e.f. March 2012 and onwards for Projects under CPM/M Kolkata Sl. No. Tender No. Date of Opening Description of Work Contract No. & date Contractor's Name Quantity (for supply contract) Estimated (for Engg./Elect/S&T/Mech.) Rate (for supply contact) Tender (for Engg./Elect/S&T/Mech.) Scheduled Date 1 RVNL/KOL/JOKA- MAJERHAT/JMS1/096 Dated JMS-1:- Construction of Joka, Thakurpukur, Sakher Bazar and Behala Chowrasta Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. Notification of Award No. RVNL/KOL/JOKA- MAJERHAT/JMS1/096 Dt M/s. Simplex Infrastructure Limited Simplex House, 27, Shakespear Sarani, Kolkata INR Cr. Apr-14 2 RVNL/KOL/JOKA- MAJERHAT/JMS2/097 Dated JMS-2:- Construction of Behala Bazar, Taratala and Majerhat Stations including all related works (architectuire, electrical & Mechanical (E&M), HVAC, Fire detection and Fire suppression system and public health engineering works) in Joka-BBD Bag corridor of Kolkata Metro Railway Line. Notification of Award No. RVNL/KOL/JOKA- MAJERHAT/JMS2/097 Dt M/s. Gammon India Limited Gammon House, Veer Savarkar Marg., Prabha Devi. Mumbai INR Cr. Apr-14 3 RVNL/KOL/CLW/DKAE/ 1 Date : Construction of sheds, structures, water supply arrangement, sewerage, drainage, roads, track, S&T, power supply arrangement, general electrical & OHE works and supply, erection & commissioning of machinery & plant in connection with setting up of Electric Locomotives Factory at Dankuni, West Bengal, India. Notification of Award No. RVNL/KOL/CLW/DKAE/1/18 76 Dated M/s Simplex Infrastructures Ltd. Simplex House 27,Shakespear Sarani, Kolkata INR Cr. Apr-14
14 BID AWARD DETAILS w.e.f. May 2013 and onwards Sl. No. Tender No. Date of Opening Description of Work Contract No. & date Contractor's Name Quantity (for supply contract) Estimated (for Engg./Elect/S&T/Mech.) Rate (for supply contact) Tender (for Engg./Elect/S&T/Mech.) Scheduled Date 1 RVNL/KOLKATA/CLW/P MC/1 Date : Project Management Consultancy Services for Construction of sheds, structures, water supply arrangement, M/s Data Technosys sewerage, drainage, roads, track, S&T, (Engineers) Pvt. Ltd. Notification of Award No. power supply arrangement, general TF II, RVNL/KOLKATA/CLW/950 electrical & OHE works and supply, Asha Apartment I, 19, Dated erection & commissioning of machinery Ram Mohan Rai Marg, & plant in connection with setting up of Lucknow Electric Locomotives Factory at Dankuni, West Bengal, India. INR 1.77 Cr. INR 1.60 Cr. 18 months (including 6 months DLP)
Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3
Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, 2016 - The Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) project takes a big leap as the Mumbai Metro
More informationInfrastructure Projects in Mumbai Metropolitan Region & Maharashtra
Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra 20 th March 2013 By: SVR Srinivas (IAS), Addl Metropolitan Commissioner & MD MMRC & PRK Murthy, Chief T&C Division MMRDA & Director MMRC
More informationNetwork Size and Growth
16.50 25.10 30.30 11.40 5.10 9.63 10.00 8.26 64.94 km 208.24 Overview Network Size and Growth At present, metro systems are operational in seven cities in India Bengaluru, Chennai, Delhi, Gurgaon, Jaipur,
More informationRITES LTD RPO KOLKATA
Sub: Publishing details s / award web site. Ref: Corporate Office letter No.V/R/CO/Policy/G-10 dated 09.10.2006 DETAILS OF CONTRACTS/AWARD OF TENDERS OF VALUE MORE THAN 50 LAKHS DURING THE MONTH OF APRIL
More informationROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Tender No Item/Nature of work Mode of Date of Last date of No. of tender Letter of Name of Value of Scheduled date Actual date Actual date of Tender Publication
More informationRAILWAYS. November 2010
RAILWAYS November 2010 RAILWAYS November 2010 Contents Advantage India Market overview Industry infrastructure Investments Policy and regulatory framework Opportunities Industry associations 2 ADVANTAGE
More informationRITES LIMITED RPO LUCKNOW
Status of s for the Month of DECEMBER 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 S.No. No. Item/ Nature of Mode of of RITES LIMITED RPO LUCKNOW parties qualified supplies/ 1 Extension of existing,
More informationS. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun
List of Offices: Following are the nodal offices for various states:- S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur 2) Ghaziabad 3) Noida 4) Kanpur 5) Naini 6) Lucknow
More informationContact and other details of SEZs established/notified prior to SEZ Act, 2005
Contact and other details of SEZs established/notified prior to SEZ Act, 2005 S.No. Name of the SEZ Name of the developer 1. *Kandla SEZ(Gujarat) 2. *SEEPZ-SEZ (Maharashtra) 3. *Noida SEZ (U.P.) Address
More informationEXHIBITORS DIRECTORY. Ms Neha Shukla American Physical Society C/o Balani Infotech Pvt. Ltd Mobile:
EXHIBITORS DIRECTORY Mr Rakesh Malik Commercial Director Asia Pacific ACCUCOMS International BV Nieuwe Energie 3e Binnenvestgracht 23R 2312 NR Leiden, The Netherlands Email: rakesh@accucoms.com Mobile:
More informationList of Institutions & Its Courses (MBA/MHMCT) Affiliated to West Bengal University of Technology for the Academic Year as on
SL. NO. WBUT COLLEGE CODE COLLEGE NAME COLLEGE ADDRESS COURSE BRANCH INTAKE AS PER AICTE 1 103 HALDIA INSTITUTE OF ICARE COMPLEX; HIT CAMPUS E 2 104 INSTITUTE OF ENGINEERING & 3 109 NETAJI SUBHASH ENGINEERING
More informationsecretary rinan/- Government of West Bengal Department of Finance- PPP Cell Date:
Government of West Bengal Department of Finance- PPP Cell No.119/PPP-C Date:04.10.2012 From: The Secretary Finance, Government of West Bengal To: The Additional Chief Secretary/ Principal Secretary/ Secretary,
More informationNotification No. 25/2018-Customs (N.T./CAA/DRI) New Delhi, dated the 16 th November, 2018
S.O. [To be published in the Gazette of India, Extraordinary, Part-II, section 3, sub-section (ii)] Government of India Ministry of Finance (Department of Revenue) Central Board of Indirect Taxes and Customs
More informationDLF Ltd. Q1 Analyst Presentation
DLF Ltd. Q1 Analyst Presentation 1 Results at a Glance Q1 Sl.No. Consolidated Financials 1Q FY08 Rs. In Crores A) 1 Sales and Other Receipts 3074 2 Other Income 47 Percentage of Total Revenue Margins(%)
More informationCOMPANY PROFILE. Quality & Work, Speaks.
KASHYAPI page 1 COMPANY PROFILE INFRASTRUCTURE PVT. LTD. CIN : U45400DL2008PTC177060 CORPORATE OFFICE : 12/45, Vasundhra, Ghaziabad, Uttar Pradesh 201012 INDIA Phone : 0120-4561396 - Fax : 0120-4561395
More informationDETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.
CVC Office Order No. 13/3/05 Dt. 16 03 2005 :PSSR:CONTRACTS DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH 01 02 2011 TO 28 02 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Tende r No. Item/Nature of work Mode
More informationLIST OF ESIC HOLIDAY HOME
LIST OF ESIC HOLIDAY HOME Sl. No. Place Address of Holiday Home Contact details RD/JDs (I/C) concerned 1. Nainital The Manager Tourist Holiday home Kumaon Mandal Vikas Nigam Ltd. Tallital Nainital (U.P.)
More information(ii) DESCRIPTION OF DUTIES - PROJECT MANAGEMENT, FINANCIAL CURRICULUM VITATE 1. NAME: SUDHIR TENGSHE
CURRICULUM VITATE 1. NAME: SUDHIR TENGSHE 2. ADDRESS: (A)- BRAMHISHTHA HOUSE NO. 910, GOPAL NAGAR, PORVORIM, BARDEZ GOA.403521 (B)- D-903, Lake Home, Phase-1, Powai Vihar, Powai Mumbai- 400 076 3. PHONE
More informationCONSTRUCTION PROJECT. INFORMATION REGARDING STATUS OF R/A/FINAL BILL PAYMENT OF CONTRACTOR'S BILL (November MONTH)
CONSTRUCTION PROJECT INFORMATION REGARDING STATUS OF R/A/FINAL BILL PAYMENT OF CONTRACTOR'S BILL (November - 2012 - MONTH) Information Regarding Status RA/Final Payment Working Agencies from 01.06.2013
More informationNow Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.
Now Available Two New Research Reports on Urban Rail Transport in India 2011 & Urban Bus Transport in India 2011 India Infrastructure Research www.indiainfrastructure.com Table of Contents URBAN RAIL TRANSPORT
More informationCentral Depository Services (India) Limited
Central Depository Services (India) Limited Convenient Dependable Secure COMMUNIQUÉ TO DEPOSITORY PARTICIPANTS /OPS/DP/TRANG/5624 December 17, 2015 TRAINING PROGRAMME FOR COMPLIANCE OFFICERS / DP OFFICIALS
More informationROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE
ROC, GURGAON S&T SBU, DETAILS OF CONTRACTS MORE THAN 02 (TWO) CRORES IN VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Tender No Item/Nature of work Mode of Date of Type of Bidding Last date of No. of
More informationOutline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity
1 Outline (1) JICA and India (2) Infrastructure Development (3) Cross-Border Connectivity 2 Outline (1) JICA and India (2) Infrastructure Development (3) Cross-Border Connectivity 3 About JICA JICA is
More informationRailways in India 2012
NOW AVAILABLE Report on Railways in India 2012 RAILWAYS IN INDIA 2012 Table of Contents SECTION I: MACRO ANALYSIS 1. Executive Summary.................................... 2. Sector Overview.......................................
More informationSl. No. 1. God father Communication Pvt Ltd 9/36/2013-BP & L. Name of MSO Address of MSO Applied date and for Area Status
List as on 21.09.2014 of MULTI SYSTEM OPERATORS (MSOs) whose REGISTRATION by MINISTRY OF INFORMATION & BROADCASTING TO OPERATE IN DIGITAL ADDRESSABLE SYSTEM (DAS) HAS BEEN CANCELLED or CASES CLOSE Sl.
More informationKey Projects Carmichael Rail Line (CRL)
01 Aarvee Associates Pty Ltd is a multi-disciplinary engineering design consultancy company established in 2011 and based at Brisbane, Australia. We are an ISO 9001, ISO 14001 and ASNZS 4801 certified
More informationPROFILE. Diploma in Civil Engineering with first division in the year 1992 & B.A (maths)
PROFILE PERSONNEL: EDUCATION: Diploma in Civil Engineering with first division in the year 1992 & B.A (maths) LANGUAGES KNOWN: Telugu,Hindi & English. EXPERIENCE SUMMARY: About FOUR years of experience
More informationDCB Bank Regional Nodal Officers
DCB Bank Regional Nodal Officers Sr. Address of the Office of the Centre No. Banking Ombudsman 1 Ahmedabad C/o Reserve Bank of India La Gajjar Chambers, Ashram Road, Ahmedabad - 380 009 2 Bengaluru C/o
More informationDAVP OP WING. Flex extra Ambedkar Nagar to Siri. 300 sq. ft. to 700 sq. ft. -Do- Delhi NCR 177 sq. ft. or meters.
DAVP OP WING A) BUS QUEUE SHELTER S. No. Name of Agency Medium Location Size Approved Rate Rental Rs. p.m. 1. Pioneer Publicity- Bus Queue BRT corridor 170 sq. ft. Rs. 1.50 Lac Shelter between Dr. Ambedkar
More informationDETAILS OF CONTRACTS AWARDED DURING THE MONTH OF SEPTEMBER ( ENGINEERING DEPARTMENT)
DETAILS OF CONTRACTS AWARDED DURING THE MONTH OF SEPTEMBER - 2018 ( ENGINEERING DEPARTMENT) NIL "Last Updated - September 2018" DETAILS OF CONTRACTS AWARDED DURING THE MONTH OF AUGUST - 2018 ( ENGINEERING
More informationJapan India Cooperation on Railway Sector
Japan India Cooperation on Railway Sector 14 th October, 2015 IREE 2015 Takema Sakamoto Chief Representative India Office Japan International Cooperation Agency (JICA) 1 Contents 1. Overview and Strategy
More informationPOYSHA INDUSTRIAL ESTATE. N.I.T. Faridabad
N.I.T. Faridabad Welcome to Haryana Take a closer look at this vibrant, fast-growing State where you will nd the perfect infrastructure for a perfect location for an enduring and pro table investment.
More informationAkshara Lotus Garden
Akshara Lotus Garden Introduction Welcome to Wonder Homes- At Akshara Lotus Garden, life blooms in all its entirely. Peace, joy, happiness- the myriad shades of life come together as one in this premium
More informationAIRPORT AT JEWAR An international airport with a capacity to handle million passengers per year will come up at Jewar in Greater Noida in the ne
AIRPORT AT JEWAR AIRPORT AT JEWAR An international airport with a capacity to handle 30-50 million passengers per year will come up at Jewar in Greater Noida in the next 5-6 years to ease the load on Delhi's
More information07/01/ /09/ /09/ /11/2014
8 Status of Pending file of GHA 31/03/2015 Sent by Sent by BCAS RDCOS HQ. for Submitt for Police Date of Security Report from ed to Action Police Verification receipt of Clearance by Central Sl. Name of
More informationPedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION
150525 Pedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION Next 20 years: From 3.5 to 5.5 b. = 2.000 m. in 20 years 300.000 every day (India: 50.000 China 30.000) 200% X 2 100% 5 % 5 10
More informationMultimodal Logistics Professionals
Multimodal Logistics Professionals 1 CONCOR - THE COMPANY INCORPORATED - MARCH 1988 OPERATIONAL - NOVEMBER 1989 AUTHORISED CAPITAL - Rs.400 CRORE SHARE CAPITAL - Rs.64.99 CRORE (RECEIVED DURING 1988-89
More informationAIRPORTS. November 2010
AIRPORTS November 2010 AIRPORTS November 2010 Contents Advantage India Market overview Investments Policy and regulatory framework Opportunities Industry associations 2 ADVANTAGE INDIA Advantage India
More informationDETAILS OF CONTRACTS AWARDED DURING THE MONTH MATERIALS MANAGEMENT DEPARTMENT (MMD)
DETAILS OF CONTRACTS AWARDED DURING THE MONTH MATERIALS MANAGEMENT DEPARTMENT (MMD) s er Contract & DECEMBER 2017 41 04/17/D/0 Glued Joints 52 Special 07/11/17 Single Bid 27/11/17 5 Nos. 5 Nos. 1) M/s.
More informationन दय ल जन आव स य जन क अतग
APPROVED Location Map HARYANA GOVERNMENT S द न दय ल जन आव स य जन क अतगत PLOTTED SCHEME Plot Size 100-180* Sq.yard AN SAB WK O H C No G.S.T Small Size ADI BHIW Upto 7 ल न Plot Starts 15 Lakh* Contact us:
More informationList of Industries placed in the 158 th meeting of the State Level Expert Appraisal Committee, West Bengal on at 10:30 A.M.
List of Industries placed in the 158 th meeting of the State Level Expert Appraisal Committee, West Bengal on 13.07.2018 at 10:30 A.M. Name of the unit & Correspondence Address A Technical Presentation
More informationHyderabad Metro Rail in PPP Mode
Hyderabad Metro Rail in PPP Mode Presentation to the 6 th Global Infrastructure Leadership Forum New York Feb 2013 NVS Reddy Managing Director w w w. h Hyderabad m r. g o Metro v. i Rail n Ltd. Hyderabad
More informationMasterCard Airport Lounge Access Program: Participating Lounges
MasterCard Airport Lounge Access Program: Participating Lounges S.no. City Lounge Name Airport terminal Location 1 Ahmedabad Port P.K Hospitality services Pvt.Ltd. Airport (T-2) 1st Floor, New Airport
More informationInvestment Opportunities DMIC UP Region
Investment Opportunities DMIC UP Region PRESENTATION TO Japanese Business Mission BY Government of Uttar Pradesh (GoUP) Monday, February 04, 2008 1 The Region comprises of Greater Noida City & Taj Expressway
More informationINDICATIVE SEAT-MATRIX FOR COUNSELLING - ACCREDITED SPECIALITIES FOR FNB JAN 2012 SESSION
SPECIALITIES FOR FNB JAN 0 SESSION Apollo Hospital Jubilee Hills, Hyderabad-34 Apollo Hospital Jubilee Hills, Hyderabad-34 3 Care Hospital Road No., Banjara Hills, Hyderabad - 34 4 5 6 7 8 Fernandez Hospital
More information1/14/2016 Panel Doctors
Panel physicians are doctors and radiologists approved by Immigration New Zealand to complete medical and chest X ray certificates for New Zealand visa applications. If a medical examination or chest X
More informationRoyal Orchid Hotels Ltd Q4FY17 & FY17 Results Presentation. Expect more from Royal Orchid Hotels
Royal Orchid Hotels Ltd Q4FY17 & FY17 Results Presentation Expect more from Royal Orchid Hotels 1 in every 11 people worldwide are employed by TOURISM SECTOR High Employment Potential Sector Rs 10 Lakhs
More informationNeed of Urban & Regional Rail Based Transport
6 th December, 2012 Mumbai Railway Vikas Corporation Presentation on Need of Urban & Regional Rail Based Transport Background India s urban population is rapidly rising. Number of million+ cities will
More informationNames of parties qualified after technical evaluation M/s
No 667120E BHEL/BAP/Ranipet ::: MSA(LDPP) Department List Ref: BHEL/BAP/MSA(LDPP): 0408 Details of contracts concluded in the month MAR-2008 List dated 01-APL-2008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Item/
More informationDesign and Construction Features of Nivedita Bridge
Design and Construction Features of Nivedita Bridge Prof S S Chakraborty FNAE, Managing Director, Consulting Engineering Services (India) Private Limited, New Delhi. The tradition is one of iconic crossings
More informationLIST OF CONSULTANTS ENGAGED IN SMALL HYDRO POWER DEVELOPMENT
LIST OF CONSULTANTS ENGAGED IN SMALL HYDRO POWER DEVELOPMENT B. Consultancy Organisation (Private) 1. M/s Consulting Engineering Tel: 51392346, 26485284, 26465484, 5, 2648 9337 Services (India) Pvt. Ltd.,
More informationGMR Infrastructure Limited (GIL) FY17 Performance Highlights
GMR Infrastructure Limited (GIL) FY17 Performance Highlights Gross Debt comes down significantly to INR 19,856 Cr from INR 37,480 Cr Net Debt to EBITDA for FY 17 improves to 4.3 from 10.2 in FY 16 Stellar
More information12. Bank of Baroda Nodal Officer. :Sonu A. Arekar
12. Bank of Baroda 12.1 Nodal Officer Name :Sonu A. Arekar Designation :Senior Manager :Mumbai Main Office Address :10/12 Mumbai Samachar Marg, Fort, Mumbai- 23 Contact Number :022-40468314, 40468307,
More informationCentral Power Research Institute Civil Engineering Division. Monthly Vigilance Report for the month of JULY 2014
Central Power Research Institute Civil Engineering Division Monthly Vigilance Report for the month of JULY 2014 s to lowest er / 1 Construction of boundary wall for CPRI office campus and staff colony
More informationCHENNAI METRO RAIL NEWS LETTER
CHENNAI METRO RAIL NEWS LETTER Volume-V 6 June 2015 June 2015 Issue-6 Alandur - Koyambedu Metro Rail Passenger Service Inaugurated Thiru.Madhusudhan Prasad, I.A.S., Secretary Ministry of Urban Development
More informationAdequate infrastructure facilities are a pre requisite for industrial development. The infrastructure facilities available in Assam are as follows:
Assam Infrastructure The state Government also proposes to implement the scheme Integrated Infrastructure Development (IID) centers which is at difference stages of clearance from the authorities. The
More informationHYDERABA D HSBC VISAKHAPA TNAM
STATE DISTRICT BRANCH ADDRESS CENTRE IFSC CONTACT1 CONTACT2 CONTACT3 MICR_CODE ANDHRA PRADESH HYDERABAD HYDERABAD ANDHRA PRADESH VISHAKHAPATN AM VISHAKHAPATN AM ASSAM KAMRUP GUWAHATI BIHAR PATNA PATNA
More informationGENSOL S SOLAR PV EPC PORTFOLIO
GENSOL S SOLAR PV EPC PORTFOLIO Gensol Engineering Private Limited I Gensol Consultants Private Limited A-2, 12th Floor, Palladium, Opp. Vodafone House, Corporate Road, Prahladnagar, Ahmedabad-380051 E:
More informationOFFICERS' TRAINING PROGRAMME
OFFICERS' TRAINING PROGRAMME - 2015-16 Course No. Start Date End Date Course Name Institute Name Place Apr-15 Duration (in weeks) Vac Course Fee (Incl of Service Tax) Officer's Share (40%) Army Navy AF
More informationIndiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)
Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314) Earnings Update Audited Financial Results FY 2013-14 April 23, 2014 Safe Harbor Statement This document contains certain forward looking statements
More informationPPP Days 2010 PPPs Lessons from the Last 18 Months
PPP Days 2010 PPPs Lessons from the Last 18 Months Rajiv B Lall March 22, 2010 1 Private Sector Participation (PSP) in India Works & Services Contracts Management Contracts Operation Concessions Build
More informationJULY - SEPTEMBER, 2015 satya VOICE A QUARTERLY UPDATE OF SATYA GROUP
JULY - SEPTEMBER, 2015 satya VOICE A QUARTERLY UPDATE OF SATYA GROUP C O N T E N T S DWARKA EXPRESSWAY: 1 40,000 HOUSING UNITS TO COME 2REAL ESTATE: THE INCREDIBLE RISE OF GURGAON S COMMERCIAL REAL ESTATE
More informationHonorable Minister for Industries inspection at CMRL Metro Stations from AG-DMS to Washermanpet
VOLUME - 10 Dec 2018 Honorable Minister for Industries inspection at CMRL Metro Stations from AG-DMS to Washermanpet T h e H o n b l e M i n i s t e r f o r I n d u s t r i e s, Thiru.M.C.Sampath inspected
More informationRoyal Orchid Hotels Ltd Q1FY18 Results Presentation. Expect more from Royal Orchid Hotels
Royal Orchid Hotels Ltd Q1FY18 Results Presentation Expect more from Royal Orchid Hotels 1 in every 11 people worldwide are employed by TOURISM SECTOR High Employment Potential Sector Rs 10 Lakhs of Investment
More information+91-8071801781 Dirak India Panel Fittings Pvt. Ltd. http://www.dirakindia.com/ We are a highly popular organization of the market engaged in manufacturing, wholesaling, exporting and importing a wide range
More informationPuri Pratham Project Highlights
Contact us now: India Mobile # +91.99.102.24999 +91.98.102.24999 9AM-9PM IST [All Days] E-mail Efficiently Designed Premium Apartment» Location Sector 84» Type 2BHK 3BHK» Sizes 1100 1400 Sq.Ft» Category
More informationDELHI MASTER PLAN INSIGHTS
DELHI MASTER PLAN- 2021 INSIGHTS Prepared by: Ruchika Bhardwaj help@delhi-masterplan.com DELHI- THE VIBRANT TOMORROW.SETTING THE PACE TODAY - INDICATORS Capital of the largest democracy & one of the fastest
More informationYosuke TAKADA. Institution for Transport Policy Studies High Speed Rail Seminar in India, Jan. 13, 2012
Criteria for High Speed Railway and Visioning Future HSR Network in India Yosuke TAKADA Today s Topic Benefits brought by the introduction of High Speed Railway(HSR) Criteria to assess the suitable country
More informationLIST OF REGIONAL MSME CARE CENTER / MSE REHABILITATION CELL (MRC) S.No. Nodal Officer. Sh. Bobby Tanwar. Sh. R.J. Verma. Sh.
LIST OF REGIONAL MSME CARE CENTER / MSE REHABILITATION CELL (MRC) S.No. Address Designatio Contact Numbers Name of the Regional Centre 1 Agra Oriental Bank of 2 nd Floor, Ispat Bhawan, 85/4, Sanjay Place,
More informationDLF Limited. Q2 Analyst Presentation
DLF Limited Q2 Analyst Presentation 1 Results at a Glance Q2 Q2 FY08 Percentage Sl.No. Consolidated Financials Rs. Crs. of Total Revenue Rs. Crs A) 1 Sales and Other Receipts 3,250 3,074 2 Other Income
More informationMILESTONE DOMESTIC SCHEME - I
MILESTONE DOMESTIC SCHEME - I July -September, 2013 Dear Investors Greetings! Please find enclosed the Investors Update for Milestone Domestic Scheme I (the Fund ) for the quarter ended September 30, 2013.
More informationAMANVILAS PLOTS A T A M A N V I L A S, F A R I D A B A D
AMANVILAS PLOTS A T A M A N V I L A S, F A R I D A B A D OPPORTUNITY TO BUY FREEHOLD PLOTS. LIKE GOOD OLD TIMES. Prime Location Excellent Potential Remarkable Infrastructure Artisitc Impression PRIME LOCATION
More informationLAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT. Changing perception of Railways
LAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT Changing perception of Railways ABOUT IRSDC Chairman (Member Engg/ Rly Board) w.e.f Sep RLDA SHAREHOLDING 50% IRCON 50% BOARD OF DIRECTORS STRUCTURE Earlier,
More informationRAILWAY RECRUITMENT BOARD (RRB) EXAM - QUESTION PAPER SOLVED
RAILWAY RECRUITMENT BOARD (RRB) EXAM - QUESTION PAPER SOLVED 1. When was the first underground railway (Metro Railway) started? (a) 1982 (b) 1989 (c) 1984 (d) 1992 2. Shatabdi Express train was started
More information07-09 SEPTEMBER 2017
07-09 SEPTEMBER 2017 Opening: 10:00 AM to 18:00 Venue: Gujarat University Exhibition Hall, Ahmedabad, Gujarat PHARMAC INDIA 2017 Pharmac India is a 3-day event being held from 7th to the 9th September
More informationDesigned Built Ecosystem for Smart Living. New Chennai Township Private Limited
Designed Built Ecosystem for Smart Living New Chennai Township Private Limited Project Overview Background Developed by New Chennai Township Pvt Ltd (NCTPL), a wholly owned subsidiary of MARG Ltd Industrial
More informationRailway Recruitment Board (RRB) Exam - Question Paper Solved
Railway Recruitment Board (RRB) Exam - Question Paper Solved 1. When was the first underground railway (Metro Railway) started? (a) 1982 (b) 1989 (c) 1984 (d) 1992 2. Shatabdi Express train was started
More informationSl. No. Proposed Project. 11:00 11:30 Hrs.
A.List of Industries placed in the 154 th meeting of the State Level Expert Appraisal Committee, West Bengal on 24.03.2018 at 11:00 A.M. Name of the unit & Correspondence Address Follow up discussion Miscellaneous
More informationAIR TRAFFIC CONTROLLERS' GUILD (INDIA)
f7i\ : (033) 2511-9520 'V : (033) 2511-2998 AIR TRAFFIC CONTROLLERS' GUILD (INDIA) EASTERN REGION, ATS COMPLEX, - 700 052 Ref. ATCGIERI S"lt- 5 S...! :.9..:.. 20.11... To The Regional Executive Director
More informationInformation for Investors
Information for Investors Why to Invest in Commercial? High Return on investment Rental (6-10%) It is the annual rent earned on a property divided by the market value of the property. In Residential Property
More informationIntroducing. CODISSIA Trade Fair Complex, Coimbatore, India. 9 th 11 th April 2010, CODISSIA Trade Fair Complex, Coimbatore, India
Introducing 9 th 11 th April 2010, CODISSIA Trade Fair Complex, Coimbatore, India Organisers Organised by: Orbitz Exhibitions Pvt Ltd: A leading Trade Fair Solution Company in India SIEMA: Founded with
More information2-3 B Action taken on decisions of previous meeting 4 C To consider the following :
RMZ ECOWORLD INFRASTRUCTURE PVT. LTD. SEZ (Formerly Adarsh Prime Projects Pvt. Ltd. SEZ) 36 th (3/2016 series) APPROVAL COMMITTEE MEETING Date: 09-05-2016 Time: 12.00 p.m. --AGENDA-- Venue: SEZ Bhavan,
More informationIntegrated Design Services (IDS), NID, Ahmedabad. List of Clients
Integrated Design Services (IDS), NID, Ahmedabad List of Clients 1. Agricultural and Processed Food Products Export Development Authority, 2. Administration of UT of Dadra & Nagar Haveli, Silvassa 3. Asian
More informationSPORTSWOOD ARCADE SECTOR-79, NOIDA
@ Not as per scale GAURSONS PVT.LTD Corporate off.: Gaur Biz Park, Plot No. 1, Abhay Khand-II, Indirapuram, Ghaziabad, U.P.-201010 Site off.: Gaur Sportswood, Sector 79, Noida Call: 9555 40 2222 Rera Number:
More informationM.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh)
M.P. POLICE HOUSING CORPORATION LTD. Multi-Storey Residential Complex for Police Personnel At 15 th Battalion, INDORE (Madhya Pradesh) Architectural Consultant Ar. ANUPAM MITTAL AR. SHUBHRA MITTAL 716,
More informationMonitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India
Page 1 of 1 S.No. Name of the Scheme Actual 2009-10 Expenditure in 2010-11 (Cumulative) (Rs. In Crores) Grand Total 2010-11 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1 CSI Airport Mumbai Target 570.00 982.00 1645.00
More informationLIST OF COMPANIES HIRING AERONAUTICAL AND AEROSPACE ENGINEERS
LIST OF COMPANIES HIRING AERONAUTICAL AND AEROSPACE ENGINEERS Bombardier India Engineering Centre Aerospace Engineering #3 Ulsoor Road, 1st Floor, Salarpuria Windsor Bangalore 560042 India Tel.: 91-80-49051200
More informationPROPINSIGHT A Detailed Property Analysis Report
PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project
More informationDetails of existing Regulation
Your valuable inputs are invited to review the Central Electricity Authority (Technical Standards for Construction of Electric Plants and Electric Lines) Regulations, 2010 in the format given below: Name
More informationCompany Profile. Beyond Squarefeet Advisory Pvt. Ltd. India Iran Nepal Nigeria Oman Qatar
Company Profile Beyond Squarefeet Advisory Pvt. Ltd. India Iran Nepal Nigeria Oman Qatar About Us India s premier shopping mall specialist company Provides gamut of services from Mall Conceptualisation
More informationTHE ASSET BUILDERS CORPORATE PROFILE
THE ASSET BUILDERS CORPORATE PROFILE A DREAM, DETERMINATION AND RELENTLESS FOCUS ON GETTING IT RIGHT, ARE THE FOUNDATION STONES OF THE AMB GROUP. SOLID EXPERIENCE. SOLID FOUNDATION DISCOVER THE REAL ASSET
More informationWESTERN INDIA REGIONAL COUNCIL OF THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA
1 Aam Aadmi Party 2 ABP Private Limited 3 Adani Energy Ltd. 4 Ahmedabad Muncipal Corporation 5 Aircel Cellular Ltd. 6 Andhra Bank Credit Card 7 Annamalai University 8 Apollo Munich Health Insurance Company
More informationSafe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~
Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~ IRC (Int l Rail Conference) 2017 @Pragati Maidan, Oct. 11 th, 2017 Takema SAKAMOTO Chief Representative Japan
More informationCapability Statement SUNJAAY ATHANKI PROJECTS MANAGEMENT PVT LTD
SUNJAAY ATHANKI PROJECTS MANAGEMENT PVT LTD Organization Background (SA) started its operations in India in 2008. We are involved in providing end to end Cost Management and Project Management services
More informationHoshangabad Road, Bhopal, Madhya Pradesh.
Hoshangabad Road, Bhopal, Madhya Pradesh Aashima Mall is Already Open.. Opening Soon : About the Developer (ARK Group) 700 crore company possessing large land banks in Bhopal Leading real estate developers
More informationMY CITY OF A M I L L I O N D R E A M S (033)
MY CITY OF A M I L L I O N D R E A M S (033) 66246624 WHAT MAKES A DREAM CITY? A city where your kids will live the childhood they deserve, your parents will enjoy the lifestyle they aspire for and a city
More informationFriday, 25 March, Copyrights 2014 Business Standard Ltd. All rights reserved. Business Standard - Mumbai; Size : 221 sq.cm.
Friday, 25 March, 2016 Copyrights 2014 Business Standard Ltd. All rights reserved. Business Standard - Mumbai; Size : 221 sq.cm.; Page : 12 Copyright 2014 Bennett Coleman & Co. Ltd.? All rights reserved
More informationSl. No. 1. God father Communication Pvt. Ltd. 9/36/2013-BP & L. Name of MSO Address of MSO Applied date and for Area Status
List as on 06.07.2015 of MULTI SYSTEM OPERATORS (MSOs) whose REGISTRATION by MINISTRY OF INFORMATION & BROADCASTING TO OPERATE IN DIGITAL ADDRESSABLE SYSTEM (DAS) HAS BEEN CANCELLED or CASES CLOSE Sl.
More informationGodrej Prakriti - The preferred life
KOLKATA Godrej Prakriti - The preferred life Winner of the BEST RESIDENTIAL PROJECT in KOLKATA at CNBC AWAAZ REAL ESTATE AWARDS 2012, Godrej Prakriti offers its residents a contemporary lifestyle in the
More informationTop 20 IT Hubs of India
Top 20 IT Hubs of India Indian Cities with Major IT Hubs The consistent growth of IT/ITeS sector has put India on the global map. Delhi NCR Indore Realising the immense potential that the sector holds,
More information